Automatic checking device and checking method for main steam isolating valve and pressure release valve

By designing an automatic calibration device for steam isolation valves and pressure relief valves, the operating conditions of pressure relief valves are simulated, enabling accurate performance testing and automatic calibration. This solves the problem of frequent pressure relief valve failures and improves maintenance efficiency and testing accuracy.

CN118913672AActive Publication Date: 2024-11-08CNNC FUJIAN FUQING NUCLEAR POWER

Patent Information

Application Number
CN202410982676.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-08
Estimated Expiration
2044-07-22

AI Technical Summary

Technical Problem

In existing technologies, the main steam isolation valve and pressure relief valve frequently fail in nuclear power plants, leading to a decline in overall performance. Replacement costs are high, procurement cycles are long, and there is a lack of effective performance testing methods, resulting in blind and incorrect maintenance.

Method used

An automatic calibration device for a steam isolation valve and pressure relief valve was designed, including an MSIV simulator, an oil tank, an intake solenoid valve, a gas-liquid dual-purpose pump, a solenoid valve, a pressure relief valve, a flow control valve, and a control system. By simulating the operating conditions of the pressure relief valve, a comprehensive performance test is conducted, and the control system is used to realize automatic calibration, alarm, and data playback.

Benefits of technology

It enables precise measurement of the opening and closing process of the pressure relief valve without affecting its overall operation. It allows for performance testing in both laboratory and field settings, guiding maintenance, improving repair efficiency, and avoiding blind operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118913672A_ABST
    Figure CN118913672A_ABST
Patent Text Reader

Abstract

The invention relates to the field of maintenance, in particular to an automatic checking device and method for a main steam isolating valve and a pressure release valve. The device is characterized in that an upper cylinder of an MSIV simulation body is connected with a nitrogen cylinder; the oil tank is connected to an oil inlet of the MSIV simulation body through an oil inlet pipeline, and an oil return opening of the MSIV simulation body is connected to the oil tank through an oil return pipeline; the air inlet electromagnetic valve and the pneumatic pump are of an integrated structure and are arranged on the oil inlet pipeline, and the pneumatic pump conveys high-pressure fire-resistant oil in the oil tank to the MSIV simulation body; the air inlet electromagnetic valve controls the pneumatic pump to start and stop; the fire-resistant oil of the oil cylinder at the lower part of the MSIV simulation body flows back to the oil tank through the flow control valve; two pressure release valves are arranged on the oil return pipeline in series, and each pressure release valve is controlled by a quick-closing electromagnetic valve; the action condition of the pressure release valve is measured by the displacement measuring element; a first pressure measuring element is arranged at an oil return opening of the MSIV simulation body, and a second pressure measuring element is arranged on an oil return pipeline arranged between the two pressure release valves. And the control system is used for controlling the execution mechanism to automatically carry out function testing, carrying out system monitoring, equipment debugging and data playback, and giving an alarm for the function testing which is not passed. The actual operation condition of the pressure release valve during the MSIV action period is simulated, the comprehensive performance of the MSIV pressure release valve is tested, the subsequent maintenance working direction of the pressure release valve is guided, whether the performance of the maintained pressure release valve is qualified or not is finally verified, and blind maintenance and wrong maintenance are effectively avoided; and the newly input spare parts can be checked to confirm the availability of the spare parts.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of maintenance, and in particular to an automatic calibration device and a calibration method for a main steam isolation valve and a pressure relief valve. Background Art

[0002] The main steam isolation valve (MSIV) is used in the secondary circuit main steam system of a pressurized water reactor nuclear power plant. It is one of the important and critical valves in a nuclear power plant. Under normal operating conditions, the valve is in an open state. Under shutdown and accident conditions, it will automatically close quickly within 5 seconds after receiving the main steam isolation signal to quickly isolate the main steam.

[0003] In order to achieve rapid closure of MSIV, the electro-hydraulic part of the MSIV of "Hualong One" is designed with a rapid pressure relief function. Its core components are two groups of four redundant fast-closing solenoid valves and the four pressure relief valves they control. Under normal conditions, the MSIV opens slowly. Under accident conditions, the two groups of four solenoid valves are energized at the same time, and the corresponding pressure relief valves are opened to achieve a 5-second rapid closing function.

[0004] The "Hualong One" MSIV was domestically produced for the first time in China. During the commissioning and normal operation of the unit, the pressure relief valve frequently malfunctioned, often causing jamming and leakage, which affected the overall performance of the MSIV. Since the pressure relief valve mainly relies on imports, its replacement cost is high and the procurement cycle is long. The commonly used overall replacement greatly increases the maintenance cost of the unit. The present invention develops a set of main steam isolation valve pressure relief valve automatic calibration device, which is used to carry out pressure relief valve performance testing, and then guide the subsequent maintenance work direction of the pressure relief valve, and improve the work efficiency of maintenance. Summary of the invention

[0005] The technical problem to be solved by the present invention is: to provide an automatic calibration device and a calibration method for the main steam isolation valve pressure relief valve, to simulate the actual operating conditions of the pressure relief valve during the operation of the MSIV, to test the comprehensive performance of the MSIV pressure relief valve, and then to guide the subsequent maintenance work direction of the pressure relief valve, and finally to verify whether the performance of the pressure relief valve after maintenance is qualified, so as to effectively avoid blind maintenance and wrong repairs; and to inspect newly invested spare parts to confirm their availability.

[0006] The present invention provides a steam isolation valve pressure relief valve automatic calibration device, comprising: a MSIV simulation body, an oil tank, an air intake solenoid valve, a gas-liquid dual-purpose pump, two solenoid valves, two pressure relief valves, a flow control valve, and a control system;

[0007] The upper cylinder of the MSIV simulation body is connected to a nitrogen tank;

[0008] The oil tank is connected to the oil inlet of the MSIV simulation body through an oil inlet pipeline, and the oil return port of the MSIV simulation body is connected to the oil tank through an oil return pipeline;

[0009] The air intake solenoid valve and the pneumatic pump are integrated structures and are arranged on the oil inlet pipeline. The pneumatic pump delivers the high-pressure fire-resistant oil in the oil tank to the MSIV simulation body; the air intake solenoid valve controls the opening and closing of the pneumatic pump;

[0010] Use a pneumatic pump to establish the oil pressure in the lower cylinder of the MSIV simulation body, and use the gas spring function of the nitrogen in the nitrogen bottle to establish the air pressure in the upper cylinder of the MSIV simulation body;

[0011] The fire-resistant oil in the lower cylinder of the MSIV simulation body flows back to the oil tank through the flow control valve;

[0012] Two pressure relief valves are arranged in series on the oil return pipeline, and each pressure relief valve is controlled by a fast-closing solenoid valve;

[0013] The action of the pressure relief valve is measured by a displacement measuring element;

[0014] A first pressure measuring element is provided at the oil return port of the MSIV simulation body, and a second pressure measuring element is provided on the oil return pipeline arranged between the two pressure relief valves.

[0015] The control system is used to control the actuator to automatically perform functional tests, and to perform system monitoring, equipment debugging, and data playback, and to alarm for failed functional tests.

[0016] In a specific embodiment of the present invention, a cross-arranged baffle and exhaust holes are provided in the upper middle portion of the oil tank.

[0017] In a specific embodiment of the present invention, the control system includes a human-machine interface as a host computer and a controller as a slave computer;

[0018] The human-machine interface is mainly a computer and a corresponding software system, which is used for the interaction between the system and the operator, receiving the operator's instructions and monitoring the system status. While displaying the system status, it sends instructions to the controller to control the corresponding actuator;

[0019] The controller receives instructions from the human-machine interface, controls the corresponding actuator, and feeds back the execution results or collected data of the actuator to the human-machine interface.

[0020] In a specific embodiment of the present invention, the software system includes a user login system, basic valve information entry, function test, alarm system, monitoring system, equipment debugging and data playback;

[0021] The functional test adopts a sequential control method. When the conditions are met, the next step is automatically performed. If the conditions cannot be met, the test is terminated and an alarm is given. The functional test includes a displacement test, a sealing test and a load test.

[0022] In a specific embodiment of the present invention, the two displacement measuring elements both adopt a linear variable differential transformer structure, wherein the measuring rod of one displacement measuring element is close to the valve core, and the measuring rod of the other displacement measuring element is integrated with the valve core of the pressure relief valve.

[0023] In a specific embodiment of the present invention, the flow control valve is a mechanical regulating valve.

[0024] The present invention also provides a method for automatically calibrating a steam isolation valve and a pressure relief valve, using the automatic calibration device for a steam isolation valve and a pressure relief valve described in the above technical solution to perform displacement testing, sealing testing and load testing.

[0025] In a specific embodiment of the present invention, the displacement test adopts sequential control logic, and automatically proceeds to the next step when the conditions are met. If the conditions cannot be met, the test is terminated and an alarm is issued, which specifically includes the following steps:

[0026] The two quick-closing solenoid valves are energized through the control system, and the displacement of the pressure relief valve controlled by the quick-closing solenoid valve is observed to confirm the opening of the pressure relief valve;

[0027] The two quick-closing solenoid valves are de-energized through the control system, and the displacement of the pressure relief valve controlled by the quick-closing solenoid valve is observed to confirm the closing condition of the pressure relief valve.

[0028] In a specific embodiment of the present invention, the sealing test adopts sequential control logic, which specifically includes the following steps:

[0029] When testing the pressure relief valve close to the MSIV simulation body: determine whether the measured pressure in front of the pressure relief valve close to the MSIV simulation body meets the preconditions. If so, close the air intake solenoid valve, keep the two quick-closing solenoid valves de-energized, read the oil pressure value in front of the pressure relief valve close to the MSIV simulation body, automatically draw a pressure curve, and compare it with the set value to determine the leakage of the pressure relief valve close to the MSIV simulation body;

[0030] When detecting the pressure relief valve far away from the MSIV simulation body: the fast closing solenoid valve of the pressure relief valve close to the MSIV simulation body is energized, and the pressure relief valve close to the MSIV simulation body is opened, and it is determined whether the pressure in front of the pressure relief valve far away from the MSIV simulation body meets the preconditions. If so, the fast closing solenoid valve of the pressure relief valve close to the MSIV simulation body remains energized, and the fast closing solenoid valve of the pressure relief valve far away from the MSIV simulation body loses power. The measured pressure of the main pipe in front of the pressure relief valve far away from the MSIV simulation body is read and compared with the set value, so as to determine the leakage of the pressure relief valve far away from the MSIV simulation body;

[0031] If there is no leakage in both pressure relief valves, the sealing test is successful and the test ends;

[0032] If there is leakage in any pressure relief valve, an alarm will be triggered.

[0033] In a specific embodiment of the present invention, the load test adopts sequential control logic, which specifically includes the following steps:

[0034] Confirm that the MSIV simulation body is open and the quick-closing solenoid valves are de-energized;

[0035] When testing the pressure relief valve close to the MSIV simulation body: briefly energize and then de-energize the quick-closing solenoid valve that controls the pressure relief valve close to the MSIV simulation body, and confirm that the pressure relief valve close to the MSIV simulation body is opened and closed by observing the displacement measuring element, and observe that the mother pipe pressure rises significantly and maintains a high pressure, which means that the pressure relief valve far away from the MSIV simulation body has no leakage. If the pressure drops to a preset value, it means that the pressure relief valve far away from the MSIV simulation body is leaking;

[0036] When detecting the pressure relief valve far away from the MSIV simulation body: briefly energize and then de-energize the quick-closing solenoid valve controlling the pressure relief valve far away from the MSIV simulation body, and confirm that the pressure relief valve far away from the MSIV simulation body is opened and closed by observing the displacement measuring element. After a period of time, if the main pipe pressure rises to a certain value, it means that the pressure relief valve close to the MSIV simulation body is leaking;

[0037] If there is no leakage in both pressure relief valves, the load test is successful and the test is over;

[0038] If there is leakage in any pressure relief valve, an alarm will be triggered.

[0039] Compared with the prior art, the main steam isolation valve pressure relief valve automatic calibration device and calibration method of the present invention have the following beneficial effects:

[0040] (1) The entire process of opening and closing the pressure relief valve can be accurately measured without affecting the overall action of the pressure relief valve;

[0041] (2) Be able to apply laboratory pressure relief valve identification methods to field testing, and conduct performance tests of single and complete pressure relief valves in combination with actual field conditions, including displacement tests, sealing tests, and load tests;

[0042] (3) The calibration device software automatically realizes the automatic calibration function, alarm function and playback function of the pressure relief valve, and can automatically generate the corresponding calibration report. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It shows the structural principle diagram of the automatic calibration device for the main steam isolation valve and pressure relief valve;

[0044] Figure 2 It represents the control schematic diagram of the automatic calibration device for the main steam isolation valve and pressure relief valve;

[0045] In the figure,

[0046] 1-MSIV simulation body, 2-fuel tank, 3-intake solenoid valve, 4-pneumatic pump, 5-first fast-closing solenoid valve, 6-second fast-closing solenoid valve, 7-first pressure relief valve, 8-second pressure relief valve, 9-flow control valve, 10-first displacement measuring element, 11-second displacement measuring element, 12-first pressure measuring element, 13-second pressure measuring element, 14-nitrogen cylinder. DETAILED DESCRIPTION

[0047] In order to further understand the present invention, the embodiments of the present invention are described below in conjunction with examples, but it should be understood that these descriptions are only for further illustrating the features and advantages of the present invention, rather than limiting the present invention.

[0048] The embodiment of the present invention discloses an automatic calibration device for a steam isolation valve and a pressure relief valve, such as Figure 1 and Figure 2 As shown, it includes: an MSIV simulation body 1, a fuel tank 2, an air intake solenoid valve 3, a gas-liquid dual-purpose pump 4, two solenoid valves, two pressure relief valves, a flow control valve 9, and a control system;

[0049] The MSIV simulation body 1 has an air cylinder at the top and an oil cylinder at the bottom, which are separated by a piston in the middle. A nitrogen bottle 14 is installed on the top of the cylinder to achieve rapid closure of the MSIV simulation body 1; the oil cylinder includes two circuits, an oil inlet circuit and an oil return circuit, wherein the oil inlet circuit is connected to the pneumatic pump 4, and the oil return circuit is connected to the oil return pipeline; the mechanical part of the MSIV is simulated by scaling down in proportion according to the mechanical characteristics of the MSIV;

[0050] Oil tank 2, which stores a certain volume of high-pressure fire-resistant oil. A cross-arranged baffle and multiple rows of exhaust holes with different apertures are arranged in the upper middle part of the oil tank, which can effectively prevent the fire-resistant oil from overflowing due to oil unloading during the fast closing process;

[0051] The oil tank 2 is connected to the oil inlet of the MSIV simulation body 1 through an oil inlet pipeline, and the oil return port of the MSIV simulation body 1 is connected to the oil tank through an oil return pipeline;

[0052] The air intake solenoid valve 3 and the pneumatic pump 4 are integrated structures and are arranged on the oil inlet pipeline to provide a reliable and stable power source; the pneumatic pump 4 delivers the high-pressure fire-resistant oil in the oil tank 2 to the MSIV simulation body 1; the air intake solenoid valve 3 controls the start and stop of the pneumatic pump 4;

[0053] The pneumatic pump 4 is a gas-liquid booster pump. When the air inlet solenoid valve 3 is powered on and opened, the pneumatic pump 4 starts, and the high-pressure fire-resistant oil is pressurized to the oil cylinder at the bottom of the MSIV simulation body 1 through the oil inlet pipeline, and the nitrogen at the top of the MSIV simulation body 1 is compressed back to the nitrogen bottle 14. When the oil cylinder pressure reaches a certain multiple of the air supply pressure of the air inlet solenoid valve 3, the pneumatic pump 4 stops running. The multiple is 40 to 70 times.

[0054] The nitrogen bottle 14 is connected to the upper cylinder of the MSIV simulation body 1, and the "gas spring" function is activated to realize the quick closing function. That is, when the MSIV simulation body 1 is opened, the lower cylinder of the MSIV simulation body 1 is filled with oil, and the nitrogen in the upper cylinder of the MSIV simulation body 1 is compressed back into the nitrogen bottle 14; when the MSIV simulation body 1 is closed, the lower cylinder of the MSIV simulation body 1 quickly discharges oil, and the nitrogen in the nitrogen bottle 14 is quickly released into the upper cylinder of the MSIV simulation body 1, thereby realizing the quick closing function;

[0055] The fire-resistant oil in the lower oil cylinder of the MSIV simulation body 1 flows back to the oil tank 2 through the flow control valve 9; the flow control valve 9 is a mechanical regulating valve used to control the speed at which the fire-resistant oil in the lower oil cylinder of the MSIV simulation body 1 returns to the oil tank. When the oil unloading speed is too low, the flow control valve 9 can be opened to increase the discharge speed, thereby shortening the fast closing time;

[0056] Two pressure relief valves are arranged in series on the oil return pipeline, namely a first pressure relief valve 7 and a second pressure relief valve 8, each of which is controlled by a fast-closing solenoid valve, that is, the first pressure relief valve 7 is controlled by the first fast-closing solenoid valve 5, and the second pressure relief valve 8 is controlled by the second fast-closing solenoid valve 6;

[0057] When the first quick-closing solenoid valve 5 is energized, the first pressure relief valve 7 opens automatically. Similarly, the second quick-closing solenoid valve 6 controls the second pressure relief valve 8 to open. Only when the first quick-closing solenoid valve 5 and the second quick-closing solenoid valve 6 are energized at the same time, the corresponding first pressure relief valve 7 and second pressure relief valve 8 are opened at the same time, and the anti-oil fuel in the lower cylinder of the MSIV simulation body 1 flows back to the oil tank 2 through the flow control valve 9. When only one of the first quick-closing solenoid valve 5 or the second quick-closing solenoid valve 6 is energized, since only one pressure relief valve is opened in the return oil pipeline, the high-pressure anti-oil fuel in the lower cylinder of the MSIV simulation body 1 will not be unloaded into the oil tank 2, and the MSIV simulation body 1 will still remain in an open state.

[0058] The action of the pressure relief valve is measured by a displacement measuring element;

[0059] Specifically, the action of the first pressure relief valve 7 is measured by the first displacement measuring element 10, and the action of the second pressure relief valve 8 is measured by the second displacement measuring element 11;

[0060] The first displacement measuring element 10 adopts a linear variable differential transformer (LVDT) structure, and its measuring rod is close to the valve core of the pressure relief valve. By reasonably setting the size of the LVDT built-in spring and the sealing structure, it is ensured that the measuring element can accurately measure the entire opening and closing process of the pressure relief valve without affecting the overall action of the pressure relief valve;

[0061] The second displacement measuring element 11 is also an LVDT structure, and its measuring rod and the pressure relief valve core are integrated into one design, thereby accurately measuring the entire operation process of the pressure relief valve 8.

[0062] A first pressure measuring element 12 is provided at the oil return port of the MSIV simulation body 1 for measuring the oil cylinder pressure at the lower part of the MSIV simulation body 1;

[0063] A second pressure measuring element 13 is provided on the oil return pipeline provided between the two pressure relief valves, and is used to measure the main pipe pressure between the first pressure relief valve 7 and the second pressure relief valve 8;

[0064] In order to realize the close arrangement of the system, a special control valve block is designed, which is connected with the MSIV simulation body 1, the oil tank 2, the air intake solenoid valve 3, the pneumatic pump 4, each fast-closing solenoid valve, each pressure relief valve, the flow control valve 9, each displacement measuring element, and each pressure measuring element. The components are connected through through holes and ferrule joints.

[0065] The control system is used to control the actuator to automatically perform functional tests, and to perform system monitoring, equipment debugging, and data playback, and to alarm for failed functional tests.

[0066] The control system includes a human-machine interface as a host computer and a controller as a slave computer;

[0067] The human-machine interface is mainly a computer and a corresponding software system, which is used for the interaction between the system and the operator, receiving the operator's instructions and monitoring the system status. While displaying the system status, it sends instructions to the controller to control the corresponding actuator;

[0068] The controller receives instructions from the human-machine interface, controls the corresponding actuator, and feeds back the execution results or collected data of the actuator to the human-machine interface.

[0069] The software system includes user login system, valve basic information entry, function test, alarm system, monitoring system, equipment debugging and data playback;

[0070] The functional test adopts a sequential control method. When the conditions are met, the next step is automatically performed. If the conditions cannot be met, the test is terminated and an alarm is given. The functional test includes a displacement test, a sealing test and a load test.

[0071] This calibration device can be used to test the performance of the main steam isolation valve and pressure relief valve. The pressure resistance of the calibration device is not less than 40MPa, and it can carry out single and complete set of pressure relief valve tests. The single valve test includes two types: displacement measurement and sealing test. The complete set of tests includes load test, which can confirm the performance of the two pressure relief valves at the same time from a system perspective.

[0072] This calibration device is designed with two different pressure relief valve displacement measuring elements: one is to place the measuring rod close to the pressure relief valve core, and reasonably set the LVDT built-in spring stiffness and sealing structure to ensure that the measuring element can accurately measure the entire process of the pressure relief valve movement without affecting the overall movement of the pressure relief valve; the other is to use an integrated structure with the pressure relief valve core, and move synchronously with the pressure relief valve core to accurately measure the entire process of the movement.

[0073] This calibration device uses a pneumatic pump to establish the oil pressure of the lower cylinder of the MSIV simulation body, and establishes the air pressure of the upper cylinder of the MSIV simulation body through the "gas spring" function of the nitrogen in the nitrogen bottle. The two reach a dynamic balance when the MSIV simulation body is opened. When the MSIV is about to close, the pressure relief valve is opened through the quick-closing solenoid valve to release the oil pressure. The calibration device simulates the entire process of the real action of the MSIV simulation body and simultaneously carries out the calibration of the pressure relief valve.

[0074] This calibration device realizes the functions of process monitoring, alarm display, trend graph, data analysis, accident playback, report printing, etc. through the software control system.

[0075] An embodiment of the present invention further discloses a method for automatically calibrating a steam isolation valve and a pressure relief valve, which uses the automatic calibration device for a steam isolation valve and a pressure relief valve described in the above technical solution to perform displacement testing, sealing testing and load testing.

[0076] The displacement test adopts sequential control logic. When the conditions are met, the next step is automatically performed. If the conditions cannot be met, the test is terminated and an alarm is issued. Specifically, the following steps are included:

[0077] The two quick-closing solenoid valves are energized through the control system, and the displacement of the pressure relief valve controlled by the quick-closing solenoid valve is observed to confirm the opening of the pressure relief valve;

[0078] The two quick-closing solenoid valves are de-energized through the control system, and the displacement of the pressure relief valve controlled by the quick-closing solenoid valve is observed to confirm the closing condition of the pressure relief valve.

[0079] Specifically, the first quick-closing solenoid valve 5 is energized, and the first displacement measuring element 10 of the first pressure relief valve 7 is observed to confirm the opening of the first pressure relief valve 7; the first quick-closing solenoid valve 5 is de-energized, and the first displacement measuring element 10 of the first pressure relief valve 7 is observed to confirm the closing of the first pressure relief valve 7. Similarly, the second solenoid valve 6 is de-energized, and the second displacement measuring element 11 is observed to confirm the operation of the second pressure relief valve 8.

[0080] The sealing test adopts sequential control logic, which specifically includes the following steps:

[0081] When testing the pressure relief valve close to the MSIV simulation body: determine whether the measured pressure in front of the pressure relief valve close to the MSIV simulation body meets the preconditions. If so, close the air intake solenoid valve, keep the two quick-closing solenoid valves de-energized, read the oil pressure value in front of the pressure relief valve close to the MSIV simulation body, automatically draw a pressure curve, and compare it with the set value to determine the leakage of the pressure relief valve close to the MSIV simulation body;

[0082] When detecting the pressure relief valve far away from the MSIV simulation body: the fast closing solenoid valve of the pressure relief valve close to the MSIV simulation body is energized, and the pressure relief valve close to the MSIV simulation body is opened, and it is determined whether the pressure in front of the pressure relief valve far away from the MSIV simulation body meets the preconditions. If so, the fast closing solenoid valve of the pressure relief valve close to the MSIV simulation body remains energized, and the fast closing solenoid valve of the pressure relief valve far away from the MSIV simulation body loses power. The measured pressure of the main pipe in front of the pressure relief valve far away from the MSIV simulation body is read and compared with the set value, so as to determine the leakage of the pressure relief valve far away from the MSIV simulation body;

[0083] If there is no leakage in both pressure relief valves, the sealing test is successful and the test ends;

[0084] If any of the pressure relief valves leaks, an alarm is sounded. Specifically, when testing the first pressure relief valve 7, it is determined whether the pressure measured before the first pressure relief valve 7, that is, the first pressure measuring element 12, meets the precondition. If so, the air intake solenoid valve 3 is closed, the first quick-closing solenoid valve 5 and the second quick-closing solenoid valve 6 remain powered off, and the oil pressure value of the first pressure measuring element 12 is read and the pressure curve is automatically drawn, and compared with the set value, so as to determine whether the first pressure relief valve 7 has a leak. When testing the second pressure relief valve 8, the first quick-closing solenoid valve 5 is energized, the first pressure relief valve 7 is opened, and it is determined whether the pressure of the main pipe before the second pressure relief valve 8 meets the precondition. If so, the air intake solenoid valve 3 is closed, the first quick-closing solenoid valve 5 remains energized, the second quick-closing solenoid valve 6 remains powered off, and the oil pressure value of the second pressure measuring element 13 is read and the pressure curve is automatically drawn, and compared with the set value, so as to determine whether the second pressure relief valve 8 has a leak.

[0085] The load test adopts sequential control logic, and specifically includes the following steps:

[0086] Confirm that the MSIV simulation body 1 is open and the quick-closing solenoid valves are de-energized;

[0087] When detecting the pressure relief valve close to the MSIV simulation body 1: briefly energize and then de-energize the quick-closing solenoid valve that controls the pressure relief valve close to the MSIV simulation body, and confirm that the pressure relief valve close to the MSIV simulation body is opened and closed by observing the displacement measuring element, and observe that the mother pipe pressure rises significantly and maintains a high pressure, which means that the pressure relief valve far away from the MSIV simulation body has no leakage. If the pressure drops to a preset value, it means that the pressure relief valve far away from the MSIV simulation body is leaking;

[0088] That is, the first quick-closing solenoid valve 5 is briefly energized and then de-energized, and the first pressure relief valve 7 is confirmed to be opened and closed by observing the first displacement measuring element 10, and the pressure of the second pressure measuring element 13 is observed to rise significantly and maintain a high pressure, which indicates that the second pressure relief valve 8 has no leakage. If the pressure drops to a preset value, it indicates that the second pressure relief valve 8 has leakage;

[0089] When detecting the pressure relief valve far away from the MSIV simulation body: briefly energize and then de-energize the quick-closing solenoid valve controlling the pressure relief valve far away from the MSIV simulation body, and confirm that the pressure relief valve far away from the MSIV simulation body is opened and closed by observing the displacement measuring element. After a period of time, if the main pipe pressure rises to a certain value, it means that the pressure relief valve close to the MSIV simulation body is leaking;

[0090] That is, the quick-closing solenoid valve 6 of the second pressure relief valve is briefly energized and then de-energized, and the second pressure relief valve 8 is confirmed to be opened and closed by observing the second displacement measuring element 11. After a period of time, if the pressure value obtained by the second pressure measuring element 13 rises to a certain value, it means that the first pressure relief valve 7 is leaking;

[0091] If there is no leakage in both pressure relief valves, the load test is successful and the test is over;

[0092] If there is leakage in any pressure relief valve, an alarm will be triggered.

[0093] The automatic control process for the normal opening of the MSIV simulation body 1 is as follows: click the normal opening button on the human-computer interaction page of the control system. When the air intake solenoid valve 3 is energized, the pneumatic pump 4 starts automatically, and pressurizes the anti-oil in the tank 2 into the lower cylinder of the MSIV simulation body 1, overcoming the nitrogen pressure released by the nitrogen bottle 14 on the upper part of the simulation body to open the MSIV simulation body 1. When the cylinder pressure reaches a predetermined value, the pneumatic pump 4 stops automatically, and the MSIV simulation body 1 remains in the open state.

[0094] The automatic control process for quick closing of the MSIV simulation body 1 is as follows: click the quick closing button on the human-computer interaction page of the control system, the air intake solenoid valve 3 loses power, the first quick-closing solenoid valve 5 and the second quick-closing solenoid valve 6 are energized at the same time, the first pressure relief valve 7 and the second pressure relief valve 8 are opened at the same time, the anti-oil in the lower cylinder of the MSIV simulation body 1 quickly flows back to the oil tank 2, and the MSIV simulation body 1 is quickly closed under the pressure of the upper cylinder.

[0095] The above embodiments are only used to help understand the method and core idea of ​​the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made to the present invention without departing from the principles of the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

[0096] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. An automatic calibration device for steam isolation valve and pressure relief valve, It is characterized in that include: MSIV simulation body, fuel tank, air intake solenoid valve, gas-liquid dual-purpose pump, two solenoid valves, two pressure relief valves, flow control valve, control system; The upper cylinder of the MSIV simulation body is connected to a nitrogen tank; The oil tank is connected to the oil inlet of the MSIV simulation body through an oil inlet pipeline, and the oil return port of the MSIV simulation body is connected to the oil tank through an oil return pipeline; The air intake solenoid valve and the pneumatic pump are integrated structures and are arranged on the oil inlet pipeline. The pneumatic pump delivers the high-pressure fire-resistant oil in the oil tank to the MSIV simulation body; the air intake solenoid valve controls the opening and closing of the pneumatic pump; Use a pneumatic pump to establish the oil pressure in the lower cylinder of the MSIV simulation body, and use the gas spring function of the nitrogen in the nitrogen bottle to establish the air pressure in the upper cylinder of the MSIV simulation body; The fire-resistant oil in the lower cylinder of the MSIV simulation body flows back to the oil tank through the flow control valve; Two pressure relief valves are arranged in series on the oil return pipeline, and each pressure relief valve is controlled by a fast-closing solenoid valve; The action of the pressure relief valve is measured by a displacement measuring element; A first pressure measuring element is provided at the oil return port of the MSIV simulation body, and a second pressure measuring element is provided on the oil return pipeline arranged between the two pressure relief valves. The control system is used to control the actuator to automatically perform functional tests, and to perform system monitoring, equipment debugging, and data playback, and to alarm for failed functional tests.

2. The automatic calibration device for steam isolation valve and pressure relief valve according to claim 1, It is characterized in that The upper middle portion of the oil tank is provided with cross-arranged baffles and exhaust holes.

3. The automatic calibration device for steam isolation valve and pressure relief valve according to claim 1, It is characterized in that The control system includes a human-machine interface as a host computer and a controller as a slave computer; The human-machine interface is mainly a computer and a corresponding software system, which is used for the interaction between the system and the operator, receiving the operator's instructions and monitoring the system status. While displaying the system status, it sends instructions to the controller to control the corresponding actuator; The controller receives instructions from the human-machine interface, controls the corresponding actuator, and feeds back the execution results or collected data of the actuator to the human-machine interface.

4. The automatic calibration device for steam isolation valve and pressure relief valve according to claim 3, It is characterized in that The software system includes user login system, valve basic information entry, function test, alarm system, monitoring system, equipment debugging and data playback; The functional test adopts a sequential control method. When the conditions are met, the next step is automatically performed. If the conditions cannot be met, the test is terminated and an alarm is given. The functional test includes a displacement test, a sealing test and a load test.

5. The automatic calibration device for steam isolation valve and pressure relief valve according to claim 1, It is characterized in that The two displacement measuring elements both adopt a linear variable differential transformer structure, wherein a measuring rod of one displacement measuring element is close to the valve core, and a measuring rod of the other displacement measuring element is integrated with the valve core of the pressure relief valve.

6. The automatic calibration device for steam isolation valve and pressure relief valve according to claim 1, It is characterized in that The flow control valve is a mechanical regulating valve.

7. A method for automatic calibration of steam isolation valve and pressure relief valve, It is characterized in that The automatic calibration device for steam isolation valve and pressure relief valve according to any one of claims 1 to 5 is used to perform displacement test, sealing test and load test.

8. The automatic calibration method for steam isolation valve and pressure relief valve according to claim 7, It is characterized in that The displacement test adopts sequential control logic. When the conditions are met, the next step is automatically performed. If the conditions cannot be met, the test is terminated and an alarm is issued. Specifically, the following steps are included: The two quick-closing solenoid valves are energized through the control system, and the displacement of the pressure relief valve controlled by the quick-closing solenoid valve is observed to confirm the opening of the pressure relief valve; The two quick-closing solenoid valves are de-energized through the control system, and the displacement of the pressure relief valve controlled by the quick-closing solenoid valve is observed to confirm the closing condition of the pressure relief valve.

9. The automatic calibration method for steam isolation valve and pressure relief valve according to claim 7, It is characterized in that The sealing test adopts sequential control logic, which specifically includes the following steps: When testing the pressure relief valve close to the MSIV simulation body: determine whether the measured pressure in front of the pressure relief valve close to the MSIV simulation body meets the preconditions. If so, close the air intake solenoid valve, keep the two quick-closing solenoid valves de-energized, read the oil pressure value in front of the pressure relief valve close to the MSIV simulation body, automatically draw a pressure curve, and compare it with the set value to determine the leakage of the pressure relief valve close to the MSIV simulation body; When detecting the pressure relief valve far away from the MSIV simulation body: the fast closing solenoid valve of the pressure relief valve close to the MSIV simulation body is energized, and the pressure relief valve close to the MSIV simulation body is opened, and it is determined whether the pressure in front of the pressure relief valve far away from the MSIV simulation body meets the preconditions. If so, the fast closing solenoid valve of the pressure relief valve close to the MSIV simulation body remains energized, and the fast closing solenoid valve of the pressure relief valve far away from the MSIV simulation body loses power. The measured pressure of the main pipe in front of the pressure relief valve far away from the MSIV simulation body is read and compared with the set value, so as to determine the leakage of the pressure relief valve far away from the MSIV simulation body; If there is no leakage in both pressure relief valves, the sealing test is successful and the test ends; If there is leakage in any pressure relief valve, an alarm will be triggered.

10. The automatic calibration method for steam isolation valve and pressure relief valve according to claim 7, It is characterized in that The load test adopts sequential control logic, and specifically includes the following steps: Confirm that the MSIV simulation body is open and the quick-closing solenoid valves are de-energized; When testing the pressure relief valve close to the MSIV simulation body: briefly energize and then de-energize the quick-closing solenoid valve that controls the pressure relief valve close to the MSIV simulation body, and confirm that the pressure relief valve close to the MSIV simulation body is opened and closed by observing the displacement measuring element, and observe that the mother pipe pressure rises significantly and maintains a high pressure, which means that the pressure relief valve far away from the MSIV simulation body has no leakage. If the pressure drops to a preset value, it means that the pressure relief valve far away from the MSIV simulation body is leaking; When detecting the pressure relief valve far away from the MSIV simulation body: briefly energize and then de-energize the quick-closing solenoid valve controlling the pressure relief valve far away from the MSIV simulation body, and confirm that the pressure relief valve far away from the MSIV simulation body is opened and closed by observing the displacement measuring element. After a period of time, if the main pipe pressure rises to a certain value, it means that the pressure relief valve close to the MSIV simulation body is leaking; If there is no leakage in both pressure relief valves, the load test is successful and the test is over; If there is leakage in any pressure relief valve, an alarm will be triggered.

Citation Information

Patent Citations

  • Method and system for detecting main steam isolation valve of nuclear power plant

    CN103672148A

  • Main steam isolation valve driving device and combined simulation modeling method thereof

    CN105843070A

  • Online flushing method for oil way of main steam isolating valve

    CN116753216A

  • Integrated device is suppressed to main steam isolation valve air powered pump and relief valve off -line

    CN208502996U

  • Main steam isolation valve pneumatic pump test device

    CN211573753U

Cited By

  • Main steam isolation valve on-load test system and method

    CN119334629A