Intelligent electric meter fault detection method and device based on concentrator and storage medium

The smart meter is connected to the concentrator, and the voltage data and abnormal fluctuation signals are analyzed, and the risk level of the smart meter is judged. The problem of external factors affecting the accuracy of fault detection in the existing technology is solved, and more efficient fault detection and maintenance is achieved.

CN118914962APending Publication Date: 2024-11-08ANTE METER GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411248204.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing smart meter fault detection methods are affected by external factors such as environmental factors and power supply quality, resulting in insufficient accuracy of fault detection results.

Method used

The smart meter is connected to the concentrator, and the voltage data is sent to obtain the command, the voltage data is received and analyzed, the reference value of the evaluation index is determined, and the risk level of the smart meter is judged based on the voltage data and abnormal fluctuation signals, and then the fault judgment is made.

Benefits of technology

It improves the accuracy of smart meter fault detection, reduces the influence of external factors, enhances targeted fault detection capabilities, and improves maintenance efficiency and accuracy of results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118914962A_ABST
    Figure CN118914962A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of intelligent electric meters, and provides an intelligent electric meter fault detection method and device based on a concentrator, and a storage medium. The fault detection method comprises the following steps: in response to a voltage acquisition request, sending a voltage data acquisition instruction to each intelligent electric meter; receiving first voltage data sent by the intelligent electric meters in response to the voltage data instruction, and determining a reference value corresponding to the evaluation index based on the distribution condition of the first voltage data corresponding to each intelligent electric meter; for each intelligent electric meter, determining the risk level of the intelligent electric meter based on the first voltage data corresponding to the intelligent electric meter and the reference value corresponding to the evaluation index; and performing fault judgment on the intelligent electric meter based on the risk level of the intelligent electric meter. Through adoption of the technical scheme, fault judgment can be performed on the intelligent electric meter by integrating voltage data distribution conditions of different intelligent electric meters, so that the influence of external factors on fault detection of the intelligent electric meter can be reduced, and the accuracy of a fault detection result can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of smart meters, and in particular to a concentrator-based smart meter fault detection method, device and storage medium. Background Art

[0002] In the remote meter reading system, the concentrator plays a connecting role. It is responsible for sending meter reading signals to smart meters and uploading reading data to the smart master station. How to detect faults in smart meters is the key to remote meter reading.

[0003] Taking fault detection of smart meters as an example, in related technologies, smart meters can run self-test programs based on self-test instructions issued by concentrators to perform self-tests, and feed back self-test results to the smart master station through the concentrators to achieve fault detection of smart meters.

[0004] However, the working parameters of the meter will be affected by multi-dimensional external factors such as environmental factors, power supply quality, and user electricity consumption. These factors will interfere with the self-test process of the smart meter, thereby affecting the accuracy of the fault detection results. Summary of the invention

[0005] In order to help improve the accuracy of fault detection results, the present application provides a concentrator-based smart meter fault detection method, device and storage medium.

[0006] In a first aspect, the present application provides a concentrator-based smart meter fault detection method, which adopts the following technical solution: A concentrator-based smart meter fault detection method is used in a concentrator, wherein the concentrator is connected to a smart meter, and the method comprises: In response to the voltage acquisition request, sending a voltage data acquisition instruction to each of the smart meters; receiving first voltage data sent by the smart meter, and determining a reference value corresponding to an evaluation indicator based on a distribution of the first voltage data corresponding to each of the smart meters; the first voltage data is sent by the smart meter to the concentrator in response to a voltage acquisition instruction; For each of the smart meters, determining a risk level of the smart meter based on the first voltage data corresponding to the smart meter and a reference value corresponding to the evaluation index; A fault determination is performed on the smart meter based on the risk level of the smart meter.

[0007] By adopting the above technical solution, the voltage data distribution of the smart meters connected to the concentrator can be analyzed based on the concentrator to obtain the reference value corresponding to the evaluation index, and then the first voltage data corresponding to each smart meter can be judged based on the reference value corresponding to the evaluation index, which can help reduce the impact of external factors on smart meter fault detection, and further help improve the accuracy of fault detection results.

[0008] Optionally, the method further includes: In response to an abnormal voltage fluctuation signal, performing an abnormal analysis on second voltage data in the abnormal voltage fluctuation signal, wherein the abnormal voltage fluctuation signal is generated by the smart meter and sent to the concentrator when abnormal voltage fluctuation is detected; In a case where it is determined that the second voltage data is abnormal, the voltage acquisition request is generated.

[0009] By adopting the above technical solution, the concentrator can generate a voltage acquisition request based on the voltage abnormal fluctuation signal sent by the smart meter when abnormal voltage fluctuation is detected, which can help improve the accuracy of voltage acquisition request generation, and further help to perform targeted fault detection on the smart meter.

[0010] Optionally, determining the risk level of the smart meter based on the first voltage data corresponding to the smart meter and a reference value corresponding to the evaluation index includes: Determine whether there is an abnormal fluctuation signal corresponding to the smart meter; In the case where there is an abnormal fluctuation signal corresponding to the smart meter, determining voltage evaluation data corresponding to the smart meter based on first voltage data corresponding to the smart meter and second voltage data in the abnormal fluctuation signal corresponding to the smart meter; The risk level of the smart meter is determined based on the voltage evaluation data and a reference value corresponding to the evaluation index.

[0011] By adopting the above technical solution, the amount of data and / or data dimension used to determine the risk level can be increased by combining the second voltage data in the abnormal fluctuation signal, which can help improve the accuracy of risk level judgment.

[0012] Optionally, the voltage evaluation data includes an index value of the evaluation index, and determining the reference voltage data corresponding to the smart meter based on the first voltage data corresponding to the smart meter and the second voltage data in the abnormal fluctuation signal corresponding to the smart meter includes: Determine a first reference value corresponding to the evaluation index based on the first voltage data; Determine a second reference value corresponding to the evaluation index based on the second voltage data; Determining an index value of the evaluation index based on a first reference value and a second reference value corresponding to the evaluation index and an index value determination method corresponding to the evaluation index; The determining the risk level of the smart meter based on the voltage evaluation data and the reference value corresponding to the evaluation index includes: In the case where there is an abnormal fluctuation signal corresponding to the smart meter, the risk level of the smart meter is determined based on the indicator value corresponding to the evaluation indicator and the reference value corresponding to the evaluation indicator.

[0013] By adopting the above technical solution, the calculation method of the evaluation value can be set according to the actual situation of the evaluation index, which can help improve the accuracy of the determined evaluation index value, and further help improve the accuracy of risk level judgment.

[0014] Optionally, the sending a voltage data acquisition instruction to each of the smart meters includes: For each of the smart meters, sending a voltage acquisition instruction to each of the smart meters based on a first communication mode corresponding to the smart meter; Determining whether feedback information corresponding to the smart meter is received within a preset time after the voltage acquisition instruction is sent; For each of the smart meters, when the feedback information is not received within the preset time period, a voltage acquisition instruction is sent to the smart meter based on a second communication mode corresponding to the smart meter, where the first communication mode is different from the second communication mode.

[0015] By adopting the above technical solution, if the concentrator does not receive feedback information within a preset time after sending a voltage acquisition instruction to the smart meter through the first communication method, it will send the voltage acquisition instruction to the smart meter again through the second communication method. This can help ensure that the smart meter can receive the voltage acquisition instruction and return feedback information to the concentrator.

[0016] Optionally, after sending the voltage acquisition instruction to the smart meter based on the second communication mode corresponding to the smart meter, the method further includes: Determining whether the feedback information is received within the preset time period after the voltage acquisition instruction is sent; In the case where the feedback information is received within the preset time period, determining that a fault exists in the first communication mode between the concentrator and the smart meter; When the feedback information is not received within the preset time period, it is directly determined that the smart meter is operating abnormally.

[0017] By adopting the above technical solution, after sending a voltage acquisition instruction to the smart meter based on the second communication method corresponding to the smart meter, the possible problems of the smart meter can be further judged based on whether feedback information is received. This can help assist the maintenance of the smart meter, and further help improve the maintenance efficiency of the smart meter.

[0018] Optionally, after determining whether the feedback information is received within a preset time period after the voltage acquisition instruction is sent, the method further includes: In the case where the feedback information is received within the preset time period, determining whether the format of the feedback information matches a preset voltage data feedback format; In the case where the format of the feedback information does not match the voltage data feedback format, determining whether there is error information in the feedback information; When error information exists in the feedback information, a fault judgment is performed on the smart meter based on the error information.

[0019] By adopting the above technical solution, the fault judgment of the smart meter can be carried out based on the matching relationship between the feedback information format and the voltage feedback data format and whether the actual feedback information contains error information, which can help improve the accuracy of the fault judgment result.

[0020] Optionally, the performing fault judgment on the smart meter based on the risk level of the smart meter includes: Determining whether the risk level is greater than a preset level threshold; When the risk level is not greater than the level threshold, acquiring historical data corresponding to the smart meter; estimating the remaining useful life of the smart meter based on the historical data; Determining whether the risk level matches the remaining useful life; In a case where the risk level does not match the remaining service life, it is determined that the smart meter has a fault.

[0021] By adopting the above technical solution, the remaining service life of the smart meter can be estimated in combination with the historical data of the smart meter, and the fault judgment of the smart meter can be made based on the matching relationship between the risk level and the remaining service life, thereby further improving the accuracy of fault judgment.

[0022] In a second aspect, the present application provides a concentrator-based smart meter fault detection method, which adopts the following technical solution: An electronic device, comprising: at least one processor; Memory; At least one application, wherein the at least one application is stored in a memory and configured to be executed by at least one processor, and the at least one application is configured to: execute any one of the concentrator-based smart meter fault detection methods provided in the first aspect.

[0023] In a third aspect, the present application provides a concentrator-based smart meter fault detection method, which adopts the following technical solution: A computer-readable storage medium stores a computer program, which, when executed in a computer, causes the computer to execute any one of the concentrator-based smart meter fault detection methods provided in the first aspect.

[0024] In summary, the present application includes at least one of the following beneficial technical effects: 1. The concentrator can be used to comprehensively analyze the voltage data distribution of different smart meters to judge the fault of smart meters, which can help reduce the impact of external factors on smart meter fault detection, and thus help improve the accuracy of fault detection results; 2. The concentrator can generate a voltage acquisition request based on the abnormal voltage fluctuation signal sent by the smart meter when abnormal voltage fluctuation is detected, which can help improve the accuracy of voltage acquisition request generation and further help to perform targeted fault detection on the smart meter. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a flow chart of a concentrator-based smart meter fault detection method provided in an embodiment of the present application; Figure 2 It is a flowchart of a method for generating a voltage data acquisition request provided in an embodiment of the present application; Figure 3 It is a flowchart of a risk level determination method provided in an embodiment of the present application; Figure 4 It is a flowchart of another risk level determination method provided in an embodiment of the present application; Figure 5 It is a flow chart of a method for sending a voltage acquisition instruction provided in an embodiment of the present application; Figure 6 It is a flowchart of a fault judgment method provided in an embodiment of the present application; Figure 7 is a flowchart of another fault judgment method provided in an embodiment of the present application; Figure 8 This is a flowchart of another fault judgment method provided in an embodiment of the present application; Fig. 9It is a structural schematic diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solutions and advantages of this application more clear, the following Figure 1-9 It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0027] The embodiment of the present application discloses a concentrator-based smart meter fault detection method, which is used in a concentrator, and the concentrator is connected to a smart meter. Figure 1 , the smart meter fault detection method includes the following steps: Step 101: In response to a voltage acquisition request, a voltage data acquisition instruction is sent to each smart meter.

[0028] Among them, the voltage acquisition request can be automatically generated by the concentrator, for example: the concentrator generates the voltage acquisition request periodically, or it can be generated by the concentrator in response to data sent by other devices, for example: the concentrator generates it in response to a detection instruction sent by the intelligent master station. This embodiment does not limit the generation method of the voltage acquisition request.

[0029] Specifically, sending a voltage acquisition instruction to each smart meter includes: sending a voltage data acquisition instruction to each smart meter through a downlink channel. Generally speaking, the downlink channel of the concentrator supports at least one communication channel such as low-voltage power line carrier, micro-power wireless, RS-485, CAN, etc., and can collect and store data from smart meters, acquisition modules and other types of equipment through the downlink channel. In actual implementation, the smart meter can automatically send data to the concentrator, or it can also send data to the concentrator in response to the data acquisition request of the concentrator.

[0030] Step 102: receiving first voltage data sent by the smart meters, and determining a reference value corresponding to the evaluation index based on the distribution of the first voltage data corresponding to each smart meter.

[0031] Among them, the first voltage data is sent by the smart meter to the concentrator in response to the voltage acquisition instruction. Specifically, after receiving the voltage data acquisition instruction sent by the concentrator, the smart meter will send the collected voltage data to the concentrator. Optionally, the voltage data includes the change of the voltage within a preset reference time. For example: the smart meter can collect the current voltage in real time, and after receiving the voltage acquisition instruction, send the voltage data collected within the preset reference time before the receiving time to the concentrator. In actual implementation, the smart meter can also start collecting voltage after receiving the voltage acquisition instruction, and send the collected voltage data to the concentrator after the voltage collection time reaches the preset collection time.

[0032] The evaluation index is pre-set according to actual needs, and the number of evaluation indexes can be one or more than two. Specifically, the evaluation index can include at least one of the voltage peak value, voltage mean value, voltage fluctuation amplitude, etc. This embodiment does not limit the type of evaluation index.

[0033] In the actual deployment process, the concentrator is usually deployed at a location close to the smart meter, so the locations of the smart meters connected to the same concentrator are similar, for example, they are all connected by the same transformer, or they belong to different users in the same building. In this embodiment, it is precisely because the meters with similar locations are affected by external factors in a similar manner that the reference value corresponding to the evaluation index is determined in combination with the distribution of the first voltage data corresponding to each smart meter. The reference value determined in this way can reflect the influence of external factors to a certain extent, so that it can help to consider the influence of different external factors on the voltage of the smart meter during the fault detection process, and further help to improve the accuracy of the abnormal detection result.

[0034] Optionally, a reference value corresponding to the evaluation index is determined based on the distribution of first voltage data corresponding to each smart meter, including: for each evaluation index, determining the distribution of index values ​​of each smart meter under the evaluation index based on the distribution of first voltage data corresponding to each smart meter; and determining the reference value corresponding to the evaluation index based on the distribution of index values ​​under the evaluation index.

[0035] The method of determining the reference value corresponding to the evaluation indicator based on the distribution of the indicator values ​​under the evaluation indicator may be to determine the mean, maximum or minimum value of the indicator value corresponding to the evaluation indicator as the reference value corresponding to the evaluation indicator.

[0036] Furthermore, the specific calculation method of the reference value can be determined based on the distribution of the indicator value. For example, for the voltage fluctuation amplitude, the maximum value of each voltage fluctuation amplitude is determined as the reference value; for the voltage peak value, the average value of each voltage peak value is determined as the reference value.

[0037] In one example, after determining the benchmark value corresponding to the evaluation indicator based on the distribution of indicator values ​​under the evaluation indicator, it also includes: determining whether the benchmark value corresponding to the evaluation indicator exceeds the preset maximum benchmark value corresponding to the evaluation indicator; if so, adjusting the benchmark value corresponding to the evaluation indicator to the preset maximum benchmark value, which can help make the benchmark value within a reasonable range.

[0038] In another example, the reference value corresponding to the evaluation index is determined based on the distribution of the first voltage data corresponding to each smart meter, including: determining a reference smart meter from each smart meter; determining the reference value corresponding to the evaluation index based on the distribution of the first voltage data corresponding to the reference smart meter. The reference meter can be determined based on the first voltage data, for example: a smart meter whose voltage amplitude fluctuation amplitude corresponding to the first voltage data is less than a preset maximum fluctuation amplitude is determined as a reference meter, and for example: a smart meter whose voltage mean value corresponding to the first voltage data is less than a preset maximum voltage is determined as a reference meter, which helps to eliminate the influence of abnormal data on the calculation of the reference value, thereby making the determined reference value within a reasonable range.

[0039] In some embodiments, after collecting voltage data, the smart meter analyzes and calculates the collected voltage data to obtain an index value corresponding to at least one evaluation index, and then sends the index value as voltage data to the concentrator. This can help the concentrator analyze the voltage data, thereby helping to reduce the amount of calculation of the concentrator during the detection process, and further helping to improve detection efficiency.

[0040] Step 103: For each smart meter, determine the risk level of the smart meter based on the first voltage data corresponding to the smart meter and the reference value corresponding to the evaluation index.

[0041] Optionally, the risk level of the smart meter is determined based on the first voltage data corresponding to the smart meter and the reference value corresponding to the evaluation index, including: determining the numerical range corresponding to each risk level based on the reference value; determining the first reference value corresponding to the evaluation index based on the first voltage data; determining the risk level corresponding to the smart meter based on the numerical range to which the first reference value belongs.

[0042] The relationship between the numerical range corresponding to each risk level and the benchmark value is preset. For example, assuming the benchmark value is a, and the risk levels include high risk, medium risk, and no risk, the numerical range corresponding to high risk can be greater than 1.2a, the numerical range corresponding to medium risk is less than or equal to 1.2a and greater than a, and the numerical range corresponding to low risk is less than or equal to a.

[0043] In one example, the evaluation index includes more than two. In this case, the risk level of the smart meter is determined based on the first voltage data corresponding to the smart meter and the reference value corresponding to the evaluation index, including: determining the first reference value corresponding to each evaluation index based on the first voltage data; for each index item, determining the numerical range corresponding to each risk level of the index item based on the reference value corresponding to the index item, and determining the risk level corresponding to the index item based on the first reference value corresponding to the index item and the reference value corresponding to the index item; determining the risk level of the smart meter based on the risk level corresponding to each index item. For example: the highest risk level among the risk levels corresponding to each index item is determined as the risk level of the smart meter.

[0044] Optionally, after determining the risk level of the smart meter, the concentrator will also upload the risk level of the smart meter to the smart master station for management personnel to conduct a more comprehensive system performance analysis.

[0045] Furthermore, when the concentrator cannot access the intelligent master station, a master station access abnormality prompt message will be generated to prompt the staff to inspect the hardware condition and communication parameter settings of the concentrator, thereby ensuring that the concentrator can connect to the master station.

[0046] Step 104: Perform fault determination on the smart meter based on the risk level of the smart meter.

[0047] Optionally, a fault judgment is made on the smart meter based on the risk level of the smart meter, including: when the risk level of the smart meter is a high risk level, determining that the smart meter is faulty, so as to prompt a staff member to perform fault repair on the smart meter.

[0048] Furthermore, the risk level of the smart meter may change dynamically. At this time, when the risk level of the smart meter belongs to the medium risk level, it can be determined based on the historical risk level of the smart meter whether the number of times the smart meter is at the medium risk level has reached a preset number. If so, a fault warning will be issued for the smart meter to prompt the staff to troubleshoot the smart meter.

[0049] The implementation principle of a smart meter fault detection method based on a concentrator in the embodiment of the present application is as follows: in response to a voltage acquisition request, a voltage data acquisition instruction is sent to each smart meter; the first voltage data sent by the smart meter is received, and the reference value corresponding to the evaluation index is determined based on the distribution of the first voltage data corresponding to each smart meter; the first voltage data is sent by the smart meter to the concentrator in response to the voltage acquisition instruction; for each smart meter, the risk level of the smart meter is determined based on the first voltage data corresponding to the smart meter and the reference value corresponding to the evaluation index; the smart meter is judged for fault based on the risk level of the smart meter. By adopting the above technical solution, the voltage data distribution of the smart meter connected to the concentrator can be analyzed based on the concentrator, so as to obtain the reference value corresponding to the evaluation index, and then the first voltage data corresponding to each smart meter can be judged based on the reference value corresponding to the evaluation index, so as to obtain the risk level of the smart meter, and then the fault analysis of the smart meter can be realized, so that the voltage data distribution of different smart meters can be comprehensively judged for the smart meter, so as to help reduce the influence of external factors on the fault detection of the smart meter, and then help improve the accuracy of the fault detection result.

[0050] In some embodiments, reference Figure 2 The concentrator-based smart meter fault detection method provided in this embodiment further includes the following steps: Step 201 , in response to an abnormal voltage fluctuation signal, performing an abnormal analysis on second voltage data in the abnormal voltage fluctuation signal.

[0051] Among them, the abnormal voltage fluctuation signal is generated by the smart meter and sent to the concentrator when it detects abnormal voltage fluctuation (for example, the fluctuation amplitude is too large, the change speed is too fast, etc.).

[0052] The data dimension of the second voltage data may be the same as that of the first voltage data, or may only include voltage fluctuations. This embodiment does not limit the content of the second voltage data.

[0053] In this embodiment, a data monitoring program is running in the smart meter, which can monitor the voltage of the smart meter, and in the case of abnormal voltage fluctuation, a voltage abnormal fluctuation signal containing the second voltage data is sent to the concentrator. Generally speaking, the abnormal judgment rules in the smart meter are pre-set and difficult to adapt to changes in the external environment. Therefore, in this embodiment, the self-check of the smart meter only plays a preliminary screening role, for example: setting a lower abnormal judgment rule can enhance the sensitivity of the smart meter to abnormal situations. As for the cause of the abnormality, in this embodiment, a more accurate judgment can be made through the concentrator.

[0054] Optionally, performing an abnormality analysis on the second voltage data in the second abnormal fluctuation signal includes: performing an abnormality analysis on fluctuation conditions of the second voltage data.

[0055] In one example, it is determined whether the fluctuation amplitude of the second voltage data is greater than a reference maximum fluctuation amplitude, and if so, it is determined that the second voltage data is abnormal.

[0056] The reference maximum fluctuation range can be predicted by the concentrator based on the historical electricity consumption data of each smart meter, for example, the reference maximum fluctuation range is determined based on the voltage fluctuation of each smart meter in the same period of the past week. Alternatively, it can be sent by the smart master station to the concentrator. It should be noted that the reference maximum fluctuation range recorded in the concentrator can be adjusted according to the actual situation, which can help improve the accuracy of abnormal judgment.

[0057] Furthermore, when the fluctuation range of the second voltage data does not change to the reference maximum fluctuation range, it can be further determined whether the fluctuation range of the second voltage data is greater than the reference risk fluctuation range. If so, it is further determined whether the maximum value of the second voltage data is greater than the reference risk voltage value; if so, it is determined that the second voltage data is abnormal. The preset risk fluctuation range is less than the preset maximum fluctuation range, for example, the preset risk fluctuation range is 80% of the preset maximum fluctuation range.

[0058] Step 202: if it is determined that the second voltage data is abnormal, generate a voltage acquisition request.

[0059] In one example, when it is determined that the second voltage data is not abnormal, the second voltage data can be further determined as reference voltage data, and the reference voltage data can be analyzed and processed regularly, which can guide the adjustment of the abnormal voltage fluctuation monitoring parameters of the smart meter, so that the abnormal voltage fluctuation monitoring of the smart meter can adapt to the current environment to a certain extent, which can help improve the accuracy of the abnormal voltage fluctuation signal.

[0060] In another example, when it is determined that the second voltage data is not abnormal, the number of abnormal prompts of the smart meter corresponding to the voltage abnormal fluctuation signal is recorded, and it is determined whether the number of abnormal prompts of the smart meter reaches the preset prompt threshold. If so, it is determined to repair the smart meter. In actual implementation, the number of abnormal prompts of the smart meter can be reset at intervals of a preset time (for example, one month), which can help avoid misjudgment caused by the long-term accumulation of abnormal prompts.

[0061] In the above implementation, the concentrator can generate a voltage acquisition request based on the fact that the smart meter sends an abnormal voltage fluctuation signal when detecting abnormal voltage fluctuation. In this way, the voltage acquisition request can be generated according to the actual situation, which can help improve the accuracy of the voltage acquisition request generation, and further help to perform targeted fault detection on the smart meter.

[0062] At the same time, since the concentrator can perform an abnormality analysis based on the second voltage data and generate a voltage acquisition request only when it is determined that the second voltage data is abnormal, the concentrator can recheck whether the smart meter has any abnormalities, which can help further improve the accuracy of voltage acquisition request generation.

[0063] Based on the above technical solution, further reference Figure 3 Step 103, for each smart meter, determining the risk level of the smart meter based on the first voltage data corresponding to the smart meter and the reference value corresponding to the evaluation index, including the following steps: Step 301, determine whether there is an abnormal fluctuation signal corresponding to the smart meter.

[0064] Step 302: When there is an abnormal fluctuation signal corresponding to the smart meter, determine voltage evaluation data corresponding to the smart meter based on first voltage data corresponding to the smart meter and second voltage data in the abnormal fluctuation signal corresponding to the smart meter.

[0065] In one example, the data dimension of the first voltage data and the second voltage data is the same, and the first voltage data is collected by the smart meter after receiving the voltage data acquisition instruction. According to the above technical solution, the second voltage data should be collected before the voltage data acquisition instruction is generated, so that the combination of the first voltage data and the second voltage data can increase the amount of data referenced in the fault judgment process, which can help improve the accuracy of risk level judgment.

[0066] In another example, there are differences in the data dimensions of the first voltage data and the second voltage data. For example, the second voltage data includes the maximum voltage fluctuation amplitude, while the first voltage data only includes the voltage fluctuation. At this time, the first voltage data may be collected by the smart meter within a preset time period before receiving the voltage data acquisition instruction. In this way, combining the first voltage data and the second voltage data can increase the data dimension of the risk level judgment reference, which can help improve the accuracy of abnormality judgment.

[0067] Step 303: determine the risk level of the smart meter based on the voltage evaluation data and the reference value corresponding to the evaluation index.

[0068] In the above implementation, for a smart meter with an abnormal fluctuation signal, the voltage evaluation data is first determined in combination with the first voltage data and the second voltage data, and then the risk level of the smart meter is determined based on the voltage evaluation data. This can help increase the amount of data and / or data dimension used to determine the risk level, and thus help improve the accuracy of the risk level judgment.

[0069] Based on the above technical solution, further, the voltage evaluation data includes the index value of the evaluation index, referring to Figure 4 Step 302, in the case where there is an abnormal fluctuation signal corresponding to the smart meter, determining the voltage evaluation data corresponding to the smart meter based on the first voltage data corresponding to the smart meter and the second voltage data in the abnormal fluctuation signal corresponding to the smart meter, including the following steps: Step 401: determine a first reference value corresponding to an evaluation index based on first voltage data.

[0070] Step 402: Determine a second reference value corresponding to the evaluation index based on the second voltage data.

[0071] Step 403: determining the index value of the evaluation index based on the first reference value and the second reference value corresponding to the evaluation index and the index value determination method corresponding to the evaluation index.

[0072] Among them, the indicator value determination method corresponding to different evaluation indicators is preset.

[0073] In one example, for the evaluation index of average voltage, the average of the first reference value and the second reference value may be determined as the index value corresponding to the average voltage.

[0074] In another example, for the evaluation index of voltage fluctuation range, the union of the first reference value and the second reference value may be determined as the index value corresponding to the voltage fluctuation range.

[0075] In yet another example, for the voltage fluctuation amplitude as an evaluation index, a relatively larger value between the first reference value and the second reference value may be determined as the index value corresponding to the voltage fluctuation amplitude.

[0076] Accordingly, step 303, determining the risk level of the smart meter based on the voltage evaluation data and the reference value corresponding to the evaluation index, includes the following steps: Step 404: in the case where there is an abnormal fluctuation signal corresponding to the smart meter, the risk level of the smart meter is determined based on the index value corresponding to the evaluation index and the reference value corresponding to the evaluation index.

[0077] In the above implementation, the voltage evaluation data is represented by the indicator value corresponding to the evaluation index, and the calculation method of each indicator value corresponds to its corresponding evaluation index. In this way, the calculation method of the evaluation value can be set according to the actual situation of the evaluation index, which can help improve the accuracy of the determined evaluation index value, and further help improve the accuracy of the risk level judgment.

[0078] In some implementations, in step 101, sending a voltage data acquisition instruction to each smart meter includes the following steps: Step 501: For each smart meter, a voltage acquisition instruction is sent to each smart meter based on a first communication mode corresponding to the smart meter.

[0079] The first communication modes corresponding to different smart meters are preset. In this embodiment, the concentrator provides at least two types of downlink communication channels, and each type of communication channel corresponds to a communication mode. The smart meter can communicate with the concentrator through any downlink communication channel.

[0080] Optionally, the first communication mode corresponding to different smart meters may be different. Specifically, the first communication mode can be set based on the installation location of the smart meter, for example: the first communication mode corresponding to the smart meter within the preset distance range of the concentrator is low-power wireless, and the first communication mode corresponding to the smart meter outside the preset distance range of the concentrator is low-voltage power line carrier, or it can also be set based on the model of the smart meter. In this way, the smart meter can communicate with the smart meter in a better communication mode, and at the same time, different types of downlink channel resources of the concentrator can be fully utilized.

[0081] Step 502: Determine whether feedback information corresponding to the smart meter is received within a preset time period after the voltage acquisition instruction is sent.

[0082] Optionally, the concentrator maintains a form of smart meters connected to the concentrator. After sending a voltage acquisition instruction to the smart meter based on the first communication method, the concentrator will record the reception status of feedback information corresponding to the smart meter in the form, and after the time from sending the voltage acquisition instruction reaches a preset time, the concentrator determines whether the feedback information corresponding to the meter is received based on the feedback information reception status recorded in the form.

[0083] Step 503: If no feedback information is received within a preset time period, a voltage acquisition instruction is sent to the smart meter based on a second communication method corresponding to the smart meter.

[0084] The first communication mode is different from the second communication mode. In actual implementation, the second communication modes corresponding to different smart meters may be different.

[0085] In this implementation, the smart meter and the concentrator can be connected to each other by at least two communication modes, namely, a first communication mode and a second communication mode. In general, the concentrator and the smart meter communicate only by the first communication mode, but when the concentrator cannot communicate with the smart meter by the first communication mode, the concentrator will enable the second communication mode to communicate with the smart meter.

[0086] In the above technical solution, if the concentrator does not receive feedback information within a preset time after sending a voltage acquisition instruction to the smart meter through the first communication method, it will send a voltage acquisition instruction to the smart meter again through the second communication method. This can help ensure that the smart meter can receive the voltage acquisition instruction and return feedback information to the concentrator.

[0087] Based on the above technical solution, further, refer to Figure 6 In the above step 503, when no feedback information is received within the preset time, after sending a voltage acquisition instruction to the smart meter based on the second communication method corresponding to the smart meter, the step further includes: Step 601, determining whether feedback information is received within a preset time period after the voltage acquisition instruction is sent.

[0088] Specifically, the implementation method of step 601 refers to the above step 502, which will not be repeated here in this embodiment.

[0089] Step 602: When feedback information is received within a preset time period, it is determined that a fault exists in the first communication mode between the concentrator and the smart meter.

[0090] Specifically, since feedback information sent by the smart meter is received within a preset time after a voltage data acquisition instruction is sent to the smart meter based on the second communication method, this indicates that the smart meter can send and receive information normally, and it can be determined that there is an abnormality in the first communication method.

[0091] Step 603: When no feedback information is received within a preset time period, it is directly determined that the smart meter is operating abnormally.

[0092] Specifically, since no feedback information is received from the smart meter within the preset time after the voltage data acquisition instruction is sent to the smart meter based on the second communication method, this indicates that the smart meter may not be able to send and receive information normally, and it can be directly determined that the smart meter has an operating abnormality.

[0093] Optionally, after determining that the smart meter is working abnormally, a working abnormality prompt message can be output to prompt the staff to conduct on-site inspections to see whether the smart meter is turned on normally and whether the communication line is intact.

[0094] In the above technical solution, after sending a voltage acquisition instruction to the smart meter based on the second communication method corresponding to the smart meter, the possible problems of the smart meter can be further judged based on whether feedback information is received. This can help assist the maintenance of the smart meter, and further help improve the maintenance efficiency of the smart meter.

[0095] For further reference, Figure 7 After the above steps 502 and 601 determine whether the feedback information corresponding to the smart meter is received within the preset time after the voltage acquisition instruction is sent, the following further includes: Step 701: when feedback information is received within a preset time period, determine whether the format of the feedback information matches a preset voltage data feedback format.

[0096] Specifically, there may be multiple types of information sent by the smart meter to the concentrator, and different types of information contain different data. Therefore, in actual implementation, corresponding feedback formats can be set for different types of feedback information. In this way, the type of feedback information can be determined based on the matching relationship between the format of the feedback information and the feedback formats corresponding to each type of feedback information.

[0097] In order to facilitate matching the format of the feedback information with the voltage data feedback format, in actual implementation, a format identification field can be set in the feedback information. The format identification field is used to indicate the format corresponding to the feedback information. Different feedback formats correspond to different format identification fields.

[0098] Step 702: When the format of the feedback information does not match the voltage data feedback format, determine whether there is error information in the feedback information.

[0099] The error information is generated by the smart meter during operation. Specifically, after generating the error information, the smart meter inserts the error information into the information fed back to the concentrator to feed back to the concentrator, so that the concentrator can determine the working condition of the smart meter based on the error information fed back by the smart meter.

[0100] Optionally, when the smart meter detects a component abnormality during operation, it will generate an error message corresponding to the component abnormality. In one example, a smart meter's information storage component fails, making it impossible to store and read information, which in turn makes it impossible for the smart meter to return voltage data to the concentrator. At this time, the smart meter will generate an abnormal prompt message corresponding to the information storage component and feedback it to the concentrator.

[0101] Optionally, when the format of the feedback information matches the voltage data feedback format, the voltage data is extracted from the feedback information based on the voltage data feedback format.

[0102] Step 703: When there is error information in the feedback information, a fault diagnosis is performed on the smart meter based on the error information.

[0103] Optionally, when the error information indicates that the smart meter has a component abnormality, it is determined that the smart meter has a component abnormality, and component abnormality prompt information corresponding to the smart meter is generated to prompt staff to repair or replace the components of the smart meter.

[0104] Optionally, when there is no error information in the feedback information, it is possible to further determine whether garbled characters, missing data, etc. appear in the feedback information in combination with the voltage data feedback format, and perform corresponding processing.

[0105] In the above technical scheme, it is possible to determine whether the feedback information is abnormal based on the matching relationship between the format of the feedback information and the voltage data feedback format. If it is determined that the feedback information is abnormal, it is further determined whether the feedback information contains error information. If error information is determined, the smart meter is fault-diagnosed based on the error information. This can help improve the accuracy of the fault judgment results.

[0106] In some embodiments, reference Figure 8 The above step 104, performing fault judgment on the smart meter based on the risk level of the smart meter, includes the following steps: Step 801, determining whether the risk level is greater than a preset level threshold.

[0107] In an example, the risk level is divided into five levels, 1-5, and the numerical value is positively correlated with the risk level, that is, the larger the numerical value, the greater the risk. In this case, the level threshold may be 3.

[0108] Step 802: When the risk level is not greater than the level threshold, obtain historical data corresponding to the smart meter.

[0109] The historical operation data includes at least one of the historical operation data uploaded by the smart meter, such as historical power consumption data, historical voltage data, historical temperature data, historical humidity data, historical error data, etc. Furthermore, the historical data may also include the maintenance data, accumulated working hours, etc. of the smart meter.

[0110] Step 803: Estimate the remaining useful life of the smart meter based on historical data.

[0111] In one example, the historical data includes the historical operation data of the smart meter. At this time, the remaining service life of the smart meter is estimated based on the historical data, including: determining abnormal data from the historical operation data; for each abnormal data, determining the impact parameter of the abnormal data on the life of the smart meter; determining the design service life of the smart meter under normal use; and correcting the design service life based on the impact parameters corresponding to each abnormal data to obtain the remaining service life of the smart meter.

[0112] Among them, the abnormal judgment method and the calculation method of the influencing parameter of different types of historical operation data are pre-set. For example: for historical error data, the corresponding influencing parameter can be determined based on the impact score of the error type corresponding to the error data; for another example: for historical voltage values, the historical voltage data can be determined to be abnormal when the historical voltage value exceeds the preset maximum voltage value, and the corresponding influencing parameter can be determined based on the amplitude of the historical voltage value exceeding the preset maximum voltage value.

[0113] Furthermore, the historical data also includes the maintenance data of the smart meter. At this time, the remaining service life of the smart meter is estimated based on the historical data, including: adjusting the remaining usage parameters of the smart meter based on the number of maintenance times. For example: one maintenance increases the remaining usage time by a preset time. Or, based on the data recorded during the most recent maintenance process, the remaining service life is corrected, which can help accurately assess the loss of the smart meter.

[0114] In another example, the remaining useful life of a smart meter is estimated based on historical data, including: extracting features from the historical data using preset feature extraction rules to obtain data feature values; and inputting the data feature values ​​into a pre-trained life assessment model to obtain the remaining useful life.

[0115] The lifespan assessment model is obtained by training based on training data. The training data includes at least one set of sample data, and each set of sample data includes a sample data characteristic value and a remaining service life corresponding to the sample data characteristic value.

[0116] In one example, the data eigenvalues ​​are obtained by principal component analysis of historical data, which can facilitate the identification of factors that have a greater impact on the service life from historical data and input them into the life assessment model, thereby helping to improve the accuracy of the remaining service life analysis results.

[0117] In another example, the data characteristic value is calculated based on historical data that are correlated with each other, such as correlating current with temperature, or correlating current, voltage and temperature. This can facilitate the determination of indicators that are valuable for evaluating the service life by combining the correlation between different historical data, thereby helping to improve the accuracy of the remaining service life analysis results. Step 804, determining whether the risk level matches the remaining useful life.

[0118] Specifically, determining whether the risk level matches the remaining useful life includes: determining a reference level corresponding to the remaining useful life; determining whether the risk level is greater than the reference level; if so, determining that the risk level does not match the remaining useful life; if otherwise, determining that the risk level matches the remaining useful life.

[0119] Furthermore, when the risk level is not greater than the preset reference level, it can be further determined whether the difference between the risk level and the reference level is less than the preset difference value threshold; if not, it is determined that there may be an abnormality in the risk level calculation process, and manual intervention is required. This can help avoid the impact of errors in the risk level calculation process on fault judgment.

[0120] Step 805: When the risk level does not match the remaining service life, it is determined that the smart meter is faulty.

[0121] In the above technical solution, when the risk level is less than the level threshold, the remaining service life of the smart meter is further estimated in combination with the historical data of the smart meter, and when the risk level does not match the remaining service life, it is determined that the smart meter has a fault. In this way, the fault judgment of the smart meter can be made based on the matching relationship between the risk level and the remaining service life, thereby further improving the accuracy of the fault judgment.

[0122] The present application also provides an electronic device. Fig. 9 As shown, Fig. 9 The electronic device 900 shown includes: a processor 901 and a memory 903. The processor 901 and the memory 903 are connected, such as through a bus 902. Optionally, the electronic device 900 may also include a transceiver 904. It should be noted that in actual applications, the transceiver 904 is not limited to one, and the structure of the electronic device 900 does not constitute a limitation on the embodiments of the present application.

[0123] The processor 901 may be a CPU (Central Processing Unit), a general-purpose processor, a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It may implement or execute various exemplary logic blocks, modules, and circuits described in conjunction with the disclosure of this application. The processor 901 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, and the like.

[0124] The bus 902 may include a path to transmit information between the above components. The bus 902 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus. The bus 902 may be divided into an address bus, a data bus, etc. For ease of representation, Fig. 9 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.

[0125] The memory 903 may be a ROM (Read Only Memory) or other types of static storage devices that can store static information and instructions, a RAM (Random Access Memory) or other types of dynamic storage devices that can store information and instructions, or an EEPROM (Electrically Erasable Programmable Read Only Memory), a disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store desired program codes in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto.

[0126] The memory 903 is used to store the application code for executing the solution of the present application, and the execution is controlled by the processor 901. The processor 901 is used to execute the application code stored in the memory 903 to implement the contents shown in the above method embodiment.

[0127] The electronic devices include, but are not limited to, mobile terminals such as mobile phones, laptop computers, PDAs (personal digital assistants), PADs (tablet computers), etc., and fixed terminals such as digital TVs, desktop computers, etc. It can also be a server terminal, etc. Fig. 9 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0128] The embodiment of the present application also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed in a computer, the computer is caused to execute the concentrator-based smart meter fault detection method provided in the above embodiment.

[0129] It should be understood that although the steps in the flowchart of the accompanying drawings are shown in sequence according to the instructions of the arrows, these steps are not necessarily performed in the order indicated by the arrows. Unless otherwise clearly stated in this document, the execution of these steps is not strictly limited in order and can be performed in other orders.

[0130] The above are only some implementation methods of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A smart meter fault detection method based on concentrator, It is characterized in that Used in a concentrator, the concentrator is connected to a smart meter, and the method includes: In response to the voltage acquisition request, sending a voltage data acquisition instruction to each of the smart meters; receiving first voltage data sent by the smart meter, and determining a reference value corresponding to an evaluation indicator based on a distribution of the first voltage data corresponding to each of the smart meters; the first voltage data is sent by the smart meter to the concentrator in response to a voltage acquisition instruction; For each of the smart meters, determining a risk level of the smart meter based on the first voltage data corresponding to the smart meter and a reference value corresponding to the evaluation index; A fault determination is performed on the smart meter based on the risk level of the smart meter.

2. The method according to claim 1, It is characterized in that The method further comprises: In response to an abnormal voltage fluctuation signal, performing an abnormal analysis on second voltage data in the abnormal voltage fluctuation signal, wherein the abnormal voltage fluctuation signal is generated by the smart meter and sent to the concentrator when abnormal voltage fluctuation is detected; In a case where it is determined that the second voltage data is abnormal, the voltage acquisition request is generated.

3. The method according to claim 2, It is characterized in that The determining the risk level of the smart meter based on the first voltage data corresponding to the smart meter and the reference value corresponding to the evaluation index includes: Determine whether there is an abnormal fluctuation signal corresponding to the smart meter; In the case where there is an abnormal fluctuation signal corresponding to the smart meter, determining voltage evaluation data corresponding to the smart meter based on first voltage data corresponding to the smart meter and second voltage data in the abnormal fluctuation signal corresponding to the smart meter; The risk level of the smart meter is determined based on the voltage evaluation data and a reference value corresponding to the evaluation index.

4. The method according to claim 3, It is characterized in that The voltage evaluation data includes an index value of the evaluation index, and the step of determining the reference voltage data corresponding to the smart meter based on the first voltage data corresponding to the smart meter and the second voltage data in the abnormal fluctuation signal corresponding to the smart meter includes: Determine a first reference value corresponding to the evaluation index based on the first voltage data; Determine a second reference value corresponding to the evaluation index based on the second voltage data; Determining an index value of the evaluation index based on a first reference value and a second reference value corresponding to the evaluation index and an index value determination method corresponding to the evaluation index; The determining the risk level of the smart meter based on the voltage evaluation data and the reference value corresponding to the evaluation index includes: In the case where there is an abnormal fluctuation signal corresponding to the smart meter, the risk level of the smart meter is determined based on the indicator value corresponding to the evaluation indicator and the reference value corresponding to the evaluation indicator.

5. The method according to claim 1, It is characterized in that The sending of a voltage data acquisition instruction to each of the smart meters comprises: For each of the smart meters, sending a voltage acquisition instruction to each of the smart meters based on a first communication mode corresponding to the smart meter; Determining whether feedback information corresponding to the smart meter is received within a preset time after the voltage acquisition instruction is sent; For each of the smart meters, when the feedback information is not received within the preset time period, a voltage acquisition instruction is sent to the smart meter based on a second communication mode corresponding to the smart meter, where the first communication mode is different from the second communication mode.

6. The method according to claim 5, It is characterized in that After sending the voltage acquisition instruction to the smart meter based on the second communication mode corresponding to the smart meter, the method further includes: Determining whether the feedback information is received within the preset time period after the voltage acquisition instruction is sent; In the case where the feedback information is received within the preset time period, determining that a fault exists in the first communication mode between the concentrator and the smart meter; When the feedback information is not received within the preset time period, it is directly determined that the smart meter is operating abnormally.

7. The method according to claim 5 or 6, It is characterized in that After determining whether the feedback information is received within a preset time after the voltage acquisition instruction is sent, the method further includes: In the case where the feedback information is received within the preset time period, determining whether the format of the feedback information matches a preset voltage data feedback format; In the case where the format of the feedback information does not match the voltage data feedback format, determining whether there is error information in the feedback information; When error information exists in the feedback information, a fault judgment is performed on the smart meter based on the error information.

8. The method according to claim 1, It is characterized in that The performing fault judgment on the smart meter based on the risk level of the smart meter includes: Determining whether the risk level is greater than a preset level threshold; When the risk level is not greater than the level threshold, acquiring historical data corresponding to the smart meter; estimating the remaining useful life of the smart meter based on the historical data; Determining whether the risk level matches the remaining useful life; In a case where the risk level does not match the remaining service life, it is determined that the smart meter has a fault.

9. An electronic device, It is characterized in that The electronic device comprises: at least one processor; Memory; At least one application, wherein the at least one application is stored in a memory and configured to be executed by at least one processor, and the at least one application is configured to: execute the concentrator-based smart meter fault detection method according to any one of claims 1 to 8.

10. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed in a computer, the computer is caused to execute the concentrator-based smart meter fault detection method according to any one of claims 1 to 8.