Alluvial river bank nest collapse early warning method and system and storage medium
Through the numerical simulation method, the finite volume method of non-structural grid is used to perform three-dimensional water and sand transfer calculation, which solves the problem of difficulty in determining location and difficulty in evaluating the warning level in burrowing, and realizes timely warning of the area and intensity of burrowing. , has strong theoretical foundation and engineering application.
Patent Information
- Application Number
- CN202410989097.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-08
AI Technical Summary
The existing river bank nest collapse warning technology is difficult to accurately determine the location and warning level of nest collapse. Especially because the longitudinal dimensions of nest collapse are small and the horizontal and vertical dimensions are comparable, it is difficult to simplify into two-dimensional or one-dimensional problems for processing, resulting in poor early warning effect. .
Using numerical simulation method, three-dimensional water and sand transfer calculation is carried out through the finite volume method of non-structural grids, combined with the vertical complex layering of the river bank, the nest collapse process is simulated, and the nest collapse positioning area, the width and position of the bank collapse area are obtained. Finally, according to The intensity value of the nest collapse and the regional importance level are issued with warning levels.
It realizes a timely warning of the area and intensity of the nest collapse, has strong theoretical basis and engineering application, and the data processing process is accessible, with unique results and operability.
Smart Images

Figure CN118917080A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of river bank collapse warning, and in particular to a method, system and storage medium for warning river bank collapse in alluvial rivers. Background Art
[0002] Collapse is a common type of bank collapse in the middle and lower reaches of the Yangtze River, with the characteristics of rapid development and strong destructive power. The middle and lower reaches of the Yangtze River are important sections of the river for navigation and flood control in my country. However, due to the recent changes in water and sediment conditions, the riverbed has been adjusted accordingly, and bank collapse has occurred frequently in some sections of the river. Large-scale collapse will seriously affect the stability of the local river and the safety of embankments, threatening the safety of people's lives and property. With the extension and promotion of the Yangtze River Economic Belt strategy in the future, it is particularly important to maintain the stability of the riverbed in the middle and lower reaches of the Yangtze River. Collapse warning, as an important means of preventing collapse disasters, cannot be ignored.
[0003] The bank collapse warning method is usually based on the bank collapse monitoring and prediction results, the determination of the bank collapse area and its potential degree of harm, and the release of related information. There are relatively few studies on bank collapse warning, and the application of numerical simulation technology in bank collapse warning in China is also relatively rare. This is related to the limitations of numerical simulation technology itself and the complexity of natural river flow and terrain conditions. In existing studies, the bank collapse warning process is mainly based on the analysis of measured terrain data. The bank collapse danger area is determined by the changes in characteristic indicators such as the depth and bank slope, height, etc., and the bank collapse warning level is divided according to the degree of harm to the life and property safety of the people along the coast. Because nest collapse has the following characteristics, the warning technology is more difficult to implement, and the existing technology does not have a warning method specifically suitable for nest collapse:
[0004] (1) The longitudinal size of a pit collapse is usually tens to hundreds of meters, which is much smaller than the several kilometers of strip collapse, which makes it more difficult to determine the location of a pit collapse;
[0005] (2) The horizontal and vertical dimensions of the pit collapse phenomenon are comparable, so it is a complex three-dimensional problem and is difficult to simplify into a two-dimensional or one-dimensional problem for processing. Summary of the invention
[0006] The present application provides an alluvial river bank pit collapse early warning method, which can solve the problem that there is no early warning method specifically suitable for pit collapse in the existing river bank pit collapse early warning technology; the longitudinal size of pit collapse is usually tens of meters to hundreds of meters, which is much smaller than the several kilometers of strip collapse, making it more difficult to determine the location of pit collapse; the lateral and longitudinal sizes of the pit collapse phenomenon are comparable, which is a complex three-dimensional problem and is difficult to simplify into a two-dimensional problem or a one-dimensional problem for processing.
[0007] In a first aspect, the present application provides an alluvial river bank collapse early warning method, comprising the following steps:
[0008] Collect basic information of the river section to be warned;
[0009] According to the basic information of the river section to be warned, the area where the landslide will occur in the river section to be warned is obtained;
[0010] Numerical simulation is performed on the area where the pit collapse occurs, and the pit collapse location area, the width of the collapsed bank area and the collapsed bank position are obtained;
[0011] According to the collapse location area, bank collapse area width and bank collapse position, the collapse warning level of the riverbank area of the alluvial river is obtained.
[0012] In combination with the first aspect, in one implementation, the step of obtaining the area where the landslide occurs in the river section to be warned based on the basic information of the river section to be warned specifically includes the following steps:
[0013] Obtain the regional continuity of riverbank engineering in the river section to be warned;
[0014] Obtain information on the presence or absence of spur dikes or reefs in the river section to be warned;
[0015] Obtain the preset conditions of the nearshore deep trough area in the river section to be warned to meet the working conditions;
[0016] According to the regional continuity of riverbank engineering, the presence or absence of spur dikes or reef heads, and the preset conditions of the nearshore deep trough area, the collapse occurrence area in the river section to be warned is obtained.
[0017] In combination with the first aspect, in one implementation, in the step of obtaining the preset condition satisfying the working condition of the nearshore deep trough area in the river section to be warned, the preset condition is:
[0018] The lowest point of the trough continues to deepen and the trough moves toward the river bank; and,
[0019] The river bank slope is greater than the critical value; and
[0020] The nearshore water flow velocity is greater than the starting flow velocity of the slope soil.
[0021] In combination with the first aspect, in one embodiment, the numerical simulation of the pit collapse occurrence area to obtain the pit collapse location area and the collapsed bank width and collapsed bank position in the pit collapse occurrence area specifically includes the following steps:
[0022] Based on the finite volume method of unstructured grids, the water and sediment elements at a given time in the area where the collapse occurs are obtained through three-dimensional water and sediment transport calculation;
[0023] Considering the complex vertical stratification of the river bank, the collapse process of the slope unit in the collapse area is calculated;
[0024] Through the information transmission and feedback of the collapse process of water and sediment elements and slope units in the collapse occurrence area under a given time step, the water flow and sediment process in the collapse process are adjusted to simulate the coupled numerical values of water and sediment transport-bed scouring and silting-collapse process in the local river section of the collapse location area;
[0025] The riverbank collapse information acquisition module is communicatively connected to the coupling numerical simulation module, and is used to obtain the collapse positioning area and the width and position of the collapsed bank in the collapse occurrence area according to the coupled numerical values of the water and sediment transport-bed scouring and siltation-collapse process in the local river section of the collapse occurrence area.
[0026] In combination with the first aspect, in one implementation, obtaining the early warning level of the riverbank area of the alluvial river according to the collapse location area, the width of the collapsed bank area and the collapsed bank position specifically includes the following steps:
[0027] According to the width of the collapse bank area in the collapse location area, the collapse intensity value of the collapse location area is obtained;
[0028] According to the collapsed bank position of the collapse location area, the regional importance level of the collapse location area is obtained;
[0029] According to the collapse intensity value and regional importance level of the collapse location area, the collapse warning level of the collapse location area is obtained.
[0030] In combination with the first aspect, in one implementation, obtaining the pit collapse strength value of the pit collapse positioning area according to the collapse bank area width of the pit collapse positioning area specifically includes:
[0031] When the dimple collapse width is less than the first width preset value, the dimple collapse strength value is set to the first dimple collapse strength value;
[0032] When the dimple collapse width is between the first preset width value and the second preset width value, setting the dimple collapse strength value to the second dimple collapse strength value;
[0033] When the dimple collapse width is between the second preset width value and the third preset width value, the dimple collapse strength value is set to the third dimple collapse strength value;
[0034] When the dimple collapse width is between the third preset width value and the fourth preset width value, the dimple collapse strength value is set to the fourth dimple collapse strength value;
[0035] When the dimple collapse width is greater than the fourth preset width value, the dimple collapse strength value is set to a fifth dimple collapse strength value.
[0036] In combination with the first aspect, in one implementation, obtaining the regional importance level of the nest collapse location area according to the collapsed bank position of the nest collapse location area specifically includes the following steps:
[0037] According to the importance of Wobeng area in flood control, shipping and shoreline utilization, and with reference to social and economic benefit indicators and the layout of engineering facilities, the regional importance level of Wobeng positioning area is obtained.
[0038] In a second aspect, the present application provides an alluvial river bank collapse early warning system, comprising:
[0039] The module for acquiring data related to landslides is used to collect basic information of the river section to be warned;
[0040] A collapse area prediction module and a collapse related data acquisition module are used to obtain the collapse occurrence area of the river section to be warned based on the basic information of the river section to be warned;
[0041] A numerical simulation module is connected to the pit collapse area prediction module for numerically simulating the pit collapse area to obtain the pit collapse location area and the bank collapse area width and bank collapse position in the pit collapse area;
[0042] The collapse warning level acquisition module is in communication connection with the data simulation module and is used to obtain the collapse warning level of the riverbank area of the alluvial river according to the collapse positioning area, the width of the collapsed bank area and the collapsed bank position.
[0043] In conjunction with the second aspect, in one implementation, the numerical simulation module includes:
[0044] A riverbed movement prediction unit is connected to the collapse area prediction module for obtaining water and sediment elements at a given time in the collapse area through three-dimensional water and sediment transport calculation based on a finite volume method of an unstructured grid;
[0045] A landslide process prediction unit, which is in communication connection with the landslide area prediction module and is used to calculate the landslide process of the bank slope unit in the landslide occurrence area;
[0046] A coupled numerical simulation module is connected to the collapse process prediction unit for communicating with the collapse process prediction unit, and is used to adjust the water flow and sediment process in the collapse process through information transmission and feedback of water and sediment elements in the collapse occurrence area and the collapse process of the slope unit under a given time step, and simulate the coupled numerical values of the water and sediment transport-bed scouring and silting-collapse process in the local river section of the collapse location area;
[0047] The riverbank collapse information acquisition module is communicatively connected to the coupling numerical simulation module, and is used to obtain the collapse positioning area and the width and position of the collapsed bank in the collapse occurrence area according to the coupled numerical values of the water and sediment transport-bed scouring and siltation-collapse process in the local river section of the collapse occurrence area.
[0048] In a third aspect, the present application provides a computer-readable storage medium, on which is stored an alluvial river bank collapse warning program, wherein when the alluvial river bank collapse warning program is executed by a processor, the steps of the alluvial river bank collapse warning method as described above are implemented.
[0049] The beneficial effects brought by the technical solution provided by the embodiment of the present application include at least:
[0050] Through the alluvial river bank collapse warning method provided in this application, the approximate collapse occurrence area is determined based on the empirical method, and the bank collapse area, bank collapse width, length, possibility, etc. are determined by combining the numerical simulation method. Finally, the collapse warning area and warning level are issued based on the collapse intensity value and regional importance.
[0051] It has a strong theoretical basis and can fully realize the timely early warning of the occurrence area and intensity of nest collapse;
[0052] The data processing process is barrier-free, the results are unique, and it has the characteristics of strong operability and engineering applicability. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Figure 1 A method flow chart of a method for early warning of riverbank collapse in an alluvial river provided in an embodiment of the present application;
[0054] Figure 2 A specific flow chart of the alluvial river bank collapse early warning method provided in the embodiment of the present application;
[0055] Figure 3 (a) is a schematic diagram of the nearshore deep trough in the Zhinan Village section of the lower reaches of the Yangtze River in Yangzhong provided in an embodiment of the present application; Figure 3 (b) is a schematic diagram of the starting distance of the nearshore deep trough and the elevation of the collapsed bank side in the Zhinan Village section of the lower reaches of the Yangtze River provided by the embodiment of the present application;
[0056] Figure 4 A calculation flow chart of the numerical simulation method provided in the embodiment of the present application;
[0057] Figure 5 A diagram of the pit collapse morphology calculated by numerical simulation provided in an embodiment of the present application;
[0058] Figure 6 A comparison diagram of different collapse widths W and dimple collapse strength values R provided in the embodiments of the present application;
[0059] Figure 7 A comparison diagram of bank collapse warning levels determined based on the pit collapse intensity value and the regional importance level provided in the embodiment of the present application;
[0060] Figure 8 A schematic diagram of a local grid of a river provided in an embodiment of the present application.
[0061] Fig. 9 (a) is a legend for explaining the determination of the slope of the grid; Fig. 9 (b) is the force analysis diagram of the grid; Fig. 9 (c) is a legend explaining the terrain adjustment of the grid;
[0062] Fig.10 (a) is a schematic diagram of the local slope stress analysis; Fig.10 Middle (b) is a schematic diagram of local terrain adjustment after local slope collapse;
[0063] Fig.11 A calculation area diagram of the simulation provided in the embodiment of the present application;
[0064] Fig.12 Middle (a) is the surface flow field in the pond; Fig.12 Middle (b) is the middle-level flow field in Wotang; Fig.12 Middle (c) is the bottom flow field in the pond;
[0065] Fig.13 (a) is the simulation result of the deformation of the inner bank of Wotang at t = 4h; Fig.13 (b) is the simulation result of the deformation of the inner bank of Wotang at t = 5.25h; Fig.13 (c) is the simulation result of the deformation of the inner bank of Wotang at t = 6h; Fig.13 (d) is the deformation simulation result of the inner bank of Wotang at t = 6.75h; Fig.13 (e) is the deformation simulation result of the inner bank of Wotang at t = 7.5h; Fig.13 (f) is the deformation simulation result of the inner bank of Wotang at t = 8.25h; Fig.13 (g) is the deformation simulation result of the inner bank of Wotang at t = 9h; Fig.13 The middle (h) is the simulation result of the deformation of the inner bank of Wotang at t = 9.75h;
[0066] Fig.14 A topographic simulation result diagram of a cross section of a Wotang provided in an embodiment of the present application;
[0067] Fig.15 A diagram showing the terrain simulation results in the pond provided in the embodiment of the present application; Fig.15 (a) is the simulated topographic map of the wotang after the wotang collapse; Fig.15 (b) is the actual measured topographic map of the wotang after the collapse. DETAILED DESCRIPTION
[0068] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0069] The terms "including" and "having" and any variations thereof in the specification and claims of this application and the above-mentioned drawings are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices. The terms "first", "second" and "third" are used to distinguish different objects, etc., and do not represent a sequence, nor do they limit "first", "second" and "third" to different types.
[0070] In the description of the embodiments of the present application, "exemplary", "for example" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary", "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary", "for example" or "for example" is intended to present related concepts in a specific way.
[0071] In the description of the embodiments of the present application, unless otherwise specified, “ / ” means or, for example, A / B can mean A or B; the “and / or” in the text is merely a description of the association relationship of associated objects, indicating that three relationships may exist, for example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, in the description of the embodiments of the present application, “multiple” refers to two or more than two.
[0072] In some processes described in the embodiments of the present application, multiple operations or steps that appear in a specific order are included, but it should be understood that these operations or steps may not be executed in the order in which they appear in the embodiments of the present application or in parallel, and the sequence number of the operation is only used to distinguish the different operations, and the sequence number itself does not represent any execution order. In addition, these processes may include more or fewer operations, and these operations or steps may be executed in sequence or in parallel, and these operations or steps may be combined.
[0073] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below with reference to the accompanying drawings.
[0074] First, as Figure 1 As shown, the present application provides an alluvial river bank collapse early warning method, comprising the following steps:
[0075] Step S1, collecting basic information of the river section to be warned;
[0076] Step S2, obtaining the area where the landslide occurs in the river section to be warned according to the basic information of the river section to be warned;
[0077] Step S3, numerically simulate the pit collapse occurrence area to obtain the pit collapse location area and the bank collapse area width and bank collapse position in the pit collapse occurrence area;
[0078] Step S4: Obtain the early warning level of the pit collapse in the riverbank area of the alluvial river according to the pit collapse positioning area, the width of the collapsed bank area and the collapsed bank position.
[0079] This application uses the alluvial river bank collapse warning method provided by this application to determine the approximate collapse occurrence area based on the empirical method, and combines the numerical simulation method to determine the collapsed bank area, collapsed bank width, length, possibility, etc., and finally publishes the collapse warning area and warning level based on the collapse intensity value and regional importance;
[0080] It has a strong theoretical basis and can fully realize the timely early warning of the occurrence area and intensity of nest collapse;
[0081] The data processing process is barrier-free, the results are unique, and it has the characteristics of strong operability and engineering applicability.
[0082] In one embodiment, the step S1, obtaining the area where the landslide occurs in the river section to be warned according to the basic information of the river section to be warned, specifically includes the following steps:
[0083] Step S11, obtaining the regional continuity of the river bank engineering in the river section to be warned;
[0084] Step S12, obtaining information on the existence of spur dikes or reefs in the river section to be warned;
[0085] Step S13, obtaining the preset conditions of the nearshore deep trough area in the river section to be warned to meet the working condition;
[0086] Step S14, according to the regional continuity of the river bank engineering, the existence of spur dikes or reef heads, and the preset conditions of the nearshore deep trough area meeting the working conditions, the collapse occurrence area in the river section to be warned is obtained.
[0087] Based on the above steps and according to the empirical method, a wider area of landslide occurrence is determined in the river section to be warned.
[0088] In one embodiment, in the step S13: obtaining the preset conditions of the nearshore deep trough area in the river section to be warned to meet the working condition, the preset conditions are:
[0089] The lowest point of the trough continues to deepen and the trough moves toward the river bank; and,
[0090] The river bank slope is greater than the critical value; and
[0091] The nearshore water flow velocity is greater than the starting flow velocity of the slope soil.
[0092] In a more specific embodiment, Figure 2 As shown, the step S14, according to the regional continuity of the river bank engineering, the existence of the spur dike or the rock head, and the preset conditions of the nearshore deep trough area satisfying the working conditions, obtains the area where the collapse occurs in the river section to be warned, which is specifically implemented as follows:
[0093] When the river bank engineering is discontinuous in the river section to be warned, or there are spur dikes or rock heads in some parts of the river section to be warned, the river section is selected as the area where the nest collapse occurs;
[0094] When the river bank engineering is continuous and there is no spur dike or reef in the part of the river section to be warned, but there is a nearshore deep trough in the river section to be warned and the preset conditions of the nearshore deep trough area are met, the river section is selected as the landslide occurrence area, such as Figure 3 Middle (a)- Figure 3 (b) is a schematic diagram of the deep trough near the shore of Yangzhong Village in the lower reaches of the Yangtze River.
[0095] In one embodiment, the step S3, performing numerical simulation on the pit collapse occurrence area to obtain the pit collapse location area and the bank collapse area width and bank collapse position in the pit collapse occurrence area, specifically includes the following steps:
[0096] Step S31, based on the finite volume method of unstructured grids, the water and sediment elements of the landslide occurrence area at a given time are obtained through three-dimensional water and sediment transport calculation;
[0097] Step S32: considering the complex vertical stratification of the river bank, calculating the collapse process of the bank slope unit in the collapse occurrence area;
[0098] Step S33: by transmitting and feedback the information of the collapse process of the water and sediment elements and the slope units in the collapse occurrence area under a given time step, the water flow and sediment process in the collapse process are adjusted to simulate the coupling value of the water and sediment transport-bed scouring and silting-collapse process in the local river section of the collapse location area. Figure 5 The predicted collapse topography of Zhinan Village in Yangzhong;
[0099] Step S34, according to the coupling values of the water and sediment transport-bed scouring and silting-dipsum collapse process in the local river section of the dimple collapse occurrence area, obtain the dimple collapse location area and the bank collapse area width and bank collapse position in the dimple collapse occurrence area.
[0100] Based on steps S31 to S34, the collapsed bank area is determined in the pit collapse occurrence area according to the numerical simulation method and defined as the pit collapse positioning area, that is, the pit collapse area with more precise positioning information in the pit collapse occurrence area, and the regional information such as the width, length, collapsed bank position, etc. of the pit collapse positioning area is obtained.
[0101] In one embodiment, the step S31, based on the finite volume method of unstructured grids, obtains the water and sediment elements of the landslide occurrence area at a given time through three-dimensional water and sediment transport calculation, specifically including the following steps:
[0102] Step S311: Obtain the basic conditions and calculation parameters for water and sediment element calculation, and construct an unstructured grid for the river channel:
[0103] The basic conditions are inlet flow, outlet water level, riverbank soil layering data, physical and mechanical characteristic parameters of each layer of soil, initial conditions (including initial riverbed elevation, flow velocity and sediment content distribution), boundary conditions, calculation time period (0~T), calculation time step (dt), and assignment time t=0;
[0104] The calculation parameters are bed roughness height, sediment settling velocity of each particle size group, maximum thickness of riverbed active layer, Coriolis force coefficient, vertical eddy viscosity coefficient, etc. The initial conditions are the initial values of the entire calculation area, including water level, riverbed elevation, flow velocity, sediment content, bed sand gradation, etc. The boundary conditions include upstream given flow, suspended sediment content, water temperature, and downstream given water level;
[0105] The unstructured grid of the river channel is as follows Figure 8 As shown, the specific implementation is:
[0106] According to the measured scattered data of river terrain, the river boundary is drawn to generate the unstructured grid of the river, and the terrain data is interpolated on the grid nodes to obtain the number (1, 2, 3...N) and elevation information of the generalized river grid nodes. The number of grid cells and information about their constituent nodes;
[0107] Step S312: According to the calculation basic conditions and calculation parameters, based on the unstructured grid of the river channel, the finite volume method is used to solve the following non-steady three-dimensional water and sediment transport equations to obtain the water level, stratified flow velocity (V t 1 , V t 2 , V t 3, …, V t N ), flow stratification sediment content Bed surface elevation Water and sand elements:
[0108] The continuity equation, momentum and pressure equations for water flow are as follows:
[0109]
[0110] Where x, y, and z are the coordinates of the east, north, and vertical directions in the rectangular coordinate system, respectively; u, v, and w are the components of the velocity in the x, y, and z directions, respectively (m / s); t is time (s); ρ is the density of water (kg / m 3 ), p is the total pressure (Pa); p a is the air pressure on the water surface (Pa), p H is the hydrostatic pressure (Pa); f is the Coriolis force coefficient; g is the gravitational acceleration (m / s 2 );K m is the vertical eddy viscosity coefficient (m 2 / s), F u 、F v 、F w is the momentum diffusion term (m / s 2 ).
[0111] The vertical mixing of the model adopts the Mellor-Yamada 2.5-order turbulence closed model modified by Galperin et al. (1988), and the horizontal mixing is determined by the horizontal diffusion coefficient (Shi Shenyang et al., 2020), which is suitable for the simulation of water-sediment dynamics in the ocean and tidal river sections. In the boundary layer, the turbulent energy (q 2 ) is generated by the vertical shear of the water flow near the boundary, q 2 and q 2 l can be expressed as:
[0112]
[0113] In the formula, q 2 =(u′ 2 +v′ 2 ) / 2 represents the turbulent energy (m 2 / s 2 ), l represents the turbulence characteristic length (m), K q is the vertical diffusion coefficient of turbulent energy (m 2 / s); E1 = 1.80; F q and F l is the horizontal diffusion term of turbulent energy and turbulent characteristic length (m 2 / s 3), solved using the Smagorinsky formula (Smagorinsky, 1963); are the shear force generation term and buoyancy generation term of turbulent kinetic energy, respectively, where ρ0 is the reference density (kg / m 3 ), ε=q 3 / B1l, is the turbulent energy dissipation rate (m 2 / s 3 ), where parameter B1 = 0.74; is the wall approximation function, where L -1 =(ξ-z) -1 +(H+z) -1 , ξ is the free surface height (m), H is the water depth relative to the reference surface (m), κ = 0.4 is the Karman constant, and E2 = 1.33.
[0114] In the formula, K m and K q The turbulence equation is closed according to the following calculation:
[0115] K m =lqS m Formula (8)
[0116] K q =0.2lq Formula (9)
[0117] In the formula, S m is a stable function, defined as:
[0118]
[0119] In the formula,
[0120] The three-dimensional suspended sediment transport equation is expressed as:
[0121]
[0122] In the formula, subscript i represents the i-th group of sediment; C i represents the concentration of suspended sediment in group i (kg / m 3 ), A hC is the horizontal diffusion coefficient of sediment (m 2 / s), which is set in the model to be the horizontal eddy viscosity coefficient A of the water flow. m Equal, K hC is the vertical diffusion coefficient of suspended sediment (m 2 / s);w i is the settling velocity of the i-th group of suspended sediment (m / s).
[0123] The settling speed w of the i-th group of suspended sediment i Calculated using the following Zhang Ruijin formula:
[0124]
[0125] Where v is the kinematic viscosity of water (m 2 / s), which is related to water temperature.
[0126] The riverbed deformation equation caused by suspended sediment transport can be expressed as:
[0127]
[0128] Where ρ′ is the dry density of bed sand (kg / m 3 ), z B is the riverbed elevation (m), t is the time in seconds, where D i and E i is the sedimentation flux on the bottom interface (kg / (m 2 .s)) and upward flux (kg / (m 2 .s)), calculated by the following formula:
[0129]
[0130]
[0131] Where P r is the probability of sediment deposition; C bi is the suspended sediment concentration near the bottom (kg / m 3 ), τ b is the shear stress of the water flow on the bottom of the riverbed (N / m 2 ), τ di is the critical sedimentation stress of the i-th group of sediment (N / m 2 ), E e is the erosion coefficient of sediment (kg / (m 2 .s)), φ is the porosity of the upper layer of the riverbed, τ ei is the starting shear stress of the i-th group of sediment (N / m 2 ).
[0132] Based on the results of the generalized flume test, the shear stress formula considering the influence of turbulent energy is used to calculate the τ b , the calculated results are in good agreement with the measured results:
[0133] τ b =CρE
[0134] In the formula, τ b is the shear stress of the water flow on the bottom of the riverbed (N / m 2 ); E is the turbulent energy at the bottom of the riverbed (m 2 / s 2 ), ρ is the density of water (kg / m3 ); C is the coefficient, and its value is 0.19.
[0135] The shear stress of water flow on the bottom of the riverbed τ b The calculation is done using the following formula:
[0136]
[0137] In the formula, τ bx and τ by are the shear stresses at the bottom of the riverbed in the x and y directions (N / m 2 ), C d is the drag coefficient, calculated as C d =max[κ 2 / ln(z ab / z0),C dmin ], where Z ab and Z o are the thickness of the bottom water layer (m) and the roughness height of the riverbed (m), respectively. dmin It is the minimum value of the drag coefficient, which is generally 0.0075 in shallow water conditions and 0.0025 in deep water conditions.
[0138] The initial shear stress τ of the i-th group of sediment ei The calculation is done using the following formula:
[0139]
[0140] In the formula, γ s , γ are the natural bulk density of sediment and water bulk density (N / m 3 ), d i is the representative particle size of the i-th group of sediment (m), c is a constant with a value of 2.9×10 -4 N / m.
[0141] In one embodiment, step S32, taking into account the complex vertical stratification of the river bank, calculating the collapse process of the bank slope unit in the collapse occurrence area, specifically includes the following steps:
[0142] Step S321, determining the bank slope, is specifically implemented as follows:
[0143] The unstructured grid of the local slope is Figure 8 As shown in the figure, A, B, and C are grid unit nodes on the bank slope, and △ABC is a grid unit on the bank slope. For the bank slope at unit △ABC, its slope is the angle ∠AQP between the △ABC surface and the horizontal plane.
[0144] Step S322: Based on the average elevation of the grid unit nodes (A, B, C), determine the soil layer to which the grid unit △ABC belongs, and then determine the soil physical and mechanical characteristic parameters (internal friction angle, Soil cohesion c, soil bulk density γ). For the slope with a slope of ∠AQP, the stress analysis is carried out, such as Figure 4 As shown in (b). Safety factor F of slope element ABC s The safety factor F of the local riverbank deformation in the predicted pit collapse area is calculated according to the following formula: s :
[0145]
[0146] Where N is the normal force component on the assumed sliding surface QS (N); is the friction coefficient, is the internal friction angle (°); c is the soil cohesion (kPa); L is the length of the assumed sliding surface (m); W = γV ABC is the gravity of the soil on the sliding surface (N), γ is the bulk density of the soil (N / m 3 ), if the center of gravity of the slope unit is above the water surface, γ is the dry bulk density of the soil (N / m 3 ), if the center of gravity of the slope unit is below the water surface, γ is taken as the wet bulk density (N / m 3 ), α and θ are the slope angle of the bank slope unit and the angle between the assumed sliding surface and the horizontal plane, respectively. In this application, θ is taken as 0.9α.
[0147] If the river bank soil is sandy, the cohesion is zero, and equation (20) is transformed into:
[0148]
[0149] Step S323, according to the obtained safety factor of the local riverbank deformation, the collapse process of the bank slope unit in the collapse occurrence area is obtained, which is specifically implemented as follows:
[0150] If the safety factor of the bank deformation is greater than the critical value of the safety factor of the bank deformation, the bank slope unit is determined to be stable and will not collapse. If the safety factor of the bank deformation is not greater than the critical value of the safety factor of the bank deformation, the bank slope unit is determined to be unstable and will collapse. According to the Technical Specifications for Building Slope Engineering, the critical value of the safety factor of the bank deformation F sc The value ranges from 1.05 to 1.35.
[0151] In this simulation, the above-mentioned bank collapse calculation is activated once every preset time step to calculate and obtain the collapse process of the slope unit in the collapse occurrence area. Specifically, the above-mentioned bank collapse calculation is activated once every 300 time steps, and the number of iterations of each bank collapse calculation is 10.
[0152] According to the collapse process of the bank slope unit in the collapse occurrence area obtained in step S322, the bed surface elevation in the water and sand element in the collapse occurrence area calculated and obtained in step S321 is adjusted, which is specifically implemented as follows:
[0153] The topographic change is achieved by rotating the slope unit around the horizontal axis. The effect is equivalent to the collapse of the slope soil in the upper part of the unit (above the horizontal axis) and being transported to the lower part of the unit ( Fig. 9 (c)). The angle of each rotation is β. If β is too large, the local terrain will change drastically in a very short time, which is not conducive to the stability of the model. This application sets β as 0.1°. In each calculation time step, the bank collapse calculation module can be iteratively executed n times, and each time the unstable slope unit (safety factor is less than the critical value) is rotated. The number of iterations in a unit time step that makes all slope nodes in a stable state is recorded as J. When n<J, it takes a certain amount of time for the slope to reach a stable state, which is consistent with the facts. In addition, the bank collapse calculation can be activated once every M time steps. The value of M is affected by the characteristics of the river bank soil. Finally, the stable riverbed elevation data at time t is obtained.
[0154] The riverbed elevation data calculated above The three-dimensional water and sand numerical calculation is fed back to step S312 to perform simulation calculation at the next time (t+dt) to obtain the water and sand elements at the time (t+dt).
[0155] Determine whether the time t is greater than the calculation time T: If t≤T, repeat steps S31 and S32, and calculate the collapse process of water and sand elements and slope units at different coupling times in turn; if t>T, the calculation process ends, and the riverbed elevation at different times t (0, 1×dt, 2×dt, ..., T) in the time period 0-T is obtained. Sand content and flow rate
[0156] The water-sediment elements and the collapse process of the slope unit at different times t in the 0-T time period are combined into Fig.10 , Fig.11 and Fig.12 , to show the movement of water and sand and riverbank collapse during beach deformation.
[0157] Simulation example: Taking the upper reaches of the Yangtze River in Yangzhong as an example, the river channel morphology is as follows: Fig.10 As shown, the total length of the river is about 38km.
[0158] Fig.10 The flow velocity distribution of the surface, middle and bottom layers of the pond calculated in this embodiment is shown. Fig.11 It further shows the shore deformation process calculated in this embodiment. Fig.12 A comparison between the shore and beach topography at the end of the calculation and the actual topography after the collapse is given. It can be seen that the calculated values are consistent with the measured values.
[0159] Fig.13 The deformation simulation result of the inner bank of the pond provided in the embodiment of the present application; Fig.14 The topographic simulation result of the cross section of the Wotang provided in the embodiment of the present application; Fig.15 This is the terrain simulation result of the pond provided in the embodiment of the present application.
[0160] In one embodiment, the step S33 adjusts the water flow and sediment process in the collapse process through information transmission and feedback of the water and sediment elements and the collapse process of the slope unit in the collapse occurrence area under a given time step, and simulates the coupled numerical value of the water and sediment transport-bed scouring and silting-collapse process in the local river section of the collapse positioning area, and is realized by adjusting the water flow and sediment process in the collapse process through information transmission and feedback under a given time step N, thereby realizing the coupled numerical simulation of the water and sediment transport-bed scouring and silting-collapse process in the local river section, which is specifically realized as follows:
[0161] like Figure 4 As shown, given the initial conditions, the current time step number N t is 0. After executing the three-dimensional water-sediment dynamics calculation of step S31 and step S32, it is judged whether the area where the collapse occurs is a bank collapse. If it is a bank collapse, the river bank morphology is changed. If it is not a bank collapse, the judgment of whether the area where the collapse occurs is a bank collapse is executed for the next time step, until the judgment of whether the bank collapse is completed for all the areas where the collapse occurs and the river bank morphology change operation of the water flow and sediment process in the corresponding collapse process are completed.
[0162] In one embodiment, the step S34, according to the coupled values of the water and sediment transport-bed scouring and silting-dip collapse process in the local river section of the pit collapse occurrence area, obtains the pit collapse location area and the width and position of the collapsed bank area in the pit collapse occurrence area, which is specifically implemented as follows:
[0163] Based on the water and sand elements in step S31 and the calculation results of steps S32, S33 and the riverbed elevation change process, tecplot and other software are used to draw the water and sand elements and riverbed elevation change map, and then the location coordinates, width, length, plane area, internal flow velocity and sediment content parameters of the pit collapse are read in the map, and the change process of the above parameters over time is plotted in Excel, which is the development process of the pit collapse in the study area.
[0164] In one embodiment, the step S4, obtaining the early warning level of the riverbank area of the alluvial river according to the collapse location area, the width of the bank collapse area and the bank collapse position, specifically includes the following steps:
[0165] Step S41, obtaining the pit collapse intensity value of the pit collapse positioning area according to the width of the collapse bank area of the pit collapse positioning area;
[0166] Step S42, obtaining the regional importance level of the collapse location area according to the collapse bank position of the collapse location area;
[0167] Step S43: Obtain the pit collapse warning level of the pit collapse locating area according to the pit collapse intensity value and the area importance level of the pit collapse locating area.
[0168] In one embodiment, the step S41 of obtaining the pit collapse strength value of the pit collapse positioning area according to the width of the collapse bank area of the pit collapse positioning area specifically includes:
[0169] When the dimple collapse width is less than the first width preset value, the dimple collapse strength value is set to the first dimple collapse strength value;
[0170] When the dimple collapse width is between the first preset width value and the second preset width value, setting the dimple collapse strength value to the second dimple collapse strength value;
[0171] When the dimple collapse width is between the second preset width value and the third preset width value, the dimple collapse strength value is set to the third dimple collapse strength value;
[0172] When the dimple collapse width is between the third preset width value and the fourth preset width value, the dimple collapse strength value is set to the fourth dimple collapse strength value;
[0173] When the dimple collapse width is greater than the fourth preset width value, the dimple collapse strength value is set to a fifth dimple collapse strength value.
[0174] In a specific embodiment, the step S41 of obtaining the pit collapse strength value of the pit collapse positioning area according to the width of the collapse bank area of the pit collapse positioning area specifically includes:
[0175] like Figure 6As shown, when the width of the nest collapse is less than 5m, the nest collapse strength value R is 0.00; when the width of the nest collapse is between 5m-20m, the nest collapse strength value R is 0.25; when the width of the nest collapse is between 20m-50m, the nest collapse strength value R is 0.5; when the width of the nest collapse is between 50m-80m, the nest collapse strength value R is 0.75; when the width of the nest collapse is greater than 80m, the nest collapse strength value R is 1.00.
[0176] In one embodiment, the step S42 of obtaining the regional importance level of the nest collapse positioning area according to the collapsed bank position of the nest collapse positioning area specifically includes the following steps:
[0177] According to the importance of the Wobeng area in the fields of flood control, shipping and shoreline utilization, and with reference to social and economic benefit indicators and the layout of engineering facilities, the regional importance level of the Wobeng location area is obtained, which is specifically divided into A level, B level and C level, and the definition of each regional importance level is as follows:
[0178] Level A: Bank collapse will pose a direct threat to the lives and property of people and the safety of important infrastructure in the warning area;
[0179] B level: bank collapse will cause great safety hazards to the warning area;
[0180] Level C: Bank collapse will cause general safety hazards to the warning area.
[0181] In one embodiment, step S43: obtaining the collapse warning level of the collapse locating area according to the collapse intensity value and the regional importance level of the collapse locating area, so that the collapse warning level becomes higher as the collapse intensity value becomes larger and the region becomes more important, and the collapse warning levels are respectively level I, level II, and level III from low to high.
[0182] In a more specific embodiment, the step S43: obtaining the nest collapse warning level of the nest collapse location area according to the nest collapse intensity value and the regional importance level of the nest collapse location area is specifically implemented as follows:
[0183] The collapse intensity value is 0.00 or 0.25, and the regional importance level of the collapse area is A, and the corresponding collapse warning level is I;
[0184] The collapse intensity value is 0.5 or 0.75, and the regional importance level of the collapse area is B, and the corresponding collapse warning level is II;
[0185] The pit collapse intensity value is 1.00, and / or the regional importance level of the pit collapse area is C level, and the corresponding pit collapse warning level is III level.
[0186] In other embodiments of the present application, it is also possible to Figure 7, to achieve comparative judgment of the cave-in warning level under different combinations of cave-in intensity values and regional importance levels of the cave-in area.
[0187] In the second aspect, the present application provides an alluvial river bank collapse warning system, including a collapse-related data acquisition module, a collapse area prediction module, a numerical simulation module, and a collapse warning level acquisition module. The collapse-related data acquisition module is used to collect basic information of the river section to be warned; the collapse area prediction module is connected to the collapse-related data acquisition module, and is used to obtain the collapse occurrence area of the river section to be warned based on the basic information of the river section to be warned; the numerical simulation module is connected to the collapse area prediction module in communication, and is used to perform numerical simulation on the collapse occurrence area, and obtain the collapse location area and the bank collapse area width and bank collapse position in the collapse occurrence area; the collapse warning level acquisition module is connected to the data simulation module in communication, and is used to obtain the collapse warning level of the alluvial river bank area based on the collapse location area, the bank collapse area width and bank collapse position.
[0188] In one embodiment, the numerical simulation module includes:
[0189] A riverbed movement prediction unit is connected to the collapse area prediction module for obtaining water and sediment elements at a given time in the collapse area through three-dimensional water and sediment transport calculation based on a finite volume method of an unstructured grid;
[0190] A landslide process prediction unit, which is in communication connection with the landslide area prediction module and is used to calculate the landslide process of the bank slope unit in the landslide occurrence area;
[0191] A coupled numerical simulation module is connected to the collapse process prediction unit for communicating with the collapse process prediction unit, and is used to adjust the water flow and sediment process in the collapse process through information transmission and feedback of water and sediment elements in the collapse occurrence area and the collapse process of the slope unit under a given time step, and simulate the coupled numerical values of the water and sediment transport-bed scouring and silting-collapse process in the local river section of the collapse location area;
[0192] The riverbank collapse information acquisition module is communicatively connected to the coupling numerical simulation module, and is used to obtain the collapse positioning area and the width and position of the collapsed bank in the collapse occurrence area according to the coupled numerical values of the water and sediment transport-bed scouring and siltation-collapse process in the local river section of the collapse occurrence area.
[0193] Among them, the functional implementation of each module in the above-mentioned alluvial river bank collapse early warning method device corresponds to the various steps in the above-mentioned alluvial river bank collapse early warning method embodiment, and its functions and implementation processes will not be repeated here one by one.
[0194] In a third aspect, an embodiment of the present application provides a method and device for early warning of riverbank collapse in an alluvial river. The method and device for early warning of riverbank collapse in an alluvial river may be a personal computer (PC), a laptop computer, a server, or other device with data processing capabilities.
[0195] The communication interface includes an input / output (I / O) interface, a physical interface, and a logical interface, etc., which are used to interconnect the devices inside the alluvial river bank collapse warning method device, and an interface used to interconnect the alluvial river bank collapse warning method device with other devices (such as other computing devices or user devices). The physical interface can be an Ethernet interface, an optical fiber interface, an ATM interface, etc.; the user device can be a display (Display), a keyboard (Keyboard), etc.
[0196] The memory can be various types of storage media, such as random access memory (RAM), read-only memory (ROM), non-volatile RAM (NVRAM), flash memory, optical storage, hard disk, programmable ROM (PROM), erasable PROM (EPROM), electrically erasable PROM (EEPROM), etc.
[0197] The processor may be a general-purpose processor, which may call the alluvial river bank collapse early warning method program stored in the memory and execute the alluvial river bank collapse early warning method provided in the embodiment of the present application. For example, the general-purpose processor may be a central processing unit (CPU). The method executed when the alluvial river bank collapse early warning method program is called may refer to the various embodiments of the alluvial river bank collapse early warning method of the present application, which will not be described in detail here.
[0198] Those skilled in the art will appreciate that the hardware structure shown in FIG. 2 does not constitute a limitation on the present application and may include more or fewer components than shown in the figure, or a combination of certain components, or a different arrangement of components.
[0199] In a fourth aspect, an embodiment of the present application also provides a readable storage medium.
[0200] The readable storage medium of the present application stores a program of an early warning method for riverbank collapse of an alluvial river. When the program of an early warning method for riverbank collapse of an alluvial river is executed by a processor, the steps of the above-mentioned early warning method for riverbank collapse of an alluvial river are implemented.
[0201] Among them, the method implemented when the alluvial river bank collapse warning method program is executed can refer to the various embodiments of the alluvial river bank collapse warning method of the present application, and will not be repeated here.
[0202] It should be noted that the serial numbers of the above-mentioned embodiments of the present application are only for description and do not represent the advantages or disadvantages of the embodiments.
[0203] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, disk, CD) as described above, and includes a number of instructions for a terminal device to execute the methods described in each embodiment of the present application.
[0204] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A method for early warning of riverbank collapse in alluvial rivers, characterized in that: The steps include: Collect basic information of the river section to be warned; According to the basic information of the river section to be warned, the area where the landslide will occur in the river section to be warned is obtained; Numerical simulation is performed on the area where the pit collapse occurs, and the pit collapse location area, the width of the collapsed bank area and the collapsed bank position are obtained; According to the collapse location area, bank collapse area width and bank collapse position, the collapse warning level of the riverbank area of the alluvial river is obtained.
2. The alluvial river bank collapse early warning method according to claim 1, characterized in that: The step of obtaining the area where the collapse of the river section to be warned occurs based on the basic information of the river section to be warned specifically includes the following steps: Obtain the regional continuity of riverbank engineering in the river section to be warned; Obtain information on the presence or absence of spur dikes or reefs in the river section to be warned; Obtain the preset conditions of the nearshore deep trough area in the river section to be warned to meet the working conditions; According to the regional continuity of riverbank engineering, the existence of spur dikes or reef heads, and the preset conditions of the nearshore deep trough area, the area where the collapse occurs in the river section to be warned is obtained.
3. The alluvial river bank collapse early warning method according to claim 2, characterized in that: In the step of obtaining the preset conditions for the nearshore deep trough area in the river section to be warned, the preset conditions are: The lowest point of the trough continues to deepen and the trough moves toward the river bank; and, The river bank slope is greater than the critical value; and The nearshore water flow velocity is greater than the starting flow velocity of the slope soil.
4. The alluvial river bank collapse early warning method according to claim 1, characterized in that: The method of numerically simulating the pit collapse occurrence area to obtain the pit collapse location area, the bank collapse area width and the bank collapse position in the pit collapse occurrence area specifically includes the following steps: Based on the finite volume method of unstructured grids, the water and sediment elements at a given time in the area where the collapse occurs are obtained through three-dimensional water and sediment transport calculation; Calculate the collapse process of the slope unit in the collapse occurrence area; Through the information transmission and feedback of the collapse process of water and sediment elements and slope units in the collapse occurrence area under a given time step, the water flow and sediment process in the collapse process are adjusted to simulate the coupled numerical values of water and sediment transport-bed scouring and silting-collapse process in the local river section of the collapse location area; The riverbank collapse information acquisition module is communicatively connected to the coupling numerical simulation module, and is used to obtain the collapse positioning area and the width and position of the collapsed bank in the collapse occurrence area according to the coupled numerical values of the water and sediment transport-bed scouring and siltation-collapse process in the local river section of the collapse occurrence area.
5. The alluvial river bank collapse early warning method according to claim 1, characterized in that: The method of obtaining the early warning level of the riverbank area of the alluvial river according to the collapse location area, the width of the bank collapse area and the bank collapse position specifically includes the following steps: According to the width of the collapse bank area in the collapse location area, the collapse intensity value of the collapse location area is obtained; According to the collapsed bank position of the collapse location area, the regional importance level of the collapse location area is obtained; According to the collapse intensity value and regional importance level of the collapse location area, the collapse warning level of the collapse location area is obtained.
6. The alluvial river bank collapse early warning method according to claim 1, characterized in that: The step of obtaining the pit collapse strength value of the pit collapse positioning area according to the width of the collapse bank area of the pit collapse positioning area specifically includes: When the dimple collapse width is less than the first width preset value, the dimple collapse strength value is set to the first dimple collapse strength value; When the dimple collapse width is between the first preset width value and the second preset width value, setting the dimple collapse strength value to the second dimple collapse strength value; When the dimple collapse width is between the second preset width value and the third preset width value, the dimple collapse strength value is set to the third dimple collapse strength value; When the dimple collapse width is between the third preset width value and the fourth preset width value, the dimple collapse strength value is set to the fourth dimple collapse strength value; When the dimple collapse width is greater than the fourth preset width value, the dimple collapse strength value is set to a fifth dimple collapse strength value.
7. The alluvial river bank collapse early warning method according to claim 1, characterized in that: The step of obtaining the regional importance level of the collapse location area according to the collapse bank position of the collapse location area specifically includes the following steps: According to the importance of Wobeng area in flood control, shipping and shoreline utilization, and with reference to social and economic benefit indicators and the layout of engineering facilities, the regional importance level of Wobeng positioning area is obtained.
8. An alluvial river bank collapse early warning system, characterized in that: include: The module for acquiring data related to landslides is used to collect basic information of the river section to be warned; A collapse area prediction module and a collapse related data acquisition module are used to obtain the collapse occurrence area of the river section to be warned based on the basic information of the river section to be warned; A numerical simulation module is connected to the pit collapse area prediction module for numerically simulating the pit collapse area to obtain the pit collapse location area and the bank collapse area width and bank collapse position in the pit collapse area; The collapse warning level acquisition module is in communication connection with the data simulation module and is used to obtain the collapse warning level of the riverbank area of the alluvial river according to the collapse positioning area, the width of the collapsed bank area and the collapsed bank position.
9. The alluvial river bank collapse early warning system as claimed in claim 8, characterized in that: The numerical simulation module comprises: A riverbed movement prediction unit is connected to the collapse area prediction module for obtaining water and sediment elements at a given time in the collapse area through three-dimensional water and sediment transport calculation based on a finite volume method of an unstructured grid; A landslide process prediction unit, which is in communication connection with the landslide area prediction module and is used to calculate the landslide process of the bank slope unit in the landslide occurrence area; A coupled numerical simulation module is connected to the collapse process prediction unit for communicating with the collapse process prediction unit, and is used to adjust the water flow and sediment process in the collapse process through information transmission and feedback of water and sediment elements in the collapse occurrence area and the collapse process of the slope unit under a given time step, and simulate the coupled numerical values of the water and sediment transport-bed scouring and silting-collapse process in the local river section of the collapse location area; The riverbank collapse information acquisition module is communicatively connected to the coupling numerical simulation module, and is used to obtain the collapse positioning area and the width and position of the collapsed bank in the collapse occurrence area according to the coupled numerical values of the water and sediment transport-bed scouring and siltation-collapse process in the local river section of the collapse occurrence area.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores an alluvial river bank collapse warning program, wherein when the alluvial river bank collapse warning program is executed by the processor, the steps of the alluvial river bank collapse warning method as described in any one of claims 1 to 7 are implemented.
