Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

326results about How to "Timely warning" patented technology

Video monitoring personnel behavior identification method and system

The invention relates to the technical field of image processing, and discloses a video monitoring personnel behavior identification method and system. The method comprises the following steps: performing action node and joint angle extraction processing on a positioning area to obtain human body action skeleton sequence data; constructing an action connection graph and a time sequence association edge, and carrying out behavior pattern learning processing to obtain space-time behavior characteristics; performing action semantic mapping processing on the spatio-temporal behavior features and the human body behavior feature vectors, and performing behavior time sequence chain construction processing to obtain behavior semantic description features; and performing behavior pattern matching and anomaly measurement processing on the behavior semantic description features, performing feature discrimination processing to obtain a behavior type identifier and an anomaly degree index, performing behavior persistence analysis processing, and performing behavior risk level evaluation processing to obtain a behavior recognition result and early warning information. According to the invention, based on multi-modal feature fusion and spatio-temporal behavior modeling, accurate identification of personnel behaviors and dynamic assessment of risk levels are realized.
Owner:JIUZHU IOT TECH CO LTD

Water quality detection method and system

The invention relates to the technical field of water quality detection, discloses a water quality detection method and system, and aims to overcome the limitation of a traditional water quality detection method and realize real-time prediction and monitoring of water quality change. According to the method and the system, firstly, historical and real-time water quality data are collected through a data acquisition layer, and the data cover various pollutant concentrations and environmental parameters; the data preprocessing layer is responsible for data cleaning, missing value processing and abnormal value detection, and data quality is ensured. And the model training and verification layer adopts a machine learning algorithm to train and verify the water quality change prediction model, and optimizes the performance of the model through parameter tuning. And the prediction and application layer inputs real-time data into the model, predicts future water quality change, analyzes a prediction result to identify a potential pollution event, and adjusts a water treatment strategy according to the potential pollution event. According to the invention, the timeliness and accuracy of water quality detection are improved, and water resource management and environmental protection are facilitated.
Owner:SICHUAN YUNNUOXIN TESTING TECH CO LTD

Management system for real-time monitoring and early warning of mine coal and gas outburst parameters

The invention discloses a management system for real-time monitoring and early warning of mine coal and gas outburst parameters, and belongs to the field of safety production, and the management system specifically comprises the steps: collecting gas and ground stress data in a mine in real time through a gas sensor and a microseismic sensor, and carrying out the real-time monitoring and early warning of the mine coal and gas outburst parameters through a time sequence analysis and spatial data mining technology and a multi-scale coupling strategy; identifying the change rule and potential correlation of the crustal stress and the gas parameters; a comprehensive outburst analysis and prediction model is established, the coal and gas outburst risk level is evaluated, and a three-level early warning mechanism and an emergency plan are designed; the method can be flexibly adjusted according to actual conditions of a mine, coal and gas outburst accidents are effectively prevented and controlled, and the safety of the mine is improved.
Owner:XIAN XIKE MEASUREMENT & CONTROL EQUIP CO LTD

Dynamic hydrological coupling data analysis method and system for complex drainage basin

The invention relates to the technical field of hydrological data analysis, in particular to a dynamic hydrological coupling data analysis method and system for a complex watershed. The method comprises the following steps: acquiring historical meteorological data, historical hydrological data and historical remote sensing data, and performing hydrological cycle simulation analysis to generate a rainfall-evaporation-permeation-runoff hydrological cycle simulation model; performing drainage basin gridding processing on the rainfall-evaporation-permeation-runoff hydrological cycle simulation model to generate a hydrological cycle gridding model; obtaining actually measured meteorological data and actually measured hydrological data, and carrying out space-time simulation division and hydrological space-time correlation analysis to obtain a hydrological change space-time correlation correlation relationship among the sub-partitions of each drainage basin; and performing drainage basin space-time coupling early warning processing on the hydrological cycle gridding model to generate a hydrological change space-time coupling early warning response result corresponding to the complex drainage basin. The method can accurately analyze and predict the hydrological change and the mutual coupling relation thereof in the complex watershed.
Owner:HEBEI PROVINCE BAODING HYDROLOGICAL SURVEY RES CENT

Power distribution network overhead line risk refined early warning method and system

The invention discloses a power distribution network overhead line risk refined early warning method and system. The method comprises the following steps: collecting meteorological time sequence data and power distribution network topology and line parameter data; and preprocessing the data, and constructing a prediction data set. And establishing a fault probability prediction model based on the meteorological data and the line parameters. Calculating the fault probability by using the mathematical model, correcting the model, training in combination with static topology and dynamic meteorological data, and constructing a fault probability network model. And analyzing the importance of the nodes and lines of the power distribution network, and evaluating the load loss proportion of the nodes. And carrying out normalization processing on the importance indexes. And comprehensively calculating the predicted fault probability, the node loss load and the importance index to obtain a branch risk parameter. Fine early warning is carried out according to a set early warning threshold value, and dynamic adjustment is carried out to adapt to the actual operation condition. The method has the advantages that comprehensive risk assessment is provided, and the accuracy of fault prediction and the timeliness of risk early warning are improved.
Owner:HUAZHONG UNIV OF SCI & TECH +1

Pig health monitoring method based on multi-source information fusion

The invention provides a live pig health monitoring method based on multi-source information fusion, and the method comprises the steps: collecting the sound data of a live pig in a natural environment, carrying out the classification and preprocessing of the sound data, forming a sound sample data set, inputting an LSTM neural network model, and carrying out the training, and obtaining a sound detection model; acquiring a live pig attitude image to obtain an attitude sample data set, and inputting the live pig attitude sample data set into the YOLOv5s model for training to obtain an attitude detection model; inputting live pig sound data collected in real time, preprocessing the data, and inputting the data into the sound detection model to obtain sound features; inputting live pig attitude images collected in real time into the attitude detection model to obtain attitude features; measuring the body temperature of the live pig by using an infrared temperature sensor, measuring the weight of the live pig by using a weight sensor, and fusing the sound feature, the posture feature, the body temperature and the weight to obtain a fusion vector; and inputting the fusion vector into a random forest classifier for decision making, and determining the health state of the live pig. According to the method, multi-modal data are fused, comprehensive evaluation and diagnosis of the health condition of the live pigs are facilitated, and the accuracy and robustness of the whole monitoring system are further improved.
Owner:HENAN INST OF SCI & TECH

River section water quality prediction method based on combined machine learning model

The invention provides a river section water quality prediction method based on a combined machine learning model, and the method comprises the steps: building river monitoring section long-time sequence water quality big data, standardizing and supplementing water quality index data, preparing a water quality index data set and a water quality evaluation data set, and selecting and processing water quality big data features. Developing a water quality prediction model based on a combined machine learning algorithm, evaluating the performance of the water quality prediction model, and testing the generalization ability of the water quality prediction model. The correlation of river section historical data in a time sequence is fully utilized, the model not only improves the accuracy and real-time performance of water quality prediction, but also enhances the response capability to sudden water quality events, the monitoring and early warning cost is remarkably reduced, the efficiency and scientificity of water environment management are improved, and the method is suitable for popularization and application. The self-learning capability and the high-frequency data processing capability of the system ensure timely updating and long-term effectiveness of a prediction result, and provide solid technical support for water pollution prevention and control and water quality management.
Owner:NORTHWEST UNIV

Power grid main equipment fault diagnosis method and system based on voiceprint cloud edge cooperation

The invention belongs to the technical field of power grid main equipment diagnosis, and provides a power grid main equipment fault diagnosis method and system based on voiceprint cloud edge collaboration, which adopts a new cloud edge collaboration method and divides the analysis of voiceprint monitoring data into two stages. According to the method, the exception detection model is deployed on the edge side, exception analysis of mass voiceprint data is achieved, concurrent requests of a large number of concurrent signals at the cloud side are avoided, and the timeliness of voiceprint monitoring and analysis is improved. In the cloud, a multi-modal defect identification method fusing voiceprint, visible light, infrared and other multi-source data is deployed, secondary classification of sound abnormal signals is realized, and the reliability of equipment operation, maintenance and management is improved.
Owner:STATE GRID INTELLIGENCE TECHNOLOGY CO LTD

Coal mine goaf gas abnormal emission monitoring and early warning method and system based on natural wind pressure change

The invention relates to a coal mine goaf gas abnormal emission monitoring and early warning method and system based on natural wind pressure changes, and belongs to the technical field of coal mine safety monitoring and early warning. The method comprises the following steps: acquiring ground atmospheric pressure change data in real time through a ground atmospheric pressure sensor, and acquiring underground air pressure and gas concentration change data in real time through air pressure sensors and gas sensors of a goaf and a working face; transmitting the acquired ground atmospheric pressure change data and the underground air pressure and gas concentration change data to a ground control center, and performing data storage and primary processing on the data by the ground control center; the ground control center calculates the ground atmospheric pressure, the underground air pressure and the underground gas concentration change conditions and analyzes the ground atmospheric pressure, the underground air pressure and the underground gas concentration change conditions to obtain an early warning grade value; and according to the early warning grade value, determining an early warning grade, and giving an early warning measure corresponding to the early warning grade. The system implements the method to ensure the safety of mine operators and the stability of the mine environment.
Owner:CHINA COAL TECH & ENG GRP CHONGQING RES INST CO LTD

Electric power meteorological disaster risk early warning method and system based on artificial intelligence

The invention relates to an electric power meteorological disaster risk early warning method and system based on artificial intelligence. The method comprises the following steps: cleaning and preprocessing basic meteorological data including temperature, humidity, wind speed and precipitation to obtain a cleaned basic meteorological data set; on the basis of satellite cloud picture or radar image data, meteorological changes are modeled through a neural network model, assimilation features are obtained, and the basic meteorological data and the assimilation features are spliced to form a joint feature vector; and constructing a comprehensive disaster risk assessment model based on the meteorological factors, the power grid factors and the geographic information, carrying out training and multi-objective optimization on the comprehensive disaster risk assessment model, and carrying out real-time electric power meteorological disaster risk early warning by using the optimized comprehensive disaster risk assessment model. According to the invention, meteorological data, power grid equipment states and geographic information can be monitored in real time, meteorological disasters possibly suffered by power equipment can be accurately warned, and the safety and stability of a power system are improved.
Owner:NANCHANG KECHEN ELECTRIC POWER TEST & RES CO LTD +1

Mine multi-dimensional fusion intelligent monitoring and early warning system method

The invention relates to the technical field of coal mine dynamic disaster monitoring and early warning, and discloses a mine multi-dimensional fusion intelligent monitoring and early warning system and method. The system is a whole time-space integrated with twelve modules including an original data acquisition module, a mining condition analysis module, a data transmission module, data early-stage preprocessing, expert analysis and demonstration, optimal parameter delineation, basic theory calculation, numerical simulation analysis, laboratory verification, machine learning and neural network optimization, coupling model construction and field application detection. The invention discloses a multi-scale and multi-parameter coupling monitoring and early warning model and system. According to the mine multi-dimensional fusion intelligent monitoring and early warning system and method provided by the invention, a multi-level means is utilized, the limitation of a traditional single scheme or the subjectivity of single human interference is avoided, and the purpose of effectively preventing mine dynamic disasters can be achieved to a great extent; the method is of great significance to monitoring and early warning of coal rock gas hybrid dynamic disasters and safety production of mines.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Battery early warning method, device and platform and storage medium

The embodiment of the invention discloses a battery early warning method and device, a platform and a storage medium. The battery early warning method comprises the steps of obtaining battery working condition data of a to-be-detected battery in a preset time period; performing feature extraction on the battery working condition data to obtain trend change features of the to-be-detected battery; comparing the trend change characteristic with a preset rule to obtain a comparison result, the preset rule being the trend change of the battery in a normal state; and carrying out early warning on the to-be-detected battery according to a comparison result. The trend change characteristics of the to-be-detected battery can be monitored in real time, so that whether the to-be-detected battery is abnormal or not is determined according to the trend change characteristics, early warning can be performed in time before the to-be-detected battery has a fault, and occurrence of battery faults is effectively avoided.
Owner:CONTEMPORARY AMPEREX FUTURE ENERGY RES INST (SHANGHAI) LTD +1

Method, device and equipment for checking salary calculation result based on clustering algorithm

The embodiment of the invention relates to the technical field of data processing, in particular to a method, a device and equipment for checking a salary calculation result based on a clustering algorithm. According to the scheme, the historical salary calculation data and the to-be-verified salary calculation data of the same batch are obtained, the same preprocessing and data filtering are respectively carried out, and then the salary calculation result clustering model training algorithm is constructed to generate the corresponding verification model; performing transverse clustering comparison on the same batch of to-be-verified salary calculation data, finding out the to-be-verified salary calculation data which does not belong to any class cluster, and marking the to-be-verified salary calculation data as an abnormal point of the same batch; comparing the to-be-checked salary calculation data with historical baseline longitudinal clustering, and marking the check salary calculation data which does not belong to any class cluster as historical comparison abnormal points; from two aspects, clustered outliers are mined as abnormal data points, so that a verification result of a salary calculation result is generated, timely early warning is performed, and a user is helped to quickly position and troubleshoot abnormal salary calculation data.
Owner:SHANGHAI PUDONG DEVELOPMENT BANK

Node type slope monitoring system and method

The invention discloses a node type slope monitoring system and method, and belongs to the technical field of slope monitoring and protection. Vibration signals before slope disasters occur are sensed in real time through the optical fiber sensors forming the monitoring nodes in the monitoring node array, and real-time and high-precision acquisition and processing of micro-vibration signals of the slope disasters are achieved in combination with the satellite time service module and the data processing module. And subsequent effective event identification, seismic source positioning, seismic magnitude evaluation and disaster early warning are carried out through the cloud server, so that high-precision and low-false-alarm-rate accurate early warning of slope disasters is realized. And the data preliminary screening module performs data preliminary screening before uploading through an STA / LTA algorithm, so that the transmission pressure of the wireless transmission module is reduced, the power consumption of a device battery is reduced, and invalid data stored in the cloud server is reduced.
Owner:ANHUI ZHIBO PHOTOELECTRIC TECHNOLOGY CO LTD

Factory equipment rapid positioning system

InactiveCN118962759AAccurately grasp the location of equipmentReduce the risk of production interruptionsNavigation by speed/acceleration measurementsPosition fixationWorkspaceMonitor equipment
The invention discloses a quick positioning system for plant equipment, and relates to the technical field of plant equipment positioning, and the system comprises a positioning acquisition module which is used for employing an advanced sensor fusion algorithm and combining a plurality of technologies of GPS, Bluetooth, Wi-Fi and inertial navigation to realize precise positioning of the plant equipment. According to the invention, the advanced sensor fusion algorithm is adopted by the positioning acquisition module, high-precision positioning of factory equipment is realized, the position of the equipment can be accurately mastered, the data processing module carries out deep analysis on positioning data by using an artificial intelligence algorithm, the movement trend of the equipment can be predicted, and potential faults can be detected by using the data processing module. Potential faults are pre-warned in advance, the risk of production interruption caused by sudden equipment faults is reduced, the position and behaviors of the equipment are monitored in real time through the abnormal behavior detection function of the pre-warning module, pre-warning can be carried out in time when the equipment deviates from a preset working area or a specified safety range, and many potential safety hazards in the production process can be reduced.
Owner:JIANGSU NEW ELEMENT DIGITAL TECH CO LTD

Severe convective weather identification method and system based on neural network

The invention discloses a severe convective weather identification method and system based on a neural network, and relates to the technical field of meteorological monitoring. The method comprises the following specific steps: acquiring detection data including multi-source observation data and high-resolution numerical forecasting data; performing data fusion and data preprocessing on the detection data to obtain first data; performing manual labeling on the first data to establish a training label to construct a sample data set; building a convolutional neural network model, and inputting the training set into the model for training to obtain a severe convective weather intelligent identification model; evaluating the severe convective weather intelligent identification model by using the test set to obtain a final severe convective weather intelligent identification model; and inputting real-time acquired real-time observation data into the final severe convection weather intelligent identification model for severe convection weather identification. According to the method, severe convective weather identification is carried out based on the deep neural network technology, automatic and quantitative prediction can be carried out, and the reliability and timeliness of severe convective weather identification are improved.
Owner:青海省气象台

Intelligent water meter warning method and system, terminal and storage medium

The invention relates to an intelligent water meter warning method and system, a terminal and a storage medium, and relates to the technical field of water meters, and the method comprises the following steps: obtaining a water volume real-time detection value on a water meter and a water pressure detection value collected by a water pressure detection device preset on the water meter; calculating a difference value between the water pressure detection value and a preset water pressure reference value and taking the difference value as a water pressure deviation value; analyzing and determining a water pressure reference deviation interval according to the water volume real-time detection value; judging whether the water pressure deviation value falls into a water pressure reference deviation interval or not; if yes, continuing to obtain a water volume real-time detection value and a water pressure detection value; if not, water leakage early warning information is analyzed and determined according to the water pressure deviation value and the water pressure reference deviation interval, and the water leakage early warning information is output to the terminal held by the manager. The water leakage early warning device has the effect of conveniently and timely carrying out early warning on the water leakage condition.
Owner:NINGBO DONGHAI GRP CORP +1

Comprehensive pipe gallery underground diaphragm wall deformation risk early warning system

The invention, which relates to the technical field of the underground diaphragm wall, discloses a comprehensive pipe gallery underground diaphragm wall deformation risk early warning system comprising a data acquisition module, a data analysis module, a risk early warning module, an external environment monitoring module and a real-time monitoring module. The data analysis module is used for analyzing the continuous wall data collected by the data acquisition module, and the data analysis module comprises a deformation prediction unit, a soil stress detection unit and a deformation comprehensive evaluation unit. The soil stress detection unit is combined with the soil pressure and the internal stress of the wall body to perform quantitative analysis on the mechanical property of the underground diaphragm wall, so that the interaction between the soil and the underground structure can be quantified, finally, the deformation comprehensive evaluation unit is used for performing comprehensive evaluation, and different risk levels are set for the result. The early warning effect is achieved, the deformation risk early warning quality is improved, and potential safety hazards are reduced.
Owner:ZHEJIANG KEJIA ENG TECH RES CO LTD

System and method for determining optimal H2S monitoring point position in drainage pipeline

The invention relates to the technical field of drainage pipeline monitoring, and discloses a system and a method for determining an optimal H2S monitoring point position in a drainage pipeline. The system comprises a numerical simulation module, a data processing module, a machine learning module, a point location selection module and an H2S mobile monitoring device, the numerical simulation module is used for simulating the H2S concentration value at the sewage liquid level of the drainage pipeline in an application scene; the data processing module is used for arranging and constructing a data set comprising a liquid level H2S concentration simulation value and a boundary condition; the machine learning module is used for carrying out ANN machine learning by adopting an artificial neural network; and the point location selection module is used for calculating a root mean square error RMSE between multiple H2S concentration detection values of each point location and a liquid level H2S concentration prediction value in an application scene. According to the method provided by the invention, the optimal monitoring point position of the H2S concentration in the drainage pipeline can be accurately determined by combining CFD numerical simulation and an artificial neural network machine learning technology, and the selected point position can better reflect the H2S concentration of the liquid level.
Owner:TONGJI UNIV

Real-time diagnosis and analysis system and method based on industrial field data

The invention provides a real-time diagnosis and analysis system and method based on industrial field data, and the system comprises a diagnosis and analysis mind map drawing module which constructs a parameter association network in a production process, and forms a flow structure; the influence factor module is used for defining and managing data indexes and setting weights and scoring rules; the diagnostic analysis node configuration module is used for configuring the behavior of the node according to the influence factor attribute; the diagnostic analysis event triggering module is used for monitoring state triggering calculation in real time; the diagnostic analysis calculation module is used for performing step-by-step calculation to obtain node scores and integrating score conditions based on the configured nodes and influence factors thereof; a diagnosis analysis result display module; receiving result data of the diagnostic analysis calculation module, and presenting a calculation result; the diagnostic analysis management module is used for managing running states and resources; and the diagnostic analysis resume module is used for recording all calculation processes. According to the invention, timely early warning, real-time notification, real-time processing and loss reduction are realized by establishing a diagnostic analysis early warning mechanism.
Owner:SHANGHAI BAOSIGHT SOFTWARE CO LTD

Beidou monitoring method for high slope along with floor height

The invention relates to the field of geological engineering, and discloses a bedding high slope Beidou monitoring method, which comprises the following steps: analyzing a topographic map and geomorphic features of a bedding high slope, determining monitoring points and reference points of the bedding high slope, and constructing Beidou monitoring modules of the monitoring points; calculating a monitoring reliability coefficient of the Beidou monitoring module, monitoring slope deformation data of a monitoring point in real time, and constructing a deformation analysis model of the bedding height slope; the anti-sliding force and the gliding force of the bedding high slope are calculated, and a slope body state model of the bedding high slope is constructed; the method comprises the following steps: constructing a slope body state influence model of a bedding high slope, coupling the slope body state influence model, the slope body state model and a deformation analysis model, analyzing a displacement-time analysis curve of the bedding high slope by using a slope body displacement analysis model, calculating a displacement abnormal coefficient of the bedding high slope, and constructing an early warning mechanism of the bedding high slope. And executing intelligent monitoring and early warning of the bedding high slope. The monitoring efficiency of the bedding high slope can be improved.
Owner:CHINA RAILWAY FIRST GROUP CO LTD +2

Photovoltaic power generation assembly fault intelligent diagnosis system based on sensor technology

The invention belongs to the field of photovoltaic power generation, relates to a fault diagnosis technology, and aims to solve the problem that the reliability of detection results of all photovoltaic arrays cannot be ensured in the prior art, in particular to an intelligent fault diagnosis system for a photovoltaic power generation module based on a sensor technology. Comprising a data statistics module, a fault monitoring module, a fault diagnosis module and a troubleshooting module. The data statistics module is used for carrying out statistics and analysis on power generation parameters of the photovoltaic array: marking the photovoltaic array as a statistical object, generating an analysis period and obtaining the power generation parameters of the statistical object in the analysis period at the end moment of the analysis period; the power generation data of the photovoltaic array in different illumination environments can be collected in the normal state of the photovoltaic array, the power generation parameters are formed, the power generation parameters serve as the running state judgment standard of the photovoltaic array, and when fault monitoring is carried out, the fault monitoring accuracy is improved. And fault monitoring is carried out by taking the power generation parameters of the same photovoltaic array in the similar illumination environment as a reference.
Owner:JIANGSU HANNA NEW ENERGY CO LTD

Fire blast risk early warning system for petrochemical industry and flame arrester

The invention provides a blast risk early warning system and a flame arrester for petrochemical engineering, and relates to the technical field of risk early warning, the system comprises an in-pipe state prediction module used for generating a preset in-pipe distributed state network; the external state prediction module is used for generating a preset external distributed state network; the real-time monitoring module is used for generating an in-pipe real-time state network and an external real-time state network; the fire blast risk point location identification module is used for generating a first risk point location; the fire-retardant simulation module is used for generating a first fire-retardant failure index and a second fire-retardant failure index; and the failure early warning module is used for generating early warning information. The technical problems that in the prior art, due to the poor monitoring effect and lack of real-time performance evaluation of the flame arrester, the failure accident of the flame arrester cannot be predicted in time, and the fire blast risk early warning accuracy is poor can be solved, and the technical effects that the early warning accuracy is improved, and fire blast accidents are prevented from being expanded are achieved.
Owner:江苏天宇石化冶金设备有限公司

Gas detection method and system for dangerous workplace

The invention relates to the technical field of gas detection, in particular to a gas detection method and system for a dangerous workplace. The method comprises the following steps: acquiring gas concentration and position information of each detection point in real time; dividing the whole detection area into a plurality of grids, and calculating the concentration density of each grid by adopting a kernel density analysis method based on the gas concentration and position information of each detection point; based on the concentration densities of all grids, constructing a gas concentration plane distribution diagram of the whole detection area; based on the gas concentration plane distribution diagram, manual inspection is carried out on the gas concentration overrun position, and the reliability and accuracy of gas detection in the working environment where gas diffusion is complex or uneven are guaranteed.
Owner:浙江省应急管理科学研究院(浙江省安全生产技术检测检验中心浙江省危险化学品登记中心) +1

Fire alarm control system and method for energy storage power station

The invention discloses a fire alarm control system and method for an energy storage power station, and belongs to the field of energy storage power station operation, and the fire alarm control system comprises a fire monitoring system, a fire information processing system and a fire alarm system. The control method comprises the following steps: taking a battery cabin as a fire monitoring unit, constructing a fire monitoring three-dimensional model, and obtaining infrared thermal imaging data; calculating fire risk coefficients of the sub-battery modules, and screening the sub-battery modules with fire risk and without fire risk; according to the video data acquired by the video acquisition module, calculating an open fire risk coefficient of the sub-battery module with the fire risk, and marking the open fire risk coefficient; calculating a predicted combustion coefficient of the sub-battery module without flames; and evaluating the risk level of the fire according to the calculated risk level coefficient, and generating a fire alarm signal. The reliability of fire alarm in the energy storage power station is greatly improved, and early monitoring, timely early warning and quick response of the fire risk of the energy storage power station are realized.
Owner:四川千页科技股份有限公司

Intelligent detection system for safe electric device

The invention relates to the field of intelligent detection, and particularly discloses an intelligent detection system for a safe electrical device, which adopts a neural network model based on deep learning to process real-time operation state parameters of monitored electrical equipment and various state parameters marked as fault states. According to the method, the time domain correlation characteristics of the equipment state multi-modal parameters of the electrical equipment in the real-time operation state and various fault states are extracted respectively, and the real-time state parameter characteristics and the fault state parameter characteristics of the electrical equipment are further inquired, matched and analyzed, so that whether the state of the monitored electrical equipment is abnormal or not is intelligently identified.
Owner:NORTEL TECH (GUANGDONG) CO LTD

Elevator accident prediction method, equipment, medium and product

PendingCN119218847Atimely warningAccurate risk assessmentElevatorsNormalized mutual informationElevator
The invention discloses an elevator accident prediction method and device, a medium and a product, and relates to the field of elevator accident prediction.The method comprises the steps that working parameters of a to-be-detected elevator are obtained; the working parameters comprise an operation parameter, a management parameter and a riding parameter; inputting the working parameters into an elevator accident prediction model to obtain a fault occurrence probability corresponding to the to-be-detected elevator; the elevator accident prediction model is a deep learning network; when the fault occurrence probability exceeds a preset threshold value, the elevator accident type is determined according to the fault occurrence probability; the elevator accident type serves as a target variable, and each working parameter serves as a characteristic variable; respectively calculating standardized mutual information values of the target variable and each characteristic variable, and determining a maximum standardized mutual information value; and determining a to-be-optimized fault combination according to the maximum standardized mutual information value. According to the invention, the elevator accident can be accurately predicted.
Owner:CHINA SPECIAL EQUIP INSPECTION & RES INST +1

Solid hydrogen storage and discharge container and system for forced circulation heat exchange hydrogen charging and electric heating hydrogen discharging

The invention provides a solid hydrogen storage and discharge container and system for forced circulation heat exchange hydrogen charging and electric heating hydrogen discharging. The solid hydrogen storage and release container is filled with a solid hydrogen storage and release material, and a plurality of reinforced breathable hole channels are evenly formed in the solid hydrogen storage and release material for hydrogen to quickly pass through. During hydrogen filling, the solid hydrogen storage and discharge container is connected into the forced circulation heat exchange hydrogen filling pipeline system, and hydrogen circularly flows in the forced circulation heat exchange hydrogen filling pipeline system through the hydrogen circulating fan. One part of the hydrogen is absorbed when passing through the solid hydrogen storage and release material, and the rest of the hydrogen is subjected to forced circulation to enhance heat exchange, balance the temperature field in the solid hydrogen storage and release container, accelerate the heat dissipation of the solid hydrogen storage and release material and improve the hydrogen filling speed. Electric heating is adopted during hydrogen desorption, the size is small, the structure is simple, heat loss is small, the hydrogen desorption speed is increased, the heat exchange structure of the hydrogen storage and release container is simplified, the size is reduced, and therefore the overall hydrogen storage density of equipment is increased.
Owner:SHANGHAI MG POWER TECH CO LTD

Radar echo extrapolation method and device based on adversarial generation and historical law perception

The invention discloses a radar echo extrapolation method and device based on adversarial generation and historical law perception, and the method comprises the steps: adding an evolution law feature and a coding feature, and obtaining a fusion feature; the fusion features are input into a Transform decoder, and a future radar echo image sequence is generated; a 3D convolutional neural network is used as a discrimination network, a future radar echo image sequence is compared with a future true value sub-sequence, a mean square error loss function, a frame-by-frame adversarial loss function and an inter-frame change adversarial loss function are calculated, and the training process of the network is assisted through the three loss functions; an input test sample obtains a query vector and perceives echo evolution rule characteristics through a historical rule perceptron, the coding characteristics of the test sample extracted by a Transform encoder are fused, and the fused characteristics are sent to a decoder to generate a future radar echo image sequence prediction result, so that simulation of future echo changes is realized, and future rainfall areas and intensity are inverted. The device comprises a processor and a memory.
Owner:TIANJIN UNIV

Hydrogen conveying flexible pipeline and hydrogen leakage detection method

PendingCN119617201AThe hydrogen leakage coefficient is reducedImproved hydrogen barrier performanceCorrosion preventionPipeline systemsMetallic aluminumNew energy
The invention relates to a hydrogen transport flexible pipeline and a hydrogen leakage detection method, the hydrogen transport flexible pipeline comprises a lining layer, an airtight layer, a fiber reinforced layer and an outer protective layer, the lining layer, the airtight layer, the fiber reinforced layer and the outer protective layer are all cylinder structures, the lining layer is made of a non-metal thermoplastic resin material, and the outer protective layer is made of a non-metal thermoplastic resin material. The airtight layer is composed of a graphene / aluminum oxide hydrogen-resistant coating and a metal aluminum layer, the fiber-reinforced layer is made of a non-metal high-strength fiber composite material, the outer protective layer is made of a non-metal thermoplastic resin material, and the fiber-reinforced layer comprises a fiber-reinforced inner layer and a fiber-reinforced outer layer; an airtight layer is wound on the outer side of the lining layer, a fiber reinforced inner layer is wound on the outer side of the airtight layer in the forward direction, a fiber reinforced outer layer is wound on the outer side of the fiber reinforced inner layer in the reverse direction, and an outer protection layer is arranged on the outer side of the fiber reinforced outer layer; a monitoring element is arranged in the outer protection layer and used for monitoring the hydrogen concentration change or the resistance change of the outer protection layer in real time, and the hydrogen protection device can be widely applied to the technical field of new energy development.
Owner:CNOOC GAS & POWER GRP