Workload assessment method and device, electronic equipment and computer readable medium
By splitting business requirements, determining the demand function and using the benchmark value method, functional point method or special method to calculate the workload, the problem of low accuracy in banking R&D resource evaluation is solved, and a more accurate workload evaluation is achieved.
Patent Information
- Application Number
- CN202411023793.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-08
AI Technical Summary
In the R&D management of the banking industry, it is difficult for the existing technology to accurately evaluate the workload of R&D resources, resulting in low accuracy of workload assessment.
By receiving workload evaluation requests, obtaining business requirements and project identification, splitting requirements items, determining requirements functions, using benchmark value method, functional point method or special methods to calculate workload model parameters, and combining history and benchmark parameters to calculate unit benchmark values. Evaluate deviations and finalize business requirements and project workload.
Improve the accuracy of workload assessment and ensure accurate assessment of R&D resources.
Smart Images

Figure CN118917541A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer technology, and in particular to a workload assessment method, device, electronic device, and computer-readable medium. Background Art
[0002] At present, in the banking industry, due to the needs of R&D management, R&D resources need to be evaluated and accounted for. The evaluation of investment in scientific and technological R&D resources is a global problem. R&D resources will vary with the complexity of demand, differences in business areas, differences in personnel capabilities, differences in management costs and quality requirements, resulting in distorted workload assessment, that is, low accuracy of workload assessment. Summary of the invention
[0003] In view of this, embodiments of the present application provide a workload assessment method, device, electronic device, and computer-readable medium, which can solve the problem of low accuracy of existing workload assessment.
[0004] To achieve the above-mentioned purpose, according to one aspect of an embodiment of the present application, a workload assessment method is provided, including: in response to receiving a workload assessment request, obtaining corresponding business requirements and project identifiers; based on the business requirements, determining the corresponding workload assessment method and determining the corresponding terminal identifier, and then splitting the business requirements into corresponding requirement items based on the terminal identifier; determining the requirement functions corresponding to the requirement items, and in response to the workload assessment method being the benchmark value method, determining the corresponding workload model assessment parameters for each requirement function corresponding to the benchmark value method; obtaining each historical workload assessment parameter value and each benchmark parameter value corresponding to the workload model assessment parameter, and determining the unit benchmark value workload based on each historical workload and each benchmark parameter value; calculating the historical workload assessment deviation, and determining the corresponding benchmark value according to the unit benchmark value workload and the historical workload assessment deviation; determining the corresponding benchmark value method workload based on the workload assessment parameter value and the benchmark value corresponding to the workload assessment model parameter, determining the workload corresponding to the business requirements based on the benchmark value method workload, and determining the workload of the project corresponding to the project identifier.
[0005] Optionally, determining a corresponding workload assessment method includes: obtaining a requirement identifier corresponding to the business requirement, and determining a corresponding business component based on the requirement identifier; in response to the business component having completed modeling, determining the corresponding workload assessment method to be a benchmark value method; in response to the business component not having completed modeling, determining the corresponding workload assessment method to be a function point method; in response to the requirement identifier corresponding to a special matter, determining the corresponding workload assessment method to be a special method.
[0006] Optionally, determining the corresponding terminal identifier includes: determining a demand production end identifier and a demand consumption end identifier according to the demand identifier.
[0007] Optionally, the workload corresponding to the business demand is determined based on the baseline value method workload, and the workload of the project corresponding to the project identifier is determined, including: summarizing the baseline value method workload of all requirement functions under the requirement items under the business demand to obtain the workload corresponding to the business demand; summarizing the baseline value method workload corresponding to the business demand associated with the project identifier to obtain the workload of the project corresponding to the project identifier.
[0008] Optionally, the method also includes: in response to the workload assessment method also including the function point method, executing the function point method workload assessment logic for each requirement function corresponding to the function point method to obtain the function point method workload; based on the baseline value method workload and the function point method workload, determining the workload corresponding to the business demand, and determining the workload of the project corresponding to the project identifier.
[0009] Optionally, the method also includes: in response to the workload assessment method also including the function point method and the special method, executing the function point method workload assessment logic for each requirement function corresponding to the function point method to obtain the function point method workload; executing the special method workload assessment logic for each requirement function corresponding to the special method to obtain the special method workload; determining the workload corresponding to the business demand based on the baseline value method workload, the function point method workload and the special method workload, and determining the workload of the project corresponding to the project identifier.
[0010] In addition, the present application also provides a workload assessment device, including: a first acquisition unit, configured to obtain corresponding business requirements and project identifiers in response to receiving a workload assessment request; a splitting unit, configured to determine the corresponding workload assessment method and the corresponding terminal identifier based on the business requirements, and then split the business requirements based on the terminal identifier to obtain corresponding demand items; a parameter determination unit, configured to determine the demand function corresponding to the demand item, and in response to the workload assessment method being the benchmark value method, determine the corresponding workload model assessment parameter for each demand function corresponding to the benchmark value method; a second acquisition unit, configured to obtain each historical workload assessment parameter value and each benchmark parameter value corresponding to the workload model assessment parameter, and determine the unit benchmark value workload based on each historical workload and each benchmark parameter value; a calculation unit, configured to calculate the historical workload assessment deviation, and determine the corresponding benchmark value according to the unit benchmark value workload and the historical workload assessment deviation; a workload determination unit, configured to determine the corresponding benchmark value method workload based on the workload assessment parameter value and the benchmark value corresponding to the workload assessment model parameter, determine the workload corresponding to the business requirement based on the benchmark value method workload, and determine the workload of the project corresponding to the project identifier.
[0011] Optionally, the splitting unit is further configured to: obtain a requirement identifier corresponding to the business requirement, and determine the corresponding business component based on the requirement identifier; in response to the business component having completed modeling, determine the corresponding workload assessment method as the benchmark value method; in response to the business component not having completed modeling, determine the corresponding workload assessment method as the function point method; in response to the requirement identifier corresponding to a special matter, determine the corresponding workload assessment method as a special method.
[0012] Optionally, the splitting unit is further configured to: determine a demand production end identifier and a demand consumption end identifier according to the demand identifier.
[0013] Optionally, the workload determination unit is further configured to: summarize the baseline value method workload of all requirement functions under the requirement items under the business requirements to obtain the workload corresponding to the business requirements; summarize the baseline value method workload corresponding to the business requirements associated with the project identifier to obtain the workload of the project corresponding to the project identifier.
[0014] Optionally, the workload determination unit is further configured to: in response to the workload assessment method also including the function point method, execute the function point method workload assessment logic for each requirement function corresponding to the function point method to obtain the function point method workload; based on the baseline value method workload and the function point method workload, determine the workload corresponding to the business demand, and determine the workload of the project corresponding to the project identifier.
[0015] Optionally, the workload determination unit is further configured to: in response to the workload assessment method also including the function point method and the dedicated method, execute the function point method workload assessment logic for each requirement function corresponding to the function point method to obtain the function point method workload; execute the dedicated method workload assessment logic for each requirement function corresponding to the dedicated method to obtain the dedicated method workload; determine the workload corresponding to the business demand based on the baseline value method workload, the function point method workload and the dedicated method workload, and determine the workload of the project corresponding to the project identifier.
[0016] In addition, the present application also provides a workload assessment electronic device, including: one or more processors; a storage device for storing one or more programs, when the one or more programs are executed by one or more processors, the one or more processors implement the workload assessment method as described above.
[0017] In addition, the present application also provides a computer-readable medium on which a computer program is stored, and when the program is executed by a processor, the workload evaluation method as described above is implemented.
[0018] To achieve the above objective, according to another aspect of the embodiments of the present application, a computer program product is provided.
[0019] A computer program product according to an embodiment of the present application includes a computer program, which, when executed by a processor, implements the workload evaluation method provided in the embodiment of the present application.
[0020] One embodiment of the above invention has the following advantages or beneficial effects: the application obtains the corresponding business demand and project identification in response to receiving a workload assessment request; determines the corresponding workload assessment method and the corresponding terminal identification based on the business demand, and then splits the business demand into corresponding demand items based on the terminal identification; determines the demand function corresponding to the demand item, and in response to the workload assessment method being the benchmark value method, determines the corresponding workload model assessment parameter for each demand function corresponding to the benchmark value method; obtains each historical workload assessment parameter value and each benchmark parameter value corresponding to the workload model assessment parameter, and determines the unit benchmark value workload based on each historical workload and each benchmark parameter value; calculates the historical workload assessment deviation, and determines the corresponding benchmark value according to the unit benchmark value workload and the historical workload assessment deviation; determines the corresponding benchmark value method workload based on the workload assessment parameter value and the benchmark value corresponding to the workload assessment model parameter, determines the workload corresponding to the business demand based on the benchmark value method workload, and determines the workload of the project corresponding to the project identification. Thus, the accuracy of workload assessment can be improved.
[0021] The further effects of the above-mentioned non-conventional optional manner will be described below in conjunction with the specific implementation manner. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The accompanying drawings are used to better understand the present application and do not constitute an improper limitation on the present application.
[0023] Figure 1 is a schematic diagram of the main process of a workload evaluation method according to an embodiment of the present application;
[0024] Figure 2 is a schematic diagram of the main process of a workload evaluation method according to an embodiment of the present application;
[0025] Figure 3a It is a schematic diagram of a workload assessment process using a benchmark value method according to an embodiment of the present application;
[0026] Figure 3b is a schematic diagram of a workload comprehensive evaluation process of a workload evaluation method according to an embodiment of the present application;
[0027] Figure 4 is a schematic diagram of the main units of the workload evaluation device according to an embodiment of the present application;
[0028] Figure 5 is an exemplary system architecture diagram to which the embodiments of the present application can be applied;
[0029] Figure 6 It is a structural diagram of a computer system of a terminal device or server suitable for implementing an embodiment of the present application. DETAILED DESCRIPTION
[0030] The following is a description of the exemplary embodiments of the present application in conjunction with the accompanying drawings, including various details of the embodiments of the present application to facilitate understanding, and they should be considered as merely exemplary. Therefore, those of ordinary skill in the art should recognize that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of the present application. Similarly, for the sake of clarity and conciseness, the description of known functions and structures is omitted in the following description. It should be noted that the acquisition, transmission, storage, use, and processing of data in the technical solution of the present application are in compliance with the relevant provisions of national laws and regulations. It should be noted that in the embodiments of the present application, certain software, components, models, and other existing solutions in the industry may be mentioned, which should be considered as exemplary, and their purpose is only to illustrate the feasibility of the implementation of the technical solution of the present application, but it does not mean that the applicant has or must have used the solution. In the technical solution of the present application, the collection, analysis, use, transmission, storage, and other aspects of the user's personal information involved are in compliance with the provisions of relevant laws and regulations, and are used for legal and reasonable purposes, and are not shared, leaked, or sold outside of these legal uses, and are subject to supervision and management by regulatory authorities. Take necessary measures to prevent illegal access to such personal information, ensure that persons with access to personal information comply with relevant laws and regulations, and ensure the security of personal information. Once such personal information is no longer needed, risks should be minimized by limiting or even prohibiting data collection and / or deleting data.
[0031] When used, including in certain related applications, user privacy is protected by de-identifying data, such as by removing specific identifiers when used, controlling the amount or specificity of data stored, controlling how data is stored, and / or other methods of de-identification.
[0032] Figure 1 is a schematic diagram of the main process of the workload evaluation method according to an embodiment of the present application, such as Figure 1 As shown, the workload evaluation method mainly includes the following steps S101 to S106.
[0033] Step S101, in response to receiving a workload assessment request, obtaining corresponding business requirements and project identifiers.
[0034] In this embodiment, the execution subject of the workload assessment method (for example, it can be a server) can receive the workload assessment request by wired connection or wireless connection. For example, it can be a request to evaluate the investment in scientific and technological research and development resources. The content of the workload assessment request is not specifically limited in the embodiment of the present application. When the execution subject receives the workload assessment request, it can obtain the business needs and project identification carried in the request. Among them, the business needs may include the addition, deletion, modification and query of a report or the adjustment of a business process or a key link of a business process, or it can also be the maintenance of system parameters, etc. The content of the business needs is not specifically limited in the embodiment of the present application. The project identification can be used to characterize the project associated with the business demand. The project identification can be the project number or project name of the project associated with the business demand. The content and form of the project identification are not specifically limited in the embodiment of the present application.
[0035] Step S102: Based on the business requirements, a corresponding workload evaluation method is determined and a corresponding terminal identifier is determined, and then the business requirements are split based on the terminal identifier to obtain corresponding requirement items.
[0036] After obtaining the business requirements, the execution subject can determine the workload assessment method to be used according to the receiving component (i.e., business component) corresponding to the business requirements. Specifically, the execution subject can obtain the component identifier in the business requirements, determine the receiving component (i.e., business component) according to the component identifier, and after determining the receiving component (i.e., business component), the execution subject can determine the workload assessment method corresponding to the receiving component (i.e., business component) according to the correspondence between the preset component and the workload assessment method. The business requirements can carry end-to-end descriptive data, and the terminal identifier corresponding to the business requirements can be determined based on the carried end-to-end descriptive data. It can be understood that the number of different terminal identifiers corresponding to the business requirements can be multiple.
[0037] After determining the terminal identifier, the execution subject can split the business demand based on the terminal identifier to obtain various demand items. For example, the execution subject can determine the demand production end and demand consumption end corresponding to the terminal identifier, and split the business demand into various demand items according to the demand production end and the demand consumption end corresponding to the demand production end.
[0038] Step S103, determining the demand function corresponding to the demand item, and in response to the workload assessment method being the benchmark value method, determining the corresponding workload model assessment parameter for each demand function corresponding to the benchmark value method.
[0039] Among them, the demand functions may include business functions and IT functions, wherein the business function may be a report, a function implementation of adding, deleting, modifying and checking, or a business process or a key link of a business process; the IT function may be to complete a system function that is unrelated to business operations, such as system parameter maintenance and other functions. The embodiments of the present application do not specifically limit the business functions and IT functions. Benchmark value method: a method for workload evaluation based on demand functions under business architecture modeling. For each determined demand function, the corresponding workload model evaluation parameters are determined, such as function complexity parameters, function change type parameters, adjustment factor parameters, etc. The workload model evaluation parameters corresponding to different demand functions may be the same or different. The embodiments of the present application do not specifically limit the workload model evaluation parameters corresponding to different demand functions. The execution subject can flexibly change the workload model evaluation parameters corresponding to the demand function according to different demand functions based on the configuration data input by the user.
[0040] Step S104, obtaining each historical workload evaluation parameter value and each benchmark parameter value corresponding to the workload model evaluation parameter, and determining the unit benchmark value workload based on each historical workload and each benchmark parameter value.
[0041] For example, when the workload model evaluation parameters are function complexity parameters, function change type parameters, and adjustment factor parameters, the execution entity can obtain the historical workload evaluation parameter values corresponding to the corresponding required functions: for example, historical function complexity parameter values, historical function change type parameter values, and historical adjustment factor parameter values. And obtain the set unchanged benchmark parameter values: for example, benchmark function complexity parameter values, benchmark function change type parameter values, and benchmark adjustment factor parameter values. And determine the ratio S / D of (the sum of historical function complexity parameter values, historical function change type parameter values, and historical adjustment factor parameter values S) and (the sum of benchmark function complexity parameter values, benchmark function change type parameter values, and benchmark adjustment factor parameter values D) as the unit benchmark workload.
[0042] Step S105, calculating the historical workload evaluation deviation, and determining the corresponding reference value according to the unit reference value workload and the historical workload evaluation deviation.
[0043] Calculate the deviation P between the estimated workload L1 of the historical project and the actual workload L2 based on the number of people, P = (L2-L1) / L1. Unit benchmark workload, for example S / D. Then the benchmark value J = S / D*(1-P).
[0044] Step S106, based on the workload assessment parameter value and the benchmark value corresponding to the workload assessment model parameter, determine the corresponding benchmark value method workload, determine the workload corresponding to the business demand based on the benchmark value method workload, and determine the workload of the project corresponding to the project identifier.
[0045] Specifically, the workload corresponding to the business demand is determined based on the benchmark value method workload, and the workload of the project corresponding to the project identifier is determined, including: summarizing the benchmark value method workload of all requirement functions under the requirement items under the business demand to obtain the workload corresponding to the business demand; summarizing the benchmark value method workload corresponding to the business demand associated with the project identifier to obtain the workload of the project corresponding to the project identifier.
[0046] When the only workload assessment method corresponding to a business requirement is the baseline value method, the product of the workload assessment parameter values corresponding to the requirement function and the baseline value can be used to determine the workload of the baseline value method. Since the project is associated with the business requirement, and the business requirement is divided into multiple requirement items, each requirement item has a corresponding requirement function, the baseline value method workload of all requirement functions under the requirement items under the business requirement is aggregated to obtain the workload corresponding to the business requirement; the baseline value method workload corresponding to the business requirement associated with the project ID is aggregated to obtain the workload of the project corresponding to the project ID.
[0047] Specifically, the method also includes: in response to the workload assessment method also including the function point method, executing the function point method workload assessment logic for each requirement function corresponding to the function point method to obtain the function point method workload; based on the baseline value method workload and the function point method workload, determining the workload corresponding to the business demand, and determining the workload of the project corresponding to the project identifier.
[0048] If the workload assessment method corresponding to a business requirement includes a function point method in addition to the benchmark value method, the workload assessment logic of the function point method is executed for each required function corresponding to the function point method to obtain the workload of the function point method; based on the workload of the benchmark value method and the workload of the function point method, the workload corresponding to the business requirement is determined, and the workload of the project corresponding to the project identifier is determined, so that the workload corresponding to the business requirement and the workload corresponding to the project are determined more accurately.
[0049] In this embodiment, in response to receiving a workload assessment request, the corresponding business demand and project identifier are obtained; based on the business demand, the corresponding workload assessment method and the corresponding terminal identifier are determined, and then the business demand is split based on the terminal identifier to obtain the corresponding demand item; the demand function corresponding to the demand item is determined, and in response to the workload assessment method being the benchmark value method, for each demand function corresponding to the benchmark value method, the corresponding workload model assessment parameter is determined; each historical workload assessment parameter value and each benchmark parameter value corresponding to the workload model assessment parameter are obtained, and the unit benchmark value workload is determined based on each historical workload and each benchmark parameter value; the historical workload assessment deviation is calculated, and the corresponding benchmark value is determined according to the unit benchmark value workload and the historical workload assessment deviation; the corresponding benchmark value method workload is determined based on the workload assessment parameter value and the benchmark value corresponding to the workload assessment model parameter, the workload corresponding to the business demand is determined based on the benchmark value method workload, and the workload of the project corresponding to the project identifier is determined. Thus, the accuracy of workload assessment can be improved.
[0050] Figure 2 FIG. 1 is a schematic diagram of the main flow of a workload evaluation method according to an embodiment of the present application. Figure 2 As shown, the workload evaluation method mainly includes the following steps S201 to S210.
[0051] Step S201, in response to receiving a workload assessment request, obtaining corresponding business requirements and project identifiers.
[0052] When the execution entity receives a workload assessment request, it can obtain the business requirements and project identifiers carried in the request. Among them, business requirements may include adding, deleting, modifying, or adjusting a business process or a key link of a business process, or may also be maintenance of system parameters, etc. The embodiments of the present application do not specifically limit the content of business requirements. The project identifier can be used to characterize the project associated with the business requirement. The project identifier can be the project number or project name of the project associated with the business requirement. The embodiments of the present application do not specifically limit the content and form of the project identifier.
[0053] Step S202: Obtain a requirement identifier corresponding to the business requirement, and determine a corresponding business component according to the requirement identifier.
[0054] A requirement identifier can correspond to one or more business components.
[0055] Step S203, in response to the business component having completed modeling, determining that the corresponding workload assessment method is a benchmark value method.
[0056] Benchmark value method: a method for workload assessment based on the required functions under business architecture modeling.
[0057] Step S204: in response to the business component not being modeled, determining that the corresponding workload assessment method is the function point method.
[0058] Function Point Method: A workload assessment method that splits requirements into functional parts based on requirements.
[0059] For example, the function point method is used to evaluate the workload. The implementation steps are as follows: Split the business requirements into multiple requirements according to the end-to-end implementation, and split the requirements into various business functions and IT functions. A business function can be a report, a function of adding, deleting, modifying and checking, or a business process or a key link in a business process; an IT function refers to the completion of a system function that is not related to business operations, such as system parameter maintenance and other functions. The business function is further divided into transaction functions / data functions, where transaction functions: that is, business behaviors, are user-identifiable, a set of atomic operations on the business, and may be composed of multiple processing logics. Data functions: that is, business objects, are functions provided to users to meet internal or external data storage needs. Generally refers to data entities. Set the functional complexity of each transaction function / data function, including high, medium, and low. Set transaction function type: EI (external input): transactions that maintain data or change system behavior; EO (external output): transactions that present or output data after processing; EQ (external query): transactions that directly present or output existing data; data function type: ILF (internal logic file): business data maintained in this system; EIF (external interface file): business data referenced by this system and maintained in other systems. Identify the modification type of transaction / data function: add, modify, delete. Set adjustment factors: transaction type, process management type, data analysis type, channel type. Set workload model parameters for function complexity, modification type and adjustment factor. Calculate the workload of each transaction function / data function using the following algorithm: function complexity parameter value * function change type parameter value * adjustment factor parameter value. Summarize and sum the workload of all transaction functions / data functions under all business functions / IT functions under the requirement items under the business requirement, which is the total workload of this requirement.
[0060] Step S205, in response to the requirement identifier corresponding to the special matter, determining that the corresponding workload assessment method is a special method.
[0061] Dedicated method: A method of evaluating workload on a case-by-case basis based on specific promotion matters.
[0062] Business requirements are divided into workload assessment according to the implementation methods of the components that undertake the requirements. If the business components corresponding to the requirements have been modeled, the benchmark value method is used for assessment; if the business components corresponding to the requirements have not been modeled, the function point method is used for assessment; if the requirements correspond to special matters such as promotion, the special method is directly used for assessment. The assessment method of the special method is mainly to use a one-item-one-setting method, matching the requirements with the special matters, multiplying by the number of matters, and obtaining the workload of the special method.
[0063] Step S206, determining the corresponding terminal identifier, and then splitting the business requirement based on the terminal identifier to obtain corresponding requirement items.
[0064] Specifically, determining the corresponding terminal identifier includes: determining a demand production end identifier and a demand consumption end identifier according to the demand identifier.
[0065] Step S207, determining the demand function corresponding to the demand item, and in response to the workload assessment method being the benchmark value method, determining the corresponding workload model assessment parameter for each demand function corresponding to the benchmark value method.
[0066] The demand functions may include business functions and IT functions, wherein a business function may be a report, an implementation of the function of adding, deleting, modifying and checking, or a business process or a key link in a business process; an IT function may be the completion of a system function that is unrelated to business operations, such as a system. Workload model evaluation parameters, such as function complexity parameters, function change type parameters, adjustment factor parameters, etc., the workload model evaluation parameters corresponding to different demand functions may be the same or different. The embodiments of the present application do not specifically limit the workload model evaluation parameters corresponding to different demand functions. The execution subject may flexibly change the workload model evaluation parameters corresponding to the demand functions according to different demand functions based on the configuration data input by the user.
[0067] Step S208, obtaining each historical workload evaluation parameter value and each benchmark parameter value corresponding to the workload model evaluation parameter, and determining the unit benchmark value workload based on each historical workload and each benchmark parameter value.
[0068] For example, when the workload model evaluation parameters are function complexity parameters, function change type parameters, and adjustment factor parameters, the execution entity can obtain the historical workload evaluation parameter values corresponding to the corresponding required functions: for example, historical function complexity parameter values, historical function change type parameter values, and historical adjustment factor parameter values. And obtain the set unchanged benchmark parameter values: for example, benchmark function complexity parameter values, benchmark function change type parameter values, and benchmark adjustment factor parameter values. And determine the ratio S / D of (the sum of historical function complexity parameter values, historical function change type parameter values, and historical adjustment factor parameter values S) and (the sum of benchmark function complexity parameter values, benchmark function change type parameter values, and benchmark adjustment factor parameter values D) as the unit benchmark workload.
[0069] Step S209, calculating the historical workload evaluation deviation, and determining the corresponding reference value according to the unit reference value workload and the historical workload evaluation deviation.
[0070] Calculate the deviation P between the estimated workload L1 of the historical project and the actual workload L2 based on the number of people, P = (L2-L1) / L1. Unit benchmark workload, for example S / D. Then the benchmark value J = S / D*(1-P).
[0071] Step S210, based on the workload assessment parameter value and the benchmark value corresponding to the workload assessment model parameter, determine the corresponding benchmark value method workload, determine the workload corresponding to the business demand based on the benchmark value method workload, and determine the workload of the project corresponding to the project identifier.
[0072] Specifically, the workload assessment method also includes: in response to the workload assessment method also including the function point method and the special method, executing the function point method workload assessment logic for each requirement function corresponding to the function point method to obtain the function point method workload; executing the special method workload assessment logic for each requirement function corresponding to the special method to obtain the special method workload; based on the baseline value method workload, the function point method workload and the special method workload, determining the workload corresponding to the business demand, and determining the workload of the project corresponding to the project identifier.
[0073] If the workload assessment method corresponding to a business requirement includes the function point method and the special method in addition to the baseline value method, then the workload assessment logic of the function point method is executed for each requirement function corresponding to the function point method to obtain the workload of the function point method; the workload assessment logic of the special method is executed for each requirement function corresponding to the special method to obtain the workload of the special method; based on the workload of the baseline value method, the workload of the function point method and the workload of the special method, the workload corresponding to the business requirement is determined, and the workload of the project corresponding to the project identifier is determined. The sum of the workloads assessed by the three workload assessment methods under the same business requirement is taken as the workload corresponding to the business requirement, and then the workload of the project to which it belongs is summarized. This makes the workload corresponding to the business requirement and the workload corresponding to the project determined more accurate.
[0074] Figure 3a It is a schematic diagram of a workload assessment process using a baseline value method according to an embodiment of the present application.
[0075] like Figure 3aAs shown, when performing workload assessment, the project is associated with the business demand. When the executive entity receives the business demand, the business demand is split into multiple demand items on an end-to-end basis. Each demand item is split into demand functions, where the demand functions may include business functions and IT functions, where a business function may be a report, a function implementation of adding, deleting, modifying and checking, or a business process or a key link in a business process; an IT function may be a system function that is not related to business operations, such as system parameter maintenance and other functions. The embodiments of this application do not specifically limit business functions and IT functions. Calculate the workload for each demand function. Specifically, the workload of each required function = function complexity parameter value * function change type parameter value * adjustment factor parameter value * baseline value, wherein the function complexity parameter value can be determined according to the function complexity selected by the user in the requirement function model management. For example, when the function complexity selected by the user is "high", the corresponding function complexity parameter value is 1.5, when the function complexity selected by the user is "medium", the corresponding function complexity parameter value is 1, and when the function complexity selected by the user is "low", the corresponding function complexity parameter value is 0.7; the function change type parameter value can be determined according to the function change type selected by the user in the requirement function model management. For example, when the function change type selected by the user is "refactoring", the corresponding function change type parameter value is 40, and when the function change type selected by the user is "complex addition", the corresponding function change The parameter value of the change type is 32. When the function change type selected by the user is "new", the corresponding parameter value of the function change type is 24. When the function change type selected by the user is "complex modification", the corresponding parameter value of the function change type is 16. When the function change type selected by the user is "simple modification", the corresponding parameter value of the function change type is 8. The adjustment factor parameter value can be determined according to the adjustment factor selected by the user in the demand function model management. When the adjustment factor selected by the user is "transaction type", the corresponding adjustment factor parameter value is 1.05. When the adjustment factor selected by the user is "process management type", the corresponding adjustment factor parameter value is 0.85. When the adjustment factor selected by the user is "data analysis type", the corresponding adjustment factor parameter value is 0.95. When the adjustment factor selected by the user is "channel type", the corresponding adjustment factor parameter value is 0.75. Specifically, the benchmark value can be calculated based on the demand function benchmark value calculation method: calculate the sum of the historical workload evaluation parameter values of the demand function: S, calculate the sum of the benchmark parameter values: D, calculate the deviation: P, and then obtain the benchmark value J of the demand function = S / D*(1-P).
[0076] Figure 3bThe following is a flowchart of a workload comprehensive evaluation method according to an embodiment of the present application. Benchmark value method: a method for evaluating workload based on demand functions under business architecture modeling. Function point method: a method for evaluating workload based on demand function splitting. Special method: a method for evaluating workload based on specific promotion matters on a case-by-case basis. Figure 3b As shown, a comprehensive workload assessment is performed based on the comprehensive workload assessment method, and the sum of the benchmark value method workload obtained by the benchmark value method, the function point method workload obtained by the function point method and the special method workload obtained by the special method is used as the workload of the requirement item corresponding to the corresponding requirement function, and then the workload of the requirement items under the business requirements is summarized to obtain the workload corresponding to the corresponding business requirements, and then the workload of the business requirements under the project can be summarized to obtain the workload corresponding to the corresponding project.
[0077] For example, the benchmark value method is used for workload assessment. During the project implementation, the business department continuously proposes business requirements, and the resource assessor associates the requirements with the project. If the business requirements correspond to the benchmark value method, they are split into multiple requirements items according to end-to-end implementation; and the requirements items are split into business functions and IT functions. Among them, the business function is CPC reduction, which restores channels, products and customers from the perspective of business modeling, forms business functions under the four-level tasks, and realizes a certain business process link end-to-end; an IT function refers to completing a system function that is not related to business operations, such as system parameter maintenance and other functions. Set the complexity of each business function / IT function, including high, medium and low; set the modification type of each business function / IT function change type: add, modify, delete; set the adjustment factor of each business function / IT function: transaction type, process management type, data analysis type, channel type; determine the benchmark value of the business function. The following takes the demand function as an example for explanation. For each business function: take the sum S of the historical workload evaluation parameter values of the business function with different complexities, change types and adjustment factors, and set a benchmark value for each type of high, medium, low, add, modify, delete, transaction type, process management type, data analysis type and channel type. Take the sum D of each benchmark value to obtain the workload of each benchmark value, that is, the unit benchmark value workload S / D; calculate the deviation P between the assessed workload L1 of the historical project and the actual workload L2 based on the number of people, P = (L2-L1) / L1, the benchmark value J = S / D*(1-P), which is the benchmark value of this business function. The workload of each business function is calculated using the following algorithm: function complexity parameter value * function change type parameter value * adjustment factor parameter value * baseline value. The workload calculation method for each IT function is similar to that for each business function, so it will not be described here. Summarize and sum the workload of all business functions / IT functions under the business requirement, which is the total workload of this requirement; summarize and sum the workload of all requirements under the project to get the workload of this project. A comprehensive evaluation method for the workload of a new banking IT project based on business architecture: During the project implementation process, the business department continuously proposes business requirements, and the resource assessor associates the requirements with the project; the business requirements are split according to the implementation method of the requirements-undertaking components, and the requirements are evaluated for workload. If the business component corresponding to the requirement has been modeled, the baseline value method is used for evaluation; if the business component corresponding to the requirement has not been modeled, the function point method is used for evaluation; if the requirement corresponds to special matters such as promotion, the special method is used directly for evaluation. The evaluation method of the special method is to use a one-item-one-setting method, correspond the requirement to the special matter, and multiply it by the number of matters to get the workload of the special method. The sum of the workload of the three methods for the same requirement is the sum of the workload of this requirement. The workload of all requirements under this project is the estimated workload of this project.
[0078] For example, the function point method is used to evaluate the workload. The implementation steps are as follows: Split the business requirements into multiple requirements according to the end-to-end implementation, and split the requirements into various business functions and IT functions. A business function can be a report, a function of adding, deleting, modifying and checking, or a business process or a key link in a business process; an IT function refers to the completion of a system function that is not related to business operations, such as system parameter maintenance and other functions. The business function is further divided into transaction functions / data functions, where transaction functions: that is, business behaviors, are user-identifiable, a set of atomic operations on the business, and may be composed of multiple processing logics. Data functions: that is, business objects, are functions provided to users to meet internal or external data storage needs. Generally refers to data entities. Set the functional complexity of each transaction function / data function, including high, medium, and low. Set transaction function type: EI (external input): transactions that maintain data or change system behavior; EO (external output): transactions that present or output data after processing; EQ (external query): transactions that directly present or output existing data; data function type: ILF (internal logic file): business data maintained in this system; EIF (external interface file): business data referenced by this system and maintained in other systems. Identify the modification type of transaction / data function: add, modify, delete. Set adjustment factors: transaction type, process management type, data analysis type, channel type. Set workload model parameters for function complexity, modification type and adjustment factor. Calculate the workload of each transaction function / data function using the following algorithm: function complexity parameter value * function change type parameter value * adjustment factor parameter value. Summarize and sum the workload of all transaction functions / data functions under all business functions / IT functions under the requirement items under the business requirement, which is the total workload of this requirement.
[0079] The comprehensive evaluation method of the workload of banking IT projects based on business architecture can achieve the uniform granularity of business function splitting. One level 4 task corresponds to one business function, and the maximum number cannot exceed 5. When each business field and each system has a business architecture modeling, the benchmark value method is used for workload evaluation, and the possibility of human distortion is reduced. Due to business modeling, the requirements will correspond to the corresponding modeling. By comparing the workload evaluation of historical projects with the actual execution, the workload evaluation model parameters (that is, the parameters managed in the demand function model) are continuously adjusted. The business function evaluation of each modeling is based on various demand situations, and the evaluation is close to the real value. The new benchmark value method is used for workload evaluation. Based on the modeling results of the business architecture, the four-level tasks of each business component under all business fields of the bank need to establish business functions. The business architect has strictly reviewed the establishment of business functions, and the historical workload evaluation results of business functions will continuously adjust the model parameters. A new comprehensive evaluation method for banking IT project workload based on business architecture is established, which divides the requirements into three categories: modeling requirements are evaluated using the benchmark value method; non-modeling requirements are evaluated using the function point method; special promotion matters are evaluated using a dedicated method, the requirements are split and located, and the applicable methods are used for evaluation and summary, ultimately obtaining the total workload accurately.
[0080] Figure 4 Schematic diagram of the main units of the workload evaluation device according to an embodiment of the present application. Figure 4 As shown, the workload evaluation device 400 includes a first acquisition unit 401 , a splitting unit 402 , a parameter determination unit 403 , a second acquisition unit 404 , a calculation unit 405 and a workload determination unit 406 .
[0081] The first acquisition unit 401 is configured to acquire corresponding business requirements and project identifiers in response to receiving a workload assessment request.
[0082] The splitting unit 402 is configured to determine a corresponding workload evaluation method and a corresponding terminal identifier based on the business requirement, and then split the business requirement based on the terminal identifier to obtain corresponding requirement items.
[0083] The parameter determination unit 403 is configured to determine the demand function corresponding to the demand item, and in response to the workload evaluation method being the benchmark value method, determine the corresponding workload model evaluation parameter for each demand function corresponding to the benchmark value method.
[0084] The second acquisition unit 404 is configured to acquire each historical workload evaluation parameter value and each benchmark parameter value corresponding to the workload model evaluation parameter, and determine the unit benchmark value workload based on each historical workload and each benchmark parameter value.
[0085] The calculation unit 405 is configured to calculate the historical workload evaluation deviation, and determine the corresponding reference value according to the unit reference value workload and the historical workload evaluation deviation;
[0086] The workload determination unit 406 is configured to determine the corresponding benchmark value workload based on the workload assessment parameter value and benchmark value corresponding to the workload assessment model parameter, determine the workload corresponding to the business demand based on the benchmark value workload, and determine the workload of the project corresponding to the project identifier.
[0087] In some embodiments, the splitting unit 402 is further configured to: obtain a requirement identifier corresponding to the business requirement, and determine the corresponding business component based on the requirement identifier; in response to the business component having completed modeling, determine the corresponding workload assessment method as the benchmark value method; in response to the business component not having completed modeling, determine the corresponding workload assessment method as the function point method; in response to the requirement identifier corresponding to a special matter, determine the corresponding workload assessment method as a special method.
[0088] In some embodiments, the splitting unit 402 is further configured to: determine a demand production end identifier and a demand consumption end identifier according to the demand identifier.
[0089] In some embodiments, the workload determination unit 406 is further configured to: summarize the baseline value workload of all demand functions under the demand items under the business requirements to obtain the workload corresponding to the business requirements; summarize the baseline value workload corresponding to the business requirements associated with the project identifier to obtain the workload of the project corresponding to the project identifier.
[0090] In some embodiments, the workload determination unit 406 is further configured to: in response to the workload assessment method also including the function point method, execute the function point method workload assessment logic for each requirement function corresponding to the function point method to obtain the function point method workload; based on the baseline value method workload and the function point method workload, determine the workload corresponding to the business demand, and determine the workload of the project corresponding to the project identifier.
[0091] In some embodiments, the workload determination unit 406 is further configured to: in response to the workload assessment method also including the function point method and the dedicated method, execute the function point method workload assessment logic for each requirement function corresponding to the function point method to obtain the function point method workload; execute the dedicated method workload assessment logic for each requirement function corresponding to the dedicated method to obtain the dedicated method workload; determine the workload corresponding to the business demand based on the baseline value method workload, the function point method workload and the dedicated method workload, and determine the workload of the project corresponding to the project identifier.
[0092] It should be noted that the workload assessment method and workload assessment device of the present application have a corresponding relationship in terms of specific implementation contents, so the repeated contents will not be described again.
[0093] Figure 5 An exemplary system architecture 500 is shown to which the workload assessment method or workload assessment device according to the embodiments of the present application can be applied.
[0094] like Figure 5 As shown, system architecture 500 may include terminal devices 501, 502, 503, a network 504 and a server 505. Network 504 is used to provide a medium for communication links between terminal devices 501, 502, 503 and server 505. Network 504 may include various connection types, such as wired, wireless communication links or optical fiber cables, etc.
[0095] Users can use terminal devices 501, 502, 503 to interact with server 505 through network 504 to receive or send messages, etc. Various communication client applications can be installed on terminal devices 501, 502, 503, such as shopping applications, web browser applications, search applications, instant messaging tools, email clients, social platform software, etc. (only as examples).
[0096] The terminal devices 501 , 502 , and 503 may be various electronic devices having a workload assessment processing screen and supporting web browsing, including but not limited to smart phones, tablet computers, laptop computers, and desktop computers.
[0097] The server 505 may be a server that provides various services, such as a background management server that provides support for workload assessment requests submitted by users using terminal devices 501, 502, and 503 (for example only). The background management server may obtain the corresponding business requirements and project identification in response to receiving the workload assessment request; determine the corresponding workload assessment method and the corresponding terminal identification based on the business requirements, and then split the business requirements into corresponding demand items based on the terminal identification; determine the demand function corresponding to the demand item, and in response to the workload assessment method being the benchmark value method, determine the corresponding workload model assessment parameter for each demand function corresponding to the benchmark value method; obtain each historical workload assessment parameter value and each benchmark parameter value corresponding to the workload model assessment parameter, and determine the unit benchmark value workload based on each historical workload and each benchmark parameter value; calculate the historical workload assessment deviation, and determine the corresponding benchmark value according to the unit benchmark value workload and the historical workload assessment deviation; determine the corresponding benchmark value method workload based on the workload assessment parameter value and the benchmark value corresponding to the workload assessment model parameter, determine the workload corresponding to the business requirement based on the benchmark value method workload, and determine the workload of the project corresponding to the project identification. This can improve the accuracy of workload assessment.
[0098] It should be noted that the workload assessment method provided in the embodiment of the present application is generally executed by the server 505 , and accordingly, the workload assessment device is generally arranged in the server 505 .
[0099] It should be understood that Figure 5 The number of terminal devices, networks and servers in the embodiment is only for illustration. Any number of terminal devices, networks and servers may be provided according to implementation requirements.
[0100] Reference below Figure 6 , which shows a schematic diagram of the structure of a computer system 600 of a terminal device suitable for implementing an embodiment of the present application. Figure 6 The terminal device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.
[0101] like Figure 6 As shown, the computer system 600 includes a central processing unit (CPU) 601, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 602 or a program loaded from a storage part 608 into a random access memory (RAM) 603. In the RAM 603, various programs and data required for the operation of the computer system 600 are also stored. The CPU 601, the ROM 602, and the RAM 603 are connected to each other via a bus 604. An input / output (I / O) interface 605 is also connected to the bus 604.
[0102] The following components are connected to the I / O interface 605: an input section 606 including a keyboard, a mouse, etc.; an output section 607 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 608 including a hard disk, etc.; and a communication section 609 including a network interface card such as a LAN card, a modem, etc. The communication section 609 performs communication processing via a network such as the Internet. A drive 610 is also connected to the I / O interface 605 as needed. A removable medium 611, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 610 as needed, so that a computer program read therefrom is installed into the storage section 608 as needed.
[0103] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from the network through the communication part 609, and / or installed from the removable medium 611. When the computer program is executed by the central processing unit (CPU) 601, the above-mentioned functions defined in the system of the present application are executed.
[0104] It should be noted that the computer-readable medium shown in the present application may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. Computer-readable storage media may include, for example, but are not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present application, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In the present application, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, in which a computer-readable program code is carried. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer-readable medium may be transmitted using any appropriate medium, including but not limited to: wireless, wire, optical cable, RF, etc., or any suitable combination of the above.
[0105] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the above-mentioned module, program segment or a part of a code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flow chart, and the combination of the boxes in the block diagram or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0106] The units involved in the embodiments described in the present application may be implemented by software or hardware. The units described may also be set in a processor, for example, it may be described as: a processor includes a first acquisition unit, a splitting unit, a parameter determination unit, a second acquisition unit, a calculation unit, and a workload determination unit. The names of these units do not, in some cases, constitute limitations on the units themselves.
[0107] As another aspect, the present application further provides a computer-readable medium, which may be included in the device described in the above embodiment; or may exist independently without being assembled into the device. The computer-readable medium carries one or more programs. When the one or more programs are executed by a device, the device obtains the corresponding business demand and project identification in response to receiving a workload assessment request; determines the corresponding workload assessment method and the corresponding terminal identification based on the business demand, and then splits the business demand into corresponding demand items based on the terminal identification; determines the demand function corresponding to the demand item, and in response to the workload assessment method being the benchmark value method, determines the corresponding workload model assessment parameter for each demand function corresponding to the benchmark value method; obtains each historical workload assessment parameter value and each benchmark parameter value corresponding to the workload model assessment parameter, and determines the unit benchmark value workload based on each historical workload and each benchmark parameter value; calculates the historical workload assessment deviation, and determines the corresponding benchmark value according to the unit benchmark value workload and the historical workload assessment deviation; determines the corresponding benchmark value method workload based on the workload assessment parameter value and the benchmark value corresponding to the workload assessment model parameter, determines the workload corresponding to the business demand based on the benchmark value method workload, and determines the workload of the project corresponding to the project identification. Thus, the accuracy of workload assessment can be improved.
[0108] The computer program product of the present application includes a computer program, and when the computer program is executed by a processor, the workload evaluation method in the embodiment of the present application is implemented.
[0109] According to the technical solution of the embodiment of the present application, the accuracy of workload assessment can be improved.
[0110] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions may occur depending on design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.
Claims
1. A workload assessment method, characterized in that: include: In response to receiving the workload assessment request, obtaining corresponding business requirements and project identifiers; Based on the business requirements, a corresponding workload evaluation method is determined and a corresponding terminal identifier is determined, and then based on the terminal identifier, the business requirements are split to obtain corresponding requirement items; Determine a demand function corresponding to the demand item, and in response to the workload assessment method being a benchmark value method, determine a corresponding workload model assessment parameter for each demand function corresponding to the benchmark value method; Acquire each historical workload evaluation parameter value and each benchmark parameter value corresponding to the workload model evaluation parameter, and determine a unit benchmark workload based on each historical workload and each benchmark parameter value; Calculate the historical workload assessment deviation, and determine the corresponding benchmark value according to the unit benchmark workload and the historical workload assessment deviation; Based on the workload assessment parameter value corresponding to the workload assessment model parameter and the benchmark value, the corresponding benchmark value method workload is determined, based on the benchmark value method workload, the workload corresponding to the business demand is determined, and the workload of the project corresponding to the project identifier is determined.
2. The method according to claim 1, characterized in that The method for determining the corresponding workload assessment includes: Obtaining a requirement identifier corresponding to the business requirement, and determining a corresponding business component according to the requirement identifier; In response to the business component having completed modeling, determining that the corresponding workload assessment method is a benchmark value method; In response to the business component not completing modeling, determining that the corresponding workload assessment method is a function point method; In response to the requirement identifier corresponding to a special matter, a corresponding workload assessment method is determined to be a special method.
3. The method according to claim 2, characterized in that The determining of the corresponding terminal identifier includes: The demand production end identifier and the demand consumption end identifier are determined according to the demand identifier.
4. The method according to claim 1, characterized in that: The determining the workload corresponding to the business demand based on the workload of the benchmark value method, and determining the workload of the project corresponding to the project identifier, includes: Summarize the workload of the benchmark value method of all demand functions under the demand items under the business demand to obtain the workload corresponding to the business demand; The baseline value method workload corresponding to the business requirements associated with the project identifier is summarized to obtain the workload of the project corresponding to the project identifier.
5. The method according to claim 1, characterized in that: The method further comprises: In response to the workload assessment method further comprising a function point method, executing the function point method workload assessment logic for each required function corresponding to the function point method to obtain the function point method workload; Based on the workload of the benchmark value method and the workload of the function point method, the workload corresponding to the business demand is determined, and the workload of the project corresponding to the project identifier is determined.
6. The method according to claim 1, characterized in that The method further comprises: In response to the workload assessment method further comprising a function point method and a dedicated method, executing the workload assessment logic of the function point method for each required function corresponding to the function point method to obtain the workload of the function point method; Execute dedicated method workload evaluation logic for each demand function corresponding to the dedicated method to obtain dedicated method workload; Based on the workload of the benchmark value method, the workload of the function point method and the workload of the dedicated method, the workload corresponding to the business demand is determined, and the workload of the project corresponding to the project identifier is determined.
7. A workload assessment device, characterized in that: include: A first acquisition unit is configured to acquire corresponding business requirements and project identifiers in response to receiving a workload assessment request; A splitting unit is configured to determine a corresponding workload evaluation method and a corresponding terminal identifier based on the business requirement, and then split the business requirement based on the terminal identifier to obtain corresponding requirement items; a parameter determination unit configured to determine a demand function corresponding to the demand item, and in response to the workload assessment method being a benchmark value method, determine a corresponding workload model assessment parameter for each demand function corresponding to the benchmark value method; A second acquisition unit is configured to acquire each historical workload evaluation parameter value and each benchmark parameter value corresponding to the workload model evaluation parameter, and determine a unit benchmark workload based on each historical workload and each benchmark parameter value; A calculation unit configured to calculate a historical workload evaluation deviation, and determine a corresponding reference value according to the unit reference value workload and the historical workload evaluation deviation; The workload determination unit is configured to determine the corresponding benchmark value method workload based on the workload assessment parameter value corresponding to the workload assessment model parameter and the benchmark value, determine the workload corresponding to the business demand based on the benchmark value method workload, and determine the workload of the project corresponding to the project identifier.
8. The device according to claim 7, characterized in that The splitting unit is further configured to: Obtaining a requirement identifier corresponding to the business requirement, and determining a corresponding business component according to the requirement identifier; In response to the business component having completed modeling, determining that the corresponding workload assessment method is a benchmark value method; In response to the business component not completing modeling, determining that the corresponding workload assessment method is a function point method; In response to the requirement identifier corresponding to a special matter, a corresponding workload assessment method is determined to be a special method.
9. The device according to claim 8, characterized in that The splitting unit is further configured to: The demand production end identifier and the demand consumption end identifier are determined according to the demand identifier.
10. The device according to claim 7, characterized in that The workload determination unit is further configured to: Summarize the workload of the benchmark value method of all demand functions under the demand items under the business demand to obtain the workload corresponding to the business demand; The baseline value method workload corresponding to the business requirements associated with the project identifier is summarized to obtain the workload of the project corresponding to the project identifier.
11. The device according to claim 7, characterized in that The workload determination unit is further configured to: In response to the workload assessment method further comprising a function point method, executing the function point method workload assessment logic for each required function corresponding to the function point method to obtain the function point method workload; Based on the workload of the benchmark value method and the workload of the function point method, the workload corresponding to the business demand is determined, and the workload of the project corresponding to the project identifier is determined.
12. The device according to claim 7, characterized in that The workload determination unit is further configured to: In response to the workload assessment method further comprising a function point method and a dedicated method, executing the workload assessment logic of the function point method for each required function corresponding to the function point method to obtain the workload of the function point method; Execute dedicated method workload evaluation logic for each demand function corresponding to the dedicated method to obtain dedicated method workload; Based on the workload of the benchmark value method, the workload of the function point method and the workload of the dedicated method, the workload corresponding to the business demand is determined, and the workload of the project corresponding to the project identifier is determined.
13. An electronic device for workload assessment, characterized in that: include: one or more processors; a storage device for storing one or more programs, When the one or more programs are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 6.
14. A computer readable medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.
15. A computer program product comprising a computer program, characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.