Intelligent construction site information monitoring management method and system based on big data
By obtaining and analyzing construction site data, assigning different levels of management levels according to residential and commercial conditions, and early warnings are made in combination with weather forecast information, the problem of inaccurate management results of the smart construction site supervision system is solved, and accurate construction site management and construction safety are achieved promote.
Patent Information
- Application Number
- CN202411041737.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-08
AI Technical Summary
The monitoring and management results of the existing smart construction site supervision system are not accurate enough, resulting in management deviations.
By obtaining a variety of data on the construction site, including real-time location information, personnel information, equipment information, weather forecast information, construction process, material information and environmental information, we can judge the surrounding residence and business conditions based on real-time location, and assign different levels of construction site management levels. , and provide warning prompts when abnormal situations are predicted.
It realizes accurate monitoring and management based on the various situations around the smart construction site, reduces the impact of noise on residence and business, improves the scientificity, safety and timeliness of construction management, and conducts accurate personnel identity verification and management.
Smart Images

Figure CN118917548A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of construction site information management methods, and in particular to a smart construction site information monitoring and management method and system based on big data. Background Art
[0002] With the urbanization process and the trend of population concentration in cities, the construction industry has developed rapidly, which has led to an increase in the number of engineering projects, a larger scale, and a wider distribution, and the requirements for refined and efficient construction site management have been increasing. However, the traditional construction site management model often has problems such as information asymmetry, delayed decision-making, and waste of resources, which makes it difficult to meet the needs of modern engineering construction. In this regard, the widespread application of new generation information technologies such as the Internet of Things, big data, cloud computing, and artificial intelligence has created smart construction sites, which provide very efficient solutions to the huge challenges and opportunities faced by the traditional construction industry in transformation and upgrading.
[0003] As an important direction of informatization in the construction industry, smart construction sites realize the digitization, networking and intelligence of construction site management by integrating advanced information technology means, which helps to improve construction efficiency, reduce costs, improve quality and ensure safety. For example, the document describes a smart construction site supervision system based on the Internet of Things and blockchain, including a construction site unit, a construction site management unit and a supervision unit, which communicate with each other; a construction site management unit corresponds to multiple construction site units; the construction site unit includes multiple data acquisition devices and data processing equipment; the data collected by the data acquisition device is stored after being processed by the data processing equipment, and is available for each construction site management unit and supervision unit to retrieve; the data processing equipment also obtains the data of the labor real-name system; the data acquisition device includes video monitoring equipment and environmental pollution detection equipment; the data processing equipment is a computer with data processing software; each construction site unit uses a data acquisition device and a data processing equipment to collect and process the personnel identification information, environmental pollution information and safety production information of the corresponding site, and stores the processing results and data storage. The purpose of solving the problem of difficult construction site management is achieved.
[0004] However, the existing smart construction site supervision system has limited data basis for supervision and judgment, which leads to certain deviations in the monitoring and management results and is not accurate enough. Summary of the invention
[0005] The present invention aims to provide a smart construction site information monitoring and management method based on big data to solve the problem that the monitoring and management results of the current method have certain deviations and are not accurate enough.
[0006] The big data-based smart construction site information monitoring and management method in this solution includes:
[0007] Step 1, obtaining a variety of construction site data obtained by monitoring the smart construction site, wherein the construction site data includes real-time location information, personnel information, equipment information, weather forecast information, construction progress, material information and environmental information;
[0008] Also includes:
[0009] Step 2: determine the residential and commercial conditions around the smart construction site based on the real-time location information, and allocate multiple management aspects of the smart construction site to multiple levels of construction site management levels according to the residential and commercial conditions;
[0010] Step 3: Perform graded predictions on the construction site data according to the construction site management level, and issue early warning prompts when abnormal situations are predicted.
[0011] The beneficial effects of this program are:
[0012] Based on the residential and commercial conditions around the smart construction site, different levels of construction site management are carried out, and different predictions and early warning prompts are given to different management levels. This can take into account the various aspects of the smart construction site for accurate monitoring and management.
[0013] Further, in step 2, the construction site management level includes a time period management level, a time period duration management level, and an interference situation management level;
[0014] The residential situation includes the distance between the residential point and the smart construction site. When the distance is less than a threshold, the noise management of the smart construction site is allocated to the time-division management level; when the distance is greater than the threshold, the noise management of the smart construction site is allocated to the time-division management level;
[0015] The business conditions include business hours, and the noise management of the smart construction site is allocated to different interference situation management levels according to the business hours.
[0016] The beneficial effect is: different levels of noise management can be carried out according to the distance between the residential area and the smart construction site, as well as the business hours of the business, and smart construction site management can be carried out at different locations, making the management of the smart construction site more in line with the needs of actual applications.
[0017] Further, in step 2, the living situation also includes the living direction. When the living direction is located in a building currently under construction near the smart construction site and the distance is less than a threshold, the noise management is performed by adjusting the construction progress of the preset short-term construction duration and time period according to the construction progress obtained in real time; when the living direction is located in a building currently under construction near the smart construction site and the distance is greater than a threshold, the noise management is performed by adjusting the construction progress of the preset short-term construction time period according to the construction progress obtained in real time;
[0018] When the residential location is located in a building under construction far away from the smart construction site and the distance is less than a threshold, noise management is performed according to the construction progress obtained in real time, with a preset long-duration construction time period and the construction progress adjustment during the period. When the residential location is located in a building under construction far away from the smart construction site and the distance is greater than a threshold, noise management is performed according to the construction progress obtained in real time, with a preset long-duration construction time period and the construction progress adjustment during the period.
[0019] The beneficial effect is: when managing according to the living conditions around the smart construction site, the duration and time periods of different construction processes are adjusted and managed based on the size of the spacing and the relative orientation of the residential area to the smart construction site. Different construction processes can perform corresponding construction operations at different durations and time periods, minimizing the noise of the smart construction site construction as much as possible without affecting the residents.
[0020] Furthermore, the business situation includes the business location. When the business location is located in a building currently under construction close to the smart construction site, low-decibel noise management is performed by adjusting the construction progress during business hours according to the construction progress obtained in real time. When the business location is located in a building currently under construction far away from the smart construction site, noise management is performed by adjusting the construction progress during business hours by alternating medium-decibel and high-resolution according to the construction progress obtained in real time.
[0021] The beneficial effect is: according to the relative positions of commercial and smart construction sites, different decibel noise management is carried out during business hours. While ensuring that commercial activities are not interfered with, the smart construction site can be guaranteed to interfere with commercial activities as little as possible and maintain the construction continuity of the smart construction site.
[0022] Furthermore, when the construction process adjustment of the preset short construction duration and time period is assigned for noise management, the subsequent construction process is carried out in combination with the assigned construction duration and time period according to the predicted construction speed of the current construction process, and it is determined whether the weather forecast information can cause abnormalities to the subsequent construction process. If it will cause abnormalities, the construction time of the corresponding construction process is adjusted.
[0023] The beneficial effect is: because when the construction progress is adjusted according to the preset short construction duration and time period, the construction duration and time period will not be sufficient, which will cause the problem of not being able to complete the construction after reaching the duration and time period. Therefore, by combining weather forecast information to predict the subsequent abnormal situations that may occur in the subsequent construction process, and adjusting the construction time of the construction process when it causes abnormalities, the management of the construction process can be more scientific and the safety and timeliness of construction management can be improved.
[0024] Furthermore, when weather forecast information will cause abnormalities to the subsequent construction process, the impact duration and impact range are determined based on the weather forecast information and the subsequent construction process, and an early warning prompt is issued when the impact duration is greater than the set duration and the impact range is greater than the preset range.
[0025] The beneficial effect is that when weather forecast information will cause abnormalities in the subsequent construction process, in-depth judgment of the duration and scope of the impact can be made, and accurate early warning prompts can be given in advance.
[0026] Furthermore, in step 3, early warning prompts are respectively given in descending order according to the time period management level, the time period duration management level and the interference situation management level.
[0027] Furthermore, the method further includes step 4 of authenticating the identity of the personnel entering the smart construction site, and allowing entry when the authentication is successful;
[0028] The required personnel information is determined according to the current construction process. When the identity authentication is successful and indicates that the personnel information does not belong to the personnel information required by the current construction process, the personnel information is highlighted.
[0029] The beneficial effect is that when some personnel have access rights but are no longer needed for the construction process, the personnel information can be marked as key points, so that different personnel in different construction processes can be accurately managed.
[0030] Furthermore, when identity authentication fails, it is determined whether the personnel information is historically valid personnel information. If so, the person corresponding to the personnel information is monitored in real time. If not, temporary identity information is obtained for verification until the verification is successful.
[0031] The beneficial effect is: because some personnel may enter with a temporary identity after completing a certain construction process and leaving the construction site, there is no corresponding complete identity verification or management measures at this time. By judging whether the historical personnel information is valid when the identity verification fails, if it is, real-time monitoring is performed to understand the personnel dynamics in a timely and accurate manner. Otherwise, temporary identity verification is performed until the verification is passed, so as to accurately control and manage the people entering and leaving.
[0032] A smart construction site information monitoring and management system based on big data includes a background processor and multiple sensors deployed in the smart construction site, wherein the sensor signals are connected to a gateway, the gateway signals are connected to a background processor, and the processor receives multiple construction site data from the sensors;
[0033] The background processing processes and analyzes the construction site data according to the steps of the above method. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1It is a schematic diagram of an embodiment of the smart construction site information monitoring and management method and system based on big data of the present invention. DETAILED DESCRIPTION
[0035] The following is further explained in detail through specific implementation methods.
[0036] Embodiment 1
[0037] Smart construction site information monitoring and management methods based on big data, such as Figure 1 As shown, including:
[0038] Step 1: Obtain various construction site data obtained by monitoring the smart construction site. The construction site data includes real-time location information, personnel information, equipment information, weather forecast information, construction progress, material information and environmental information. The construction site data is collected through corresponding sensors or information recording devices, such as locators, access control, temperature and humidity sensors, etc.
[0039] Step 2: Determine the residential and commercial conditions around the smart construction site based on the real-time location information, and assign multiple management aspects of the smart construction site to multiple levels of construction site management levels according to the residential and commercial conditions. The real-time location is the location of the smart construction site. Determining the surrounding residential and commercial conditions is mainly based on the surrounding areas that have been established before the construction of the smart construction site. For example, there will be certain businesses or residences around the construction site for the renovation of old urban areas. The construction site management level includes time period management level, time period duration management level, and interference situation management level.
[0040] The residential conditions include the distance between the residential area and the smart construction site. The distance is measured by the distance between the smart construction site and the edge of the residential area on the map. When the distance is less than the threshold, the threshold is set according to the actual situation, such as the threshold of 5m. The noise management of the smart construction site is allocated to the time period management level. The time period management is the construction duration management of a certain time period. For example, the duration of high-noise construction in the period from 7:00 am to 10:00 am must be less than 1.5 hours. When the distance is greater than the threshold, the noise management of the smart construction site is allocated to the time period management level. The time period management is the management of noise construction types in a certain time period. The business conditions include business hours. The noise management of the smart construction site is allocated to the interference situation management level according to the business hours. The interference situation management is the management of different degrees of interference situations during business hours. For example, the interference situation of high noise level shall not exceed a certain period of time, and the interference situation of medium noise level shall not exceed a certain period of time, etc.
[0041] The living situation also includes the living direction, which is the location of the building under construction near the smart construction site. When the living direction is located in the building under construction near the smart construction site and the distance is less than a threshold, the noise management is performed by adjusting the construction progress of the preset short construction time and the time period according to the real-time acquired construction progress. The preset short construction time is set to less than 60 minutes according to actual needs. For example, the preset short construction time in the noisy pile foundation driving and excavation construction process is set to 40 minutes. When the living direction is located in the building under construction near the smart construction site and the distance is greater than a threshold, the noise management is performed by adjusting the construction progress of the preset short construction time period according to the real-time acquired construction progress. For example, in the noisy concrete mixing and slag transportation construction process, the noise management is performed with a preset short construction time period of 30 minutes at night.
[0042] When the residential location is located in a building under construction far away from the smart construction site and the distance is less than a threshold, noise management is performed by adjusting the construction progress during the preset long construction period according to the real-time obtained construction progress. The preset long construction period is set to be greater than 1.5 hours according to actual needs. For example, the preset long construction period in the noisy pile driver and excavator excavation process is set to 2 hours. When the residential location is located in a building under construction far away from the smart construction site and the distance is greater than a threshold, noise management is performed by adjusting the construction progress during the preset long construction period according to the real-time obtained construction progress. For example, in the noisy concrete mixing and slag transportation construction process, noise management is performed with a preset long construction period of 2.5 hours during the night period of 9:00-12:00.
[0043] The business situation includes the business location. When the business location is in a building under construction close to the smart construction site, low-decibel noise management is performed by adjusting the construction progress during business hours according to the real-time construction progress allocation. For example, if the current construction process is a concrete mixing process with louder noise, low-decibel noise management such as installing mobile steel structure protection sheds and closed steel bar processing workshops is performed during business hours. When the business location is in a building under construction far away from the smart construction site, noise management is performed by adjusting the construction progress during business hours by alternating medium-decibel and high-resolution construction progress allocations according to the real-time construction progress allocations.
[0044] In another embodiment, when the construction process adjustment of the preset short construction duration and time period is assigned for noise management, the construction speed is predicted according to the current construction process, and the subsequent construction process is carried out in combination with the allocated construction duration and time period, and it is determined whether the weather forecast information can cause abnormalities to the subsequent construction process. The prediction of the subsequent construction process is based on the allocated construction duration and the duration allowed for construction within the time period. For example, the excavation construction of a certain project by an excavator requires 3 hours, but the actual allocated time is only 1.5 hours, which will result in the project being unable to be completed in one go. If the weather forecast information is heavy rain, then the heavy rain will cause water accumulation or even collapse of the unfinished project. If it will cause abnormalities, the construction time of the corresponding construction process will be adjusted, such as carrying out construction in advance or accelerating the construction progress. When weather forecast information will cause abnormalities to subsequent construction progress, the impact duration and impact range are determined based on the weather forecast information and subsequent construction progress, and an early warning is issued when the impact duration is greater than the set duration and the impact range is greater than the preset range. The impact duration and impact range are determined based on the construction progress. For example, the soil for excavation construction is soft and prone to collapse, with a range of 100 cubic meters, and the heavy rain lasts for 30 minutes, then the impact duration is greater than 30 minutes, and the range is 100 cubic meters.
[0045] Step 3: Perform graded predictions on the construction site data according to the construction site management level, and issue early warnings when abnormal situations are predicted. The graded predictions can be safety predictions before, during, and after construction, and are based on the size of the monitoring data or the firmness of the safety facilities. Early warnings are issued in descending order according to the time period management level, time period duration management level, and interference situation management level.
[0046] Step 4: Authenticate the identity of the person entering the smart construction site. The identity authentication can be face recognition or access card information verification. When the verification is successful, entry is allowed.
[0047] The required personnel information is determined based on the current construction progress. For example, if watering is required for highway maintenance, the required personnel include the water truck driver. When the identity authentication is successful and it indicates that the personnel information does not belong to the personnel information required for the current construction process, the personnel information is highlighted.
[0048] When identity authentication fails, determine whether the personnel information is historically valid personnel information, that is, the personnel information is a person who once had permission to enter. If so, the person corresponding to the personnel information is monitored in real time. If not, obtain temporary identity information for verification until the verification is successful.
[0049] Compared with the existing monitoring and management methods, this embodiment conducts different levels of construction site management according to the residential and commercial conditions around the smart construction site, and provides different predictions and early warning prompts for different management levels. It can take into account various aspects of the smart construction site for accurate monitoring and management.
[0050] Embodiment 2
[0051] A smart construction site information monitoring and management system based on big data includes a background processor and multiple sensors deployed in the smart construction site, the sensor signals are connected to a gateway, the gateway signals are connected to a background processor, and the processor receives a variety of construction site data from the sensors; the background processing processes and analyzes the construction site data according to the steps of the method in Example 1.
[0052] The above is only an embodiment of the present invention, and the common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the structure of the present invention, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. A smart construction site information monitoring and management method based on big data, including: Step 1, obtaining a variety of construction site data obtained by monitoring the smart construction site, wherein the construction site data includes real-time location information, personnel information, equipment information, weather forecast information, construction progress, material information and environmental information; It is characterized by further comprising: Step 2: determine the residential and commercial conditions around the smart construction site based on the real-time location information, and allocate multiple management aspects of the smart construction site to multiple levels of construction site management levels according to the residential and commercial conditions; Step 3: Perform graded predictions on the construction site data according to the construction site management level, and issue early warning prompts when abnormal situations are predicted.
2. The method for monitoring and managing smart construction site information based on big data according to claim 1 is characterized in that: In step 2, the construction site management level includes a time period management level, a time period duration management level, and an interference situation management level; The residential situation includes the distance between the residential point and the smart construction site. When the distance is less than a threshold, the noise management of the smart construction site is allocated to the time-division management level; when the distance is greater than the threshold, the noise management of the smart construction site is allocated to the time-division management level; The business conditions include business hours, and the noise management of the smart construction site is allocated to different interference situation management levels according to the business hours.
3. The method for monitoring and managing smart construction site information based on big data according to claim 2 is characterized in that: In the step 2, the living situation also includes the living direction. When the living direction is located in a building currently under construction near the smart construction site and the distance is less than a threshold, the noise management is performed by adjusting the construction progress of the preset short-term construction duration and time period according to the construction progress obtained in real time; when the living direction is located in a building currently under construction near the smart construction site and the distance is greater than a threshold, the noise management is performed by adjusting the construction progress of the preset short-term construction time period according to the construction progress obtained in real time; When the residential location is located in a building under construction far away from the smart construction site and the distance is less than a threshold, noise management is performed according to the construction progress obtained in real time, with a preset long-duration construction time period and the construction progress adjustment during the period. When the residential location is located in a building under construction far away from the smart construction site and the distance is greater than a threshold, noise management is performed according to the construction progress obtained in real time, with a preset long-duration construction time period and the construction progress adjustment during the period.
4. The method for monitoring and managing smart construction site information based on big data according to claim 3 is characterized in that: The business situation includes the business location. When the business location is located in a building currently under construction close to the smart construction site, low-decibel noise management is performed according to the construction progress adjustment during business hours obtained based on the real-time construction progress allocation. When the business location is located in a building currently under construction far away from the smart construction site, noise management is performed according to the construction progress adjustment during business hours obtained based on the real-time construction progress allocation using alternating medium-decibel and high-resolution.
5. The method for monitoring and managing smart construction site information based on big data according to claim 4 is characterized in that: When adjusting the construction progress of the preset short construction duration and time period for noise management, the subsequent construction process is carried out in combination with the allocated construction duration and time period according to the predicted construction speed of the current construction process, and it is determined whether the weather forecast information can cause abnormalities to the subsequent construction process. If it will cause abnormalities, the construction time of the corresponding construction process is adjusted.
6. The method for monitoring and managing smart construction site information based on big data according to claim 5 is characterized in that: When weather forecast information will cause abnormalities to the subsequent construction process, the impact duration and impact range are determined based on the weather forecast information and the subsequent construction process, and an early warning prompt is issued when the impact duration is greater than the set duration and the impact range is greater than the preset range.
7. The method for monitoring and managing smart construction site information based on big data according to claim 1 is characterized in that: In the step 3, early warning prompts are respectively given in descending order according to the time period management level, the time period duration management level and the interference situation management level.
8. The method for monitoring and managing smart construction site information based on big data according to claim 2 is characterized in that: The step also includes step 4, authenticating the personnel information entering the smart construction site, and allowing entry when the authentication is successful; The required personnel information is determined according to the current construction process. When the identity authentication is successful and indicates that the personnel information does not belong to the personnel information required by the current construction process, the personnel information is highlighted.
9. The method for monitoring and managing smart construction site information based on big data according to claim 8 is characterized in that: When identity authentication fails, determine whether the personnel information is historically valid personnel information. If so, monitor the person corresponding to the personnel information in real time. If not, obtain temporary identity information for verification until the verification is successful.
10. A smart construction site information monitoring and management system based on big data, comprising a background processor and a plurality of sensors deployed in the smart construction site, wherein the sensor signal is connected to a gateway, the gateway signal is connected to a background processor, and the processor receives a variety of construction site data from the sensor; Features: The background processing processes and analyzes the construction site data according to the steps of the method according to any one of claims 1-9.