Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

443results about How to "Address reliability" patented technology

Mechanical arm grabbing control method and system based on digital twinning

The invention discloses a mechanical arm grabbing control method and system based on digital twinning, and relates to the technical field of industrial robot intelligent control, and the mechanical arm grabbing control method comprises the steps that target object data and grabbing scene data are collected, and a digital twinning model of a target object and a grabbing scene is constructed; dynamic changes of the target object and the grabbing scene are monitored in real time, the digital twin model is dynamically corrected, and a high-precision digital twin model is generated; based on a high-precision digital twinborn model, extracting characteristics of a target object, and identifying an optimal grabbing point; generating a grabbing strategy based on the optimal grabbing point and the high-precision digital twin model, and verifying the feasibility of the grabbing strategy; and according to a verification result, dynamically executing an intelligent grabbing strategy. According to the method, the grabbing precision and stability of the mechanical arm are improved by correcting the digital twin model in real time and recognizing the optimal grabbing point.
Owner:SUZHOU SOFT CONTROL TECH CO LTD

Solid state disk testing method and system, storage medium and program product

The invention discloses a solid state disk testing method and system, a storage medium and a program product, and relates to the field of computer storage testing, and the method comprises the following steps: dividing a storage space of a solid state disk to be tested into a plurality of physical areas; determining the number of read-write tests of the to-be-tested solid state disk within a preset duration at a preset temperature; performing read-write test operation on the plurality of physical areas in sequence within a preset duration to obtain read-write error rates respectively corresponding to the plurality of physical areas, the number of read-write times of the read-write test operation being the number of read-write test times; if the read-write error rates corresponding to the physical areas exceeding the preset number are higher than a preset error rate threshold value, determining that the to-be-tested solid state disk is unqualified; and if the read-write error rates corresponding to the physical areas lower than the preset number are lower than a preset error rate threshold, determining that the to-be-tested solid state disk is qualified. By implementing the method, the specific problem area in the solid state disk can be positioned and diagnosed more accurately, so that the quality evaluation standard and the maintenance efficiency of the whole solid state disk are improved.
Owner:SHENZHEN XINGYAO SEMICON CO LTD

Gas leakage prediction method, gas leakage prediction device and electronic equipment

The invention provides a gas leakage prediction method, a gas leakage prediction device and electronic equipment. The method comprises the following steps: acquiring environmental data, establishing a gas environment model according to the environmental data, constructing gas leakage conditions, and acquiring the current gas concentration and gas concentration change rate of the gas environment model under the gas leakage conditions, the gas leakage condition is a condition representing the strength of gas leakage; establishing a state space according to the current gas concentration and the gas concentration change rate, calculating an initial state transition probability matrix of the state space, and calculating a state transition probability matrix corresponding to a future time sequence according to the initial state transition probability matrix; and determining a risk level of gas leakage according to the state transition probability matrix, and outputting the risk level so as to carry out early warning and maintenance on the gas leakage. According to the invention, the problem that a hydrogen leakage prediction method in the prior art cannot realize efficient prediction is solved.
Owner:GUANGDONG DIANWANG GONGSI YUNFU POWER SUPPLY BUREAU

Wind power master control system based on safe and credible software and hardware platform

The invention discloses a wind power master control system based on a safe and credible software and hardware platform, which belongs to the technical field of wind power generation and comprises a data acquisition module, a data analysis module, a monitoring result judgment module, an abnormal unit optimization control module and a data backup module. According to the invention, the data acquisition module acquires the operation monitoring parameters of the wind turbine generator in real time, and the operation monitoring parameters are processed by the data analysis module to obtain the operation monitoring evaluation value, so that the operation state of the wind turbine generator is accurately judged, and accurate monitoring and timely early warning of the wind turbine generator are realized; the problem that in the prior art, a wind power master control system is insufficient in safety performance and reliability is effectively solved, and the safe operation level and the fault handling capacity of a wind power plant are improved.
Owner:FUQING BRANCH OF HUADIAN FUXIN ENERGY DEV CO LTD

Direct current corona discharge mode identification method and system based on YOLOv8 and CNN model

The invention discloses a direct-current corona discharge mode recognition method and system based on YOLOv8 and a CNN model, and relates to the technical field of power equipment monitoring. The invention aims to solve the technical problem that the corona discharge phenomenon of high-voltage direct-current electrical equipment is difficult to monitor in real time and accurately classify. According to the scheme, the method comprises the following steps: firstly, shooting a corona discharge visible light image by using a digital single lens reflex camera, and carrying out manual labeling and data enhancement processing; then detecting and positioning a corona discharge source by using a YOLOv8 model; inputting the positioned corona discharge area image into a deep convolutional neural network (CNN) for classification of discharge modes; finally, the output results of the CNN models are fused through integrated learning, and the classification accuracy is improved. According to the method, real-time monitoring and accurate classification of the corona discharge phenomenon of the high-voltage direct-current electrical equipment can be realized, a powerful guarantee is provided for safe operation of power equipment, the operation and maintenance efficiency is remarkably improved, and the equipment fault risk caused by corona discharge is reduced.
Owner:CHINA THREE GORGES UNIV

Measurement and control system for intelligent power transmission and transformation equipment

The invention discloses a measurement and control system for intelligent power transmission and transformation equipment, which comprises a data packet module, a time synchronization module and a time deviation adjustment control module, and is used for executing a measurement and control method for the intelligent power transmission and transformation equipment. A unified time service source is adopted, a master clock signal, a slave clock signal and a transmission medium are utilized to construct a master-slave time synchronization frame, time synchronization operation is performed from top to bottom based on a master-slave time synchronization mode, and signal comparison judgment and communication channel monitoring are performed based on time service equipment and time-served equipment. The method comprises the steps that a time synchronization device receives a time signal, the time deviation is calculated and adjusted for the first time through an NTP algorithm, and finally the time synchronization device conducts final time deviation adjustment control on the received time signal based on a set threshold value through an error correction mechanism. And the data accuracy and reliability are not high due to the problem of time asynchronization.
Owner:SUZHOU FEIJIAWO ELECTROMAGNETIC TECH CO LTD

Coal mining machine equipment health management method and device

The invention provides a health management method and device for coal mining machine equipment, and relates to the technical field of equipment operation and intelligent management.The health management method for the coal mining machine equipment comprises the steps that operation data information of all parts of the coal mining machine equipment is obtained, and a measuring point threshold value is automatically calculated according to the obtained data through an adaptive judgment method; determining abnormal indication information of data corresponding to the coal mining machine equipment according to the self-adaptive threshold value, and obtaining a fault analysis strategy corresponding to the data type so as to determine abnormal positioning information of the data type; obtaining a related data set of the coal mining machine equipment, and determining a first score corresponding to the related data set according to a data level in the related data set; fusing the first scores to determine a health score of the coal mining machine equipment; and determining the health level of the coal mining machine equipment according to the health score, thereby performing health management on the coal mining machine equipment, and solving the technical problems that the health management of the coal mining machine equipment is not intelligent enough and the accuracy is low in the prior art.
Owner:CHINA COAL TECH GRP INFORMATION TECH CO LTD

Multi-modal information fusion belt roadway monitoring method and device

The invention discloses a belt roadway monitoring method and device based on multi-modal information fusion. The method comprises the following steps: acquiring monitoring video data of a belt roadway through a camera to obtain first target data, and acquiring operation data of equipment in the belt roadway through various sensors to obtain second target data; preprocessing the first target data to obtain third target data; inputting the coal flow data and the second target data into a multi-modal fusion model to obtain fourth target data of the coal flow data in the belt roadway and fifth target data of the abnormal state of the belt roadway; and sending target alarm information based on the fourth target data and the fifth target data, and controlling equipment in the belt roadway. The technical problem that in the prior art, monitoring data and sensor data are pre-warned and controlled respectively, so that the accuracy and reliability of a prediction result are low is solved.
Owner:WUHAI ENERGY CO LTD UNDER CHN ENERGY +2

Insurance industry supervision submitted data verification method and system

The invention provides an insurance industry supervision submitted data verification method and system, and the method comprises the steps: taking a record of a customer theme table, a record of an underwriting theme table, and a record of a charging and paying theme table in a relational database as nodes; establishing an insurance industry supervision submission data graph database by taking an underwriting relationship between a customer theme table and an underwriting theme table in the relational database and a collection and payment record relationship between a collection and payment theme table and an underwriting theme as first association relationships between nodes; according to a preset verification rule and an insurance company business core database, verifying the graph database formed by the insurance industry supervision submitted data, marking risk nodes, if a certain node is marked as the risk node, determining that the insurance industry supervision submitted data related to the node does not pass verification, and if the node is marked as the risk node, determining that the insurance industry supervision submitted data related to the node does not pass verification. And the verification efficiency and reliability of the supervision submitted data in the insurance industry are effectively improved.
Owner:CHINA LIFE INSURANCE CO LTD

Region-level remote disaster recovery method, system and device based on Paas cloud platform and medium

The invention discloses a Region-level remote disaster recovery method, system and device based on a Paas cloud platform and a medium, in the Paas cloud platform, a WAN optimization technology is adopted, and a data compression algorithm, an acceleration algorithm and a cache algorithm are adopted, so that the data transmission time delay and network congestion are reduced, and the data synchronization efficiency and speed are improved; a remote multi-activity technology is introduced, so that the main data center and the backup data center simultaneously provide services to the outside, high availability and disaster tolerance of services are ensured, the main data center is automatically switched to the backup data center when the main data center breaks down, and rapid fault switching is realized; a load balancing mechanism and a fault switching mechanism are adopted, the flow is automatically switched to the backup data center when the main data center breaks down, and rapid fault switching is achieved. By adopting the WAN optimization technology, the time and delay of cross-geographic-position data synchronization are reduced, and the reliability and real-time performance of data synchronization are ensured.
Owner:CHINA TELECOM DIGITAL INTELLIGENCE TECH CO LTD

Microwave radio frequency signal transmission monitoring system

The invention discloses a transmission monitoring system for microwave radio-frequency signals, relates to the technical field of transmission monitoring of microwave radio-frequency signals, and solves the technical problem that in the prior art, prediction of path loss of the radio-frequency signals in the transmission process is not considered, so that the monitoring precision and reliability of the radio-frequency signals are low. The method comprises the following steps: acquiring signal data and environment data in a microwave radio frequency signal transmission process; calculating a signal loss evaluation coefficient based on the signal data; calculating an environment loss evaluation coefficient based on the environment data; training an artificial intelligence model based on the historical evaluation coefficient to obtain an evaluation coefficient prediction model; predicting the signal loss evaluation coefficient and the environment loss evaluation coefficient through an evaluation coefficient prediction model to obtain a prediction result; calculating a signal quality evaluation coefficient based on the prediction result; and judging whether to carry out signal transmission early warning based on the signal quality evaluation coefficient and a preset signal quality threshold. The technical problem is solved.
Owner:HEFEI YUFEIMEN ELECTRONIC TECH CO LTD

Energy management control method and system for extended-range mine car

The invention relates to an energy management control method and system for an extended-range mine car, and belongs to the field of mining trucks. The method comprises a fixed-point working mode of the range extender, and comprises the following specific steps: acquiring vehicle driving required power; if the vehicle driving demand power is smaller than the vehicle driving power lower limit, the range extender requests the generated power to be 0; if the vehicle driving demand power is between the vehicle driving power lower limit and the vehicle driving power upper limit, the range extender request generated power is the first range extender generated power; if the vehicle driving demand power is larger than the vehicle driving power upper limit, the range extender request generated power is the second range extender generated power; the method is used for solving the problems that different working modes need to be judged and selected due to different working conditions in the vehicle running process, hardware such as a sensor and a chip with higher computing power are additionally added, cost is increased, and reliability is reduced.
Owner:郑州宇通矿用装备有限公司

Photovoltaic energy storage system regulation and control method and system based on multiple time scales

The invention relates to the technical field of new energy regulation and control, and provides a photovoltaic energy storage system regulation and control method and system based on multiple time scales. The method comprises the steps that in a short time scale, if power grid frequency fluctuation exceeds a set threshold value, a photovoltaic energy storage system conducts regulation and control so that the power grid frequency can be stable; based on the meteorological data and the illumination intensity of the medium time scale, adopting an illumination intensity prediction model to predict the illumination intensity of the medium time scale in the future; based on the meteorological data, the illumination intensity and the power grid power-on data, predicting the power grid demand of the time scale in the future by adopting a power grid demand prediction model; if it is judged that the illumination intensity fluctuation range of the time scale in the future exceeds the key threshold value, the charging and discharging states of the photovoltaic energy storage system are adjusted in advance; and acquiring long-time-scale meteorological data, power grid load change and electricity price trend, solving by taking profit maximization as an objective function and a constraint condition, and outputting a solution for regulating and controlling charging and discharging of the photovoltaic energy storage system.
Owner:SHANDONG LUNENG SOFTWARE TECH

Multi-bus decoupling distributed embedded hardware rendering architecture, system and method

The invention discloses a multi-bus decoupling distributed embedded hardware rendering architecture, system and method, and relates to the technical field of ultra-high-definition video hardware processing, and the key points of the technical scheme are that the architecture comprises a multi-bus decoupling module which comprises a plurality of hardware buses which are physically isolated from one another, each hardware bus is an exclusive hardware transmission link bearing a single-type manufacturing task; the modular processing unit is an independent hardware board card and is integrated with an external signal input port, an upstream bus signal input port and a downstream bus signal output port; the plurality of modular processing units are cascaded in sequence through a hardware bus in the multi-bus decoupling module to form a distributed assembly line rendering link; when the modular processing units are newly added, the signal processing capability and the rendering synthesis capability are linearly improved along with the increase of the number of the modular processing units. According to the invention, the problem of performance bottleneck of the traditional architecture in processing 4K / 8K ultra-high-definition and multichannel rendering is fundamentally solved.
Owner:CHENGDU SOBEY DIGITAL TECH CO LTD

Distributed decentralized task scheduling system

The invention relates to the technical field of task scheduling, in particular to a distributed decentralized task scheduling system which comprises a task type grading module, a node monitoring calculation module, a node selection module, a load balancing module, a fault-tolerant self-healing module and an accuracy verification module. The real-time performance index of each node is monitored through the node monitoring calculation module, the task priority is determined in combination with the task type grading module, data support is provided for follow-up task distribution, the node selection module selects the node for executing the task according to the processing capacity of the node and the task priority, and the task execution efficiency is improved. The load balancing module further ensures that the tasks are uniformly distributed among the selected nodes, overload and resource waste are avoided, and when the system detects that the task execution is deviated from the expected task execution through the fault-tolerant self-healing module, the process of reselecting the nodes is triggered, so that the reliability of the tasks and the stability of the system are ensured.
Owner:北京科杰科技有限公司

Landslide deformation monitoring device

The invention belongs to the technical field of natural disaster monitoring and early warning, and particularly discloses a landslide deformation monitoring device which comprises monitoring piers, the monitoring piers are arranged on the two sides of a crack, a monitoring box is fixedly arranged on the upper side of one monitoring pier, and a rope end fastening mechanism is arranged on the upper side of the other monitoring pier. A winding disc, a displacement monitoring mechanism and a centrifugal driving anti-interference mechanism are arranged in the monitoring box, the winding disc is rotationally arranged on the side wall of the monitoring box in a clamped mode, the displacement monitoring mechanism is located on the rope outlet side of the winding disc, the centrifugal driving anti-interference mechanism and the winding disc are coaxially arranged, and the winding disc is connected with a tension pre-tightening mechanism on the outer side of the monitoring box. A solar power assembly is arranged on the upper side of the monitoring box. According to the invention, a pure mechanical structure is utilized to judge the real reason of the change of the monitoring value, the influence of external interference on the crack width monitoring result is effectively eliminated, so that false alarm is avoided, the requirement of frequently going to the site for troubleshooting is reduced, the installation is simple, convenient and rapid, complex operation is not needed, and the device can be rapidly deployed in various terrain environments.
Owner:四川省第七地质大队

Magnetic memory cell and SOT-MRAM memory

The invention discloses a magnetic memory unit and an SOT-MRAM memory, which are applied to the technical field of MRAM memories, and comprise at least one group of differential bits and an auxiliary magnetic structure, the differential bit includes: a spin orbit moment provision line; the two magnetic tunnel junctions are positioned on one side of the spin orbit moment providing line; the differential bit has a first direction parallel to the axis of the spin orbit moment providing line and an initial magnetization direction perpendicular to the first direction; the auxiliary magnetic structure provides a bias magnetic field for the two magnetic tunnel junctions in the same differential bit, and the bias magnetic field has a component in the first direction and a component in the initial magnetization direction; the component directions of the two bias magnetic fields along the initial magnetization direction are the same, and the component directions of the two bias magnetic fields along the first direction are opposite. Initialization can be completed only through one-time initial magnetization in the initial magnetization direction, and meanwhile the reliable writing-in problem and the high-speed reading problem of the perpendicularly magnetized MTJ zero magnetic field are solved.
Owner:ZHEJIANG HIKSTOR TECHOGY CO LTD

Multi-channel circulating grouting-pipeline in-situ cleaning integrated plugging device and using method thereof

The invention discloses a multi-channel circulating grouting-pipeline in-situ cleaning integrated plugging device and a using method thereof.The multi-channel circulating grouting-pipeline in-situ cleaning integrated plugging device comprises an initial grouting pipe, a later grouting pipe, a cleaning pipe, a first bag, a second bag and a third bag, and the first bag, the second bag and the third bag are sequentially installed on an extraction pipe at intervals from front to back; the initial grouting pipe penetrates through the first bag, the second bag and the third bag, the later grouting pipe and the cleaning pipe are next to each other and sequentially penetrate through the first bag and the second bag side by side from front to back, and a grouting-pipeline cleaning one-way valve located between the second bag and the third bag is arranged at the rear end opening of the later grouting pipe and the rear end opening of the cleaning pipe. The in-situ cleaning device is scientific in principle, simple in structure and convenient to operate, by means of in-situ cleaning of the grouting pipe after grouting in the later period, the next time of grouting and plugging of the gas extraction drill hole are smoother, and therefore the reliability and continuity of plugging of the drill hole in the gas extraction process are achieved.
Owner:HENAN POLYTECHNIC UNIV

Micro spot welding machine with spot welding head calibration control function

The utility model provides a micro spot welding machine with spot welding head calibration control, which comprises a micro spot welding machine body, a first PLC (programmable logic controller) is arranged on the front surface of the micro spot welding machine body, an adjusting mechanism is arranged on one side of the micro spot welding machine body, and a second PLC is arranged on the other side of the micro spot welding machine body. A first welding head is arranged at the bottom of the adjusting mechanism, a side plate is slidably connected into the micro spot welding machine body, and a second welding head is arranged at the top of the side plate. And the cleaning assembly is arranged on one side of the micro spot welding machine body. According to the micro spot welding machine with the spot welding head calibration control function, the problems that when part of micro spot welding machines are used for a long time, welding heads of the micro spot welding machines make contact with air to form oxidation layers, and meanwhile the oxidation layers on the outer sides of the welding heads possibly affect the electrical conductivity, the thermal conductivity, the mechanical strength and other performance of the welding points; therefore, the quality and the reliability of the whole welding structure are influenced.
Owner:JIANGSU XINGNUOXUN AUTOMATION TECH CO LTD

Vehicle data encryption method and device in Internet of Vehicles environment

The invention discloses a vehicle data encryption method and device in an Internet of Vehicles environment, and relates to the technical field related to data communication, and the method comprises the steps: carrying out the user division according to attribute characteristics for a user side, and generating a user list; mining data risk characteristics of a vehicle networking data network, wherein the vehicle networking data network has fog computing nodes based on an encrypted pattern; an authorization agent unit is initialized and configured in a mode of constructing an alias certificate number by using double hash chains; executing data pattern encryption to generate a layer of encryption result; and performing risk control evaluation on the first-layer encryption result, executing two-layer differential relaxation conversion encryption for the sensitive data, and determining a data encryption result. The technical problem that high safety and reliability of vehicle data of the Internet of Vehicles cannot be met due to the fact that existing vehicle data encryption is difficult to adapt to large data volume, strong dynamic nature and various sources in the Internet of Vehicles environment is solved, and the technical effect of improving the safety and reliability of vehicle data encryption is achieved.
Owner:WUXI XINENG REAL ESTATE MANAGEMENT CO LTD +1

Integrated plate type metal-supported solid oxide fuel cell or electrolytic cell and power supply

The invention provides an integrated plate type metal-supported solid oxide fuel cell or electrolytic tank and a power supply, and relates to the technical field of fuel cells. The battery or the electrolytic tank comprises a metal supporting body, an insulating layer, an electrochemical reaction unit and a conductive piece. The metal support body has a first surface, a second surface and a peripheral surface which are hermetically connected. And a flow channel for reaction medium materials is arranged between the first surface and the second surface. And the metal support body is provided with a plurality of ventilating through hole areas communicated with the flow channel of the reaction medium material. An electrochemical reaction unit is arranged on at least one surface of the metal supporting body, an insulating layer is arranged between the metal supporting body and the electrochemical reaction unit, and the through holes of the ventilation through hole area penetrate through the insulating layer. The conductive part is used for connecting the electrochemical reaction unit. The problems that a solid oxide fuel cell is difficult to seal, slow in start and stop, poor in thermal shock resistance, low in mass power density, low in output voltage and the like are effectively solved, and the solid oxide fuel cell is particularly suitable for portable power supplies, aircrafts, other mobile carrier power supplies and other scenes.
Owner:GUANGDONG INST OF NEW MATERIALS

Chinese rose yield increasing method and system, medium and product

The invention discloses a Chinese rose yield increasing method and system, a medium and a product, and relates to the field of plant planting, and the method comprises the steps: determining the predicted yield of Chinese roses according to a planting area based on a historical area-yield corresponding table; inputting the actual irrigation amount and the actual fertilization amount of the preset duration into a preset yield evaluation model, and determining the actual yield of the Chinese roses; comparing the actual yield of the Chinese rose with the predicted yield of the Chinese rose, and determining whether the actual yield of the Chinese rose is within the range of the predicted yield of the Chinese rose; if the actual yield of the Chinese rose is not within the range of the predicted yield of the Chinese rose, determining the optimal irrigation amount and the optimal fertilization amount according to the current soil humidity, the target soil humidity, the current soil nutrient content, the target soil nutrient content, the rainfall, the first plant growth coefficient, the second plant growth coefficient, the planting area and the fertilization efficiency coefficient; and sending the optimal irrigation amount and the optimal fertilization amount as a Chinese rose yield increasing strategy to a user side. By implementing the method, the yield of Chinese roses can be increased.
Owner:SHENZHEN TIMES HORTICULTURE FLORAL CO LTD

Grounding handcart and switch cabinet locking device

The utility model relates to the technical field of high-voltage switches, in particular to a grounding handcart and switch cabinet locking device. The grounding handcart and switch cabinet locking device comprises a first locking part and a second locking part, the first locking part is installed on a grounding handcart, and the second locking part is a travel switch installed on a switch cabinet; in a grounding handcart position locking loop in a grounding handcart, test position contacts of a main transformer wire inlet cabinet and / or a bus coupler cabinet circuit breaker are led out and connected in series before grounding handcart position locking; in a circuit breaker position locking loop of a main transformer inlet wire cabinet and / or a bus coupler cabinet in the switch cabinet, a contact of a travel switch is led out and connected in series before the circuit breaker position locking of the main transformer inlet wire cabinet and / or the bus coupler cabinet; and when the grounding handcart is safely pushed into the working position of the handcart chamber of the switch cabinet, the first locking part is in contact with the travel switch to enable the contact of the travel switch to be in an off state, so that the main transformer incoming line cabinet and / or bus coupler cabinet circuit breaker position locking loop is in an off state.
Owner:XIDIAN BAOJI ELECTRIC CO LTD +1

Mainboard handle, mainboard assembly and server

The embodiment of the utility model provides a mainboard handle, a mainboard assembly and a server. The mainboard lifting handle comprises a main body part connected with a mainboard, the main body part is of an integrated frame structure, the main body part is provided with a channel allowing a cable to penetrate through and a lifting handle area allowing personnel to operate, and the lifting handle area is located on the side face of the channel. The server mainboard handle solves the problem that a server mainboard handle in the prior art is complex in structure.
Owner:INSPUR SUZHOU INTELLIGENT TECH CO LTD

Industrial internet information model modeling optimization method based on natural language processing

The invention provides an industrial internet information model modeling optimization method based on natural language processing, and relates to the technical field of computers. The method comprises the following steps: inputting a preset data source and model prompt information into a preset natural language processing model, and extracting to obtain modeling elements; the model prompt information comprises first-stage prompt information and second-stage prompt information; dividing the modeling elements into a corresponding number of modeling element clusters based on the target cluster number; constructing an information model based on the modeling element cluster; the information model is used for indicating the relationship among the modeling elements; the information model comprises a tree structure layer or a combination of the tree structure layer and a net structure layer; wherein the tree structure layer comprises an object class layer corresponding to the information model, a cluster class layer corresponding to each modeling element cluster and a representative element layer corresponding to each modeling element cluster; the problem that an information model is poor in effect and reliability can be solved. And the effect and reliability of the information model are improved.
Owner:BEIJING UNIV OF POSTS & TELECOMM

Ultra-high voltage silicon capacitor manufacturing method and system, silicon capacitor and electronic equipment

PendingCN119095480AEliminate arc clusteringEliminate weaknessesSemiconductor/solid-state device detailsSolid-state devicesCapacitanceUltra high voltage
The invention provides a manufacturing method and system of an ultrahigh-voltage silicon capacitor, the silicon capacitor and electronic equipment. The method comprises the following steps: etching a deep groove in a silicon substrate; depositing to generate a dielectric layer, and carrying out surface planarization treatment by adopting a CMP (Chemical Mechanical Polishing) process; depositing to generate a tungsten conductive layer, and carrying out surface planarization treatment by adopting a CMP (Chemical Mechanical Polishing) process; depositing to generate an IMD layer; forming holes in the IMD layer, depositing and generating a tungsten electrode contact layer, and performing surface planarization treatment by adopting a CMP process; an aluminum / copper conducting layer is deposited and generated, one section of the aluminum / copper conducting layer is connected with the dielectric layer through a first tungsten electrode contact layer, and the other section of the aluminum / copper conducting layer is connected with the silicon substrate through a second tungsten electrode contact layer; and thinning the back surface of the wafer to enable the thickness of the thinned wafer to be smaller than the depth of the deep groove. According to the invention, the bottom arc corners of the groove are ground away, the accumulation of an electric field at the bottom arc is eliminated, the purpose of ultra-high voltage is achieved, the weakness of a deep groove structure is eliminated, and the voltage resistance and reliability of the silicon capacitor are improved.
Owner:SHANGHAI LANGSI TECH CO LTD

Discharging device of sand mill and assembly structure of discharging device

The utility model relates to a sand mill discharging device and an assembly structure thereof, a discharging rotor is arranged on a sand mill main shaft which is positioned in a barrel body and is close to a rear end cover of the barrel body, the discharging rotor is enclosed by a first half barrel body and a second half barrel body in a half way and is integrally barrel-shaped, and the barrel wall and the barrel bottom are provided with a material passing channel for grinding slurry to pass through; the barrel bottom is provided with a shaft hole which is in key connection with a sand mill spindle. According to the split half type Haff structure of the discharging rotor, after the sand mill barrel is split, when the first half barrel body and the second half barrel body are separated and enclosed in the radial displacement direction, the space needed for disassembling and assembling the first half barrel body and the second half barrel body is very small, and the disassembling and assembling efficiency of the discharging rotor is remarkably improved.
Owner:HEFEI HUAYUN MACHINERY MFG CO LTD

Data-driven environment-friendly gas arc extinguishing system multi-objective optimization method and related equipment

The invention discloses a data-driven environment-friendly gas arc extinguishing system multi-objective optimization method and related equipment, and the method comprises the steps: firstly inputting a collected key design variable of an environment-friendly gas arc extinguishing system into a parameterized circuit breaker cold state simulation model for simulation, and outputting an objective function value; constructing and training a data driving model by using the key design variables and the corresponding objective function values to predict and evaluate a design space; and finally, the data driving model is combined with an optimization objective function used for representing the breaking capacity of the circuit breaker, a multi-objective genetic algorithm is adopted to output an optimal design variable, and optimization of the environment-friendly gas arc extinguishing system is achieved. According to the method, based on multi-objective collaborative optimization and a data driving model, the problems of reliability and efficiency in traditional design are solved, the structure of the circuit breaker is modified in a small range so that the breaking performance of the circuit breaker can be remarkably improved, and the reliability and efficiency of the design process of the circuit breaker are improved.
Owner:XI AN JIAOTONG UNIV

Standard regulation management method, device and system based on vehicle types

The invention provides a standard regulation management method, device and system based on vehicle models, and the method comprises the steps: determining a standard regulation list corresponding to a target vehicle model according to the mapping relation between the target vehicle model and the standard regulation; according to the type attribute information of the standard regulations in the standard regulation list and the identification information of whether the standard regulations are stored in the standard regulation list, the standard regulations which are not stored in the standard regulation list are correspondingly sent to an external standard regulation management module or an internal standard regulation management module; performing corresponding warehousing and full-process management according to the standard regulations which are not warehoused in the external standard regulation management module or the internal standard regulation management module; and outputting the standard regulations after full-process management in the standard regulation list corresponding to the target vehicle model. The reliability and practicability of the automobile standard regulations in the management process are effectively improved.
Owner:SINO TRUK JINAN POWER CO LTD

Visual color difference data level-to-level management method and device, equipment and medium

The invention relates to the technical field of computers, in particular to a visual color difference data level-to-level management method and device, equipment and a medium. The method comprises the following steps of: converting respective RGB (Red, Green and Blue) values of a plurality of peripheral adjacent colors of a standard color to calculate color differences between the peripheral adjacent colors and the standard color, and performing color difference grading on the peripheral adjacent colors according to the color differences, and after target color difference grades close to the color difference of the batch color and a target reference color sample with the minimum color difference value with the batch color in the target color difference grades are screened out from the multiple reference color samples corresponding to the different color difference grades, screen display is carried out, so that a user can carry out visual evaluation according to an output display result. The effect that any color is provided with a reference color sample of a full-color-difference grade is achieved, the purpose of digital color difference visualization is achieved, and the problems that in color difference management, visual inspection management is high in cost, and digital management is insufficient in reliability are solved.
Owner:COLORO CO LTD