Water consumption scheduling system and method based on total amount control

By designing a water scheduling system based on total control, using historical water use data to calculate the water consumption and growth rate of each region, generating a scheduling plan and making real-time adjustments, the problem of unreasonable allocation of regional water in urban water scheduling is solved, and water use is realized reasonable allocation and supply and demand balance.

CN118917621APending Publication Date: 2024-11-08NANJING HYDRAULIC RES INST
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411118800.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing urban water scheduling scheme cannot achieve the reasonable allocation of water for different urban areas, resulting in water shortages in some areas and lack of accurate allocation calculation methods.

Method used

A water scheduling system based on total control is designed, including a water use prediction subsystem, a scheduling and distribution subsystem, a water use evaluation subsystem and a scheduling optimization subsystem. The water use and growth rate of each area is calculated through historical water use data to generate water use. Scheduling the plan and real-time adjustments are made through penalty functions to ensure reasonable allocation of water.

Benefits of technology

It has achieved reasonable scheduling of urban water, met the water demand in different regions, ensured a balance between supply and demand, avoided water resource shortage, and improved the efficiency of water resource utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917621A_ABST
    Figure CN118917621A_ABST
Patent Text Reader

Abstract

The invention provides a water consumption scheduling system and method based on total amount control, and the system comprises a water consumption prediction subsystem which is used for calculating the total water consumption of a city in the current year and the water consumption of each region in the current year according to the historical water consumption data of the city; the scheduling distribution subsystem is used for adjusting and controlling the total water consumption of the city in the current year according to the water consumption of each region in the current year and generating a water consumption scheduling scheme; the water consumption evaluation subsystem is used for evaluating the water consumption scheduling scheme in the water consumption scheduling process to obtain an evaluation result; and the scheduling optimization subsystem is used for adjusting the water scheduling scheme according to the evaluation result. According to the method, the total water consumption is controlled according to the water consumption of each region, the water consumption scheduling scheme is generated, and the scheduling process is adjusted in real time by constructing the penalty value, so that the reasonable scheduling of urban water is further ensured, and the water consumption requirements of different regions are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of urban water dispatching, and in particular to a water dispatching system and method based on total quantity control. Background Art

[0002] Urban water scheduling refers to the process of rationally allocating and scheduling limited water resources within the city. This process needs to comprehensively consider the principles of supply and demand balance, sustainable use and fairness to ensure the efficient and rational use of water resources. By rationally scheduling and allocating urban water resources, we can ensure a stable supply of water for daily life of residents and improve their quality of life. At the same time, we can meet the large amount of water resources needed for industrial production, ensure a stable supply of industrial water, and promote the sustainable and healthy development of the economy.

[0003] However, existing urban water scheduling plans often rely on information collection equipment and system control equipment, and are unable to apply more precise configuration calculation methods. Therefore, it is difficult to achieve reasonable allocation of water in different urban areas, resulting in water shortages in some areas. Summary of the invention

[0004] In view of this, the present invention proposes a water scheduling system and method based on total amount control to solve the problems existing in the above-mentioned prior art.

[0005] On the one hand, to achieve the above-mentioned purpose, the present invention proposes a water use scheduling system based on total amount control, comprising a water use prediction subsystem, a scheduling allocation subsystem, a water use evaluation subsystem, and a scheduling optimization subsystem connected in sequence;

[0006] The water consumption prediction subsystem is used to calculate the total water consumption of the city and the water consumption of each region in the current year based on the historical water consumption data of the city;

[0007] The dispatching and allocation subsystem is used to adjust and control the total water consumption of the city in the current year according to the water consumption of each area in the current year, and generate a water dispatching plan;

[0008] The water use evaluation subsystem is used to evaluate the water use scheduling plan during the water use scheduling process and obtain the evaluation result;

[0009] The scheduling optimization subsystem is used to adjust the water use scheduling plan according to the evaluation result.

[0010] Optionally, the water consumption prediction subsystem obtains the historical total water consumption data of the city and the historical water consumption data of different areas in the city in years;

[0011] Calculate the average value of the total historical water consumption and the growth rate of the total historical water consumption based on the total historical water consumption data, and calculate the total water consumption for the current year based on the average value of the total historical water consumption and the growth rate of the total historical water consumption;

[0012] The historical average water consumption and the historical water consumption growth rate of different areas of the city are calculated according to the historical water consumption data, and the water consumption of each area in the current year is calculated according to the historical average water consumption and the historical water consumption growth rate.

[0013] Optionally, the scheduling and allocation subsystem obtains the total water consumption for the year and the water consumption for the year of each area of ​​the city calculated by the water consumption prediction subsystem, and calculates the ratio of the water consumption for the year of each area to the total water consumption for the year. When the sum of the ratios of the water consumption for the year of each area is not greater than 1, the water consumption for the year of each area is added up as the new total water consumption for the year, and water scheduling is performed based on the new total water consumption for the year and the water consumption for the year of each area; when the sum of the ratios of the water consumption for the year of each area is greater than 1, the scheduling and allocation subsystem calculates the ratio of the part greater than 1, and constructs a proportion threshold at the same time. If the ratio of the part greater than 1 does not exceed the proportion threshold, the water consumption for the year of each area is added up as the new total water consumption for the year, and water scheduling is performed based on the new total water consumption for the year and the water consumption for the year of each area; if the ratio of the part greater than 1 exceeds the proportion threshold, after calculating the new total water consumption for the year according to the proportion threshold, the urban areas with increased water consumption are prioritized according to the historical water use growth rate of each urban area, and then water scheduling is performed for the urban areas with reduced water consumption.

[0014] Optionally, during the water use scheduling process, the water use assessment subsystem evaluates the water use scheduling and allocation of the scheduling and allocation subsystem by calculating the difference between the actual water use of each area and the calculated water use of the year, and at the same time, calculates a penalty function to represent the deviation of the water use scheduling; the calculation method of the penalty function is as follows:

[0015] R=k|w i -w j |

[0016] Among them, R represents the penalty value, k represents the penalty coefficient greater than 0, and w i represents the actual water consumption in a certain area of ​​the city, w j It indicates the calculated water consumption of the city area in the current year.

[0017] Optionally, the scheduling optimization subsystem determines the deviation of water use scheduling in each area based on the penalty coefficient calculated by the water use assessment subsystem, and sets a penalty threshold. If the penalty value is not greater than the penalty threshold, the corresponding urban area continues to be scheduled according to the water use scheduling plan. If the penalty value is greater than the penalty threshold, the proportion of the excess part to the penalty value is calculated, and the water use scheduling of the corresponding city is subtracted at the same proportion.

[0018] On the other hand, to achieve the above-mentioned purpose, the present invention proposes a water use scheduling method based on total amount control, comprising:

[0019] Obtain the city's historical water use data, and calculate the city's total water use in the current year and the water use in each region in the current year based on the city's historical water use data;

[0020] Adjust and control the total water consumption of the city in that year according to the water consumption of each region in that year, and generate a water use scheduling plan;

[0021] During the water use scheduling process, the water use scheduling plan is evaluated to obtain an evaluation result;

[0022] The water use scheduling plan is adjusted according to the evaluation results.

[0023] Optionally, the city's historical water consumption data includes historical total water consumption data in years, and historical water consumption data of different areas in the city; the process of calculating the city's total water consumption for the year and the water consumption of each area for the year based on the city's historical water consumption data includes:

[0024] Calculate the average value of the total historical water consumption and the growth rate of the total historical water consumption based on the total historical water consumption data, and calculate the total water consumption for the current year based on the average value of the total historical water consumption and the growth rate of the total historical water consumption;

[0025] The historical average water consumption and the historical water consumption growth rate of different areas of the city are calculated according to the historical water consumption data, and the water consumption of each area in the current year is calculated according to the historical average water consumption and the historical water consumption growth rate.

[0026] Optionally, the process of adjusting and controlling the total water consumption of the city in the current year according to the water consumption of each area in the current year includes:

[0027] The ratio of the water consumption of each region in the current year to the total water consumption of the current year is calculated respectively. When the sum of the ratios of the water consumption of each region in the current year is not greater than 1, the water consumption of each region in the current year is added as the new total water consumption of the current year, and water use is scheduled based on the new total water consumption of the current year and the water consumption of each region in the current year; when the sum of the ratios of the water consumption of each region in the current year is greater than 1, the scheduling and allocation subsystem calculates the ratio of the part greater than 1, and constructs a proportion threshold at the same time. If the ratio of the part greater than 1 does not exceed the proportion threshold, the water consumption of each region in the current year is added as the new total water consumption of the current year, and water use is scheduled based on the new total water consumption of the current year and the water consumption of each region in the current year; if the ratio of the part greater than 1 exceeds the proportion threshold, after calculating the new total water consumption of the current year based on the proportion threshold, the urban areas with increased water consumption are prioritized according to the historical water use growth rate of each urban area, and then water use is scheduled for the urban areas with reduced water consumption.

[0028] Optionally, the process of evaluating the water use scheduling scheme during the water use scheduling process includes:

[0029] The difference between the actual water consumption of each area and the calculated water consumption of the year is calculated, and the deviation of the water scheduling is expressed by calculating the penalty function; the calculation method of the penalty function is as follows:

[0030] R=k|w i -w j |

[0031] Among them, R represents the penalty value, k represents the penalty coefficient greater than 0, and w i represents the actual water consumption in a certain area of ​​the city, w j It indicates the calculated water consumption of the city area in the current year.

[0032] Optionally, the process of adjusting the water use scheduling plan according to the evaluation result includes:

[0033] The deviation of water use scheduling in each area is judged according to the penalty coefficient, and a penalty threshold is set at the same time. If the penalty value is not greater than the penalty threshold, the corresponding urban area continues to be scheduled according to the water use scheduling plan. If the penalty value is greater than the penalty threshold, the proportion of the excess part to the penalty value is calculated, and the water use scheduling of the corresponding city is subtracted at the same proportion.

[0034] Compared with the prior art, the beneficial effect of the present invention lies in that the present invention first calculates the total urban water consumption, the average water consumption of each region and the growth rate based on the historical water consumption data of the city to perform a preliminary calculation of the water consumption, and controls the total water consumption based on the water consumption of each region, generates a water scheduling plan, and adjusts the scheduling process in real time by constructing a penalty value, thereby further ensuring the reasonable scheduling of urban water and meeting the water needs of different regions. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0036] Figure 1 is a structural diagram of a water use scheduling system based on total amount control in an embodiment of the present invention;

[0037] Figure 2 This is a flow chart of a water use scheduling method based on total amount control in an embodiment of the present invention. DETAILED DESCRIPTION

[0038] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to be able to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments of the present invention and the features described in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0039] This embodiment proposes a water scheduling system based on total amount control, such as Figure 1 As shown, it includes a water consumption prediction subsystem, a scheduling allocation subsystem, a water consumption assessment subsystem, and a scheduling optimization subsystem connected in sequence;

[0040] Among them, the water consumption prediction subsystem is used to calculate the total water consumption of the city and the water consumption of each region in the current year based on the historical water consumption data of the city;

[0041] In some embodiments, the water consumption prediction subsystem obtains historical total water consumption data of the city and historical water consumption data of different areas in the city in years;

[0042] After obtaining the city's historical total water consumption data, calculate the historical total water consumption average and the historical total water consumption growth rate based on the historical total water consumption data, and calculate the total water consumption for the current year based on the historical total water consumption average and the historical total water consumption growth rate;

[0043] After obtaining the historical water consumption data of each region, the historical average water consumption and the historical water consumption growth rate of different regions of the city are calculated based on the historical water consumption data, and the water consumption of each region in the current year is calculated based on the historical average water consumption and the historical water consumption growth rate.

[0044] It is understandable that the collection of historical water use data of cities and regions and the calculation of water consumption for the current year through the water use forecasting subsystem will help water resource management departments to rationally allocate water resources, ensure a balance between supply and demand, adjust water resource allocation plans in advance, and ensure water demand in key areas.

[0045] In some embodiments, the scheduling and allocation subsystem is used to adjust and control the total water consumption of the city in the current year according to the water consumption of each area in the current year, and generate a water scheduling plan;

[0046] The dispatching and allocation subsystem obtains the total water consumption for the year calculated by the water forecasting subsystem and the water consumption of each area in the city, calculates the ratio of the water consumption of each area to the total water consumption for the year, and adjusts the total water consumption of the city based on the above ratio.

[0047] Specifically, when the sum of the ratios of the water consumption of each region in the current year is not greater than 1, the water consumption of each region in the current year is added as the new total water consumption of the current year, and water use is scheduled based on the new total water consumption of the current year and the water consumption of each region in the current year; when the sum of the ratios of the water consumption of each region in the current year is greater than 1, the scheduling and allocation subsystem calculates the ratio of the part greater than 1, and constructs a percentage threshold at the same time. If the ratio of the part greater than 1 does not exceed the percentage threshold, the water consumption of each region in the current year is added as the new total water consumption of the current year, and water use is scheduled based on the new total water consumption of the current year and the water consumption of each region in the current year; if the ratio of the part greater than 1 exceeds the percentage threshold, after calculating the new total water consumption of the current year based on the percentage threshold, the urban areas with increased water consumption are prioritized according to the historical water use growth rate of each urban area, and then water use is scheduled for the urban areas with reduced water consumption.

[0048] It can be understood that this embodiment controls the total urban water consumption through the different proportions of the calculated water consumption of each region and the growth rate. When the sum of the water consumption of each region is within the threshold range, the latest total water consumption is obtained based on the water consumption of each region. When it exceeds the threshold range, it means that the city's water consumption is too large. At this time, it is judged that the area with a larger water consumption growth rate will use more water resources, and the area with a smaller water consumption growth rate should continue to reduce water consumption. Therefore, priority is given to scheduling the area with a larger growth rate to meet the regional water consumption growth needs and achieve reasonable planning.

[0049] In some embodiments, the water use assessment subsystem is used to assess the water use scheduling scheme during the water use scheduling process and obtain the assessment results;

[0050] Specifically, during the water use scheduling process, the water use assessment subsystem evaluates the water use scheduling and allocation of the scheduling and allocation subsystem by calculating the difference between the actual water use of each area and the calculated water use of the year, and at the same time, calculates the penalty function to represent the deviation of the water use scheduling; the calculation method of the penalty function is as follows:

[0051] R=k|w i -w j |

[0052] Among them, R represents the penalty value, k represents the penalty coefficient greater than 0, and w i represents the actual water consumption in a certain area of ​​the city, w j It indicates the calculated water consumption of the city area in the current year.

[0053] In some embodiments, the scheduling optimization subsystem is used to adjust the water scheduling plan according to the evaluation results.

[0054] Specifically, the scheduling optimization subsystem determines the deviation of water use scheduling in each area based on the penalty coefficient calculated by the water use assessment subsystem, and sets a penalty threshold. If the penalty value is not greater than the penalty threshold, the corresponding urban area continues to be scheduled according to the water use scheduling plan. If the penalty value is greater than the penalty threshold, the proportion of the excess to the penalty value is calculated, and the water use scheduling of the corresponding city is subtracted at the same proportion.

[0055] It can be understood that this embodiment controls the water consumption of areas with unreasonable water allocation during water scheduling by constructing a penalty value to meet the problem of insufficient water consumption in other areas, thereby achieving a reasonable allocation of water resources and providing protection for residents' daily life and industrial production.

[0056] Those skilled in the art will appreciate that embodiments of the present invention may be provided as systems or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.

[0057] The present invention is described with reference to the flowcharts and / or block diagrams of computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowcharts and / or block diagrams, as well as the combination of processes and / or blocks in the flowcharts and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the process in the flowchart. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0058] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0059] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0060] Embodiment 2

[0061] This embodiment proposes a water scheduling method based on total amount control, such as Figure 2 As shown, including:

[0062] Obtain the city's historical water use data, and calculate the city's total water use for the year and the water use of each region for the year based on the city's historical water use data;

[0063] Adjust and control the city's total water consumption for the year based on the water consumption of each region, and generate a water use scheduling plan;

[0064] Evaluate the water use scheduling plan during the water use scheduling process and obtain the evaluation results;

[0065] Adjust the water use scheduling plan based on the evaluation results.

[0066] As a preferred implementation of the present application, the city's historical water use data includes historical total water use data in years, as well as historical water use data for different regions within the city; the process of calculating the city's total water use for the year and the water use for the year for each region based on the city's historical water use data includes:

[0067] Calculate the average historical total water consumption and the historical total water consumption growth rate based on the historical total water consumption data, and calculate the total water consumption for the current year based on the average historical total water consumption and the historical total water consumption growth rate;

[0068] Based on the historical water consumption data, the historical average water consumption and the historical water consumption growth rate of different areas of the city are calculated respectively, and the water consumption of each area in the current year is calculated based on the historical average water consumption and the historical water consumption growth rate.

[0069] As a preferred implementation of the present application, the process of adjusting and controlling the total water consumption of the city in the current year according to the water consumption of each region in the current year includes:

[0070] The ratio of the water consumption of each region in the current year to the total water consumption of the current year is calculated respectively. When the sum of the ratios of the water consumption of each region in the current year is not greater than 1, the water consumption of each region in the current year is added as the new total water consumption of the current year, and water use is scheduled based on the new total water consumption of the current year and the water consumption of each region in the current year; when the sum of the ratios of the water consumption of each region in the current year is greater than 1, the scheduling and allocation subsystem calculates the ratio of the part greater than 1, and constructs a percentage threshold at the same time. If the ratio of the part greater than 1 does not exceed the percentage threshold, the water consumption of each region in the current year is added as the new total water consumption of the current year, and water use is scheduled based on the new total water consumption of the current year and the water consumption of each region in the current year; if the ratio of the part greater than 1 exceeds the percentage threshold, the new total water consumption of the current year is calculated based on the percentage threshold, and then the urban areas with increased water consumption are prioritized according to the historical water use growth rate of each urban area, and then the urban areas with reduced water consumption are scheduled.

[0071] As a preferred implementation of the present application, the process of evaluating the water use scheduling scheme during the water use scheduling process includes:

[0072] Calculate the difference between the actual water consumption of each area and the calculated water consumption for the year, and express the deviation of water scheduling by calculating the penalty function; the calculation method of the penalty function is as follows:

[0073] R=k|w i -w j |

[0074] Among them, R represents the penalty value, k represents the penalty coefficient greater than 0, and w i represents the actual water consumption in a certain area of ​​the city, w j It indicates the calculated water consumption of the city area in the current year.

[0075] As a preferred implementation of the present application, the process of adjusting the water use scheduling plan according to the evaluation results includes:

[0076] The deviation of water use scheduling in each area is judged according to the penalty coefficient, and a penalty threshold is set at the same time. If the penalty value is not greater than the penalty threshold, the corresponding urban area continues to be scheduled according to the water use scheduling plan. If the penalty value is greater than the penalty threshold, the proportion of the excess part to the penalty value is calculated, and the water use scheduling of the corresponding city is subtracted at the same proportion.

[0077] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. As for the method disclosed in the embodiment, since it corresponds to the system disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description.

[0078] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, those skilled in the art should understand that any person skilled in the art can still modify the technical solutions described in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or perform equivalent replacements on some of the technical features thereof; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention. They should all be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims

1. A water dispatching system based on total volume control, characterized in that: It includes a water consumption prediction subsystem, a dispatching and allocation subsystem, a water consumption assessment subsystem, and a dispatching and optimization subsystem which are connected in sequence; The water consumption prediction subsystem is used to calculate the total water consumption of the city and the water consumption of each region in the current year based on the historical water consumption data of the city; The dispatching and allocation subsystem is used to adjust and control the total water consumption of the city in the current year according to the water consumption of each area in the current year, and generate a water dispatching plan; The water use evaluation subsystem is used to evaluate the water use scheduling plan during the water use scheduling process and obtain the evaluation result; The scheduling optimization subsystem is used to adjust the water use scheduling plan according to the evaluation result.

2. The water use scheduling system based on total amount control according to claim 1 is characterized in that: The water consumption prediction subsystem obtains the historical total water consumption data of the city and the historical water consumption data of different areas in the city in years; Calculate the average value of the total historical water consumption and the growth rate of the total historical water consumption based on the total historical water consumption data, and calculate the total water consumption for the current year based on the average value of the total historical water consumption and the growth rate of the total historical water consumption; The historical average water consumption and the historical water consumption growth rate of different areas of the city are calculated according to the historical water consumption data, and the water consumption of each area in the current year is calculated according to the historical average water consumption and the historical water consumption growth rate.

3. The water use scheduling system based on total amount control according to claim 1 is characterized in that: The scheduling and allocation subsystem obtains the total water consumption for the year and the water consumption for the year of each area of ​​the city calculated by the water consumption prediction subsystem, and calculates the ratio of the water consumption for the year of each area to the total water consumption for the year. When the sum of the ratios of the water consumption for the year of each area is not greater than 1, the water consumption for the year of each area is added up as the new total water consumption for the year, and water scheduling is performed based on the new total water consumption for the year and the water consumption for the year of each area; when the sum of the ratios of the water consumption for the year of each area is greater than 1, the scheduling and allocation subsystem calculates the ratio of the part greater than 1, and constructs a proportion threshold at the same time. If the ratio of the part greater than 1 does not exceed the proportion threshold, the water consumption for the year of each area is added up as the new total water consumption for the year, and water scheduling is performed based on the new total water consumption for the year and the water consumption for the year of each area; if the ratio of the part greater than 1 exceeds the proportion threshold, after calculating the new total water consumption for the year based on the proportion threshold, the urban areas with increased water consumption are prioritized according to the historical water use growth rate of each urban area, and then water scheduling is performed for the urban areas with reduced water consumption.

4. The water use scheduling system based on total amount control according to claim 1 is characterized in that: During the water use scheduling process, the water use assessment subsystem evaluates the water use scheduling and allocation of the scheduling and allocation subsystem by calculating the difference between the actual water use of each area and the calculated water use of the year, and at the same time, calculates the penalty function to represent the deviation of the water use scheduling; the calculation method of the penalty function is as follows: R=k|w i -w j | Among them, R represents the penalty value, k represents the penalty coefficient greater than 0, and w i represents the actual water consumption in a certain area of ​​the city, w j It indicates the calculated water consumption of the city area in the current year.

5. The water use scheduling system based on total amount control according to claim 1 is characterized in that: The scheduling optimization subsystem determines the deviation of water use scheduling in each area according to the penalty coefficient calculated by the water use assessment subsystem, and sets a penalty threshold. If the penalty value is not greater than the penalty threshold, the corresponding urban area continues to be scheduled according to the water use scheduling plan. If the penalty value is greater than the penalty threshold, the proportion of the excess part to the penalty value is calculated, and the water use scheduling of the corresponding city is subtracted at the same proportion.

6. A water scheduling method based on total amount control, characterized in that: include: Obtain the city's historical water use data, and calculate the city's total water use in the current year and the water use in each region in the current year based on the city's historical water use data; Adjust and control the total water consumption of the city in that year according to the water consumption of each region in that year, and generate a water use scheduling plan; During the water use scheduling process, the water use scheduling plan is evaluated to obtain an evaluation result; The water use scheduling plan is adjusted according to the evaluation results.

7. The water use scheduling method based on total amount control according to claim 6 is characterized in that: The historical water use data of the city includes the historical total water use data in years as time units, and the historical water use data of different areas in the city; the process of calculating the total water use of the city in that year and the water use of each area in that year based on the historical water use data of the city includes: Calculate the average value of the total historical water consumption and the growth rate of the total historical water consumption based on the total historical water consumption data, and calculate the total water consumption for the current year based on the average value of the total historical water consumption and the growth rate of the total historical water consumption; The historical average water consumption and the historical water consumption growth rate of different areas of the city are calculated according to the historical water consumption data, and the water consumption of each area in the current year is calculated according to the historical average water consumption and the historical water consumption growth rate.

8. The water use scheduling method based on total amount control according to claim 6, characterized in that: The process of adjusting and controlling the total water consumption of the city in the current year according to the water consumption of each region in the current year includes: The ratio of the water consumption of each region in the current year to the total water consumption of the current year is calculated respectively. When the sum of the ratios of the water consumption of each region in the current year is not greater than 1, the water consumption of each region in the current year is added as the new total water consumption of the current year, and water use is scheduled based on the new total water consumption of the current year and the water consumption of each region in the current year; when the sum of the ratios of the water consumption of each region in the current year is greater than 1, the scheduling and allocation subsystem calculates the ratio of the part greater than 1, and constructs a proportion threshold at the same time. If the ratio of the part greater than 1 does not exceed the proportion threshold, the water consumption of each region in the current year is added as the new total water consumption of the current year, and water use is scheduled based on the new total water consumption of the current year and the water consumption of each region in the current year; if the ratio of the part greater than 1 exceeds the proportion threshold, after calculating the new total water consumption of the current year based on the proportion threshold, the urban areas with increased water consumption are prioritized according to the historical water use growth rate of each urban area, and then water use is scheduled for the urban areas with reduced water consumption.

9. The water use scheduling method based on total amount control according to claim 6, characterized in that: The process of evaluating the water use scheduling plan during the water use scheduling process includes: The difference between the actual water consumption of each area and the calculated water consumption of the year is calculated, and the deviation of the water scheduling is expressed by calculating the penalty function; the calculation method of the penalty function is as follows: R=k|w i -w j | Among them, R represents the penalty value, k represents the penalty coefficient greater than 0, and w i represents the actual water consumption in a certain area of ​​the city, w j It indicates the calculated water consumption of the city area in the current year.

10. The water use scheduling method based on total amount control according to claim 6, characterized in that: The process of adjusting the water use scheduling plan according to the evaluation results includes: The deviation of water use scheduling in each area is judged according to the penalty coefficient, and a penalty threshold is set at the same time. If the penalty value is not greater than the penalty threshold, the corresponding urban area continues to be scheduled according to the water use scheduling plan. If the penalty value is greater than the penalty threshold, the proportion of the excess part to the penalty value is calculated, and the water use scheduling of the corresponding city is subtracted at the same proportion.

Citation Information

Patent Citations

  • A drainage basin water quantity dynamic optimization distribution method oriented to total quantity control

    CN109685256A

  • Water environment optimization method and system based on multi-source complementation and local regulation and control

    CN114580793A

  • Water resource scheduling method and device, electronic equipment and storage medium

    CN116862174A

  • Urban water supply intelligent scheduling method and system based on mixed integer programming model

    CN118278687A

  • Control device and irrigation program

    JP2022054221A