Method for creating golf court by using rice field
By planning the golf course during the non-planting period of rice and rice fields, using the rice field irrigation system and natural terrain, the problem of large-scale land and environmental impact of traditional golf courses is solved, and efficient use of land and environmentally friendly golf courses is achieved, providing unique sports Experience and low-cost solutions.
Patent Information
- Application Number
- CN202411398347.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-09
- Publication Date
- 2025-01-10
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The construction of traditional golf courses covers a large area, has high construction and maintenance costs, and has an impact on the environment. Land resources are tight and environmental protection requirements are improved. New ways of using the site are needed.
During the non-planting period of rice and rice fields, use rice fields to irrigate the rice fields and natural terrain, lay sleepers and golf blankets, set practice target points, greens, sand pits and obstacle areas, equipped with seating areas and environmentally friendly lighting equipment, and Rice field planting conditions are restored after the golf event.
It improves land utilization, reduces environmental pollution, reduces construction and maintenance costs, protects the natural ecological environment, and provides a unique golf experience.
Smart Images

Figure CN119287736A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of golf course construction, in particular to a method for building a golf course using a rice field. Background Art
[0002] Traditional golf course construction usually requires the occupation of large tracts of land, which not only has high construction costs, but also requires a large amount of water resources for lawn maintenance in daily operations, which leads to high maintenance costs. In addition, traditional golf courses often have adverse effects on soil, water sources and ecosystems. For example, excessive fertilization may cause water pollution, and waste generated during lawn mowing also needs to be properly handled. With the acceleration of urbanization, land resources available for golf course construction are becoming increasingly scarce, and environmental protection has also put forward more stringent requirements for golf courses.
[0003] Since rice fields are idle during non-planting seasons, in order to achieve efficient integration of resources, rice fields are organically combined with golf courses, and a new and sustainable way of building golf courses is sought. A method of building a golf course using rice fields is proposed. Summary of the invention
[0004] The purpose of the present invention is to provide a method for building a golf course using a rice field site, so as to solve the problem mentioned in the above background technology that traditional golf courses occupy a large area, have high construction and maintenance costs, and may have a certain impact on the environment. The shortage of land resources and the increase in environmental protection requirements require the exploration of new site utilization methods.
[0005] To achieve the above object, the present invention provides the following technical solution: a method for building a golf course using a rice field, comprising the following steps:
[0006] S1: After rice is harvested, the golf course shall be planned during the non-planting period of rice fields, and the plan shall include at least a standard 18-hole golf course layout;
[0007] S2: Laying sleepers on the pipe network and canals of the rice field irrigation system to build a stable foundation layer;
[0008] S3: Laying golf carpet on the sleepers to form a surface suitable for golfing;
[0009] S4: Set up practice target points at different distances in the area where the golf carpet is laid to meet the needs of golf enthusiasts for swing practice;
[0010] S5: Provide putting greens, bunkers and other hazards in accordance with the Rules of Golf on the planned arena;
[0011] S6: Set up rest areas, viewing areas, parking lots and other facilities around the stadium for users to use to improve user comfort and convenience;
[0012] As a further preferred embodiment of the present technical solution: the golf ball carpet in S3 is made of biodegradable materials to reduce environmental pollution and facilitate restoration of rice field functions;
[0013] As a further preferred embodiment of the present technical solution: the sand pit filler is a mixture of natural sand and rice husks to maintain the functionality of the sand pit;
[0014] As a further preferred embodiment of the technical solution: after the golf activity is over, measures are taken to restore the planting conditions of the rice fields so as not to affect the rice planting in the next season;
[0015] As a further preferred embodiment of the technical solution: the planning of the golf course also includes natural terrain features such as ponds and hillocks to increase the challenge and uniqueness of the golf course;
[0016] As a further preferred embodiment of the technical solution: environmentally friendly lighting equipment is arranged around the golf course to ensure the feasibility of nighttime activities;
[0017] As a further preferred embodiment of the technical solution: before laying the sleepers, the pipe network and the canal of the rice field irrigation system shall be inspected and maintained to ensure that they are free of damage and blockage, so as to ensure the normal operation of the irrigation system during the construction and use of the golf course;
[0018] As a further preferred embodiment of the present technical solution, the setting of the practice target points can be distinguished by using markers or lighting devices of different colors, so that golf enthusiasts can clearly identify them under different lighting conditions.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] 1. The present invention makes full use of the idle time and space of rice paddies during the non-planting period and transforms them into golf courses, thereby improving the utilization rate of land resources. This method avoids the waste of idle land during the non-planting period, enables the land to play its value in different time periods, and realizes the effective combination of idle rice paddies and sports land.
[0021] 2. In the process of site construction, the present invention selects environmentally friendly and recyclable materials, which can be naturally decomposed after use and will not cause long-term pollution to the environment like traditional synthetic materials. The sand pit uses a mixture of natural sand and rice husks as fillers, which not only utilizes agricultural waste rice husks, but also reduces the excessive exploitation of natural sand, which conforms to the concept of environmental protection and sustainable development;
[0022] 3. The golf course is designed by taking advantage of the natural topography and landforms of the rice fields, which reduces the need for large-scale transformation of the original topography and protects the natural ecological environment. At the same time, after the golf game is over, the course can be relatively easily restored to the state of rice planting, which has less impact on the environment and is conducive to the stability and sustainable development of the ecosystem;
[0023] 4. Utilizing the existing irrigation system and natural topography of rice fields reduces the cost of site leveling and large-scale infrastructure construction. There is no need to re-lay a complex irrigation system. The original pipe network and canals in the rice fields can meet the water needs of the golf course. At the same time, the use of sand pit fillers mixed with rice husks also reduces material costs.
[0024] 5. Combining golf with rice field landscape creates a unique sports experience. Golf enthusiasts can enjoy the fun of sports in the natural environment of rice fields and feel the natural scenery and unique charm of rice fields. This distinctive venue design can attract more people to participate in golf and is conducive to the promotion and popularization of golf. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 The present invention is a schematic layout diagram of a method for building a golf course using a rice field. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] Example
[0028] See also Figure 1 As shown, the present invention provides a technical solution: a method for building a golf course using a rice field, characterized in that it includes the following steps:
[0029] S1: After the rice is harvested, the golf course should be planned during the non-planting period of the rice fields. The planning should at least include the layout of a standard 18-hole golf course. In the planning process, the topography, size of the rice fields, and surrounding environment should be fully considered to ensure that the layout of the course is reasonable and coordinated with the surrounding environment.
[0030] S2: Lay sleepers on top of the pipes and canals of the rice field irrigation system to build a stable foundation layer. The sleepers should be laid in a way that ensures they are closely arranged and firmly fixed to avoid loosening or displacement. At the same time, the material of the sleepers should have a certain strength and durability to withstand the weight of people walking and equipment placed during golf games.
[0031] S3: Lay a golf rug on the sleepers to form a surface suitable for golf. The rug should be laid to ensure that the surface is flat, without wrinkles and gaps, and the material of the rug should have appropriate elasticity and friction to meet the requirements of rolling and hitting the golf ball on it.
[0032] S4: Practice target points at different distances should be set up in the area where the golf carpet is laid to meet the needs of golf enthusiasts for swing practice. The setting of practice target points should have clear identification and positioning, and can be adjusted and changed according to different practice difficulties and levels.
[0033] S5: Putting greens, bunkers and other obstacles that comply with golf rules should be set up on the planned playing field. The setting of the putting green should meet the standard requirements of golf competitions, including slope, flatness and turf quality. The setting of bunkers should take into account their shape, depth and location to ensure that they can increase the difficulty and challenge of the game. The setting of other obstacles should make full use of the natural features of rice fields, such as ditches and ridges, so that they comply with the rules of the game and have a unique style.
[0034] S6: Rest areas, viewing areas, parking lots and other facilities should be set up around the stadium for users to use to improve user comfort and convenience. The rest areas should be equipped with comfortable seats, sunshade facilities, trash cans and other equipment. The viewing areas should have good views and safety protection facilities. The parking lots should be reasonably planned and laid out to meet the parking needs of vehicles during peak hours of the stadium.
[0035] In this embodiment, specifically: after the rice is harvested, first organize a survey of the rice fields, measure the area, shape and surrounding environment of the rice fields, evaluate the soil conditions, irrigation water sources, etc., to ensure that the rice fields are suitable for building golf courses and do not affect subsequent planting; according to the survey results, combined with golf rules and standards, plan at least a standard 18-hole golf course layout, and in the planning process, fully consider the original topographical features of the rice fields, such as ponds can be planned as landscape obstacles or special hitting areas, and hillocks can be designed as part of the green or tee box to increase the challenge and uniqueness of the golf course; at the same time, it is necessary to reasonably plan the direction and length of the fairway to avoid excessive damage to the soil structure of the rice fields and ensure that the fertility and air permeability of the soil can meet the growth needs of rice in subsequent planting.
[0036] In this embodiment, specifically: before laying the sleepers, the pipe network and pipelines of the rice field irrigation system are comprehensively inspected and maintained; the debris and dirt on the pipe network are cleaned, and the pipes are checked for damage or leakage, and if there are any problems, they are repaired in time; for the pipelines, ensure that the inside is flat and unblocked so that the sleepers can be laid firmly; select suitable sleeper materials, such as high-quality wood that has been treated with antiseptics, and its specifications should be determined according to the design bearing capacity and actual needs of the golf course; the laying of sleepers should be carried out according to the pre-designed plan to ensure that the spacing is uniform and meets the structural requirements of the golf course; during the laying process, use professional tools to firmly fix the sleepers on the pipe network and pipelines to avoid loosening or displacement; after the sleepers are laid, check their stability and levelness again, and adjust them if necessary to provide a solid foundation for the subsequent laying of golf carpets.
[0037] In this embodiment, specifically: a golf ball blanket material that meets biodegradable standards is selected, and the material should have good elasticity, friction and wear resistance to meet the requirements of golf; before laying the blanket, the surface of the sleeper is cleaned to ensure that there is no debris and dust; according to the design plan of the golf course, the blanket is gradually laid from one end to ensure that the stitching between the blankets is tight and seamless; during the laying process, the blanket is stretched flat to avoid wrinkles or bulges that affect the rolling trajectory of the ball; for the edge of the blanket, a fixing device is used to fix it on the sleeper to prevent the blanket from shifting during use; after laying, the overall surface of the blanket is inspected and tested to ensure that its flatness and elasticity meet the standards, providing a good batting experience for golf enthusiasts.
[0038] In this embodiment, specifically: according to different needs and difficulty levels of golf practice, the setting position and distance of the practice target point are determined; using measuring tools and equipment, the distance between the target point and the serving point is accurately measured; the target point can be set in a variety of ways, such as setting obvious markers on the ball blanket, the color of the markers should be bright and easy to identify, and different colors of markers can be set according to different distances, such as using green markers for close-range target points, yellow markers for medium-range target points, and red markers for long-range target points; or using an embeddable small target device, embedding it under the ball blanket, so that it forms a slightly raised target area on the surface of the ball blanket, increasing the realism of hitting the ball; at the same time, setting corresponding signs around the target point, indicating the distance of the target point and hitting suggestions, so as to facilitate golf enthusiasts to conduct targeted practice.
[0039] In this embodiment, specifically: for the setting of the green, firstly, grass species suitable for the local climate and soil conditions are selected to ensure that the grass species have good adaptability and resistance to trampling; before planting the turf, the soil in the green area is improved and treated, and an appropriate amount of organic fertilizer and soil conditioner are added to improve the fertility and water retention of the soil; according to the design requirements, the turf is laid in the green area to ensure that the splicing between the turfs is tight and gapless; after the turf is laid, the green is shaped using professional tools to make it have a slope and surface flatness that meet the standards of golf competitions; for the setting of the sand pit, the shape and depth of the sand pit are excavated according to the design requirements to ensure that the size of the sand pit meets the rules of golf; natural sand and rice husks are mixed evenly in a predetermined ratio as the filler of the sand pit; during the filling process, it is ensured that the filler is evenly distributed in the sand pit and has good stability and air permeability; for other obstacle areas that meet the rules of golf, full use is made of the natural features of the rice fields, such as ponds, ditches, etc., and they are properly trimmed and marked to make them challenging obstacle areas, increasing the fun and difficulty of the game.
[0040] In this embodiment, specifically: the area and location of the rest area shall be reasonably planned according to the scale of the stadium and the expected passenger flow; the rest area shall be selected in a relatively cool and well-ventilated area of the stadium, close to the main fairway and viewing area, so as to be convenient for players and spectators; comfortable seats shall be provided in the rest area, and the design of the seats shall conform to the principles of ergonomics and be able to provide good support and comfort; the seat material may be made of durable and easy-to-clean materials, such as plastic or wood; at the same time, sunshade facilities, such as large parasols or awnings, shall be provided in the rest area, and the area of the sunshade facilities shall be sufficient to cover most of the rest area to provide users with good sunshade effects; trash cans shall also be provided in the rest area, and the capacity of the trash cans shall be determined according to the number of users of the rest area and the amount of garbage generated, and the trash cans shall have a classification function to facilitate garbage recycling and disposal.
[0041] In this embodiment, specifically: select environmentally friendly lighting equipment, such as solar street lights or low-energy LED lighting fixtures. According to the layout of the stadium and the needs of nighttime activities, reasonably determine the installation location and quantity of lighting equipment. Lighting equipment should be installed in the main passages, rest areas, viewing areas and parking lots of the stadium to ensure that these areas have sufficient brightness at night. For solar street lights, ensure that their solar panels can fully receive sunlight and be effectively charged during the day. During the installation process, ensure that the lighting equipment is firmly installed and the wires are securely connected to avoid leakage or short circuits. At the same time, regularly inspect and maintain the lighting equipment to ensure its normal operation and no interference with the surrounding ecological environment.
[0042] In this embodiment, specifically: after the golf activity is over, the golf course environment restoration program is immediately started; first, all temporary facilities on the golf course are removed, such as markers of practice target points, information display screens in the viewing area, etc.; then, the golf carpet is cleaned and processed. If the golf carpet is made of biodegradable material, it can be left in the rice field to degrade naturally according to its degradation characteristics, or it can be recycled according to prescribed procedures; for the filling in the sand pit, rice husks can be treated as agricultural waste; then, the sleepers are removed and processed, and the recyclable parts of the sleepers are recycled; finally, the soil of the rice field is leveled and repaired, and agricultural machinery is used to restore the land to its original flatness, and the irrigation system is repaired to ensure that the fertility and air permeability of the soil return to normal levels, so as to prepare for the next season of rice planting.
[0043] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for building a golf course using a rice field, characterized in that: The following steps are involved: S1: After rice is harvested, the golf course shall be planned during the non-planting period of rice fields, and the plan shall include at least a standard 18-hole golf course layout; S2: Laying sleepers on the pipe network and canals of the rice field irrigation system to build a stable foundation layer; S3: Laying golf carpet on the sleepers to form a surface suitable for golfing; S4: Set up practice target points at different distances in the area where the golf carpet is laid to meet the needs of golf enthusiasts for swing practice; S5: Provide putting greens, bunkers and other hazards in accordance with the Rules of Golf on the planned arena; S6: Set up rest areas, viewing areas, parking lots and other facilities around the stadium for users to use to improve user comfort and convenience.
2. The method for building a golf course using a rice field according to claim 1, characterized in that: The golf ball carpet in S3 is made of biodegradable materials to reduce environmental pollution and facilitate the restoration of rice field functions.
3. The method for building a golf course using a rice field according to claim 1, characterized in that: The sand pit filler is a mixture of natural sand and rice husks, which maintains the functionality of the sand pit.
4. The method according to any one of claims 1 to 3, characterized in that: After the golf event, measures were taken to restore the planting conditions of the rice fields so as not to affect the next season's rice planting.
5. The method for building a golf course using a rice field according to claim 1, characterized in that: The planning of the golf course also includes natural terrain features such as ponds and hills to increase the challenge and uniqueness of the course.
6. The method for building a golf course using a rice field according to claim 1, characterized in that: Environmentally friendly lighting equipment is installed around the golf course to ensure the feasibility of night activities.
7. The method for building a golf course using a rice field according to claim 1, characterized in that: Before laying sleepers, the pipe network and canals of the rice field irrigation system should be inspected and maintained to ensure that they are free of damage and blockage, so as to ensure the normal operation of the irrigation system during the construction and use of the golf course.
8. The method for building a golf course using a rice field according to claim 1, characterized in that: The setting of practice target points can be distinguished by using markers or lighting devices of different colors so that golf enthusiasts can clearly identify them under different lighting conditions.