Annual investment decision-making method for oil and gas project

Through the comprehensive score calculation method, combined with unit net present value, operating cost and future cash flow, the shortcomings of single-factor decisions in the annual investment decisions of oil and gas enterprises are solved, multi-factor considerations and time value assessments are achieved, and scientific and reasonable investments are provided. Decision-making basis.

CN118917676APending Publication Date: 2024-11-08CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310513176.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-08
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing annual investment decision-making methods of oil and gas enterprises mainly rely on single factors and cannot take into account long-term and short-term and time values, resulting in unscientific and reasonable decisions.

Method used

The comprehensive score calculation method is adopted, based on the unit net present value, unit operating cost and cash flow in the next nearly N years, the comprehensive score is calculated through the weight coefficients K1, K2, and K3, and combined with normalization processing, a multi-factor investment decision model is provided.

Benefits of technology

It provides a scientific and reasonable annual investment decision-making method, considers the long-term and time value, simplifies the calculation model, and improves the economic evaluation and applicability of decision-making.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917676A_ABST
    Figure CN118917676A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides an oil and gas project annual investment decision-making method, and the method comprises the steps: calculating the comprehensive score of a planned investment unit according to the unit net present value, the unit operation cost and the cash flow in recent N years in the future of the planned investment unit of an oil and gas project, and N is greater than or equal to 1; and performing investment decision on the planned investment unit according to the comprehensive score of the planned investment unit. The technical scheme provided by the embodiment of the invention at least has the following advantages: 1) a scientific and reasonable comprehensive method is provided for annual investment decision, a plurality of decision factors are considered, and economic evaluation is carried out on new investment from long and short term and time value methods; a calculation model is simple, normalized score distribution is determined through simple distribution of numerical values, understanding is easy, and practicability is high; and 3) the method is wide in applicability, and is suitable for annual new investment decisions of domestic and overseas oil and gas assets.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of oil and gas exploration technology, and in particular to an annual investment decision-making method for oil and gas projects. Background Art

[0002] Investment activities are an important prerequisite for the production, operation and development of an enterprise. For oil and gas companies, the investment decision on new capacity projects or new engineering projects in the next year is an important factor affecting the benefits of oil and gas companies. Only scientific and reasonable annual planned investment decisions can ensure the maximization of the benefits of the company's production and operation.

[0003] The commonly used methods for annual investment plan decision-making in oil and gas enterprises are single-factor decision-making methods, such as the net present value method, the payback period method, the present value index method, the internal rate of return method, etc. The net present value method uses a certain discount rate to discount the cash flow expected to be generated by the new investment activities in the future, and the size of the net present value is used as the basis for investment decisions; the payback period method is divided into the static payback period method and the dynamic payback period method. The static payback period method does not consider the time value of funds, and uses the difference between the starting investment year and the year when the cumulative cash flow turns positive as the basis for investment decisions. The dynamic payback period method considers the time value of funds, and uses the difference between the starting investment year and the year when the cumulative discounted cash flow turns positive as the basis for investment decisions; the present value index method uses the ratio between the present value of future cash flows and the investment as the basis for investment decisions; the internal rate of return method uses the discount rate that makes the net present value zero as the basis for investment decisions. The above methods also have certain problems, such as the net present value method cannot reflect the part of the capital return that is higher than the capital cost rate, that is, the part of the net present value greater than zero is not treated differently. The dynamic payback period method loses its judgment significance when the cash flow in a future year is accidentally negative, and specific issues need to be studied specifically. The concept of the present value index method is not easy to understand, and its evaluation standard value needs to be determined according to the company's own business objectives, so it is difficult to get a reasonable standard; the internal rate of return method cannot measure the absolute growth of value, and it is also difficult to determine the evaluation standard.

[0004] Judging from the current research content, there is no method that takes into account multiple comprehensive factors such as net present value, cash flow and cost as the basis for annual investment decisions. Summary of the invention

[0005] In view of this, the present application provides an annual investment decision-making method for oil and gas projects, so as to solve the problem that the existing technology uses a single factor to evaluate investment decisions and cannot take into account both long-term and short-term as well as time value.

[0006] In a first aspect, an embodiment of the present application provides an annual investment decision-making method for an oil and gas project, comprising:

[0007] Calculate the comprehensive score of the planned investment unit based on the unit net present value, unit operating cost and cash flow in the next N years of the planned investment unit of the oil and gas project, where N≥1;

[0008] An investment decision is made for the planned investment unit according to the comprehensive score of the planned investment unit.

[0009] In a possible implementation, the comprehensive score of the planned investment unit is calculated based on the unit net present value, unit operating cost and cash flow in the next N years of the planned investment unit of the oil and gas project, including:

[0010] The comprehensive score of the planned investment unit is calculated according to the formula: Comprehensive score = K1*UNPVi+K2*FCFi-K3*UOCi, where UNPVi is the normalized value of the unit net present value of the ith planned investment unit, FCFi is the normalized value of the unit operating cost of the ith planned investment unit, UOCi is the normalized value of the cash flow of the ith planned investment unit in the next N years, and K1, K2, and K3 are weight coefficients.

[0011] In a possible implementation, the method for normalizing the unit net present value includes:

[0012] When the unit net present value is less than 0, the normalized value of the unit net present value is 0;

[0013] When the unit net present value is greater than or equal to 0 and less than or equal to 10, the normalized value of the unit net present value is 0 to 0.6;

[0014] When the unit net present value is greater than 25, the normalized value of the unit net present value is 0.8-1.

[0015] In a possible implementation, the method for normalizing the unit operating cost includes:

[0016] When the unit operating cost is less than 0, the normalized value of the unit operating cost is 0;

[0017] When the unit operating cost is greater than or equal to 0 and less than 25, the normalized value of the unit operating cost is 0 to 01;

[0018] When the unit operating cost is greater than 25, the normalized value of the unit operating cost is 1.

[0019] In a possible implementation, the method for normalizing the cash flows in the next N years includes:

[0020] When the cash flow in the next N years is less than -70, the normalized value of the cash flow in the next N years is 0;

[0021] When the cash flow in the next N years is greater than or equal to -70 and less than 0, the normalized value of the cash flow in the next N years is 0 to 0.2;

[0022] When the cash flow in the next N years is greater than or equal to 0 and less than 50, the normalized value of the cash flow in the next N years is 0.2 to 0.8;

[0023] When the cash flow in the next N years is greater than or equal to 50, the normalized value of the cash flow in the next N years is 0.8~1.

[0024] In a possible implementation, the values ​​of K1, K2, and K3 are 0.3, 0.5, and 0.2, respectively.

[0025] In a possible implementation, the cash flow in the next N years is specifically: the cash flow in the next 3 years.

[0026] In a second aspect, an embodiment of the present application provides an annual investment decision-making device for an oil and gas project, comprising:

[0027] A comprehensive score calculation module is used to calculate the comprehensive score of the planned investment unit of the oil and gas project according to the unit net present value, unit operating cost and cash flow in the next N years, where N≥1;

[0028] An investment decision module is used to make investment decisions on the planned investment unit according to the comprehensive score of the planned investment unit.

[0029] The technical solution provided by the embodiment of the present application has at least the following advantages:

[0030] 1) Provides a scientific and reasonable comprehensive method for annual investment decision-making, taking into account multiple decision-making factors, and conducting economic evaluation of new investments from the perspectives of long-term, short-term and time value methods;

[0031] 2) The calculation model is simple, and the normalized score distribution is determined by the simple distribution of the values, which is easy to understand and has strong practicality;

[0032] 3) It has wide applicability and is applicable to annual new investment decisions for domestic and overseas oil and gas assets. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0034] Figure 1 A flow chart of an annual investment decision-making method for an oil and gas project provided in an embodiment of the present application;

[0035] Figure 2 This application also provides a structural block diagram of an annual investment decision-making device for oil and gas projects. DETAILED DESCRIPTION

[0036] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.

[0037] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0038] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.

[0039] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0040] In recent years, oil and gas production companies have paid more and more attention to efficiency first, and the scientificity and rationality of annual investment decisions have become the top priority of oil and gas production companies. How to find an investment decision-making method that considers multiple factors and is simple and easy to operate is an urgent problem to be solved. At present, most oil and gas production companies use single-factor decision-making methods, which only consider single indicators such as net present value, internal rate of return, present value index, etc., and cannot take into account long-term and short-term as well as time value. Against this research background, the embodiment of the present application proposes a comprehensive decision-making method for annual investment with multiple factors, which provides a more scientific and reasonable decision-making basis for the annual investment decisions of oil and gas companies. It is explained in detail in conjunction with the specific implementation method below.

[0041] See also Figure 1 , is a flow chart of an annual investment decision-making method for oil and gas projects provided in an embodiment of the present application. Figure 1 As shown, it mainly includes the following steps.

[0042] Step S101: Calculate the comprehensive score of the planned investment unit of the oil and gas project according to the unit net present value, unit operating cost and cash flow in the next N years, where N≥1.

[0043] In the specific implementation, the main indicators of economic evaluation such as net present value, cash flow, unit operating cost, etc. can be used as the basis to establish a multi-factor investment decision-making model with unit net present value (UNPV), unit operating cost (UOC) and cash flow (FCF) in the next N years as decision factors.

[0044] In addition, in order to improve the accuracy of the calculation results, the three decision factors need to be normalized, and different scores should be assigned according to the distribution of the values ​​of each decision factor, that is, the concentration of the values ​​of different indicators should be observed, and the threshold value should be determined by the normalization method of the broken line. Different values ​​should be assigned to different threshold intervals to obtain the normalized scores of each indicator, and then the comprehensive score should be obtained.

[0045] In a possible implementation, the multi-factor investment decision model is: comprehensive score = K1*UNPVi+K2*FCFi-K3*UOCi. Among them, UNPVi is the normalized value of the unit net present value of the i-th planned investment unit, FCFi is the normalized value of the unit operating cost of the i-th planned investment unit, UOCi is the normalized value of the cash flow of the i-th planned investment unit in the next N years, and K1, K2, and K3 are weight coefficients. In a specific implementation, K1, K2, and K3 can take values ​​of 0.3, 0.5, and 0.2, respectively. Of course, those skilled in the art can set other weights for K1, K2, and K3 respectively according to actual needs, and the embodiments of the present application do not impose specific restrictions on this.

[0046] In one possible implementation, the normalized score distributions of unit net present value, unit operating cost, and cash flows over the next N years are shown in Table 1.

[0047] Table 1:

[0048]

[0049] As shown in Table 1, when the unit net present value is less than 0, the normalized value of the unit net present value is 0; when the unit net present value is greater than or equal to 0 and less than or equal to 10, the normalized value of the unit net present value is 0 to 0.6; when the unit net present value is greater than 25, the normalized value of the unit net present value is 0.8 to 1.

[0050] When the unit operating cost is less than 0, the normalized value of the unit operating cost is 0; when the unit operating cost is greater than or equal to 0 and less than 25, the normalized value of the unit operating cost is 0-01; when the unit operating cost is greater than 25, the normalized value of the unit operating cost is 1.

[0051] When the cash flow in the next N years is less than -70, the normalized value of the cash flow in the next N years is 0; when the cash flow in the next N years is greater than or equal to -70 and less than 0, the normalized value of the cash flow in the next N years is 0~0.2; when the cash flow in the next N years is greater than or equal to 0 and less than 50, the normalized value of the cash flow in the next N years is 0.2~0.8; when the cash flow in the next N years is greater than or equal to 50, the normalized value of the cash flow in the next N years is 0.8~1.

[0052] It should be pointed out that those skilled in the art can set other normalized scores for the unit net present value, unit operating cost and cash flow in the next N years according to actual needs, and the embodiments of the present application do not impose specific restrictions on this.

[0053] Step S102: Make an investment decision on the planned investment unit based on the comprehensive score of the planned investment unit.

[0054] In the specific implementation, the planned investment units can be sorted according to the comprehensive score, and then a list of planned investment units with priority investment can be obtained for investment decisions.

[0055] The technical solution provided by the embodiment of the present application has at least the following advantages:

[0056] 1) Provides a scientific and reasonable comprehensive method for annual investment decision-making, taking into account multiple decision-making factors, and conducting economic evaluation of new investments from the perspectives of long-term, short-term and time value methods;

[0057] 2) The calculation model is simple, and the normalized score distribution is determined by the simple distribution of the values, which is easy to understand and has strong practicality;

[0058] 3) It has wide applicability and is applicable to annual new investment decisions for domestic and overseas oil and gas assets.

[0059] For ease of understanding, the annual investment decision method for oil and gas projects provided by the embodiment of this application will be exemplified below based on a specific application scenario.

[0060] Specifically, for the 77 planned investment units added in 2019, three indicators, namely unit operating cost, estimated unit net present value during the future contract period, and total cash flow for the three years from 2019 to 2021, were selected as decision factors.

[0061] First, the three decision factors are normalized to obtain the normalized values ​​as shown in Table 2.

[0062] Table 2:

[0063]

[0064]

[0065] Secondly, the unit operating cost, the estimated unit net present value of the future contract period and the total cash flow from 2019 to 2021 were assigned weights of 0.2, 0.3 and 0.5 respectively. Substituting them into the decision model formula, the comprehensive scores of the 77 planned investment units were obtained. For the convenience of display, the comprehensive scores were processed in percentage. The results are shown in Table 3.

[0066] Table 3:

[0067]

[0068]

[0069]

[0070] After evaluating the 77 planned investment units in 2019 through a multi-factor investment decision-making model, it was recommended to suspend the investment plan for the planned investment units ranked after 60th in the comprehensive score. In the decision-making of the 2019 plan, the recommendations of the decision-making model were adopted for key operator projects.

[0071] Corresponding to the above-mentioned embodiments, the present application also provides an annual investment decision-making device for oil and gas projects.

[0072] See also Figure 2 , which is a structural block diagram of an annual investment decision-making device for oil and gas projects provided in this application. Figure 2 As shown, it mainly includes the following modules.

[0073] The comprehensive score calculation module 201 is used to calculate the comprehensive score of the planned investment unit of the oil and gas project according to the unit net present value, unit operating cost and cash flow in the next N years, where N≥1;

[0074] The investment decision module 202 is used to make an investment decision on the planned investment unit according to the comprehensive score of the planned investment unit.

[0075] The technical solution provided by the embodiment of the present application has at least the following advantages:

[0076] 1) Provides a scientific and reasonable comprehensive method for annual investment decision-making, taking into account multiple decision-making factors, and conducting economic evaluation of new investments from the perspectives of long-term, short-term and time value methods;

[0077] 2) The calculation model is simple, and the normalized score distribution is determined by the simple distribution of the values, which is easy to understand and has strong practicality;

[0078] 3) It has wide applicability and is applicable to annual new investment decisions for domestic and overseas oil and gas assets.

[0079] It should be pointed out that the specific contents involved in the embodiments of the present application can be found in the description of the above method embodiments, and for the sake of brevity, they will not be repeated here.

[0080] The above is only a specific implementation of the present application. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. The protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A method for annual investment decision-making in oil and gas projects. It is characterized in that include: Calculate the comprehensive score of the planned investment unit based on the unit net present value, unit operating cost and cash flow in the next N years of the planned investment unit of the oil and gas project, where N≥1; An investment decision is made for the planned investment unit according to the comprehensive score of the planned investment unit.

2. The method according to claim 1, It is characterized in that The comprehensive score of the planned investment unit is calculated based on the unit net present value, unit operating cost and cash flow in the next N years of the planned investment unit of the oil and gas project, including: The comprehensive score of the planned investment unit is calculated according to the formula: Comprehensive score = K1*UNPVi+K2*FCFi-K3*UOCi, where UNPVi is the normalized value of the unit net present value of the ith planned investment unit, FCFi is the normalized value of the unit operating cost of the ith planned investment unit, UOCi is the normalized value of the cash flow of the ith planned investment unit in the next N years, and K1, K2, and K3 are weight coefficients.

3. The method according to claim 2, It is characterized in that The normalization method of the unit net present value includes: When the unit net present value is less than 0, the normalized value of the unit net present value is 0; When the unit net present value is greater than or equal to 0 and less than or equal to 10, the normalized value of the unit net present value is 0 to 0.6; When the unit net present value is greater than 25, the normalized value of the unit net present value is 0.8-1.

4. The method according to claim 2, It is characterized in that The normalization method of the unit operating cost includes: When the unit operating cost is less than 0, the normalized value of the unit operating cost is 0; When the unit operating cost is greater than or equal to 0 and less than 25, the normalized value of the unit operating cost is 0 to 01; When the unit operating cost is greater than 25, the normalized value of the unit operating cost is 1.

5. The method according to claim 2, It is characterized in that The normalization method of the cash flow in the next N years includes: When the cash flow in the next N years is less than -70, the normalized value of the cash flow in the next N years is 0; When the cash flow in the next N years is greater than or equal to -70 and less than 0, the normalized value of the cash flow in the next N years is 0 to 0.2; When the cash flow in the next N years is greater than or equal to 0 and less than 50, the normalized value of the cash flow in the next N years is 0.2 to 0.8; When the cash flow in the next N years is greater than or equal to 50, the normalized value of the cash flow in the next N years is 0.8~1.

6. The method according to claim 2, It is characterized in that The values ​​of K1, K2 and K3 are 0.3, 0.5 and 0.2 respectively.

7. The method according to claim 1, It is characterized in that The cash flow in the next N years is specifically: the cash flow in the next 3 years.