BIM-based building material management system, method and equipment and storage medium

By integrating BIM model and material management module in the building material management system, the problem of delay in material information update in traditional management methods is solved, precise positioning and efficient management of building materials are realized, and material utilization and management efficiency of construction projects are improved. .

CN118917754AInactive Publication Date: 2024-11-08SHIYUN TECH (SHENZHEN) CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411419506.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional building materials management relies on manual forms and paper records, which leads to inefficiency and error-proneness, and the inability to track the storage location and use of materials in real time, resulting in delays in information updates and affecting material utilization and project progress.

Method used

Adopt a BIM-based building material management system, through the integration of the model management module and the material management module, the correlation between building material information and the BIM model is realized, and data is synchronized in real time, providing functions such as model construction, regional management and material category management to ensure material information Accurate positioning and efficient management.

Benefits of technology

It realizes accurate positioning, real-time tracking and efficient management of building materials, improves material utilization and management efficiency, reduces the delay in information updates, and ensures the smooth progress of the project and cost control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917754A_ABST
    Figure CN118917754A_ABST
Patent Text Reader

Abstract

The invention discloses a BIM-based building material management system, method and device, and a storage medium, and relates to the technical field of building material management, and the system comprises a BIM management side and a material management side; the model management module is arranged on the BIM management side and is used for managing a BIM model of a building project and associating the building material information with the BIM model by importing the building material information corresponding to the building project so as to realize spatial positioning of the building material information; and the material management module is arranged on the material management side and is used for managing full-cycle data of the building material information and performing real-time data synchronization with the building material information of the BIM management side so as to realize real-time updating of the building material information. By integrating the BIM model and the material management module, positioning and real-time updating of the building materials are realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building material management, and in particular to a building material management system, method, device and storage medium based on BIM. Background Art

[0002] With the rapid development of the construction industry, the scale of construction projects continues to expand, and the types and quantities of construction materials involved are also increasing. Traditional construction material management mainly relies on manual forms and paper records, which is not only inefficient and prone to errors, but also unable to track the storage location of construction materials and their actual use and storage in real time, resulting in delays in the update of construction material information. This untimely information not only affects the efficient use of construction materials, but may also cause project delays and increased costs. Summary of the invention

[0003] The main purpose of this application is to provide a BIM-based building material management system, method, device and storage medium, aiming to solve the technical problem of being unable to track the storage location and usage of construction materials in real time.

[0004] To achieve the above objectives, the embodiment of the present application provides a BIM-based building material management system, including a BIM management side and a material management side; A model management module is provided on the BIM management side, and is used to manage the BIM model of the construction project, and to import the building resource information corresponding to the construction project, associate the building resource information with the BIM model, and realize the spatial positioning of the building resource information; The material management module is arranged on the material management side, and is used to manage the full-cycle data of the building material information, and to synchronize the real-time data with the building material information on the BIM management side, so as to realize the real-time update of the building material information.

[0005] In one embodiment, the model management module includes a model building unit, a regional management unit and a BIM model unit; The model building unit is used to receive the model file uploaded by the user and perform lightweight processing on the model file; After the model file has completed lightweight processing, extracting the building structure and building components in the model file; The building component is associated with corresponding geometric data and component attributes to obtain a geometric component with parameters.

[0006] In one embodiment, the area management unit is used to divide the construction area of ​​the construction project and manage the hierarchical structure of the construction area by constructing an area structure tree; The area management unit is further used to associate the building area with the building resource information and the geometric component to manage the building resource information in the building area.

[0007] In one embodiment, the BIM model unit is configured with an interactive interface, and the interactive interface is used to display the model selected from the uploaded model file, or the geometric component corresponding to the model; On the interactive interface, scaling, translation and rotation operations are supported on the model or the geometric component; When the geometric component is selected, the parameters of the geometric component and the corresponding building material information are displayed synchronously.

[0008] In one embodiment, the material management module includes: A material category management unit, used to classify the building material information and manage the building material information according to the material category; A material acceptance management unit, configured to receive new construction material information, confirm the material category and material quantity of the new construction material information, and allocate the new construction material information to a corresponding construction area; A storage management unit, used to manage the storage records of the building material information, including the material category, material quantity and storage area of ​​the building material information, and update the inventory status of the building material information in real time; A delivery management unit, used to manage the delivery and use of the building resource information and record delivery data of the building resource information; The return management unit is used to manage the information of unused or returned construction materials; The exit management unit is used to manage the exit of materials at the end of the construction project, including the recovery, transfer or disposal of construction materials, and record the exit data to ensure the clear destination of the construction materials; Waste material disposal unit, used to recycle or process waste building materials that are no longer in use; The loss calculation unit is used to calculate the loss of the building materials according to the outbound data and the outbound data, and provide a loss report.

[0009] In one embodiment, the waste material disposal unit also includes two methods: scrapping and damage processing; The scrapping process is used to process the building materials that have no reuse value, and record the scrapped quantity and corresponding financial data; The damage reporting process is used to process the building materials that are lost or unusable, and record the amount of damage reported.

[0010] In one embodiment, the BIM-based building material management system further includes: Based on the association between the building resource information and the BIM model, the user selects a geometric component of the BIM model on the interactive interface to query the building resource information corresponding to the building area associated with the geometric component; When the inventory status of the building resource information changes, the corresponding building resource information in the building area associated with the geometric component is updated in real time.

[0011] The embodiment of the present application also provides a BIM-based construction material management method, the BIM-based construction material management method comprising: On the BIM management side, a model file of a building project is uploaded by using a model building unit, and building resource information corresponding to the building project is imported to associate the building resource information with the building model corresponding to the model file; Divide the building project into different building areas in the building model corresponding to the building project by a regional management unit, and associate the divided building areas with the corresponding building resource information to achieve zoning management of the building resource information; The BIM model unit provides an interactive interface to display the building model corresponding to the building project, and on the interactive interface, the real-time update and query of the building material information in the building area are realized; On the material management side, the material management module is used to perform full-cycle management of the building material information, update the inventory status of the building material information in real time, and maintain real-time data synchronization with the building material information on the BIM management side.

[0012] An embodiment of the present application also provides a BIM-based building material management device, the device comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, the computer program being configured to implement the steps of the BIM-based building material management method as described above.

[0013] An embodiment of the present application further provides a storage medium, which is a readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the BIM-based building material management method as described above are implemented.

[0014] The embodiment of the present application discloses a BIM-based building material management system, including a BIM management side and a material management side; a model management module, which is arranged on the BIM management side, and is used to manage the BIM model of the construction project, and by importing the building material information corresponding to the construction project, the building material information is associated with the BIM model to achieve the spatial positioning of the building material information; a material management module, which is arranged on the material management side, and is used to manage the full-cycle data of the building material information, and performs real-time data synchronization with the building material information on the BIM management side to achieve real-time update of the building material information. The present application realizes the precise positioning, real-time tracking and efficient management of building materials by integrating the BIM model and the material management module, thereby improving the utilization rate and management efficiency of building materials in the construction project. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a system flow diagram of a first embodiment of a BIM-based building material management system involved in the embodiment scheme of the present application; Figure 2 This is a page diagram of a model building unit 110 of a first embodiment of a BIM-based building material management system according to an embodiment of the present application; Figure 3 This is a BIM model display page of the first embodiment of the BIM-based building material management system involved in the embodiment of the present application; Figure 4 This is a model loading selection page for the first embodiment of the BIM-based building material management system involved in the embodiment of the present application; Figure 5 A three-dimensional view display page of a BIM model of the first embodiment of the BIM-based building material management system involved in the embodiment of the present application; Figure 6 This is a flow chart of a third embodiment of a BIM-based building material management method according to an embodiment of the present application; Figure 7 This is a structural diagram of the BIM-based building material management equipment for this application.

[0016] Description of Figure Numbers: 10. Model management module; 20. Material management module; 110. Model building unit; 120. Area management unit; 130. BIM model unit; 210. Material category management unit; 220. Material acceptance management unit; 230. Warehouse entry management unit; 240. Warehouse exit management unit; 250. Warehouse return management unit; 260. Exit management unit; 270. Waste material disposal unit; 280. Loss calculation unit.

[0017] The purpose, features and advantages of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0018] It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0019] With the rapid development of the construction industry, the scale of construction projects continues to expand, and the types and quantities of construction materials involved are also increasing. Traditional construction material management mainly relies on manual forms and paper records, which is not only inefficient and prone to errors, but also unable to track the storage location of construction materials and their actual use and storage in real time, resulting in delays in the update of construction material information. This untimely information not only affects the efficient use of construction materials, but may also cause project delays and increased costs.

[0020] In order to solve the above-mentioned defects existing in the relevant technology, the embodiment of the present application proposes a BIM-based building material management system, including a BIM management side and a material management side; a model management module, which is arranged on the BIM management side, is used to manage the BIM model of the construction project, and by importing the building material information corresponding to the construction project, the building material information is associated with the BIM model to achieve the spatial positioning of the building material information; a material management module, which is arranged on the material management side, is used to manage the full-cycle data of the building material information, and performs real-time data synchronization with the building material information on the BIM management side to achieve real-time update of the building material information. By integrating the BIM model and the material management module, the present application realizes the precise positioning, real-time tracking and efficient management of building materials, thereby improving the utilization rate and management efficiency of building materials in the construction project.

[0021] For ease of understanding, the technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application.

[0022] The first embodiment of the BIM-based building material management system proposed in this application, please refer to Figure 1 , the system includes BIM management side and material management side: The model management module 10 is arranged on the BIM management side, and is used to manage the BIM model of the construction project, and to associate the construction resource information with the BIM model by importing the construction resource information corresponding to the construction project, so as to realize the spatial positioning of the construction resource information.

[0023] In this embodiment, the model management module 10 is responsible for managing the building model of the construction project. The building model is a specific form of the building information model (Building Information Modeling, BIM), which is a virtual reproduction of the entire construction project in a digital environment. The model management module 10 manages the BIM models corresponding to all construction projects, and associates the building material information required in the construction project with the BIM model, thereby realizing the positioning and management of the building material information in three-dimensional space.

[0024] Specifically, the construction of a BIM model involves converting the architectural elements in the design drawings into a digital three-dimensional model, which can be done through professional BIM software such as Autodesk Revit (a building design and construction software). After the user uploads the BIM model file to the system, the system will parse the corresponding BIM model file and extract the building structure and building components. Building components are the basic elements in the construction project, corresponding to the actual building materials and components. Then the building components are bound to their corresponding geometric data and component attribute information to create geometric components with parameters. An identifier is established for each geometric component. Through the identification information of the geometric component, the system can identify, track and manage each geometric component in the BIM model. Next, the construction project is divided into multiple different building areas, which can be defined according to function, floor or other standards in order to effectively organize and manage the construction project.

[0025] After completing the division of the building area, the model management module 10 will further associate the geometric components in the BIM model with the building area to ensure that the geometric components in each building area can be accurately located and tracked. On this basis, the building material information is associated with the geometric components to mark the stacking place of the building materials. When the user views the BIM model in the system, he can obtain the building material information associated with the geometric components in the building area by accessing the building area, thereby realizing the spatial positioning of the building material information.

[0026] In addition, the model management module 10 also provides an interactive interface for displaying the BIM model corresponding to the construction project, allowing users to view and operate the BIM model and the construction material information associated with the BIM model in an intuitive manner, thereby reflecting the construction project's engineering progress and the inventory status of construction materials in real time.

[0027] In this embodiment, the system will automatically or manually import construction material information into the BIM model. This construction material information includes but is not limited to the type, specification, quantity, supplier information, etc. of building materials and other materials. By associating the construction material information with the corresponding geometric components in the BIM model, intuitive data support can be provided for the subsequent management of construction materials. In addition, the imported construction material information is dynamic, that is, as the construction project progresses, the actual use of construction materials can be updated in real time in the BIM model, thereby ensuring that project managers can make decisions based on the latest construction material information.

[0028] Optionally, importing building material information into the BIM model involves docking with the material management module 20, which can be directly connected to the supply chain management system or enterprise resource planning (ERP) system of the construction project through a data interface or a data exchange platform. In this way, building material information can be automatically extracted from the supplier database or the order placed by the procurement mall, and imported into the BIM model according to the preset rules and format. This automated data exchange not only reduces manual input errors, but also improves the efficiency of information updating, ensuring the accuracy and timeliness of building material information in the BIM model.

[0029] Optionally, mobile data collection technology can be used, such as mobile devices with barcode scanning or radio frequency identification (RFID) functions. Use these mobile devices on the construction site to directly scan the labels of building materials to quickly obtain information such as the type, specification, and quantity of building materials. The collected material data can then be uploaded to the system via a wireless network and matched and associated with the geometric components of the corresponding building area in the BIM model. This method can monitor the availability of building materials in real time, and instantly update the building material information in the BIM model when the building materials are used or moved.

[0030] In this embodiment, the basic information part is the information basis of the building materials management system, which contains the core data elements required by the system. Among them, the building materials information is a key component of the basic information, which records in detail the relevant information of all building materials, such as material type, specification, supplier information, purchase price, etc. These building materials information provide the project team with a basis for the selection of building materials, while ensuring the quality and continuity of supply of building materials throughout the project cycle. IPM (Integrated Project Management) is a management practice that integrates the building model of a construction project with the procurement and inventory management of building materials related to the construction project through an integrated management method to form an efficient and collaborative work system. In the building materials management system, IPM is integrated into the management of basic information, and the efficiency of project management is improved by integrating and optimizing building materials information. Contract information records all contract terms and details in the construction project, including supplier contracts, subcontracts, etc. This information is essential for maintaining contract obligations and tracking contract execution. Personnel information covers the detailed information of all construction project participants, including name, position, contact information, etc. Through the management of personnel information, project managers can effectively assign tasks and ensure that the right people are involved in the construction project. In addition, supplier information records the detailed information of all suppliers who provide construction materials and services for construction projects, including supplier qualifications, historical cooperation records, building material supply categories, etc.

[0031] In this embodiment, the model management module 10 includes a model construction unit 110, an area management unit 120 and a BIM model unit 130. The model construction unit 110 is used to create, edit and update the BIM model, and manage the building structure and building component information of the BIM model. The area management unit 120 is used to divide different building areas in the construction project and associate the building areas with the building material information so as to perform zoning management on the building material information. The BIM model unit 130 is used to display the building model of the construction project and provide an interactive interface based on the associated building material information to perform visual management on the building material information.

[0032] It should be noted that the model management module 10 aims to realize the mapping and circulation of building resource information in the BIM model by integrating the three submodules of the model construction unit 110, the regional management unit 120 and the BIM model unit 130. In this process, the model construction unit 110 ensures the dynamic update and maintenance of the BIM model, and the regional management unit 120 realizes the positioning and real-time tracking of building resource information by dividing the building area and associating the building resource information. The BIM model unit 130 makes the management of building resource information more intuitive through three-dimensional visualization. The collaborative work of the model construction unit 110, the regional management unit 120 and the BIM model unit 130 solves the problem of information islands in the traditional building resource management system, so that the building resource information can be effectively linked with the design, construction and other links of the building project, thereby improving the management efficiency of the entire building project life cycle.

[0033] Specifically, the model building unit 110 is used to receive the BIM model file uploaded by the user and perform lightweight processing on the uploaded BIM model file. After the BIM model file is lightweight, the building structure and building components in the BIM model file are extracted. The building components are keyed with the corresponding geometric data and component attributes to obtain geometric components with parameters.

[0034] Specifically, please refer to Figure 2 , Figure 2 It is a schematic diagram of the model construction unit 110 page. The model construction unit 110 supports uploading BIM models. When the user operates on the model construction unit 110 page, click to upload the model and select the model type to ensure that the model file matches the format supported by the system. After selecting the model type, upload the corresponding model file. When the model file is uploaded successfully, the model construction unit 110 will automatically trigger the lightweight process. During the lightweighting process of the BIM model, the user can view the lightweight status of the current BIM model by clicking and switching the Tab page (lightweighted, lightweighting in progress, not lightweighted), such as which models are in the state of waiting to be lightweighted and which models are being lightweighted. After the lightweighting is completed, the user can view the lightweighted model on the model display page.

[0035] For example, please refer to Figure 3 , Figure 3 This is the BIM model display page. On the BIM model display page, users can zoom in and out, translate, rotate, and change the viewing angle to view the lightweight BIM model.

[0036] It should be noted that lightweighting is the process of optimizing the BIM model, which aims to reduce the amount of data in the BIM model and improve the loading and processing speed of the BIM model while retaining the core information and details of the BIM model.

[0037] It should be noted that the model lightweight conversion service component can be used to lightweight and convert professional format models into gltf / glb, 3dtiles, fbx or obj, etc.

[0038] Specifically, the following are the extraction methods corresponding to different data format models:

[0039] Specifically, please refer to Figure 2 After the model is lightweight, in the page diagram of the model building unit 110, select the [Synchronize Data] button to synchronize the model data of the BIM model. The synchronization process first involves the extraction of model data. The system will obtain the building structure, building components, and geometric data and related attribute information corresponding to the building components in the model file. These attribute information include but are not limited to the size, material, location coordinates, etc. of the building components. Then associate the components of the BIM model with the geometric data and related attribute information corresponding to the building components to obtain geometric components with complete parameters. When the model data synchronization is completed, the user can click on the BIM model through the model display page to view the model specific data such as component properties and axis grids.

[0040] It should be noted that the purpose of synchronizing model data is to ensure that information such as the building structure and component properties in the BIM model is consistent with the actual construction project, thereby providing an accurate information basis for material management.

[0041] It should be noted that if you choose to delete the BIM model, the corresponding BIM model option on the model display page will disappear.

[0042] In an optional implementation, the area management unit 120 is used to divide the construction project into different construction areas, and manage the hierarchical structure of the construction areas by constructing an area structure tree.

[0043] The area management unit 120 receives information from the user based on the layout of the building project, creates and manages the architecture of the building area, and displays the architecture of the building area through a tree structure, thereby realizing the selection, editing and query of the building area. In order to accurately reflect these building areas in the BIM model, the system supports associating the building area with the geometric components to determine the attribute information and spatial position corresponding to the building area in the BIM model.

[0044] Optionally, the spatial coordinate data of all geometric components are extracted from the BIM model, and then the spatial boundaries of each building area are set according to the design requirements of the building project. The spatial boundaries can be determined by entering coordinate values ​​or selecting reference planes in the BIM model. Then, all geometric components in the BIM model are traversed, and the spatial coordinates of these geometric components are compared with the spatial boundary conditions to determine the building area to which they belong. After all geometric components are partitioned, nodes are created in the regional architecture tree for each determined building area, and these nodes are sorted according to the hierarchical relationship of the building area (such as the height of the floor) to form a clear hierarchical architecture. Finally, each building component is associated with the node of the corresponding building area, so as to construct the regional architecture tree of the BIM model corresponding to the building project.

[0045] Optionally, building area division is performed based on functional zoning. First, a series of functional categories are defined according to the functional requirements of the building project, such as office area, conference room, rest area, etc. Then, the attribute information of each geometric component is extracted from the BIM model. Based on the attribute information of the geometric component, the predefined classification rules are applied to perform conditional matching operations on the attributes of the geometric component and the classification rules, and the geometric component is assigned to the corresponding functional area. Then, a node is created for each functional area in the regional architecture tree, and the relationship between the functional area nodes is constructed according to the logical relationship between the functional areas (such as inclusion, adjacency, etc.). Finally, each geometric component is associated with the functional area node to which it belongs, so as to realize the hierarchical architecture management of different functional areas in the building project.

[0046] Optionally, the different building areas in the construction project are divided according to the construction phase. The system automatically identifies the construction phase by integrating the construction schedule and divides the building areas according to the construction characteristics and requirements of each phase.

[0047] For example, in the early stage of construction, the construction project is divided into earth excavation area, foundation construction area, etc. In the later stage of construction, it is divided into interior decoration area, peripheral construction area, etc. The system will dynamically adjust the regional division according to the update of the construction progress to ensure that the regional architecture tree is consistent with the actual construction progress.

[0048] Optionally, the building areas can be manually divided through an interactive interface based on actual construction experience and management requirements, and the position of each building area in the regional architecture tree can be determined.

[0049] Specifically, the user selects, edits and queries building areas through the provided user interface, thereby constructing a regional architecture tree that meets the needs of the actual building project. The editing operation may specifically include adding a new area, modifying the area name, deleting an area, and uploading a building area drawing.

[0050] It should be noted that if you need to delete a region in the region architecture tree, you can only delete the last-level nodes of unused regions, and the used region node data cannot be deleted.

[0051] It should be noted that when you click the regional architecture tree button of the BIM model, if the regional architecture tree of the corresponding BIM model does not appear, it means that the model data is not synchronized or the model data is not synchronized successfully. Similarly, when you click the building component property button of the BIM model, if the corresponding building component property does not appear, it means that the model data is not synchronized or the model data is not synchronized successfully.

[0052] In an optional implementation, the area management unit 120 is further used to associate the building area with the building material information and geometric components to manage the building material information in the building area.

[0053] It should be noted that the construction area is associated with the construction material information so as to manage the construction materials in different areas. The area management unit 120 has a clear definition for each construction area in the construction project, which not only helps to organize and control the flow of construction materials on the construction site, ensure that the construction materials can be efficiently allocated to the designated construction area according to the construction progress and construction requirements, but also enables the project manager to better understand the construction material requirements of each construction area.

[0054] Optionally, extract the identifier of each geometric component from the BIM model, and use the identifier as a unique index to match the database record of the material management module. Use SQL statements or similar data manipulation languages ​​to use the identifier of the geometric component as a query condition to retrieve the corresponding building material information from the material information table in the database. Then use a spatial analysis algorithm, such as a minimum bounding box algorithm, to determine the spatial range of each geometric component, and compare these spatial ranges with the spatial definition of the building area. By calculating whether the center point of the spatial range of the geometric component is located inside a specific building area, the geometric component is associated with the corresponding building area. Finally, create an intermediate table in the database or use an associated field to associate the building material information corresponding to the geometric component with the geometric data of the geometric component and the building area to which it belongs.

[0055] Optionally, define data synchronization rules to specify how to correspond geometric components in the BIM model to database records of building resource information. During the data synchronization process, traverse each geometric component in the BIM model, extract its attribute information, and map this attribute information to the corresponding fields of the building resource information in the database according to the synchronization rules. For example, use the category attribute of the geometric component to match the material type, and use the ID of the geometric component to uniquely identify the corresponding building resource record. Then use spatial indexing technology, such as R-tree indexing, to create a spatial index table of geometric components to quickly locate the building area to which the geometric component belongs. After completing data synchronization, update the association table in the database to ensure consistency between the building resource information, geometric data and the building area to which each geometric component corresponds.

[0056] The area management unit 120 logically divides the construction project into several small and easy-to-manage construction areas, and at the same time associates the construction areas with construction materials, so that the flow and use of construction materials are effectively supervised, thereby improving the accuracy and efficiency of material management and thus improving construction efficiency.

[0057] It should be noted that the area management unit 120 is not only the division of physical space, but also involves the allocation and positioning of building materials.

[0058] Optionally, the BIM model unit 130 is used to display the three-dimensional model of the construction project, associate it with corresponding building resources, and provide an interactive interface for visual management of the building resources.

[0059] Specifically, the BIM model unit 130 is configured with an interactive interface, which is used to display the model selected from the uploaded model file, or the geometric component corresponding to the model. On the interactive interface, the model or geometric component can be scaled, translated, and rotated. When a geometric component is selected, the parameters of the geometric component and the corresponding building material information are displayed synchronously.

[0060] In this embodiment, please refer to Figure 4 , Figure 4 The page for selecting a model to load. The user enters the model building unit 110 page and selects to load a model. The page for loading a model displays a list of lightweight BIM models. Select the BIM model to be displayed, and a 3D visualization view page of the corresponding BIM model appears. Please refer to Figure 5 , Figure 5 This is the 3D view display page for the BIM model.

[0061] In addition, the BIM model unit 130 supports direct positioning of building asset information in a three-dimensional view. Users can view the building model from different angles and levels through operations such as zooming, rotating, and panning. They can also obtain building asset information by searching for the number of building assets or the number of the building area where the building assets are stored, thereby achieving intuitive management and monitoring of building asset information. Through this visual management method, building asset information can be understood in a timely manner, building asset plans can be adjusted, resource allocation can be optimized, and the smooth progress of the construction project can be ensured.

[0062] For example, when a user chooses to load the BIM model corresponding to a building project for viewing, if the perspective of the BIM model changes during the operation, the main view button can be used to quickly return to the front view of the BIM model, thereby ensuring that the user can review the overall layout and structure of the model from a standard perspective. In addition, a full-screen view function is also provided to display the model display page in full screen, further enhancing the visual experience.

[0063] Optionally, the interactive interface also provides auxiliary functions such as search and highlighting to help users quickly locate specific building resources or building areas and perform corresponding viewing or management operations.

[0064] For example, the search function allows users to enter keywords or parameters, such as area names, building resource names, etc., and the system will automatically match and highlight eligible building components for users to quickly view. The highlight function can display building resources or building areas in different colors or styles in the BIM model after searching for material information or building area information, so that users can quickly locate and identify them.

[0065] Optionally, you can also simulate the construction progress of the building project. Through the simulated progress button, you can view the construction progress according to different dimensions such as planned time and actual time. You can also compare the current time with the planned time and actual time, conduct deviation analysis on the construction, mark components in different construction status with different colors, and visually display construction deviations.

[0066] Specifically, by obtaining the planned completion time and actual completion time of each geometric component in the BIM model, the deviation between the current time and the planned time is calculated. Then, the system determines the construction status of the corresponding geometric component based on the deviation value. If the deviation value is within the allowable range, the construction progress of the geometric component is considered normal; otherwise, it is considered that there is a deviation in the construction progress of the geometric component.

[0067] For example, in order to intuitively display the construction deviation, the system will mark the components in different construction states with different colors. For example, green is used to indicate the geometric components with normal construction progress, red is used to indicate the geometric components with serious deviations in construction progress, and blue is used to indicate the geometric components with construction progress ahead of schedule. Users can quickly understand the construction progress of the entire construction project by observing the colors of the geometric components.

[0068] Optionally, the system provides a first-person roaming function, allowing users to set roaming speed parameters and select a roaming starting point, roaming in the BIM model from a first-person perspective to enhance the gaming experience.

[0069] It should be noted that the roaming model can be started from the roaming starting point.

[0070] Optionally, the system also provides axis grid function and actual measurement function. In the axis grid function based on the BIM model, the system first parses the BIM model file and extracts the axis grid layer information of the building project, including the axis grid layer number, position coordinates, size, etc. of each geometric component. Then, the system draws the axis grid diagram based on the axis grid layer information. Users can view the corresponding axis grid diagram by selecting different axis grid layers, and set the simulation progress and view the progress list. Specifically, the corresponding progress list is generated according to the user settings, including information such as the planned completion time, actual completion time, and construction status of each geometric component. In addition, the system also supports users to view actual measurement reports. When the user clicks on a geometric component, the system will pop up the actual measurement report window corresponding to the geometric component to display the detailed information of the report.

[0071] The material management module 20 is arranged at the material management side, and is used to manage the full-cycle data of the building material information, and to synchronize the real-time data with the building material information at the BIM management side to achieve real-time update of the building material information.

[0072] It should be noted that the full-cycle data includes the entire life cycle of construction materials from acceptance, warehousing, outbound delivery, return, withdrawal, disposal of waste materials, and calculation of consumption, ensuring that project managers can grasp the inventory status of construction materials in real time.

[0073] In an optional embodiment, the material management module 20 includes: The material category management unit 210 is used to classify construction materials and maintain basic information of construction materials based on material categories. Through the material category management unit 210, the manager can maintain basic information of construction materials, including the code, name, specification, model, supplier information and unit information of the construction materials, so as to quickly retrieve and call them in the subsequent material management process.

[0074] The material acceptance management unit 220 is used to receive new construction materials, confirm the material category and material quantity, and ensure that the construction materials actually received are consistent with the contents recorded in the purchase order. After acceptance (i.e. confirmation of the order), the new construction materials are allocated to the corresponding construction areas.

[0075] For example, after receiving the goods, the project site material management personnel use the mobile terminal function to fill in the receipt information, including material category, acceptance quantity, stacking area, issuing unit, issued quantity, etc. After the materials are accepted, the unissued construction materials will be automatically counted as entered into the warehouse, and the issued construction materials will be automatically counted as issued from the warehouse.

[0076] The storage management unit 230 is used to create material storage records. During the storage process, it will record information such as the material category, material quantity, and material storage area of ​​the construction materials, and update the inventory status of the construction materials to ensure the real-time and accuracy of the inventory data.

[0077] Specifically, after the materials are accepted, the warehousing records of the building materials are recorded according to the accepted material categories. The warehousing data can be imported or manually entered, and the corresponding building area is selected for warehousing. It supports viewing the quantity statistics of building materials by building area, material category, and material acceptance batch.

[0078] The outbound management unit 240 is used to record the issuance and use of construction materials. Whenever construction materials are outbound, outbound data is recorded, including the receiving department, receiving person, receiving quantity, receiving date, etc. Recording outbound data helps managers track the use of construction materials in real time and prevent waste of resources.

[0079] Specifically, after the materials are accepted and put into storage, the construction materials that have been shipped out are recorded, and the outbound operation of the existing inventory of construction materials is supported. Select the material category and the storage area of ​​the construction materials for outbound delivery, and the inventory will be deducted accordingly after the outbound delivery is successful.

[0080] It should be noted that the outbound quantity of construction materials cannot be greater than the inventory quantity.

[0081] Specifically, material transfer is the process and management of the transfer of construction materials between different departments or sites of a construction project. The main function of material transfer is to ensure that construction materials are efficiently and accurately transferred from one construction area to another according to the needs of the construction project.

[0082] For example, the manager creates a material transfer request based on the actual construction progress and demand. When a certain construction area requires a specific amount of construction materials, a transfer request is submitted, detailing the type, quantity, specifications, and expected transfer time of the required construction materials. The system then automatically checks the inventory of the corresponding construction materials to confirm whether there are enough construction materials to meet the transfer request.

[0083] Once the transfer request is approved, the system will generate a transfer order, which includes detailed information on the transferred materials, the locations of transfers, transfer dates, etc.

[0084] During the actual transfer of construction materials, the system will update the inventory status of construction materials in real time, remove the corresponding construction materials from the inventory in the storage area, and then put them into the destination building area where they need to be transferred. That is, the inventory at the transfer-out location will be reduced accordingly, while the inventory at the transfer-in location will be increased.

[0085] The return management unit 250 is used to process unused or returned construction materials, allowing these construction materials to be re-included in the inventory and updating the inventory status to ensure the effective use of construction materials.

[0086] Specifically, the construction materials that have not been used up by the receiving unit can be returned to the warehouse. The return operation requires selecting the return material category and the construction area. After the return is successful, the inventory quantity of the returned construction materials in the corresponding construction area is increased.

[0087] The exit management unit 260 is used to handle the exit of construction materials at the end of the construction project, including the recovery, transfer or disposal of construction materials, and record the exit data to ensure that the destination of the construction materials is clearly recorded.

[0088] The waste material disposal unit 270 is used to recycle or process the waste building materials that are no longer used, and update the inventory status at the same time. By properly disposing of the waste building materials, the construction project can also save project costs.

[0089] Optionally, the waste material disposal unit 270 also includes: the waste material disposal unit 270 includes two methods of scrapping and damage processing, the scrapping is used to deal with the building materials that have no reuse value, and record the scrap quantity and financial data; the damage processing is used to deal with the building materials that are lost or unusable, and record the damage quantity, and update the inventory status at the same time.

[0090] Specifically, at the end of a certain stage of a construction project or when the entire project is finally finished, the remaining unused construction materials need to be disposed of. Scrap disposal means recycling these materials as scrap, and the system supports recording the recycling amount. When adding a scrap order, the user needs to select the corresponding construction materials in the inventory and fill in the scrap quantity, tax-inclusive amount, tax rate, and tax-exclusive amount. After saving the scrap order information, the system will automatically recalculate the inventory and deduct the number of scrapped materials. In addition, damage processing treats construction materials as losses and does not involve the recycling amount. When adding a damage report, the user only needs to select the construction materials to be damaged from the inventory and fill in the damage quantity. After saving the damage report information, the system will also update the inventory, subtracting the number of damaged materials to maintain the accuracy of the inventory data.

[0091] It is understandable that, through the waste material disposal unit 270, it can be determined whether the material procurement plan is reasonable.

[0092] The loss calculation unit 280 calculates the loss of the building materials according to the outbound data and the outbound data, and provides a loss report.

[0093] Specifically, after the disposal of waste materials in construction materials is completed, the loss quantity is automatically calculated according to the material category. The loss calculation of leased materials is divided into two situations: on-site and off-site. The loss quantity of on-site materials is accumulated through active reporting, and statistics are made according to the different material categories reported by different subcontractors. The specific calculation method is: loss quantity = the sum of the loss quantities reported by a certain material under a certain subcontractor. The off-site calculation is to automatically calculate the quantity of materials when the materials are off-site. The specific calculation method is: loss quantity = total outbound quantity - total outbound quantity (that is, outbound data minus outbound data). Other materials do not need to calculate losses.

[0094] The second embodiment of the BIM-based building material management system proposed in the present application further includes: Based on the association between building resource information and BIM models, users select geometric components of the BIM model on the interactive interface to query the corresponding building resource information in the building area associated with the geometric components; When the inventory status of the building resource information changes, the corresponding building resource information in the building area associated with the geometric component is updated in real time.

[0095] In this embodiment, the system establishes an intuitive query mechanism by associating the building material information in the material management module 20 with the geometric components in the BIM model. Specifically, the user can select any geometric component in the BIM model, and the system will display the building material information associated with the geometric component, including key data such as the type and quantity of the building material. This association mechanism greatly improves the query efficiency, allowing project managers to quickly obtain detailed information on the required building materials, thereby making more accurate decisions.

[0096] When the inventory status of building materials changes, such as when building materials are used, returned or scrapped, the system will automatically identify the changes in the inventory status of the corresponding building materials and synchronously update the building material inventory of the corresponding geometric components in the BIM model. The synchronous update mechanism ensures that the building material inventory in the BIM model always reflects the actual status of building materials and realizes the real-time update of building material information.

[0097] This synchronous update mechanism not only reduces the possible errors of manual operation, but also ensures that the construction project can rely on accurate and real-time construction material information for project management and decision support throughout the construction life cycle. In addition, the material management of the construction project has become more efficient and transparent, which helps to improve the management level of the entire construction project.

[0098] Please refer to Figure 6 The BIM-based building material management method of the third embodiment proposed in this application further includes the following steps S310-S340: Step S310: On the BIM management side, the model file of the building project is uploaded by using the model building unit 110, and the building resource information corresponding to the building project is imported to associate the building resource information with the building model corresponding to the model file.

[0099] On the BIM management side, the building resource information is associated with the building model corresponding to the model file, ensuring that the building resource information can be accurately mapped to specific building components and building areas, providing basic data support for the visual management of building resources.

[0100] Step S320: The area management unit 120 divides the building project into different building areas in the building model, and associates the divided building areas with the corresponding building resource information to achieve zoning management of the building resource information.

[0101] By dividing the building model corresponding to the building project into different building areas through the area management unit 120, and associating the divided building areas with the corresponding building resource information, the allocation and zoning management of the building resource information is realized, and the management efficiency and allocation efficiency of the building resources are improved.

[0102] Step S330: The BIM model unit 130 provides an interactive interface to display the building model corresponding to the building project, and on the interactive interface, the real-time update and query of the building resource information in the building area are realized.

[0103] The BIM model unit 130 provides an interactive interface to display the building model corresponding to the construction project, so that managers can intuitively view the distribution and real-time inventory of construction materials in each construction area and make real-time adjustments according to the construction needs of the construction project. The real-time update and query functions ensure the timeliness and accuracy of the construction material data.

[0104] Step S340: On the material management side, the material management module 20 is used to perform full-cycle management on the building material information, update the inventory status of the building material information in real time, and maintain real-time data synchronization with the building material information on the BIM management side.

[0105] On the material management side, the material management module is used to manage the construction material information throughout the entire cycle, and the real-time data is synchronized with the construction material information on the BIM management side, ensuring the timely update and accuracy of the material information, and avoiding management problems caused by information lag or errors. At the same time, the full-cycle management also covers all aspects from material procurement, warehousing, collection to return, realizing comprehensive monitoring and management of material circulation.

[0106] In this embodiment, the system realizes the full-cycle management of building materials by associating the building materials in the material management module 20 with the geometric components in the BIM model. The user can select a specific geometric component in the BIM model, and the system will automatically query and display the building material information associated with the geometric component, making the material information query more intuitive and convenient. In addition, when the inventory status of building materials changes, such as the departure, withdrawal or loss of building materials, the system will automatically update the building material information of the corresponding geometric component in the BIM model, ensuring that the building materials in the BIM model are synchronized with the actual building materials, realizing the real-time update of building materials.

[0107] The present application provides a BIM-based building material management device, which includes: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the BIM-based building material management method in the above-mentioned embodiment 1.

[0108] Reference below Figure 7, which shows a schematic diagram of the structure of a BIM-based building material management device suitable for implementing an embodiment of the present application. The BIM-based building material management device in the embodiment of the present application may include various hardware and software components for implementing a scheduling method for inspection tasks. Figure 7 The BIM-based building material management equipment shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0109] like Figure 7 As shown, the BIM-based building material management device may include a processing device 1001 (e.g., a central processing unit, a graphics processing unit, etc.), which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM: Read Only Memory) 1002 or a program loaded from a storage device 1003 to a random access memory (RAM: Random Access Memory) 1004. In RAM1004, various programs and data required for the operation of the BIM-based building material management device are also stored. The processing device 1001, ROM1002, and RAM1004 are connected to each other through a bus 1005. An input / output (I / O) interface 1006 is also connected to the bus. Generally, the following systems can be connected to the I / O interface 1006: an input device 1007 including, for example, a touch screen, a touch pad, a keyboard, etc.; an output device 1008 including, for example, a liquid crystal display (LCD: Liquid Crystal Display), a speaker, a vibrator, etc.; a storage device 1003 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 1009. The communication device 1009 can allow the BIM-based building material management device to communicate with other devices wirelessly or by wire to exchange data. Although the BIM-based building material management device with various systems is shown in the figure, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems can be implemented or have alternatively.

[0110] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.

[0111] The BIM-based building material management device provided by the present application adopts the BIM-based building material management device method in the above embodiment, which can solve the technical problem of being unable to track the storage location and usage of building materials in real time. Compared with the prior art, the beneficial effects of the BIM-based building material management device provided by the present application are the same as the beneficial effects of the BIM-based building material management method provided by the above embodiment, and the other technical features of the BIM-based building material management device are the same as the features disclosed in the method of the previous embodiment, which will not be repeated here.

[0112] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.

[0113] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0114] The present application provides a readable storage medium having readable program instructions (ie, computer programs) stored thereon, and the computer readable program instructions are used to execute the BIM-based building material management method in the above-mentioned embodiment.

[0115] The readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM: Random Access Memory), a read-only memory (ROM: Read Only Memory), an erasable programmable read-only memory (EPROM: Erasable Programmable Read Only Memory or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM: CD-Read Only Memory), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, system or device. The program code contained on the readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency: Radio Frequency), etc., or any suitable combination of the above.

[0116] The above-mentioned readable storage medium may be included in the BIM-based building material management device; or it may exist independently without being assembled into the BIM-based building material management device.

[0117] The readable storage medium carries one or more programs. When the one or more programs are executed by a BIM-based building material management device, the BIM-based building material management device: on the BIM management side, the model file of the building project is uploaded by the model construction unit 110, and the building material information corresponding to the building project is imported to associate the building material information with the building model corresponding to the model file; the building project is divided into different building areas in the building model by the area management unit 120, and the divided building areas are associated with the corresponding building material information to realize the zoning management of the building material information; the BIM model unit 130 provides an interactive interface to display the building model corresponding to the building project, and on the interactive interface, the real-time update and query of the building material information in the building area are realized; on the material management side, the material management module 20 is used to perform full-cycle management of the building material information, the inventory status of the building material information is updated in real time, and real-time data synchronization is maintained with the building material information on the BIM management side.

[0118] Computer program code for performing the operations of the present application may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0119] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0120] The modules involved in the embodiments described in the present application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.

[0121] The readable storage medium provided by the present application stores readable program instructions (i.e., computer programs) for executing the above-mentioned BIM-based construction material management method, which can solve the technical problem of being unable to track the storage location and usage of construction materials in real time. Compared with the prior art, the beneficial effects of the readable storage medium provided by the present application are the same as the beneficial effects of the BIM-based construction material management method provided by the above-mentioned embodiment, and will not be elaborated here.

[0122] An embodiment of the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the steps of the above-mentioned BIM-based building material management method.

[0123] The computer program product provided by this application can solve the technical problem of being unable to track the storage location and usage of construction materials in real time. Compared with the prior art, the beneficial effects of the computer program product provided by the embodiment of this application are the same as the beneficial effects of the BIM-based construction material management method provided by the above embodiment, which will not be repeated here.

[0124] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent processing scope of the present application.

[0125] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.

[0126] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method.

[0127] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.

Claims

1. A BIM-based building materials management system, characterized in that: Including BIM management side and material management side; A model management module is provided on the BIM management side, and is used to manage the BIM model of the construction project, and to import the building resource information corresponding to the construction project, associate the building resource information with the BIM model, and realize the spatial positioning of the building resource information; The material management module is arranged on the material management side, and is used to manage the full-cycle data of the building material information, and to synchronize the real-time data with the building material information on the BIM management side, so as to realize the real-time update of the building material information.

2. The BIM-based building materials management system according to claim 1, characterized in that: The model management module includes a model construction unit, a regional management unit and a BIM model unit; The model building unit is used to receive the model file uploaded by the user and perform lightweight processing on the model file; After the model file has completed lightweight processing, extracting the building structure and building components in the model file; The building component is associated with corresponding geometric data and component attributes to obtain a geometric component with parameters.

3. The BIM-based building materials management system according to claim 2, characterized in that: The area management unit is used to divide the construction area of ​​the construction project and manage the hierarchical structure of the construction area by constructing a regional structure tree; The area management unit is further used to associate the building area with the building resource information and the geometric component to manage the building resource information in the building area.

4. The BIM-based building materials management system according to claim 2, characterized in that: The BIM model unit is configured with an interactive interface, and the interactive interface is used to display the model selected from the uploaded model file, or the geometric component corresponding to the model; On the interactive interface, scaling, translation and rotation operations are supported on the model or the geometric component; When the geometric component is selected, the parameters of the geometric component and the corresponding building material information are displayed synchronously.

5. The BIM-based building materials management system according to claim 1, characterized in that: The material management module includes: A material category management unit, used to classify the building material information and manage the building material information according to the material category; A material acceptance management unit, configured to receive new construction material information, confirm the material category and material quantity of the new construction material information, and allocate the new construction material information to a corresponding construction area; A storage management unit, used to manage the storage records of the building material information, including the material category, material quantity and storage area of ​​the building material information, and update the inventory status of the building material information in real time; A delivery management unit, used to manage the delivery and use of the building resource information and record delivery data of the building resource information; The return management unit is used to manage the information of unused or returned construction materials; The exit management unit is used to manage the exit of materials at the end of the construction project, including the recovery, transfer or disposal of construction materials, and record the exit data to ensure the clear destination of the construction materials; Waste material disposal unit, used to recycle or process waste building materials that are no longer in use; The loss calculation unit is used to calculate the loss of the building materials according to the outbound data and the outbound data, and provide a loss report.

6. The BIM-based building material management system according to claim 5, characterized in that: The waste material disposal unit also includes two modes: scrapping and damage handling; The scrapping process is used to process the building materials that have no reuse value, and record the scrapped quantity and corresponding financial data; The damage reporting process is used to process the building materials that are lost or unusable, and record the amount of damage reported.

7. The BIM-based building material management system according to claim 1, characterized in that: The BIM-based building materials management system also includes: Based on the association between the building resource information and the BIM model, the user selects a geometric component of the BIM model on the interactive interface to query the building resource information corresponding to the building area associated with the geometric component; When the inventory status of the building resource information changes, the corresponding building resource information in the building area associated with the geometric component is updated in real time.

8. A method for building material management based on BIM, characterized in that: The BIM-based building materials management method includes: On the BIM management side, a model file of a building project is uploaded by using a model building unit, and building resource information corresponding to the building project is imported to associate the building resource information with the building model corresponding to the model file; Divide the building project into different building areas in the building model corresponding to the building project by a regional management unit, and associate the divided building areas with the corresponding building resource information to achieve zoning management of the building resource information; The BIM model unit provides an interactive interface to display the building model corresponding to the building project, and on the interactive interface, the real-time update and query of the building material information in the building area are realized; On the material management side, the material management module is used to perform full-cycle management of the building material information, update the inventory status of the building material information in real time, and maintain real-time data synchronization with the building material information on the BIM management side.

9. A BIM-based building material management device, characterized in that: The BIM-based building material management device includes: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program is configured to implement the steps of the building material management method according to any one of claims 1 to 8.

10. A storage medium, characterized in that: The storage medium is a readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the building resources management method according to any one of claims 1 to 8 are implemented.

Citation Information

Patent Citations

  • Power distribution network physical asset whole-process management and control method based on BIM technology

    CN110796427A

  • Building information management system based on BIM technology

    CN115713161A

  • Construction scene graphical management method and device based on BIM

    CN116663098A