Device and method for supporting multi-data-source and multi-environment project management
By designing multi-data source multi-environment project management devices and methods in the GeoEast system, using permission management modules and pre-check algorithms, the project management inconvenience in traditional systems in multiple data sources and multiple environments is solved, and efficient project management is achieved and permission control improve management efficiency.
Patent Information
- Application Number
- CN202310506361.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-08
- Publication Date
- 2024-11-08
AI Technical Summary
When facing project management in multiple data sources and multiple environments, the traditional GeoEast system has problems such as inconvenient user permission management, inconvenient database switching, and large management workload, which is difficult to meet the needs of massive PB-scale earthquake data and multidisciplinary collaboration. .
A device and method supporting multi-data source and multi-environment project management is designed, including user permission management module, project information acquisition module, project creation module, project modification module and project deletion module, and multi-data is realized through permission mechanism and pre-check algorithm. Project management in multiple sources environments is unified, allowing super administrators, project managers and operators to create, modify and delete projects based on permissions.
Efficient management of seismic data projects in multiple data sources and multiple environments has been realized, reducing the management difficulty of administrators, improving project management efficiency, and reducing conflicts in the use of multiple environment projects.
Smart Images

Figure CN118917783A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of geophysical exploration technology, and relates to seismic data project management technology, and specifically to a device and method for supporting multi-data source and multi-environment project management. Background Art
[0002] GeoEast is a large-scale integrated processing and interpretation system independently developed by China National Petroleum Corporation. Since the launch of GeoEast V1.0 version in 2004, after years of continuous research and development, GeoEast large-scale integrated processing and interpretation software system has become China National Petroleum Corporation's mainstream processing and interpretation software.
[0003] The GeoEast system divides data management into three levels: project, work area, and survey line (wire harness). To use the GeoEast system, users must first create a corresponding project. As an essential component of the GeoEast system, seismic data projects require a project management device and method to support unified management of project creation, modification, and deletion in the GeoEast system.
[0004] In traditional processes, due to the small amount of seismic data, a GeoEast system equipped with a database source can meet the work of production units. However, with the dramatic increase in seismic data volume, the original single data source can no longer meet production requirements.
[0005] In order to better cope with the challenges of PB-level massive seismic data, multidisciplinary collaboration, and establishing an open ecosystem, GeoEast has launched the GeoEast-iEco platform, a new generation of multidisciplinary integrated open software platform. The GeoEast-iEco platform has broken through the technical bottleneck of multi-source data sharing and developed a multi-data source access framework based on a unified data model. Given that GeoEast-iEco supports access to multiple data sources, GeoEast project management methods and devices are required to be able to uniformly manage projects from multiple data sources.
[0006] In addition, during the installation of the GeoEast system in the user's production environment, on the basis of a unified data model, different versions and different environments may share a database. In order to cope with the installation of multiple versions of the GeoEast system in the user's production environment, the GeoEast project management method and device are required to be able to uniformly manage projects with multiple versions and multiple environments. The original GeoEast system design is that one user belongs to only one database. If a user wants to use multiple databases, the GeoEast system administrator needs to modify the properties of the database to which the user belongs. As the GeoEast system is no longer a single database, the original design that one user belongs to only one database source no longer meets actual production needs. If the administrator manually modifies the properties of the database to which the user belongs, the management workload is increased, and it is not convenient for users to switch databases. Therefore, a more convenient way is needed to enable users to switch databases and to achieve convenient management of GeoEast multiple database sources. Summary of the invention
[0007] In order to solve the above deficiencies in the prior art, the present invention aims to provide a device and method for supporting multi-data source and multi-environment project management, so as to improve the utilization rate of multiple data sources while ensuring that the GeoEast system under multiple data sources and multiple environments can achieve unified management of seismic data project browsing, creation, modification, deletion, etc. according to the user authority mechanism; thereby realizing efficient management of seismic data projects with multiple data sources and multiple environments.
[0008] To achieve the above purpose, the technical solution adopted by the present invention is as follows: A device supporting multi-data source and multi-environment project management, comprising a user authority management module, a project information acquisition module, a project creation module, a project modification module and a project deletion module; The user authority management module is connected in communication with the project information acquisition module, the user authority management module is connected in communication with the project creation module, the user authority management module is connected in communication with the project modification module, and the user authority management module is connected in communication with the project deletion module.
[0009] The present invention also provides a method for supporting multi-data source and multi-environment project management, which is based on the device for supporting multi-data source and multi-environment project management described in claim 1, and the method comprises the following steps performed in sequence: S1. Browse project information S11. Get the information list of each database of multiple data sources in the GeoEast system in the current operating environment, and display the names of all databases; S12. Obtain all seismic data project information in each database in turn, and the user displays the seismic data project name that the user can read under the current database according to his or her own authority; S13. Obtain all project information in the current operating environment through the project configuration file, and identify the project name that is not in the current operating environment; S2. Operate on the project Super administrators, project managers and operators create, modify and delete projects according to their own permissions and needs.
[0010] As a limitation, in step S12, the users include super administrators, project managers and operators.
[0011] As a further limitation, the super administrator has the authority to create projects, modify all projects, delete all projects, and browse all project information; The project manager has the rights to create projects, modify owner projects, delete owner projects, and browse information of projects with read permissions. The operator's permissions are to modify owner project information and browse read-authorized project information.
[0012] As another limitation, in step S2, the steps of creating the project are: S21. The super administrator and project manager select a database, fill in project information, and prepare to create a project; S22. Use a pre-check algorithm to check whether the operation of creating a project can be performed at present.
[0013] As a further limitation, in step S22, the check content includes whether the relevant configuration files and disks meet the conditions for creating a project.
[0014] Due to the adoption of the above technical solution, the present invention has the following beneficial effects compared with the prior art: ① The device and method for supporting multi-data source and multi-environment project management provided by the present invention realize the function of seismic data project management under multi-data source and multi-environment.
[0015] ② The device and method for supporting multi-data source and multi-environment project management provided by the present invention reduces the difficulty of administrators in managing multi-data source seismic data projects, improves project management efficiency, and reduces conflicts in the use of multi-environment projects. It is the main means of GeoEast project management.
[0016] The present invention is applicable to multi-data source and multi-environment project management. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0018] Figure 1 A schematic diagram of a device supporting multi-data source and multi-environment project management in an embodiment of the present invention; Figure 2 Schematic diagram of user authority mechanism in an embodiment of the present invention; Figure 3 This is a schematic diagram of a project configuration file in an embodiment of the present invention; Figure 4 Schematic diagram of a multi-data source and multi-environment project information display mechanism in an embodiment of the present invention; Figure 5 A schematic diagram of a project pre-check algorithm is created in an embodiment of the present invention. DETAILED DESCRIPTION
[0019] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and understand the present invention, and are not used to limit the present invention.
[0020] Embodiment 1 A device supporting multi-data source and multi-environment project management The schematic diagram of the device supporting multi-data source and multi-environment project management in this embodiment is as follows Figure 1 As shown: it includes a user authority management module 1, a project information acquisition module 2, a project creation module 3, a project modification module 4 and a project deletion module 5; In this embodiment, the user authority management module 1 is used by the project administrator to set whether the user has the authority to create a project in the database after the project administrator selects the database.
[0021] In this embodiment, the project information acquisition module 2 is used to acquire the project information of the database and the project configuration file, and display the project information according to different database sources in the database / project structure list.
[0022] In this embodiment, the project creation module 3 is used to select a database, and after the current user has the permission to create a project in the current database, a GeoEast project is created in the current database, the project configuration file and the system disk. The GeoEast project must specify the project owner.
[0023] In this embodiment, the project modification module 4 is used to modify the selected project information according to the project owner's authority.
[0024] In this embodiment, the project deletion module 5 is used to delete the selected project information according to the project owner's authority.
[0025] Embodiment 2 A method for supporting multi-data source and multi-environment project management In this embodiment, users include super administrators, project managers, and operators. The permissions of each user are as follows: Figure 2 As shown; The super administrator user has the following permissions: create projects, modify all projects, delete all projects, and browse all project information; The project manager user has the following permissions: create projects, modify owner projects, delete owner projects, and browse information about projects with read permissions. The permissions of the operator user are: modifying part of the owner project information and browsing the project information with read permission.
[0026] This implementation specifically includes the following steps: S1. Browse project information S11. Get the information list of each database of multiple data sources in the GeoEast system in the current operating environment, and display the names of all databases; S12. Obtain all seismic data project information in each database in turn, and the super administrator, project manager and operator display the names of seismic data projects that users can read under the current database according to their own permissions; Among them, the super administrator can obtain all project information, and the project manager and operator can obtain the project information with read permission; S13. Obtain all project information in the current operating environment through the project configuration file, and identify the project name that is not in the current operating environment; The project configuration file refers to the only configuration file projects.conf in the GeoEast system that records project information. It is in XML format. Figure 3 As shown; The schematic diagram of the multi-data source and multi-environment project information display mechanism in this embodiment is as follows Figure 4 shown.
[0027] S2. Operate on the project Super administrators, project managers and operators can create, modify and delete projects according to their own permissions and needs; (1) The steps to create a project are: ①Super administrators and project managers select databases, fill in project information, and prepare to create projects; ② Use the pre-check algorithm to check whether the project creation operation can be performed at present, including checking whether the project information is filled in correctly, checking whether the current database can create the project, and checking whether the relevant configuration files and disks meet the conditions for creating the project. Only after passing the pre-check algorithm can the actual project creation operation be performed. If the pre-check algorithm fails, the project information needs to be modified; Among them, the super administrator can create projects in any database, and the project manager can only create projects in the database authorized by the project manager. The schematic diagram of the algorithm for creating a project pre-check is as follows: Figure 5 shown.
[0028] (2) The steps for project modification are: The super administrator, project manager, and operator select the project to be modified and use the right-click menu to pop up the project modification window; Among them, the super administrator can modify projects in any database, the project manager can only modify the owner project information, and the operator can only modify part of the owner project information; (3) Deleting items The super administrator and project manager select the project to be deleted and delete it through the right-click menu; Among them, the super administrator can delete projects in any database, and the project leader can only delete the owner project in the current running environment.
Claims
1. A device supporting multi-data source and multi-environment project management, characterized in that: It includes user authority management module, project information acquisition module, project creation module, project modification module and project deletion module; The user authority management module is connected in communication with the project information acquisition module, the user authority management module is connected in communication with the project creation module, the user authority management module is connected in communication with the project modification module, and the user authority management module is connected in communication with the project deletion module.
2. A method for supporting multi-data source and multi-environment project management, characterized in that: It is based on the device for supporting multi-data source and multi-environment project management described in claim 1, and the method includes the following steps performed in sequence: S1. Browse project information S11. Get the information list of each database of multiple data sources in the GeoEast system in the current operating environment, and display the names of all databases; S12. Obtain all seismic data project information in each database in turn, and the user displays the seismic data project name that the user can read under the current database according to his or her own authority; S13. Obtain all project information in the current operating environment through the project configuration file, and identify the project name that is not in the current operating environment; S2. Operate on the project Super administrators, project managers and operators create, modify and delete projects according to their own permissions and needs.
3. A method for supporting multi-data source and multi-environment project management according to claim 2, characterized in that: In step S12, the users include super administrators, project managers and operators.
4. A method for supporting multi-data source and multi-environment project management according to claim 3, characterized in that: The super administrator has the following permissions: create projects, modify all projects, delete all projects, and browse all project information; The project manager has the rights to create projects, modify owner projects, delete owner projects, and browse information of projects with read permissions. The operator's permissions are to modify owner project information and browse read-authorized project information.
5. The method for supporting multi-data source and multi-environment project management according to claim 2, characterized in that: In step S2, the steps of project creation are: S21. The super administrator and project manager select a database, fill in project information, and prepare to create a project; S22. Use a pre-check algorithm to check whether the operation of creating a project can be performed at present.
6. A method for supporting multi-data source and multi-environment project management according to claim 5, characterized in that: In step S22, the checking content includes whether the relevant configuration files and disks meet the conditions for creating a project.
