Intelligent examination and approval system and method for construction land

Through the intelligent approval system for construction land, virtual models and ecological environment simulation evaluation, the problem of insufficient assessment of the impact of project design on the ecological environment is solved, the project plan is optimized, the ecological environment protection and economic benefits are ensured, and the scientific nature of the approval system is improved. and efficiency.

CN118917788APending Publication Date: 2024-11-08NINGXIA HUI AUTONOMOUS REGION NATURAL RESOURCES INFORMATION CENT (AUTONOMOUS REGION NATURAL RESOURCES ARCHIVES) +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410947937.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

When designing the project plan, the existing intelligent approval system for construction land failed to effectively evaluate the impact of the project land and surrounding ecological environment, resulting in serious damage to the ecological environment after the project construction is completed. An intelligent approval system and method are needed to solve this problem. A question.

Method used

An intelligent approval system for construction land including the publishing end, the application end and the approval end was designed. A three-dimensional model was created through the virtual model module, the public module disclosed the project land data, the evaluation unit conducted plan evaluation, and the optimization unit conducted ecological environment interactive simulation and data. Analyze, optimize the plan to avoid the ecological environment impact exceeding the threshold, and rank the project plan through economic benefit indicators.

Benefits of technology

Through virtual models and ecological environment simulation assessment, the project plans with risks and unreasonable economic conditions are eliminated, the ecological environment impact is optimized, and the project plans are ensured in compliance with ecological environment regulations, which improves the scientificity and economic benefits of project design, and ensures the protection of the ecological environment. Improve the fairness and efficiency of project approval.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917788A_ABST
    Figure CN118917788A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent construction land approval system and method, and particularly relates to the field of construction land approval, and the system comprises a publishing end, an application end and an approval end, and the publishing end comprises a project land module used for project land data exploration. The project land module is electrically connected with a virtual model module used for manufacturing a project land model, and the virtual model module is electrically connected with a public module used for public information. According to the invention, indexes of economic benefits of project schemes are calculated through the effect simulation module, advantages and disadvantages of a plurality of schemes can be known more clearly through the ranking module, the publication module is controlled to publish the ranking of the project schemes through the publication module, and the project schemes can be designed by an application end through checking the ranking of the projects in an approval period. And after the approval period is ended, the first project scheme is approved, and the publication module controls the publication module to publish the project scheme and the project ranking, so that the application end can more clearly know the advantages and disadvantages of the first ranking.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of construction land approval, and in particular to an intelligent construction land approval system and method. Background Art

[0002] The intelligent approval system for construction land is a system that uses modern information technology and artificial intelligence technology to optimize and accelerate the approval process for construction land. However, in use, although the design project plan of the applicant can be evaluated in terms of risk, economy, regulations, etc. during approval, the design plan of the applicant will have a certain impact on the ecological environment of the project land and the surrounding ecological environment during the design application. It is more likely that the designed plan will seriously damage the ecological environment of the construction land and the surrounding environment after the construction of the project land is completed, which will lead to the need for further discussion of the project plan that has passed the approval system. At this time, a construction land intelligent approval system and method are needed to solve the above problems. Summary of the invention

[0003] The purpose of the present invention is to solve the shortcomings existing in the prior art. Although the design project plan of the applicant can be evaluated in terms of risks, economy, regulations, etc. during the approval process, the design plan of the applicant will have a certain impact on the ecological environment of the project land and the surrounding ecological environment during the design application. It is more likely that the designed plan will seriously damage the ecological environment and the surrounding environment of the construction land after the construction of the project land is completed, thereby resulting in the need for further discussion of the project plan that has passed the approval system. Therefore, an intelligent approval system and method for construction land are proposed.

[0004] In order to achieve the above object, the present invention adopts the following technical solutions: A construction land intelligent approval system includes a publishing end, an application end and an approval end, wherein the publishing end includes a project land module for project land data survey, the project land module is electrically connected to a virtual model module for project land model production, the virtual model module is electrically connected to a disclosure module for public information, the application end includes an acquisition module for obtaining public information, the acquisition module is electrically connected to a viewing module for viewing the project land model, the viewing module is electrically connected to an entry module for project plan entry, the entry module is electrically connected to a feedback receiving module for receiving feedback information, the approval end includes a scheme receiving module for receiving schemes, the scheme receiving module is electrically connected to an approval unit for scheme approval, the disclosure module is electrically connected to the acquisition module, and the entry module is electrically connected to the scheme receiving module.

[0005] The present invention is further configured as follows: the approval module includes an evaluation unit for scheme evaluation, the evaluation unit is electrically connected to a rejection module for rejecting an application, the evaluation unit is electrically connected to an optimization unit for scheme optimization suggestions, the optimization unit is electrically connected to a feedback module for feedback, and the feedback module is electrically connected to a feedback receiving module.

[0006] The present invention is further configured as follows: the publishing end obtains specific data of the project site through the project land module, and the virtual model module makes a three-dimensional model based on the data, and the public module discloses the three-dimensional model of the project land model, the application end obtains the information disclosed by the public module in the publishing end through the acquisition module, and the information is viewed by the viewing module, the entry module enters the project plan according to the plan designed by the application end, and the plan receiving module in the approval end receives the project plan, and the evaluation unit evaluates the project plan.

[0007] The present invention is further configured as follows: the evaluation unit includes a solution evaluation module for evaluating whether the solution can be implemented, the solution evaluation module is electrically connected to a risk evaluation module for evaluating risks, the risk evaluation module is electrically connected to an economic evaluation module for evaluating economics, the solution evaluation module, the risk evaluation module and the economic evaluation module are all electrically connected to the rejection module, and the economic evaluation module is electrically connected to the optimization unit.

[0008] The present invention is further configured as follows: the scheme evaluation module receives the project scheme, and analyzes the application of the project construction technology proposed in the project scheme according to the existing technology. When the scheme evaluation module analyzes that the existing technology of the project scheme cannot be completed, the rejection module rejects the application. When the scheme evaluation module analyzes that the existing technology of the project scheme can be completed, the risk assessment module performs risk assessment on the project scheme to analyze whether the compliance and natural disaster response of the project scheme meet the regulations. When the project scheme fails to pass the risk assessment of the risk assessment module, the rejection module rejects the project scheme. When the project scheme passes the risk assessment of the risk assessment module, the economic assessment module evaluates the project scheme to evaluate the economic development and employment of the project scheme. When the project scheme fails to pass the economic assessment of the economic assessment module, the rejection module rejects the project scheme. When the project scheme passes the economic assessment of the economic assessment module, the optimization module optimizes the project scheme. The rejection module generates rejection information according to the rejection path, and the feedback receiving module receives it.

[0009] The present invention is further configured as follows: the optimization unit includes an ecological data module for collecting ecological environment data of the project land and the surrounding areas of the project land, the ecological data module is electrically connected to a scheme interaction module for interaction between the project scheme and the ecological environment, the scheme interaction module is electrically connected to a simulation module for simulating the interaction between the project scheme and the ecological environment, the simulation module is electrically connected to a data analysis module for analyzing the impact of the project scheme on the ecological environment over time, the data analysis module is electrically connected to a competition unit for multi-scheme competition and an optimization module for optimizing the project scheme, the optimization module is electrically connected to an audit module for project scheme auditing, and the audit module is electrically connected to a feedback module.

[0010] The present invention is further configured as follows: the ecological data module obtains ecological environment data of the project land and surrounding ecological environment data, and interacts with the project plan provided by the plan interaction module, and the project plan and the ecological environment are interacted in the simulation module. The simulation module simulates the changes in the ecological environment data and the project plan over time, and the data analysis module analyzes the impact of the project plan on the ecological environment over time, and analyzes whether the ecological environment changes exceed the prescribed threshold of the ecological environment. When the data analysis module analyzes that the impact of the project plan on the ecological environment does not exceed the prescribed threshold of the ecological environment, the competition unit records and saves the project plan. When the data analysis module When the impact of the project plan on the ecological environment exceeds the prescribed threshold of the ecological environment, the optimization module will make targeted optimization suggestions based on the data analyzed by the data analysis module and formulate a proposed plan. The review module will review whether the proposed plan is reasonable and whether the proposed plan exceeds the prescribed threshold of the ecological environment. When the proposed plan passes the review of the review module, the feedback module will provide feedback on the project plan modification suggestions. When the proposed plan fails to pass the review of the review module, the optimization module will continue to optimize the project plan. The feedback module will transmit the feedback modification suggestions to the feedback receiving module, make detailed modifications to the project plan according to the modification opinions, and enter the new project plan through the entry module.

[0011] The present invention is further configured as follows: the competition unit includes a data sorting module for data sorting, the data sorting module is electrically connected to a solution storage module for storing solutions, the solution storage module is electrically connected to an effect simulation module for sorting solution effects, the effect simulation module is electrically connected to a ranking module for ranking multiple solutions, and the ranking module is electrically connected to a disclosure module for publicizing and publishing project solutions.

[0012] The present invention is further configured as follows: the data sorting module receives the project plan, and sorts out the cost effect, duration effect and future trend effect of the project plan, and the plan storage module stores the project plan and the project effect, and the effect simulation module is based on the formula: [\text{Score}=\frac{CF}{C_0}]; (CF) represents the total cash flow of the project (the sum of cash flows from year 0 to year N); (C_0) represents the initial investment cost of the project; (\text{Score}) is an indicator of the economic benefits of the project solution, which represents the ratio between the total cash flow and the initial investment cost; The profit effect of the project plan is simulated, and the ranking module ranks multiple projects according to the size of (\text{Score}), and the formula module analyzes according to the approval end time. When the project land approval time is over, the publicity module will generate a public instruction to control the public module to publish the project plan and project plan ranking. When the project land approval time has not ended, the publicity module will generate a public instruction to control the public module to publish the project plan ranking.

[0013] A method for intelligent approval of construction land, comprising the following specific steps: 1) The project land module in the publishing end obtains the project land data, and uses the virtual model module to create a three-dimensional model based on the project land data. The public module publishes the project land three-dimensional model; 2) The application end obtains the 3D model of the public project land data, and views the 3D model of the project land in the viewing module, and makes a project plan based on the 3D model of the project land, and enters the project plan into the approval end through the input module; 3) The scheme receiving module receives the project scheme, and the evaluation unit in the approval unit evaluates the project scheme; 4) The project plan is evaluated by the plan evaluation module, risk assessment module and economic evaluation module. If the project plan fails to pass the evaluation of the plan evaluation module, risk assessment module and economic evaluation, the rejection module will reject the application; 5) When the project plan passes the technical evaluation of the plan evaluation module, the risk assessment module will conduct risk assessment. When the project plan passes the risk assessment of the risk assessment module, the economic assessment module will conduct economic assessment. When the project plan passes the economic assessment of the economic assessment module, the optimization module will make suggestions for optimization of the project plan. The rejection information of the rejection module will be received by the feedback receiving module of the application end. 6) The optimization unit obtains the environmental ecological data of the project land and the surrounding environmental data, and interacts with the project plan interaction module to perform ecological environmental data interaction. The simulation module simulates the project plan and ecological environmental data to obtain simulation data. The data analysis module analyzes the impact of the project plan on the ecological environment based on the simulation data. 7) When the impact of the project plan on the ecological environment exceeds the threshold of the ecological environment, the optimization module formulates a proposal, and the review module reviews the rationality of the proposal. The proposal that passes the review of the review module will be fed back by the feedback module with modification suggestions for the project plan. The proposal that does not pass the review of the review module will be re-optimized by the optimization module, and the feedback module will feedback the modification suggestions and transmit them to the feedback receiving module. The applicant will make detailed modifications to the project plan based on the modification opinions and enter the new project plan through the entry module. When the impact of the project plan on the ecological environment does not exceed the threshold of the ecological environment, the competition unit will record and save the project plan; 8) The data sorting module and the scheme storage module sort out and save the project scheme, and the effect simulation module obtains simulation data based on the project scheme. At the same time, the effect simulation module obtains the indicators of the economic benefits of the project scheme according to the cost effect, construction period effect and future trend effect and the formula; 9) The ranking module ranks projects according to their economic benefit indicators. When the project approval is not yet completed, the announcement module will control the public module to publish the project plan rankings. When the project approval is completed, the announcement module will control the public module to publish the project plans and project rankings. The project plan ranked first in the public module will be automatically approved, and the applicant can query the project approval results from the public module.

[0014] The beneficial effects of the present invention are: The present invention 1. By making a three-dimensional model through the virtual model module, you can have a clearer understanding of the project land situation. By making the three-dimensional model of the project land model public through the public module, it can be more fair. The applicant can obtain the information disclosed by the public module in the publishing end through the acquisition module, and can see the three-dimensional model of the project land more clearly. According to the three-dimensional model of the project land, a project plan is formulated. The project plan is entered through the input module to apply for the project. If the project plan fails to pass the evaluation of the plan evaluation module, the risk assessment module and the economic evaluation, it means that the existing technology cannot realize the plan technology, the risk is relatively high and the economic benefit is relatively low. The application can be rejected through the rejection module, which can greatly eliminate the project plans that are applied for at random; 2. Obtain the ecological and environmental data of the project land and the surrounding ecological and environmental data through the ecological data module, and interact the project plan with the ecological environment through the plan interaction module. The simulation module is used to simulate the project plan and the ecological environment, so that it can be more clearly concluded whether the changes in the ecological environment in the future trend exceed the ecological and environmental threshold. The plan that exceeds the ecological and environmental threshold is optimized through the optimization module. The optimization module gives suggestions and makes suggested projects for the parts of the project plan that affect the ecological environment, so that the applicant can know the project problems more clearly and can better design new project plans. The audit module can make the suggested project optimization more perfect more accurately. The effect simulation module calculates the indicators of the economic benefits of the project plan. The ranking module can more clearly understand the advantages and disadvantages of multiple plans. The public announcement module controls the public module to publicize the project plan ranking. During the approval period, the applicant can design the project plan by checking the project ranking, and the project plan ranked first at the end of the approval period will be approved. The public announcement module controls the public module to publicize the project plan and project ranking, so that the applicant can more clearly understand the advantages and disadvantages of the first ranking. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a system flow diagram of the publishing end, application end and approval end of a construction land intelligent approval system and method in the present invention; Figure 2 A schematic diagram of the system flow of an approval unit of an intelligent construction land approval system and method in the present invention; Figure 3 It is a system flow diagram of an evaluation unit of an intelligent construction land approval system and method in the present invention; Figure 4 It is a system flow diagram of an optimization unit of an intelligent construction land approval system and method in the present invention; Figure 5 It is a system flow diagram of a competition unit of an intelligent construction land approval system and method in the present invention. DETAILED DESCRIPTION

[0016] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0017] like Figure 1-5As shown, an intelligent approval system for construction land includes a publishing end, an application end and an approval end, the publishing end includes a project land module for project land data survey, the project land module is electrically connected to a virtual model module for project land model production, the virtual model module is electrically connected to a public module for public information, the application end includes an acquisition module for acquiring public information, the acquisition module is electrically connected to a viewing module for viewing the project land model, the viewing module is electrically connected to an entry module for project plan entry, the entry module is electrically connected to a feedback receiving module for receiving feedback information, the approval end includes a scheme receiving module for receiving schemes, the scheme receiving module is electrically connected to an approval unit for scheme approval, the public module is electrically connected to the acquisition module, and the entry module is electrically connected to the scheme receiving module; The approval module includes an evaluation unit for program evaluation, the evaluation unit is electrically connected to a rejection module for rejecting applications, the evaluation unit is electrically connected to an optimization unit for program optimization suggestions, the optimization unit is electrically connected to a feedback module for feedback, and the feedback module is electrically connected to the feedback receiving module; The publishing end obtains the specific data of the project site through the project land module, and the virtual model module makes a three-dimensional model based on the data, and the public module publishes the three-dimensional model of the project land model. The application end obtains the information disclosed by the public module in the publishing end through the acquisition module, and the viewing module views it. The input module enters the project plan according to the plan designed by the application end, and the plan receiving module in the approval end receives the project plan, and the evaluation unit evaluates the project plan; Through the above embodiment, the three-dimensional model is made through the virtual model module, so that the project land situation can be understood more clearly. The three-dimensional model of the project land model is made public through the public module, which can be more fair. The applicant obtains the information disclosed by the public module in the publishing end through the acquisition module, and can see the three-dimensional model of the project land more clearly. A project plan is formulated according to the three-dimensional model of the project land, and the project plan is entered through the entry module to apply for the project. The evaluation unit includes a solution evaluation module for evaluating whether the solution can be realized, the solution evaluation module is electrically connected to a risk evaluation module for evaluating risks, the risk evaluation module is electrically connected to an economic evaluation module for evaluating economics, the solution evaluation module, the risk evaluation module and the economic evaluation module are all electrically connected to the rejection module, and the economic evaluation module is electrically connected to the optimization unit; The scheme evaluation module receives the project scheme, and analyzes the application of the project construction technology proposed in the project scheme based on the existing technology analysis. When the scheme evaluation module analyzes that the existing technology cannot complete the project scheme, the rejection module rejects the application. When the scheme evaluation module analyzes that the existing technology can complete the project scheme, the risk assessment module conducts a risk assessment on the project scheme to analyze whether the compliance and natural disaster response of the project scheme meet the regulations. When the project scheme fails to pass the risk assessment of the risk assessment module, the rejection module rejects the project scheme. When the project scheme passes the risk assessment of the risk assessment module, the economic assessment module evaluates the project scheme to evaluate the economic development and employment of the project scheme. When the project scheme fails to pass the economic assessment of the economic assessment module, the rejection module rejects the project scheme. When the project scheme passes the economic assessment of the economic assessment module, the optimization module optimizes the project scheme. The rejection module generates rejection information according to the rejection path, and the feedback receiving module receives it. According to the above embodiment, if the project plan fails to pass the evaluation of the plan evaluation module, the risk evaluation module and the economic evaluation, it means that the existing technology cannot realize the plan technology, the risk is relatively high and the economic benefit is relatively low. The application is rejected by the rejection module, thereby greatly eliminating the randomly applied project plans. The optimization unit includes an ecological data module for collecting ecological environment data of the project land and the surrounding area of ​​the project land, the ecological data module is electrically connected to a scheme interaction module for interaction between the project scheme and the ecological environment, the scheme interaction module is electrically connected to a simulation module for simulating interaction between the project scheme and the ecological environment, the simulation module is electrically connected to a data analysis module for analyzing the impact of the project scheme on the ecological environment over time, the data analysis module is electrically connected to a competition unit for multi-scheme competition and an optimization module for optimizing the project scheme, the optimization module is electrically connected to an audit module for project scheme auditing, and the audit module is electrically connected to a feedback module; The ecological data module obtains the ecological environment data of the project land and the surrounding ecological environment data, and interacts with the project plan provided by the plan interaction module. The project plan and the ecological environment interact in the simulation module. The simulation module simulates the changes in the ecological environment data and the project plan over time. The data analysis module analyzes the impact of the project plan on the ecological environment over time, and analyzes whether the ecological environment changes exceed the prescribed threshold of the ecological environment. When the data analysis module analyzes that the impact of the project plan on the ecological environment does not exceed the prescribed threshold of the ecological environment, the competition unit records and saves the project plan. When the data analysis module analyzes that the impact of the project plan on the ecological environment exceeds the prescribed threshold of the ecological environment, the optimization module makes targeted optimization suggestions based on the data analyzed by the data analysis module and formulates a proposed plan. The review module reviews whether the proposed plan is reasonable and whether the proposed plan exceeds the prescribed threshold of the ecological environment. When the proposed plan passes the review of the review module, the feedback module provides feedback on the project plan modification suggestions. When the proposed plan fails to pass the review of the review module, the optimization module continues to optimize the project plan. The feedback module transmits the feedback modification suggestions to the feedback receiving module, and makes detailed modifications to the project plan according to the modification opinions and enters the new project plan through the entry module. Through the above embodiment, the ecological environment data of the project land and the surrounding ecological environment data are obtained through the ecological data module, and the project plan and the ecological environment are interacted through the plan interaction module. The simulation module is used to simulate the project plan and the ecological environment, so that it can be more clearly concluded whether the change of the ecological environment in the future trend exceeds the ecological environment threshold, and the plan that exceeds the ecological environment threshold is optimized through the optimization module. The optimization module gives suggestions to the part of the project plan that affects the ecological environment and makes a suggested project, so that the applicant can know the project problems more clearly and can better design new project plans, and the audit module can make the optimization of the suggested project more accurate and perfect; The competition unit includes a data sorting module for data sorting, the data sorting module is electrically connected to a solution storage module for storing solutions, the solution storage module is electrically connected to an effect simulation module for sorting the effects of solutions, the effect simulation module is electrically connected to a ranking module for ranking multiple solutions, and the ranking module is electrically connected to a publicizing module for publicizing and publishing project solutions; The data sorting module receives the project plan and sorts out the cost effect, duration effect and future trend effect of the project plan. The plan storage module stores the project plan and project effect. The effect simulation module uses the formula: [\text{Score}=\frac{CF}{C_0}]; (CF) represents the total cash flow of the project (the sum of cash flows from year 0 to year N); (C_0) represents the initial investment cost of the project; (\text{Score}) is an indicator of the economic benefits of the project solution, which represents the ratio between the total cash flow and the initial investment cost; Simulate the profit effect of the project plan, and the ranking module will rank multiple projects according to the size of (\text{Score}), and the formula module will analyze according to the approval end time. When the project land approval time ends, the public announcement module will generate a public instruction to control the public module to publish the project plan and project plan ranking. When the project land approval time has not ended, the public announcement module will generate a public instruction to control the public module to publish the project plan ranking; Through the above embodiment, the economic benefit index of the project plan is calculated through the effect simulation module, the advantages and disadvantages of multiple plans can be more clearly understood through the ranking module, and the ranking of the project plan can be publicized by the public display module. During the approval period, the applicant can design the project plan by checking the project ranking, and the project plan ranked first at the end of the approval period is approved. The public display module controls the public module to publish the project plan and project ranking so that the applicant can more clearly understand the advantages and disadvantages of the first ranking; A method for intelligent approval of construction land, the method comprising the following specific steps: 1) The project land module in the publishing end obtains the project land data, and uses the virtual model module to create a three-dimensional model based on the project land data. The public module publishes the project land three-dimensional model; 2) The application end obtains the 3D model of the public project land data, and views the 3D model of the project land in the viewing module, and makes a project plan based on the 3D model of the project land, and enters the project plan into the approval end through the input module; 3) The scheme receiving module receives the project scheme, and the evaluation unit in the approval unit evaluates the project scheme; 4) The project plan is evaluated by the plan evaluation module, risk assessment module and economic evaluation module. If the project plan fails to pass the evaluation of the plan evaluation module, risk assessment module and economic evaluation, the rejection module will reject the application; 5) When the project plan passes the technical evaluation of the plan evaluation module, the risk assessment module will conduct risk assessment. When the project plan passes the risk assessment of the risk assessment module, the economic assessment module will conduct economic assessment. When the project plan passes the economic assessment of the economic assessment module, the optimization module will make suggestions for optimization of the project plan. The rejection information of the rejection module will be received by the feedback receiving module of the application end. 6) The optimization unit obtains the environmental ecological data of the project land and the surrounding environmental data, and interacts with the project plan interaction module to perform ecological environmental data interaction. The simulation module simulates the project plan and ecological environmental data to obtain simulation data. The data analysis module analyzes the impact of the project plan on the ecological environment based on the simulation data. 7) When the impact of the project plan on the ecological environment exceeds the threshold of the ecological environment, the optimization module formulates a proposal, and the review module reviews the rationality of the proposal. The proposal that passes the review of the review module will be fed back by the feedback module with modification suggestions for the project plan. The proposal that does not pass the review of the review module will be re-optimized by the optimization module, and the feedback module will feedback the modification suggestions and transmit them to the feedback receiving module. The applicant will make detailed modifications to the project plan based on the modification opinions and enter the new project plan through the entry module. When the impact of the project plan on the ecological environment does not exceed the threshold of the ecological environment, the competition unit will record and save the project plan; 8) The data sorting module and the scheme storage module sort out and save the project scheme, and the effect simulation module obtains simulation data based on the project scheme. At the same time, the effect simulation module obtains the indicators of the economic benefits of the project scheme according to the cost effect, construction period effect and future trend effect and the formula; 9) The ranking module ranks projects according to their economic benefit indicators. When the project approval is not yet completed, the announcement module will control the public module to publish the project plan rankings. When the project approval is completed, the announcement module will control the public module to publish the project plans and project rankings. The project plan ranked first in the public module will be automatically approved, and the applicant can query the project approval results from the public module.

[0018] Working principle: When the present invention is used, the project land module in the publishing end obtains the project land data, and makes a three-dimensional model according to the project land data through the virtual model module, the public module makes the project land three-dimensional model public, the application end obtains the three-dimensional model of the public project land data, and the three-dimensional model of the project land is viewed in the viewing module, and the project plan is made with the three-dimensional model of the project land, and the project plan is entered into the approval end by the input module, the plan receiving module receives the project plan, and the evaluation unit in the approval unit evaluates the project plan, and the project plan is evaluated by the plan evaluation module, the risk evaluation module and the economic evaluation module. When the project plan does not pass the plan evaluation module, the risk evaluation module and the economic evaluation module, the project plan is evaluated by the plan evaluation module, the risk evaluation module and the economic evaluation module. When the evaluation is conducted, the rejection module rejects the application. When the project plan passes the technical evaluation of the plan evaluation module, the risk assessment module conducts risk assessment. When the project plan passes the risk assessment of the risk assessment module, the economic assessment module conducts economic assessment. When the project plan passes the economic assessment of the economic assessment module, the optimization module makes suggestions for optimizing the project plan. The rejection information of the rejection module is received by the feedback receiving module at the application end. The optimization unit obtains the environmental ecological data of the project land and the surrounding environmental data, and interacts with the project plan interaction module for ecological environmental data. The simulation module simulates the project plan and ecological environmental data to obtain simulation data. The data analysis module analyzes the project plan according to the simulation. The proposed data analysis project plan will analyze the impact of the ecological environment. When the impact of the project plan on the ecological environment exceeds the threshold of the ecological environment, the optimization module will formulate a proposal, and the review module will review the rationality of the proposal. The proposal that passes the review of the review module will be fed back by the feedback module. The proposal that does not pass the review of the review module will be re-optimized by the optimization module, and the feedback module will feedback the modification suggestions and transmit them to the feedback receiving module. The applicant will make detailed modifications to the project plan based on the modification opinions and enter the new project plan through the entry module. When the impact of the project plan on the ecological environment does not exceed the threshold of the ecological environment, the competition unit will record it. And save the project plan, the data sorting module and the plan storage module sort and save the project plan, the effect simulation module obtains simulation data according to the project plan, and at the same time, the effect simulation module obtains the economic benefit indicators of the project plan according to the cost effect, construction period effect and future trend effect, and the ranking module ranks according to the economic benefit indicators of the project plan. When the project approval is not completed, the publicity module will control the public module to disclose the project plan ranking. When the project approval is completed, the publicity module will control the public module to disclose the project plan and project ranking. The project plan with the first ranking disclosed by the public module will be automatically approved, and the applicant can query the project approval result from the public module.

[0019] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An intelligent construction land approval system, It is characterized in that It includes a publishing end, an application end and an approval end. The publishing end includes a project land module for project land data survey, the project land module is electrically connected to a virtual model module for project land model production, the virtual model module is electrically connected to a disclosure module for public information, the application end includes an acquisition module for obtaining public information, the acquisition module is electrically connected to a viewing module for viewing the project land model, the viewing module is electrically connected to an entry module for project plan entry, the entry module is electrically connected to a feedback receiving module for receiving feedback information, the approval end includes a solution receiving module for receiving solutions, the solution receiving module is electrically connected to an approval unit for solution approval, the disclosure module is electrically connected to the acquisition module, and the entry module is electrically connected to the solution receiving module.

2. According to claim 1, an intelligent construction land approval system, It is characterized in that The approval module includes an evaluation unit for scheme evaluation, the evaluation unit is electrically connected to a rejection module for rejecting applications, the evaluation unit is electrically connected to an optimization unit for scheme optimization suggestions, the optimization unit is electrically connected to a feedback module for feedback, and the feedback module is electrically connected to a feedback receiving module.

3. According to claim 2, an intelligent construction land approval system, It is characterized in that The publishing end obtains specific data of the project site through the project land module, and the virtual model module makes a three-dimensional model based on the data, and the public module publishes the three-dimensional model of the project land model. The application end obtains the information disclosed by the public module in the publishing end through the acquisition module, and the information is viewed by the viewing module. The entry module enters the project plan according to the plan designed by the application end, and the plan receiving module in the approval end receives the project plan, and the evaluation unit evaluates the project plan.

4. According to claim 2, an intelligent construction land approval system, It is characterized in that The evaluation unit includes a solution evaluation module for evaluating whether the solution can be implemented. The solution evaluation module is electrically connected to a risk evaluation module for evaluating risks. The risk evaluation module is electrically connected to an economic evaluation module for evaluating economics. The solution evaluation module, risk evaluation module and economic evaluation module are all electrically connected to the rejection module, and the economic evaluation module is electrically connected to the optimization unit.

5. According to claim 4, an intelligent construction land approval system, It is characterized in that The scheme evaluation module receives the project scheme, and analyzes the application of the project construction technology proposed in the project scheme based on the existing technology. When the scheme evaluation module analyzes that the existing technology cannot complete the project scheme, the rejection module rejects the application. When the scheme evaluation module analyzes that the existing technology can complete the project scheme, the risk assessment module performs a risk assessment on the project scheme to analyze whether the compliance and natural disaster response of the project scheme meet the regulations. When the project scheme fails to pass the risk assessment of the risk assessment module, the rejection module rejects the project scheme. When the project scheme passes the risk assessment of the risk assessment module, the economic assessment module evaluates the project scheme to evaluate the economic development and employment of the project scheme. When the project scheme fails to pass the economic assessment of the economic assessment module, the rejection module rejects the project scheme. When the project scheme passes the economic assessment of the economic assessment module, the optimization module optimizes the project scheme. The rejection module generates rejection information according to the rejection path, and the feedback receiving module receives it.

6. According to claim 2, an intelligent construction land approval system, It is characterized in that The optimization unit includes an ecological data module for collecting ecological environment data of the project land and its surrounding areas, the ecological data module is electrically connected to a scheme interaction module for interaction between the project scheme and the ecological environment, the scheme interaction module is electrically connected to a simulation module for simulating interaction between the project scheme and the ecological environment, the simulation module is electrically connected to a data analysis module for analyzing the impact of the project scheme on the ecological environment over time, the data analysis module is electrically connected to a competition unit for multi-scheme competition and an optimization module for optimizing the project scheme, the optimization module is electrically connected to an audit module for project scheme auditing, and the audit module is electrically connected to a feedback module.

7. The intelligent construction land approval system according to claim 6, It is characterized in that The ecological data module obtains the ecological environment data of the project land and the surrounding ecological environment data, and interacts with the project plan provided by the plan interaction module. The project plan and the ecological environment are interacted in the simulation module. The simulation module simulates the changes in the ecological environment data and the project plan over time. The data analysis module analyzes the impact of the project plan on the ecological environment over time, and analyzes whether the ecological environment changes exceed the prescribed threshold of the ecological environment. When the data analysis module analyzes that the impact of the project plan on the ecological environment does not exceed the prescribed threshold of the ecological environment, the competition unit records and saves the project plan. When the data analysis module analyzes the project plan, the competition unit records and saves the project plan. When the impact of the proposal on the ecological environment exceeds the prescribed threshold of the ecological environment, the optimization module will make targeted optimization suggestions based on the data analyzed by the data analysis module and formulate a proposal plan. The review module will review whether the proposal plan is reasonable and whether the proposal plan exceeds the prescribed threshold of the ecological landscape. When the proposal plan passes the review of the review module, the feedback module will provide feedback on the project plan modification suggestions. When the proposal plan fails to pass the review of the review module, the optimization module will continue to optimize the project plan. The feedback module will transmit the feedback modification suggestions to the feedback receiving module, make detailed modifications to the project plan according to the modification opinions, and enter the new project plan through the entry module.

8. According to claim 6, an intelligent construction land approval system, It is characterized in that The competition unit includes a data sorting module for data sorting, the data sorting module is electrically connected to a solution storage module for storing solutions, the solution storage module is electrically connected to an effect simulation module for sorting solution effects, the effect simulation module is electrically connected to a ranking module for ranking multiple solutions, and the ranking module is electrically connected to a disclosure module for publicizing and publishing project solutions.

9. The intelligent construction land approval system according to claim 8, It is characterized in that The data sorting module receives the project plan and sorts out the cost effect, duration effect and future trend effect of the project plan. The plan storage module stores the project plan and project effect. The effect simulation module calculates the project plan and project effect according to the formula: [\text{Score}=\frac{CF}{C_0}]; (CF) represents the total cash flow of the project (the sum of cash flows from year 0 to year N); (C_0) represents the initial investment cost of the project; (\text{Score}) is an indicator of the economic benefits of the project solution, which represents the ratio between the total cash flow and the initial investment cost; The profit effect of the project plan is simulated, and the ranking module ranks multiple projects according to the size of (\text{Score}), and the formula module analyzes according to the approval end time. When the project land approval time is over, the publicity module will generate a public instruction to control the public module to publish the project plan and project plan ranking. When the project land approval time has not ended, the publicity module will generate a public instruction to control the public module to publish the project plan ranking.

10. A construction land intelligent approval method, applied to a construction land intelligent approval system according to any one of claims 1 to 9, wherein the method: It is characterized in that The specific steps include: 1) The project land module in the publishing end obtains the project land data, and uses the virtual model module to create a three-dimensional model based on the project land data. The public module publishes the project land three-dimensional model; 2) The application end obtains the 3D model of the public project land data, and views the 3D model of the project land in the viewing module, and makes a project plan based on the 3D model of the project land, and enters the project plan into the approval end through the input module; 3) The scheme receiving module receives the project scheme, and the evaluation unit in the approval unit evaluates the project scheme; 4) The project plan is evaluated by the plan evaluation module, risk assessment module and economic evaluation module. If the project plan fails to pass the evaluation of the plan evaluation module, risk assessment module and economic evaluation, the rejection module will reject the application; 5) When the project plan passes the technical evaluation of the plan evaluation module, the risk assessment module will conduct risk assessment. When the project plan passes the risk assessment of the risk assessment module, the economic assessment module will conduct economic assessment. When the project plan passes the economic assessment of the economic assessment module, the optimization module will make suggestions for optimization of the project plan. The rejection information of the rejection module will be received by the feedback receiving module of the application end. 6) The optimization unit obtains the environmental ecological data of the project land and the surrounding environmental data, and interacts with the project plan interaction module to perform ecological environmental data interaction. The simulation module simulates the project plan and ecological environmental data to obtain simulation data. The data analysis module analyzes the impact of the project plan on the ecological environment based on the simulation data. 7) When the impact of the project plan on the ecological environment exceeds the threshold of the ecological environment, the optimization module formulates a proposal, and the review module reviews the rationality of the proposal. The proposal that passes the review of the review module will be fed back by the feedback module with modification suggestions for the project plan. The proposal that does not pass the review of the review module will be re-optimized by the optimization module, and the feedback module will feedback the modification suggestions and transmit them to the feedback receiving module. The applicant will make detailed modifications to the project plan based on the modification opinions and enter the new project plan through the entry module. When the impact of the project plan on the ecological environment does not exceed the threshold of the ecological environment, the competition unit will record and save the project plan; 8) The data sorting module and the scheme storage module sort out and save the project scheme, and the effect simulation module obtains simulation data based on the project scheme. At the same time, the effect simulation module obtains the indicators of the economic benefits of the project scheme according to the cost effect, construction period effect and future trend effect and the formula; 9) The ranking module ranks projects according to their economic benefit indicators. When the project approval is not yet completed, the announcement module will control the public module to publish the project plan rankings. When the project approval is completed, the announcement module will control the public module to publish the project plans and project rankings. The project plan ranked first in the public module will be automatically approved, and the applicant can query the project approval results from the public module.

Citation Information

Patent Citations

  • Three-dimensional model generation and analysis system and method for approval

    CN113052557A

  • Analysis and decision-making method and system based on engineering construction project approval

    CN118071169A