Tunnel excavation data processing method of three-dimensional geologic model

By constructing a three-dimensional geological model, analyzing the geological information of tunnel excavation and designing construction methods, the problems of insufficient expression of geological information and low efficiency in the existing technology are solved, and the work efficiency and data accuracy of tunnel excavation are improved.

CN118918278AInactive Publication Date: 2024-11-08BEIJING URBAN CONSTR EXPLORATION & SURVEYING DESIGN RES INST

Patent Information

Application Number
CN202410575957.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-10
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing CAD mapping software is difficult to fully express multi-source geological information during tunnel excavation, resulting in low work efficiency and poor data accuracy, which cannot meet professional needs.

Method used

By constructing a three-dimensional geological model, analyzing the geological information of tunnel excavation, and designing a reasonable tunnel excavation construction method based on the visual analysis results, and generating a data table.

Benefits of technology

It fully expresses multi-source geological information, improves the efficiency and data accuracy of tunnel excavation work, and provides a construction method with practical reference significance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118918278A_ABST
    Figure CN118918278A_ABST
Patent Text Reader

Abstract

The invention provides a three-dimensional geologic model-based tunnel excavation data processing method, which comprises the following steps of: acquiring three-dimensional geologic model data in a geological condition analysis step of an area where a preset tunnel is located, and acquiring geological condition information of the area where the preset tunnel is located through analysis and processing according to acquired drilling information data; in the tunnel drawing area selection step, an area selection instruction is triggered according to geological condition information of the position of a tunnel, and a position area of a tunnel drawing three-dimensional data model is selected; the step of constructing the three-dimensional data model of tunnel excavation comprises the steps of identifying attribute information of tunnel drawing, triggering an instruction for drawing the three-dimensional data model of the tunnel, generating the three-dimensional data model of the tunnel excavation, and visually analyzing geological information of the tunnel excavation by constructing the three-dimensional data model of the tunnel excavation on the three-dimensional geological model. And the method has practical reference significance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of data processing methods, and in particular to a method for processing tunnel excavation data of a three-dimensional geological model. Background Art

[0002] Tunnels are engineering structures buried in the ground. They are a form of human use of underground space. Tunnels can be divided into traffic tunnels, hydraulic tunnels, etc. Tunnel excavation requires information such as the geological conditions of the tunnel, the judgment of the surrounding rock grade, and construction experience. Drawing tunnel design drawings is an inevitable process of tunnel excavation. The current CAD drawing software used for drawing cannot fully express the geological information contained in the existing multi-source data on the one hand; in order to meet the needs of the professional field, on the other hand, the work efficiency is low and the data accuracy is poor. Therefore, it is necessary to provide a three-dimensional data model for tunnel excavation. Summary of the invention

[0003] In response to the above technical problems, the present invention constructs a tunnel model on a three-dimensional geological model to visualize the geological information of tunnel excavation, and on the other hand, can design reasonable tunnel excavation construction method data based on the visualized analysis of the geological information of tunnel excavation and output a data table.

[0004] The first aspect of the present invention provides: a method for processing tunnel excavation data of a three-dimensional geological model, comprising the following steps: a geological condition analysis step of a preset tunnel area to obtain three-dimensional geological model data, and according to the acquired drilling information data, obtain geological condition information of the preset tunnel area through analysis and processing;

[0005] The step of selecting a tunnel drawing area triggers an area selection instruction according to geological condition information of the location of the tunnel, and selects a location area for drawing a three-dimensional data model of the tunnel;

[0006] The step of constructing a three-dimensional data model of tunnel excavation identifies attribute information of tunnel drawing, triggers an instruction to draw a three-dimensional data model of the tunnel, and generates a three-dimensional data model of the tunnel excavation.

[0007] The second aspect of the present invention provides: a computer-readable storage medium having a computer program / instruction stored thereon, which, when executed by a processor, implements the steps of the method provided in the first aspect.

[0008] The third aspect of the present invention provides: a tunnel excavation data processing system for a three-dimensional geological model, characterized in that the system includes at least one processor, a computer, and a memory, which stores instructions. When the instructions are executed by at least one processor, the steps of the method provided in the first aspect are implemented.

[0009] The technical solution of the present invention has at least the following beneficial effects: on the one hand, by constructing a tunnel model on a three-dimensional geological model and visually analyzing the geological information of tunnel excavation, the geological information contained in the existing multi-source data can be fully expressed; to meet the needs of the professional field, on the other hand, reasonable tunnel excavation construction method data can be designed based on the visual analysis of the geological information of tunnel excavation and a data table can be output, which has more practical reference significance for tunnel excavation work, improves work efficiency, and has high data accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 The process of the embodiment of the present invention Figure 1 ;

[0011] Figure 2 The process of the embodiment of the present invention Figure 2 ;

[0012] Figure 3 The process of the embodiment of the present invention Figure 3 ;

[0013] Figure 4 The process of the embodiment of the present invention Figure 4 ;

[0014] Figure 5 Schematic diagram of the system of the embodiment of the present invention. DETAILED DESCRIPTION

[0015] The following examples further illustrate the content of the present invention, but should not be construed as limiting the present invention. Without departing from the spirit and substance of the present invention, modifications or substitutions made to the methods, steps or conditions of the present invention all fall within the scope of the present invention.

[0016] It should also be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0017] In some embodiments, a method for processing tunnel excavation data of a three-dimensional geological model comprises the following steps:

[0018] The step of analyzing the geological conditions of the area where the preset tunnel is located obtains the three-dimensional geological model data, and obtains the geological condition information of the area where the preset tunnel is located after analyzing and processing the obtained drilling information data;

[0019] The step of selecting a tunnel drawing area triggers an area selection instruction according to geological condition information of the location of the tunnel, and selects a location area for drawing a three-dimensional data model of the tunnel;

[0020] The step of constructing a three-dimensional data model of tunnel excavation identifies attribute information of tunnel drawing, triggers an instruction to draw a three-dimensional data model of the tunnel, and generates a three-dimensional data model of the tunnel excavation.

[0021] In these embodiments: on the established three-dimensional geological model data, the borehole location and distribution area are obtained, and the borehole information data can be obtained by identifying the borehole, wherein the borehole information includes but is not limited to attribute information, data statistics, and civil engineering test data, wherein the borehole attribute information includes: name, stratum attribute, layer thickness, layer top elevation, coordinate information, and the data statistics information includes uniaxial saturated compressive strength, point load strength, rock mass longitudinal wave velocity, rock mass integrity index, etc.; wherein the civil engineering test data includes water content, natural density, dry density, saturated weight, dry weight, and soil particle specific gravity; and Therefore, according to the simulated direction of the tunnel, a virtual borehole is set on the three-dimensional geological model, the position where the borehole needs to be drilled on the three-dimensional geological model is identified, and the virtual borehole information data is identified. The information data of the virtual borehole includes: number, longitude, latitude, and altitude. After data calculation and processing, a virtual borehole model is obtained, the virtual borehole position is identified, and the attribute information data of the virtual borehole can be obtained. The attribute information of the virtual borehole is the same as the type of borehole information: such as including but not limited to attribute information, data statistics, civil test data, etc., and then the virtual borehole information can be stored and exported to a workbook;

[0022] The layer structure of the geology in the area where the preset tunnel is located can be directly observed through the virtual section on the three-dimensional geological model. The perspective of the area can also be achieved by adjusting the transparency of the area where the preset tunnel is located. All identifiable locations in the area where the preset tunnel is located display the values ​​of longitude, latitude, altitude, heading angle, pitch angle, and visual height, so as to confirm the location of the preset tunnel. The attribute information of the section is obtained in the process of identifying the virtual section of the area where the tunnel is located. The attribute information of the section includes number, length, and depth; identify the geological area of ​​the virtual section, obtain the geological attribute information, data statistics information, and high-precision model attributes of the identified area, and the geological attribute information includes basic information and coordinate information. The basic information includes: stratum name, grid level, grid size, etc.; high-precision model attributes include rock stratum number, rock and soil name, water content, etc. Then the overall information of the virtual section can be stored and exported to the workbook;

[0023] Among them, geological conditions mainly refer to topography, stratum lithology, geological structure, earthquake, hydrogeology, natural building materials, and geological phenomena such as karst, landslide, collapse, sand liquefaction, and foundation deformation. The stratum lithology in the geological condition information is represented by different color blocks according to the type. The lithology types include fill, silt, clay, sand, sandy gravel, etc.

[0024] The attribute information of tunnel drawing includes tunnel excavation width and tunnel excavation depth.

[0025] In some embodiments, in the step of analyzing the geological conditions of the area where the preset tunnel is located, the geological condition information of the selected borehole and each location in the area where the preset tunnel is located is queried, and each location of each borehole can be selected for query, and each location in the area where the preset tunnel is located can be selected for query. This makes it convenient to determine the geological conditions of each location and facilitates an overall analysis of the area where the preset tunnel is located.

[0026] In some embodiments, in the step of analyzing the geological conditions of the area where the preset tunnel is located, the instructions of the selected fence profile control on the three-dimensional structural model are identified to obtain a fence diagram analysis model of the area where the preset tunnel is located, so as to facilitate viewing the geological conditions of each stratum in various forms and ultimately determine the generation location of the three-dimensional data model of the tunnel excavation.

[0027] In some embodiments, in the step of selecting a tunnel drawing area, a pre-operation area is selected, and a zoom-in or zoom-out or turn or perspective command may be executed to further facilitate viewing of the geological conditions of each stratum.

[0028] In some embodiments, in the step of constructing a three-dimensional data model of tunnel excavation, the attribute information of tunnel drawing includes a custom drawing mode and an imported drawing mode. The custom drawing mode is to execute the drawing instructions of the three-dimensional data model of tunnel excavation according to the custom tunnel drawing attribute information, and the imported drawing mode is to import the pre-saved tunnel drawing attribute information and execute the drawing instructions of the three-dimensional data model of tunnel excavation.

[0029] In some embodiments, the tunnel excavation data processing method of the three-dimensional geological model further includes a tunnel excavation construction simulation step:

[0030] Identify the virtual profile of the tunnel, obtain the cross section of the tunnel excavation location, and obtain the geological condition information of the tunnel excavation cross section location through analysis and processing based on the acquired drilling information data;

[0031] According to the three-dimensional data model of the tunnel excavation after drawing and the geological condition information of the tunnel excavation section location obtained, after simulation analysis and processing, the reasonable tunnel excavation construction model data is simulated and designed;

[0032] In these embodiments: by obtaining data of geological condition information of the tunnel excavation section location, combining it with the geological information data of each area location of the three-dimensional data model of the tunnel excavation for analysis, finally obtaining reasonably designed tunnel excavation construction model data.

[0033] In some embodiments, the three-dimensional data model of the tunnel excavation after drawing is combined with the geological condition information of the tunnel excavation section position obtained, and after simulation analysis and processing, the tunnel excavation construction model data with reasonable design is simulated, and the tunnel surrounding rock grade is evaluated according to the geological condition information of the tunnel excavation section position obtained, and the corresponding surrounding rock grade data is obtained, and the tunnel excavation construction method data is obtained according to the evaluated tunnel surrounding rock grade data and a data table is output;

[0034] In these embodiments: surrounding rock classification refers to dividing an infinite rock sequence into a finite number of categories with different degrees of stability according to indicators such as rock integrity and rock strength, that is, classifying some surrounding rocks with similar stability into one category, and dividing all surrounding rocks into several categories. In this application, the surrounding rock is divided into six levels according to geological condition information such as the three-dimensional data model of tunnel excavation and the location of the tunnel excavation section. More reasonable tunnel excavation method data is determined according to the specific level of the surrounding rock, and analysis is performed through multiple dimensions, which has more practical reference significance.

[0035] In some embodiments, in the step of evaluating the tunnel surrounding rock grade according to the acquired geological condition information at the tunnel excavation section location, the geological condition information at the tunnel excavation section location includes:

[0036] Rock strength indicators: including uniaxial saturated compressive strength and point load strength;

[0037] Rock mass acoustic wave indicators: rock mass longitudinal wave velocity and rock mass integrity indicators;

[0038] When the uniaxial saturated compressive strength is greater than 60MPa, the point load strength is greater than 2.5MPa, the rock mass longitudinal wave velocity is greater than 5km / s, and the rock mass integrity index is greater than 0.75, the corresponding surrounding rock grade data is Grade I;

[0039] When the uniaxial saturated compressive strength is 30-60MPa or greater than 60PMa, the point load strength is 1.25-2.5MPa or greater than 2.5PMa, the rock mass longitudinal wave velocity is 3.7-5.2km / s, and the rock mass integrity index is greater than 0.5 or greater than 0.75, the corresponding surrounding rock grade data is Grade II;

[0040] When the uniaxial saturated compressive strength is 20-30PMa or 30-60MPa or greater than 60PMa, the point load strength is 0.85-1.25MPa or 1.25-2.5MPa or greater than 2.5PMa, the rock mass longitudinal wave velocity is 3.0-4.5km / s, and the rock mass integrity index is 0.3-0.5 or 0.5-0.75 or greater than 0.75, the corresponding surrounding rock grade data is Grade III;

[0041] When the uniaxial saturated compressive strength is 10-30PMa or greater than 30PMa, the point load strength is 0.42-1.25MPa or greater than 1.25MPa, the rock mass longitudinal wave velocity is 2.0-3.5km / s or greater than 2.0km / s, and the rock mass integrity index is 0.5-0.75 or 0.2-0.4 or greater than 0.15, the corresponding surrounding rock grade data is IV;

[0042] When the rock mass longitudinal wave velocity is less than 2.0 km / s, the corresponding surrounding rock grade data is Grade V;

[0043] When the longitudinal wave velocity of the rock mass is less than 1.0 km / s, the corresponding surrounding rock grade data is grade VI.

[0044] In some embodiments, in the step of obtaining tunnel excavation construction method data and outputting a data table according to the evaluated tunnel surrounding rock level data, the tunnel excavation construction method data includes: full section method, step method, partial excavation method, the step method includes long step method, short step method, and ultra-short step method, and the partial excavation method includes annular excavation and core soil retention method, middle partition wall method, cross middle partition wall method, and double side wall pilot tunnel method;

[0045] In some more specific embodiments:

[0046] For example, in the three-dimensional data model of tunnel excavation, the main engineering geological characteristics of the surrounding rock are obtained through the drilling information data. The main engineering geological characteristics of the surrounding rock include but are not limited to the type and properties of the surrounding rock, the thickness of the rock layer, the structural characteristics and whether it is complete, etc. Combined with the uniaxial saturated compressive strength and point load strength and rock mass longitudinal wave velocity and rock mass integrity index and other data, the surrounding rock level corresponding to the tunnel excavation section is judged, and the corresponding tunnel excavation method data is matched by the surrounding rock level. Further, the tunnel attribute information data is identified. The tunnel attribute information data includes a two-lane tunnel and a three-lane tunnel. In the case of identifying the tunnel attribute information data as a two-lane tunnel, when the surrounding rock level is judged to be level I or III, the corresponding tunnel excavation construction method data obtained is the full section method; when the surrounding rock level is judged to be level III or IV, the corresponding tunnel excavation construction method data obtained is the long step method; when the surrounding rock level is judged to be level IV or V, the corresponding tunnel excavation construction method data obtained is the short step method; when the surrounding rock level is judged to be level V, the corresponding tunnel excavation construction method data obtained is the The method data is the ultra-short step method; when the surrounding rock level is judged to be level V or VI, the corresponding tunnel excavation construction method data is the circular excavation core soil retention method or the middle partition wall method or the cross middle partition wall method; in the case of the identification tunnel attribute information data as a three-lane tunnel, when the surrounding rock level is judged to be level I or II, the corresponding tunnel excavation construction method data is the full section method, when the surrounding rock level is judged to be level II or III, the corresponding tunnel excavation construction method data is the long step method, when the surrounding rock level is judged to be level III or IV, the corresponding tunnel excavation construction method data is The tunnel excavation construction method data is the short step method or the circular excavation and core soil retention method; when the surrounding rock grade is judged to be grade VI, the corresponding tunnel excavation construction method data obtained is the ultra-short step method, when the surrounding rock grade is judged to be grade IV or V, the corresponding tunnel excavation construction method data obtained is the middle partition wall method, when the surrounding rock grade is judged to be grade IV or V or VI, the corresponding tunnel excavation construction method data obtained is the cross middle partition wall method; when the surrounding rock grade is judged to be grade V or VI, the corresponding tunnel excavation construction method data obtained is the double side wall pilot pit method.

[0047] In some embodiments, in the step of constructing a three-dimensional data model of tunnel excavation or in the step of simulating tunnel excavation construction, a tunnel roaming step is also included:

[0048] Receive tunnel roaming instructions, identify tunnel roaming data information, and execute roaming instructions according to the tunnel type;

[0049] In these embodiments: tunnel roaming data information includes duration, viewing angle, distance from starting point, tunnel shape, excavation depth, number of tunnel sides, arc diameter, rectangular bottom height, etc., and tunnel roaming instructions include but are not limited to stop roaming, start roaming, pause, return, fast forward, rewind, viewing angle up, viewing angle down, etc.

[0050] In some embodiments, the tunnel type includes: rectangular tunnel or circular tunnel or arched tunnel

[0051] In some embodiments, the tunnel roaming step includes identifying any tunnel surface area when executing the start tunnel roaming instruction, and obtaining geological attribute information of the area through data processing, wherein the geological attribute information includes various geological condition information.

[0052] In some embodiments of the present invention, a computer-readable storage medium stores a computer program / instruction thereon, and when the computer program / instruction is executed by a processor, the steps of the method described in any of the above embodiments are implemented.

[0053] In some embodiments of the present invention, a tunnel excavation data processing system for a three-dimensional geological model includes at least one processor, a computer, and a memory, which stores instructions. When the instructions are executed by at least one processor, the steps of the method described in any of the above embodiments are implemented.

[0054] A computer program (which may also be referred to or described as a program, software, software application, module, software module, script or code) may be written in any form of programming language, including compiled or interpreted languages ​​or declarative or procedural languages, and the computer program may be deployed in any form, including as a stand-alone program or as a module, component, subroutine or other unit suitable for use in a computing environment. A computer program may, but need not, correspond to a file in a file system. A program may be stored in a portion of a file that stores other programs or data, for example, one or more scripts stored in the following: in a markup language document; in a single file dedicated to a related program; or in multiple collaborative files, for example, files storing one or more modules, subroutines or code portions. A computer program may be deployed to execute on one or more computers, the computers being located in one place or distributed to multiple locations and interconnected by a communication network.

[0055] The above-described embodiments are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A method for processing tunnel excavation data of a three-dimensional geological model, characterized in that: The steps include: The step of analyzing the geological conditions of the area where the preset tunnel is located obtains the three-dimensional geological model data, and obtains the geological condition information of the area where the preset tunnel is located after analyzing and processing the obtained drilling information data; The step of selecting a tunnel drawing area triggers an area selection instruction according to geological condition information of the location of the tunnel, and selects a location area for drawing a three-dimensional data model of the tunnel; The step of constructing a three-dimensional data model of tunnel excavation identifies attribute information of tunnel drawing, triggers an instruction to draw a three-dimensional data model of the tunnel, and generates a three-dimensional data model of the tunnel excavation.

2. According to claim 1, it is characterized in that: In the step of analyzing the geological conditions of the area where the preset tunnel is located, the geological condition information of the selected borehole and each position in the area where the preset tunnel is located is queried.

3. According to claim 1, it is characterized in that: In the step of analyzing the geological conditions of the area where the preset tunnel is located, the instructions of the fence section control selected on the three-dimensional structure model are identified to obtain a fence diagram analysis model of the area where the preset tunnel is located.

4. The method according to claim 1, characterized in that: In the step of selecting the tunnel drawing area, select the pre-operation area and execute the zoom in, zoom out, turn or perspective command.

5. According to claim 1, it is characterized in that: In the step of constructing a three-dimensional data model of tunnel excavation, the attribute information of tunnel drawing includes a custom drawing mode and an imported drawing mode. The custom drawing mode is to execute the drawing instructions of the three-dimensional data model of tunnel excavation according to the custom tunnel drawing attribute information, and the imported drawing mode is to import the pre-saved tunnel drawing attribute information and execute the drawing instructions of the three-dimensional data model of tunnel excavation.

6. The method according to claim 1, characterized in that: The tunnel excavation data processing method of the three-dimensional geological model also includes a tunnel excavation construction simulation step: Identify the virtual profile of the tunnel, obtain the cross section of the tunnel excavation location, and obtain the geological condition information of the tunnel excavation cross section location through analysis and processing based on the acquired drilling information data; According to the three-dimensional data model of the tunnel excavation after drawing and the geological condition information of the tunnel excavation section location obtained, after simulation analysis and processing, reasonable tunnel excavation construction model data is simulated and designed.

7. The method according to claim 6, characterized in that: The three-dimensional data model of the tunnel excavation after drawing is combined with the geological condition information of the tunnel excavation section position obtained, and after simulation analysis and processing, a reasonable tunnel excavation construction model data is simulated and designed, and the tunnel surrounding rock grade is evaluated according to the geological condition information of the tunnel excavation section position obtained, and the corresponding surrounding rock grade data is obtained, and the tunnel excavation construction method data is obtained according to the evaluated tunnel surrounding rock grade data and a data table is output.

8. The method according to claim 7, characterized in that: In the step of evaluating the tunnel surrounding rock grade according to the acquired geological condition information at the tunnel excavation section location, the geological condition information at the tunnel excavation section location includes: Rock strength indicators: including uniaxial saturated compressive strength and point load strength; Rock mass acoustic wave indicators: rock mass longitudinal wave velocity and rock mass integrity indicators; When the uniaxial saturated compressive strength is greater than 60MPa, the point load strength is greater than 2.5MPa, the rock mass longitudinal wave velocity is greater than 5km / s, and the rock mass integrity index is greater than 0.75, the corresponding surrounding rock grade data is Grade I; When the uniaxial saturated compressive strength is 30-60MPa or greater than 60PMa, the point load strength is 1.25-2.5MPa or greater than 2.5PMa, the rock mass longitudinal wave velocity is 3.7-5.2km / s, and the rock mass integrity index is greater than 0.5 or greater than 0.75, the corresponding surrounding rock grade data is Grade II; When the uniaxial saturated compressive strength is 20-30PMa or 30-60MPa or greater than 60PMa, the point load strength is 0.85-1.25MPa or 1.25-2.5MPa or greater than 2.5PMa, the rock mass longitudinal wave velocity is 3.0-4.5km / s, and the rock mass integrity index is 0.3-0.5 or 0.5-0.75 or greater than 0.75, the corresponding surrounding rock grade data is Grade III; When the uniaxial saturated compressive strength is 10-30PMa or greater than 30PMa, the point load strength is 0.42-1.25MPa or greater than 1.25MPa, the rock mass longitudinal wave velocity is 2.0-3.5km / s or greater than 2.0km / s, and the rock mass integrity index is 0.5-0.75 or 0.2-0.4 or greater than 0.15, the corresponding surrounding rock grade data is IV; When the rock mass longitudinal wave velocity is less than 2.0 km / s, the corresponding surrounding rock grade data is Grade V; When the longitudinal wave velocity of the rock mass is less than 1.0 km / s, the corresponding surrounding rock grade data is grade VI.

9. The method according to claim 6, characterized in that: In the step of obtaining tunnel excavation construction method data according to the evaluated tunnel surrounding rock grade data and outputting a data table, the tunnel excavation construction method data include: full section method, step method, partial excavation method, the step method includes long step method, short step method, and ultra-short step method, and the partial excavation method includes circular excavation and core soil retention method, middle partition wall method, cross middle partition wall method, and double side wall pilot pit method.

10. A computer-readable storage medium having a computer program / instruction stored thereon, which, when executed by a processor, implements the steps of the method according to any one of claims 1 to 9.

Citation Information

Patent Citations

  • Method for fast establishing interactive tunnel and wall rock body three-dimensional models

    CN101882171A

  • Method for establishing relation between open cut pit engineering investigation parameters and simulated parameters

    CN107315862A

  • Long tunnel digital twin system and method based on BIM + GIS technology

    CN114201798A

  • BIM-based earth and rockfill dam engineering overall model integration method

    CN116244802A

  • Attribute information-oriented tunnel three-dimensional geological modeling and updating method and system

    CN117173349A

Cited By

  • Geological information efficient extraction and calculation method based on tunnel engineering geological longitudinal profile drawing

    CN119648934A