Risk early warning method and system for replacing flight handling airplane by flight
By obtaining basic information about the aircraft operating the flight and the airport delay status, and calculating the risk level, the problem of risk warning for changing the aircraft operating the flight was solved, and the accuracy and reliability of flight departure time were improved.
Patent Information
- Application Number
- CN202411127453.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-08
AI Technical Summary
Current technology cannot provide timely risk warnings about the need to change aircraft based on the current aircraft location, which affects the accuracy of the estimated flight departure time.
By obtaining basic flight information of the currently operating aircraft, identifying the base airline, calculating the estimated delay time, obtaining the airport delay status and available aircraft list, and determining the risk level of changing the operating aircraft based on the risk potential coefficient and early warning strategy.
It improves the accuracy of flight estimated departure times and enhances the reliability of aircraft tracking estimated departure time calculation results.
Smart Images

Figure CN118918734A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of aviation technology, and in particular to a risk warning method and system for changing an operating aircraft of a flight. Background Art
[0002] The explosive growth in passenger volume and the substantial increase in flight schedules have put forward new and higher requirements for the efficiency of the transportation control system, the utilization rate of aircraft, and the quality of flight-dimensional data. Affected by multiple factors such as weather, air traffic control, military, airlines, passengers, and the aircraft themselves, the dynamics of flights may change at any time, and the chain affects the dynamics of downstream flights. The aircraft operating the flight may also be adjusted under certain circumstances. The current flight estimated departure time forecast is largely based on the location of the aircraft, but airlines often make temporary adjustments to the aircraft, which will cause a significant change in the forecast data. The risk warning of replacing the operating aircraft cannot be issued in time according to the current location, thus affecting the accuracy of the flight's estimated departure time. Summary of the invention
[0003] In order to solve the technical problems existing in the background technology, the present invention proposes a risk warning method and system for changing the operating aircraft of a flight.
[0004] The present invention provides a risk warning method for changing the operating aircraft of a flight, comprising the following steps:
[0005] S1. Obtain the basic flight information of the aircraft currently operating the flight, including but not limited to the departure airport, arrival airport, flight segment, aircraft model, and the number of passengers m on the flight;
[0006] S2. Obtain a base airline correspondence table corresponding to the flight, and determine at least one base airline related to the flight based on the base airline correspondence table, the departure airport, and the flight segment;
[0007] S3, calculating the estimated delay duration based on the current position of the aircraft operating the flight;
[0008] S4. Obtain the current delay status of the airport corresponding to the base airline, and determine the potential coefficient of replacement risk based on the current delay status, the expected delay duration, and the preset replacement risk potential table;
[0009] S5. Obtain a list of remaining available aircraft at the airport corresponding to the base airline, and determine the number of aircraft that can be used to replace the flight based on the aircraft type, the number of passengers m on the flight, and the preset screening strategy;
[0010] S6. Determine the risk level of changing the aircraft operating the current flight based on the potential coefficient of change risk, the number of aircraft to be changed, and the preset warning strategy.
[0011] Preferably, the determining of at least one base airline related to the flight based on the base airline correspondence table, the departure airport, and the flight segment specifically includes:
[0012] Based on the base airline correspondence table and the flight segment, determine whether there is a base airline on the flight segment;
[0013] When there is a base airline on the flight segment, the corresponding base airline will be marked as the base airline related to the flight;
[0014] Determine whether the departure airport is a base airline based on the base airline correspondence table;
[0015] When the departure airport is a base airline, the corresponding base airline will be marked as the base airline related to the flight.
[0016] Preferably, the delay status includes large-area delay, large-area cancellation, small-area delay, small-area cancellation, and normal; the preset replacement risk potential table is configured with multiple delay durations, and the multiple delay durations and delay statuses are preset with corresponding replacement risk potential coefficients in the preset replacement risk potential table in a one-to-one correspondence; the replacement risk potential coefficient is determined based on the current delay status, the expected delay duration, and the preset replacement risk potential table, specifically including:
[0017] Based on the current delay status and the expected delay duration, the corresponding replacement risk potential coefficient is queried from the preset replacement risk potential table.
[0018] Preferably, the aircraft types include wide-body aircraft and narrow-body aircraft; the preset screening strategy specifically includes:
[0019] Filter out the first type of candidate aircraft that is consistent with the aircraft model of the flight from the list of remaining available aircraft at the airport corresponding to the base airline;
[0020] Obtain the number of available seats n corresponding to the first type of candidate aircraft, and compare the number of available seats n with the number of passengers m on the flight;
[0021] When the number of available seats n is greater than the number of passengers m on the flight, the corresponding first type of aircraft to be selected is retained;
[0022] The number of the retained first type of aircraft to be selected is counted and used as the number of aircraft available for replacement flights.
[0023] Preferably, the risk levels include low risk, medium risk, and high risk; the replacement risk potential coefficients include but are not limited to p1, p2, and p3, and p1, p2, and p3 are not equal; the preset warning strategy specifically includes:
[0024] When the potential coefficient of replacement risk is specifically P1, the risk level of replacing the operating aircraft of the current flight is specifically low risk;
[0025] When the potential coefficient of replacement risk is P2 and the number of aircraft available for replacement is greater than 0, the risk level of replacement of the aircraft for the current flight is medium risk;
[0026] When the potential coefficient of replacement risk is specifically P2 and the number of aircraft available for replacement is equal to 0, the risk level of replacement of the aircraft for the current flight is specifically low risk;
[0027] When the potential coefficient of replacement risk is P3 and the number of aircraft available for replacement is greater than 0, the risk level of replacing the aircraft for the current flight is high risk;
[0028] When the potential coefficient of replacement risk is specifically P3 and the number of aircraft available for replacement is equal to 0, the risk level of replacing the operating aircraft of the current flight is specifically low risk.
[0029] Preferably, it also includes: when base airlines related to multiple flights are determined based on the base airline correspondence table, departure airport, and flight segment, the risk level of changing the operating aircraft of the current flight is determined for each base airline, and the highest risk level among the determined multiple risk levels is used as the final warning level.
[0030] Preferably, the process of obtaining the number of passengers m on the flight specifically includes:
[0031] When the sales data of the current flight is obtained, the current actual number of ticket sellers is extracted from the sales data, and the current actual number of ticket sellers is used as the number of passengers m on the flight;
[0032] When the sales data of the current flight is not obtained, the passenger number data of the preset historical period is obtained from the flight sales database, and the average value of the passenger number data of the preset historical period is used as the number of passengers m of the flight.
[0033] The present invention provides a risk warning system for changing the operating aircraft of a flight, comprising:
[0034] The data acquisition module is used to obtain the basic flight information of the aircraft currently operating the flight, including but not limited to the departure airport, arrival airport, flight segment, aircraft model, and the number of passengers on the flight;
[0035] The first processing module is used to obtain a base airline corresponding table corresponding to the flight, and determine at least one base airline related to the flight based on the base airline corresponding table, the departure airport, and the flight segment;
[0036] The second processing module is used to calculate the estimated delay time based on the position of the current aircraft operating the flight;
[0037] The third processing module is used to obtain the current delay status of the airport corresponding to the base airline, and determine the replacement risk potential coefficient based on the current delay status, the expected delay duration and the preset replacement risk potential table;
[0038] The fourth processing module is used to obtain the list of remaining available aircraft at the airport corresponding to the base airline, and determine the number of aircraft that can be used to replace the flight based on the aircraft model, the number of passengers m on the flight, and the preset screening strategy;
[0039] The risk rating module is used to determine the risk level of changing the aircraft operating the current flight based on the potential coefficient of change risk, the number of aircraft to be replaced and the preset early warning strategy.
[0040] In the present invention, the proposed risk warning method and system for flight replacement of the aircraft, obtain the basic flight information of the current aircraft of the flight; obtain the corresponding table of the base airline corresponding to the flight, and determine at least one base airline related to the flight based on the corresponding table of the base airline, the departure airport, and the flight segment; calculate the expected delay time based on the position of the current aircraft of the flight; obtain the current delay status of the airport corresponding to the base airline, and determine the replacement risk potential coefficient based on the current delay status, the expected delay time and the preset replacement risk potential table; obtain the remaining available aircraft list of the airport corresponding to the base airline, and determine the number of aircraft that can be used for replacement based on the aircraft model, the number of people m on the flight, and the preset screening strategy; determine the risk level of the current flight replacement aircraft based on the replacement risk potential coefficient, the number of replacement aircraft and the preset warning strategy. It can better analyze the possibility of the airline temporarily replacing the aircraft of the flight on the day, thereby improving the accuracy of the estimated take-off time of the flight, and better judge the reliability of the calculation result of the estimated take-off time based on aircraft tracking. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 A schematic diagram of the work flow structure of a risk warning method for changing the operating aircraft of a flight proposed by the present invention;
[0042] Figure 2 A schematic diagram of the system architecture of a risk warning system for changing the operating aircraft of a flight proposed by the present invention. DETAILED DESCRIPTION
[0043] Reference Figure 1 and Figure 2 The present invention proposes a risk warning method for changing the operating aircraft of a flight, comprising the following steps:
[0044] S1. Obtain basic flight information of the aircraft currently operating the flight, including but not limited to the departure airport, arrival airport, flight segment, aircraft model, and the number of passengers m on the flight.
[0045] In this embodiment, the process of obtaining the number of passengers m on the flight specifically includes:
[0046] When the sales data of the current flight is obtained, the current actual number of ticket sellers is extracted from the sales data, and the current actual number of ticket sellers is used as the number of passengers m on the flight;
[0047] When the sales data of the current flight is not obtained, the passenger number data of the preset historical period is obtained from the flight sales database, and the average value of the passenger number data of the preset historical period is used as the number of passengers m of the flight.
[0048] S2. Obtain a base airline correspondence table corresponding to the flight, and determine at least one base airline related to the flight based on the base airline correspondence table, the departure airport, and the flight segment.
[0049] In this embodiment, at least one base airline related to a flight is determined based on the base airline correspondence table, the departure airport, and the flight segment, specifically including:
[0050] Based on the base airline correspondence table and the flight segment, determine whether there is a base airline on the flight segment;
[0051] When there is a base airline on the flight segment, the corresponding base airline will be marked as the base airline related to the flight;
[0052] Determine whether the departure airport is a base airline based on the base airline correspondence table;
[0053] When the departure airport is a base airline, the corresponding base airline will be marked as the base airline related to the flight.
[0054] In this embodiment, if the departure airport is not the base airline of the airline, and there is no base airline between the segment the aircraft is currently executing and the current segment, it is considered that the probability of the flight temporarily changing the aircraft is low. If it is a base airline, or there is a base airline between the segment the aircraft is currently executing and the current segment, it is necessary to obtain the remaining available aircraft list at the airport corresponding to the base airline and the current delay status data of the airport.
[0055] S3. Calculate the estimated delay duration based on the current position of the aircraft operating the flight.
[0056] In this embodiment, the delay duration of the flight currently calculated based on the position of the aircraft is obtained, and the data can be obtained from the flight schedule interface.
[0057] S4. Obtain the current delay status of the airport corresponding to the base airline, and determine the potential coefficient of replacement risk based on the current delay status, the expected delay duration, and the preset replacement risk potential table.
[0058] In this embodiment, the delay status includes large-area delay, large-area cancellation, small-area delay, small-area cancellation, and normal; a plurality of delay durations are configured in the preset replacement risk potential table, and a plurality of delay durations and delay statuses are preset in the preset replacement risk potential table in a one-to-one correspondence with a replacement risk potential coefficient; based on the current delay status, the expected delay duration, and the preset replacement risk potential table, the replacement risk potential coefficient is determined, specifically including:
[0059] Based on the current delay status and the expected delay duration, the corresponding replacement risk potential coefficient is queried from the preset replacement risk potential table.
[0060] In this embodiment, the preset replacement risk potential table is as follows:
[0061] Large-scale delays Large-scale cancellation Minor delay Small area cancellation normal Arrival delay of more than 240 minutes p2 p2 p3 p3 p3 Arrival delay 120-240 minutes p1 p2 p3 p3 p3 Arrival delay 60-120 minutes p1 p1 p2 p2 p2 Arrival delay 30-60 minutes p1 p1 p1 p2 p2 Arrival delay within 30 minutes p1 p1 p1 p1 p1
[0062] Among them, the specific values of p1, p2, and p3 can be adjusted according to actual conditions, and p1, p2, and p3 are not equal.
[0063] S5. Obtain a list of remaining available aircraft at the airport corresponding to the base airline, and determine the number of aircraft that can be used to replace the flight based on the aircraft model, the number of passengers m on the flight, and the preset screening strategy.
[0064] In this embodiment, the aircraft types include wide-body aircraft and narrow-body aircraft; the preset screening strategies specifically include:
[0065] Filter out the first type of candidate aircraft that is consistent with the aircraft model of the flight from the list of remaining available aircraft at the airport corresponding to the base airline;
[0066] Obtain the number of available seats n corresponding to the first type of candidate aircraft, and compare the number of available seats n with the number of passengers m on the flight;
[0067] When the number of available seats n is greater than the number of passengers m on the flight, the corresponding first type of aircraft to be selected is retained;
[0068] The number of the retained first type of aircraft to be selected is counted and used as the number of aircraft available for replacement flights.
[0069] S6. Determine the risk level of changing the aircraft operating the current flight based on the potential coefficient of change risk, the number of aircraft to be changed, and the preset warning strategy.
[0070] In this embodiment, the risk levels include low risk, medium risk, and high risk; the replacement risk potential coefficients include but are not limited to p1, p2, and p3, and p1, p2, and p3 are not equal; the preset warning strategies specifically include:
[0071] When the potential coefficient of replacement risk is specifically P1, the risk level of replacing the operating aircraft of the current flight is specifically low risk;
[0072] When the potential coefficient of replacement risk is P2 and the number of aircraft available for replacement is greater than 0, the risk level of replacement of the aircraft for the current flight is medium risk;
[0073] When the potential coefficient of replacement risk is specifically P2 and the number of aircraft available for replacement is equal to 0, the risk level of replacement of the aircraft for the current flight is specifically low risk;
[0074] When the potential coefficient of replacement risk is P3 and the number of aircraft available for replacement is greater than 0, the risk level of replacing the aircraft for the current flight is high risk;
[0075] When the potential coefficient of replacement risk is specifically P3 and the number of aircraft available for replacement is equal to 0, the risk level of replacing the operating aircraft of the current flight is specifically low risk.
[0076] In this embodiment, the risk levels are shown in the following table:
[0077] p1 p2 p3 q>7 Low risk Medium risk High risk 7>q>3 Low risk Medium risk High risk 3>q>1 Low risk Medium risk High risk q is 0 Low risk Low risk Low risk
[0078] Among them, q is the number of aircraft that can be used for replacement flights, and p1, p2, and p3 are the specific values of the potential coefficients of replacement risk.
[0079] In this embodiment, it also includes: when the base airlines related to multiple flights are determined based on the base airline correspondence table, the departure airport, and the flight segment, the risk level of changing the operating aircraft of the current flight is determined for each base airline, and the highest risk level among the determined multiple risk levels is used as the final warning level.
[0080] In this embodiment, the method can effectively analyze the probability of changing the operating aircraft of a flight. For flights with a high-risk or medium-risk probability of changing the operating aircraft, it is necessary to use the estimated take-off time based on the position of the operating aircraft with caution, as this time has a greater risk of jumping.
[0081] For high-risk flights, the estimated take-off time data of the operating aircraft can be directly discarded. For medium-risk flights, it needs to be verified in combination with other data. If the error is within the set range, it can be used. For flights with large errors, it needs to be discarded. On the contrary, for low-risk flights, the estimated take-off time calculated by the operating aircraft is more reliable and can be used as a reliable reference time for display and application.
[0082] Reference Figure 1 and Figure 2 The present invention proposes a risk warning system for changing the operating aircraft of a flight, comprising:
[0083] The data acquisition module is used to obtain the basic flight information of the aircraft currently operating the flight, including but not limited to the departure airport, arrival airport, flight segment, aircraft model, and the number of passengers on the flight;
[0084] The first processing module is used to obtain a base airline corresponding table corresponding to the flight, and determine at least one base airline related to the flight based on the base airline corresponding table, the departure airport, and the flight segment;
[0085] The second processing module is used to calculate the estimated delay time based on the position of the current aircraft operating the flight;
[0086] The third processing module is used to obtain the current delay status of the airport corresponding to the base airline, and determine the replacement risk potential coefficient based on the current delay status, the expected delay duration and the preset replacement risk potential table;
[0087] The fourth processing module is used to obtain the list of remaining available aircraft at the airport corresponding to the base airline, and determine the number of aircraft that can be used to replace the flight based on the aircraft model, the number of passengers m on the flight, and the preset screening strategy;
[0088] The risk rating module is used to determine the risk level of changing the aircraft operating the current flight based on the potential coefficient of change risk, the number of aircraft to be replaced and the preset early warning strategy.
[0089] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A risk warning method for changing the operating aircraft of a flight, characterized in that: The following steps are involved: S1. Obtain the basic flight information of the aircraft currently operating the flight, including but not limited to the departure airport, arrival airport, flight segment, aircraft model, and the number of passengers m on the flight; S2. Obtain a base airline correspondence table corresponding to the flight, and determine at least one base airline related to the flight based on the base airline correspondence table, the departure airport, and the flight segment; S3, calculating the estimated delay duration based on the current position of the aircraft operating the flight; S4. Obtain the current delay status of the airport corresponding to the base airline, and determine the potential coefficient of replacement risk based on the current delay status, the expected delay duration, and the preset replacement risk potential table; S5. Obtain a list of remaining available aircraft at the airport corresponding to the base airline, and determine the number of aircraft that can be used to replace the flight based on the aircraft type, the number of passengers m on the flight, and the preset screening strategy; S6. Determine the risk level of changing the aircraft operating the current flight based on the potential coefficient of change risk, the number of aircraft to be changed, and the preset warning strategy.
2. The risk warning method for changing the operating aircraft of a flight according to claim 1 is characterized in that: The determining of at least one base airline related to the flight based on the base airline correspondence table, the departure airport, and the flight segment specifically includes: Based on the base airline correspondence table and the flight segment, determine whether there is a base airline on the flight segment; When there is a base airline on the flight segment, the corresponding base airline will be marked as the base airline related to the flight; Determine whether the departure airport is a base airline based on the base airline correspondence table; When the departure airport is a base airline, the corresponding base airline will be marked as the base airline related to the flight.
3. The risk warning method for changing the operating aircraft of a flight according to claim 1 is characterized in that: The delay status includes large-area delay, large-area cancellation, small-area delay, small-area cancellation, and normal; the preset replacement risk potential table is configured with multiple delay durations, and the multiple delay durations and delay statuses are preset in a one-to-one correspondence with the corresponding replacement risk potential coefficients in the preset replacement risk potential table; The potential coefficient of replacement risk is determined based on the current delay status, the expected delay duration and the preset replacement risk potential table, specifically including: Based on the current delay status and the expected delay duration, the corresponding replacement risk potential coefficient is queried from the preset replacement risk potential table.
4. The risk warning method for changing the operating aircraft of a flight according to claim 1 is characterized in that: The aircraft types include wide-body aircraft and narrow-body aircraft; The preset screening strategy specifically includes: Filter out the first type of candidate aircraft that is consistent with the aircraft model of the flight from the list of remaining available aircraft at the airport corresponding to the base airline; Obtain the number of available seats n corresponding to the first type of candidate aircraft, and compare the number of available seats n with the number of passengers m on the flight; When the number of available seats n is greater than the number of passengers m on the flight, the corresponding first type of aircraft to be selected is retained; The number of the retained first type of aircraft to be selected is counted and used as the number of aircraft available for replacement flights.
5. The risk warning method for changing the operating aircraft of a flight according to claim 1 is characterized in that: The risk levels include low risk, medium risk, and high risk; the replacement risk potential coefficients include but are not limited to p1, p2, and p3, and p1, p2, and p3 are not equal; the preset warning strategies specifically include: When the potential coefficient of replacement risk is specifically P1, the risk level of replacing the operating aircraft of the current flight is specifically low risk; When the potential coefficient of replacement risk is P2 and the number of aircraft available for replacement is greater than 0, the risk level of replacement of the aircraft for the current flight is medium risk; When the potential coefficient of replacement risk is specifically P2 and the number of aircraft available for replacement is equal to 0, the risk level of replacement of the aircraft for the current flight is specifically low risk; When the potential coefficient of replacement risk is P3 and the number of aircraft available for replacement is greater than 0, the risk level of replacing the aircraft for the current flight is high risk; When the potential coefficient of replacement risk is specifically P3 and the number of aircraft available for replacement is equal to 0, the risk level of replacing the operating aircraft of the current flight is specifically low risk.
6. The risk warning method for changing the operating aircraft of a flight according to claim 1 is characterized in that: Also includes: When the base airlines related to multiple flights are determined based on the base airline correspondence table, departure airport, and flight segment, the risk level of changing the operating aircraft of the current flight is determined for each base airline, and the highest risk level among the determined multiple risk levels is used as the final warning level.
7. The risk warning method for changing the operating aircraft of a flight according to claim 1 is characterized in that: The process of obtaining the number of passengers m on the flight specifically includes: When the sales data of the current flight is obtained, the current actual number of ticket sellers is extracted from the sales data, and the current actual number of ticket sellers is used as the number of passengers m on the flight; When the sales data of the current flight is not obtained, the passenger number data of the preset historical period is obtained from the flight sales database, and the average value of the passenger number data of the preset historical period is used as the number of passengers m of the flight.
8. A risk warning system for changing the operating aircraft of a flight, characterized in that: include: The data acquisition module is used to obtain the basic flight information of the aircraft currently operating the flight, including but not limited to the departure airport, arrival airport, flight segment, aircraft model, and the number of passengers on the flight; The first processing module is used to obtain a base airline corresponding table corresponding to the flight, and determine at least one base airline related to the flight based on the base airline corresponding table, the departure airport, and the flight segment; The second processing module is used to calculate the estimated delay time based on the position of the current aircraft operating the flight; The third processing module is used to obtain the current delay status of the airport corresponding to the base airline, and determine the replacement risk potential coefficient based on the current delay status, the expected delay duration and the preset replacement risk potential table; The fourth processing module is used to obtain the list of remaining available aircraft at the airport corresponding to the base airline, and determine the number of aircraft that can be used to replace the flight based on the aircraft model, the number of passengers m on the flight, and the preset screening strategy; The risk rating module is used to determine the risk level of changing the aircraft operating the current flight based on the potential coefficient of change risk, the number of aircraft to be replaced and the preset early warning strategy.