Radiation protection control method for maintenance of in-reactor equipment of sodium-cooled fast reactor unit
By using radioactive argon gas purge decay system and maintenance silo in sodium-cooled fast reactor units, the problem of radiation risk during equipment maintenance is solved, the core and environment safety protection is achieved, and the radiation risk and pollution are reduced. .
Patent Information
- Application Number
- CN202410906292.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-11-08
AI Technical Summary
The sodium-cooled fast reactor unit has radiation risks and technical gaps in radiation protection measures during equipment maintenance, resulting in core damage and the accidental release of radioactive substances, causing serious air pollution and environmental pollution, posing a radiation safety threat to the operators.
It adopts a type of unit shutdown, natural radioactive decay of the top gas chamber, argon gas replacement, radioactive source item analysis and detection, reducing the pressure of the gas chamber in the reservoir, installing and repairing silos, de-sealing and dismantling of equipment, sodium removal and cleaning, maintenance and The radiation protection control method for back-installation reduces the radioactive level and air chamber pressure through the use of radioactive argon purge decay system and maintenance silo, and ensures the safety of equipment maintenance.
It effectively reduces the radioactivity level and radiation risks in the top air cavity of the stack, prevents the release of radioactive substances, protects the safety of the core and operating environment, and improves the safety of the equipment maintenance process and the radiation protection effect of personnel.
Smart Images

Figure CN118919104A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of nuclear power plant radiation protection, and in particular relates to a radiation protection control method for overhauling in-pile equipment of a sodium-cooled fast reactor unit. Background Art
[0002] A sodium-cooled fast reactor is a nuclear reactor that uses liquid metallic sodium as a coolant, causes nuclear fission reactions by fast neutrons, and maintains a chain reaction. High-power commercial sodium-cooled fast reactors are generally designed as a sodium-sodium-water three-circuit pool structure. The coolant for the first and second circuits is active alkali metal sodium. Sodium is active in nature and will react violently when it comes into contact with water. It must not come into contact with air. The main equipment of the first circuit, such as sodium pumps, in-core components, intermediate heat exchangers, independent heat exchangers, core sodium flow measurement components, core nuclear measurement equipment, and refueling equipment, are all placed in the first-circuit sodium pool. There is a certain air cavity space above the sodium pool, and the air cavity is filled with argon as a covering gas to ensure that the sodium is isolated from the air. During the operation of a sodium-cooled fast reactor unit, the sodium in the primary circuit is activated by neutrons to produce highly radioactive Na-24. The structural materials of the primary circuit system equipment are activated to generate activation products. At the same time, the fission materials react with neutrons to generate fission products. Most of the fission products generated by the reaction between the fuel and neutrons are contained in the fuel cladding and are not released into the primary sodium. Only when the fuel cladding is damaged will the fission products migrate into the primary sodium through the rupture. Coolant sodium will also enter the covering gas in the form of steam and aerosol. The main radioactive substances are Na-24, Na-22, and volatile fission products I-131, Cs-134, and Cs-137.
[0003] Since the sodium-cooled fast reactor unit is quite different from the pressurized water reactor unit in terms of core structure, coolant type, system equipment characteristics, radioactive source term, migration and release pathway of radioactivity in the reactor, and personnel radiation protection method, the radiation risk, radiation protection plan and radiation protection measures during the overhaul of the in-core equipment of the sodium-cooled fast reactor unit cannot adopt the radiation protection control method of the pressurized water reactor unit. There is no experience to learn from for the radiation protection control method of the in-core equipment maintenance of the sodium-cooled fast reactor unit, and it is in a blank state. Improper radiation protection plan and inadequate protection measures will not only introduce air into the core and cause core damage, but also the large-scale release of radioactive substances in the in-core equipment will spread to the working environment, causing serious air pollution and environmental pollution, and bringing great radiation safety risks to the operators. Summary of the invention
[0004] In view of the above problems existing in the maintenance of in-pile equipment of a sodium-cooled fast reactor unit, according to the radiation source items and the radioactive migration paths of the sodium-cooled fast reactor unit, and in combination with the steps of in-pile equipment maintenance, the purpose of the present invention is to provide a radiation protection control method for the maintenance of in-pile equipment of a sodium-cooled fast reactor unit, to provide a feasible solution for the radiation protection control during the maintenance of in-pile equipment of the sodium-cooled fast reactor unit, to ensure the safe operation of the sodium-cooled fast reactor unit and the radiation safety of personnel, to prevent core damage and accidental release of radioactive substances during the maintenance of in-pile equipment of the fast reactor unit, to reduce the radiation risk during the operation, to reduce the harm to the operators and the environment, and to fill the technical gap of the radiation protection control method for the maintenance of in-pile equipment of the sodium-cooled fast reactor unit.
[0005] In order to achieve the above object, the technical solution adopted by the present invention is:
[0006] A radiation protection control method for the overhaul of in-pile equipment of a sodium-cooled fast reactor unit comprises the following steps: S1, natural decay of radioactivity in the primary loop of the unit when the unit is shut down and in the gas cavity at the top of the pile; S2, replacement of the radioactive argon gas in the gas cavity at the top of the pile; S3, analysis and detection of radioactive source terms in the gas cavity at the top of the pile; S4, lowering the pressure in the gas cavity at the top of the pile; S5, installing an overhaul silo for in-pile equipment, and unsealing and dismantling the in-pile equipment; S6, removing sodium from and cleaning the in-pile equipment; S7, overhauling the in-pile equipment; and S8, overhauling and reinstalling the in-pile equipment.
[0007] Step S1 specifically includes: after the unit is shut down for a period of time, the radioactivity in the primary circuit and the radioactivity in the gas cavity at the top of the reactor are naturally decayed.
[0008] Step S2 specifically includes: S21, when the reactor is in a cold shutdown condition, the gas in the gas cavity at the top of the reactor is discharged to the argon decay tank through the radioactive argon purge decay system, and the pressure of the reactor main container is reduced to 5kPa. During this period, the radioactive sodium aerosol is filtered in the sodium vapor trap, and the inert gas is stored in the decay tank after being pressurized; S22, the pressure of the reactor main container is inflated to 50kPa through the primary argon distribution system; S23, the gas in the gas cavity at the top of the reactor is discharged to the argon decay tank through the radioactive argon purge decay system, and the pressure of the reactor main container is reduced to 5kPa; S24, repeating the above filling and exhausting operations n times, completing the high-pressure gas replacement of the main container, diluting the radioactive concentration of the gas in the gas cavity at the top of the reactor, reducing the radioactive activity concentration, and improving the cleanliness of the main container covering gas; S25, the radioactive gas in the decay tank decays for a certain period of time and is discharged after being monitored and qualified.
[0009] Step S3 specifically includes: S31, during the gas replacement process of the reactor main container, putting into operation the fuel damage covering gas monitoring system and its inert gas γ monitor and γ spectrometer monitoring station; S32, continuously monitoring the radioactivity of the reactor main container gas, real-time monitoring the radioactive activity concentration of the main container gas, or manually sampling the reactor main container gas, measuring the radioactive activity concentration of the main container gas in the laboratory using a γ spectrometer, and evaluating the main container gas replacement effect according to the activity concentration measurement results; S33, deriving the air concentration limit according to the radioactive gas concentration of the main container, and determining the number of gas replacements of the reactor main container and the limit of radioactive activity concentration control.
[0010] Step S4 specifically includes: S41. When the reactor is shut down for refueling near the installation of a special silo for overhauling the in-core equipment, the main container of the reactor discharges the gas in the gas cavity on the top of the reactor to the argon decay tank through the radioactive argon purge decay system, and the pressure of the main container of the reactor is reduced to 3 kPa; S42. The pressure of the main container of the reactor is inflated to 5 kPa through a primary argon distribution system; S43. The above operation is repeated n times to complete the low-pressure gas replacement of the main container, reduce the concentration of radioactive sodium aerosol in the main container, and reduce the gas cavity pressure in the reactor.
[0011] Step S5 specifically includes: S51, installing an adapter seat and a support seat above the in-pile maintenance equipment, and installing a sealing ring in the inner wall groove of the support seat; S52, assembling the silo and hoisting it above the in-pile maintenance equipment; S53, loosening the bolts of the maintenance equipment, connecting the winch hook in the silo to the maintenance equipment, the silo continues to descend, and connecting the silo to the support seat flange. After the connection, connect the silo air inlet pipe to the external argon gas supply pipe, open the inlet and outlet ball valves, replace the argon gas in the silo, until the argon gas concentration discharged from the exhaust pipe port reaches 99.9%, close the exhaust pipe ball valve, and pressurize the silo. To 5.5kPa, close the air inlet pipe ball valve; S54, lift the maintenance equipment into the silo through the winch hook; S55, close the upper sealing cover plate of the D-type section of the maintenance silo and the upper sealing cover plate of the silo; S56, open the upper exhaust valve of the maintenance silo, and connect the exhaust valve pipeline to the factory exhaust system to exhaust the gas in the silo to the ventilation system, and discharge it after filtration; S57, dismantle the flange connecting the D-type section of the maintenance silo and the support seat, and move the maintenance equipment together with the silo away from the top of the core; S58, lower the silo, and connect the silo and the sodium-related equipment cleaning container with the adapter flange bolts.
[0012] Step S6 specifically includes: S61, the silo is lowered to the cleaning container adapter flange, the flange bolts are connected, and the maintenance equipment is lowered into the sodium-related equipment cleaning container; S62, the maintenance equipment is de-sodiumed and the equipment is decontaminated in the sodium-related equipment cleaning container.
[0013] Step S7 specifically includes: S71, after the equipment is de-sodiumed and decontaminated, the equipment is hoisted to the maintenance stand and maintenance site for equipment inspection and repair; S72, a contaminated isolation area is established, and the maintenance equipment is placed in the maintenance stand and special equipment; personnel wear plastic shoe covers and plastic gloves, and wear paper clothes.
[0014] Step S8 specifically includes: S81, hoisting the maintenance equipment into the sodium-related equipment cleaning container; S82, hoisting the silo above the sodium-related equipment cleaning container, connecting the winch hook to the maintenance equipment, starting the winch to hoist the maintenance equipment into the silo, and closing the sealing cover in the silo; S83, hoisting the silo together with the maintenance equipment above the core; S84, connecting the silo to the D-type section silo; S85, filling the silo with argon gas, and connecting the silo air inlet pipe to the external argon gas supply pipe , open the inlet and outlet ball valves, replace the argon in the silo, until the argon concentration discharged from the exhaust pipe is 99.9%, then close the exhaust pipe ball valve, pressurize the silo to 5.5kPa, and close the inlet pipe ball valve; S86, open the sealing cover in the silo; S87, start the winch, and lower the maintenance equipment to the core; S88, disassemble the silo and the adapter flange, move the silo out of the maintenance area and place it on a special bracket for storage; S89, install the maintenance equipment bolts and seal it.
[0015] After all steps are completed, the maintenance site will be cleaned and surveyed for radioactive contamination.
[0016] The beneficial effects achieved by the present invention are:
[0017] (1) The present invention can reduce the radiation source item and radioactivity level in the gas cavity at the top of the pile by replacing the gas in the gas cavity inside the pile;
[0018] (2) The gas in the gas cavity at the top of the reactor is discharged to the argon decay tank through the radioactive argon purge decay system. The radioactive sodium aerosol in the gas cavity at the top of the reactor is filtered by the sodium vapor trap of the system, and the radioactive inert gas is pressurized and stored in the decay tank. This method can greatly reduce the radioactivity level of the main container;
[0019] (3) Through the detection of radioactive gases, the activity concentration limit of released gases is determined and controlled to meet the emission standards for personnel and the environment, greatly improving the safety of maintenance personnel;
[0020] (4) Use a dedicated silo for in-core equipment maintenance to unseal equipment and control equipment hoisting to prevent large-scale release of radioactivity, prevent air from entering the core, and prevent the introduction of impurities into the core, which plays a key role in protecting the safety of the core and preventing large-scale release of radioactivity;
[0021] (5) Using a dedicated silo for in-core equipment maintenance, replacing argon in the silo, and maintaining a positive pressure in the dedicated silo, which plays a good role in preventing radioactivity from being released from the core and preventing air from entering the core, thus improving the safety of the equipment maintenance process;
[0022] (6) The gas in the maintenance silo is connected to the plant ventilation system through a discharge pipe and discharged after being filtered and purified. At the same time, a dynamic SAS is set up in the workplace to ensure a negative pressure in the working environment and prevent the spread of radioactivity outside the working area, thus protecting the safety of the operators and the environment;
[0023] (7) The workers wear paper clothes, plastic shoe covers, plastic gloves, and gas masks for personal protection. On the premise of ensuring the radiation safety of the personnel, the large amount of argon gas released is prevented from reducing the oxygen content in the working environment and causing the risk of suffocation to the personnel, which greatly reduces the safety hazards during the maintenance operation;
[0024] (8) The equipment in the pile is de-sodiumed and cleaned in the sodium-related equipment cleaning system, removing sodium from the equipment while ensuring safety, preventing sodium contamination and sodium fire incidents during equipment maintenance, and improving the safety of the equipment maintenance process;
[0025] (9) During the disassembly of the equipment inside the reactor, the pressure changes in the reactor container are observed in real time and air is added according to the pressure to ensure that the main container is at positive pressure, prevent air from entering the reactor cavity and causing damage to the reactor, and play a key role in protecting the safety of the core.
[0026] (10) The present invention formulates an optimal radiation protection implementation plan and control point files based on the radiation source items and radioactive migration paths of the sodium-cooled fast reactor unit and the steps of in-pile equipment maintenance, completes the radiation protection control file work for the maintenance project, and performs radiation protection control on the in-pile equipment maintenance based on the radiation protection control files, which can reduce the radiation risk during the maintenance operation and ensure the radiation safety of the operators. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is a flow chart of a radiation protection control method for the maintenance of in-pile equipment of a sodium-cooled fast reactor unit;
[0028] Figure 2 This is a risk control schematic diagram for the maintenance of in-core equipment in a sodium-cooled fast reactor unit;
[0029] In the figure: 1: argon storage tank; 2: argon inlet isolation valve; 3: pile top air cavity; 4: special silo for maintenance; 5: sodium vapor trap inlet isolation valve; 6: sodium vapor trap; 7: isolation valve A; 8: compressor; 9: gas sampling device; 10: isolation valve B; 11: diaphragm compressor; 12: isolation valve C; 13: argon decay tank inlet valve; 14: argon decay tank; 15: argon decay tank outlet valve; 16: waste gas discharge valve. DETAILED DESCRIPTION
[0030] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0031] A radiation protection control method for overhauling equipment in a sodium-cooled fast reactor unit comprises the following steps:
[0032] 1) According to the radiation source items and radioactive migration paths of the sodium-cooled fast reactor unit, combined with the steps of equipment maintenance in the reactor, formulate the radiation protection optimization implementation plan and control point documents, and complete the radiation protection control document work of the maintenance project.
[0033] 2) Furthermore, the present invention provides a radiation protection control method for the maintenance of in-pile equipment of a sodium-cooled fast reactor unit, which mainly comprises the following steps:
[0034] S1. Radioactivity in the primary circuit of the unit when it is shut down and natural decay of radioactivity in the gas cavity at the top of the reactor;
[0035] S2, replacement of the gas cavity at the top of the pile with radioactive argon;
[0036] S3. Analysis and detection of radioactive source items in the gas cavity at the top of the reactor;
[0037] S4. Reduce the air cavity pressure in the pile;
[0038] S5. Install a special silo for the maintenance of in-pile equipment, and unseal and dismantle the in-pile equipment;
[0039] S6. Sodium removal and cleaning of equipment in the pile;
[0040] S7. Maintenance of equipment inside the pile;
[0041] S8. Repair and reinstall equipment inside the pile.
[0042] 3) Clean up the maintenance site and conduct a survey and measurement of radioactive contamination.
[0043] In the radiation protection control method of the present invention, the step S1 specifically includes:
[0044] S11. According to the characteristics of the radiation source items of the primary circuit and the gas cavity on the top of the reactor in the sodium-cooled fast reactor unit, the radioactivity in the primary circuit and the gas cavity on the top of the reactor will decay naturally for a period of time after the unit is shut down. The radioactivity can be greatly reduced through natural decay.
[0045] Furthermore, in the radiation protection control method of the present invention, step S2 specifically includes:
[0046] S21. When the reactor is in a cold shutdown condition, the gas in the gas cavity at the top of the reactor is discharged to the argon decay tank through the radioactive argon purge decay system, and the pressure of the reactor main container is reduced to 5 kPa. During this period, the radioactive sodium aerosol is filtered in the sodium vapor trap, and the inert gas is pressurized and stored in the decay tank;
[0047] S22. Further, the pressure of the reactor main vessel is inflated to 50 kPa through a primary loop argon distribution system;
[0048] S23. Further, the gas in the gas cavity at the top of the reactor is discharged to the argon decay tank through the radioactive argon purge decay system, and the pressure of the reactor main vessel is reduced to 5 kPa;
[0049] S24, repeat the above filling and exhausting operation n times to complete the high-pressure gas replacement of the main container, so that the radioactivity concentration of the gas in the gas cavity on the top of the pile is diluted, the radioactivity concentration is reduced, and the cleanliness of the covering gas of the main container is improved;
[0050] S25. The radioactive gas (inert gas) in the decay tank decays for a certain period of time and is discharged after passing the monitoring.
[0051] Furthermore, in the radiation protection control method of the present invention, step S3 specifically includes:
[0052] S31. During the gas replacement process of the reactor main vessel, the fuel damage covering gas monitoring system and its inert gas gamma monitor and gamma spectrometer monitoring station are put into operation;
[0053] S32. Continuously monitor the radioactivity of the reactor main container gas, monitor the radioactive activity concentration of the main container gas in real time, or manually sample the reactor main container gas, measure the radioactive activity concentration of the main container gas using a gamma spectrometer in the laboratory, and evaluate the main container gas replacement effect based on the activity concentration measurement results.
[0054] S33. Derive the air concentration limit based on the radioactive gas concentration in the main container, and determine the number of gas replacements in the reactor main container and the limit for radioactivity concentration control.
[0055] Furthermore, in the radiation protection control method of the present invention, step S4 specifically includes:
[0056] S41. When the reactor is shut down for refueling near the installation of a dedicated silo for in-core equipment maintenance, the reactor main vessel discharges the gas in the gas cavity at the top of the reactor into the argon decay tank through the radioactive argon purge decay system, reducing the pressure of the reactor main vessel to 3 kPa;
[0057] S42, inflating the reactor main vessel to a pressure of 5 kPa through a primary argon distribution system;
[0058] S43. Repeat the above operation n times to complete the low-pressure gas replacement in the main container, reduce the concentration of radioactive sodium aerosol in the main container, and reduce the air cavity pressure in the pile.
[0059] Furthermore, in the radiation protection control method of the present invention, step S5 specifically includes:
[0060] S51. Install the adapter seat and the support seat above the in-pile maintenance equipment, and install the sealing ring in the inner wall groove of the support seat;
[0061] S52, assemble and hoist the silo above the in-pile maintenance equipment;
[0062] S53. Loosen the bolts of the maintenance equipment, connect the winch hook in the silo to the maintenance equipment, continue to lower the silo, connect the silo to the support flange, connect the silo air inlet pipe to the external argon gas supply pipe, open the inlet and outlet ball valves, replace the argon gas in the silo, until the argon concentration discharged from the exhaust pipe port reaches 99.9%, close the exhaust pipe ball valve, pressurize the silo to 5.5kPa, and close the inlet pipe ball valve;
[0063] S54, further, lifting the maintenance equipment into the silo by means of a winch hook;
[0064] S55. Close and inspect the upper sealing cover plate of the D-type section of the silo and the upper sealing cover plate of the silo;
[0065] S56. Open the exhaust valve on the upper section of the maintenance silo. The exhaust valve pipeline is connected to the exhaust system of the plant to exhaust the gas in the silo to the ventilation system and then discharged after filtering;
[0066] S57, dismantle the flange connecting the D-type section of the maintenance silo and the support seat, and move the maintenance equipment together with the silo away from above the core;
[0067] S58. Lower the silo and connect the silo to the sodium-related equipment cleaning container with the adapter flange bolts.
[0068] Furthermore, in the radiation protection control method of the present invention, step S6 specifically includes:
[0069] S61. Lower the silo to the cleaning container adapter flange, connect the flange bolts, and lower the maintenance equipment into the sodium-related equipment cleaning container;
[0070] S62, the maintenance equipment is used to remove sodium and decontaminate the equipment in the sodium-related equipment cleaning container;
[0071] Furthermore, in the radiation protection control method of the present invention, step S7 specifically includes:
[0072] S71. After the equipment is decontaminated with sodium, it is hoisted to the maintenance stand and maintenance site for equipment inspection and repair;
[0073] S72. Establish a contaminated isolation area and place maintenance equipment in maintenance racks and special equipment;
[0074] Personnel wear plastic shoe covers, plastic gloves and paper clothes.
[0075] Furthermore, in the radiation protection control method of the present invention, step S8 specifically includes:
[0076] S81. Lift the maintenance equipment into the sodium-related equipment cleaning container.
[0077] S82, hoist the silo above the sodium-related equipment cleaning container, connect the hoist hook to the maintenance equipment, start the hoist to hoist the maintenance equipment into the silo, and close the sealing cover in the silo;
[0078] S83, hoist the silo together with the maintenance equipment above the core;
[0079] S84, connect the silo to the D-type segment silo;
[0080] S85. Fill the silo with argon, connect the silo air inlet pipe to the external argon supply pipe, open the air inlet and outlet pipe ball valves, replace the argon in the silo until the argon concentration discharged from the exhaust pipe port reaches 99.9%, then close the exhaust pipe ball valve, pressurize the silo to 5.5 kPa, and close the air inlet pipe ball valve;
[0081] S86. Open the sealing cover in the silo;
[0082] S87, start the winch to lower the maintenance equipment to the core;
[0083] S88. Disassemble the silo and adapter flange, move the silo out of the maintenance area and place it on a special bracket for storage;
[0084] S89. Install the maintenance equipment bolts and seal them.
[0085] The present embodiment provides a radiation protection control method for the maintenance of in-pile equipment of a sodium-cooled fast reactor unit, which mainly includes the following steps:
[0086] Step 1: The radioactivity in the primary circuit of the unit and the natural decay of the radioactivity in the gas cavity at the top of the reactor;
[0087] Step 2: Replacement of the air cavity at the top of the reactor with radioactive argon;
[0088] Step 3: Analysis and detection of radioactive source items in the gas cavity at the top of the reactor;
[0089] Step 4: Reduce the air cavity pressure in the pile;
[0090] Step 5: Install a special silo for in-pile equipment maintenance;
[0091] Step 6: Unseal the equipment inside the pile;
[0092] Step 7: Remove sodium and clean the equipment in the pile;
[0093] Step 8: Maintenance of in-pile equipment;
[0094] Step 1: The radioactivity in the primary circuit of the unit and the natural decay of the radioactivity in the gas cavity at the top of the reactor;
[0095] According to the characteristics of the radiation source items in the primary circuit and the top air cavity of the sodium-cooled fast reactor unit, the radioactivity in the primary circuit and the top air cavity will decay naturally for a period of time after the unit is shut down. The main radioactive nuclides are Na-24, Na-22, Ar-41 and Ne-23. If the fuel is damaged, there will also be radioactive nuclides such as Cs-137, Cs-134, Xe-133, I-133, Kr-85 in the top air cavity. Since some radioactive nuclides have a short half-life, the radioactivity can be reduced by 30 to 100 times through natural decay for 5-7 days, greatly reducing its radiation source items.
[0096] Step 2: Replacement of the air cavity at the top of the reactor with radioactive argon;
[0097] When the reactor is in a cold shutdown condition, the radioactive argon gas purge decay system is put into operation, the sodium vapor trap inlet isolation valve 5, isolation valve 10, isolation valve 12, isolation valve 13 are opened, and the diaphragm compressor 11 is started to discharge the gas in the reactor top air cavity to the argon decay tank 14, and the pressure in the reactor main container air cavity 3 is reduced to 5 kPa. During this period, the radioactive sodium aerosol is filtered in the sodium vapor trap 6, and the gas in the reactor main container air cavity 3 is pressurized and stored in the argon decay tank 14;
[0098] Further, the isolation valve 2 is opened, and the argon gas in the argon storage tank 1 is charged into the gas cavity 3 of the reactor main container, and the pressure of the reactor main container is charged to 50 kPa;
[0099] Furthermore, the gas in the gas cavity 3 of the reactor main container is discharged to the argon decay tank through the radioactive argon purge decay system, and the pressure of the reactor main container is reduced to 5 kPa;
[0100] Repeat the above filling and exhausting operation n times to complete the high-pressure gas replacement of the main container, so that the radioactivity concentration of the gas in the gas cavity 3 of the reactor main container is diluted, the radioactivity concentration is greatly reduced, and the cleanliness of the main container covering gas is improved;
[0101] The radioactive gas (inert gas) in the argon decay tank 14 decays for a certain period of time. After sampling and monitoring, if it is qualified, the waste gas discharge valve 16 is opened to discharge the gas in the argon decay tank 14 to the chimney.
[0102] Step 3: Analysis and detection of radioactive source items in the gas cavity at the top of the reactor;
[0103] During the gas replacement process of the reactor main vessel, the fuel damage covering gas monitoring system and its inert gas gamma monitor and gamma spectrometer monitoring station are put into operation to sample and measure the gas in the gas cavity of the reactor main vessel;
[0104] Furthermore, in the process of discharging the radioactive argon gas in the reactor top gas cavity to the argon decay tank, the isolation valve 7 is opened, the compressor 8 is started, and the radioactive gas detection channel and equipment in the reactor top gas cavity are put into operation to continuously monitor the radioactivity of the reactor main container gas, and the radioactive activity concentration of the main container gas is monitored in real time, or the reactor main container gas is manually sampled through a quick interface, and the radioactive activity concentration of the main container gas is measured in the laboratory using a gamma spectrometer, and the main container gas replacement effect is evaluated based on the activity concentration measurement results.
[0105] The air concentration limit is derived from the radioactive gas concentration in the main container, and the number of gas replacements in the reactor main container and the limit of radioactive activity concentration control are determined to be 1E+5Bq / m 3 When the inert gas activity concentration in the reactor main container air cavity is lower than this limit, personnel do not need to take air pollution protection measures.
[0106] Step 4: Reduce the air cavity pressure in the pile;
[0107] When the reactor is shut down for refueling near the installation of the dedicated silo 4 for overhauling the equipment inside the reactor, the main reactor vessel discharges the gas in the gas cavity at the top of the reactor to the argon decay tank 14 through the radioactive argon purge decay system, and reduces the pressure of the main reactor vessel to 3 kPa;
[0108] Further, the pressure of the reactor main vessel is inflated to 5 kPa through the primary argon distribution system;
[0109] Repeat the above operation n times to complete the low-pressure gas replacement in the main container, reduce the concentration of radioactive sodium aerosol in the main container, reduce the air cavity pressure in the pile, and reduce.
[0110] Step 5: Install a special silo for in-pile equipment maintenance;
[0111] Install the adapter seat and the support seat above the in-pile maintenance equipment, and install the sealing ring in the inner wall groove of the support seat;
[0112] Assemble and hoist the silo above the in-pile maintenance equipment;
[0113] Loosen the bolts of the maintenance equipment, connect the winch hook in the silo to the maintenance equipment, continue to lower the silo, connect the silo to the support flange, connect the silo air inlet pipe to the external argon gas supply pipe, open the inlet and outlet ball valves, replace the argon gas in the silo, until the argon concentration discharged from the exhaust pipe port reaches 99.9%, close the exhaust pipe ball valve, pressurize the silo to 5.5kPa, and close the inlet pipe ball valve;
[0114] Furthermore, a pollution isolation zone is established in the maintenance operation area, and workers wear paper clothes, plastic shoe covers, plastic gloves, and air masks for personal protection. This can not only reduce the risk of personnel contamination, but also reduce the risk of personnel suffocation, and improve the safety of on-site operations.
[0115] Furthermore, air radiation monitors are arranged at the work site to monitor the radioactivity of the air in the workplace. The air radiation monitors include mobile inert gas monitors, mobile aerosol monitors or mobile iodine monitors, and each monitor is set with an alarm threshold.
[0116] Furthermore, if the monitor sounds an alarm during the operation, the operator should be evacuated immediately;
[0117] Furthermore, when the equipment in the reactor is being lifted, the radiation protection personnel use a long-pole measuring instrument to monitor the dose rate level on the equipment surface and at the personnel's working position in real time. If it is found that the dose rate exceeds the estimated value, the lifting of the equipment will be stopped immediately, and the personnel's operating distance will be increased, the operating time will be shortened, and the personnel will wear tungsten clothing for external radiation protection;
[0118] Further, the inspection equipment is lifted into the silo by means of a winch hook;
[0119] Close and inspect the upper sealing cover plate of the D-type section of the silo and the upper sealing cover plate of the silo;
[0120] Open the exhaust valve on the upper section of the maintenance silo, connect the exhaust valve pipeline to the exhaust system of the plant, and exhaust the gas in the silo to the ventilation system, and then discharge it after filtering;
[0121] Remove the flange connecting the D-section of the maintenance silo and the support seat, and move the maintenance equipment together with the silo away from above the core;
[0122] Lower the silo and connect the silo to the sodium-related equipment cleaning container with the adapter flange bolts.
[0123] Step 6: Unseal the equipment inside the pile;
[0124] The silo is lowered to the cleaning container adapter flange, the flange bolts are connected, and the maintenance equipment is lowered into the sodium-related equipment cleaning container;
[0125] The repair equipment is decontaminated and sodium is removed in the sodium-related equipment cleaning container to remove residual sodium on the surface of the equipment in the pile to reduce safety risks. After decontamination, the radioactivity level on the surface of the equipment is reduced, reducing radiation safety risks;
[0126] Step 7: Remove sodium and clean the equipment in the pile;
[0127] After the equipment is de-sodiumed and decontaminated, it is hoisted to the maintenance stand and maintenance site for equipment inspection and repair;
[0128] Establish a contaminated isolation area, place maintenance equipment in maintenance racks and special equipment;
[0129] Personnel wear plastic shoe covers, plastic gloves and paper clothes.
[0130] Step 8: Maintenance of in-pile equipment;
[0131] Lift the maintenance equipment into the sodium-related equipment cleaning container.
[0132] Lift the silo above the sodium-related equipment cleaning container, connect the hoist hook to the maintenance equipment, start the hoist to lift the maintenance equipment into the silo, and close the sealing cover in the silo;
[0133] Lift the silo together with the maintenance equipment above the core;
[0134] Connect the silo to the D-section silo;
[0135] Fill the silo with argon, connect the silo air inlet pipe to the external argon supply pipe, open the inlet and outlet ball valves, replace the argon in the silo until the argon concentration discharged from the exhaust pipe is 99.9%, then close the exhaust pipe ball valve, pressurize the silo to 5.5kPa, and close the air inlet pipe ball valve;
[0136] Open the sealing cover inside the silo;
[0137] Start the winch and lower the maintenance equipment to the core;
[0138] Disassemble the silo and adapter flange, move the silo out of the maintenance area and place it on a special bracket for storage;
[0139] Install the inspection equipment bolts and seal them.
[0140] Clean up the maintenance site and conduct a pollution survey of the site.
Claims
1. A radiation protection control method for the maintenance of in-pile equipment in a sodium-cooled fast reactor unit. Features: The following steps are involved: S1. Natural decay of radioactivity in the primary circuit of the unit and in the air cavity on the top of the reactor; S2. Replacement of radioactive argon in the air cavity on the top of the reactor; S3. Analysis and detection of radioactive source items in the air cavity on the top of the reactor; S4. Reducing the pressure in the air cavity inside the reactor; S5. Installing the silo for maintenance of equipment inside the reactor, and unsealing and dismantling the equipment inside the reactor; S6. Removal of sodium and cleaning of equipment inside the reactor; S7. Maintenance of equipment inside the reactor; S8. Reinstallation of equipment inside the reactor after maintenance.
2. The radiation protection control method for the maintenance of in-pile equipment of a sodium-cooled fast reactor unit according to claim 1, Features: Step S1 specifically includes: after the unit is shut down for a period of time, the radioactivity in the primary circuit and the radioactivity in the gas cavity at the top of the reactor are naturally decayed.
3. The radiation protection control method for the maintenance of in-pile equipment of a sodium-cooled fast reactor unit according to claim 2, Features: Step S2 specifically includes: S21, when the reactor is in a cold shutdown condition, the gas in the gas cavity at the top of the reactor is discharged to the argon decay tank through the radioactive argon purge decay system, and the pressure of the reactor main container is reduced to 5kPa. During this period, the radioactive sodium aerosol is filtered in the sodium vapor trap, and the inert gas is stored in the decay tank after being pressurized; S22, the pressure of the reactor main container is inflated to 50kPa through the primary argon distribution system; S23, the gas in the gas cavity at the top of the reactor is discharged to the argon decay tank through the radioactive argon purge decay system, and the pressure of the reactor main container is reduced to 5kPa; S24, repeating the above filling and exhausting operations n times, completing the high-pressure gas replacement of the main container, diluting the radioactive concentration of the gas in the gas cavity at the top of the reactor, reducing the radioactive activity concentration, and improving the cleanliness of the main container covering gas; S25, the radioactive gas in the decay tank decays for a certain period of time and is discharged after being monitored and qualified.
4. The radiation protection control method for the maintenance of in-pile equipment of a sodium-cooled fast reactor unit according to claim 3, Features: Step S3 specifically includes: S31, during the gas replacement process of the reactor main container, putting into operation the fuel damage covering gas monitoring system and its inert gas γ monitor and γ spectrometer monitoring station; S32, continuously monitoring the radioactivity of the reactor main container gas, real-time monitoring the radioactive activity concentration of the main container gas, or manually sampling the reactor main container gas, measuring the radioactive activity concentration of the main container gas in the laboratory using a γ spectrometer, and evaluating the main container gas replacement effect according to the activity concentration measurement results; S33, deriving the air concentration limit according to the radioactive gas concentration of the main container, and determining the number of gas replacements of the reactor main container and the limit of radioactive activity concentration control.
5. The radiation protection control method for the maintenance of in-pile equipment of a sodium-cooled fast reactor unit according to claim 4, Features: Step S4 specifically includes: S41. When the reactor is shut down for refueling near the installation of a special silo for overhauling the in-core equipment, the main container of the reactor discharges the gas in the gas cavity on the top of the reactor to the argon decay tank through the radioactive argon purge decay system, and the pressure of the main container of the reactor is reduced to 3 kPa; S42. The pressure of the main container of the reactor is inflated to 5 kPa through a primary argon distribution system; S43. The above operation is repeated n times to complete the low-pressure gas replacement of the main container, reduce the concentration of radioactive sodium aerosol in the main container, and reduce the gas cavity pressure in the reactor.
6. The radiation protection control method for the maintenance of in-pile equipment of a sodium-cooled fast reactor unit according to claim 5, Features: Step S5 specifically includes: S51, installing an adapter seat and a support seat above the in-pile maintenance equipment, and installing a sealing ring in the inner wall groove of the support seat; S52, assembling the silo and hoisting it above the in-pile maintenance equipment; S53, loosening the bolts of the maintenance equipment, connecting the winch hook in the silo to the maintenance equipment, the silo continues to descend, and connecting the silo to the support seat flange. After the connection, connect the silo air inlet pipe to the external argon gas supply pipe, open the inlet and outlet ball valves, replace the argon gas in the silo, until the argon gas concentration discharged from the exhaust pipe port reaches 99.9%, close the exhaust pipe ball valve, and pressurize the silo. To 5.5kPa, close the air inlet pipe ball valve; S54, lift the maintenance equipment into the silo through the winch hook; S55, close the upper sealing cover plate of the D-type section of the maintenance silo and the upper sealing cover plate of the silo; S56, open the upper exhaust valve of the maintenance silo, and connect the exhaust valve pipeline to the factory exhaust system to exhaust the gas in the silo to the ventilation system, and discharge it after filtration; S57, dismantle the flange connecting the D-type section of the maintenance silo and the support seat, and move the maintenance equipment together with the silo away from the top of the core; S58, lower the silo, and connect the silo and the sodium-related equipment cleaning container with the adapter flange bolts.
7. The radiation protection control method for the maintenance of in-pile equipment of a sodium-cooled fast reactor unit according to claim 6, Features: Step S6 specifically includes: S61, the silo is lowered to the cleaning container adapter flange, the flange bolts are connected, and the maintenance equipment is lowered into the sodium-related equipment cleaning container; S62, the maintenance equipment is de-sodiumed and the equipment is decontaminated in the sodium-related equipment cleaning container.
8. The radiation protection control method for the maintenance of in-pile equipment of a sodium-cooled fast reactor unit according to claim 7, Features: Step S7 specifically includes: S71, after the equipment is de-sodiumed and decontaminated, the equipment is hoisted to the maintenance stand and maintenance site for equipment inspection and repair; S72, a contaminated isolation area is established, and the maintenance equipment is placed in the maintenance stand and special equipment; personnel wear plastic shoe covers and plastic gloves, and wear paper clothes.
9. The radiation protection control method for the maintenance of in-pile equipment of a sodium-cooled fast reactor unit according to claim 8, Features: Step S8 specifically includes: S81, hoisting the maintenance equipment into the sodium-related equipment cleaning container; S82, hoisting the silo above the sodium-related equipment cleaning container, connecting the winch hook to the maintenance equipment, starting the winch to hoist the maintenance equipment into the silo, and closing the sealing cover in the silo; S83, hoisting the silo together with the maintenance equipment above the core; S84, connecting the silo to the D-type section silo; S85, filling the silo with argon gas, and connecting the silo air inlet pipe to the external argon gas supply pipe , open the inlet and outlet ball valves, replace the argon in the silo, until the argon concentration discharged from the exhaust pipe is 99.9%, then close the exhaust pipe ball valve, pressurize the silo to 5.5kPa, and close the inlet pipe ball valve; S86, open the sealing cover in the silo; S87, start the winch, and lower the maintenance equipment to the core; S88, disassemble the silo and the adapter flange, move the silo out of the maintenance area and place it on a special bracket for storage; S89, install the maintenance equipment bolts and seal it.
10. The radiation protection control method for the maintenance of in-pile equipment of a sodium-cooled fast reactor unit according to claim 1, Features: After all steps are completed, the maintenance site will be cleaned and surveyed for radioactive contamination.