Rapid power reduction method and control system

By calculating the power-rod position slope factor and the number of downsized steps, controlling the downsized insertion of the ash control rod, the problem of insufficient reduction of reactor power when the secondary side load changes in the prior art is solved, and the rapid matching of reactor power is achieved and The stable control of the steam generator level improves the safety of the reactor.

CN118919109AActive Publication Date: 2024-11-08SHANGHAI NUCLEAR ENGINEERING RESEARCH & DESIGN INSTITUTE CO LTD

Patent Information

Application Number
CN202410955652.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-08
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

The existing fast power reduction system cannot effectively reduce reactor power when facing a transient with small secondary load changes, resulting in too low liquid level of the steam generator and the risk of shutdown.

Method used

Using multiple sets of gray control rods, the lower insertion of the gray control rod is quickly controlled by calculating the power-rod position slope factor F and the required downward step number ΔN, so as to achieve a smaller amplitude reduction of power in the reactor and at the power-rod position Curve correction and overlapping step relationship reconstruction are adjusted to ensure the maintenance of steam generator level margin.

Benefits of technology

Quickly control the reactor power when the secondary side load changes slightly, avoiding the steam generator level too low, and improving the safety and operation stability of the reactor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118919109A_ABST
    Figure CN118919109A_ABST
Patent Text Reader

Abstract

A rapid power reduction method comprises the following steps: providing multiple groups of gray control rods, and calculating a power-rod position slope factor F = deltaP / deltaS, where deltaP is the relative power change percentage of a reactor core, and deltaS is the downward insertion step number of the control rods; when a given power reduction triggering condition is met, the downward insertion step number delta N = (P0-Pt) / F required by the grey control rod is calculated, P0 is the relative power percentage of the current reactor core, and Pt is the reactor core power percentage matched with the secondary side power under the power reduction triggering condition; the target rod position Nc = N0-delta N is further calculated, N0 is the rod position of the current gray control rod, the step number corresponding to complete downward insertion of a single set of gray control rods is set to be n, and according to knlt; nc < = (k-1) n; and determining the group number k of the grey control rods needing to be controlled and inserted downwards. According to the method, the reactor core power can be rapidly reduced under the transient condition that the secondary side power is reduced slightly, shutdown caused by too low liquid level of the steam generator is avoided, and the operation economy of the reactor is improved. The invention further provides a rapid power reduction control system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of nuclear power, and in particular relates to a rapid power reduction method and a control system. Background Art

[0002] The reactor of a nuclear power plant has a rapid power reduction system (RPRS) to deal with large load change transients such as turbine tripping. The existing RPRS system can achieve a rapid decrease in core power by controlling the fall of a preset black rod, which can quickly reduce the core power to 50% RTP (below rated thermal power), and then achieve power matching between the primary and secondary circuits with the cooperation of control systems such as the bypass system and the rod control system. However, when an event with a small change in secondary side load occurs, such as a single main feedwater pump tripping transient under full power operation conditions, the RPRS action will not be triggered. In this case, the transient development process may cause the narrow range low liquid level margin of the evaporator (SG) to be too low, and there is a risk of triggering a shutdown. Therefore, providing a control method that can achieve a small power reduction for transients is of positive significance for effectively dealing with the tripping condition of a single main feedwater pump and improving the safety of reactor operation. Summary of the invention

[0003] The purpose of the present invention is to provide a rapid power reduction method, which can realize rapid power reduction of a reactor with a relatively small amplitude. The present invention also provides a rapid power reduction control system.

[0004] According to an embodiment of one aspect of the present invention, a rapid power reduction method is provided, comprising the following steps: providing multiple groups of gray control rods, calculating a power-rod position slope factor F, where F=ΔP / ΔS, wherein ΔP is a core relative power change percentage, ΔS is a control rod insertion step number, and F is updated with the reactor cycle burnup; giving a power reduction trigger condition, wherein the power reduction trigger condition includes a secondary side load mutation; when the power reduction trigger condition is reached, calculating the required number of gray control rod insertion steps ΔN, where ΔN=(P0-P t ) / F, where P0 is the current core relative power percentage, P t is the core power percentage matching the secondary side power under the power reduction trigger condition; calculate the target rod position N c , N c =N0-ΔN, where N0 is the current position of the gray control rod, with rising as positive and falling as negative; let the number of steps corresponding to the complete falling of a single group of gray control rods be n, and control k groups of gray control rods to be completely fallen, where kn <N c ≤(k-1)n.

[0005] The above method can quickly control the reactor rate to decrease when the secondary side load changes slightly, which is not enough to trigger the RPRS action, so as to achieve power matching between the primary and secondary sides, enable the unit to enter a stable operation state, and avoid the accident risk caused by the low liquid level of the steam generator (SG).

[0006] Furthermore, in some embodiments, the update period of the power-rod position slope factor F is no longer than 2000MWd / tU. In different burnup stages, the influence of the gray control rod on power varies, and updating F can achieve more accurate power control.

[0007] Furthermore, in some embodiments, the calculation of ΔN also includes a step of correcting the power-rod position slope factor according to the power-rod position curve. During the operation of the reactor, the control rods may be in different rod positions. Under some operating conditions, the initial rod position also affects the rate of change of power with the rod position, which needs to be corrected according to the actual situation.

[0008] Further, in some embodiments, the P t It is the secondary side core power percentage when one main feedwater pump trips.

[0009] Further, in some embodiments, the P t No more than 50%. RPRS intervention can reduce the reactor power to below 50%, and the gray control rod intervention scenario is a transient state that does not trigger RPRS.

[0010] Furthermore, in some embodiments, the gray control rods are configured in four groups.

[0011] Furthermore, in some embodiments, after controlling the k groups of gray control rods to be completely inserted, the method further includes controlling the adjacent gray control rods to reestablish the overlapping steps. Under normal circumstances, there are certain overlapping steps between adjacent gray control rod groups. When the gray control rods are urgently inserted, the overlapping step relationship is broken, and the overlapping step relationship needs to be reestablished to restore the normal control of the gray control rods.

[0012] Furthermore, in some embodiments, after the power reduction triggering condition is reached, the liquid level margin of the steam generator is not less than 5%.

[0013] According to an embodiment of another aspect of the present invention, there is provided a rapid power reduction control system, which includes a secondary side detection device, a memory, a processor and a gray rod control system, wherein the secondary side detection device detects the load state of the secondary side of the reactor; the gray rod control system includes a driving device and a plurality of groups of gray control rods, the driving device drives the plurality of groups of gray control rods to rise or plunge; the memory stores a control program, and when the control program is executed by the processor, the rapid power reduction system can implement the rapid power reduction method provided in any of the aforementioned embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 A schematic diagram of the structure of a rapid power reduction control system in an embodiment;

[0015] Figure 2 A schematic diagram of a power-rod position curve in an embodiment;

[0016] Figure 3 Schematic diagram of power-rod position curve at different fuel consumption stages in one embodiment;

[0017] Figure 4 Schematic diagram of power-rod position curves under different initial rod positions in one embodiment;

[0018] Figure 5 Schematic diagram of power-rod position curves at different initial powers in one embodiment;

[0019] Figure 6 is a pair of power variation curves under accident conditions;

[0020] Figure 7 A pair of proportional SG water level change curves under accident conditions;

[0021] Figure 8 is a power variation curve under an accident condition in an embodiment;

[0022] Fig. 9 SG water level variation curve under accident conditions in one embodiment.

[0023] Meaning of the reference numerals: 1 - core; 2 - ash control rods; 3 - drive device; 4 - steam generator; 5 - main pump; 6 - steam turbine; 7 - condenser; 8 - main feed water pump group; 9 - controller; 10 - storage.

[0024] The purpose of the above drawings is to explain the present invention in detail so that those skilled in the art can understand the technical concept of the present invention, but it is not intended to limit the present invention. For the sake of simplicity, the above drawings only schematically illustrate the structures related to the technical features of the present invention, and do not strictly follow the actual proportions to draw the complete structure and all details. DETAILED DESCRIPTION

[0025] The present invention is further described in detail below through specific embodiments in conjunction with the accompanying drawings.

[0026] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The phrase appearing in various locations in the specification does not necessarily refer to the same embodiment, nor is it limited to mutually exclusive independent or alternative embodiments. Those skilled in the art should be able to understand that the embodiments herein may be combined with other embodiments without causing structural conflicts.

[0027] In the description of this article, unless otherwise clearly specified and limited, the technical terms "installed", "connected", "connected" and the like should be understood in a broad sense, for example, it can be a mechanical structure connection, or a signal connection relationship; it can be a movable connection, or a fixed connection or integration. For ordinary technicians in this field, the specific meanings of the above terms in the embodiments of this application can be understood according to specific circumstances.

[0028] In the description of this document, terms indicating orientation or positional relationships, such as "up", "down", "left", "right", "horizontal", "vertical", "height", "length", and "width", are intended to accurately describe the embodiments and simplify the description, but are not intended to limit the parts or structures involved to have a specific orientation, be installed or operate in a specific orientation, and should not be construed as a limitation on the embodiments in this document.

[0029] In the description of this article, the terms "first", "second" and the like are only used to distinguish different objects, and cannot be understood as indicating relative importance or limiting the quantity, specific order or primary and secondary relationship of the described technical features. In the description of this article, the meaning of "plurality" is at least two.

[0030] General structural combination of conventional civil pressurized water reactor power plants Figure 1 It is understood that it includes a core 1, a primary cooling medium that transfers the heat released by the fuel rods in the core 1 to the steam generator 4, and the primary cooling medium exchanges heat with the secondary cooling medium in the steam generator 4 to heat the secondary cooling medium into steam, and then the primary cooling medium with reduced temperature returns to the core 1 for circulation under the action of the main pump 5; the steam formed by the secondary cooling medium in the steam generator 4 is transported to the turbine 6 for power generation, and then cooled to liquid in the condenser 7, and the condensed secondary cooling medium is transported back to the steam generator 4 via the main feed water pump group 8 to complete the cycle.

[0031] When an accident such as the tripping of the steam turbine 6 occurs in the secondary circuit, the secondary side load decreases rapidly. If the output power of the core 1 remains unchanged, the coolant in the steam generator 4 will decrease rapidly, resulting in the risk of accidents. Therefore, at present, a rapid power reduction system (RPRS) is usually provided in the pressurized water reactor. When a large load change transient such as the tripping of the steam turbine 6 occurs, the RPRS system can quickly insert a certain number of black control rods in a certain position into the core 1 to achieve a rapid decrease in the core power. Usually, the black control rods are made of materials such as silver-indium-cadmium alloy that have a strong absorption capacity for neutrons, which can absorb a large amount of neutrons in the core and quickly reduce the core power. The RPRS system can quickly reduce the core power to less than 50% of the rated thermal power (RTP) to prevent accidents caused by large-scale mutations in the secondary side load. Subsequently, with the cooperation of control systems such as the bypass system and the rod control system, the power matching of the primary and secondary circuits is achieved.

[0032] However, during the operation of the reactor, in addition to the transient state where the secondary side load drops significantly due to the tripping of the steam turbine 6, there is also the transient state where the secondary side load drops slightly due to the tripping of a single main water pump in the main feed water pump group 8.

[0033] In a comparative example, Figure 6 As shown in the figure, when one of the three main feedwater pumps trips, the secondary power drops by about 40%. At this time, the RPRS system will not intervene to quickly and significantly reduce the power of the core 1. It takes about 10 minutes to achieve primary and secondary power matching by adjusting the reactor power through conventional methods. Before the primary and secondary power are matched, since the output power of the core 1 is greater than the power load of the secondary side, it will cause excessive evaporation of the secondary circuit cooling medium in the steam generator 4, causing the narrow range water level in the steam generator 4 to drop rapidly. Figure 7 As shown in the figure, about 5 minutes after the single main feedwater pump tripped, the water level in the steam generator 4 dropped to the minimum, and the minimum margin from the SG narrow range low water level shutdown line was only 2.7%, which posed a high risk to the normal operation of the reactor. In this state, if the conventional control method fails to reduce the output power of the core 1 in time, or the circulation system of the secondary circuit fails, it is very likely to cause a shutdown accident, resulting in serious consequences.

[0034] In order to solve the above problem, an embodiment of one aspect of the present invention provides a fast power reduction method.

[0035] like Figure 1As shown, in addition to the black control rods, the reactor is also provided with a gray rod control system, which includes a plurality of gray control rods 2 and a drive device 3. The gray control rods 2 can be inserted into the core 1 under the drive of the drive device 3. The gray control rods 2 are made of materials with weak neutron absorption capacity such as stainless steel, which can reduce the neutron dose in the core 1, but the neutron absorption performance of the gray rods is weaker than that of the black rods, and will not cause significant power distortion, nor will it cause the core 1 to completely shut down. Under normal operating conditions, in different fuel cycle burnup stages, the output power or backup reactivity of the reactor can be adjusted by adjusting the rod position of the gray control rods inserted into the core. Usually, the movement of the gray control rods 2 in the fuel burnup cycle is adjusted step by step in small amplitudes according to the burnup state.

[0036] In the embodiment, in order to cope with transient conditions such as the tripping of a single main feed water pump in the main feed water pump group 8, which causes a small decrease in secondary side load (usually a decrease of about 30%-40%), several groups of gray control rods 2 can be controlled by the drive device 3 to be quickly and completely inserted into the core 1 to achieve rapid power reduction of the core 1.

[0037] Specifically, the number of gray control rods 2 that need to be inserted is determined by:

[0038] First, the power-rod position slope factor F is analyzed, F = ΔP / ΔS, where ΔP is the percentage change of the relative power of the core, and ΔS is the number of control rod insertion steps. Among them, F may change to a certain extent at different stages of the reactor cyclic burnup, so the specific value of F should be updated with the cyclic burnup. In a preferred embodiment, the update period of F is no longer than 2000MWd / tU. F can be determined based on the power-rod position curve, which can be measured during the operation of the reactor or determined by simulation calculation. In a preferred embodiment, the specific value of F should be specifically corrected based on the initial rod position of the gray control rod 2 in the core 1 and the influence of the initial power of the reactor on the power-rod position curve.

[0039] Next, when the secondary side load suddenly changes and reaches the triggering condition of the rapid power reduction method, the total number of steps ΔN required for the transient gray control rod 2 to be inserted is calculated, ΔN = (P0-P t ) / F, where P0 is the current core relative power percentage, P t It is the core power percentage that matches the secondary side power under the power reduction trigger condition.

[0040] Next, determine the target stick position N c , N c =N0-ΔN, where N0 is the current gray control stick position, with rising as positive and falling as negative.

[0041] Then, the number of gray control rods 2 inserted into the core 1 is determined. Assume that the number of steps corresponding to the complete insertion of a single set of gray control rods is n, and the number of gray control rods k that need to be inserted during the rapid power reduction process satisfies kn <N c ≤(k-1)n. During the normal operation of the reactor, different groups of gray control rods 2 are inserted into the core 1 or lifted from the core 1 one by one according to the cycle burnup, and during the rapid power reduction control process, k groups of gray control rods need to be quickly and completely inserted into the core 1.

[0042] Under normal operating conditions, there is a certain number of overlapping steps between adjacent gray control rod groups in order to maintain normal regulation of reactor power. Therefore, in a preferred embodiment, after the k-group gray control rods are quickly and completely inserted into the core 1, the adjacent gray control rod 2 is then controlled to be quickly inserted downward to reestablish a normal overlapping step relationship.

[0043] In a preferred embodiment, the above control process is written as a control program and stored in the memory 10. When the controller 9 detects through the secondary side detection device that the secondary side load state reaches the trigger condition for rapid power reduction, the controller 9 can execute the control program stored in the memory 10 to instruct the drive device 3 to automatically implement the rapid power reduction method provided in the above embodiment.

[0044] In a preferred embodiment, the core 1 is loaded with 157 fuel assemblies and is provided with 4 groups of gray control rods 2. Under normal operating conditions, the 4 groups of gray control rods 2 move sequentially, and the number of steps corresponding to each group of gray control rods 2 completely falling into the core 1 is -181 steps (with rising as positive and falling as negative).

[0045] Under normal operating conditions, the power-rod position curve is measured as follows: Figure 2 As shown, the power-rod position is approximately a piecewise linear relationship.

[0046] Under different fuel consumption conditions, the measured power-rod position curve is as follows Figure 3 As shown in the figure, when the curve intervals of different fuel consumption states are small, it means that the slope factor F does not change much with the fuel consumption and the update cycle can be set longer. The larger the curve interval, the higher the update frequency of the slope factor F should be in this interval. Under the preferred state, the update cycle of F should not be longer than 2000MWd / tU.

[0047] The calculation results of power-rod position curve under different initial rod positions are as follows: Figure 4 As shown, in most intervals, the curves of different initial rod positions are approximately parallel, and the error calculated with the same slope factor is within an acceptable range. Only after all four groups of gray control rods 2 are fully inserted, there is a certain deviation, but in this state, the power limit of the gray control rods 2 on the core 1 is close to the limit, and the influence of the deviation of F on the power limit result is within an acceptable range.

[0048] When the accident transient occurs, the reactor may be at different operating powers. The power-position curves calculated for different initial powers (in percentage) are as follows: Figure 5 As shown in the figure, in most intervals, the curves of different initial powers are approximately parallel, and the same F value can be used for calculation. If the curves of different initial powers are less parallel, the value of F needs to be determined based on the power-rod position curve at the corresponding initial power.

[0049] Assume that under the power level of 100%RTP, one of the three main feedwater pumps of the main feedwater pump group 8 trips at the beginning of a cycle, causing the secondary side load to drop to 70% of the original load instantaneously. At this time, the initial rod position of the gray control rod 2 is 90 steps. Based on the rod position-power curve under this state, it is calculated that F=0.1 (%RTP / step) under this state.

[0050] In order to quickly reduce the output power of the reactor core 1 and avoid shutdown caused by too low liquid level in the steam generator 4, a rapid power reduction control is implemented in the following manner.

[0051] First, calculate ΔN, ΔN = (P0-P t ) / F=(100-70) / 0.1=300 steps.

[0052] Next, calculate the target stick position, N c =N0-ΔN=-270 steps. The calculation results are positive for rising and negative for falling.

[0053] -181×2<270<-181, so the first two groups of gray control rods 2 should be completely dropped into the core 1.

[0054] The above-mentioned rapid power reduction method is used for control, and the power change of the core 1 is as follows: Figure 8 As shown, it can be seen that Figure 6 The power of the core 1 decreases faster than that of the comparative example shown. In the preferred embodiment, after the first two groups of gray control rods 2 are quickly dropped into the core, the third group of gray control rods 2 is also quickly inserted into the core to reestablish the normal overlap step, so as to quickly reestablish the power balance between the primary and secondary sides. Fig. 9 As shown, since the power of the core 1 is quickly controlled, the water level in the steam generator 4 is effectively maintained, and the minimum margin of the water level is maintained at more than 10%, which effectively improves the safety of the reactor.

[0055] The above control process can be automatically implemented by the controller 9 executing a control program pre-stored in the memory 10 .

[0056] The purpose of the above embodiments is to further explain the present invention in detail in conjunction with the accompanying drawings so that those skilled in the art can understand the technical concept of the present invention. Within the scope of the present invention, the optimization or equivalent replacement of the system or method steps involved, and the combination of implementation methods in different embodiments without conflict of structure and principle, all fall within the protection scope of the present invention.

Claims

1. A rapid power reduction method, characterized in that: The following steps are involved: Provide multiple groups of gray control rods and calculate the power-rod position slope factor F, F = ΔP / ΔS, where ΔP is the core relative power change percentage, ΔS is the number of control rod insertion steps, and F is updated with the reactor cycle burnup; Given a power reduction triggering condition, the power reduction triggering condition includes a sudden change in secondary side load; When the power reduction trigger condition is reached, the number of downward insertion steps ΔN required for the gray control rod is calculated, ΔN = (P0-P t ) / F, where P0 is the current core relative power percentage, P t is the core power percentage that matches the secondary side power under the power reduction triggering condition; Calculate the target stick position N c , N c =N0-ΔN, where N0 is the current position of the gray control rod, with rising as positive and falling as negative; Assume that the number of steps corresponding to the complete insertion of a single group of gray control rods is n, and control k groups of gray control rods to be completely inserted, where kn <N c ≤(k-1)n.

2. The rapid power reduction method according to claim 1, characterized in that: The updating period of the power-rod position slope factor F is not longer than 2000MWd / tU.

3. The rapid power reduction method according to claim 1 or 2, characterized in that: When calculating ΔN, the method also includes the step of correcting the power-rod position slope factor according to the power-rod position curve.

4. The rapid power reduction method according to claim 1 or 2, characterized in that: The P t It is the secondary side core power percentage when one main feedwater pump trips.

5. The rapid power reduction method according to claim 1 or 2, characterized in that: The P t Not more than 50%.

6. The rapid power reduction method according to claim 1 or 2, characterized in that: The gray control rods are configured in four groups.

7. The rapid power reduction method according to claim 1 or 2, characterized in that: After controlling k groups of the grey control rods to be completely inserted, the method further includes controlling adjacent grey control rods to reconstruct overlapping steps.

8. The rapid power reduction method according to claim 1 or 2, characterized in that: After the power reduction triggering condition is reached, the liquid level margin of the steam generator is not less than 5%.

9. A rapid power reduction control system, characterized in that: It includes a secondary side detection device, a memory, a processor and a gray rod control system, wherein: The secondary side detection device detects the load status of the secondary side of the reactor; The gray rod control system includes a driving device and multiple groups of gray control rods, and the driving device drives the multiple groups of gray control rods to rise or insert; The memory stores a control program. When the control program is executed by the processor, the rapid power reduction system can implement the rapid power reduction method according to any one of claims 1 to 8.

Citation Information

Patent Citations

  • Nuclear reactor power adjusting method based on operation data and adjusting system thereof

    CN111462925A

  • Control system device of nuclear turbine and control method of control system device

    CN113658733A

  • Non-adjustment boron load tracking operation and control method for pressurized water reactor nuclear power plant

    CN113793707A

  • Method and system for controlling nuclear power of high-temperature gas cooled reactor nuclear power plant

    CN116994787A

  • Reactor power controller

    JP1994123792A

Cited By

  • Quick power reduction method and system based on adjusting rod group and pressurized water reactor

    CN121148748A

  • Fast power reduction methods, systems, and pressurized water reactors based on regulating rod assemblies

    CN121148748B

  • Reactor control method based on rapid power reduction system, electronic equipment and medium

    CN121171661A

  • Reactor control method based on fast power reduction system, electronic device and medium

    CN121171661B