Beam adjustment method and device and computer readable storage medium
By adjusting the beamwidth based on the beam spread reference information of the terminal, the problem of low frequency domain resource utilization is solved, achieving more efficient resource utilization and improved signal quality.
Patent Information
- Application Number
- CN202310516545.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-08
- Publication Date
- 2024-11-08
AI Technical Summary
In existing millimeter-wave and terahertz communication systems, the frequency domain resource utilization is low under analog beamforming or hybrid beamforming methods, resulting in resource waste and poor received signal quality.
By obtaining the beam spread reference information of the terminal, it is determined whether the beam spread conditions are met. If they are met, the beam width is expanded to cover more terminals; otherwise, the beam width is maintained or narrowed to improve signal quality.
This improves the utilization rate of frequency domain resources and enhances the quality of received signals and network user experience for terminals.
Smart Images

Figure CN118921088A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of communication technology, and in particular to a beam adjustment method, device, and computer-readable storage medium. Background Art
[0002] Millimeter wave communication and terahertz communication have attracted widespread attention due to their large bandwidth characteristics that can meet the needs of high-speed data services. In the field of communications, millimeter wave communication generally uses analog beamforming or hybrid beamforming to work. At present, when systems using analog beamforming or hybrid beamforming use narrow beams to schedule users, the number of users scheduled at the same time is also limited. For bandwidth-rich millimeter wave and terahertz communication systems, frequency domain resources are not fully utilized in this way, resulting in a large waste of resources. Summary of the invention
[0003] The embodiments of the present application provide a beam adjustment method, device, and computer-readable storage medium, which can improve the utilization rate of frequency domain resources.
[0004] On the one hand, a beam adjustment method is provided, including: obtaining beam expansion reference information of a first terminal to be scheduled; judging whether the first terminal meets a beam expansion condition based on the beam expansion reference information of the first terminal; if the beam expansion condition is not met, determining that the width of the beam pointing to the first terminal is a first width; if the beam expansion condition is met, determining that the width of the beam is a second width, and the second width is greater than or equal to the first width.
[0005] On the other hand, a beam adjustment device is provided, comprising: an acquisition module and a determination module. The acquisition module is used to acquire beam expansion reference information of a first terminal to be scheduled; the determination module is used to determine whether the first terminal meets the beam expansion condition based on the beam expansion reference information of the first terminal; the determination module is also used to determine that the width of the beam pointing to the first terminal is a first width when the beam expansion condition is not met; the determination module is also used to determine that the width of the beam is a second width when the beam expansion condition is met, and the second width is greater than or equal to the first width.
[0006] In some embodiments, the beam expansion reference information includes resource utilization and a modulation and coding scheme (MCS) value; the beam expansion condition includes that the MCS value is greater than a first threshold and the resource utilization is less than a second threshold.
[0007] In some embodiments, the determination module is specifically used to, when a beam expansion condition is met, detect whether there is a second terminal around the first terminal; when it is detected that there is a second terminal around the first terminal, determine that the width of the beam is a third width, and the third width is greater than the first width; when it is detected that there is no second terminal around the first terminal, determine that the width of the beam is the first width.
[0008] In some embodiments, the determination module is specifically used to detect whether there is a second terminal within the coverage of the beam at the third width when the beam expansion condition is met.
[0009] In some embodiments, the determination module is specifically configured to, when a beam expansion condition is met, detect whether the terminal set to which the first terminal belongs includes the second terminal.
[0010] In some embodiments, the third width is a width when the coverage range of the beam can cover the first terminal and the second terminal.
[0011] In some embodiments, the second terminal is another terminal in the terminal set to which the first terminal belongs except the first terminal; or, the second terminal is another terminal to be scheduled in another terminal in the terminal set to which the first terminal belongs except the first terminal.
[0012] In some embodiments, the acquisition module is also used to obtain information of multiple terminals including the first terminal, the information of each terminal including resource utilization, scheduling information, behavior information, measurement information and location information; based on the information of multiple terminals, the multiple terminals are clustered to obtain at least one terminal set.
[0013] In some embodiments, the first width is a minimum width of the coverage range of the beam that can cover the first terminal.
[0014] In some embodiments, the acquisition module is further used to acquire the scheduling priorities of multiple terminals; the determination module is further used to select the terminal with the highest scheduling priority among the multiple terminals as the first terminal.
[0015] On the other hand, a communication device is provided, comprising: a memory and a processor; the memory and the processor are coupled; the memory is used to store a computer program; and the processor implements the beam adjustment method described in any of the above embodiments when executing the computer program.
[0016] On the other hand, a computer-readable storage medium is provided, on which computer program instructions are stored. When the computer program instructions are executed by a processor, the beam adjustment method described in any of the above embodiments is implemented.
[0017] On the other hand, a computer program product is provided, which includes computer program instructions, and when the computer program instructions are executed by a processor, the beam adjustment method described in any of the above embodiments is implemented.
[0018] The beam adjustment method provided in the embodiment of the present application determines that the width of the beam pointing to the first terminal is a first width when the beam expansion reference information of the first terminal does not meet the beam expansion condition. When the beam expansion reference information of the first terminal meets the beam expansion condition, the width of the beam pointing to the first terminal is determined to be a second width greater than or equal to the first width. The method expands the width of the beam pointing to the first terminal according to the beam expansion reference information of the first terminal, so that the beam can cover and schedule more terminals to improve the utilization of frequency domain resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solution in the present application, the drawings required for use in some embodiments of the present application will be briefly introduced below. Obviously, the drawings described below are only drawings of some embodiments of the present application. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0020] Figure 1 A schematic diagram of a communication network architecture provided for some embodiments of the present application;
[0021] Figure 2 A schematic diagram of the functional composition of a base station provided in some embodiments of the present application;
[0022] Figure 3 A schematic diagram of a flow chart of a beam adjustment method provided in some embodiments of the present application;
[0023] Figure 4 A flowchart of another beam adjustment method provided in some embodiments of the present application;
[0024] Figure 5 A schematic diagram of a beam width provided for some embodiments of the present application;
[0025] Figure 6 A schematic diagram of another beam width provided for some embodiments of the present application;
[0026] Figure 7 A schematic diagram of another beam width provided for some embodiments of the present application;
[0027] Figure 8 A schematic flow chart of another beam adjustment method provided in some embodiments of the present application;
[0028] Fig. 9A schematic diagram of the structure of a beam adjustment device provided in some embodiments of the present application;
[0029] Fig.10 A schematic diagram of the composition of a communication device provided in some embodiments of the present application. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in this application to clearly and completely describe the technical solutions in this application. Obviously, the described embodiments are only part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0031] It should be noted that, in this application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in this application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.
[0032] In the following, the terms "first" and "second" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features.
[0033] In the description of this application, unless otherwise specified, " / " means "or", for example, A / B can mean A or B. "And / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, "at least one" means one or more, and "multiple" means two or more.
[0034] As described in the background technology, the fifth-generation mobile communication technology 5G (5th-generation mobile communication technology) millimeter wave and terahertz have attracted widespread attention due to their large bandwidth characteristics that can meet the needs of high-speed data services. Compared with microwaves, 5G millimeter wave and terahertz signals have more serious path loss due to their short wavelengths, but the path loss can be offset by installing a large-scale antenna array at the receiving / transmitting end, that is, introducing multiple-input multiple-output (MIMO) to increase the signal gain, and using beamforming technology to make the beam pointing more precise.
[0035] Beamforming includes analog beamforming, digital beamforming and hybrid beamforming. The traditional all-digital beamforming implementation scheme is very expensive to implement in actual large-scale multi-antenna systems. Millimeter wave communications generally use analog beamforming or hybrid beamforming. Analog beamforming adjusts the phase of the antenna receive and transmit signals through a phase shifter, thereby overcoming the hardware limitations of the RF link and reducing the cost and energy consumption of the antenna system.
[0036] In analog beamforming, phase adjustment can only be made according to the fixed weight value of the phase shifter. If the number of antennas is too large, the number of phase shifters required will also be very large, and the energy consumption and cost will be relatively high. Therefore, the number of antennas supported is limited, that is, the beams sent simultaneously are also limited. Therefore, when the equipment using analog beamforming or hybrid beamforming uses narrow beams to schedule users, the number of users scheduled simultaneously will also be limited, and more time domain resources will be needed to schedule users. For large-capacity communication systems, especially the bandwidth-rich millimeter wave and terahertz systems, the frequency domain resources are not fully utilized in this way.
[0037] Based on this, an embodiment of the present application provides a beam adjustment method, in which, when the beam expansion reference information of the first terminal does not meet the beam expansion condition, the width of the beam pointing to the first terminal is determined to be a first width. In the case where the beam expansion reference information of the first terminal meets the beam expansion condition, the width of the beam pointing to the first terminal is determined to be a second width greater than or equal to the first width. This method expands the width of the beam pointing to the first terminal according to the beam expansion reference information of the first terminal, so that the beam can cover and schedule more terminals to improve the utilization of frequency domain resources.
[0038] Figure 1 This is a schematic diagram of the structure of a communication system provided in an embodiment of the present application. Figure 1 As shown, the communication system includes a communication device and a terminal. The communication device and the terminal may be connected via a wireless network. The wireless network may include a router, a switch, or other devices that facilitate communication between the communication device and the terminal, which is not limited in the embodiments of the present application.
[0039] In some embodiments, the communication device can adaptively select the beam form and send information using beamforming. The communication device includes but is not limited to low-frequency communication devices, millimeter wave communication devices, terahertz communication devices, and other devices using analog beamforming or hybrid beamforming, such as satellites, Internet of Vehicles, base stations, etc. The present application embodiment takes a base station as an example.
[0040] In some embodiments, a base station is used to provide wireless access services to terminals. Specifically, a base station provides a service coverage area (also called a cell). Terminals entering the area can communicate with the base station through wireless signals to receive wireless access services provided by the base station. In addition, the service coverage area of the base station can also be divided into near field and far field. The terminal may be within the range of the near field or the range of the far field.
[0041] In some embodiments, the base station may be an evolution nodeB (eNB), a next generation nodeB (gNB), a transmission receive point (TRP), a transmission point (TP), and some other access node. According to the size of the service coverage area provided, the base station can be divided into a macro base station for providing macro cells, a micro base station for providing pico cells, and a femto base station for providing femto cells. With the continuous evolution of wireless communication technology, future base stations may also adopt other names.
[0042] In some embodiments, the base station may adaptively select a beam form according to a certain strategy and measurement information. The certain strategy may be statistics within a time window, such as resource utilization, user scheduling information, user behavior information, the number of users receiving information, user behavior prediction, and user traffic, etc., wherein the measurement information may include content measured by the information receiver and reported to the information sender, or may be measurement information when the information sender receives a response from the other party.
[0043] In some embodiments, the terminal may be a device with wireless transceiver functions, such as a mobile phone, a tablet computer, a wearable device, a vehicle-mounted device, an augmented reality (AR) / virtual reality (VR) device, a notebook computer, an ultra-mobile personal computer (UMPC), a netbook, a personal digital assistant (PDA), etc. The embodiments of the present invention do not limit the specific types of terminals.
[0044] In some embodiments, the base station may send information to each terminal via a beam in a beamforming manner.
[0045] It should be understood that Figure 1 is an exemplary structural diagram, Figure 1The communication system shown includes an unlimited number of devices, for example, an unlimited number of base stations and an unlimited number of terminals. Figure 1 In addition to the equipment shown, Figure 1 The communication system shown may also include other devices, which are not limited to this. Figure 1 The system shown introduces the beam adjustment method provided by the present application.
[0046] Figure 2 A schematic diagram of the functional composition of a base station provided in an embodiment of the present application. Figure 2 As shown, it includes an input unit, a decision unit and an output unit. The input unit is used to obtain information of the terminal, such as beam expansion reference information, and resource utilization, scheduling information, behavior information, etc. required for clustering. The decision unit is used to determine whether the terminal meets the beam expansion condition based on the information of the terminal, and how to determine the expansion width of the beam if it meets the condition. The output unit is used to adjust the beam according to the expansion width determined by the decision unit.
[0047] Figure 3 The following is a flow chart of a beam adjustment method provided in an embodiment of the present application. For example, the beam adjustment method provided in the present application can be applied to Figure 1 In the communication system shown.
[0048] like Figure 3 As shown, the beam adjustment method provided in the present application may specifically include the following steps:
[0049] S301. Obtain beam extension reference information of a first terminal to be scheduled.
[0050] In some embodiments, as described in the background technology, due to hardware limitations, it is not possible to configure a corresponding beam for each terminal for adjustment, so more time domain resources are required for scheduling. Therefore, in order to improve frequency domain utilization, when the beam needs to be adjusted so that the beam can cover more terminals, the base station can determine the first terminal to be scheduled and obtain the beam expansion reference information of the first terminal.
[0051] Exemplarily, the first terminal may periodically report beam expansion reference information to the base station, or the base station may determine the first terminal to be scheduled and then send an instruction to the first terminal to instruct the first terminal to report the beam expansion reference information, or the base station may obtain the beam expansion reference information of the first terminal based on data statistics of historical records.
[0052] In some embodiments, the base station may determine the first terminal to be scheduled according to the scheduling priorities of multiple terminals managed by the base station.
[0053] In some embodiments, the beam extension reference information may include at least one of the following: resource utilization and MCS value of the terminal. Among them, the MCS value is an indicator of the modulation and coding scheme, which reflects the quality of the signal received by the terminal. The higher the MCS value, the better the signal quality received by the terminal, and it also means that the base station can use a more efficient modulation and coding scheme to transmit data. The base station can determine the MCS value of the first terminal based on the quality of the received signal fed back by the first terminal. Resource utilization includes but is not limited to frequency domain resources and time domain resources. Frequency domain resources may include but are not limited to resource blocks (RB, resource block) and the utilization rate of the entire bandwidth, and time domain resources may include but are not limited to time slots, subframes, and resource usage within frames. The base station can use a prediction algorithm to estimate the resource utilization of the first terminal in the future period of time based on the statistics of the resource utilization of the first terminal in a historical period of time. The embodiment of the present application does not limit the specific content of the resource utilization and the prediction algorithm.
[0054] S302: Determine whether the first terminal meets a beam expansion condition based on the beam expansion reference information of the first terminal.
[0055] In some embodiments, after acquiring the beam expansion reference information reported by the first terminal, the base station may further determine whether the first terminal meets the conditions for beam expansion based on the beam expansion reference information.
[0056] In some embodiments, when the beam expansion reference information includes resource utilization and MCS value, the above beam expansion condition is: the MCS value is greater than the first threshold, and the resource utilization is less than the second threshold. For example, if the MCS value of the first terminal is greater than the threshold value T, and the estimated RB resource ratio is less than x%, it is determined that the first terminal meets the beam expansion condition. It should be noted that, as mentioned above, the size of the MCS value is proportional to the quality of the received signal of the terminal. If the first terminal meets the beam expansion condition that the MCS value is greater than a certain threshold and the resource utilization is less than a certain threshold, it means that the quality of the received signal of the first terminal is good enough, but the resource utilization is low. Therefore, the width of the beam pointing to the first terminal can be expanded to appropriately reduce the quality of the received signal of the first terminal to improve resource utilization.
[0057] S303: When a beam expansion condition is not met, determine that a width of the beam directed to the first terminal is a first width.
[0058] In some embodiments, when it is determined that the first terminal does not meet the beam expansion condition, the base station may determine that the width of the beam directed to the first terminal is a first width, and then adjust the width of the beam based on the first width.
[0059] Among them, the beam with adjusted width can be applied to the downlink channel or the uplink channel. The downlink channel includes but is not limited to the physical downlink control channel (physical downlink control channel, PDCCH), the physical downlink shared channel (physical downlink shared channel, PDSCH), the channel state information reference signal (channel state information-reference signal, CSI-RS), etc. The uplink channel includes but is not limited to the physical uplink control channel (physical uplink control channel, PUCCH), the physical uplink shared channel (physical uplink shared channel, PUSCH), SRS, etc.
[0060] In some embodiments, the first width is the minimum width of the coverage range of the beam that can cover the first terminal. It should be noted that if the beam expansion condition is not met, it means that the received signal quality of the first terminal is not good enough and occupies too many resources. Therefore, the beam can be adjusted to the minimum width covering the first terminal, so that the beam can be more concentratedly pointed to the first terminal, thereby improving the received signal quality of the first terminal and improving the user's network experience.
[0061] S304: When a beam expansion condition is met, determine that the width of the beam is a second width, where the second width is greater than or equal to the first width.
[0062] In some embodiments, when determining that the first terminal meets the beam expansion condition, the base station may determine that the width of the beam directed to the first terminal is a second width greater than or equal to the first width, and then adjust the width of the beam based on the second width.
[0063] In some embodiments, the second width is a minimum width of the coverage range of the beam that can cover some terminals around the first terminal.
[0064] The beam adjustment method provided in the embodiment of the present application determines that the width of the beam pointing to the first terminal is a first width when the beam expansion reference information of the first terminal does not meet the beam expansion condition. When the beam expansion reference information of the first terminal meets the beam expansion condition, the width of the beam pointing to the first terminal is determined to be a second width greater than or equal to the first width. The method expands the width of the beam pointing to the first terminal according to the beam expansion reference information of the first terminal, so that the beam can cover and schedule more terminals to improve the utilization of frequency domain resources.
[0065] The above step S304 is described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0066] In some embodiments, Figure 4 As shown, the above S304 can be specifically implemented as the following S3041-S3043.
[0067] S3041. When a beam expansion condition is met, detect whether there is a second terminal around the first terminal.
[0068] In this embodiment, when it is determined that the first terminal meets the beam expansion condition, the base station may detect whether there are other second terminals around the first terminal according to the location information of multiple terminals managed by the base station.
[0069] Exemplarily, the base station may determine the location information of multiple terminals managed by itself based on a beam direction of arrival (DOA) estimation algorithm, and then detect whether there are other second terminals around the first terminal based on the location information of the multiple terminals.
[0070] The DOA estimation algorithm may include but is not limited to the following methods: 1. Estimating the terminal's location information based on the global positioning system (GPS) information reported by the terminal. 2. Estimating the terminal's location information based on sounding reference signal (SRS) measurements.
[0071] It should be understood that if the first terminal meets the beam expansion conditions and further determines whether there are other terminals around the first terminal, it can avoid expanding the beam. However, since there are no other terminals around the first terminal, the expanded beam is only used to schedule the first terminal, which not only wastes frequency domain resources, but also affects the received signal quality of the first terminal.
[0072] In a possible implementation, the detection of whether there is a second terminal around the first terminal in the above S3041 can be specifically implemented as: when the beam expansion condition is met, detecting whether there is a second terminal within the coverage of the beam at the third width.
[0073] Among them, the third width can be a preset value accumulated based on historical experience, or it can be a width determined by other means. For example, in the process of expanding the beam width, the base station can obtain the received signal strength indication reported by the first terminal in real time, and detect the decrease of the received signal strength indication. If the received signal strength indication of the first terminal drops to a certain threshold, the expansion of the beam width is stopped, and the current beam width is determined to be the third width. Alternatively, in the process of expanding the beam width, the base station can detect the gain of the antenna, and when the antenna gain drops to a certain threshold, the expansion of the beam width is stopped, and the current beam width is determined to be the third width.
[0074] For example, Figure 5 As shown, when the beam expansion conditions are met, the base station can use the normal direction pointing to the first terminal as a reference to determine whether there are other terminals within the range of D degrees on the left and right sides of the normal. Where D is a preset value. If there are other terminals within the expanded range, the beam width is set to 2×D degrees (i.e., the third width mentioned above) so that the beam can cover other terminals around the first terminal. If there are no other terminals within the expanded range, the beam width is set to the first width so that the beam can cover the first terminal.
[0075] In another possible implementation manner, the detecting whether there is a second terminal around the first terminal in the above S3041 may be specifically implemented as: if the beam extension condition is met, detecting whether the terminal set to which the first terminal belongs includes the second terminal.
[0076] Exemplarily, the base station obtains information (such as location information) of multiple terminals, and uses clustering or other artificial intelligence (AI) technology self-learning methods to cluster adjacent terminals into one category to obtain at least one terminal set, and then determines whether the terminal set to which the first terminal belongs includes the second terminal, so as to determine the beam width according to the size of the cluster. It should be noted that the selection of the beam width can be a beam covering the entire terminal set, or a minimum beam width covering all terminals to be scheduled in the class, and the specific parameters are described below.
[0077] S3042: When it is detected that a second terminal exists around the first terminal, determine that a width of the beam is a third width, where the third width is greater than the first width.
[0078] In this embodiment, when the second terminal is detected around the first terminal, the width of the beam is determined to be a third width greater than the first width, wherein the third width is a width when the coverage range of the beam can cover the first terminal and the second terminals around it.
[0079] S3043: When it is detected that there is no second terminal around the first terminal, determine that the width of the beam is a first width.
[0080] In this embodiment, when it is detected that there is no second terminal around the first terminal, the base station determines the width of the beam to be a width that can cover the first terminal. It can be understood that, as mentioned above, if there are no other terminals around the first terminal, expanding the beam pointing to the first terminal will result in the expanded beam being able to only schedule the first terminal, resulting in a waste of frequency domain resources and affecting the quality of the received signal. Therefore, it is sufficient to ensure that the beam can cover the first terminal, and ensure that the quality of the received signal of the first terminal is optimal.
[0081] In combination with S3041-S3043 above, different situations of the second terminal in the case of determining whether the second terminal exists around the first terminal based on the terminal set are described below.
[0082] In some implementations, the second terminal is a terminal other than the first terminal in the terminal set to which the first terminal belongs. That is, if the base station detects that there are other terminals other than the first terminal in the terminal set, it can be determined that there is a second terminal around the first terminal, and the width of the beam is adjusted to a width that can cover the first terminal and the second terminal around the first terminal. If the base station detects that there are no other terminals in the terminal set except the first terminal, it can be determined that there is no second terminal around the first terminal, and the width of the beam is adjusted to the first width.
[0083] For example, the base station may cluster multiple terminals managed by itself in advance to obtain one or more terminal sets. Then, the base station may determine whether there are other terminals in the base station set to which the first terminal belongs. Figure 6 As shown, multiple terminals are clustered to obtain three terminal sets. The terminal set to which the first terminal belongs also includes other terminals 2 and terminal 3. Therefore, the base station expands the beam pointing to the first terminal so that the beam can cover all terminals in the terminal set (i.e., the first terminal, terminal 2 and terminal 3).
[0084] It should be noted that clustering can more reasonably and accurately determine whether there are other terminals around the first terminal, and then reasonably and accurately determine the width of the beam expansion.
[0085] In some other embodiments, the second terminal is a terminal to be scheduled among other terminals in the terminal set to which the first terminal belongs except the first terminal. That is, if the base station detects that there are other terminals to be scheduled except the first terminal in the terminal set, it can be determined that there is a second terminal around the first terminal, and the width of the beam is adjusted to cover the first terminal and the second terminal around the first terminal. If the base station detects that there are no other terminals to be scheduled except the first terminal in the terminal set, it can be determined that there is no second terminal around the first terminal, and the width of the beam is adjusted to the first width. Among them, the terminal to be scheduled is a terminal whose quality of service (QoS) value is greater than a preset threshold.
[0086] For example, the base station may cluster multiple terminals managed by itself in advance to obtain one or more terminal sets. Then, the base station may determine whether there are other terminals to be scheduled in the base station set to which the first terminal belongs. Figure 7 As shown, multiple terminals are clustered to obtain three terminal sets, and the terminal set to which the first terminal belongs also includes other terminals 2 and 3. Figure 7 In the figure, the terminals to be scheduled are represented by pure black boxes, and the common terminals (or non-scheduled terminals) are represented by white boxes. It can be seen that terminal 2 is a common terminal and terminal 3 is a terminal to be scheduled. Therefore, the base station can expand the beam directed to the first terminal so that the beam can cover the first terminal and terminal 3 in the terminal set to which the first terminal belongs.
[0087] It should be noted that the terminal to be scheduled is a terminal with better service quality, that is, a terminal with better received signal quality. The beam width is determined according to the terminal to be scheduled in the terminal set. The terminal to be scheduled can guarantee a certain service quality even when the beam is scheduled after the width is expanded, and will not affect the user's network experience.
[0088] The above clustering process is described in detail below in conjunction with specific embodiments.
[0089] In some embodiments, before the above S3041, the beam adjustment method provided in the embodiment of the present application also includes the following steps a and b.
[0090] Step a: Acquire information of multiple terminals including the first terminal, where the information of each terminal includes one or more of the following: resource utilization, scheduling information, behavior information, measurement information, and location information.
[0091] The scheduling information includes but is not limited to MCS value, number of repetitions, modulation mode, beam information, etc. The behavior information may include but is not limited to user terminal traffic, user moving speed, regularity of user terminal sending data, etc. The behavior information may be user behavior predicted by the base station based on historical information, or user behavior obtained from other devices, such as the core network, or user behavior reported directly to the base station by the terminal.
[0092] The measurement information may be a measurement made by a terminal device, and the result is sent to a system device. The measurement information made by the terminal includes but is not limited to a channel quality indicator (CQI), a reference signal receiving power (RSRP), a rank indicator (RI), or a reference signal received quality (RSRQ) information.
[0093] The measurement information may also be obtained from the base station measuring information sent by the terminal, such as the signal to interference plus noise ratio (SINR) and reception level measured by the base station on PUSCH or SRS, or the measurement information obtained by measuring SRS or other signals.
[0094] Step b: clustering the multiple terminals according to the information of the multiple terminals to obtain at least one terminal set.
[0095] The base station can set different weights for different parameters in the information based on the actual scenario requirements according to the information of multiple terminals, and then cluster the multiple terminals using a clustering algorithm to obtain at least one terminal set. The specific clustering algorithm can be found in the relevant technology and will not be described in detail here.
[0096] The process of determining the first terminal is described in detail below in conjunction with a specific embodiment.
[0097] In some embodiments, Figure 8 As shown, before S301, the beam adjustment method provided in the embodiment of the present application also includes the following S300a-S300b.
[0098] S300a. Obtain scheduling priorities of multiple terminals.
[0099] S300b: The terminal with the highest scheduling priority among the multiple terminals is selected as the first terminal.
[0100] In this embodiment, a QoS table is stored in the database of the base station, and the table records the QoS values of multiple terminals managed by the base station. The base station can sort the multiple terminals from large to small according to the size of the QoS value to obtain the scheduling priority of the multiple terminals. Further, the base station determines the terminal with the highest scheduling priority (that is, the largest QoS value) as the first terminal, and then subsequently expands the beam pointing to the first terminal.
[0101] It should be understood that the highest scheduling priority means that the terminal has the highest service quality and there is a certain degree of redundancy in service quality changes. Therefore, it is least affected by the beam width expansion and basically does not affect the network usage experience of the user belonging to the first terminal.
[0102] The beam adjustment method provided in the embodiment of the present application determines that the width of the beam pointing to the first terminal is a first width when the beam expansion reference information of the first terminal does not meet the beam expansion condition. When the beam expansion reference information of the first terminal meets the beam expansion condition, the width of the beam pointing to the first terminal is determined to be a second width greater than or equal to the first width. The method expands the width of the beam pointing to the first terminal according to the beam expansion reference information of the first terminal, so that the beam can cover and schedule more terminals to improve the utilization of frequency domain resources.
[0103] Furthermore, the present application selects the terminal with the highest scheduling priority as the first terminal, so as to facilitate the subsequent expansion of the beam directed to the first terminal, so as to achieve appropriate expansion of the beam while ensuring that the signal quality of the first terminal is qualified, so as to improve the coverage of the beam. In addition, the present application clusters the information of the terminal to determine the beam width, which is more comprehensive and can be applied to most beamforming scenarios.
[0104] It is understandable that, in order to implement the above functions, the beamforming device (which may be the above-mentioned base station) includes hardware structures and / or software modules corresponding to the execution of each function. Those skilled in the art should easily realize that, in combination with the algorithm steps of each example described in the embodiments of the present application, the present application can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in the form of hardware or computer software driving hardware depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0105] The embodiment of the present application can divide the beam adjustment device into functional modules according to the above method embodiment. For example, each functional module can be divided corresponding to each function, or two or more functions can be integrated into one functional module. The above integrated module can be implemented in the form of hardware or software. It should be noted that the division of modules in the embodiment of the present application is schematic and is only a logical function division. There may be other division methods in actual implementation. The following is an example of dividing each functional module corresponding to each function.
[0106] Fig. 9 is a schematic diagram of the structure of a beam adjustment device provided in an embodiment of the present application. The beam adjustment device can execute the beam adjustment method provided in the above method embodiment. Fig. 9 As shown, the beam adjustment device includes: an acquisition module 901 and a determination module 902.
[0107] The acquisition module 901 is used to acquire beam expansion reference information of a first terminal to be scheduled.
[0108] The determination module 902 is used to determine whether the first terminal meets the beam expansion condition based on the beam expansion reference information of the first terminal.
[0109] The determination module 902 is further configured to, when a beam expansion condition is not met, determine that the width of the beam directed to the first terminal is a first width.
[0110] The determination module 902 is further configured to, when a beam expansion condition is met, determine that the width of the beam is a second width, where the second width is greater than or equal to the first width.
[0111] In some embodiments, the beam expansion reference information includes resource utilization and an MCS value; the beam expansion condition includes that the MCS value is greater than a first threshold and the resource utilization is less than a second threshold.
[0112] In some embodiments, the determination module 902 is specifically used to, when a beam expansion condition is met, detect whether there is a second terminal around the first terminal; when it is detected that there is a second terminal around the first terminal, determine that the width of the beam is a third width, and the third width is greater than the first width; when it is detected that there is no second terminal around the first terminal, determine that the width of the beam is the first width.
[0113] In some embodiments, the determination module 902 is specifically used to detect whether there is a second terminal within the coverage of the beam at the third width when the beam expansion condition is met.
[0114] In some embodiments, the determination module 902 is specifically configured to, when a beam expansion condition is met, detect whether the terminal set to which the first terminal belongs includes the second terminal.
[0115] In some embodiments, the third width is a width when the coverage range of the beam can cover the first terminal and the second terminal.
[0116] In some embodiments, the second terminal is another terminal in the terminal set to which the first terminal belongs except the first terminal; or, the second terminal is another terminal to be scheduled in another terminal in the terminal set to which the first terminal belongs except the first terminal.
[0117] In some embodiments, the acquisition module 901 is also used to obtain information of multiple terminals including the first terminal, the information of each terminal including resource utilization, scheduling information, behavior information, measurement information and location information; based on the information of multiple terminals, the multiple terminals are clustered to obtain at least one terminal set.
[0118] In some embodiments, the first width is a minimum width of the coverage range of the beam that can cover the first terminal.
[0119] In some embodiments, the acquisition module 901 is further used to acquire the scheduling priorities of multiple terminals; the determination module 902 is further used to select the terminal with the highest scheduling priority among the multiple terminals as the first terminal.
[0120] In the case of implementing the functions of the above-mentioned integrated modules in the form of hardware, the embodiment of the present application provides another possible structure of the communication device involved in the above-mentioned embodiment. Fig.10 As shown, the communication device 100 includes: a processor 1002 and a bus 1004. Optionally, the communication device may further include a memory 1001; optionally, the communication device may further include a communication interface 1003.
[0121] Processor 1002 may be a processor that implements or executes various exemplary logic blocks, modules, and circuits described in conjunction with the embodiments of the present application. The processor 1002 may be a central processing unit, a general-purpose processor, a digital signal processor, an application-specific integrated circuit, a field programmable gate array, or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It may implement or execute various exemplary logic blocks, modules, and circuits described in conjunction with the embodiments of the present application. Processor 1002 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, and the like.
[0122] The communication interface 1003 is used to connect with other devices via a communication network, such as Ethernet, wireless access network, wireless local area network (WLAN), etc.
[0123] The memory 1001 may be a read-only memory (ROM) or other types of static storage devices that can store static information and instructions, a random access memory (RAM) or other types of dynamic storage devices that can store information and instructions, or an electrically erasable programmable read-only memory (EEPROM), a disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store desired program codes in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto.
[0124] As a possible implementation, the memory 1001 may exist independently of the processor 1002, and the memory 1001 may be connected to the processor 1002 via a bus 1004 for storing instructions or program codes. When the processor 1002 calls and executes the instructions or program codes stored in the memory 1001, the beam adjustment method provided in the embodiment of the present application can be implemented.
[0125] In another possible implementation, the memory 1001 may also be integrated with the processor 1002 .
[0126] The bus 1004 may be an extended industry standard architecture (EISA) bus, etc. The bus 1004 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Fig.10 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0127] The embodiment of the present application also provides a computer-readable storage medium. All or part of the processes in the above method embodiments can be completed by computer instructions to instruct the relevant hardware, and the program can be stored in the above computer-readable storage medium. When the program is executed, it may include the processes of the above method embodiments. The computer-readable storage medium can be the memory or memory of any of the above embodiments. The above computer-readable storage medium can also be an external storage device of the above detection area recovery device, such as a plug-in hard disk, a smart memory card (smart media card, SMC), a secure digital (secure digital, SD) card, a flash card (flash card), etc. equipped on the above detection area recovery device. Further, the above computer-readable storage medium can also include both the internal storage unit of the above detection area recovery device and an external storage device. The above computer-readable storage medium is used to store the above computer program and other programs and data required by the above detection area recovery device. The above computer-readable storage medium can also be used to temporarily store data that has been output or is to be output.
[0128] Exemplarily, the above-mentioned computer-readable storage media may include, but are not limited to: magnetic storage devices (e.g., hard disks, floppy disks or magnetic tapes, etc.), optical disks (e.g., compact disks (CD), digital versatile disks (DVD), etc.), smart cards and flash memory devices (e.g., erasable programmable read-only memory (EPROM), cards, sticks or key drives, etc.). The various computer-readable storage media described in this application may represent one or more devices and / or other machine-readable storage media for storing information. The term "machine-readable storage medium" may include, but is not limited to, wireless channels and various other media capable of storing, containing and / or carrying instructions and / or data.
[0129] An embodiment of the present application provides a computer program product comprising instructions. When the computer program product is run on a computer, the computer is enabled to execute the beam adjustment method described in any one of the above embodiments.
[0130] Although the present application is described herein in conjunction with various embodiments, in the process of implementing the claimed application, those skilled in the art may understand and implement other changes to the disclosed embodiments by viewing the drawings, the disclosure, and the appended claims. In the claims, the word "comprising" does not exclude other components or steps, and "one" or "an" does not exclude multiple situations. A single processor or other unit can implement several functions listed in the claims. Certain measures are recorded in different dependent claims, but this does not mean that these measures cannot be combined to produce good results.
[0131] Although the present application has been described in conjunction with specific features and embodiments thereof, it is obvious that various modifications and combinations may be made thereto without departing from the spirit and scope of the present application. Accordingly, this specification and the drawings are merely exemplary illustrations of the present application as defined by the appended claims, and are deemed to have covered any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, those skilled in the art may make various modifications and variations to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
[0132] The above are only specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A beam adjustment method, characterized in that: The method comprises: Obtaining beam expansion reference information of a first terminal to be scheduled; Determining, based on the beam expansion reference information of the first terminal, whether the first terminal meets the beam expansion condition; When the beam expansion condition is not met, determining that the width of the beam directed to the first terminal is a first width; When the beam expansion condition is met, the width of the beam is determined to be a second width, and the second width is greater than or equal to the first width.
2. The method according to claim 1, characterized in that: The beam expansion reference information includes resource utilization and adjustment and coding strategy MCS value; The beam expansion condition includes that the MCS value is greater than a first threshold and the resource utilization rate is less than a second threshold.
3. The method according to claim 1, characterized in that The step of determining the width of the beam to be a second width when the beam expansion condition is met includes: When the beam expansion condition is met, detecting whether there is a second terminal around the first terminal; In a case where it is detected that the second terminal exists around the first terminal, determining that the width of the beam is a third width, where the third width is greater than the first width; In a case where it is detected that the second terminal does not exist around the first terminal, the width of the beam is determined to be a first width.
4. The method according to claim 3, characterized in that The detecting whether there is a second terminal around the first terminal when the beam expansion condition is met includes: When the beam expansion condition is met, it is detected whether the second terminal exists within the coverage of the beam at the third width.
5. The method according to claim 3, characterized in that: The detecting whether there is a second terminal around the first terminal when the beam expansion condition is met includes: When the beam extension condition is met, it is detected whether the terminal set to which the first terminal belongs includes the second terminal.
6. The method according to claim 5, characterized in that The third width is a width when the coverage range of the beam can cover the first terminal and the second terminal.
7. The method according to claim 5, characterized in that The second terminal is another terminal in the terminal set to which the first terminal belongs except the first terminal; or, The second terminal is a terminal to be scheduled among other terminals in the terminal set to which the first terminal belongs, except the first terminal.
8. The method according to any one of claims 5 to 7, characterized in that: The method further comprises: Acquire information of multiple terminals including the first terminal, where the information of each terminal includes resource utilization, scheduling information, behavior information, measurement information, and location information; The multiple terminals are clustered according to the information of the multiple terminals to obtain at least one terminal set.
9. The method according to claim 3, characterized in that: The first width is a minimum width of the coverage range of the beam that can cover the first terminal.
10. The method according to claim 1, characterized in that Before acquiring the beam extension reference information of the first terminal to be scheduled, the method further includes: Get the scheduling priorities of multiple terminals; A terminal with the highest scheduling priority among the multiple terminals is used as the first terminal.
11. A communication device, characterized in that: include: a processor and a memory for storing instructions executable by the processor; The processor is configured to execute the instructions so that the communication device performs the beam adjustment method as described in any one of claims 1-10.
12. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and when the computer instructions are executed on a communication device, the communication device executes the beam adjustment method according to any one of claims 1 to 10.
