Transport system
By blocking the object path in advance, repelling the items to the effective area and adjusting the delivery instructions, the problems of high load of the control device and high frequency of passing the conveyor truck during the path closure process are solved, and more efficient delivery system operation is achieved.
Patent Information
- Application Number
- CN202380028535.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2022-03-29
- Filing Date
- 2023-02-24
- Publication Date
- 2024-11-08
AI Technical Summary
When the path closing process is performed, the processing load of the control device becomes high, and the frequency of the transport vehicle passing through the blocking area increases, resulting in a decrease in the transport efficiency.
Block the object path in stages through pre-processing, including only allowing part of the transport vehicle to pass through the object path, repelling the items to the effective area, allowing the processing location to be the destination, prohibiting the storage location as the destination, reducing the load on the control device and the passing frequency of the transport vehicle Spend.
It effectively suppresses the processing load of the control device, reduces the frequency of the transport vehicle passing through the object path, ensures smooth retreat of the items, and avoids the reduction in efficiency after the path is closed.
Smart Images

Figure CN118922343A_ABST
Abstract
Description
Technical Field
[0001] The present invention mainly relates to a transport system for transporting articles using a transport vehicle. Background Art
[0002] The transport system of Patent Document 1 includes a travel path, a transport vehicle traveling along the travel path, and a control device for controlling the transport vehicle. The control device can perform a route-down process on a portion of the travel path. The control device controls the transport vehicle so that it does not pass through the travel path after the route is closed.
[0003] Prior art literature
[0004] Patent Literature
[0005] Patent Document 1: International Publication No. 2010 / 100834 Summary of the invention
[0006] Problems to be solved by the invention
[0007] When executing the route closing process, various processes are required in conjunction with the route closing process. For example, it is sometimes necessary to change the route of the transport vehicle. In addition, it is sometimes necessary to close the transport port destination associated with the driving route after the route closing. Therefore, the processing load of the control device becomes high when executing the route closing process.
[0008] The present invention has been made in view of the above circumstances, and a main object of the present invention is to provide a transport system capable of suppressing the processing load of a control device when executing a route closing process.
[0009] Solutions and results for solving problems
[0010] The problems to be solved by the present invention are as described above. Next, means for solving the problems and their effects will be described.
[0011] According to an aspect of the present invention, a transport system having the following structure is provided. That is, the transport system includes a transport vehicle and a control device. The transport vehicle transports articles by traveling along a track. The control device controls the transport vehicle. The destination of the transport vehicle includes a processing location and a storage location, wherein the processing location is a location for delivering the article to a processing device, and the storage location is a location for temporarily storing the article. When the control device closes (down) a path selected from a plurality of paths on the track, i.e., an object path, the control device performs a pre-processing and a path closing process. The pre-processing includes at least one of the following processes: (1) a process of allowing only a part of the transport vehicle to pass through the object path; (2) a process of using the transport vehicle to retreat the article located in a blocked area to an effective area, wherein the blocked area is an area that is predetermined to be blocked by closing the object path, and the effective area is an area that is not blocked before and after the closing of the object path; (3) a process of allowing transport with the processing location in the blocked area as the destination and prohibiting transport with the storage location in the blocked area as the destination. The route closing process is a process performed after the preliminary process, and is a process for prohibiting the transport vehicle from traveling on the target route.
[0012] This makes it possible to perform blocking of the target path in stages, thereby reducing the processing load on the control device.
[0013] In the transport system, it is preferable to set the following structure. That is, the control device performs processing to make only a part of the transport vehicles pass through the object path. The control device makes the transport vehicle travel to the destination along a path that does not pass through the object path when there is a detour path that avoids the object path. The control device makes the transport vehicle travel to the destination along a path that passes through the object path when there is no detour path that avoids the object path.
[0014] This can reduce the frequency with which the transport vehicle passes through the target route, and allow the transport vehicle to pass through the target route when it is necessary to do so.
[0015] In the transport system, preferably, the preliminary processing includes using the transport vehicle to retreat the items located in the blockade area to the effective area, and the control device retreats all the items from the blockade area to the effective area after ensuring the retreat destination for all the items to be retreated from the blockade area to the effective area.
[0016] Thus, the article can be evacuated after the evacuation destination is set, so the article can be evacuated smoothly.
[0017] In the above-mentioned conveying system, preferably, the article is a container for accommodating a conveying object.
[0018] This makes it difficult for containers to remain in the blocked area, and thus it is possible to suppress a decrease in the transport efficiency after the path closing process. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic plan view of a conveying system according to one embodiment of the present invention.
[0020] Figure 2 This is the front view of the transport system.
[0021] Figure 3 This is a schematic top view showing the blocked area and effective area after the object path is set.
[0022] Figure 4 This is a flowchart showing the process from receiving an instruction of a route closing reservation process to executing the route closing process.
[0023] Figure 5 This is a table showing the contents of the first preliminary process, the second preliminary process, and the path closing process. DETAILED DESCRIPTION
[0024] Next, embodiments of the present invention will be described with reference to the drawings.
[0025] Figure 1 The transport system 1 shown is set in a facility such as a semiconductor manufacturing plant or a warehouse, and transports an article 50. The article 50 transported by the transport system 1 is a container for accommodating wafers (semiconductor wafers). Specifically, the container is a FOUP (Front-Opening Unified Pod: front-opening wafer transfer box) or a wafer box. In addition, the article 50 can also be a reticle box for accommodating a reticle. In addition, when the transport system 1 is set in a warehouse, the article 50 is a commodity or a part stored in the warehouse.
[0026] like Figure 1 and Figure 2 As shown, the transport system 1 includes a management control device (control device) 10 , a transport vehicle 20 , and a track 30 .
[0027] The management control device 10 is a computer having a computing device such as a CPU and a storage device such as an HDD, SSD, or flash memory. The management control device 10 can perform various controls related to the transportation and processing of the article 50 by reading out and executing the program stored in the storage device. The management control device 10 generates a transportation instruction based on the information received from the upper control device, and distributes the transportation instruction to the transportation vehicle, thereby instructing the transportation vehicle 20 to transport the article 50.
[0028] The transport vehicle 20 is an OHT (Overhead Hoist Transfer). The transport vehicle 20 is a vehicle that moves unmanned along a track 30 suspended from the ceiling and transports articles 50. Figure 2 As shown, the transport vehicle 20 includes a communication device 21 , a drive control device 22 , a motor 23 , wheels 24 , and a transport unit 25 .
[0029] The communication device 21 is a wireless communication module for wireless communication with the outside. The communication device 21 can communicate with the management control device 10 that controls the conveying system 1. The drive control device 22 is a computer having a computing device such as a CPU and a storage device such as an HDD, SSD or flash memory. The drive control device 22 can perform various controls related to the conveying vehicle 20 by reading out the program stored in the storage device and executing it. The drive control device 22 operates the motor 23 based on the conveying instruction received from the management control device 10, for example. The motor 23 uses the power supplied via the track 30 to generate a driving force for driving the conveying vehicle 20. The driving force generated by the motor 23 is transmitted to the wheel 24 via the transmission mechanism. As a result, the conveying vehicle 20 travels along the track 30. The conveying unit 25 has a hand that can switch, for example, the state of holding the article 50 and the state of releasing the holding of the article 50, and can realize the collection and delivery of the article 50.
[0030] A semiconductor manufacturing plant is provided with storage racks 31 and processing apparatuses 101. The storage racks 31 and processing apparatuses 101 are arranged near rails 30. The transport vehicle 20 can deliver and receive articles 50 to and from the storage racks 31 and processing apparatuses 101.
[0031] The storage rack 31 is a portion for temporarily storing the articles 50. The storage rack 31 of this embodiment is arranged at a position adjacent to the track 30 in a plan view. The storage rack 31 temporarily stores the articles 50 waiting to be processed by the processing device 101, and temporarily stores the articles 50 to be transported to other locations. The position where the transport vehicle 20 delivers the articles 50 to the storage rack 31 is called a storage position. The direction of travel along the track 30 is referred to as the front-rear direction, and the direction orthogonal to the front-rear direction in a plan view is referred to as the left-right direction. The storage rack 31 is arranged, for example, outside the track 30 in the left-right direction.
[0032] The processing device 101 has a loading port (processing position) 102 for receiving the article 50 from the transport vehicle 20. The processing device 101 takes in the article 50 placed in the loading port 102 by the transport vehicle 20, and processes the wafers contained in the article 50 (for example, a process for manufacturing semiconductor devices). The loading port 102 is arranged at a position overlapping with the track 30 in a plan view, but may be arranged at a different position.
[0033] In addition, a transfer assisting device may be provided adjacent to the processing device 101. The assisting device temporarily stores the article 50 waiting to be processed by the processing device 101. The transfer assisting device takes in the article 50 delivered from the transport vehicle 20 and temporarily stores it. Then, after the processing device 101 is in a state where the processing device 101 can process, the transfer assisting device delivers the article 50 to the processing device 101. The position where the transport vehicle 20 delivers the article 50 to the transfer assisting device is the position for delivering the article 50 to the processing device 101, and therefore corresponds to the processing position.
[0034] Next, refer to Figures 3 to 5 , the path closing process is explained.
[0035] The path closing process refers to closing a part of the track 30 for the purpose of maintenance, for example. Types of maintenance include, for example, maintenance of the track 30 and maintenance related to power supply via the track 30. Alternatively, when communication or control between the management control device 10 and the transport vehicle 20 is temporarily stopped, the track 30 included in the area where communication or control is stopped is closed. The transport vehicle 20 cannot travel on the closed path. In detail, the management control device 10 sets the destination and path of the transport vehicle 20 so that the transport vehicle 20 does not travel on the closed path. Hereinafter, the path to be closed will be referred to as the "target path".
[0036] Next, the blocked area and the effective area are described. In the transport system 1, there may be an area (blocked area) that is scheduled to be blocked when the path closing process is executed. When a certain area is blocked, the transport vehicle 20 cannot travel from the blocked area to the outside thereof, and the transport vehicle 20 cannot travel from the outside of the blocked area to the blocked area. For example, Figure 3 As shown, when there are two target paths, the area surrounded by the two target paths becomes a closed area. On the other hand, an area that is valid both before and after the execution of the path closing process (an unblocked area) is called a valid area.
[0037] Assuming that the management control device 10 immediately executes the route closing process after receiving the instruction of the route closing process, it is necessary to change the destination or route of all the transport vehicles 20 affected by it. Therefore, the processing load of the management control device 10 when executing the route closing process becomes high, and as a result, there is a possibility that other controls performed by the management control device 10 are delayed. In addition, the article 50 that is in the blocked area when the route closing process is executed cannot be used after the execution of the route closing process. As a result, there is a possibility that the transport efficiency of the wafer is reduced.
[0038] In this regard, the management control device 10 of this embodiment performs the pre-processing before executing the path closing process. This can distribute the processing load of the management control device 10. As a result, it is possible to reduce the delay of other controls performed by the management control device 10. The pre-processing will be described in detail below.
[0039] When the route closing process is required, the administrator operates his own terminal or PC, etc., to set the target route and the start time. Thus, the instruction of the route closing reservation process is sent to the management control device 10. The administrator can also directly operate the management control device 10 to instruct the route closing reservation process. Alternatively, the management control device 10 can be instructed to perform the route closing reservation process according to a pre-created schedule.
[0040] The management control device 10 determines whether an instruction for route closing reservation processing is received ( S101 ). When an instruction for route closing reservation processing is received, the management control device 10 enters the target route and start time of the route closing processing ( S102 ).
[0041] Next, the management control device 10 executes the first pre-processing (S103). In this embodiment, the pre-processing is divided into two stages: the first pre-processing and the second pre-processing. Figure 5 As shown, the first pre-processing includes "1. Path countermeasures", "2. Evacuation of articles", and "3. Transport instruction countermeasures". In addition, the order of performing the first pre-processing "1. Path countermeasures", "2. Evacuation of articles", and "3. Transport instruction countermeasures" is not limited, and at least two processes can be performed simultaneously.
[0042] “1. Route countermeasure” is a process for temporarily prohibiting the transportation vehicles 20 from traveling on the target route. By reducing the frequency, the number of transportation vehicles 20 affected when the route closing process is executed is reduced, thereby reducing the processing load of the management control device 10.
[0043] In the first preliminary processing "1. Path Countermeasures", the cost (cost) of passing the object path is increased. The cost is a parameter usually used when performing path exploration. The management control device 10 explores a path that minimizes the cost from the departure point to the destination and sets it for the transport vehicle 20. In principle, the cost increases as the driving distance becomes longer. In addition, the cost of passing through a location that is not preferred is set to a value greater than the cost of passing through other locations. Therefore, by significantly increasing the cost of passing through the object path compared to the cost of passing through other paths, the frequency of the transport vehicle 20 passing through the object path can be reduced.
[0044] Specifically, if there is a detour route that deviates from the target route, a route that travels on the detour route is set for the transport vehicle 20. On the other hand, if there is no detour route, a route that leads to the destination via the target route is set for the transport vehicle 20. In addition, the management control device 10 sets the transport vehicle 20 that passes through the target route and travels from the effective area to the blocked area as a monitoring target and lists it. This list is used in the second preliminary processing.
[0045] In addition, the process of increasing the cost of passing through the target path in "1. Path Countermeasures" is an example, and can also be replaced by other processes that allow only some of the transport vehicles 20 to pass through the target path. For example, it is also possible to allow the transport vehicles 20 that set the location within the blockade area as the destination to pass through the target path, and prohibit the transport vehicles 20 that set the location outside the blockade area as the destination to pass through the target path.
[0046] "2. Evacuation of articles" is a process of evacuating articles located in a blocked area to an effective area. When the path closing process is performed with the articles 50 located in the blocked area, the number of articles 50 that can be used decreases, and thus the wafer conveying efficiency decreases. In addition, sometimes it is necessary to record the fact that the articles 50 become unusable, and in this case, the processing load of the management and control device 10 increases. Furthermore, it takes labor for the operator to transport these articles 50 to the effective area. In this regard, by causing the transport vehicle 20 to move the articles 50 to the effective area before the path closing process is performed, the number of articles 50 that can be used after the path closing process is unlikely to decrease, and thus the wafer conveying efficiency can be maintained. In addition, the processing load of the management and control device 10 during the path closing process can be suppressed. In addition, labor can be reduced compared to the method of manually transporting the articles 50.
[0047] In the first preliminary processing "2. Evacuation of articles", first, the articles 50 located in the blockade area are determined. The management control device 10 controls the use of the transport vehicle 20 to transport the articles 50 based on the position of the transport vehicle 20 and the position of the articles 50. Therefore, the management control device 10 can determine the articles 50 located in the blockade area based on the information used in the control. Next, the management control device 10 ensures the same number of evacuation destinations as the number of determined articles 50. The evacuation destination is a storage rack 31 in the effective area, and is a place where no other articles 50 exist and is not the destination of other articles 50. In the case where such a evacuation destination exists, the management control device 10 ensures the evacuation destination by blocking the evacuation destination. Blocking means setting it so that no other articles 50 are placed on the transport vehicle 20.
[0048] "3. Transport instruction countermeasure" is a process of gradually reducing transport instructions that set the blocked area as the departure point or destination. This reduces the number of transport vehicles 20 affected when the route closing process is executed, thereby reducing the processing load of the management control device 10.
[0049] In the "3. Transport Instruction Countermeasures" of the first preliminary process, all transport instructions are allowed. In other words, the conditions related to the transport instructions are the same before and after the first preliminary process. Therefore, the management control device 10 can generate a transport instruction with a departure point or destination at an arbitrary location based on the information received from the upper-level control device and assign it to the transport vehicle 20.
[0050] After starting the execution of the first preliminary process, the management control device 10 determines whether it is the time to transfer to the second preliminary process (S104). The management control device 10 determines that it is the time to transfer to the second preliminary process at a time point before a predetermined time that is, for example, the start time of the route closing process. Alternatively, the condition for transferring to the second preliminary process may be that the evacuation destination of all the articles 50 is ensured in the first preliminary process.
[0051] When the management control device 10 determines that it is the time to transfer to the second preliminary process, it executes the second preliminary process (S105). The second preliminary process includes "1. Path countermeasures", "2. Evacuation of objects" and "3. Transport instruction countermeasures". In addition, the order of performing the second preliminary process "1. Path countermeasures", "2. Evacuation of objects" and "3. Transport instruction countermeasures" is not limited. However, it is preferred to perform "3. Transport instruction countermeasures" after performing "2. Evacuation of objects". In addition, at least two processes can also be performed simultaneously.
[0052] In the second preliminary process "1. Route countermeasures", the transportation vehicle 20 is prohibited from traveling on the target route in principle. The transportation vehicle 20 that is allowed to travel on the target route is limited to the transportation vehicles 20 listed in the list created in the first preliminary process. Since the transportation vehicles 20 listed in the list are located in the blocked area, they become unable to operate after the route closing process is executed. Therefore, the transportation vehicle 20 is allowed to move from the blocked position to the valid position.
[0053] Furthermore, when the second preliminary process "1. Route countermeasure" and "2. Evacuation of articles" are performed in parallel, the transport vehicle 20 for "2. Evacuation of articles" is allowed to travel on the target route. Furthermore, when the "1. Route countermeasure" and "3. Transport instruction countermeasure" are performed in parallel, the transport vehicle 20 for "3. Transport instruction countermeasure" is allowed to travel on the target route. However, the "1. Route countermeasure" may be performed after the "2. Evacuation of articles" and "3. Transport instruction countermeasure" are completed.
[0054] The management control device 10 performs a process of prohibiting the vehicle from traveling on the subject route. Furthermore, when the above-mentioned permission situation occurs, the management control device 10 temporarily permits the vehicle to travel on the subject route by performing a cancellation process or a suspension process.
[0055] In "2. Evacuation of Articles" of the second preliminary process, the evacuation of the articles 50 for which the evacuation destination was secured in the first preliminary process is performed. That is, in the present embodiment, after the evacuation destination is secured for all the articles 50 to be evacuated in the second preliminary process, the evacuation of the articles 50 is started. Specifically, the management control device 10 instructs the transport vehicle 20 to collect the articles 50 located in the blockade area and to transport the articles 50 to the evacuation destination secured in the first preliminary process. After the evacuation of all the articles 50 in the blockade area is completed, the management control device 10 notifies the superior control device of the purpose.
[0056] In the "3. Transport Instruction Countermeasures" of the second preliminary processing, transport instructions that set the storage location of the blocked area as the destination are not allowed. Specifically, the management control device 10 closes or seals the location (port) corresponding to the storage location of the blocked area so that the storage location of the blocked area will not become the destination. In addition, transport instructions that set the processing location of the blocked area as the destination are allowed. This is because, since the purpose of the semiconductor factory is to process the wafer by the processing device 101, the transportation of the object 50 to the processing location has a high priority. In the "2. Evacuation of Objects" of the second preliminary processing, transportation is performed with the storage location as the destination in order to recover the object 50 in the blocked area. Therefore, in the second preliminary processing, it is preferred to perform the "3. Transport Instruction Countermeasures" after performing the "2. Evacuation of Objects".
[0057] After starting the execution of the second preliminary process, the management control device 10 determines whether it is the time to transfer to the route closing process (S106). The management control device 10 determines that it is the time to transfer to the route closing process at a time point that becomes the start time of the route closing process, for example. In addition, when the start time of the route closing process is not set, the completion of the evacuation of all the objects 50 in the second preliminary process can be a condition for transferring to the route closing process.
[0058] When the management control device 10 determines that it is time to transfer to the path closing process, the path closing process is executed (S107). In the path closing process, travel on the target path is prohibited without exception. Moreover, all transportations with the blocked location as the departure point or destination are not allowed. Specifically, the management control device 10 closes or seals all locations (ports) located in the blocked area so that the blocked area will not become the departure point and destination of the transport vehicle 20. Through the above, the path closing process is completed. The path closing process continues until other instructions to cancel the closure of the target path are received.
[0059] As described above, the transport system 1 of the present embodiment includes the transport vehicle 20 and the management control device 10. The transport vehicle 20 transports the article 50 by traveling along the track 30. The management control device 10 controls the transport vehicle 20. The destination of the transport vehicle 20 includes a processing position as a position for delivering the article 50 to a processing device and a storage position as a position for delivering the article 50 to a storage rack 31 for temporarily storing the article 50. When closing a target path selected from a plurality of paths on the track, the management control device 10 performs a preliminary process and a path closing process. The pre-processing includes at least one of the following processes: (1) processing of allowing only a portion of the transport vehicles 20 to pass through the target path; (2) processing of using the transport vehicle 20 to evacuate the articles 50 located in the blocked area to the effective area, wherein the blocked area is an area that is scheduled to be blocked by closing the target path, and the effective area is an area that is not blocked before and after the closing of the target path; (3) processing of allowing transportation with the processing position in the blocked area as the destination and prohibiting transportation with the storage position in the blocked area as the destination. The path closing process is a process performed after the pre-processing and is a process of prohibiting the transport vehicle 20 from traveling on the target path.
[0060] This makes it possible to perform blocking of the target path in stages, thereby reducing the processing load of the management control device 10 .
[0061] In the transport system 1 of the present embodiment, the management control device 10 performs processing to make only a part of the transport vehicles 20 pass through the target path. If there is a detour path that avoids the target path, the management control device 10 makes the transport vehicle 20 travel to the destination via a path that does not pass through the target path. If there is no detour path that avoids the target path, the management control device 10 makes the transport vehicle 20 travel to the destination via a path that passes through the target path.
[0062] This can reduce the frequency with which the transport vehicle 20 passes through the target route, and allow the transport vehicle 20 to pass through the target route when it is necessary to do so.
[0063] In the transport system 1 of the present embodiment, the preliminary processing includes using the transport vehicle 20 to retreat the items 50 located in the blocked area to the effective area. After the retreat destination is ensured for all items 50 to be retreated from the blocked area to the effective area, all items 50 are retreated from the blocked area to the effective area.
[0064] Thus, the article 50 can be evacuated after the evacuation destination is set, so the article 50 can be evacuated smoothly.
[0065] In the transport system 1 of the present embodiment, the article 50 is a container (FOUP) that accommodates wafers as transport objects.
[0066] This makes it difficult for containers to remain in the blocked area, and thus it is possible to suppress a decrease in the transport efficiency after the path closing process.
[0067] As mentioned above, the preferred embodiment of the present invention has been described, but the above-mentioned structure can be modified as follows, for example.
[0068] The flowchart shown in the above embodiment is an example, and part of the processing may be omitted, the content of part of the processing may be changed, and new processing may be added. For example, the pre-processing may be processed as one processing without distinguishing between the first pre-processing and the second pre-processing. In this case, as "1. Path Countermeasures", either a process of increasing the cost of passing through the target path or a process of prohibiting driving on the target path in principle is performed. As "2. Evacuation of Articles", a process of transferring the transport vehicle 20 each time the evacuation destination can be ensured is performed.
[0069] As a preliminary process, the management control device 10 may only perform one of "1. Route countermeasures", "2. Evacuation of articles" and "3. Transport instruction countermeasures". Even in this case, the processing load of the management control device 10 can be reduced compared to the case of immediately performing the route closing process.
[0070] In the first pre-processing "1. Path Countermeasure" of the above-mentioned embodiment, the cost of passing through the target path is increased. Alternatively, other settings of the path exploration may be changed. For example, it may be set to set the target path as non-travelable and perform path exploration. If there is a path from the departure point to the destination, the path is set. If there is no path from the departure point to the destination, the target path is set as travelable and the path exploration is performed again. Even with this setting, the frequency of the transport vehicle 20 traveling on the target path can be reduced.
[0071] In the above-mentioned embodiment, the OHT is described as an example of the transport vehicle 20 , but the present invention can also be applied to other vehicles such as AGV (Automated Guided Vehicle) or a suspension crane.
[0072] Description of Reference Numerals
[0073] 1Conveying system
[0074] 10 Management control device (control device)
[0075] 20 Transport vehicle
[0076] 30 tracks
[0077] 101 Processing Device
[0078] 102 loading port (processing position).
Claims
1. A conveying system, characterized in that: have: a transport vehicle that transports articles by traveling along a track; and a control device, wherein the control device controls the transport vehicle, The destination of the transport vehicle includes a processing location and a storage location, wherein the processing location is a location for delivering the article to a processing device, and the storage location is a location for delivering the article to a storage rack for temporarily storing the article. The control device performs a preliminary process and a path closing process when closing a target path selected from a plurality of paths on the track. The pre-processing performs at least one of the following processes: (1) a process of allowing only a portion of the transport vehicle to pass through the object path; (2) a process of using the transport vehicle to evacuate the items located in a blocked area to a valid area, wherein the blocked area is an area that is scheduled to be blocked by closing the object path, and the valid area is an area that is not blocked before and after the closing of the object path; (3) a process of allowing transport with the processing position in the blocked area as the destination and prohibiting transport with the storage position in the blocked area as the destination, The route closing process is a process performed after the preliminary process, and prohibits the transport vehicle from traveling on the target route.
2. The conveying system according to claim 1, characterized in that: In the pre-processing, the control device performs processing to make only a part of the transport vehicles pass through the target path. Thus, if there is a detour route that avoids the target route, the transport vehicle is driven to the destination along a route that does not pass through the target route. When there is no detour route avoiding the target route, the transport vehicle is caused to travel to a destination along a route passing through the target route.
3. The conveying system according to claim 1 or 2, characterized in that: The preliminary processing includes a process of using the transport vehicle to evacuate the article located in the blocked area to the effective area. The control device causes all the objects to be evacuated from the blockade area to the effective area after ensuring an evacuation destination for all the objects to be evacuated from the blockade area to the effective area.
4. The conveying system according to claim 3, characterized in that: The article is a container for storing an object to be transported.
Citation Information
Patent Citations
Transfer vehicle system
CN102753458A
Article Transport Facility
CN107055019A
Transportation system and transportation control method
CN113811498A
Carrying system and grid system
CN114341026A
Conveyance vehicle system
JP2013088987A
