Process method for disassembling quayside container crane

By transforming the hydraulic hoisting and lifting equipment, the safety and economic problems of the dismantling process of the shore container crane are solved by combining bottom-up circulation dismantling and car crane, and the safety and reliability of the shore bridge are achieved. , economical batch disassembly, suitable for disassembly of multiple scenarios and different models.

CN118926861APending Publication Date: 2024-11-12SHANGHAI ZHENHUA HEAVY IND
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411063200.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing shore container crane dismantling process has safety and economic problems. The overturned dismantling may lead to damage to the dock, the rental cost of floating crane lifting and dismantling is high, and the application is limited, and the structural incision calculation is inaccurate, resulting in safety hazards.

Method used

Design and renovate the hydraulic hoisting tooling to make it modular, standardized and lightweight. Through the detachable cow legs and electromechanical and hydraulic integrated lifting system, the shore bridge door legs can be disassembled from the bottom up, and further disassembled with the car crane to avoid Large tonnage cranes and structural center of gravity transfer are used at high altitudes.

Benefits of technology

It realizes the safe, reliable and economical batch dismantling of the shore and bridges, reduces environmental pollution, improves the dismantling efficiency and safety, and is suitable for dismantling of multiple scenarios and different models.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118926861A_ABST
    Figure CN118926861A_ABST
Patent Text Reader

Abstract

The invention discloses a quayside container crane disassembling process method which comprises the following steps: carrying out structural design transformation on an existing hydraulic jacking type heightening tool, and shrinking structures in the track gauge and base distance directions into a quayside crane door frame to be applied to quayside crane disassembling; by optimizing the process, the door frame of the quayside container crane is disassembled through the improved hydraulic jacking type heightening tool. The quayside container crane disassembling process method is safe, reliable and economical, and has strong technical competitive advantages in the quayside container crane disassembling market.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of container crane disassembly, and more specifically, to a method for disassembling a shore container crane. Background Art

[0002] As time goes by, more and more shore container cranes (hereinafter referred to as quay cranes) have reached or even exceeded their service life and need to be disassembled as a whole. The commonly used disassembly processes are pull-down disassembly and floating crane disassembly. Among them, pull-down disassembly is to pull the quay crane to the ground by external force, and then use equipment such as car cranes to disassemble the parts in blocks. It has the advantages of low cost, less labor, short cycle, no tooling, and no need to rent large lifting equipment. However, due to the limited pressure of the terminal, it is necessary to check whether it can withstand the impact force. Even if it can withstand the impact force, the base surface is still damaged to varying degrees. Therefore, the terminal with strict safety management explicitly prohibits the use of this process. In addition, the structural cut calculation of this process is inaccurate, which will lead to dumping deviation and even machine destruction and death. Floating crane disassembly is to use a floating crane to lift each component to the ground from top to bottom. The process is safer and more reliable, but its rental cost is high. It is not available in some areas and its application is limited; the center of gravity of the upper structure changes during the disassembly process of this process, and counterweights need to be added when necessary; the state of the steel structure at the lifting lug needs to evaluate the degree of corrosion. Therefore, based on the various shortcomings of the existing commonly used dismantling processes, it is urgent to study a safe, reliable, economical and efficient quay crane dismantling process method. Summary of the invention

[0003] The purpose of the present invention is to provide a method for dismantling a shore container crane, namely, a method for dismantling a shore crane by hydraulic jacking, so as to solve various shortcomings of the commonly used dismantling processes of shore cranes in the prior art, and to redesign and transform the existing hydraulic jacking heightening tooling so that it can be modularized, standardized, lightweight and adjustable for shore crane dismantling; and by optimizing the process, the modified tooling is suitable for batch dismantling of shore cranes of various models in multiple scenarios.

[0004] In order to achieve the above object, the present invention adopts the following technical solutions:

[0005] The present invention provides a method for disassembling a shore container crane, comprising the following steps:

[0006] S1. Reconstruct the structure of the existing hydraulic lifting tooling, and shrink the structure in the track gauge and base distance direction into the quay crane door frame for dismantling of the quay crane;

[0007] S2. Through process optimization, the door frame of the shore container crane is dismantled using the modified hydraulic jacking and heightening tooling.

[0008] As one aspect of a disassembly process method of a shore container crane of the present invention, S1 comprises the following steps:

[0009] S11. The upper and lower structures of the hydraulic lifting tooling were remodeled. The original four crisscross beams of the upper structure were remodeled into four detachable brackets. The original floor-type load-bearing beams of the lower structure were eliminated and remodeled into a riding beam structure.

[0010] S12. The tooling structure in the track gauge and base distance directions is reduced, and adjustable modules are respectively provided in the middle section of the structure in the track gauge and base distance directions.

[0011] As one aspect of a disassembly process method of a shore container crane of the present invention, S2 comprises the following steps:

[0012] S21. Preliminary preparation process;

[0013] S22. Tooling installation process;

[0014] S23. Door frame disassembly process;

[0015] S24. Subsequent disassembly process.

[0016] As one aspect of a disassembly process method of a shore container crane of the present invention, the S21 comprises the following steps:

[0017] S211. The trolley moves between the door frames and anchors;

[0018] S212. Install the door frame support in advance;

[0019] S213. Use the trolley of the quay crane to turn 90 degrees and pull the quay crane to move to the land side to the projection area under the front beam, which is completely within the land area of ​​the terminal.

[0020] As one aspect of a disassembly process method of a shore container crane of the present invention, the S22 comprises the following steps:

[0021] S221. Assemble the modified hydraulic lifting tooling and test the electromechanical and hydraulic integrated lifting system of the modified hydraulic lifting tooling;

[0022] S222. Consider the location of the detachable corbel installation based on the height of the door legs of the modified hydraulic jacking and raising tooling and the height of the standard section.

[0023] As one aspect of a disassembly process method of a shore container crane of the present invention, the S23 comprises the following steps:

[0024] S231. Install two removable brackets from bottom to top, draw lines to locate the cutting line, and add blocks one by one until the first removable bracket contacts and leans against the lifting beam, so that the force of the quay crane body is transferred to the tooling;

[0025] S232. Cut off the door legs and separate the cut parts from the main body using a lifting device;

[0026] S233. The tooling takes the material blocks one by one until the door leg is lowered to contact with the lower beam to remove the first removable bracket. The tooling adds material blocks together with S231 until the second removable bracket contacts and leans against the lifting beam;

[0027] S234. Install the removed bull leg to the preparation point required for the next cutting, and draw the line for the next positioning cutting line in step S231;

[0028] S235. Cut and remove in a cycle in batches until the specified height is reached.

[0029] As one aspect of a disassembly process method of a shore container crane of the present invention, the S233 comprises the following steps:

[0030] S2331. The tooling takes the material blocks one by one until the door leg descends to contact the lower crossbeam, and temporarily provides rigid fixing protection at the contact point;

[0031] S2332. After removing the first corbel, the tooling and S231 adding blocks are in contact and secure with the second removable corbel and the lifting beam.

[0032] As one aspect of a disassembly process method of a shore container crane of the present invention, the S235 comprises the following steps:

[0033] S2351. Same as steps S232 to S233, but after the detachable bracket is removed, the tooling is not lifted;

[0034] S2352. Remove the standard sections, connecting rods, barrels and blocks on the upper layer of the hydraulic lifting and heightening tooling after modification;

[0035] S2353. After the tooling is added to the second removable corbel and the jacking beam in contact and close to the solid, the same operation is performed as in step S231;

[0036] S2354. Same operation as steps S232 to S234;

[0037] S2355. Perform the same operation as steps S232 to S233, but after the detachable corbel is removed, the tooling is no longer lifted.

[0038] As one aspect of a disassembly process method of a shore container crane of the present invention, the S24 comprises the following steps:

[0039] S241. Check the temporary reinforcement of the lower beam and door legs, and remove the tooling after confirming that they are correct;

[0040] S242. Use a car crane to lift the trolley assembly to the ground;

[0041] S243. Use a truck crane to further dismantle the upper structure of the opposite shore bridge to the ground;

[0042] S244. Remove the remaining door frames and carts from top to bottom;

[0043] S245. Each component is further subdivided and disassembled on the ground according to user requirements and transportation methods.

[0044] By adopting the above technical solution, the present invention has the following advantages:

[0045] The present invention provides a dismantling process method for a shore container crane, and designs and transforms the existing hydraulic jacking heightening tooling to make it modular, standardized, lightweight, and adjustable for dismantling shore cranes; and by optimizing the process, the modified tooling (i.e., hydraulic jacking tower dismantling tooling) is suitable for batch dismantling of shore cranes of various models in multiple scenarios. By alternately using detachable brackets, the shore crane portal legs are dismantled in a ladder-like cycle from bottom to top in the order of lifting, cutting, lowering, and adjusting, until the upper structure of the shore crane falls to a specified height, and then further dismantled with a truck crane. Avoid the problem of using a large-tonnage truck crane at high altitude for a long time and the center of gravity shift of the upper structure of the shore crane during the dismantling process. At the same time, by reasonably designing the standard section height of the tooling and the screw-type detachable bracket, the number of door leg cutting times and the welding workload on the construction site are minimized, and environmental pollution such as smoke, grinding, and paint touch-up is reduced. The dismantling process method of the shore container crane is a safe, reliable and economical dismantling process method. Due to its intelligent, green and efficient characteristics, it has a strong technical competitive advantage in the shore crane dismantling market. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Other features, objectives and advantages of the present invention will become more apparent from a reading of the detailed description of non-limiting embodiments made with reference to the following accompanying drawings.

[0047] Figure 1 It is a structural schematic diagram of a hydraulic jacking type heightening tool in the prior art;

[0048] Figure 2 It is a structural schematic diagram of the modified hydraulic jacking tower dismantling tooling;

[0049] Figure 3 It is a structural schematic diagram of the screw-type detachable bracket of the present invention;

[0050] Figure 4It is a schematic diagram of the process of disassembling the quay crane door frame of the present invention. DETAILED DESCRIPTION

[0051] The technical solution of the present invention is specifically described below in conjunction with the drawings in the specification. The detailed features and advantages of the present invention are described in detail in the specific implementation mode. The content is sufficient to enable any technical personnel in the field to understand the technical content of the present invention and implement it accordingly. According to the description, claims and drawings disclosed in this specification, the technical personnel in the field can easily understand the relevant purposes and advantages of the present invention.

[0052] Figure 1 The schematic diagram of the hydraulic lifting heightening tool in the prior art is shown, and the structure and working principle of the tool are disclosed. The hydraulic lifting heightening tool in the prior art includes an upper structure and a lower structure. Figure 1 As shown, the four supporting beams 8 of the upper structure are in contact with the quay crane. The hydraulic jacking system of the lower structure uses jacks to synchronously lift the material blocks, driving the jacking beams to achieve the lifting effect. The four-corner vertical jacking structure falls outside the quay crane.

[0053] The present invention provides a method for disassembling a shore container crane, comprising the following steps:

[0054] S1. Reconstruct the structure of the existing hydraulic lifting tooling, and shrink the structure in the track gauge and base distance direction into the quay crane door frame for dismantling of the quay crane;

[0055] Figure 2 The structure of the hydraulic jacking and heightening tooling after modification is shown. The modified hydraulic jacking and heightening tooling consists of an electromechanical and hydraulic integrated lifting system, a base 1, a standard section 2, a jacking beam 7, a detachable corbel 3, a lower support beam 4, a connecting rod 5, and a barrel and a material block 6. Figure 2 shown.

[0056] Among them, the electromechanical and hydraulic integrated lifting system performs lifting operations through the synchronous operation of the hydraulic pump station, oil cylinder and computer control. The oil cylinder anchor has a reverse motion self-locking function and can be reliably locked at any position during the lifting process. Computer control can achieve millimeter-level fine-tuning function, which plays a role in precise positioning and compensation of deviations.

[0057] The base 1 falls on the lower crossbeam near the inner side of the door leg, and the electromechanical and hydraulic integrated lifting system is embedded in it. Above it are the standard section 2, the lifting beam 7 and the detachable bracket 3. The standard section 2 adopts a tower design to achieve the purpose of lightweight design. The lifting beam 7 is placed in the slide track of the standard section 2 and on the lifting pin of the base 1 (when the pin is closed).

[0058] The detachable corbel 3 adopts a detachable screw type, and at least two sets are prepared for repeated alternating use; when positioning, try to align it with the door leg cross partition to reduce the workload of strengthening the box body. Figure 3 The schematic diagram of the structure of the screw-type detachable bracket is shown, wherein: Figure 3 (a) is a front view of a screw-type detachable bracket; Figure 3 (b) is a side view of a screw-type detachable corbel; the detachable corbel 3 is composed of a corbel body, a screw 31 and auxiliary accessories such as a shear block 32. Figure 3 As shown. The screw 31 penetrates into the quay crane structure box, and by tightening the nut, the horizontal force generated during the jacking operation is effectively shared. The vertical force is transmitted to the quay crane structure through the bracket body and the shear block 32, which plays a jacking role. The detachable bracket 3 has the advantages of modularization, fast assembly, less welding and reusability.

[0059] The material block is placed in the barrel, and the barrel is placed on both sides of the standard section 2. When the material block falls from the bottom of the barrel to the base 1 and is pushed above the hydraulic jack, the lifting pin is opened, and the jack lifts the material block, driving the lifting beam 7 and the detachable bracket 3 in turn, so that the quay crane body rises; the lower support beam 4 and the connecting rod 5 are connected by bolts and an adjustable module is set.

[0060] S1 includes the following specific steps:

[0061] S11. The upper and lower structures of the hydraulic lifting tooling are modified. The upper structure transforms the original four "cross-shaped" supporting beams 8 into four detachable brackets 3, which can be repeatedly assembled on the gantry legs for lifting. The lower structure cancels the original ground-type load-bearing beam 9 and transforms it into a riding beam structure, which falls on the lower supporting beam 4 of the gantry, which can reduce the occupation of the construction site;

[0062] S12. The tooling structure in the gauge and base direction is reduced, and adjustable modules are set in the middle of the structure in both directions to meet the dismantling requirements of quay cranes with different trolley gauges and door frame net widths. The hydraulic jacking system at the bottom of the tooling synchronously lifts the material block 6 through the jack, and successively drives the jacking beam 7 and the detachable bracket 3, so that the quay crane body rises and falls accordingly.

[0063] By modifying the upper and lower structures of the hydraulic lifting tooling, the structures in the track gauge and base distance directions are retracted into the quay crane door frame to adapt to the dismantling conditions. After the modification, the tooling can lift a design load of 2000t (the ultimate load is 2400t), and can achieve a maximum lifting range of 10m. This tooling adopts a fully detachable assembly joint with three-way adjustable functions (i.e., sea and land side, inside and outside, and height direction), which can reduce installation and adjustment time and ensure the quality of use. In addition, after all tooling components are disassembled, the smallest unit can be placed in a container for transportation, reducing transportation costs.

[0064] Figure 4The diagram shows the most important part of the disassembly process of the shore container crane, namely the door frame disassembly process.

[0065] S2. Through process optimization, the door frame of the shore container crane is dismantled using the modified hydraulic jacking and heightening tooling.

[0066] S2 includes the following steps:

[0067] S21. Preliminary preparation process;

[0068] Wherein, S21 includes the following specific steps:

[0069] S211. The trolley moves between the door frames and anchors;

[0070] S212. Install the door frame support in advance;

[0071] S213. Utilize the 90° steering function of the quay crane trolley to move the quay crane toward the land side to the projection area below the front beam, which is completely within the land area of ​​the terminal.

[0072] S22. Tooling installation process;

[0073] S22 includes the following specific steps:

[0074] S221. Assemble the modified hydraulic lifting tooling and test the electromechanical and hydraulic integrated lifting system of the modified hydraulic lifting tooling;

[0075] S222. Consider the location of the detachable corbel installation based on the height of the door legs of the modified hydraulic jacking and raising tooling and the height of the standard section.

[0076] S23. Door frame disassembly process;

[0077] S23 includes the following steps: Figure 4 As shown:

[0078] S231. Install two detachable brackets from bottom to top, draw lines to locate the cutting line, and add blocks one by one until the first bracket (counting from bottom to top, the following ones are in the same direction) contacts and presses against the lifting beam 7, so that the force of the quay crane body is transferred to the tooling;

[0079] S232. First cutting: cutting off the door legs, etc., and using the lifting equipment to separate the cut part from the main body;

[0080] S233. The tooling takes the material blocks one by one until the door leg is lowered to contact with the lower beam to remove the first removable bracket. The tooling adds material blocks together with S231 until the second removable bracket contacts and leans against the lifting beam;

[0081] S233 includes the following specific steps:

[0082] S2331. The tooling takes the material blocks one by one until the door leg descends to contact the lower crossbeam, and temporarily provides rigid fixing protection at the contact point;

[0083] S2332. After removing the first corbel, the tooling and S231 adding blocks are in contact and secure with the second removable corbel and the lifting beam.

[0084] S234. Install the removed detachable corbel to the preparation point required for the next cutting, and draw the line for the next cutting line in step S231;

[0085] S235. Cut and remove in a cycle in batches until the specified height is reached.

[0086] S235 includes the following specific steps:

[0087] S2351. Same as steps S232 to S233, the second cutting, but after the detachable corbel is removed, the tooling is not lifted;

[0088] S2352. Remove the standard sections, connecting rods, barrels and blocks on the upper layer of the hydraulic lifting and heightening tooling after modification;

[0089] S2353. After the tooling is added to the second removable corbel and the jacking beam in contact and close to the solid, the same operation is performed as in step S231;

[0090] S2354. The third removal, the same operation as steps S232 to S234;

[0091] S2355. Cut off the legs for the fourth time, and operate in the same way as steps S232 to S233, but after the detachable corbel is removed, the tooling is no longer lifted.

[0092] S24. Subsequent disassembly process.

[0093] S24 includes the following specific steps:

[0094] S241. Check the temporary reinforcement of the lower beam and door legs, and remove the tooling after confirming that they are correct;

[0095] S242. Use a car crane to lift the trolley assembly to the ground;

[0096] S243. Use a truck crane to further dismantle the upper structure of the opposite shore bridge to the ground;

[0097] S244. Remove the remaining door frames and carts from top to bottom;

[0098] S245. Each component is further subdivided and disassembled on the ground according to user requirements and transportation methods.

[0099] Finally, it should be pointed out that although the present invention has been described with reference to the current specific embodiments, ordinary technicians in this technical field should realize that the above embodiments are only used to illustrate the present invention and are not used as a limitation of the present invention. Various equivalent changes or substitutions can be made without departing from the concept of the present invention. Therefore, as long as the changes and modifications to the above embodiments are within the essential spirit of the present invention, they will fall within the scope of the claims of the present invention.

Claims

1. A method for dismantling a shore container crane, characterized in that: The following steps are involved: S1. Reconstruct the structure of the existing hydraulic lifting tooling, and shrink the structure in the track gauge and base distance direction into the quay crane door frame for dismantling of the quay crane; S2. Through process optimization, the door frame of the shore container crane is dismantled using the modified hydraulic jacking and heightening tooling.

2. A method for dismantling a shore container crane according to claim 1, characterized in that: The S1 comprises the following steps: S11. The upper and lower structures of the hydraulic lifting tooling were remodeled. The upper structure changed the original four crisscross beams into four removable brackets, and the lower structure cancelled the original floor-type load-bearing beams and was remodeled into a riding beam structure; S12. The tooling structure in the track gauge and base distance directions is reduced, and adjustable modules are respectively provided in the middle section of the structure in the track gauge and base distance directions.

3. The method for dismantling a shore container crane according to claim 1, characterized in that: The S2 comprises the following steps: S21. Preliminary preparation process; S22. Tooling installation process; S23. Door frame disassembly process; S24. Subsequent disassembly process.

4. A method for dismantling a shore container crane according to claim 3, characterized in that: The S21 comprises the following steps: S211. The trolley moves between the door frames and anchors; S212. Install the door frame support in advance; S213. Use the trolley of the quay crane to turn 90 degrees and pull the quay crane to move to the land side to the projection area under the front beam, which is completely within the land area of ​​the terminal.

5. The method for dismantling a shore container crane according to claim 3, characterized in that: The S22 comprises the following steps: S221. Assemble the modified hydraulic lifting tooling and test the electromechanical and hydraulic integrated lifting system of the modified hydraulic lifting tooling; S222. Consider the location of the detachable corbel installation based on the height of the door legs of the modified hydraulic jacking and raising tooling and the height of the standard section.

6. A method for dismantling a shore container crane according to claim 5, characterized in that: The S23 comprises the following steps: S231. Install two removable brackets from bottom to top, draw lines to locate the cutting line, and add blocks one by one until the first removable bracket contacts and leans against the lifting beam, so that the force of the quay crane body is transferred to the tooling; S232. Cut off the door legs and separate the cut parts from the main body using a lifting device; S233. The tooling takes the material blocks one by one until the door leg is lowered to contact with the lower beam to remove the first removable bracket. The tooling adds material blocks together with S231 until the second removable bracket contacts and leans against the lifting beam; S234. Install the removed detachable corbel to the preparation point required for the next cutting, and draw the line for the next cutting line in step S231; S235. Cut and remove in a cycle in batches until the specified height is reached.

7. A method for dismantling a shore container crane according to claim 6, characterized in that: The S233 comprises the following steps: S2331. The tooling takes the material blocks one by one until the door leg descends to contact the lower crossbeam, and temporarily provides rigid fixing protection at the contact point; S2332. After removing the first corbel, the tooling and S231 adding blocks are in contact and secure with the second removable corbel and the lifting beam.

8. The method for dismantling a shore container crane according to claim 6, characterized in that: The S235 comprises the following steps: S2351. Same as steps S232 to S233, but after the detachable bracket is removed, the tooling is not lifted; S2352. Remove the standard sections, connecting rods, barrels and blocks on the upper layer of the hydraulic lifting and heightening tooling after modification; S2353. After the tooling is added to the second removable corbel and the jacking beam in contact and close to the solid, the same operation is performed as in step S231; S2354. The same operation as steps S232 to S234; S2355. Perform the same operation as steps S232 to S233, but after the detachable corbel is removed, the tooling is no longer lifted.

9. The method for dismantling a shore container crane according to claim 3, characterized in that: The S24 comprises the following steps: S241. Check the temporary reinforcement of the lower beam and door legs, and remove the tooling after confirming that they are correct; S242. Use a car crane to lift the trolley assembly to the ground; S243. Use a truck crane to further dismantle the upper structure of the opposite shore bridge to the ground; S244. Remove the remaining door frames and carts from top to bottom; S245. Each component is further subdivided and disassembled on the ground according to user requirements and transportation methods.

Citation Information

Patent Citations

  • Hoisting platform capable of being lifted and disassembled and application method thereof

    CN101618835A

  • Jacking type heightening equipment

    CN103964300A

  • Lifting bracket and lifting bracket structure

    CN209161430U

  • Kranaufbocksystem

    DE102022110726A1

  • Ship's cargo unloading crane - has guides allowing stowage of gantry in hold after removal of tower legs at sides of hold

    FR2428565A1