Injection molding machine pull rod failure early warning method, system and device and storage medium

By analyzing the real-time and historical peaks of the mold locking pressure of the injection molding machine, and determining and outputting a pull rod failure warning in advance, the problem of difficult to early warning of pull rod fatigue and fracture in the prior art is solved, and production safety and efficiency are improved.

CN118927556APending Publication Date: 2024-11-12HAITIAN PLASTICS MACHINERY GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410921874.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

It is difficult for existing injection molding machines to early warning of fatigue fracture failure of the pull rod. Usually, it is discovered only after the break occurs through the machine's inability to lock the mold or the product flash, resulting in the inability to early warning.

Method used

By obtaining the real-time peak and historical peak of the mode locking pressure, calculating the average peak and peak drop, combining preset parameters for analysis, judging and outputting the pull rod failure warning information to ensure that early warning is provided before cracks appear on the pull rod.

Benefits of technology

The advance warning of the failure of the tie rod is achieved, unnecessary operations when replacing the mold or adjusting the locking force after breaking is avoided, and production safety and efficiency are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118927556A_ABST
    Figure CN118927556A_ABST
Patent Text Reader

Abstract

The invention relates to an early warning method, system and device for failure of a pull rod of an injection molding machine and a storage medium, and relates to the technical field of injection molding machines. Selecting an initial preset peak value, selecting a real-time peak value of the mold locking pressure corresponding to the number value, and calculating an average value as an average peak value of the mold locking pressure; analyzing according to the average peak value of the mold locking pressure to determine a pull rod failure early warning parameter value; and analyzing according to the real-time peak value of the mold locking pressure, the average peak value of the mold locking pressure and the pull rod failure early warning parameter value to determine a failure early warning judgment execution scheme, and executing the failure early warning judgment execution scheme to perform failure early warning. The method has the effect of early warning the failure condition of the pull rod in advance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of injection molding machines, and in particular to a method, system, device and storage medium for early warning of failure of a tie rod of an injection molding machine. Background Art

[0002] An injection molding machine is a main molding equipment used to heat thermoplastics or thermosetting plastics into a molten state and use plastic molding molds to make plastic products of various shapes. It is widely used in automobile manufacturing, furniture manufacturing, toy manufacturing and other fields.

[0003] Three-plate injection molding machine is a common type of injection molding machine, mainly used for the production of plastic products. As an important part of three-plate injection molding machine, the tie rod bears the clamping and expanding forces. When the three-plate injection molding machine is working, the tie rod needs to continuously go through the cycle of clamping, expanding and opening the mold, which makes it easy to fail due to fatigue fracture.

[0004] At present, the failure of the tie rod due to fatigue fracture is generally understood when the machine cannot complete the clamping process or the product has serious flash. At this time, the tie rod has already broken, making it difficult to warn of the failure of the tie rod in advance. Summary of the invention

[0005] In order to give early warning of tie rod failure, the present invention provides a tie rod failure warning method, system, device and storage medium for an injection molding machine.

[0006] In a first aspect, the present invention provides a method for early warning failure of a tie rod of an injection molding machine, which adopts the following technical solution:

[0007] An injection molding machine tie rod failure early warning method, comprising:

[0008] Get the real-time peak value of clamping pressure of each mold during operation;

[0009] Select the initial preset peak value, select the real-time peak value of the clamping pressure corresponding to the value, and calculate the average value as the average peak value of the clamping pressure;

[0010] Analyze the average peak value of clamping pressure to determine the tie rod failure warning parameter value;

[0011] An analysis is performed based on the real-time peak value of the clamping pressure, the average peak value of the clamping pressure and the tie rod failure warning parameter value to determine the failure warning judgment execution plan, and the failure warning judgment execution plan is executed to perform a failure warning.

[0012] Optional failure warning judgment execution solutions include:

[0013] The difference between the real-time peak value of the clamping pressure and the average peak value of the clamping pressure is calculated and used as the peak drop amount;

[0014] According to the comparison between the peak value of the drop and the pull rod failure warning parameter value, the drop warning count value is determined;

[0015] If and only if the descent warning count value is greater than the preset descent warning reference value, the preset pull rod failure warning information is output.

[0016] Optionally, a method for determining the pull rod failure warning parameter value includes:

[0017] Analyze the average peak value of the clamping pressure and the preset failure parameter ratio value to determine the current failure warning parameter value;

[0018] When no mold replacement information or clamping pressure adjustment information is received, the current failure warning parameter value is used as the tie rod failure warning parameter value.

[0019] Optionally, the method further includes steps after determining the current failure warning parameter value, which are as follows:

[0020] When receiving mold replacement information or clamping pressure adjustment information, query and obtain the historical peak value and measurement accuracy of clamping pressure;

[0021] Select the historical peak value of the clamping pressure corresponding to the last preset peak value and calculate the average value of the difference between the peak value and the average peak value of the clamping pressure as the historical peak value decline average value;

[0022] Based on the preset failure warning judgment parameter value calculation formula, the current failure warning parameter value, the average peak value of the clamping pressure and the average value of the historical peak value drop are analyzed and calculated to obtain the failure warning judgment parameter value;

[0023] According to the corresponding relationship between the measurement accuracy value and the preset early warning judgment reference value, the early warning judgment reference value corresponding to the measurement accuracy value is determined;

[0024] The failure warning parameter adjustment value is determined based on the comparison result between the failure warning judgment parameter value and the warning judgment reference value, and the failure warning parameter adjustment value is used as the tie rod failure warning parameter value.

[0025] Optionally, the calculation formula of the failure warning judgment parameter value is specifically: δ=S1'*(α-γ) / (S'-γ);

[0026] Among them, δ is the failure warning judgment parameter value;

[0027] S1' is the average peak value of the clamping pressure after receiving the mold change information or the clamping pressure adjustment information;

[0028] α is the current failure warning parameter value;

[0029] S' is the average peak value of the clamping pressure before receiving the mold change information or the clamping pressure adjustment information;

[0030] γ is the average value of the historical peak decline.

[0031] Optionally, a method for determining the failure warning parameter adjustment value includes:

[0032] Determine whether the failure warning judgment parameter value is less than the warning judgment reference value;

[0033] If yes, then the sum of the failure warning judgment parameter value and the warning judgment reference value is calculated and used as the failure warning parameter comprehensive value, and the failure warning parameter comprehensive value is used as the failure warning parameter adjustment value;

[0034] If not, the failure warning judgment parameter value is used as the failure warning parameter adjustment value.

[0035] Optionally, the method further includes a step after taking the comprehensive value of the failure warning parameter as the adjustment value of the failure warning parameter, which is specifically as follows:

[0036] Based on the acquisition of the comprehensive value of the failure warning parameter, counting is performed and used as the comprehensive parameter count value;

[0037] If and only if the comprehensive parameter count value is greater than the preset comprehensive parameter count reference value, the execution of the failure warning judgment execution plan is suspended, and the preset pull rod failure warning information is output.

[0038] In a second aspect, the present invention provides an injection molding machine tie rod failure warning system, which adopts the following technical solution:

[0039] An injection molding machine tie rod failure warning system, comprising:

[0040] An acquisition module is used to obtain the real-time peak value of the clamping pressure, the historical peak value of the clamping pressure and the measurement accuracy value;

[0041] A memory for storing a program of the method for early warning failure of a tie rod of an injection molding machine as described in any one of the first aspects;

[0042] The program in the processor memory can be loaded and executed by the processor to implement the injection molding machine tie rod failure warning method as described in any one of the first aspects.

[0043] In a third aspect, the present invention provides a pull rod failure warning device for an injection molding machine, which adopts the following technical solution:

[0044] A device for early warning of tie rod failure of an injection molding machine comprises a memory and a processor, wherein the memory stores a computer program that can be loaded by the processor and executes a method for early warning of tie rod failure of an injection molding machine as described in any one of the first aspects.

[0045] In a fourth aspect, the present invention provides a computer storage medium capable of storing a corresponding program, which has the characteristic of being easy to implement early warning of the failure of the tie rod, and adopts the following technical solution:

[0046] A computer storage medium stores a computer program that can be loaded by a processor and executes the method for early warning of failure of a tie rod of an injection molding machine as described in any one of the first aspects.

[0047] In summary, the present invention includes at least one of the following beneficial technical effects:

[0048] 1. The average peak value of the clamping pressure is obtained by selecting and calculating the real-time peak value of the clamping pressure, and the tie rod failure warning parameter value is determined by the average peak value of the clamping pressure. Then, the failure warning judgment execution plan is determined and executed through the real-time peak value of the clamping pressure, the average peak value of the clamping pressure and the tie rod failure warning parameter value, so as to make a failure warning judgment on the tie rod in real time, thereby achieving the purpose of early warning of the tie rod failure;

[0049] 2. By judging whether mold replacement information or clamping pressure adjustment information is received, the tie rod failure warning parameter values ​​are analyzed and obtained respectively to improve the accuracy of the obtained tie rod failure warning parameter values, thereby improving the accuracy of the tie rod failure warning when the mold is replaced or the clamping pressure is adjusted;

[0050] 3. By obtaining the comprehensive parameter count value and judging it with the preset comprehensive parameter count reference value, if and only if the comprehensive parameter count value is greater than the preset comprehensive parameter count reference value, the failure warning judgment execution plan is suspended, and the preset tie rod failure warning information is output, thereby preventing the mold from being replaced or the clamping force from being adjusted just after the tie rod cracks but before the alarm is sounded. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is a flow chart of the method for early warning of failure of a tie rod of an injection molding machine according to an embodiment of the present application.

[0052] Figure 2 It is a method flow chart of the failure warning judgment execution scheme of an embodiment of the present application.

[0053] Figure 3 It is a method flow chart of a method for determining a pull rod failure warning parameter value according to an embodiment of the present application.

[0054] Figure 4 It is a method flow chart of a method for determining a failure warning parameter adjustment value according to an embodiment of the present application.

[0055] Figure 5 It is a system flow chart of the injection molding machine tie rod failure warning in an embodiment of the present application.

[0056] Explanation of the accompanying drawings: 1. Acquisition module; 2. Memory; 3. Processor. DETAILED DESCRIPTION

[0057] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the following Figure 1-5 It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0058] The embodiment of the invention discloses a method for early warning of failure of a tie rod of an injection molding machine.

[0059] Reference Figure 1 , a method for early warning failure of a tie rod of an injection molding machine includes:

[0060] Step S100: obtaining the real-time peak value of the clamping pressure of each mold during operation.

[0061] The real-time peak value of the clamping pressure refers to the maximum pressure value applied by the mold in the injection molding machine when each mold process is closed at the current time. The real-time peak value of the clamping pressure is detected and obtained by a pressure detection device preset on the injection molding machine.

[0062] Step S200: Select the real-time peak value of the clamping pressure corresponding to the peak value selected from the initial preset peak value and calculate the average value to serve as the average peak value of the clamping pressure.

[0063] Among them, the average peak value of the clamping pressure refers to the average value corresponding to the selected peak value selection, and the peak value selection value refers to the value of the pressure peak value that needs to be selected when calculating the average peak value of the clamping pressure. The peak value selection value is obtained by querying the database storing the peak value selection value. After selecting the initial obtained real-time peak value of the clamping pressure to obtain the number corresponding to the peak value selection value, the average value of the real-time peak value of the clamping pressure corresponding to the selected peak value selection value is calculated and used as the average peak value of the clamping pressure for subsequent use.

[0064] Furthermore, in order to improve the accuracy of the peak value selection, the following steps are also included before step S200.

[0065] Step S210: Obtain the tie rod material information and the current production target value.

[0066] The tie rod material information refers to the material information of the current tie rod, and the tie rod material information is obtained through pre-input by the operator. The current production target value refers to the target value that needs to be achieved in the current production time, and the current production target value is obtained through pre-input by the operator.

[0067] Step S220: Retrieve the material history value based on the pull rod material information.

[0068] The material history count value refers to the number of times the material to which the pull rod belongs has been used in historical time, and the material history count value is obtained by querying a database storing the material history count values.

[0069] Step S230: Calculate the average of the material history times and use it as the material history average.

[0070] The material historical average value refers to the average number of times the material to which the pull rod belongs has been used in history. The average value of all material historical times is calculated and used as the material historical average value for convenience in subsequent use.

[0071] Step S240: determining a material history selected value corresponding to the material history average value according to a correspondence between the material history average value and a preset material history selected value.

[0072] The material history selection value refers to the value selected based on the number of times the pull rod material has been used in history. The material history selection value is obtained by querying a database storing the material history selection values. The material history selection value is determined by querying the material history average value, which is convenient for subsequent use.

[0073] Step S250: Determine a production target selection value corresponding to the current production target value according to a corresponding relationship between the current production target value and a preset production target selection value.

[0074] The production target selection value refers to the value selected based on the current production target, and the production target selection value is obtained by querying the database storing the production target selection value. The production target selection value is determined by querying the current production target value, which is convenient for subsequent use.

[0075] Step S260: Calculate the difference between the material history selection number value and the production target selection number value and use it as the target selection number deviation value.

[0076] Among them, the target selection number deviation value refers to the deviation value when the number selected according to the production target deviates. The difference between the material historical selection number value and the production target selection number value is calculated and used as the target selection number deviation value for subsequent use.

[0077] Step S270: determining a selection number adjustment value according to whether the target selection number deviation value falls within a preset number deviation reference interval, and using the selection number adjustment value as the peak selection number value.

[0078] Among them, the number deviation reference interval refers to the reference interval that can be tolerated by the number deviation caused by the production target, and the number deviation reference interval is obtained by querying from the database storing the number deviation reference interval. By analyzing the falling situation of the target selected number deviation value and the preset number deviation reference interval, when the target selected number deviation value falls into the number deviation reference interval, it means that the production target selected number value can be directly adopted at this time, so the production target selected number value is used as the selected number adjustment value, and the selected number adjustment value is used as the peak selected number value. When the target selected number deviation value does not fall into the number deviation reference interval, it means that the production target selected number value cannot be directly adopted at this time. Therefore, according to the corresponding relationship between the number deviation reference interval and the preset number deviation reference adjustment value, the number deviation reference adjustment value corresponding to the number deviation reference interval is determined, and the sum between the number deviation reference adjustment value and the material history selected number value is calculated and used as the number deviation correction value, and the number deviation correction value is used as the selected number adjustment value, and the selected number adjustment value is used as the peak selected number value, thereby improving the accuracy of the peak selected number value obtained.

[0079] Step S300: Analyze the average peak value of the clamping pressure to determine the tie rod failure warning parameter value.

[0080] The tie rod failure warning parameter value refers to a reference value used for warning of tie rod failure. The tie rod failure warning parameter value is determined by analyzing the average peak value of the clamping pressure, which is convenient for subsequent use.

[0081] Step S400: Analyze the real-time peak value of the clamping pressure, the average peak value of the clamping pressure and the tie rod failure warning parameter value to determine the failure warning judgment execution plan, and execute the failure warning judgment execution plan to perform a failure warning.

[0082] Among them, the failure warning judgment execution plan refers to the execution plan used to make a warning judgment on the failure of the tie rod. By analyzing the real-time peak value of the clamping pressure, the average peak value of the clamping pressure and the tie rod failure warning parameter value, the failure warning judgment execution plan is determined and executed to perform a failure warning, and then a failure warning judgment is made on the tie rod situation in real time, ultimately achieving the purpose of giving an early warning of the tie rod failure.

[0083] exist Figure 1 In step S300, in order to further ensure the rationality of the failure warning judgment execution plan, it is necessary to further analyze and calculate the failure warning judgment execution plan. Figure 2 The steps shown are explained in detail.

[0084] Reference Figure 2 ,The failure warning judgment execution scheme includes the following steps:

[0085] Step S410: Calculate the difference between the real-time peak value of the mold clamping pressure and the average peak value of the mold clamping pressure and use it as the peak drop amount.

[0086] The peak drop refers to the drop in the real-time peak value of the clamping pressure after the injection molding machine is running stably. The difference between the real-time peak value of the clamping pressure and the average peak value of the clamping pressure is calculated and used as the peak drop for subsequent use.

[0087] Step S420: Determine the descent warning count value according to the comparison between the peak descent amount and the pull rod failure warning parameter value.

[0088] Among them, the descent warning count value refers to the number of times corresponding to the count when the peak descent amount is greater than the pull rod failure warning parameter value. By analyzing the comparison between the peak descent amount and the pull rod failure warning parameter value, and counting when the peak descent amount is greater than the pull rod failure warning parameter value, the descent warning count value is determined for subsequent use.

[0089] Step S430: Outputting preset pull rod failure warning information when and only when the descent warning count value is greater than the preset descent warning reference value.

[0090] The descent warning benchmark value refers to the benchmark number of times that the descent amount can be tolerated, and the descent warning benchmark value is obtained by querying the database storing the descent warning benchmark value. The tie rod failure warning information refers to the warning information used for failure warning of the tie rod, and the tie rod failure warning information is obtained by querying the database storing the tie rod failure warning information.

[0091] If and only if the descent warning count value is greater than the preset descent warning reference value, it indicates that the damage on the tie rod is about to cause the tie rod to fail, so the preset tie rod failure warning information is output, thereby warning of the tie rod failure in advance.

[0092] exist Figure 1 In step S300, in order to further ensure the rationality of the pull rod failure warning parameter value, it is necessary to further analyze and calculate the pull rod failure warning parameter value separately, specifically by Figure 3 The steps shown are explained in detail.

[0093] Reference Figure 3 , the method for determining the pull rod failure warning parameter value includes the following steps:

[0094] Step S310: Analyze the average peak value of the clamping pressure and the preset failure parameter ratio value to determine the current failure warning parameter value.

[0095] Among them, the failure parameter ratio value refers to the ratio value required to calculate the failure warning parameter value, and the failure parameter ratio value is obtained by querying from the database storing the failure parameter ratio value. The current failure warning parameter value refers to the parameter value used when the failure warning is performed at the current time. The current failure warning parameter value is determined by analyzing the average peak value of the clamping pressure and the preset failure parameter ratio value, which is convenient for subsequent use.

[0096] Furthermore, in order to improve the accuracy of the acquired failure parameter ratio value, the following steps are included before step S310.

[0097] Step S311: determining the initial ratio value of the tie rod corresponding to the tie rod material information according to the corresponding relationship between the tie rod material information and the preset initial ratio value of the tie rod.

[0098] The initial ratio value of the tie rod refers to the initial ratio value of the tie rod according to the material, and the initial ratio value of the tie rod is obtained by querying the database storing the initial ratio value of the tie rod. The initial ratio value of the tie rod is determined by querying the tie rod material information, which is convenient for subsequent use.

[0099] Step S312: Obtaining the pull rod working condition information, the ambient temperature detection value and the ambient humidity detection value.

[0100] Among them, the tie rod working condition information refers to the detection information of the working condition of the tie rod, and the tie rod working condition information is obtained by reading the injection molding machine. The ambient temperature detection value refers to the detection value of the ambient temperature of the tie rod at the current time, and the ambient temperature detection value is detected and obtained by the temperature detection device preset on the injection molding machine. The ambient humidity detection value refers to the detection value of the ambient humidity of the tie rod at the current time, and the ambient humidity detection value is detected and obtained by the humidity detection device preset on the injection molding machine.

[0101] Step S313: Retrieve the pull rod load value and the pull rod usage time value based on the pull rod working condition information.

[0102] The rod load value refers to the load value of the rod when it is working, and the rod load value is obtained by querying from a database storing the rod load value. The rod usage time value refers to the cumulative duration value of the current rod working, and the rod usage time value is obtained by querying from a database storing the rod usage time value.

[0103] Step S314: determining the usage time impact value corresponding to the usage time value of the rod according to the correspondence between the usage time value of the rod and the preset usage time impact value.

[0104] The usage time impact value refers to the impact degree value when the cumulative usage time of the pull rod has an impact, and the usage time impact value is obtained by querying the database storing the usage time impact value. The usage time impact value is determined by querying the usage time value of the pull rod, which is convenient for subsequent use.

[0105] Step S315: determining the tie rod load influence value corresponding to the tie rod load value according to the corresponding relationship between the tie rod load value and the preset tie rod load influence value.

[0106] The tie rod load impact value refers to the impact value of the load on the tie rod when it is working, and the tie rod load impact value is obtained by querying the database storing the tie rod load impact value. The tie rod load impact value is determined by querying the tie rod load value, which is convenient for subsequent use.

[0107] Step S316: Calculate the sum of the usage time influence value and the tie rod load influence value and use it as the tie rod usage influence value.

[0108] The tie rod use impact value refers to the impact degree value of the tie rod when in use. The sum of the use time impact value and the tie rod load impact value is calculated and used as the tie rod use impact value to facilitate subsequent use.

[0109] Step S317: determining the environmental humidity impact interval corresponding to the environmental temperature detection value and the pull rod material information according to the corresponding relationship between the environmental temperature detection value, the pull rod material information and the preset environmental humidity impact interval.

[0110] The environmental humidity impact interval refers to the reference interval corresponding to the impact of environmental humidity, and the environmental humidity impact interval is obtained by querying from a database storing environmental humidity impact intervals. The environmental humidity impact interval is determined by querying the ambient temperature detection value and the pull rod material information, which is convenient for subsequent use.

[0111] Step S318: Determine the environmental impact value according to whether the environmental humidity detection value falls within the environmental humidity impact interval.

[0112] Among them, the environmental impact value refers to the degree of influence of the environment on the pull rod. By analyzing the fall between the environmental humidity detection value and the environmental humidity influence interval, when the environmental humidity detection value does not fall within the environmental humidity influence interval, it means that there will be no impact at this time, so the preset humidity baseline impact value is output and used as the environmental impact value. When the environmental humidity detection value falls within the environmental humidity influence interval, it means that there will be an impact at this time. According to the correspondence between the environmental humidity detection value and the preset humidity real-time impact value, the humidity real-time impact value corresponding to the environmental humidity detection value is determined, and the humidity real-time impact value is used as the environmental impact value.

[0113] Step S319: Calculate the product of the tie rod usage impact value and the environmental impact value and use it as the comprehensive impact value.

[0114] Among them, the comprehensive impact value refers to the degree of influence of the comprehensive impact on the proportion value. It is calculated by multiplying the pull rod use impact value and the environmental impact value and used as the comprehensive impact value for subsequent use.

[0115] Step S31A: Calculate the sum of the initial ratio value of the tie rod and the comprehensive influence value and use it as the tie rod ratio correction value, and use the tie rod ratio correction value as the failure parameter ratio value.

[0116] Among them, the tie rod ratio correction value refers to the correction value after the tie rod ratio value is corrected. The sum of the tie rod initial ratio value and the comprehensive influence value is calculated and used as the tie rod ratio correction value, and the tie rod ratio correction value is used as the failure parameter ratio value, thereby improving the accuracy of the obtained failure parameter ratio value.

[0117] Step S320: When no mold replacement information or clamping pressure adjustment information is received, the current failure warning parameter value is used as the tie rod failure warning parameter value.

[0118] Among them, mold replacement information refers to prompt information for indicating the replacement of the mold in the injection molding machine, and the mold replacement information is obtained by the operator's pre-input when the operator replaces the mold or by the system's automatic detection. Clamping pressure adjustment information refers to prompt information when the clamping pressure of the injection molding machine is adjusted, and the clamping pressure adjustment information is obtained by the operator's pre-input when the operator adjusts the clamping pressure or by the system's automatic detection.

[0119] When no mold replacement information or clamping pressure adjustment information is received, it indicates that the current state is a normal operating state, so the current failure warning parameter value is used as the tie rod failure warning parameter value, thereby improving the accuracy of the obtained tie rod failure warning parameter value.

[0120] Step S330: when mold replacement information or mold clamping pressure adjustment information is received, query and obtain the historical peak value and measurement accuracy value of the mold clamping pressure.

[0121] The historical peak value of the clamping pressure refers to the peak value of the clamping pressure detected in the historical time, and the historical peak value of the clamping pressure is obtained by querying the database storing the historical peak value of the clamping pressure. The measurement accuracy value refers to the accuracy value when collecting and measuring the peak value of the clamping pressure, and the measurement accuracy value is obtained by querying the database storing the measurement accuracy value.

[0122] When mold replacement information or clamping pressure adjustment information is received, it indicates that the mold is replaced or the clamping pressure is adjusted at this time, so the historical peak value and measurement accuracy value of the clamping pressure are queried and obtained for subsequent use.

[0123] Step S340: Select the historical peak value of the mold clamping pressure corresponding to the last preset peak value and calculate the average value of the difference between the peak value and the average peak value of the mold clamping pressure as the historical peak value drop average value.

[0124] The historical peak value drop average refers to the average value of the clamping pressure peaks selected in the historical time. It is selected by selecting the number corresponding to the last peak value in the historical peak value of the clamping pressure, and calculating the difference between the selected historical peak value of the clamping pressure and the average peak value of the clamping pressure. Then, the average value of the difference is calculated and used as the historical peak value drop average for subsequent use.

[0125] Step S350: Based on the preset failure warning judgment parameter value calculation formula, the current failure warning parameter value, the average peak value of the clamping pressure and the average value of the historical peak value drop are analyzed and calculated to obtain the failure warning judgment parameter value.

[0126] Among them, the failure warning judgment parameter value calculation formula refers to the formula for calculating the failure warning judgment parameter value, and the failure warning judgment parameter value calculation formula is obtained by querying the database storing the failure warning judgment parameter value calculation formula. The failure warning judgment parameter value calculation formula is specifically: δ = S1'*(α-γ) / (S'-γ); wherein δ is the failure warning judgment parameter value; S1' is the average peak value of the clamping pressure after receiving the mold replacement information or the clamping pressure adjustment information; α is the current failure warning parameter value; S' is the average peak value of the clamping pressure before receiving the mold replacement information or the clamping pressure adjustment information; γ is the average value of the historical peak value decline. The current failure warning parameter value, the average peak value of the clamping pressure, and the average value of the historical peak value decline are analyzed and calculated through the failure warning judgment parameter value calculation formula, so as to obtain the failure warning judgment parameter value, which is convenient for subsequent use.

[0127] For example, when S=100, α=6, and the mold is replaced after the machine has run for a period of time, γ=4 is obtained. After the mold is replaced, S1'=120. Now, by substituting it into the formula for calculation, the failure warning judgment parameter value δ=120*((6-4) / (100-4)=2.5 can be obtained.

[0128] Step S360: According to the correspondence between the measurement accuracy value and the preset early warning judgment reference value, the early warning judgment reference value corresponding to the measurement accuracy value is determined.

[0129] The early warning judgment reference value refers to the reference parameter value when making a failure early warning judgment, and the early warning judgment reference value is obtained by querying the database storing the early warning judgment reference value. The early warning judgment reference value is determined by querying the measurement accuracy value, which is convenient for subsequent use.

[0130] Step S370: determining a failure warning parameter adjustment value according to a comparison result between the failure warning judgment parameter value and the warning judgment reference value, and using the failure warning parameter adjustment value as the tie rod failure warning parameter value.

[0131] Among them, the failure warning parameter adjustment value refers to the parameter value after adjusting the failure warning parameter. The failure warning parameter adjustment value is determined by analyzing the comparison result between the failure warning judgment parameter value and the warning judgment reference value, and the failure warning parameter adjustment value is used as the tie rod failure warning parameter value, thereby improving the accuracy of the tie rod failure warning when the mold is replaced or the clamping pressure is adjusted.

[0132] exist Figure 3 In step S370, in order to further ensure the rationality of the failure warning parameter adjustment value, it is necessary to further analyze and calculate the failure warning parameter adjustment value. Figure 4 The steps shown are explained in detail.

[0133] Reference Figure 4 , the method for determining the failure warning parameter adjustment value includes the following steps:

[0134] Step S371: Determine whether the failure warning judgment parameter value is less than the warning judgment reference value. If yes, execute step S372; if no, execute step S373.

[0135] Here, by judging whether the failure warning judgment parameter value is less than the warning judgment reference value, it is judged whether the failure warning judgment parameter value can be used directly.

[0136] Step S372: Calculate the sum of the failure warning parameter value and the warning reference value and use it as the failure warning parameter comprehensive value, and use the failure warning parameter comprehensive value as the failure warning parameter adjustment value.

[0137] Among them, the comprehensive value of the failure warning parameter refers to the comprehensive parameter value after the failure warning parameter is adjusted. When the failure warning judgment parameter value is less than the warning judgment reference value, it means that the failure warning judgment parameter value cannot be used directly at this time. Therefore, the sum of the failure warning judgment parameter value and the warning judgment reference value is calculated and used as the comprehensive value of the failure warning parameter, and the comprehensive value of the failure warning parameter is used as the failure warning parameter adjustment value, thereby improving the accuracy of the obtained failure warning parameter adjustment value.

[0138] Step S373: Counting is performed based on the acquisition of the comprehensive value of the failure warning parameter and used as the comprehensive parameter count value.

[0139] The comprehensive parameter count value refers to the count value of counting the comprehensive value of the failure warning parameter. By counting the obtained comprehensive value of the failure warning parameter and using it as the comprehensive parameter count value, subsequent use is facilitated.

[0140] Step S374: When and only when the comprehensive parameter count value is greater than the preset comprehensive parameter count reference value, suspend the execution of the failure warning judgment execution plan and output the preset pull rod failure warning information.

[0141] The comprehensive parameter counting reference value refers to the maximum reference value that can be tolerated when counting the comprehensive parameter counting values, and the comprehensive parameter counting reference value is obtained by querying from a database storing the comprehensive parameter counting reference values.

[0142] When and only when the comprehensive parameter count value is greater than the preset comprehensive parameter count reference value, it means that when the mold is replaced or the clamping pressure is adjusted, there is already a crack in the tie rod. Therefore, the execution of the failure warning judgment execution plan is suspended, and the preset tie rod failure warning information is output, thereby improving the warning of tie rod failure.

[0143] Step S375: using the failure warning judgment parameter value as the failure warning parameter adjustment value.

[0144] Among them, when the failure warning judgment parameter value is not less than the warning judgment reference value, it means that the failure warning judgment parameter value can be used directly at this time, so the failure warning judgment parameter value is used as the failure warning parameter adjustment value.

[0145] Reference Figure 5 Based on the same inventive concept, an embodiment of the present invention provides an injection molding machine tie rod failure warning system, comprising:

[0146] Acquisition module 1, used to obtain the real-time peak value of the clamping pressure, the historical peak value of the clamping pressure and the measurement accuracy value;

[0147] Memory 2, used to store Figures 1 to 4 A procedure for the early warning method for failure of a tie rod of an injection molding machine as described in any one of the above;

[0148] Processor 3, the program in the memory can be loaded and executed by the processor and realize the following Figures 1 to 4 The injection molding machine tie rod failure early warning method described in any one of the above.

[0149] Based on the same inventive concept, an embodiment of the present invention provides an injection molding machine tie rod failure warning device, including a memory and a processor, the memory stores a program that can be loaded and executed by the processor. Figures 1 to 4A computer program for the injection molding machine tie rod failure early warning method described in any one of the above.

[0150] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional modules is used as an example. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. The specific working process of the system, device and unit described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0151] An embodiment of the present invention provides a computer storage medium storing a computer program that can be loaded and executed by a processor. Figures 1 to 4 A computer program for the injection molding machine tie rod failure early warning method described in any one of the above.

[0152] Computer storage media include, for example, various media that can store program codes, such as USB flash drives, mobile hard disks, read-only memories (ROM), random access memories (RAM), magnetic disks or optical disks.

[0153] The above are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Any feature disclosed in this specification (including the abstract and drawings), unless otherwise stated, can be replaced by other equivalent or alternative features with similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.

Claims

1. A method for early warning of failure of tie rod of injection molding machine, It is characterized in that include: Get the real-time peak value of the clamping pressure of each mold during operation; Select the initial preset peak value, select the real-time peak value of the clamping pressure corresponding to the value, and calculate the average value as the average peak value of the clamping pressure; Analyze the average peak value of clamping pressure to determine the tie rod failure warning parameter value; An analysis is performed based on the real-time peak value of the clamping pressure, the average peak value of the clamping pressure and the tie rod failure warning parameter value to determine the failure warning judgment execution plan, and the failure warning judgment execution plan is executed to perform a failure warning.

2. The method for early warning of failure of tie rod of injection molding machine according to claim 1, It is characterized in that The failure warning judgment execution plan includes: The difference between the real-time peak value of the clamping pressure and the average peak value of the clamping pressure is calculated and used as the peak drop amount; According to the comparison between the peak value of the drop and the pull rod failure warning parameter value, the drop warning count value is determined; If and only if the descent warning count value is greater than the preset descent warning reference value, the preset pull rod failure warning information is output.

3. The method for early warning of failure of tie rod of injection molding machine according to claim 1, It is characterized in that The method for determining the pull rod failure warning parameter value includes: Analyze the average peak value of the clamping pressure and the preset failure parameter ratio value to determine the current failure warning parameter value; When no mold replacement information or clamping pressure adjustment information is received, the current failure warning parameter value is used as the tie rod failure warning parameter value.

4. The method for early warning of failure of a tie rod of an injection molding machine according to claim 3, It is characterized in that The steps after determining the current failure warning parameter value are also included, which are as follows: When receiving mold replacement information or clamping pressure adjustment information, query and obtain the historical peak value and measurement accuracy of clamping pressure; Select the historical peak value of the clamping pressure corresponding to the last preset peak value and calculate the average value of the difference between the peak value and the average peak value of the clamping pressure as the historical peak value decline average value; Based on the preset failure warning judgment parameter value calculation formula, the current failure warning parameter value, the average peak value of the clamping pressure and the average value of the historical peak value drop are analyzed and calculated to obtain the failure warning judgment parameter value; According to the corresponding relationship between the measurement accuracy value and the preset early warning judgment reference value, the early warning judgment reference value corresponding to the measurement accuracy value is determined; The failure warning parameter adjustment value is determined based on the comparison result between the failure warning judgment parameter value and the warning judgment reference value, and the failure warning parameter adjustment value is used as the tie rod failure warning parameter value.

5. The method for early warning of failure of tie rod of injection molding machine according to claim 4, It is characterized in that The specific calculation formula of the failure warning judgment parameter value is: δ = S1'*(α-γ) / (S'-γ); Among them, δ is the failure warning judgment parameter value; S1' is the average peak value of the clamping pressure after receiving the mold change information or the clamping pressure adjustment information; α is the current failure warning parameter value; S' is the average peak value of the clamping pressure before receiving the mold change information or the clamping pressure adjustment information; γ is the average value of the historical peak decline.

6. The method for early warning of failure of tie rod of injection molding machine according to claim 4, It is characterized in that The method for determining the failure warning parameter adjustment value includes: Determine whether the failure warning judgment parameter value is less than the warning judgment reference value; If yes, then the sum of the failure warning judgment parameter value and the warning judgment reference value is calculated and used as the failure warning parameter comprehensive value, and the failure warning parameter comprehensive value is used as the failure warning parameter adjustment value; If not, the failure warning judgment parameter value is used as the failure warning parameter adjustment value.

7. The method for early warning of failure of tie rod of injection molding machine according to claim 6, It is characterized in that The method further includes the following steps after taking the failure warning parameter comprehensive value as the failure warning parameter adjustment value: Based on the acquisition of the comprehensive value of the failure warning parameter, counting is performed and used as the comprehensive parameter count value; If and only if the comprehensive parameter count value is greater than the preset comprehensive parameter count reference value, the execution of the failure warning judgment execution plan is suspended, and the preset pull rod failure warning information is output.

8. An injection molding machine tie rod failure warning system, It is characterized in that include: An acquisition module (1) is used to acquire the real-time peak value of the mold locking pressure, the historical peak value of the mold locking pressure and the measurement accuracy value; A memory (2), used for storing a program of a method for early warning failure of a tie rod of an injection molding machine according to any one of claims 1 to 7; A processor (3), wherein the program in the memory can be loaded and executed by the processor and implement the injection molding machine tie rod failure warning method as described in any one of claims 1 to 7.

9. An injection molding machine tie rod failure warning device, It is characterized in that The method comprises a memory and a processor, wherein the memory stores a computer program that can be loaded by the processor and executes the method for early warning of failure of a tie rod of an injection molding machine as claimed in any one of claims 1 to 7.

10. A computer storage medium, It is characterized in that A computer program is stored which can be loaded by a processor and execute the method for early warning of failure of a tie rod of an injection molding machine according to any one of claims 1 to 7.