High-speed train pantograph based on novel composite material
By adopting a tension-closing connection structure and an electric push rod driving carriage movement design in a high-speed rail EMU pantograph, the problem of fixing and unadjustable angle of the pantograph installation is solved, and flexible adjustment of angle and length is achieved, and the installation is improved. and the convenience of maintenance.
Patent Information
- Application Number
- CN202411261582.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-12
AI Technical Summary
The installation and fixation of high-speed rail EMUs lead to uneven force in the connection of multi-stage guide columns, which cannot be lifted normally, and the angle of traditional pantographs cannot be flexibly adjusted, which has limitations in use.
A high-speed rail EMU pantograph based on a new composite material is designed, adopting a tension-combination connection structure, including the first pillar, hydraulic cylinder, second pillar, extension rod and first bearing, and the carriage is driven to move through the electric push rod to realize Flexible angle adjustment and length adjustment of the power receiving plate.
It realizes flexible opening and opening of pantographs, which facilitates installation and maintenance, avoids stuck phenomenon, and improves the convenience of installation and maintenance.
Smart Images

Figure CN118928051A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of high-speed railway motor vehicle pantographs, in particular to a high-speed railway motor vehicle pantograph based on a novel composite material. Background Art
[0002] Pantographs are widely used in high-speed trains, but they are installed in four fixed shifts, which leads to uneven force between the multi-level guide columns, causing them to get stuck and unable to rise and fall normally, thus causing malfunctions. In addition, the angle of traditional high-speed train pantographs cannot be flexibly adjusted, and their use is limited. Summary of the invention
[0003] The purpose of the present invention is to solve the above problems and to design a high-speed train pantograph based on a new composite material.
[0004] The technical solution of the present invention to achieve the above-mentioned purpose is a high-speed train pantograph based on a new composite material, comprising a power receiving plate, a slide, an electric push rod and a mounting frame, the mounting frame is provided with a strip groove, the slide is arranged inside the strip groove, the electric push rod is arranged inside the strip groove, a first connecting frame is installed on the driving end of the electric push rod, the first connecting frame is connected to the moving end on the slide, and an opening and closing connection structure is installed on the slide; The opening and closing connection structure comprises: a first support, a hydraulic cylinder, a second support, an extension rod and a first bearing; The slide is provided with a first connecting seat, the first bearing is arranged on the first connecting seat, the first connecting rod is arranged on the first bearing, the first pillar is arranged on the first connecting rod, the first pillar is provided with a first plugging hole, the second bearing is inserted in the first plugging hole, the second connecting rod is provided on the second bearing, the second pillar is provided with a second connecting rod, the first driving mounting seat is provided on the first pillar, the hydraulic cylinder is arranged on the first driving mounting seat, the second connecting frame is provided on the driving end of the hydraulic cylinder, the second connecting frame is connected to the second pillar, the second pillar is provided with a slot, the guide rod is inserted in the slot, the sliding body is provided on the guide rod, the third connecting seat is provided on the sliding body, the extension rod is arranged on the third connecting seat, the extension rod is provided with a rectangular frame, the rectangular frame is provided with a rectangular slot, the third bearing is inserted in the rectangular slot, the third connecting rod is provided on the third bearing, the third connecting rod is provided with a top column, the bracket is provided on the top column, and the power receiving plate is arranged on the bracket.
[0005] A folding plate is installed on the lower wall surface of the mounting frame, a fourth threaded opening is opened on the folding plate, and a fourth screw is installed in the fourth threaded opening.
[0006] The sliding body is provided with an arc-shaped positioning plate, the arc-shaped positioning plate is provided with a third threaded opening, the second pillar is provided with a third threaded groove matching the third threaded opening, and a third screw matching the third threaded groove is inserted into the third threaded opening.
[0007] The second connecting rod is sleeved with a second annular washer, the second annular washer is provided with a second threaded opening, the second pillar is provided with a second threaded groove matching the second threaded opening, and a second screw matching the second threaded groove is inserted into the second threaded opening.
[0008] A first annular washer is installed on the first connecting rod, a first threaded opening is formed on the first annular washer, a first threaded groove matching the first threaded opening is formed on the first connecting seat, and a first screw connected to the first threaded groove is inserted into the first threaded opening.
[0009] A strip-shaped slide groove is provided in the strip-shaped groove, and a limiting rod inserted into the strip-shaped slide groove is installed at the movable end of the slide.
[0010] The third connecting rod is sleeved with a third circular washer, the third circular washer is provided with a fourth threaded opening, the rectangular slot wall is provided with a fourth threaded groove matching the fourth threaded opening, and a fourth screw matching the third threaded groove is installed in the fourth threaded opening.
[0011] A high-speed train pantograph based on a new composite material is manufactured using the technical solution of the present invention, and the opening and closing connection structure ensures opening and closing when in use, and is convenient and flexible to use. At the same time, the angle can be flexibly adjusted without getting stuck, which is convenient for installation and subsequent maintenance, and the length can be adjusted. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a structural schematic diagram of a high-speed train pantograph based on a novel composite material according to the present invention; Figure 2 This is a side view of the second support of a high-speed train pantograph based on a novel composite material according to the present invention; Figure 3 It is a side view of an arc-shaped positioning plate of a high-speed train pantograph based on a novel composite material according to the present invention; Figure 4 It is a side view of a rectangular frame of a high-speed train pantograph based on a novel composite material according to the present invention; Figure 5 This is a structural diagram of a first connection seat of a high-speed train pantograph based on a novel composite material according to the present invention; Figure 6 This is a structural diagram of a second connecting rod of a high-speed train pantograph based on a novel composite material according to the present invention; In the figure, 1, power receiving plate; 2, slide; 3, electric push rod; 4, mounting frame; 5, first connecting frame; 6, first pillar; 7, hydraulic cylinder; 8, second pillar; 9, extension rod; 10, first bearing; 11, first connecting seat; 12, first connecting rod; 13, second bearing; 14, second connecting rod; 15, first drive mounting seat; 16, second connecting frame; 17, guide rod; 18, slide; 19, third connecting seat; 20, rectangular frame; 21, third bearing; 22, third connecting rod; 23, top column; 24, bracket; 25, folding plate; 26, fourth screw; 27, arc positioning plate; 28, third screw; 29, second annular washer; 30, second screw; 31, first annular washer; 32, first screw; 33, limit rod; 34, third circular washer; 35, third screw. DETAILED DESCRIPTION
[0013] The present invention will be described in detail below in conjunction with the accompanying drawings. Figure 1-6As shown, a high-speed train pantograph based on a new composite material includes a power receiving plate 1, a slide 2, an electric push rod 3 and a mounting frame 4, a strip groove is opened on the mounting frame 4, the slide 2 is arranged inside the strip groove, the electric push rod 3 is arranged inside the strip groove, a first connecting frame 5 is installed on the driving end of the electric push rod 3, the first connecting frame 5 is connected to the moving end on the slide 2, and an opening and closing connection structure is installed on the slide 2; the opening and closing connection structure includes: a first support 6, a hydraulic cylinder 7, a second support 8, an extension rod 9 and a first bearing 10; a first connecting seat 11 is installed on the slide 2, the first bearing 10 is arranged on the first connecting seat 11, a first connecting rod 12 is installed on the first bearing 10, and the first support 6 is arranged on the first connecting rod 12. The first pillar 6 is provided with a first plugging hole, in which a second bearing 13 is inserted, a second connecting rod 14 is installed on the second bearing 13, a second pillar 8 is installed on the second connecting rod 14, a first driving mounting seat 15 is installed on the first pillar 6, the hydraulic cylinder 7 is placed on the first driving mounting seat 15, a second connecting frame 16 is installed on the driving end of the hydraulic cylinder 7, the second connecting frame 16 is connected to the second pillar 8, a slot is provided on the second pillar 8, a guide rod 17 is inserted in the slot, a sliding body 18 is installed on the guide rod 17, a third connecting seat 19 is installed on the sliding body 18, an extension rod 9 is placed on the third connecting seat 19, a rectangular frame 20 is installed on the extension rod 9, the rectangular frame 20 is provided with a rectangular slot, a third bearing 21 is inserted in the rectangular slot, and the third A third connecting rod 22 is installed on the bearing 21, a top column 23 is installed on the third connecting rod 22, a bracket 24 is installed on the top column 23, the power receiving board 1 is placed on the bracket 24, a folding plate 25 is installed on the lower wall of the mounting frame 4, a fourth threaded opening is provided on the folding plate 25, a fourth screw 26 is installed in the fourth threaded opening, an arc-shaped positioning plate 27 is installed on the sliding body 18, a third threaded opening is provided on the arc-shaped positioning plate 27, a third threaded opening is provided on the second pillar 8, a third threaded groove matching the third threaded opening is provided, a third screw 28 matching the third threaded groove is inserted in the third threaded opening, a second annular washer 29 is sleeved on the second connecting rod 14, a second threaded opening is provided on the second annular washer 29, a third threaded opening is provided on the second pillar 8, a third threaded opening matching the second threaded opening is provided on the second pillar 8 A first screw 32 connected to the first thread groove is inserted in the first threaded groove, a strip groove is provided in the strip groove, a limiting rod 33 inserted into the strip groove is provided at the moving end of the slide 2, a third circular washer 34 is mounted on the third connecting rod 22, a third threaded opening is provided on the third circular washer 34, a third threaded opening is provided on the wall of the rectangular groove, a third threaded groove matching the third threaded opening is provided, and a third screw 35 matching the third threaded groove is installed in the third threaded opening.
[0014] The characteristics of this implementation scheme are that it includes a power receiving plate 1, a slide 2, an electric push rod 3 and a mounting frame 4, a strip groove is opened on the mounting frame 4, the slide 2 is placed inside the strip groove, the electric push rod 3 is placed inside the strip groove, a first connecting frame 5 is installed on the driving end of the electric push rod 3, the first connecting frame 5 is connected to the moving end on the slide 2, and a stretching connection structure is installed on the slide 2. When in use, the stretching connection structure ensures that it is stretched and opened, and is convenient and flexible to use. At the same time, the angle can be flexibly adjusted without getting stuck, which is convenient for installation and subsequent maintenance, and the length can be adjusted.
[0015] In this embodiment, it includes a power receiving plate 1, a slide 2, an electric push rod 3 and a mounting frame 4, a strip groove is opened on the mounting frame 4, the slide 2 is placed inside the strip groove, the electric push rod 3 is placed inside the strip groove, a first connecting frame 5 is installed on the driving end of the electric push rod 3, the first connecting frame 5 is connected to the moving end on the slide 2, and an opening and closing connection structure is installed on the slide 2; It should be noted that: the mounting frame 4 facilitates the overall installation of the device, and the slide 2 in the strip groove serves to connect the moving end on the slide 2 with the electric push rod 3. The moving end of the electric push rod 3 can be extended and retracted to push the moving end on the slide 2 to move, and the moving end on the slide 2 moves to achieve the movement adjustment position of the opening and closing connection structure.
[0016] The opening and closing connection structure includes: a first support 6, a hydraulic cylinder 7, a second support 8, an extension rod 9 and a first bearing 10; A first connecting seat 11 is installed on the slide 2, a first bearing 10 is placed on the first connecting seat 11, a first connecting rod 12 is installed on the first bearing 10, a first pillar 6 is placed on the first connecting rod 12, a first plug hole is opened on the first pillar 6, a second bearing 13 is inserted in the first plug hole, a second connecting rod 14 is installed on the second bearing 13, a second pillar 8 is installed on the second connecting rod 14, a first driving mounting seat 15 is installed on the first pillar 6, a hydraulic cylinder 7 is placed on the first driving mounting seat 15, and a second connecting frame 16 is installed on the driving end of the hydraulic cylinder 7. The second connecting frame 16 is connected to the second pillar 8. A slot is provided on the second pillar 8. A guide rod 17 is inserted into the slot. A slide 18 is installed on the guide rod 17. A third connecting seat 19 is installed on the slide 18. The extension rod 9 is placed on the third connecting seat 19. A rectangular frame 20 is installed on the extension rod 9. The rectangular frame 20 is provided with a rectangular slot. A third bearing 21 is inserted into the rectangular slot. A third connecting rod 22 is installed on the third bearing 21. A top column 23 is installed on the third connecting rod 22. A bracket 24 is installed on the top column 23. The power receiving board 1 is placed on the bracket 24. It should be noted that: the first connecting seat 11 on the slide 2 plays a supporting role, and is used to support the first connecting rod 12 on the first bearing 10, so that the first connecting rod 12 can rotate, so that the first pillar 6 can swing to adjust the use angle, and the second bearing 13 on the first pillar 6 is installed with the second pillar 8 on the second connecting rod 14, and the second pillar 8 can swing, so that the first pillar 6 and the second pillar 8 can be opened and closed, and the use angle of the power receiving board 1 can be adjusted by opening and closing the angle, and the guide rod 17 on the second pillar 8 plays a supporting role, and is used to support the sliding body 18, and the sliding body 18 can be pulled to adjust the position to adjust the use position of the extension rod 9, and the extension rod 9 can move to adjust the use position of the power receiving board 1, and extend the use position, and then the third connecting rod 22 supported by the third bearing 21 on the rectangular frame 20 can rotate, so that the top column 23 swings, and the use angle of the power receiving board 1 is adjusted; As a preferred technical solution, further, a folding plate 25 is installed on the lower wall of the mounting frame 4, a fourth threaded opening is opened on the folding plate 25, and a fourth screw 26 is installed in the fourth threaded opening; the fourth screw 26 is used to fix the mounting frame 4, thereby fixing the device for use.
[0017] As a preferred technical solution, further, an arc-shaped positioning plate 27 is installed on the sliding body 18, a third threaded opening is opened on the arc-shaped positioning plate 27, a third threaded groove matching the third threaded opening is opened on the second pillar 8, and a third screw 28 matching the third threaded groove is inserted in the third threaded opening; the third screw 28 is used to facilitate fixing the sliding body 18, thereby fixing the use position of the sliding body 18.
[0018] As a preferred technical solution, further, the second connecting rod 14 is provided with a second annular washer 29, the second annular washer 29 is provided with a second threaded opening, the second pillar 8 is provided with a second threaded groove matching the second threaded opening, and a second screw 30 matching the second threaded groove is inserted in the second threaded opening; the second screw 30 is used to facilitate fixing the swing angle of the second connecting rod 14.
[0019] As a preferred technical solution, further, a first annular washer 31 is installed on the first connecting rod 12, a first threaded opening is opened on the first annular washer 31, a first threaded groove matching the first threaded opening is opened on the first connecting seat 11, and a first screw 32 connected to the first threaded groove is inserted in the first threaded opening; the first screw 32 is used to facilitate fixing the swing angle of the first connecting rod 12.
[0020] As a preferred technical solution, further, a strip-shaped slide groove is provided in the strip-shaped groove, and a limiting rod 33 inserted into the strip-shaped slide groove is installed at the moving end of the slide 2 .
[0021] As a preferred technical solution, further, a third circular washer 34 is mounted on the third connecting rod 22, a third threaded opening is provided on the third circular washer 34, a third threaded groove matching the third threaded opening is provided on the wall of the rectangular groove, and a third screw 35 matching the third threaded groove is installed in the third threaded opening.
[0022] The above technical solutions only reflect the preferred technical solutions of the technical solutions of the present invention. Some changes that may be made to certain parts thereof by technicians in this technical field all reflect the principles of the present invention and fall within the protection scope of the present invention.
Claims
1. A high-speed train pantograph based on a novel composite material, comprising a power receiving plate (1), a slide (2), an electric push rod (3) and a mounting frame (4), characterized in that: The mounting frame (4) is provided with a strip groove, the slide (2) is arranged inside the strip groove, the electric push rod (3) is arranged inside the strip groove, a first connecting frame (5) is installed on the driving end of the electric push rod (3), the first connecting frame (5) is connected to the moving end on the slide (2), and an opening and closing connection structure is installed on the slide (2).
2. The high-speed train pantograph based on the novel composite material according to claim 1 is characterized in that: The opening and closing connection structure comprises: a first support column (6), a hydraulic cylinder (7), a second support column (8), an extension rod (9) and a first bearing (10); The slide frame (2) is provided with a first connecting seat (11), the first bearing (10) is arranged on the first connecting seat (11), a first connecting rod (12) is arranged on the first bearing (10), the first pillar (6) is arranged on the first connecting rod (12), a first plug hole is provided on the first pillar (6), a second bearing (13) is inserted into the first plug hole, a second connecting rod (14) is arranged on the second bearing (13), a second pillar (8) is arranged on the second connecting rod (14), a first driving mounting seat (15) is arranged on the first pillar (6), the hydraulic cylinder (7) is arranged on the first driving mounting seat (15), a second connecting frame (16) is arranged on the driving end of the hydraulic cylinder (7), and the second The connecting frame (16) is connected to the second pillar (8); the second pillar (8) is provided with a slot, a guide rod (17) is inserted into the slot, a slide body (18) is installed on the guide rod (17), a third connecting seat (19) is installed on the slide body (18), the extension rod (9) is placed on the third connecting seat (19), a rectangular frame (20) is installed on the extension rod (9), the rectangular frame (20) is provided with a rectangular slot, a third bearing (21) is inserted into the rectangular slot, a third connecting rod (22) is installed on the third bearing (21), a top column (23) is installed on the third connecting rod (22), a bracket (24) is installed on the top column (23), and the power receiving plate (1) is placed on the bracket (24).
3. The high-speed train pantograph based on the novel composite material according to claim 1 is characterized in that: A folding plate (25) is installed on the lower wall surface of the mounting frame (4), a fourth threaded opening is provided on the folding plate (25), and a fourth screw (26) is installed in the fourth threaded opening.
4. The high-speed train pantograph based on the novel composite material according to claim 2 is characterized in that: An arc-shaped positioning plate (27) is mounted on the sliding body (18), a third threaded opening is formed on the arc-shaped positioning plate (27), a third threaded groove matching the third threaded opening is formed on the second support column (8), and a third screw (28) matching the third threaded groove is inserted into the third threaded opening.
5. The high-speed train pantograph based on the novel composite material according to claim 2 is characterized in that: The second connecting rod (14) is sleeved with a second annular washer (29), the second annular washer (29) is provided with a second threaded opening, the second support column (8) is provided with a second threaded groove matching the second threaded opening, and a second screw (30) matching the second threaded groove is inserted into the second threaded opening.
6. The high-speed train pantograph based on the novel composite material according to claim 2 is characterized in that: A first annular washer (31) is mounted on the first connecting rod (12), a first threaded opening is formed on the first annular washer (31), a first threaded groove matching the first threaded opening is formed on the first connecting seat (11), and a first screw (32) connected to the first threaded groove is inserted into the first threaded opening.
7. The high-speed train pantograph based on the novel composite material according to claim 1 is characterized in that: A strip-shaped slide groove is provided in the strip-shaped groove, and a limit rod (33) inserted into the strip-shaped slide groove is installed at the movable end of the slide frame (2).
8. The high-speed train pantograph based on the novel composite material according to claim 2 is characterized in that: The third connecting rod (22) is sleeved with a third circular washer (34), the third circular washer (34) is provided with a fourth threaded opening, the rectangular slot wall is provided with a fourth threaded groove matching the fourth threaded opening, and a fourth screw (35) matching the third threaded groove is installed in the fourth threaded opening.