Crawler-type transport vehicle, transport method, control system and readable storage medium
By designing a crawler transport vehicle with transportation and installation functions, the construction risks of high-power fans in limited space and harsh environments and the low attendance rate of equipment are solved, efficient installation and maintenance of wind power equipment is achieved, and construction costs are reduced and environmental damage.
Patent Information
- Application Number
- CN202411074842.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-12
AI Technical Summary
The use of crawler crane equipment required for installation of high-power fans in limited space and harsh environments brings construction risks and low equipment attendance problems, resulting in limited project quality and progress.
A crawler transport vehicle is designed with transportation and installation functions, including a crawler transport chassis, wind power equipment installation base and removable lifting cylinder, which can assemble wind power equipment in workshops or open fields and be realized through hydraulic systems and power boxes. Walking, combining GPS navigation and hydraulic pump modules to achieve automatic navigation and stable transportation.
It reduces construction risks, improves equipment attendance rate and project quality, reduces the demand for large-scale operation sites, reduces construction costs and environmental damage, and realizes efficient installation and maintenance of wind power equipment.
Smart Images

Figure CN118928571A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of engineering machinery, and in particular to a crawler transport vehicle, a transport method, a control system and a readable storage medium. Background Art
[0002] my country is rich in wind energy resources, and developing wind power is an important energy development strategy for my country to adjust its energy structure and achieve emission reduction targets. In recent years, a wave of wind turbine construction has emerged in China, with the number of wind turbines increasing and wind farms extending from the Central China Plain to the Northwest Mountain Area.
[0003] The wind turbine mainly consists of three parts: tower, nacelle and blades. Each component of the wind turbine is tall, large and heavy. The assembly of wind turbines is currently mainly completed by large-tonnage crawler cranes.
[0004] With the promotion and application of a large number of wind turbines, the development of wind turbine and crawler crane technology has been promoted. On the one hand, it has promoted the development and application of high-power wind turbine technology, and 3MW and 4MW high-power wind turbines have been launched and applied one after another. At the same time, the increase in wind turbine weight and height has also promoted the development of thousand-ton crawler crane equipment. XCMG and other main engine manufacturers quickly launched a series of thousand-ton wind power special crawler cranes.
[0005] At the same time, the market competition for high-power wind turbines is more intense, and the application of wind turbines and crawler cranes has brought severe challenges, especially the installation space is one of the main problems. The height of high-power wind turbines is as high as hundreds of meters, and the arm length of the crawler crane is also hundreds of meters. The installation space of the crawler crane alone requires hundreds of meters of installation work site. In recent years, with the large-scale construction of wind farms, flat land resources have become increasingly precious and scarce, and there are fewer and fewer flat wind farm sites with good conditions. In the future, the development of high-power wind turbines may be oriented to areas with poor conditions, especially areas with limited site space, and the application environment is even worse. Summary of the invention
[0006] The inventors have found that how to develop a device and process suitable for the installation of large-power wind turbines that can reduce construction risks, achieve safe construction, increase equipment attendance rate, and further improve project quality and progress is an urgent problem to be solved by technical personnel in this field.
[0007] The present invention proposes a crawler transport vehicle, a transport method, a control system and a readable storage medium, which are used to expand the application scenarios of large-scale wind power equipment.
[0008] An embodiment of the present invention provides a crawler transport vehicle, comprising:
[0009] A crawler transport chassis, comprising a first crawler, a second crawler, a first crawler beam and a second crawler beam arranged at intervals; the first crawler is mounted on the first crawler beam, and the second crawler is mounted on the second crawler beam; and
[0010] The wind power equipment installation base is detachably installed between the first crawler beam and the second crawler beam, and the wind power equipment installation base is configured to be used for installing wind power equipment.
[0011] In some embodiments, the crawler transport chassis further comprises:
[0012] a first connecting beam, one end of which is connected to the first crawler beam, and the other end of which is connected to the second crawler beam;
[0013] a second connecting beam, one end of which is connected to the first crawler beam and the other end of which is separated from the second crawler beam;
[0014] a third connecting beam, one end of which is connected to the second crawler beam and the other end of which is separated from the first crawler beam; the second connecting beam and the third connecting beam are both parallel to the first connecting beam and arranged at intervals; and
[0015] A counterweight is connected to both the second connecting beam and the third connecting beam, and at least a portion of the counterweight is located between the second connecting beam and the third connecting beam.
[0016] In some embodiments, the second connecting beam and the third connecting beam correspond to the same position in the length direction of the first crawler beam.
[0017] In some embodiments, the crawler transport chassis further comprises:
[0018] A power box is carried by the first connecting beam and is dispersedly arranged with the counterweight; the power box includes a battery power source, a motor and a hydraulic system; the hydraulic system is drivingly connected to the first crawler beam and the second crawler beam; wherein the battery power source provides electrical energy to the motor, the motor drives the hydraulic system, and then realizes the movement of the first crawler beam and the second crawler beam.
[0019] In some embodiments, the crawler transport chassis further comprises:
[0020] a tray, located between the first crawler beam and the second crawler beam, and carried by the first crawler beam and / or the second crawler beam;
[0021] The counterweight comprises a first part and a second part which are fixedly connected or integrally formed; the first part is located between the second connecting beam and the third connecting beam, and the second part is carried by the tray.
[0022] In some embodiments, at least one of the first connecting beam, the second connecting beam and the third connecting beam is provided with a connecting piece for fixing the bottom of the wind power equipment.
[0023] In some embodiments, each of the first connecting beam, the second connecting beam and the third connecting beam is provided with more than two connecting members for fixing the bottom of the wind power equipment.
[0024] In some embodiments, the counterweight comprises:
[0025] roof;
[0026] a bottom plate, spaced apart from the top plate; and
[0027] A plurality of side panels are installed between the top panel and the bottom panel;
[0028] The top plate, the bottom plate and the plurality of side plates together form a closed hollow box; the top plate is constructed to be openable and closable, and / or at least one of the side plates is constructed to be openable and closable.
[0029] In some embodiments, the two opposite side plates are each provided with a connecting portion, and the counterweight is connected to the second connecting beam and the third connecting beam through the connecting portion.
[0030] In some embodiments, the wind power equipment installation base can be installed on the crawler transport chassis in a liftable manner; wherein the crawler transport vehicle further includes:
[0031] two sets of lifting cylinders, one set of the lifting cylinders is carried by and mounted on the first crawler beam, and the other set of the lifting cylinders is carried by and mounted on the second crawler beam; and
[0032] A plurality of connecting members, wherein a part of the connecting members is detachably connected or fixedly connected to one group of the lifting cylinders so as to be raised or lowered along with the extension and retraction of the lifting cylinders; another part of the connecting members is detachably connected or fixedly connected to another group of the lifting cylinders so as to be raised or lowered along with the extension and retraction of the lifting cylinders; each of the connecting members is constructed to be detachably connected to a wind power device.
[0033] In some embodiments, the first crawler beam and / or the second crawler beam are configured to be self-propelled.
[0034] The embodiment of the present invention further provides a crawler transport vehicle transportation method, which is implemented by using the crawler transport vehicle provided by any technical solution of the present invention, and the transportation method comprises the following steps:
[0035] Moving the crawler transport vehicle to a first workstation;
[0036] Using a first crawler crane to install the tower of the wind power equipment on the wind power equipment installation base of the crawler transport vehicle;
[0037] The side surface of the tower is fixedly connected to the installation base of the wind power equipment;
[0038] Moving the crawler transport vehicle carrying the tower to the second workstation;
[0039] Using a second crawler crane to install the blades of the wind power equipment on the tower carried by the crawler transport vehicle to complete the assembly of the wind power equipment;
[0040] Moving the crawler transport vehicle carrying the wind power equipment to a destination;
[0041] The wind power equipment is removed as a whole.
[0042] In some embodiments, the wind power equipment includes:
[0043] a platform base configured to provide support;
[0044] A fan base, detachably placed on or installed on the platform base;
[0045] A tower, mounted on the wind turbine base;
[0046] A fan blade assembly is mounted on the top of the tower; and
[0047] A fan fastening device has one end fixedly connected to the side wall of the tower and the other end fixedly connected to the fan base.
[0048] The embodiment of the present invention further provides a crawler transport vehicle control system, comprising:
[0049] Memory; and
[0050] A processor coupled to the memory, wherein the processor is configured to execute the crawler transport vehicle transport method provided by any technical solution of the present invention based on instructions stored in the memory.
[0051] An embodiment of the present invention further provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the crawler transport vehicle transport method provided by any technical solution of the present invention.
[0052] The crawler transport vehicle provided by the above technical solution not only has the function of transportation, but also has the function of providing a platform for the installation of wind power equipment. It has the functions of transporting and installing wind power equipment as a whole, realizing multiple uses of one machine. Specifically, the crawler transport vehicle provided by the embodiment of the present invention can be used as an assembly platform for wind power equipment, and cooperates with a crawler crane to sub-assemble the wind power equipment at a suitable position, and complete the overall assembly of the wind turbine equipment on the chassis; the installed wind power equipment can be formed into a whole with the crawler transport vehicle, and can be transported to the target location as a whole by itself; finally, when the wind power equipment needs to be repaired or upgraded, the wind power equipment can be reconnected to the crawler transport vehicle, and then the wind power equipment can be transported to an open site or a maintenance workshop for disassembly and maintenance of the wind power equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0054] Figure 1 A schematic structural diagram of a crawler transport vehicle carrying wind power equipment provided by an embodiment of the present invention.
[0055] Figure 2 A schematic diagram of the structure of a crawler transport vehicle provided in an embodiment of the present invention from a top view.
[0056] Figure 3 This is a schematic diagram of the left-side structure of a crawler transport vehicle provided in an embodiment of the present invention.
[0057] Figure 4 Another schematic diagram of the structure of the crawler transport vehicle provided in an embodiment of the present invention is a top view.
[0058] Figure 5 A schematic front view of a counterweight for a crawler transport vehicle provided in an embodiment of the present invention.
[0059] Figure 6 A schematic cross-sectional view of a counterweight of a crawler transport vehicle provided in an embodiment of the present invention.
[0060] Figure 7 A schematic top view of the structure of a crawler transport vehicle with a counterweight provided in an embodiment of the present invention.
[0061] Figure 8 Schematic diagrams of three working conditions of the crawler transport vehicle provided in an embodiment of the present invention.
[0062] Figure 9a A schematic diagram of the structure in which a wind power equipment mounting base of a crawler transport vehicle provided in an embodiment of the present invention can be raised and lowered.
[0063] Figure 9b A comparison diagram of the lowered state of the wind power equipment installation base of the crawler transport vehicle provided in an embodiment of the present invention.
[0064] Fig.10 A schematic structural diagram of the control part of the crawler transport vehicle provided in an embodiment of the present invention.
[0065] Fig.11 A schematic diagram of the navigation process of a crawler transport vehicle provided in an embodiment of the present invention.
[0066] Fig.12 A schematic diagram of state switching of a crawler transport vehicle provided in an embodiment of the present invention.
[0067] Fig.13 A schematic flow chart of a transport method using a crawler transport vehicle provided in an embodiment of the present invention.
[0068] Fig.14 A schematic diagram of a transport method using a crawler transport vehicle provided in an embodiment of the present invention.
[0069] Reference numerals:
[0070] 1. Crawler transport chassis; 2. Wind power equipment installation base; 3. Wind power equipment;
[0071] 11. First crawler track; 12. Second crawler track; 13. First crawler track beam; 14. Second crawler track beam; 15. First connecting beam; 16. Second connecting beam; 17. Third connecting beam; 18. Counterweight; 19. Power box; 10. Pallet;
[0072] 181, top plate; 182, bottom plate; 183, side plate;
[0073] 31. Platform base; 32. Fan base; 33. Tower; 34. Fan blade assembly; 35. Fan fastening device. DETAILED DESCRIPTION
[0074] Combine the following Figure 1 to Figure 14 The technical solution provided by the present invention is described in more detail. The description of the exemplary embodiments is merely illustrative and is by no means intended to limit the present disclosure and its application or use. The present disclosure can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to make the present disclosure thorough and complete and to fully express the scope of the present disclosure to those skilled in the art. It should be noted that unless otherwise specifically stated, the relative arrangement of the components and steps, the composition of the materials, the numerical expressions and the numerical values described in these embodiments should be interpreted as being merely exemplary and not limiting.
[0075] The words "first", "second" and similar words used in this disclosure do not indicate any order, quantity or importance, but are only used to distinguish different parts. The words "include" or "comprise" and similar words mean that the elements before the word include the elements listed after the word, and do not exclude the possibility of also including other elements.
[0076] In the present disclosure, when a specific device is described as being located between a first device and a second device, there may or may not be an intermediate device between the specific device and the first device or the second device. When a specific device is described as being connected to other devices, the specific device may be directly connected to the other devices without an intermediate device, or may not be directly connected to the other devices but have an intermediate device.
[0077] All terms used in the present disclosure, including technical terms or scientific terms, have the same meanings as those understood by ordinary technicians in the field to which the present disclosure belongs, unless otherwise specifically defined. It should also be understood that terms defined in general dictionaries, such as general dictionaries, should be interpreted as having meanings consistent with their meanings in the context of the relevant technology, and should not be interpreted in an idealized or extremely formal sense, unless explicitly defined herein.
[0078] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment are considered part of the specification.
[0079] The dimensions of the various parts shown in the drawings are not drawn according to the actual proportional relationship. In the drawings, the same reference numerals are attached to common structural elements or structural elements of the same type, and their repeated descriptions are appropriately omitted.
[0080] After research, the inventor found that the height of a high-power wind turbine is as high as hundreds of meters, and the arm length of the crawler crane is also hundreds of meters. The installation space of the crawler crane alone requires hundreds of meters of installation site. At the same time, the flatness of the large crawler crane site is required to be less than 1%, and the site needs to be a solid and flat ground. When a high-power wind turbine is applied to a limited space in a plain area, if there is a large amount of cultivated land around it, it is necessary to build a large-scale construction to build a flat site, destroy the cultivated land, and the cost is higher, and it will cause large-scale environmental damage in the surrounding area.
[0081] To this end, an embodiment of the present invention provides a crawler transport vehicle that can transport wind power equipment and can also be used as a platform for installing wind power equipment. Wind power equipment can be directly assembled in a workshop or other open space, especially high-power wind turbine equipment. High-power wind power equipment is directly assembled on the crawler transport vehicle, and then the crawler transport vehicle is moved to the target site. The target site can be an area with a relatively poor natural environment, such as a small area, a slope, a mountain, or soft ground. The small area referred to here refers to a small area that a crawler crane cannot enter, but in which wind power equipment can be installed.
[0082] The crawler crane used to hoist wind power equipment only needs to be placed in a workshop or other open space, and there is no need to transport the crawler crane to the target site of the wind power equipment. Wind power equipment is no longer limited by the large space required for the crawler crane to operate, and the crawler crane can be directly placed in an open area that can ensure the safety of operation and installation. There is no need to build a site for the crawler crane, no large-scale civil engineering is required, the cost is lower, and it will not cause large-scale environmental damage in the surrounding area, which is conducive to mitigation and protection.
[0083] Figure 1 A schematic structural diagram of a crawler transport vehicle carrying wind power equipment provided by an embodiment of the present invention. Figure 2 A schematic structural diagram of a crawler transport vehicle provided in an embodiment of the present invention. Figure 3 This is a schematic diagram of the left-side structure of a crawler transport vehicle provided in an embodiment of the present invention. Figure 4 Another schematic diagram of the structure of the crawler transport vehicle provided in an embodiment of the present invention is a top view. Figure 5 A schematic front view of a counterweight 18 of a crawler transport vehicle provided in an embodiment of the present invention. Figure 6 A schematic cross-sectional view of a counterweight 18 of a crawler transport vehicle provided in an embodiment of the present invention. Figure 7 A schematic top view of the structure of a crawler transport vehicle with a counterweight 18 provided in an embodiment of the present invention.
[0084] See also Figures 1 to 4 The embodiment of the present invention provides a crawler transport vehicle, comprising a crawler transport chassis 1 and a wind power equipment installation base 2. The crawler transport chassis 1 comprises a first crawler 11, a second crawler 12, a first crawler beam 13 and a second crawler beam 14 arranged at intervals. The first crawler 11 is mounted on the first crawler beam 13, and the second crawler 12 is mounted on the second crawler beam 14. The wind power equipment installation base 2 is mounted between the first crawler beam 13 and the second crawler beam 14, and the wind power equipment installation base 2 is configured to be used for installing wind power equipment.
[0085] See also Figure 2The crawler transport chassis 1 can realize the walking function and can carry the wind power equipment installation base 2. The first crawler 11 and the second crawler 12 can adopt the same structure, and the first crawler beam 13 and the second crawler beam 14 can also adopt the same structure. The first crawler beam 13 is used to install the first crawler 11, and the second crawler beam 14 is used to install the second crawler 12. The first crawler 11 and the second crawler 12 can both adopt a crawler beam with a large width, and the specific width depends on the weight of the wind power equipment to be carried and the state of the road surface. The structure of the crawler transport chassis 1 is symmetrical, and the symmetry line is the center line S1 of the crawler transport chassis 1 parallel to its own length direction (also the straight forward and backward direction). The crawler transport chassis 1 adopts a symmetrical structure, and the load is more balanced, and smooth movement can be achieved even in harsh ground conditions.
[0086] See also Figure 3 and Figure 4 In some embodiments, the crawler transport chassis 1 further includes a first connecting beam 15, a second connecting beam 16, a third connecting beam 17 and a counterweight 18. The first connecting beam 15 is a whole beam, one end of which is connected to the first crawler beam 13, and the other end of the first connecting beam 15 is connected to the second crawler beam 14. The second connecting beam 16 and the third connecting beam 17 are both half beams, that is, the length is only about half of the first connecting beam 15. One end of the second connecting beam 16 is connected to the first crawler beam 13, specifically, it is detachably connected through a pin. The other end of the second connecting beam 16 is separated from the second crawler beam 14. One end of the third connecting beam 17 is connected to the second crawler beam 14, specifically, it is detachably connected through a pin. The other end of the third connecting beam 17 is separated from the first crawler beam 13. The second connecting beam 16 and the third connecting beam 17 are both parallel to the first connecting beam 15 and arranged at intervals. The counterweight 18 is connected to both the second connecting beam 16 and the third connecting beam 17 , and at least a portion of the counterweight 18 is located between the second connecting beam 16 and the third connecting beam 17 .
[0087] In some embodiments, the second connecting beam 16 and the third connecting beam 17 correspond to the same position in the length direction of the first crawler beam 13. The second connecting beam 16 and the third connecting beam 17 cooperate with each other to install the counterweight 18.
[0088] In some embodiments, at least one of the first connecting beam 15, the second connecting beam 16 and the third connecting beam 17 is provided with a connecting piece for fixing the bottom of the wind turbine device. The connecting piece is, for example, a pin shaft. A pin hole is correspondingly provided at the bottom of the wind turbine device, and the wind turbine device is mounted to the first connecting beam 15, the second connecting beam 16 and the third connecting beam 17 through the cooperation of the pin shaft and the pin hole.
[0089] In some embodiments, the first connecting beam 15, the second connecting beam 16 and the third connecting beam 17 are each provided with more than two connecting pieces for fixing the bottom of the wind power equipment. Using more connecting pieces can make the installation between the wind power equipment and each connecting beam more stable.
[0090] In some embodiments, two opposite side plates 183 are both provided with connecting parts, and the counterweight 18 is connected to the second connecting beam 16 and the third connecting beam 17 through the connecting parts.
[0091] In order to meet the needs of overall transportation of the wind turbine equipment and increase the convenience of installation, the crawler transport chassis 1 adopts a modular structure, and the wind turbine equipment itself has the function of disassembly and assembly, and no auxiliary equipment is required for disassembly and assembly.
[0092] Figure 8 Schematic diagrams of three working conditions of the crawler transport vehicle provided in an embodiment of the present invention.
[0093] See also Figure 8 The crawler transport chassis 1 can realize three working conditions of the crawler transport vehicle: transporting large load objects (i.e. transporting wind power equipment), overall disassembly and assembly, and no-load travel.
[0094] See also Figure 8 In (a), when transporting wind power equipment, the first connecting beam 15, the second connecting beam 16, the third connecting beam 17 and the wind power equipment installation base 2 together form a frame structure and a transportation platform structure with strong stability and high rigidity, which can achieve smooth movement. The first connecting beam 15 is a whole beam, and is connected to the first crawler beam 13 and the second crawler beam 14, which can ensure the stability of the crawler beam in a short distance straight line. The spacing between the first crawler beam 13 and the second crawler beam 14 can be set relatively large to achieve a large track gauge, and the chassis has strong stability, further ensuring the stability and safety of transporting large heights and heavy weights.
[0095] See also Figure 8 In (b), when the wind power equipment needs to be disassembled, the pins of the wind power equipment mounting base 2 and the crawler transport chassis 1 are unplugged, and the wind power equipment mounting base 2 and the wind power equipment are disassembled as a whole, which is very convenient.
[0096] See also Figure 8 In (c), when the vehicle is traveling without load, the counterweight 18 is installed in place, and the counterweight 18, the first crawler beam 13, the second crawler beam 14, the power box 19, the first connecting beam 15, the second connecting beam 16 and the third connecting beam 17 together form a stable frame structure to meet the stability of the chassis when traveling without load and turning.
[0097] Back to Figure 4 and Figure 5In some embodiments, the counterweight 18 is roughly in the shape of a convex letter. The counterweight 18 includes a first part and a second part that are fixedly connected or integrally formed. The first part is smaller in size and the second part is larger in size. The first part and the second part are pieced together to form a convex letter. The first part is located between the second connecting beam 16 and the third connecting beam 17. The first part and the second connecting beam 16 and the third connecting beam 17 can be connected by a pin shaft. This connection method is simple, reliable, and easy to disassemble. The second part is carried by the tray 10.
[0098] Continue to see Figure 6 The counterweight 18 includes a top plate 181, a bottom plate 182, and a plurality of side plates 183. The bottom plate 182 and the top plate 181 are arranged at intervals; the plurality of side plates 183 are installed between the top plate 181 and the bottom plate 182. The top plate 181, the bottom plate 182, and the plurality of side plates 183 together form a closed hollow box. The top plate 181 is configured to be openable and / or at least one of the side plates 183 is configured to be openable and / or.
[0099] The counterweight 18 is hollow. When the crawler chassis transporter is transporting the wind turbine equipment, the counterweight 18 is filled with sand to increase the weight and ensure walking stability. After the wind turbine equipment is installed, the sand can be removed to reduce the weight of the crawler chassis transporter itself. Just remove the rear cover, and the sand will flow out during the walking process, reducing the weight of the crawler transporter. When the counterweight 18 is used again, open the upper cover and fill the counterweight 18 with sand, stones and other materials available on site. The counterweight 18 can be filled with materials or only partially filled. The counterweight 18 with the above-mentioned structure can be made of local materials, and the weight of the counterweight 18 can be flexibly set, which reduces the cost of the counterweight 18, improves the reliability and stability of the crawler transporter transportation, and reduces the manufacturing cost and transportation costs.
[0100] See also Figure 3 and Figure 4 In some embodiments, the crawler transport chassis 1 further includes a power box 19, which is carried by the first connecting beam 15. Specifically, the power box 19 and the first connecting beam 15 are fixed by a pin. The power box 19 and the counterweight 18 are arranged in a dispersed manner; the power box 19 includes a battery power source, a motor and a hydraulic system. The hydraulic system is drivingly connected to the first crawler beam 13 and the second crawler beam 14; wherein the battery power source provides electrical energy to the motor, and the motor drives the hydraulic system, thereby realizing the walking of the first crawler beam 13 and the second crawler beam 14.
[0101] The crawler transport chassis 1 also includes structures such as driving wheels and supporting wheels. These structures can adopt existing component structures. The specific dimensions are determined according to the load-bearing capacity of the crawler transport chassis 1 provided by the embodiment of the present invention, and will not be introduced in detail here.
[0102] The power box 19 provides the crawler transport vehicle with power for movement. The power box 19 includes a battery power source, a charging interface for a wind power generation transformer, and the like. The use of a battery power source is more energy-efficient than a diesel engine. The battery power source mainly uses an external power source to charge the battery through a charging interface (or normally disassembles and charges the battery). At the same time, during the waiting period for the installation of the wind power equipment or during transportation, the wind power equipment can convert wind energy into electrical energy and charge the battery power source through the wind power generation transformer to collect energy and utilize wind energy locally, which is more energy-efficient. In addition, the battery power source is evenly distributed inside the power box 19 and can be used as a counterweight 18 to increase the stability of transportation.
[0103] See also Figure 3 and Figure 4 Along the length direction L of the crawler transport chassis 1, the power box 19 and the counterweight 18 are dispersedly arranged in the length direction, so that the load on each area of the crawler transport vehicle can be balanced.
[0104] Figure 9a 9b is a comparative diagram of the lowered state of the wind power equipment installation base 2 of the crawler transport vehicle provided by the embodiment of the present invention. Fig.10 A schematic structural diagram of the control part of the crawler transport vehicle provided in an embodiment of the present invention. Fig.11 A schematic diagram of the navigation process of a crawler transport vehicle provided in an embodiment of the present invention. Fig.12 A schematic diagram of state switching of a crawler transport vehicle provided in an embodiment of the present invention.
[0105] Figure 7 and Fig.10 For the positions of left I travel motor A1, left II travel motor A2, right I travel motor A3, right II travel motor A4, front 1 / 2 fulcrum lifting cylinder A5, rear 3 / 4 fulcrum lifting cylinder A6, power pin cylinder A7 and power pin cylinder A8, refer to Figure 7 As shown. The two lifting cylinders A5 are symmetrically distributed, and the two lifting cylinders A6 are symmetrically distributed. Figure 7 The detection control module includes sensors, which mainly include line navigation sensor B1, GPS positioning sensor B2, level sensor B3, and height limit sensor B4. Through each sensor, the corresponding parameter is measured.
[0106] See also Figure 9a and Figure 9bIn some embodiments, the wind power equipment installation base 2 can be installed on the crawler transport chassis 1 in a liftable manner. The crawler transport vehicle also includes two groups of lifting cylinders and multiple connecting parts. One group of lifting cylinders is supported by the first crawler beam 13 and installed on the first crawler beam 13, and the other group of lifting cylinders is supported by the second crawler beam 14 and installed on the second crawler beam 14. A part of the connecting parts is detachably connected or fixedly connected to one group of lifting cylinders to be lifted and lowered as the lifting cylinders are extended and retracted; another part of the connecting parts is detachably connected or fixedly connected to another group of lifting cylinders to be lifted and lowered as the lifting cylinders are extended and retracted; each connecting part is constructed to be detachably connected to the wind power equipment.
[0107] See also Figure 9a The crawler transport vehicle can realize the overall lifting of the wind power equipment installation base 2 to meet the requirements of small height lifting and high safety.
[0108] Figure 9a The enlarged schematic diagram A in the figure shows the state where the wind power equipment installation base 2 is not raised; Figure 9a The enlarged schematic diagram B in FIG. 1 shows the state of the wind power equipment installation base 2 after it is raised. Figure 9a As shown in the enlarged view in middle B: the upper part of the first crawler beam 13 is welded with an oblong hole guide mounting double ear plate 71, and the middle of the oblong hole guide mounting double ear plate 71 is bolted to fix the front 1 / 2 fulcrum lifting cylinder B5. The middle part of the front 1 / 2 fulcrum lifting cylinder B5 is bolted to connect the top block support 72, and the lower part of the front 1 / 2 fulcrum lifting cylinder B5 (specifically the piston rod) is welded with a bearing base 73. The bearing base 73 can bear the weight and load of the platform and reduce the load on the cylinder power pin B7. During the chassis walking process, there is an impact at the connection hinge between the crawler transport chassis 1 and the wind power equipment installation base 2. The wind power equipment installation base 2 is placed on the bearing base 73. The cylinder power pin B7 only plays a limiting role, with less force, and the walking process is smoother.
[0109] See also Figure 9a A round hole mounting hinge ear 74 is welded on the wind power equipment mounting base 2, and the round hole mounting hinge ear 71 is fixedly connected to the cylinder pin shaft B7 by bolts.
[0110] The working principle is as follows: the cylinder barrel of the lifting cylinder A5 is fixed, and the piston rod is liftable. The piston rod of the lifting cylinder A5 is fixedly connected to the wind turbine installation base 2. The lifting and lowering of the wind turbine installation base 2 is achieved through the linear telescopic movement of the piston rod of the lifting cylinder A5, thereby achieving the lifting and lowering of the wind turbine installation base 2, and further achieving the lifting and lowering of the wind turbine installed on the wind turbine installation base 2. It can be seen that the above scheme can achieve the overall smooth lifting and lowering of the wind turbine equipment, while ensuring the safety of the transportation process. Fig.11, the chassis height L1 is lower than the height L3 of the platform base 31, the chassis moves to the vicinity of the platform base 31, the lifting cylinder A5 / A6 is extended and retracted, and the wind power equipment installation base 2 is lifted to a height of L2, and L2 is greater than L3. The crawler transport chassis 1 moves to the top of the platform base 31, aligns with the platform base 31, and the lifting cylinder A5 / A6 is retracted to lower the wind power equipment installation base 2, and finally fix the wind power equipment installation base 2 on the platform base 31. The above process uses the cylinder to realize the lifting and installation of the wind power equipment by lifting the fixed hinge point.
[0111] Back to Figure 4 In some embodiments, the first crawler beam 13 and / or the second crawler beam 14 are configured to be self-propelled. That is, after the connecting beams between the first crawler beam 13 and the second crawler beam 14 are disassembled, the first crawler beam 13 and the second crawler beam 14 can each move independently without tipping over or falling over.
[0112] The following are other functions that crawler transport vehicles can have.
[0113] First, the control part of the crawler transporter is introduced. The control part can be divided into four modules: power source template, hydraulic pump group module, detection control module and drive execution unit. The power source template has been introduced above and will not be repeated here. The hydraulic pump group module consists of a motor, a pump and a valve group. The hydraulic pump group module converts electrical energy into hydraulic potential energy.
[0114] See also Fig.11 The target positioning function of the intelligent navigation walking module can realize three functions: 1) GPS positioning automatic navigation walking; 2) fine-tuning the target direction position; 3) positioning alignment.
[0115] The control system is equipped with a GPS positioning system, a route navigation automatic deviation correction sensor and a horizontal sensor B3. GPS positioning requires the installation of the target position of the wind power equipment. According to the positioned target position information, each travel motor is controlled to drive the travel reducer to travel and reach the vicinity of the target position. When approaching the target position, the control system's front 1 / 2 fulcrum lifting cylinder B5 is extended and retracted, and the rear 3 / 4 fulcrum lifting cylinder B6 is extended and retracted, from L1 to L2, ensuring that the L2 height > L3 (installation platform height). At the same time, navigation lines are set on both sides of the target position. The control system controls the travel motor and, according to the route navigation automatic deviation correction sensor, promptly corrects the walking direction position to the target position, ensuring the left and right front and back position deviation (the wind turbine structure and the installation base also ensure a certain installation deviation) to achieve position alignment. The horizontal sensor detects the ground slope as a safety protection.
[0116] The above technical solution enables the crawler transport vehicle to integrate the automatic navigation target position function, the disassembly-free assembly function, and the reduction of auxiliary crane assembly procedures, and can realize the rapid separation and assembly connection function of the crawler transport chassis 1 and the wind turbine equipment.
[0117] See also Fig.12 The overall assembly of wind power equipment includes four steps: 1. Walking to the designated position; 2. Alignment; 3. Overall installation of the base; 4. Separation of the crawler walking device, such as Fig.12 shown.
[0118] The initial state of the crawler chassis transporter is as follows Fig.12 Then the control system controls the power pin cylinder A7 to remove the counterweight 18, as shown in the state A in the middle; Fig.12 Then, the fan base 32 is installed as a platform, and the counterweight 18 is installed in reverse. The control system controls the power pin cylinders A7 and A8, and the pin fixes the fan base 32, and finally Fig.12 The fan is assembled on this basis. The reverse installation of the counterweight 18 means that the head and tail of the counterweight 18 are swapped, where the head and tail are relative to the linear moving direction of the crawler transport vehicle, that is, Figure 3 The L direction.
[0119] Fig.13 A schematic flow chart of a transport method using a crawler transport vehicle provided in an embodiment of the present invention. Fig.14 A schematic diagram of a transport method using a crawler transport vehicle provided in an embodiment of the present invention.
[0120] The embodiment of the present invention further provides a crawler transport vehicle transportation method, which is implemented by using the crawler transport vehicle provided by any technical solution of the present invention. The transportation method comprises the following steps:
[0121] Step S100, moving the crawler transport vehicle to the first workstation.
[0122] Step S200, using a first crawler crane 11 to install the tower 33 of the wind power equipment onto the wind power equipment installation base 2 of the crawler transport vehicle;
[0123] Step S300, fixing the side of the tower 33 to the wind power equipment installation base 2;
[0124] Step S400, moving the crawler transport vehicle carrying the tower 33 to the second workstation;
[0125] Step S500, using the second crawler crane 12 to install the blades of the wind power equipment to the tower 33 carried by the crawler transport vehicle to complete the assembly of the wind power equipment;
[0126] Step S600, moving the crawler transport vehicle carrying the wind power equipment to the destination;
[0127] Step S700: remove the wind power equipment as a whole.
[0128] See also Fig.13 The assembly line installation of wind power equipment is divided into two parts: centralized installation and self-installation of each line.
[0129] First, centralized division of labor for installation. In the SA1 station: the crawler transport vehicle moves to the SA1 station, and the small-tonnage crawler crane completes the assembly of parts with small lifting height and light weight, and completes the assembly of the wind power equipment installation base 2 of the crawler transport vehicle. In the SA2 station: the crawler transport chassis 1 moves to the SA2 station, and the medium-tonnage crawler crane completes the assembly of the tower 33, and the lifting height and weight are medium. In the SA3 station: the crawler transport chassis 1 moves to the SA3 station, and the large-tonnage crawler crane completes the assembly of blades, etc., and the lifting height and weight are large. Finally, the crawler transport chassis 1 cooperates with three crawler cranes to complete the assembly of the wind turbine.
[0130] Second, install by yourself according to the lines. According to the installation plan of the wind turbine group, determine the installation lines and positions of SB, SC, SD, SE, etc.; the crawler transport vehicle will install by itself according to the determined SB1 / SC1 / SD1 / SE1 lines and SB2 / SC2 / SD2 / SE2 positions.
[0131] The crawler transport vehicle transportation method provided by the above technical solution can realize the centralized installation of wind power equipment, and realize the assembly of wind power equipment by moving the crawler transport vehicle in various positions. The various components of the wind power equipment only need to be placed in the workshop or the required location, and then the crawler transport vehicle is used to assemble the various parts of the wind power equipment. The assembly line installation of wind power equipment is realized, and the lifting of multiple wind turbine equipment is also realized by a large-tonnage crawler crane. The above scheme adopts the method of parallel installation of wind turbines to replace the traditional serial installation of wind turbines, and the large, medium and small lifting equipment are divided into subdivided lifting to replace a large-tonnage full-process lifting, and the assembly line installation reduces the construction cost, improves the construction efficiency, and is more energy-saving and economical. At the same time, it reduces the dependence of wind turbine equipment installation on large lifting equipment and reduces the dependence on the surrounding environment, providing a more economical solution for the installation of wind turbine groups.
[0132] The above technical solution uses crawler transport vehicles for long-distance transportation instead of on-site hoisting, and uses overall installation instead of sub-assembly. The equipment does not need to be sub-assembled on-site, and there is no need to build a large work site. The required site space is small, which solves the problem of insufficient space conditions for wind turbine installation sites. Compared with existing technologies, it has lower costs, requires a smaller site area, and is more environmentally friendly and economical. At the same time, when hoisting a high-power wind turbine above 4MW, a 400-ton transport vehicle replaces a crawler crane equipment above 1000t, which can reduce the equipment cost by more than 2 times, reduce the required site by 10 times, reduce damage to the surrounding environment, and be more environmentally friendly and economical.
[0133] In some embodiments, the wind turbine device includes a platform base 31, a wind turbine base 32, a tower 33, a wind turbine blade assembly 34, and a wind turbine fastening device 35. The platform base 31 is configured to provide support. The wind turbine base 32 is detachably placed on or mounted on the platform base 31. The tower 33 is mounted on the wind turbine base 32. The wind turbine blade assembly 34 is mounted on the top of the tower 33. One end of the wind turbine fastening device 35 is fixedly connected to the side wall of the tower 33, and the other end of the wind turbine fastening device 35 is fixedly connected to the wind turbine base 32.
[0134] Back to Figure 1 The wind power equipment installation base 2 is installed in the middle of the crawler transport chassis 1, and the two are connected and fixed by a pin shaft. The upper part of the wind power equipment installation base 2 is an installation platform, and the installation platform is fixedly connected to the tower 33 by a circle of bolts. The side of the tower 33 is provided with a hanging ear to connect the wind turbine fastening device 353. The other end of the wind turbine fastening device 35 is connected to the tower 33, and the tower 33 is bolted to fix the wind turbine blade assembly 34. The wind power equipment installation base 2 and the bottom of the tower 33 are designed with sufficient strength and rigidity. The new wind turbine tower 33, the anti-side load zipper and the chassis structure can ensure the overall transportation safety and feasible transportation.
[0135] When installing the wind turbine equipment on the wind turbine equipment installation base 2, the crawler transport vehicle can achieve two functions: fine-tuning the centering and fixing. According to the installation centering of the wind turbine base 32 and the wind turbine equipment installation base 2, the front and rear left and right and horizontal adjustments can be made. The two main crawlers can be turned in situ, and the installation structure can ensure a certain installation deviation. After centering, the control system controls the front 1 / 2 fulcrum lifting cylinder B5 to shrink, and the rear 3 / 4 fulcrum lifting cylinder B6 to shrink, so that the platform falls on the base as a whole, and then the fixing bolts are installed.
[0136] The process of separating the crawler chassis transporter from the wind power equipment is as follows: Fig.12 As shown, the disassembly and assembly steps are opposite to the installation. After the wind turbine is installed and fixed, the crawler chassis transport vehicle is in the following state: Fig.12 The counterweight 18 is removed, and at the same time, the control system controls the power pin cylinder A7, and the wind turbine installation base 2 is separated from the wind turbine base; then, the wind turbine installation base 2 continues to move forward until it is completely separated, as shown in FIG. Fig.12 Then, the counterweight 18 is installed in reverse, and the control system controls the power pin cylinders A7 and A8 to fix, and re-form a crawler chassis transport vehicle, and finally Fig.12 The C state is thus returned. Repeat the next cycle installation.
[0137] In the above technical solution, the crawler transport vehicle adds a wind turbine installation base along with the large mobile wind turbine, and at the same time increases the convenience of wind turbine assembly and disassembly, providing the possibility of secondary utilization. In addition, the present invention expands the construction process based on the special chassis for wind power hoisting, focuses on reducing the construction cost of high-power wind turbines, and takes the lead in proposing a parallel assembly line construction process to replace the serial construction process, thereby improving the utilization rate of large-tonnage equipment and providing an efficient solution for wind power installation.
[0138] The crawler transporter integrates the functions of transportation, installation, wind power generation, and side load resistance into one, realizing the overall transportation of a large-height and heavy-weight wind turbine device. The crawler transport chassis 1 adopts a large-gauge crawler chassis structure, and the chassis has strong stability, which realizes the safety of the transportation process of large-height and heavy-weight pieces. The crawler chassis has an independent power system, which is mainly used for transportation and walking; the wind power equipment installation base 2 has a strong platform structure to achieve safety during the transportation process, and at the same time has upper and lower bottom installation platforms, which mainly meet the installation of the wind turbine; the equipment wind turbine fastening device 35 is composed of a zipper and a fastening device, and the technical cost is not detailed. The wind turbine fastening device 35 mainly reduces the shaking during transportation.
[0139] The above technical solution is suitable for the assembly line installation of wind power equipment groups. Multiple wind turbines only need one large-tonnage lifting equipment, which reduces the cost of large-tonnage lifting equipment, reduces construction costs, and improves construction efficiency. A wind farm installs at least dozens or even hundreds of wind turbines. The parallel construction process method is adopted. The construction method of multiple operation lines of the assembly line are constructed at the same time, which realizes that large vehicles do big work and small vehicles do small work: small vehicles complete the installation of the tower 33 base, medium-tonnage equipment completes the lifting of the medium-height tower 33, and large-tonnage completes the assembly of the last weight wind turbine blades. Finally, the wind power lifting special chassis transports the wind turbine to the designated location for assembly, and the assembly line construction realizes the optimal assembly of a large number of wind turbines and improves the utilization rate of large-tonnage crawler cranes.
[0140] An embodiment of the present invention provides a crawler transport vehicle control system, including a memory and a processor coupled to the memory, wherein the processor is configured to execute the crawler transport vehicle transportation method in any one of the aforementioned embodiments based on instructions stored in the memory.
[0141] The memory may include, for example, a system memory, a fixed non-volatile storage medium, etc. The system memory may store, for example, an operating system, an application program, a boot loader, and other programs.
[0142] Some embodiments of the present disclosure further provide a computer-readable storage medium having a computer program stored thereon, wherein when the program is executed by a processor, the crawler transport vehicle transport method in any of the above embodiments is implemented.
[0143] The processor described herein may include a general-purpose processor, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic device, a discrete gate or transistor logic, a discrete hardware component, or any combination thereof designed to perform the functions described herein to implement or execute. A general-purpose processor may be a microprocessor, but in an alternative, the processor may be any conventional processor, controller, microcontroller, or state machine. The processor may also be implemented as a combination of computing devices, such as a combination of a DSP and a microprocessor, a plurality of microprocessors, one or more microprocessors cooperating with a DSP core, or any other such configuration.
[0144] Storage media can be any available media that can be accessed by a computer. As an example and not limitation, such computer-readable media may include RAM, ROM, EEPROM, CD-ROM or other optical disk storage, disk storage or other magnetic storage devices, or any other media that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer. Any connection is also properly referred to as a computer-readable medium. For example, if the software is transmitted from a website, server, or other remote source using a coaxial cable, fiber optic cable, twisted pair, digital subscriber line (DSL), or wireless technologies such as infrared, radio, and microwaves, the coaxial cable, fiber optic cable, twisted pair, DSL, or wireless technologies such as infrared, radio, and microwaves are included in the definition of the medium. As used herein, disks (disk) and discs (disc) include compact discs (CDs), laser discs, optical discs, digital versatile discs (DVDs), floppy disks, and blue-ray discs, wherein disks (disk) often reproduce data magnetically, and discs (disc) reproduce data optically with lasers. The above combination should also be included in the scope of computer-readable media.
[0145] Those skilled in the art will appreciate that the method embodiments of the present disclosure may be provided as methods, systems, or computer program products. Therefore, the present disclosure may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present disclosure may take the form of a computer program product implemented on one or more computer-usable non-transient storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0146] The present disclosure is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0147] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0148] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0149] In the description of the present invention, it is necessary to understand that the terms "center", "longitudinal", "lateral", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the protection content of the present invention. When the absolute position of the object being described changes, the relative positional relationship may also change accordingly.
[0150] In the description of the present invention, each technical feature may be combined with other technical features where feasible.
[0151] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein, but these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A crawler transport vehicle, characterized in that: include: A crawler transport chassis (1) comprises a first crawler (11), a second crawler (12), a first crawler beam (13) and a second crawler beam (14) arranged at intervals; the first crawler (11) is mounted on the first crawler beam (13), and the second crawler (12) is mounted on the second crawler beam (14); and The wind power equipment installation base (2) is detachably installed between the first crawler beam (13) and the second crawler beam (14), and the wind power equipment installation base (2) is configured to be used for installing wind power equipment.
2. The crawler transport vehicle according to claim 1, characterized in that: The crawler transport chassis (1) further comprises: A first connecting beam (15), one end of which is connected to the first crawler beam (13), and the other end of which is connected to the second crawler beam (14); A second connecting beam (16), one end of which is connected to the first crawler beam (13), and the other end of which is separated from the second crawler beam (14); a third connecting beam (17), one end of which is connected to the second crawler beam (14), and the other end of which is separated from the first crawler beam (13); the second connecting beam (16) and the third connecting beam (17) are both parallel to the first connecting beam (15) and arranged at intervals; and A counterweight (18) is connected to both the second connecting beam (16) and the third connecting beam (17), and at least a portion of the counterweight (18) is located between the second connecting beam (16) and the third connecting beam (17).
3. The crawler transport vehicle according to claim 2, characterized in that: The second connecting beam (16) and the third connecting beam (17) correspond to the same position in the length direction of the first crawler beam (13).
4. The crawler transport vehicle according to claim 2, characterized in that: The crawler transport chassis (1) further comprises: A power box (19) is carried by the first connecting beam (15) and is dispersedly arranged with the counterweight (18); the power box (19) comprises a battery power source, a motor and a hydraulic system; the hydraulic system is drivingly connected to the first crawler beam (13) and the second crawler beam (14); wherein the battery power source provides electrical energy to the motor, the motor drives the hydraulic system, and then realizes the walking of the first crawler beam (13) and the second crawler beam (14).
5. The crawler transport vehicle according to claim 2, characterized in that: The crawler transport chassis (1) further comprises: a pallet (10) located between the first crawler beam (13) and the second crawler beam (14), and supported by the first crawler beam (13) and / or the second crawler beam (14); The counterweight (18) comprises a first part and a second part which are fixedly connected or integrally formed; the first part is located between the second connecting beam (16) and the third connecting beam (17), and the second part is supported by the tray (10).
6. The crawler transport vehicle according to claim 2, characterized in that: At least one of the first connecting beam (15), the second connecting beam (16) and the third connecting beam (17) is provided with a connecting piece for fixing the bottom of the wind power equipment.
7. The crawler transport vehicle according to claim 6, characterized in that: The first connecting beam (15), the second connecting beam (16) and the third connecting beam (17) are each provided with more than two connecting pieces for fixing the bottom of the wind power equipment.
8. The crawler transport vehicle according to claim 2, characterized in that: The counterweight (18) comprises: Top plate (181); a bottom plate (182) spaced apart from the top plate (181); and A plurality of side panels (183) installed between the top panel (181) and the bottom panel (182); The top plate (181), the bottom plate (182) and the plurality of side plates (183) together form a closed hollow box; the top plate (181) is constructed to be openable and closable, and / or at least one of the side plates (183) is constructed to be openable and closable.
9. The crawler transport vehicle according to claim 8, characterized in that: The two opposite side plates (183) are both provided with connecting parts, and the counterweight (18) is connected to the second connecting beam (16) and the third connecting beam (17) via the connecting parts.
10. The crawler transport vehicle according to claim 1, characterized in that: The wind power equipment installation base (2) is liftably mounted on the crawler transport chassis (1); wherein the crawler transport vehicle further comprises: Two groups of lifting cylinders (A5, A6), wherein one group of the lifting cylinders (A5) is carried by the first crawler beam (13) and installed on the first crawler beam (13), and the other group of the lifting cylinders (A6) is carried by the second crawler beam (14) and installed on the second crawler beam (14); and A plurality of connecting members, wherein a portion of the connecting members is detachably connected or fixedly connected to one group of the lifting cylinders (A5) so as to be raised or lowered along with the extension and retraction of the lifting cylinders (A5); another portion of the connecting members is detachably connected or fixedly connected to another group of the lifting cylinders (A6) so as to be raised or lowered along with the extension and retraction of the lifting cylinders (A6); each of the connecting members is constructed to be detachably connected to a wind power device.
11. The crawler transport vehicle according to claim 1, characterized in that: The first crawler beam (13) and / or the second crawler beam (14) are configured to be self-propelled.
12. A method for transporting with a crawler transport vehicle, characterized in that: The method is implemented by using the crawler transport vehicle according to any one of claims 1 to 11, and the transport method comprises the following steps: Moving the crawler transport vehicle to a first workstation; Using a first crawler (11) crane to install a tower (33) of a wind power equipment onto a wind power equipment installation base (2) of the crawler transport vehicle; The side surface of the tower (33) is fixedly connected to the wind power equipment installation base (2); Moving the crawler transport vehicle carrying the tower (33) to a second workstation; Using a second crawler (12) crane to install the blades of the wind power equipment on the tower (33) carried by the crawler transport vehicle, so as to complete the assembly of the wind power equipment; Moving the crawler transport vehicle carrying the wind power equipment to a destination; The wind power equipment is removed as a whole.
13. The crawler transport vehicle transportation method according to claim 12, characterized in that: The wind power equipment (3) comprises: a platform base (31) configured to provide support; A fan base (32) is detachably placed on or mounted on the platform base (31); A tower (33) mounted on the fan base (32); A fan blade assembly (34) is mounted on the top of the tower (33); and A fan fastening device (35) has one end fixedly connected to the side wall of the tower (33) and the other end fixedly connected to the fan base (32).
14. A crawler transport vehicle control system, characterized in that: include: Memory; and A processor coupled to the memory, wherein the processor is configured to execute the crawler transport vehicle transport method according to claim 12 or 13 based on instructions stored in the memory.
15. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the program is executed by a processor, the crawler transport vehicle transport method as claimed in claim 12 or 13 is implemented.