Segmented construction and total group positioning method for full-width superstructure
Patent Information
- Application Number
- CN202410886221.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The insufficient assembly accuracy of upper-level sections and the increase in correction work caused by deformation of section hoisting during ship construction affects the construction cycle.
The full-width upper-construction segment construction method is adopted. By dividing the segments into wall sheets, deck sheets and vertical and cross-division bulkhead sheets for cutting and panel production, the deviation is adjusted using three-dimensional data acquisition and matching analysis. , combine linear tire frames and channel steel to strengthen the structure to ensure construction accuracy, and use linear tires and door frames for lifting and adjustment during the overall group positioning process.
The construction accuracy and efficiency of the upper construction sections are improved, deformation during the lifting process is prevented, and the accuracy and stability of the total group is ensured.
Smart Images

Figure CN118928690A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of shipbuilding, and in particular to a full-width superstructure segmented construction and overall assembly positioning method. Background Art
[0002] The plates used for building sections in ship construction are usually thin plates. During the construction process, the sections are often assembled with insufficient precision and deformed during hoisting, which increases the workload of the section assembly and loading correction. In addition, the sections used to be assembled and loaded one by one in sequence. The waiting time after the sections are completed is long, and the sections are also prone to deformation during storage, which affects the dock construction cycle.
[0003] Prior art such as publication number CN117262104A discloses a method for controlling the construction accuracy of upper sections of a container ship, which achieves accuracy control of the upper sections by controlling the panel assembly accuracy, frame material installation accuracy and assembly accuracy of the deck, longitudinal wall panels and transverse wall panels. Summary of the invention
[0004] In order to solve the problem of precision control of upper-building segmented construction and subsequent overall assembly positioning, the present invention provides a full-width upper-building segmented construction and overall assembly positioning method to improve construction precision and construction efficiency.
[0005] The technical objectives of the present invention are achieved through the following technical solutions:
[0006] A full-width upper-building segmented construction method, the method comprising:
[0007] Step 1: Divide the upper construction sections into enclosure sheets, deck sheets, and longitudinal and transverse bulkhead sheets, and cut the required plates for each sheet;
[0008] Step 2, respectively, making the panels of the enclosure wall sheet, the deck sheet, and the longitudinal and transverse bulkhead sheets on the tire frame;
[0009] Step 3: Reversely build the deck sheet on the frame with the deck sheet as the base surface, and sequentially hoist the longitudinal and transverse bulkhead sheets and the surrounding wall sheets on the deck sheet;
[0010] Step 4: After the lifting is completed, welding is carried out. Before and after welding, the three-dimensional data of the upper construction segment is collected. Before and after welding, the collected data is matched and analyzed with the theoretical three-dimensional data of the upper construction segment to find out the deviation value and make adjustments based on the deviation value.
[0011] Furthermore, when cutting, the cutting accuracy control of the plate requires that the length and width deviation of the plate is within ±1mm, the diagonal deviation is within ±1mm, and the natural groove deviation is within ±1mm.
[0012] Further, in step 2, the center line of the tire frame and the rib inspection line are marked on the flat ground, the center line of the tire frame and the rib inspection line are perpendicular to each other, grid lines are marked along the center line of the tire frame and the rib inspection line, and the tire frame is arranged along the grid lines; the tire frame of the deck plate and the surrounding wall plate is a linear tire frame, including a tire frame column and a linear tire plate, the tire frame column is vertically fixed at the intersection of the grid lines, and the linear tire plate is installed at the upper end of the tire frame column; the tire frame of the longitudinal and transverse bulkhead plates is a flat tire frame.
[0013] Furthermore, when the deck plate is manufactured, the plate at the center of the deck plate is firstly hoisted onto the frame, the center line of the plate at the center of the deck plate in the fore-and-aft direction is found, a positioning line is drawn on the ground according to the theoretical distance between the rib inspection line and the end face of the plate, the center line of the plate at the center of the deck plate is adjusted to coincide with the center line of the frame, and the end of the plate coincides with the positioning line; the plate at the center of the deck plate is extended outward to complete the paneling welding of the deck plate, and after the paneling is completed, the contact surface between the plate and the frame is spot welded and fixed; the longitudinal girder structure is installed above the panel.
[0014] Furthermore, the longitudinal and transverse bulkhead panels include longitudinal bulkhead panels and transverse bulkhead panels; the longitudinal bulkhead panels and transverse bulkhead panels are welded with the edge without margin as the reference edge.
[0015] Furthermore, in step 3, when the longitudinal and transverse bulkhead segments and the surrounding wall segments are sequentially hoisted onto the deck segment for positioning, reverse deformation is set on their respective smooth surfaces, and the structural surfaces of the longitudinal and transverse bulkhead segments and the surrounding wall segments are diagonally braced and reinforced by channel steels.
[0016] The present invention also provides a method for positioning the overall assembly of full-width upper construction sections. After the full-width upper construction sections are constructed according to the above method, the overall assembly positioning is performed according to the following steps:
[0017] S1. Before the upper construction section is separated from the tire frame, the deck plates at the front, middle and rear positions of the upper construction section are welded to the linear tire plates at the corresponding positions, and the upper construction section together with the linear tire plates are hoisted onto the portal frame;
[0018] S2. Mark the centerline of the section and the inspection line 150mm from the stern end face on the smooth surface of the deck sheet of the upper section;
[0019] S3, turn over the upper construction section and place it on the ground in a normal position, and adjust the horizontality of the upper construction section;
[0020] S4. Horizontally move the center line of the upper section and the 150mm inspection line of the bow and stern end faces to the ground;
[0021] S5. Load the upper sections on top of the upper sections to form the upper sections, and adjust the position of the upper sections according to the section centerline on the ground and the 150mm inspection line on the bow and stern end faces;
[0022] S6. Carry out three-dimensional precision measurement on the upper construction section after the overall assembly to verify the accuracy of the overall assembly.
[0023] Furthermore, in step S5, the height of the upper segment is increased by 5 mm based on the average height of the four corners of the upper end surface of the upper segment.
[0024] Compared with the prior art, the present invention has the following beneficial effects:
[0025] 1. On the one hand, the present invention provides a method for constructing a full-width upper construction segment. The upper construction segment is constructed by this method. Three-dimensional data of the upper construction segment is collected before and after welding, and the collected data is matched and analyzed with theoretical three-dimensional data to find out the deviation and make adjustments based on the deviation, thereby ensuring the construction accuracy of the upper construction segment.
[0026] 2. Another aspect of the present invention provides a method for positioning a full-width upper construction segment assembly. Based on the construction accuracy of the upper construction segment, a linear tire plate is used for lifting during the removal and lifting to ensure the deck throwing tendency of the upper construction segment and prevent the upper construction segment from being deformed during the lifting process. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the upper construction segmented structure in the present invention.
[0028] Figure 2 It is a schematic diagram of the arrangement of the centerline tire frame of the present invention.
[0029] Figure 3 It is a schematic diagram of positioning of plate A in an embodiment of the present invention.
[0030] Figure 4 It is a schematic diagram of the arrangement of the linear tire plate after the deck sheet is debonded in an embodiment of the present invention.
[0031] Figure 5 It is a schematic diagram of the setting of the segment center line of the upper construction segment and the 150mm inspection line of the bow and stern end faces in an embodiment of the present invention.
[0032] Figure 6 Schematic diagram of channel steel arrangement in an embodiment of the present invention.
[0033] In the figure, 1. Deck sheet; 2. Wall sheet; 3. Longitudinal and transverse bulkhead sheets; 4. Center line of tire frame; 5. Rib inspection line; 6. Linear tire plate; 7. Angle steel tie rod; 8. Tire frame column; 9. A plate; 10. Center line; 11. Positioning line; 12. Section center line; 13. 150mm inspection line; 14. Channel steel. DETAILED DESCRIPTION
[0034] The technical solution of the present invention is further described below in conjunction with specific embodiments:
[0035] Example 1
[0036] A full-width upper-building segmented construction method, the method comprising:
[0037] Step 1: Figure 1 As shown, the upper structure is divided into the enclosure sheet 2, the deck sheet 1 and the longitudinal and transverse bulkhead sheet 3, and the required plates for each sheet are cut;
[0038] When cutting, the cutting accuracy control of the plate requires that the length and width deviation of the plate is within ±1mm, the diagonal deviation is within ±1mm, and the natural groove deviation is within ±1mm.
[0039] Preferably, a laser cutting machine is used for cutting. Before cutting, a 300*300mm test plate is cut. The test plate is required to meet the length and width deviation within ±1mm, the diagonal deviation within ±1mm, and the natural groove deviation within ±1mm after cutting. If the test plate cutting requirements are not met, the cutting equipment is debugged.
[0040] Step 2, respectively, on the tire frame, the surrounding wall piece 2, the deck piece 1 and the longitudinal and transverse bulkhead piece 3 are assembled;
[0041] like Figure 2 As shown, the tire frame center line 4 and the rib inspection line 5 are drawn on the flat ground, the tire frame center line 4 and the rib inspection line 5 are perpendicular to each other, grid lines are drawn along the tire frame center line 4 and the rib inspection line 5, and a number of equally spaced lines are drawn parallel to the tire frame center line 4 and the rib inspection line 5 to form a number of square grids. In this embodiment, the square grids are 1m*1m grids, and the tire frame is arranged along the grid lines.
[0042] Since the deck sheet and the surrounding wall sheet are linear, the tire frame of the deck sheet and the surrounding wall sheet is a linear tire frame, including tire frame columns 8 and linear tire plates 6. The tire frame columns 8 are vertically fixed at the intersection of the grid lines, and the linear tire plates 6 are installed on the upper ends of the tire frame columns 8. When installing the linear tire plates 6, linear plates of equal proportions are made according to the linear shapes of the deck sheet and the surrounding wall sheet, and the linear plate materials are such as wood boards, plastic boards, foam boards, etc. The linear tire plates are installed according to the linear shapes of the linear boards; in order to increase the strength and stability of the tire frame, angle steel braces 7 are stretched between the tire frame columns in a direction perpendicular to the linear tire plates.
[0043] The longitudinal and transverse bulkhead panels include longitudinal bulkhead panels and transverse bulkhead panels, which do not have a linear design, so the tire frames of the longitudinal and transverse bulkhead panels are flat-plate tire frames.
[0044] When making the deck sheet, Figure 3As shown, firstly, the plate at the center of the deck plate body is hoisted onto the frame, and the plate at the center of the deck plate body is defined as A plate 9. The center line 10 in the head-to-tail direction of A plate 9 is found. Specifically, the center points are found in the middle of the head and tail ends of A plate 9 respectively. The line connecting the center points of the head and tail ends of A plate is the center line.
[0045] A positioning line 11 is drawn on the ground according to the theoretical distance between the rib inspection line and the end face of the A plate 9. For example, the theoretical distance between the rib inspection line and the head end face of the A plate is 1.5m, and the theoretical distance between the rib inspection line and the tail end face of the A plate is 1.2m. Then, a positioning line 11 is drawn on the ground parallel to the rib inspection line at 1.5m and 1.2m respectively.
[0046] Adjust the center line 10 of plate A to coincide with the center line 4 of the frame, and the end of plate A to coincide with the positioning line 11. Specifically, since plate A is at a certain height from the ground, a plumb line can be used for positioning. A plumb line is hung at each end of the center line of plate A, and the position of plate A is adjusted so that the plumb lines at both ends are located on the center line of the frame. Similarly, plate A is moved along the center line of the frame with the help of the plumb lines at both ends so that the plumb lines at both ends are located at the positioning lines, thereby ensuring the squareness of plate A and the accuracy of the outward assembly along plate A.
[0047] The deck plate is extended outward from the center of the deck plate to complete the panel welding of the deck plate. After the panel is completed, the contact surface between the plate and the tire frame is spot welded and fixed; the longitudinal girder structure is installed above the panel.
[0048] The longitudinal and transverse bulkhead sheets include longitudinal bulkhead sheets and transverse bulkhead sheets, and the longitudinal bulkhead sheets and transverse bulkhead sheets are welded by taking the edge without excess as the reference edge.
[0049] Step 3: After the production of each sheet is completed, reverse production is carried out on the tire frame with the deck sheet as the base surface, and the longitudinal and transverse bulkhead sheets and the surrounding wall sheets are hoisted on the deck sheet in sequence;
[0050] Since one side of the longitudinal and transverse bulkhead sheets and the surrounding wall sheets is not provided with structural profiles and is a smooth surface, and the other side is provided with structural profiles, the shrinkage rates of the two sides are different during welding, which is prone to welding deformation. Figure 6 As shown, when the longitudinal and transverse bulkhead segments and the surrounding wall segments are hoisted to the deck segments in sequence for positioning, anti-deformation is set on their respective smooth surfaces. The direction of anti-deformation is as follows: Figure 6 In the direction of the middle arrow, in this embodiment, 5mm anti-deformation is added along the direction of the arrow; the structural surfaces of the longitudinal and transverse bulkhead sheets and the surrounding wall sheets are strengthened by diagonal bracing through channel steel 14, one end of the channel steel 14 is welded to the side where the structural profile is set, and the other end of the channel steel 14 is welded to the deck sheet.
[0051] Step 4: After the lifting is completed, welding is carried out. Before and after welding, the three-dimensional data of the upper construction segment is collected. Before and after welding, the collected data is matched and analyzed with the theoretical three-dimensional data of the upper construction segment to find out the deviation value and make adjustments based on the deviation value.
[0052] Specifically, in this embodiment, the three-dimensional data of the upper segment is collected before welding and matched with the theoretical three-dimensional data for analysis, and the deviation value is found to check whether the positioning accuracy of each sheet meets the requirements according to the deviation value;
[0053] Before welding, local welding will also be performed between the sheets, and the welding volume is less than 30% of the total welding volume. Local welding includes internal structure welding and positioning welding.
[0054] After welding, the sheets of the upper construction segment were completely welded, and the welding volume reached 100%. The three-dimensional data of the upper construction segment was collected and matched with the theoretical three-dimensional data for analysis, the deviation value was found and local corrections were made according to the deviation value, such as local welding deformation correction, flatness correction, etc.
[0055] Example 2
[0056] A method for positioning a full-width upper construction segment assembly. After the full-width upper construction segment is constructed according to the method in the above embodiment, the assembly is positioned according to the following steps:
[0057] S1. Before the upper construction segment leaves the tire frame, Figure 4 As shown, the deck plates at the fore, middle and stern positions of the upper construction section are welded to the linear tread plates at the corresponding positions respectively, and the upper construction section together with the linear tread plates are hoisted onto the portal frame;
[0058] S2. Draw the center line 12 of the section and the 150mm inspection line 13 of the bow and stern end faces on the smooth surface of the upper sectioned deck. Figure 5 As shown;
[0059] S3, turn over the upper construction section and place it on the ground in a normal position, and adjust the horizontality of the upper construction section;
[0060] S4, translate the segment centerline 12 and the 150mm inspection line 13 of the bow and stern end faces on the upper segment to the ground with the help of a total station, that is, draw a 150mm inspection line at a position 150mm away from the bow end face and the stern end face, and make a mark for the foreign impact;
[0061] S5. Load the upper sections on top of the upper sections to form the upper sections, and adjust the position of the upper sections according to the section centerline on the ground and the 150mm inspection line on the bow and stern end faces;
[0062] Preferably, the height of the upper segment is increased by 5 mm based on the average height of the four corners of the upper end surface of the upper segment to prevent welding shrinkage.
[0063] S6. Carry out three-dimensional precision measurement on the upper construction section after the overall assembly to verify the accuracy of the overall assembly.
[0064] This embodiment is only a further explanation of the present invention, not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to this embodiment as needed, but as long as it is within the scope of the claims of the present invention, it will be protected by the patent law.
Claims
1. A full-width upper-building segmented construction method, characterized in that: The method includes: Step 1: Divide the upper construction sections into enclosure sheets, deck sheets, and longitudinal and transverse bulkhead sheets, and cut the required plates for each sheet; Step 2, respectively, making the panels of the enclosure wall sheet, the deck sheet, and the longitudinal and transverse bulkhead sheets on the tire frame; Step 3: Reversely build the deck sheet on the frame with the deck sheet as the base surface, and sequentially hoist the longitudinal and transverse bulkhead sheets and the surrounding wall sheets on the deck sheet; Step 4: After the lifting is completed, welding is carried out. Before and after welding, the three-dimensional data of the upper construction segment is collected. Before and after welding, the collected data is matched and analyzed with the theoretical three-dimensional data of the upper construction segment to find out the deviation value and make adjustments based on the deviation value.
2. A full-width upper-building segmented construction method according to claim 1, characterized in that: When cutting, the cutting accuracy control of the plate requires that the length and width deviation of the plate is within ±1mm, the diagonal deviation is within ±1mm, and the natural groove deviation is within ±1mm.
3. A full-width upper-building segmented construction method according to claim 1, characterized in that: In step 2, the center line of the tire frame and the rib inspection line are marked on the flat ground, the center line of the tire frame and the rib inspection line are perpendicular to each other, grid lines are marked along the center line of the tire frame and the rib inspection line, and the tire frame is arranged along the grid lines; the tire frames of the deck plate and the surrounding wall plate are linear tire frames, including tire frame columns and linear tire plates, the tire frame columns are vertically fixed at the intersection of the grid lines, and the linear tire plates are installed at the upper ends of the tire frame columns; the tire frames of the longitudinal and transverse bulkhead plates are flat tire frames.
4. A full-width upper-building segmented construction method according to claim 3, characterized in that: When the deck sheet is manufactured, the plate at the center of the deck sheet is firstly hoisted onto the frame, the center line of the plate at the center of the deck sheet in the fore-and-aft direction is found, a positioning line is drawn on the ground according to the theoretical distance between the rib inspection line and the end face of the plate, the center line of the plate at the center of the deck sheet is adjusted to be vertically coincident with the center line of the frame, and the end of the plate is adjusted to be vertically coincident with the positioning line; the plate at the center of the deck sheet is extended outward to complete the paneling welding of the deck sheet, and after the paneling is completed, the contact surface between the plate and the frame is spot welded and fixed; and the longitudinal girder structural member is installed above the paneling.
5. A full-width upper-building segmented construction method according to claim 4, characterized in that: The longitudinal and transverse bulkhead panels include longitudinal bulkhead panels and transverse bulkhead panels; the longitudinal bulkhead panels and transverse bulkhead panels are welded with the edge without margin as the reference edge.
6. A full-width upper-building segmented construction method according to claim 1, characterized in that: In step 3, when the longitudinal and transverse bulkhead segments and the surrounding wall segments are sequentially hoisted onto the deck segments for positioning, reverse deformation is set on their respective smooth surfaces, and the structural surfaces of the longitudinal and transverse bulkhead segments and the surrounding wall segments are braced and reinforced by channel steel.
7. A full-width upper construction segmented assembly positioning method, characterized in that: After the full-width upper construction sections are constructed according to the method described in any one of claims 3 to 6, the overall assembly positioning is performed according to the following steps: S1. Before the upper construction section is separated from the tire frame, the deck plates at the front, middle and rear positions of the upper construction section are welded to the linear tire plates at the corresponding positions, and the upper construction section together with the linear tire plates are hoisted onto the portal frame; S2. Draw the section centerline and 150mm inspection line at the bow and stern ends on the smooth surface of the upper section deck; S3, turn over the upper construction section and place it on the ground in a normal position, and adjust the horizontality of the upper construction section; S4. Horizontally move the center line of the upper section and the 150mm inspection line of the bow and stern end faces to the ground; S5. Load the upper sections on top of the upper sections to form the upper sections, and adjust the position of the upper sections according to the section centerline on the ground and the 150mm inspection line on the bow and stern end faces; S6. Carry out three-dimensional precision measurement on the upper construction section after the overall assembly to verify the accuracy of the overall assembly.
8. A full-width upper construction segmented assembly positioning method according to claim 7, characterized in that: In step S5, the height of the upper segment is increased by 5 mm based on the average height of the four corners of the upper end surface of the upper segment.
Citation Information
Patent Citations
Container ship building segment building precision control method
CN117262104A
Novel ship control cabin segment and manufacturing method thereof
CN102320350A
Method for manufacturing bed-jig with aluminum alloy in segmented mode
CN103612712A
Overall manufacture method for forecastle bulwark of ship
CN104908885A
Method for manufacturing duplex stainless steel middle assembly plate frame of chemical tanker
CN109552552A
Cited By
Construction method for preventing deformation of full-width superstructure
CN119796438A
Construction method for preventing deformation of superstructure
CN119796438B
LNG ship low-temperature pipe unit support positioning method
CN119821617A
LNG ship low-temperature pipe unit support positioning method
CN119821617B
Construction method for segmental assembly of torsion box
CN120440221A