Lifting hook and lifting appliance for lifting
By introducing translation drive parts, vertical adjustment parts, positioning seats, positioning rods and other technologies into the lifting hooks and spreaders, the problems of lifting hole error and shaking during the lifting process of the concrete cylinder of the deep sea breakwater are solved, and the stability of lifting is achieved and efficiency improvement.
Patent Information
- Application Number
- CN202411197492.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-12
AI Technical Summary
During the lifting process, the concrete cylinder of the deep-sea breakwater is inconsistent in the height of the lifting hole and the inclination of the top wall due to processing errors, which increases the difficulty of lifting and causes the lifting equipment and objects to be lifted to shake in complex marine environments, affecting safety.
A lifting hook is designed, using a translation drive and a vertical adjustment member, which can achieve hanging and unhooking operations and height and angle adjustment between the lifting hook and the lifting hole, adapting to the errors of different lifting holes; at the same time, it provides a The circumferential positioning of the hanger and the cylinder is achieved through positioning seats and positioning rods, reducing the difficulty of lifting.
It effectively overcomes the processing error of lifting holes, improves lifting balance and stability, reduces the difficulty of lifting in deep-sea operations, improves lifting efficiency, and reduces the impact of shaking caused by wind and waves and ocean currents in the marine environment.
Smart Images

Figure CN118929409A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of hoisting construction, and more specifically, to a hoisting hook and hoisting equipment. Background Art
[0002] With the further development of marine engineering, the construction of offshore breakwaters has also made certain progress. Compared with offshore breakwaters, deep-sea breakwaters are located at a greater depth, and the ocean dynamic conditions such as waves, ocean currents and water pressure they face are more complex and intense, resulting in a more complex structure of deep-sea breakwaters and the need to use large concrete components for production. Taking concrete cylinders as an example, the concrete cylinders used in the construction of deep-sea breakwaters have the characteristics of heavy weight, large diameter, high height, and thin cylinder wall. Therefore, there is a great difficulty in lifting. In addition, affected by the processing technology of prefabricated concrete cylinders, the processed cylinders are prone to the problem of inconsistent heights of various lifting holes, and there are also defects such as the tilt of the top wall of the lifting hole. The above defects will affect the force balance of different positions of the hoisting device, increase the difficulty of the hoisting operation, and may even cause the object being hoisted to tilt, causing excessive wear on the connecting parts of the hoisting device, and in severe cases even affecting the safety of the hoisting operation.
[0003] In addition to the above, due to the different operating environment, the wind, waves and ocean currents in the deep sea environment will cause the lifting equipment and the cylinder to be lifted to shake, resulting in a sharp increase in the difficulty of lifting control and an increase in the risk of collision. In other words, traditional lifting equipment and slings are no longer able to adapt to the requirements of deep-sea operations in terms of operating environment and operating difficulty.
[0004] In order to solve the above problems, it is necessary to develop a new type of lifting structure. Summary of the invention
[0005] The present application provides a lifting hook and lifting equipment to reduce the difficulty of lifting cylindrical components to at least a certain extent, making them more suitable for deep-sea working environments.
[0006] In the first aspect, the present application provides a lifting hook for lifting a component with a lifting hole, comprising a mounting bracket and a lifting hook, the mounting bracket being provided with a translation drive member and a vertical adjustment member, the vertical adjustment member being arranged on the mounting bracket via the action end of the translation drive member and being capable of translationally moving relative to the mounting bracket under the drive of the translation drive member; the lifting hook having a connected connecting portion and a lifting portion, the connecting portion being used for swinging connection with the vertical adjustment member, and at least a portion of the lifting portion being located below the mounting bracket and being used for cooperating with the lifting hole.
[0007] In the lifting hook provided in the embodiment of the present application, the hooking and unhooking operations of the lifting hook and the lifting hole can be realized by a translational driving member, and the vertical adjusting member is used to adjust the matching relationship between the lifting hook and the top wall of the lifting hole. The vertical adjusting member can drive the lifting hook to rise and fall and deflect within a certain angle range, so that the lifting hook matched with the lifting hole can be closely matched with the top wall of the lifting hole, which can not only overcome the processing height error of the lifting hole in the component to be lifted, but also can use the vertical adjusting member to drive the lifting hook to swing appropriately so that the lifting part of the lifting hook can adapt to the lifting hole that is inclined due to the processing error, so that the lifting hook can better match with the component to be lifted through the lifting hole, thereby reducing the difficulty of the lifting operation.
[0008] Optionally, the vertical adjustment member includes a vertical jack and a hook ear seat, the hook ear seat connects the vertical jack and the connecting part, and the hook ear seat is hinged to the connecting part.
[0009] Optionally, the hoisting portion is an L-shaped structure, and a pressure block is provided at one end of the hoisting portion facing away from the connecting portion, and the hoisting portion is in contact with the top wall of the hoisting hole via the pressure block.
[0010] Optionally, a through groove is provided at one end of the connecting portion facing away from the hoisting portion, and the connecting portion is movably connected to the mounting bracket via the through groove.
[0011] In a second aspect, the present application provides a hoisting device for hoisting a cylinder with a hoisting hole, comprising a hanger, a positioning seat and a hoisting hook, the hanger having a circular projection, and a positioning rod extending radially along the hanger is provided below the hanger, the number of the positioning rods is multiple and they are arranged in sequence along the circumference of the hanger; the positioning seat is provided at the end of the cylinder, the positioning seat is provided with a guide positioning socket, the opening size of the guide positioning socket gradually decreases toward the side close to the cylinder, the positioning rod can cooperate with the positioning seat through the guide positioning socket; the hoisting hook is any one of the hoisting hooks described above, the mounting bracket extends radially along the hanger and is fixed below the hanger, the number of the hoisting hooks is multiple and they are arranged in sequence along the circumference of the hanger; when the positioning rod is connected to the positioning seat through the guide positioning socket, the hoisting hook is arranged relative to the hoisting hole and can be inserted or retracted relative to the hoisting hole.
[0012] The sling provided in the embodiment of the present application can achieve basic circumferential positioning of the hanger and the cylinder by cooperating with the positioning rod located below the hanger through the positioning seat. At this time, the relative arrangement of the lifting hook and the lifting hole on the cylinder can be achieved, which is helpful for the subsequent coordination and connection between the lifting hook and the lifting hole on the cylinder and the rapid hooking and unhooking of the cylinder to improve the lifting efficiency of the cylinder. The mutual coordination of the positioning seat and the positioning rod can achieve rapid circumferential positioning of the sling and the cylinder, effectively reducing the difficulty of coordination between the sling and the cylinder, and reducing the difficulty of lifting the concrete cylinder in the deep-sea working environment.
[0013] Optionally, the positioning seat includes a guide alignment portion and a seat portion that are fixedly connected, the guide alignment portion includes two guide members that are arranged opposite to each other, and the guide positioning socket is provided between the two guide members and points to the seat portion.
[0014] Optionally, the end of the seat portion facing away from the guiding and aligning portion comprises a first connecting plate and a second connecting plate arranged opposite to each other, and at least one of the first connecting plate and the second connecting plate is provided with a clamping adjustment member;
[0015] When the cylinder is connected to the seat, the first connecting plate and the second connecting plate are respectively located at the inner and outer sides of the cylinder, and the clamping adjustment member passes through the first connecting plate or the second connecting plate to abut against the inner wall or outer wall of the cylinder.
[0016] Optionally, the hanger is further provided with a guide frame, which is arranged below the hanger and protrudes downward relative to any one of the positioning rod and the hanging hook in the axial direction of the hanger, and the orthographic projection of the guide frame on the hanger falls within the orthographic projection of the cylinder on the hanger;
[0017] After the guide frame is inserted into the cylinder, the positioning rod can cooperate with the positioning seat.
[0018] Optionally, there are multiple guide frames arranged in a circular pattern on the hanger. Along the radial direction of the hanger, the guide frames extend outwardly at an angle, and at least one end of the guide frame facing away from the hanger is inclined inward to form a guide angle.
[0019] Optionally, the guide frame and the lifting hook are arranged at intervals in the circumferential direction of the hanger; and / or the guide frame and the positioning rod are arranged one by one opposite to each other in the radial direction of the hanger.
[0020] Compared with the prior art, the present invention has at least the following beneficial effects:
[0021] The lifting hook provided in the embodiment of the present application utilizes a translational drive component to achieve the hooking and unhooking of the lifting component to be lifted, and utilizes a vertical adjustment component to adjust the matching relationship between the lifting hook and the top wall of the lifting hole, so as to obtain the maximum contact area between the lifting hook and the top wall of the lifting hole, overcome the situation where the top wall of the lifting hole is too high or the top wall is skewed due to processing errors, and enable the lifting hook to be stably and tightly connected to the lifting hole, thereby achieving the purpose of overcoming the processing errors of the lifting holes and improving the balance and stability of the lifting; at the same time, the above-mentioned lifting hook greatly reduces the difficulty of lifting through the mutually cooperating translational drive component and vertical adjustment component.
[0022] The sling provided in the embodiment of the present application includes the above-mentioned lifting hook, so the beneficial effects of the sling including any one or several of the above-mentioned lifting hooks are not repeated here. In addition, the sling can also use the positioning rods and positioning seats that cooperate with each other to realize circumferential positioning of the hanger and the cylinder, so that the lifting hook can be conveniently matched with the lifting holes provided on the cylinder; at the same time, the sling can also realize the rapid positioning of the hanger and the cylinder in the radial direction through the guide frame, which helps to reduce the relative shaking between the sling and the cylinder to be hoisted, and to a certain extent reduce the impact of shaking caused by waves and airflow on the lifting operation. At this time, the cooperation of the above-mentioned various components can realize the rapid guidance and rapid positioning of the lifting hook and the cylinder. The sling can realize the balance of lifting pressure at each lifting hole on the cylinder, and ultimately achieve the purpose of reducing the difficulty of deep-sea lifting and improving lifting efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0024] Figure 1 A schematic diagram of the structure of a lifting hook assembly provided in an embodiment of the present application;
[0025] Figure 2 for Figure 1 A cross-sectional view of
[0026] Figure 3 A schematic diagram of the structure of the lifting hook provided in the embodiment of the present application in the hooked state;
[0027] Figure 4 A schematic diagram of the structure of the lifting hook provided in the embodiment of the present application in the unhooked state;
[0028] Figure 5 A structural elevation diagram of the hoist provided in the embodiment of the present application in a hoisting state;
[0029] Figure 6 for Figure 5 Schematic diagram of the assembly of the lifting hook and the cylinder;
[0030] Figure 7 A schematic diagram of the coordination of the positioning rod and the positioning seat in the lifting device provided in the embodiment of the present application;
[0031] Figure 8 A schematic diagram of the cooperation between the positioning seat and the cylinder in the sling provided in the embodiment of the present application;
[0032] Fig. 9 A partial structural top view of a sling in a hoisting state provided in an embodiment of the present application;
[0033] Fig.10 A partial structural cross-sectional view of a sling in a hoisting state provided in an embodiment of the present application;
[0034] Fig.11 Another structural elevation view of the hoist provided in the embodiment of the present application in the hoisting state;
[0035] Fig.12 for Fig.11 A top view of the spreader in FIG.
[0036] Fig.13 for Fig.11 Schematic diagram of the coordination between the guide frame and the cylinder.
[0037] Among them, the reference numerals in the figure are:
[0038] 1. Lifting hook; 11. Mounting bracket; 111. Translational drive member; 112. Vertical adjustment member; 1121. Vertical jack; 1122. Lifting hook ear seat; 12. Lifting hook; 121. Connecting part; 1211. Through slot; 122. Lifting part; 123. Pressure block; 2. Hanger; 21. Positioning rod; 3. Positioning seat; 301. Guide positioning socket; 31. Guide alignment part; 311. Guide member; 32. Seat; 321. First connecting plate; 322. Second connecting plate; 323. Clamping adjustment member; 4. Guide frame; 41. Guide bevel; 20. Cylinder; 201. Lifting hole. DETAILED DESCRIPTION
[0039] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0040] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0041] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0042] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0043] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0044] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0045] In the present application, the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0046] When constructing engineering breakwaters in a marine environment, it is generally necessary to use bottomless cylindrical structures. The diameters of this type of cylinders are 30m, 28m, 26m and other specifications, the heights are 41m, 42m and 43m, and the weight exceeds 4000t. The size and weight of this type of cylinder are large, and they are oversized and overweight. Traditional lifting equipment is difficult to meet the requirements. At the same time, considering the processing errors that exist in the preparation of this type of cylindrical structure, such as the inconsistent heights of the lifting holes on the same cylinder, and the tilt of the top walls of some lifting holes, the naughty steps of the lifting process are more complicated, further increasing the difficulty of lifting.
[0047] In order to reduce the difficulty of lifting to a certain extent, simplify the leveling process when lifting the component to be lifted and reduce the leveling difficulty, in the first aspect, an embodiment of the present application provides a lifting hook 1, which is suitable for lifting components with lifting holes 201, such as cylindrical 20-shaped components.
[0048] For details, please refer to Figure 1-Figure 4 The hoisting hook 1 comprises a mounting bracket 11 and a hoisting hook 12. The mounting bracket 11 is provided with a translation driving member 111 and a vertical adjusting member 112. The vertical adjusting member 112 is provided on the mounting bracket 11 via the action end of the translation driving member 111 and can translate relative to the mounting bracket 11 under the drive of the translation driving member 111; the hoisting hook 12 has a connecting portion 121 and a hoisting portion 122 connected thereto. The connecting portion 121 is used for swinging connection with the vertical adjusting member 112. Please refer to Figure 1-Figure 2 .
[0049] At least part of the hoisting portion 122 is located below the mounting bracket 11 and is used to cooperate with the hoisting hole 201. The translation drive member 111 can be hydraulically driven or motor driven.
[0050] The hoisting hook 12 can reciprocate along a certain path under the drive of the translation drive member 111. After determining the horizontal position, the vertical adjustment member 112 can be activated to make the hoisting hook 12 rise and fall in the vertical direction. When the hoisting portion 122 in the hoisting hook 12 matches with the corresponding hoisting hole 201, the hoisting portion 122 can tend to contact and fit tightly with the top wall of the hoisting hole 201 under the pull of the vertical adjustment member 112. In the process from the hoisting portion 122 contacting the top wall of the hoisting hole 201 to the hoisting portion 122 and the top wall of the hoisting hole 201 being tightly fitted, when the top wall of the hoisting hole 201 is tilted, the hoisting portion 122 can tilt toward the same side along the tilt direction of the tilted top wall, thereby driving the connecting portion 121 of the hoisting hook 12 to swing relative to the vertical adjustment member 112, and finally achieving the hoisting portion 122 and the top wall of the hoisting hole 201. Close fit.
[0051] The above-mentioned vertical adjustment member 112 cooperates with the lifting hook 12, which can not only overcome the processing height error of the lifting hole 201 in the component to be lifted, but also can adapt to the lifting hole 201 whose top wall is inclined due to the processing error, so that the lifting hook 1 can better cooperate with the component to be lifted through the lifting hole 201, reduce the difficulty of lifting operation, and achieve lifting balance in a shorter time.
[0052] Specifically, the hoisting hook 12 composed of the connecting portion 121 and the hoisting portion 122 is an integrated structure.
[0053] The lifting hook 1 provided in the embodiment of the present application can realize the hooking and unhooking operations of the lifting hook 12 and the lifting hole 201 through the translation driving part 111, and the vertical adjusting part 112 is used to adjust the matching relationship between the lifting hook 12 and the top wall of the lifting hole 201. The vertical adjusting part 112 can drive the lifting hook 12 to rise and fall and deflect within a certain angle range, so that the lifting hook 12 matched with the lifting hole 201 can be closely matched with the top wall of the lifting hole 201, which can not only overcome the processing height error of the lifting hole 201 in the component to be lifted, but also can use the vertical adjusting part 112 to drive the lifting hook 12 to swing appropriately so that the lifting part 122 of the lifting hook 12 can adapt to the lifting hole 201 that is tilted due to the processing error, so that the lifting hook 1 can better match with the component to be lifted through the lifting hole 201, thereby reducing the difficulty of the lifting operation.
[0054] In some embodiments, the hoisting portion 122 is an L-shaped structure, and one end thereof facing away from the connecting portion 121 is bent and points toward the hoisting hole 201 of the component to be hoisted.
[0055] In order to better realize the swing connection between the vertical adjustment member 112 and the connecting portion 121, in some embodiments, the vertical adjustment member 112 and the connecting portion 121 are hinged, see Figure 2The vertical adjustment member 112 includes a vertical jack 1121 and a hook ear seat 1122 . The hook ear seat 1122 connects the vertical jack 1121 and the connecting portion 121 . The hook ear seat 1122 is hinged to the connecting portion 121 .
[0056] During hoisting, in order to ensure that the hoisting hook 1 can cooperate with the hoisting hole 201 on the component to be hoisted, the cross-sectional size of the part of the hoisting part 122 used to cooperate with the hoisting hole 201 is generally set to be smaller than the opening size of the hoisting hole 201, and the height of the part of the hoisting part 122 used to cooperate with the hoisting hole 201 must be smaller than the height of the hoisting hole 201. Before the hoisting part 122 cooperates with the hoisting hole 201, the height of the top wall of the end of the hoisting part 122 used to contact the hoisting hole 201 should be adjusted to be lower than the height of the top wall of the hoisting hole 201, so as to achieve the cooperation between the hoisting part 122 and the hoisting hole 201 without damaging the hoisting hole 201, and the hoisting part 122 can be driven to move upward by the vertical adjustment member 112 to achieve a close cooperation with the top wall of the hoisting hole 201.
[0057] In addition, in order to maximize the contact area between the top surface of the lifting part 122 and the top wall of the lifting hole 201, avoid damage to the top wall of the lifting hole 201 during the lifting process, and make the force on the top wall of the lifting hole 201 uniform, thereby reducing the loss of the lifting hook 1, in the process of the vertical adjustment part 112 pulling the lifting part 122 upward, the lifting part 122 can be deflected along the inclined top wall of the lifting hole 201 driven by the connecting part 121 until the contact area between the top surface of the lifting part 122 and the top wall of the lifting hole 201 is maximized.
[0058] In some embodiments, in order to prevent the hanging portion 122 from damaging the hanging hole 201, the hanging portion 122 is better matched with the hanging hole 201. Figure 1-Figure 2 A pressure block 123 is also provided at one end of the hanging part 122 facing away from the connecting part 121, and the top surface of the pressure block 123 is a pressure surface. In other words, the surface of the pressure block 123 is used to contact the top wall of the hanging hole 201, and the hanging part 122 can be attached to and tightly connected with the top wall of the hanging hole 201 through the pressure block 123.
[0059] Specifically, the pressure block 123 may be made of a compressible high-strength polymer material.
[0060] See also Figure 2 In order to facilitate the connection between the hoisting hook 12 and the mounting bracket 11, in some embodiments, a through slot 1211 is provided at one end of the connecting portion 121 facing away from the hoisting portion 122, and the connecting portion 121 is movably connected to the mounting bracket 11 through the through slot 1211. At this time, driven by the translation driving member 111, the connecting portion 121 can translate relative to the mounting bracket 11 within a certain range.
[0061] The mounting bracket 11 is connected to the connecting portion 121 , and can limit the connecting portion 121 to a certain extent, thereby preventing the connecting portion 121 from lateral movement relative to the mounting bracket 11 .
[0062] In some embodiments, the mounting bracket 11 is provided with a limit block for limiting the moving path of the lifting hook 12. The two limit blocks are used to limit the moving range of the lifting hook 12.
[0063] It should be noted that the size of the through slot 1211 should be sufficient to allow the connection portion 121 to rise, fall and swing relative to the support bracket within a certain range when driven by the vertical adjustment member 112 .
[0064] In order to prevent the contact between the mounting bracket 11 and the connecting part 121 from affecting the normal movement of the connecting part 121, a plurality of guide blocks are provided on the outer circumference of the mounting bracket 11. The guide blocks are made of a material with a smooth surface, such as polytetrafluoroethylene, etc. The guide blocks have good friction reduction performance.
[0065] When the connecting portion 121 moves up and down, swings or translates relative to the mounting bracket 11, the connecting portion 121 can directly contact the guide block. The guide block can help reduce the friction between the connecting portion 121 and the mounting bracket 11, ensuring the normal movement of the connecting portion 121.
[0066] The above-mentioned lifting hook 1 is hooked and unhooked through the lifting hole 201 on the component to be lifted. Figure 3-Figure 4 .exist Figure 3 In the embodiment, the lifting hook 12 is inserted into the lifting hole 201 through the pressure block 123. Figure 4 In the embodiment, the hoisting hook 12 is driven by the translation driving member 111 to disengage from the hoisting hole 201 .
[0067] When hoisting a component with multiple hoisting holes 201, the hoisting hook 1 can be used to cooperate with each hoisting hole 201 respectively. At this time, the hoisting hook 1 can adjust its height and inclination according to the actual situation of the hoisting holes 201 to quickly achieve force balance at each hoisting hole 201.
[0068] Considering the complex and changeable ocean currents and strong winds and waves in the deep-sea operation environment, the difficulty of the lifting operation is further increased. In order to reduce the difficulty of deep-sea lifting operations to at least a certain extent and improve the lifting efficiency, in the second aspect, the embodiment of the present application provides a lifting device for lifting a cylinder 20 with a lifting hole 201, including a hanger 2, a positioning seat 3 and a lifting hook 1, please refer to Figure 5-Figure 13 .
[0069] For details, please refer to Figure 5The sling is suitable for the lifting of super-large cylindrical wave-proof components, wherein the hanger 2 is a support structure with a certain thickness, and can be connected to a hook on a crane ship through a sling to achieve lifting. In order to ensure the safety of the hanger 2 when in use, the middle part of the hanger 2 is also connected to the auxiliary hook on the crane ship through a plurality of auxiliary slings. The orthographic projection of the hanger 2 is circular, and a positioning rod 21 and the above-mentioned mounting bracket 11 are provided below the hanger 2 and are provided along the radial direction of the hanger 2. The number of the positioning rod 21 and the mounting bracket 11 is multiple and they are arranged in sequence along the circumference of the hanger 2. The positioning seat 3 is provided at the end of the cylinder 20, and the positioning seat 3 is provided with a guide positioning socket 301. The opening size of the guide positioning socket 301 gradually decreases toward the side close to the cylinder 20, and the positioning rod 21 can be matched with the positioning seat 3 through the guide positioning socket 301. The lifting hook 1 is any of the above-mentioned lifting hooks 1, and the lifting hook 12 in the lifting hook 1 is installed below the hanger 2 through the above-mentioned mounting bracket 11. When the positioning rod 21 is connected to the positioning seat 3 through the guide positioning socket 301, the lifting hook 1 is arranged relative to the lifting hole 201 and inserted or retracted relative to the lifting hole 201.
[0070] First, during lifting, a plurality of lifting hooks 1 are evenly spaced along the circumference of the hanger 2. The hanger can achieve basic circumferential positioning of the hanger 2 and the cylinder 20 through the positioning rod 21 located below the hanger 2 cooperating with the positioning seat 3 located on the cylinder 20. At this time, the relative arrangement of the lifting hook 1 and the lifting hole 201 located on the cylinder 20 can be achieved, which is helpful for the subsequent cooperation and connection between the lifting hook 1 and the lifting hole 201 on the cylinder 20 and the rapid hooking and unhooking of the cylinder 20, so as to improve the lifting efficiency of the cylinder 20. The mutual cooperation between the positioning seat 3 and the positioning rod 21 can achieve rapid circumferential positioning of the hanger and the cylinder 20, effectively reducing the difficulty of cooperation between the hanger and the cylinder 20, and reducing the difficulty of lifting the concrete cylinder 20 in the deep-sea working environment. When the hanger cooperates with the corresponding cylinder 20 in the circumferential direction, the lifting hook 1 can respectively cooperate with the corresponding lifting holes 201 in the circumferential direction, please refer to Figure 6 , so that the hoisting pressure at each hoisting hole 201 of the cylinder 20 remains uniform, so as to effectively eliminate the unbalance error caused by the processing error of the hoisting hole 201, improve the hoisting safety, and reduce the difficulty of the hoisting operation.
[0071] In order to better control each lifting hook 1, a hydraulic power system can also be provided on the hanger 2, and the hydraulic power system includes a hydraulic pump and a hydraulic pipeline, one end of the hydraulic pipeline is connected to the hydraulic pump, and the other end is connected to the vertical jacks 1121 in all the lifting hooks 1. Through the precise control of each vertical jack 1121, the unbalance error that may exist at each lifting hole 201 is effectively eliminated, and the lifting pressure is locked.
[0072] By arranging the technical solution of locating the hydraulic power system on the hanger 2, the length of the hydraulic pipeline in the hydraulic power system can be effectively shortened to reduce the resistance caused by friction in the hydraulic pipeline, avoid large fluctuations in the driving pressure, and help improve the control accuracy and control efficiency and reduce the control cost.
[0073] The structure and arrangement of the above-mentioned hydraulic power system are prior art and will not be described in detail here.
[0074] Of course, the above-mentioned translation driving member 111 can also be driven by a hydraulic power system, or by other electronically controlled motors and the like.
[0075] In other embodiments, the translation drive member 111 and the vertical adjustment member 112 may also have a remote control function, and the hooking and unhooking operations of the hoisting hook 1 may be controlled by remotely controlling the actions of the two components. The remote operation may be achieved through wireless networks, satellite control, 5G communication, etc. The above-mentioned methods for achieving remote operation are prior art and will not be described in detail here.
[0076] When the hoisting device is used to hoist the cylinder 20, in order to ensure safety during the hoisting process, the hoisting can be paused after reaching a certain load, and the oil pressure data of each hoisting hook 1 can be confirmed, and the loading can be continued after ensuring that the pressure of each hoisting hook 1 is balanced. The above process can be repeated several times until the full load is loaded and the cylinder 20 is completely hoisted.
[0077] In some embodiments, in order to further ensure the safety of hoisting, each of the above-mentioned hoisting hooks 1 may be provided with a camera assembly, so that the matching status of the hoisting hook 12 and the hoisting hole 201 can be obtained in real time during the hoisting process. The above-mentioned camera assembly can be connected to the central control room provided in the crane ship, and the central control room can obtain the operating status of each hoisting hook 1 in real time through the camera assembly, so as to monitor the hoisting work. Of course, the above-mentioned camera assembly can also be provided at other structures.
[0078] The connection between the above-mentioned camera assembly and the central control room can realize the visualization of the lifting site, avoid the safety problems that may arise in manual inspection of the lifting site, and at the same time realize the defect of poor information exchange between the crane ship and large lifting components, thereby improving the safety of artificial offshore operations.
[0079] When the above-mentioned lifting equipment is used for lifting operations, please refer to Figure 5 As the hanger 2 gradually approaches the cylinder 20, the positioning rod 21 located below the hanger 2 can cooperate with the positioning seat 3 through the guide positioning socket 301, see Figure 7. In this process, the guide positioning socket 301 can realize the automatic circumferential positioning of the hanger 2 and the cylinder 20 by guiding the positioning rod 21 to slide down to cooperate with the positioning seat 3. After the positioning rod 21 slides to the bottom of the guide positioning socket 301, the hanger 2 and the lifting hook 1 located on the hanger 2 are aligned with the cylinder 20 in the circumferential direction, and finally the hanger 2 is located at the end of the cylinder 20, and the lifting hook 1 cooperates with the wall of the cylinder 20. The guide positioning socket 301 on the positioning seat 3 can help reduce the difficulty of matching the positioning rod 21 and the positioning seat 3, and realize the rapid connection and positioning of the positioning rod 21 and the positioning seat 3, so as to achieve the purpose of reducing the difficulty of lifting the concrete cylinder 20 in the deep-sea working environment.
[0080] When arranging the positioning rod 21, the positioning seat 3 and the lifting hook 1, it is necessary to set the relative position relationship between the positioning rod 21 and the lifting hook 1 located on the hanger 2 to be consistent with the relative position relationship between the positioning seat 3 and the lifting hole 201 provided on the cylinder 20, so as to ensure that after the positioning rod 21 and the positioning seat 3 cooperate with each other, the lifting hook 1 and the lifting hole 201 respectively provided on the hanger 2 and the cylinder 20 can also cooperate exactly.
[0081] It should be noted that in order to ensure the lifting effect, generally, the number of positioning rods 21 and lifting hooks 1 is not less than three, and the number and distribution positions of the lifting hooks 1 can be adaptively adjusted according to the lifting holes 201 (i.e., the number of lifting points) on the cylinder 20 component to be lifted.
[0082] In some embodiments, the number of the positioning rods 21 and the number of the lifting hooks 1 are both four and are evenly arranged along a ring on the hanger 2. In order to reduce the difficulty of the positioning rods 21 and the positioning seats 3 to quickly achieve circumferential matching and align the hanger 2 and the cylinder 20 in the circumferential direction, it is necessary to set the positioning rods 21 to have a certain length and to extend along the axial direction of the hanger 2.
[0083] In addition, the positioning rods 21 arranged along the axial extension of the hanger 2 can also cooperate with cylinders 20 and positioning seats 3 of various specifications, which helps to improve the applicability of the hanger.
[0084] For the convenience of operation, generally speaking, before the cylinder 20 to be hoisted is transported to the sea, the positioning seat 3 needs to be assembled on the cylinder 20 .
[0085] Specifically, the positioning seat 3 can be assembled on the cylinder 20 during the processing of the cylinder 20, and the positioning seat 3 is firmly combined with the cylinder 20 and cannot be separated; or, after the cylinder 20 is processed, the positioning seat 3 can be connected to the cylinder 20 in a detachable manner to facilitate its recycling and reuse. For example, the component made of concrete (i.e., the cylinder 20) can be secured and fixed during the outfitting of the prefabrication plant, see Figure 8 .
[0086] In some embodiments, see Figure 7 and Fig.10 The positioning seat 3 includes a fixedly connected guide alignment portion 31 and a seat portion 32, wherein the seat portion 32 is used to be fixedly connected to the cylinder 20, and the guide alignment portion 31 is located at one end of the seat portion 32 facing away from the cylinder 20, and is used to cooperate with the positioning rod 21.
[0087] Specifically, the guide alignment portion 31 includes two guide members 311 arranged opposite to each other, and the guide positioning socket 301 is disposed between the two guide members 311 and points to the seat portion 32. The opening shape of the guide positioning socket 301 is a trumpet-shaped structure, and the opening size gradually increases from the seat portion 32 to the guide alignment portion 31.
[0088] The positioning rod 21 can be inserted between the two guide members 311 through the guide positioning socket 301 and connected to the seat 32 through the alignment portion. The end of the positioning rod 21 pointing to the guide positioning socket 301 has a tapered width that matches the shape of the guide positioning socket 301.
[0089] In some embodiments, the two guide members 311 are symmetrically arranged.
[0090] In some embodiments, the end of the seat 32 facing away from the guiding and aligning portion 31 includes a first connecting plate 321 and a second connecting plate 322 arranged opposite to each other, and the minimum distance between the first connecting plate 321 and the second connecting plate 322 is greater than the wall thickness of the cylinder 20 to be hoisted. At least one of the first connecting plate 321 and the second connecting plate 322 is provided with a clamping adjustment member 323. When the cylinder 20 is connected to the seat 32, the first connecting plate 321 and the second connecting plate 322 are respectively located at the inner and outer sides of the cylinder 20, and the clamping adjustment member 323 passes through the first connecting plate 321 or the second connecting plate 322 and abuts against the inner wall or the outer wall of the cylinder 20.
[0091] It should be noted that the positioning seat 3 is only used to cooperate with the positioning rod 21 to achieve the circumferential positioning of the cylinder 20 and the hanger 2, and the positioning seat 3 does not bear the lifting pressure of the cylinder 20.
[0092] In some embodiments, see Figure 7The number of the above-mentioned first connecting plates 321 is multiple, and they are tubular or flat sheet structures. The number of the corresponding second connecting plates 322 can also be multiple, and their structures are basically the same as those of the first connecting plates 321.
[0093] Specifically, at least two clamping adjustment members 323 may be arranged on the first connecting plate 321 and the second connecting plate 322. The clamping adjustment members 323 may be T-shaped threaded screws. The clamping adjustment members 323 are used to fix the seat 32 on the cylinder 20. Fig.10 By adjusting the clamping adjusting member 323, the first connecting plate 321 and the second connecting plate 322 can be firmly combined with the cylinder 20. In addition, within a certain range, such a structural design can also make the positioning seat 3 applicable within a certain range and can be installed on the ends of cylinders 20 of various sizes.
[0094] In addition, the ends of the first connecting plate 321 and the second connecting plate 322 facing away from the guiding alignment portion 31 are both deflected in opposite directions to form a flared opening, and the cylinder 20 can be inserted into the seat portion 32 through the flared opening to match the seat portion 32. The flared opening can reduce the difficulty of connecting the positioning seat 3 and the cylinder 20.
[0095] During processing, the positioning seat 3 can be welded from seamless steel pipes and steel plates, wherein the two guide pieces 311 used to form the guide positioning socket 301 can be welded from arc-shaped seamless steel pipes. The side wall of the guide piece 311 used to form the guide positioning socket 301 is a smooth curved surface without any angle blocking, which can guide the positioning rod 21 to quickly position. Figure 7 and Fig. 9 ,in, Fig. 9 Only the lower structure of the hanger 2 is drawn.
[0096] Under the guidance and positioning of the positioning rod 21 and the positioning seat 3, the lifting device can overcome the problems of large shaking amplitude and high difficulty in alignment in the marine working environment to a certain extent, and realize the rapid circumferential alignment of the cylinder 20 with the hanger 2 and the lifting hook 1 on the hanger 2. Subsequently, the lifting device can realize the rapid hooking and unhooking of the cylinder 20 through the lifting hook 1 to improve the lifting efficiency of the cylinder 20.
[0097] In order to further reduce the difficulty of offshore lifting operations, improve lifting efficiency, and overcome the shaking problem, in some embodiments, the lifting device can also be configured to include a guide frame 4.
[0098] See also Figure 11-13 The guide frame 4 is disposed below the hanger 2 and protrudes downward along the axis of the hanger 2 relative to any one of the positioning rod 21 and the hoisting hook 1 in the axial direction of the hanger 2 .
[0099] At this time, the guide frame 4 can partially extend into the cylinder 20 before the positioning rod 21 cooperates with the positioning seat 3, so as to achieve preliminary positioning of the cylinder 20 and the hanger in the radial direction.
[0100] Specifically, one end of the guide frame 4 used for inserting into the cylinder 20 is formed with an inwardly contracted bevel structure. When the axis of the hanger 2 does not coincide with the axis of the cylinder 20, as the guide frame 4 is inserted into the cylinder 20, the bevel structure of the guide frame 4 will first contact the cylinder wall, and then the guide frame 4 will automatically slide down along the bevel direction under the guidance of the cylinder wall, so that the axis of the hanger 2 remains parallel to and substantially coincides with the axis of the cylinder 20. After the guide frame 4 extends into the cylinder 20 for a certain distance, the cylinder 20 and the hanger can be initially positioned in the radial direction.
[0101] Since the weight of the cylinder 20 is relatively large, it has sufficient wind and wave resistance. The crane ship will shake to a certain extent under the influence of the wind volume, and drive the sling to shake. When the guide frame 4 in the sling extends into the cylinder 20 for a certain distance, the guide frame 4 inserted into the cylinder 20 can effectively avoid the influence of the wind volume under the limitation of the cylinder 20. At this time, the hanger 2 and the positioning rod 21 and the lifting hook 1 located on the hanger 2 can also remain basically stable in the radial direction relative to the cylinder 20, thereby greatly reducing the difficulty of subsequent circumferential positioning operations and lifting operations. For example, it helps to reduce the difficulty of matching the positioning rod 21 with the positioning seat 3.
[0102] In order to prevent the guide frame 4 from affecting the normal use of the positioning rod 21 and the lifting hook 1, it is necessary to set the above-mentioned guide frame 4 on the hanger 2 so that its orthographic projection falls within the orthographic projection of the cylinder 20 on the hanger 2. Generally speaking, the diameter of the circle where the end of the orthographic projection of each guide frame 4 on the hanger 2 points to the radial outside of the hanger 2 is slightly smaller than the inner diameter of the cylinder 20.
[0103] In some embodiments, the number of the guide frames 4 is four and they are evenly spaced and arranged on the hanger 2. Fig.12 , for easy viewing, Fig.12 The lifting hook 1 is not shown.
[0104] See also Figure 11-13 The maximum distance between the outer edges of the two oppositely arranged guide frames 4 in the radial direction is smaller than the inner diameter of the cylinder 20 , so that the guide frames 4 can be easily inserted into the cylinder 20 .
[0105] In some embodiments, along the radial direction of the hanger 2 , the guide frame 4 extends outwardly at an angle, and at least one end of the guide frame 4 facing away from the hanger 2 is inclined inward to form a guiding angle 41 .
[0106] For details, please refer to Fig.11 and Fig.13, arranged along the radial direction of the hanger 2, the outer side wall of the guide frame 4 includes a first outer side wall and a second outer side wall, the first outer side wall connects the second outer side wall and the hanger 2, the end of the first outer side wall facing away from the hanger 2 is inclined toward the outside of the hanger 2, and the side of the second outer side wall facing away from the hanger 2 is inclined toward the inside of the hanger 2; the inner side wall of the guide member connects the hanger 2 and the second outer side wall. The above-mentioned guide bevel 41 is formed on the second outer side wall.
[0107] Such a structural design helps to reduce the difficulty of inserting the guide frame 4 into the cylinder 20, and can help to increase the speed of the combination of the guide frame 4 and the cylinder 20, so as to achieve rapid insertion of the guide frame 4 into the cylinder; at the same time, after the guide frame 4 is extended into the cylinder 20, the special structure of the middle part of the guide frame 4 that protrudes radially outward can be used to further position the guide frame 4 on the cylinder 20 in the radial direction, thereby improving the radial positioning accuracy of the sling and the cylinder 20, and helping to reduce the difficulty of the subsequent coordination between the positioning rod 21 and the lifting hook 1 and the cylinder 20.
[0108] In addition, the above structure can reduce the swing amplitude of the lifting device relative to the cylinder 20 to be lifted, while also providing certain protection for the inner wall of the cylinder 20 and the lifting hook 1 located under the hanger 2, thereby avoiding damage to the cylinder 20 or the lifting hook 1 during the lifting operation.
[0109] Specifically, the minimum distance between the guide bevel 41 and the inner wall of the cylinder 20 is 0.2 m, and the maximum distance is 1 m.
[0110] See also Fig.12 The guide frame 4 and the positioning rod 21 are arranged opposite to each other in the radial direction of the hanger 2.
[0111] Taking into account the possible interference between the guide frame 4 and the lifting hook 1, in some embodiments, the guide frame 4 and the lifting hook 1 can be arranged to be spaced apart in the circumferential direction of the hanger 2; or, the height of the end of the guide frame 4 with the largest radial dimension is always set to be lower than the height of the lifting hook 12 in the lifting hook 1.
[0112] The following is a detailed introduction to the hoisting process of the sling:
[0113] First, the sling needs to be connected to the hooks (including the main hook and the auxiliary hook) on the crane ship in sequence through the corresponding slings, etc., and at the same time, ensure that the lifting hooks 12 in each lifting hook 1 in the sling are all returned to the unhooking position. When the sea conditions and weather conditions meet the operation requirements, the crane ship enters the lifting station and lifts the sling to a suitable height, then adjusts the hook position so that the axis of the sling is basically coincident with the axis of the cylinder 20 to be lifted; lowers the sling so that the guide frame 4 extends into the cylinder 20. When the positioning rod 21 is about 2m away from the top of the cylinder 20, stop lowering the sling and slowly adjust the hook position of the crane ship so that the positioning rod 21 below the sling is basically corresponding to the guide positioning socket 301 of the positioning seat 3 located at the top of the cylinder 20 (generally, the deviation between the two should be controlled within 300mm). Then continue to lower the sling. At this time, the sling can automatically slide down and align with the positioning seat 3 driven by the positioning rod 21, and finally the sling is located on the top of the cylinder 20. At this time, the deviation between the sling and the cylinder 20 in the circumferential direction can be controlled within the design range.
[0114] At this time, the lifting hook 12 in the lifting hook 1 is located in the cylinder 20 and points to the lifting hole 201 of the cylinder 20. It is generally designed that the axial distance between the pressure block 123 of the lifting hook 12 and the top wall of the lifting hole 201 does not exceed 50 mm. Then the lifting hook 1 can be started, and the lifting hook 12 can be controlled to move radially along the hanger 2 and inserted into the lifting control under the drive of the horizontal drive member. The lifting hook 12 automatically stops after contacting the limit block. At this time, the lifting hook 1 cooperates with the cylinder 20 through the lifting hole 201. Then start the vertical adjustment member 112 to adjust the pressure block 123 located at the lifting hook 12 to be in close contact with the top wall of the lifting hole 201 until the oil pressure of each lifting point is uniform. At this time, the forces at each lifting hook 1 are balanced.
[0115] Finally, lock the pressure value at the vertical adjustment member 112 corresponding to the lifting hook 12, and keep this state for a period of time, generally 20 minutes, when the hook is lifted to 20% of the rated load. During the waiting process, it is necessary to check again to confirm whether the pressure values at each lifting hook 1 remain uniform. Then continue to increase the load to 75% of the rated load, and repeat the above steps. Continue to load to the full load and carry out the lifting operation of the cylinder 20.
[0116] After the cylinder 20 is in place and installed stably, the lifting device is lowered to fall on the top of the cylinder 20 again, and the lifting hook 1 at each lifting point is depressurized and returned, and the lifting hook 12 completely releases the lifting force and retracts to the unhooking position. After confirming that each lifting point is separated, the lifting device is lifted, and the crane ship leaves the lifting station, and this lifting is completed.
[0117] After the cylinder 20 is completely stabilized, the positioning seat 3 arranged on the cylinder 20 can be recovered as needed so as to be reused in subsequent lifting operations.
[0118] It can be understood that the sling provided in the embodiment of the present application is more suitable for marine working environment than traditional slings. It can not only solve the problems of large size, high dead weight, harsh construction environment and difficulty in manual operation of large cylindrical structures, but also help overcome common unfavorable factors such as force imbalance and dynamic load impact during the lifting process, and realize rapid guidance, precise positioning and automatic lifting detection and adjustment during the lifting process, which can effectively overcome the prefabrication error of the cylinder 20 and realize safe and efficient offshore lifting operations. Among them: the sling can realize the circumferential positioning of the hanger 2 and the cylinder 20 through the cooperation of the positioning rod 21 and the positioning seat 3, at this time, it can be ensured that the lifting hook 1 provided on the hanger 2 and the lifting hole 201 provided on the cylinder 20 are arranged relatively in the circumferential direction; the guide frame 4 can realize the rapid positioning of the hanger 2 and the cylinder 20 in the radial direction, which helps to reduce the relative shaking between the sling and the cylinder 20 to be lifted, and to a certain extent reduce the influence of the shaking caused by waves and airflow on the lifting operation. At this time, the cooperation of the above-mentioned components can realize the rapid guidance and rapid positioning of the lifting hook 1 and the cylinder 20. The lifting hook 12 in the lifting hook 1 can be quickly hooked and unhooked with the lifting hole 201 under the action of the translation drive member 111 and the vertical adjustment member 112 to improve the lifting efficiency. At the same time, the translation drive member 111 in the lifting hook 1 can also be used to adjust the radial distance between the lifting hook 12 and the cylinder 20 to adapt to the lifting operation of cylinders 20 of different specifications; the vertical adjustment member 112 is used to adjust the height of the lifting hook 12, and the hook ear seat 1122 hinged to the connecting portion 121 can be used to adjust the height of the lifting hook 12. Under the premise of ensuring the normal cooperation between the lifting hook 12 and the lifting hole 201, the lifting part 122 can be attached to the top wall of the lifting hole 201 through the pressure block 123, ensuring that each lifting hook 12 can be automatically leveled with the lifting hole 201, helping to overcome the problem of uneven distribution of lifting pressure of the cylinder 20 due to the processing height of the lifting hole 201 and the opening error, ensuring the lifting pressure at each lifting hook 12 is balanced, and ultimately achieving the purpose of reducing the difficulty of lifting and improving the lifting efficiency.
[0119] The above description of various embodiments tends to emphasize the differences between the various embodiments. The same or similar aspects can be referenced to each other, and for the sake of brevity, they will not be repeated herein.
[0120] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A lifting hook for lifting, used for lifting a component with a lifting hole, characterized in that: include: The mounting bracket is provided with a translation driving member and a vertical adjusting member, wherein the vertical adjusting member is arranged on the mounting bracket via an action end of the translation driving member and can translate relative to the mounting bracket under the drive of the translation driving member; The hoisting hook comprises a connecting portion and a hoisting portion which are connected to each other, wherein the connecting portion is used for being swingably connected to the vertical adjusting member, and at least a part of the hoisting portion is located below the mounting bracket and is used for cooperating with the hoisting hole.
2. The lifting hook according to claim 1, characterized in that: The vertical adjustment member comprises a vertical jack and a hook ear seat, wherein the hook ear seat connects the vertical jack and the connecting portion, and the hook ear seat is hinged to the connecting portion.
3. The hoisting hook according to claim 1, characterized in that: The hoisting part is an L-shaped structure, and a pressure block is provided at one end of the hoisting part facing away from the connecting part, and the hoisting part is attached to the top wall of the hoisting hole through the pressure block.
4. The hoisting hook according to claim 1, characterized in that: A through slot is provided at one end of the connecting portion facing away from the hoisting portion, and the connecting portion is movably connected to the mounting bracket via the through slot.
5. A lifting device for lifting a cylinder having a lifting hole, characterized in that: include: A hanger, wherein the orthographic projection of the hanger is circular, and a positioning rod extending radially of the hanger is provided below the hanger, wherein the number of the positioning rods is multiple and the positioning rods are sequentially arranged at intervals along the circumference of the hanger; A positioning seat is arranged at the end of the cylinder, the positioning seat is provided with a guide positioning socket, the opening size of the guide positioning socket is gradually reduced toward the side close to the cylinder, and the positioning rod can be matched with the positioning seat through the guide positioning socket; A lifting hook, wherein the lifting hook is the lifting hook according to any one of claims 1 to 4, wherein the mounting bracket extends radially along the hanger and is fixedly arranged below the hanger, and the number of the lifting hooks is multiple and is arranged at intervals along the circumference of the hanger; When the positioning rod is connected to the positioning seat via the guide positioning socket, the hanging hook is arranged opposite to the hanging hole and can be inserted into or retracted relative to the hanging hole.
6. The sling according to claim 5, characterized in that: The positioning seat comprises a guide alignment portion and a seat portion which are fixedly connected, the guide alignment portion comprises two guide members which are arranged opposite to each other, and the guide positioning socket is arranged between the two guide members and points to the seat portion.
7. The sling according to claim 6, characterized in that: The end of the seat portion facing away from the guiding and aligning portion comprises a first connecting plate and a second connecting plate arranged opposite to each other, and at least one of the first connecting plate and the second connecting plate is provided with a clamping adjustment member; When the cylinder is connected to the seat, the first connecting plate and the second connecting plate are respectively located at the inner and outer sides of the cylinder, and the clamping adjustment member passes through the first connecting plate or the second connecting plate to abut against the inner wall or outer wall of the cylinder.
8. The sling according to any one of claims 5 to 7, characterized in that: The hanger is also provided with a guide frame, which is arranged below the hanger and protrudes downward relative to any one of the positioning rod and the hanging hook in the axial direction of the hanger, and the orthographic projection of the guide frame on the hanger falls within the orthographic projection of the cylinder on the hanger; After the guide frame is inserted into the cylinder, the positioning rod can cooperate with the positioning seat.
9. The sling according to claim 8, characterized in that: There are multiple guide frames arranged on the hanger in a circular pattern. Along the radial direction of the hanger, the guide frames extend outwardly at an angle, and at least one guide frame has an end facing away from the hanger and tilted inward to form a guiding angle.
10. The sling according to claim 8, characterized in that: The guide frame and the lifting hook are arranged at intervals in the circumferential direction of the hanger; And / or, the guide frame and the positioning rod are arranged opposite to each other in the radial direction of the hanger.