Rotation control method for tower crane

By calculating the torque and environmental data during the rotation of the tower crane, the automatic control of the tower crane slewing is realized, which solves the problems of low accuracy and high safety hazards in the traditional tower crane slewing control methods, and improves construction efficiency and safety.

CN118929462AInactive Publication Date: 2024-11-12JIANGXI DEYE ZHIHUI IOT TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410999449.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure CN118929462A_ABST
    Figure CN118929462A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of mechanical control, and discloses a rotation control method for a tower crane, which comprises the following steps: when a forearm of the tower crane suspends an object to rotate, acquiring the distance between the object and a rotation support, and recording the distance as P; the mass center of the object is obtained, and the distance between the mass center and the rotation center of the tower crane forearm is calculated and recorded as L; the weight of the object is obtained and recorded as W; calculating a comprehensive distance D according to the distance L and the distance P, and calculating a moment M according to the comprehensive distance D and the weight W; according to the calculated moment M, determining control parameters of the tower crane rotary motor; and acquiring real-time environment data, and adjusting the control parameters according to the real-time environment data. By acquiring the distance P, the distance L and the weight W, the moment M of the object in rotation is accurately calculated, and stable and accurate rotation of the tower crane is ensured. Meanwhile, control parameters are dynamically adjusted according to real-time environment data, the accuracy and adaptability of tower crane rotation control are improved, the tower crane rotation control system adapts to different environments and working conditions, and the working efficiency and safety are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of mechanical control, and in particular to a slewing control method for a tower crane. Background Art

[0002] As an indispensable large-scale lifting equipment in modern construction, the precise control of the slewing mechanism of tower cranes is of great significance to improving construction efficiency and ensuring construction safety. However, traditional tower crane slewing control methods mostly rely on manual operation, which has problems such as low operating accuracy, slow response speed and great safety hazards. With the development of automation technology, higher requirements are also put forward for the slewing control of tower cranes. Especially in large-scale engineering projects, efficient and precise control of tower cranes plays a vital role in construction quality and progress.

[0003] Therefore, a slewing control method for a tower crane is invented, which can improve the automation level, operation accuracy and response speed of the slewing control of the tower crane and reduce safety hazards. Summary of the invention

[0004] In view of this, the present invention proposes a slewing control method for a tower crane, aiming to improve the automation and intelligence level of the slewing control of the tower crane, further ensure construction safety and improve construction efficiency.

[0005] The present invention proposes a slewing control method for a tower crane, comprising:

[0006] When the tower crane forearm suspends an object and rotates, obtain the distance between the object and the slewing support, which is recorded as P;

[0007] Get the center of mass of the object and calculate the distance between the center of mass and the rotation center of the tower crane forearm, denoted as L;

[0008] Get the weight of the object, denoted as W;

[0009] Calculate a comprehensive distance D according to the distance L and the distance P, and calculate a moment M according to the comprehensive distance D and the weight W;

[0010] According to the calculated torque M, the control parameters of the tower crane's slewing motor are determined;

[0011] Acquire real-time environmental data and adjust control parameters according to the real-time environmental data.

[0012] Preferably, obtaining the center of mass of the object includes:

[0013] Divide the object into several small parts and measure the mass of each small part, recorded as mi;

[0014] Determine the geometric center coordinates (x i ,yi ,z i ), according to the mass and geometric center coordinates of each small part, use the center of mass calculation formula to calculate the center of mass coordinates of the object (x cm ,y cm ,z cm );

[0015] The calculation formula for calculating the centroid coordinates is:

[0016]

[0017] Among them, ∑m i is the total mass of all the small parts.

[0018] Preferably, the distance between the center of mass and the rotation center of the tower crane forearm is calculated, including:

[0019] Get the position coordinates of the rotation center (x 0 ,y 0 ,z 0 );

[0020] According to the position coordinates of the rotation center (x 0 ,y 0 ,z 0 ) and the centroid coordinates (x cm ,y cm ,z cm ), calculate the distance L between the center of mass and the rotation center of the tower crane forearm, the calculation formula is:

[0021]

[0022] Preferably, when calculating the comprehensive distance D according to the distance L and the distance P, and calculating the moment M according to the comprehensive distance D and the weight W, it includes:

[0023] The comprehensive distance D is calculated according to the following formula:

[0024]

[0025] Calculate the moment M according to the following formula:

[0026] M = W·D.

[0027] Preferably, according to the calculated torque M, the control parameters of the tower crane slewing motor are determined, including:

[0028] Obtain the vertical distance between the highest point of the object and the forearm of the tower crane, recorded as Lx, and compare the vertical distance Lx with the preset vertical distance value Lt;

[0029] When the vertical distance Lx is greater than the vertical distance preset value Lt, the torque M is adjusted according to the vertical distance Lx, and the adjusted torque is recorded as Ma, and then the control parameters of the tower crane rotary motor are determined according to the torque Ma;

[0030] When the vertical distance Lx is not greater than the preset vertical distance value, the torque M is not adjusted, and the control parameters of the tower crane rotary motor are determined according to the torque M;

[0031] Wherein, the control parameters include rotation speed and rotation angle.

[0032] Preferably, when the vertical distance Lx is greater than the vertical distance preset value Lt, the moment M is adjusted according to the vertical distance Lx, and the adjusted moment is recorded as Ma, including:

[0033] The torque adjustment factor k is calculated by the following formula:

[0034]

[0035] According to the adjustment coefficient k and the moment M, the adjusted moment Ma is calculated by the following formula:

[0036] Ma=M·k.

[0037] Preferably, when determining the control parameters of the tower crane slewing motor according to the torque M, it includes:

[0038] According to the torque M and the efficiency factor e, the motor torque z is calculated by the following formula:

[0039] z = M·e;

[0040] According to the moment of inertia j and the motor torque z, the rotation speed w is calculated by the following formula:

[0041]

[0042] Preferably, when determining the control parameters of the tower crane slewing motor according to the torque M, it also includes:

[0043] The rotation angle θ(t) within time t is calculated according to the following formula:

[0044]

[0045] Among them, w 0 is the initial angular velocity; θ 0 is the initial angle.

[0046] Preferably, obtaining real-time environmental data and adjusting control parameters according to the real-time environmental data includes:

[0047] The real-time environmental data includes wind speed Vwind and wind direction θwind. According to the wind speed Vwind and wind direction θwind, the wind load Fwind is calculated by the following calculation formula:

[0048]

[0049] Among them, ρ is the air density; A is the frontal area of ​​the object; Cd is the drag coefficient;

[0050] Preset the maximum wind load Fmax and the minimum wind load Fmin, and compare the maximum wind load Fmax with the wind load Fwind;

[0051] When the maximum wind load Fmax is greater than the wind load Fwind, and the minimum wind load Fmin is less than the wind load Fwind, the rotation speed is adjusted according to the maximum wind load Fmax and the wind load Fwind to obtain a new rotation speed wn; when the maximum wind load Fmax is less than or equal to the wind load Fwind, the tower crane stops rotating;

[0052] Among them, the rotation speed is adjusted according to the wind load Fwind and calculated by the following formula:

[0053]

[0054] w n =w·(1-ε).

[0055] Preferably, obtaining real-time environmental data and adjusting the control parameters according to the real-time environmental data also includes:

[0056] Obtain the distance dx from the wind load action point to the rotation center, and calculate the wind load moment Mwind based on the distance dx and the wind load Fwind. The calculation formula is:

[0057] Mwind=Fwind·dx;

[0058] The comprehensive moment Mtotal is calculated based on the wind load moment Mwind and moment M. The calculation formula is:

[0059] Mtotal=M+Mwind;

[0060] The rotation speed θr that should be reduced is calculated based on the comprehensive torque Mtotal. The calculation formula is:

[0061]

[0062] The final rotation speed θl is calculated based on the rotation speed θr that should be reduced. The calculation formula is:

[0063] θl=θ(t)-θr.

[0064] Compared with the prior art, the present invention has the following beneficial effects:

[0065] First, the present invention can accurately calculate the torque M generated by the object during the rotation process by obtaining the distance P between the object and the slewing support, the distance L between the center of mass of the object and the rotation center of the tower crane forearm, and the weight W of the object. This ensures that the tower crane can accurately and stably control the movement of the object during the rotation process, and effectively avoids safety accidents caused by inaccurate torque calculation. Secondly, the present invention further improves the accuracy and adaptability of the tower crane's slewing control by obtaining real-time environmental data and dynamically adjusting the control parameters. This enables the tower crane to adapt to different working environments and working conditions, and improves work efficiency and safety.

[0066] In conclusion, the tower crane rotation control method of the present invention has the advantages of accuracy, stability, and strong adaptability, and provides a strong guarantee for the safe and efficient operation of the tower crane. BRIEF DESCRIPTION OF THE DRAWINGS

[0067] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0068] Figure 1 A flow chart of a slewing control method for a tower crane provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0069] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments of the present invention and the features described in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0070] See also Figure 1 This embodiment provides a slewing control method for a tower crane, comprising:

[0071] S1. When the tower crane forearm suspends an object and rotates, obtain the distance between the object and the slewing support, which is recorded as P;

[0072] S2, obtain the center of mass of the object, and calculate the distance between the center of mass and the rotation center of the tower crane forearm, denoted as L;

[0073] S3, obtain the weight of the object, denoted as W;

[0074] S4, calculating a comprehensive distance D according to the distance L and the distance P, and calculating a moment M according to the comprehensive distance D and the weight W;

[0075] S5. Determine the control parameters of the tower crane slewing motor according to the calculated torque M;

[0076] S6. Acquire real-time environmental data and adjust control parameters according to the real-time environmental data.

[0077] It can be understood that this embodiment specifically provides a technical solution for the slewing operation control of a tower crane (hereinafter referred to as "tower crane"), which mainly involves the following steps:

[0078] First, when the object suspended by the forearm of the tower crane performs a rotation action, the vertical distance between the object and the slewing support of the tower crane is monitored and obtained in real time through a sensor or other measuring device, and this distance is recorded as P;

[0079] Secondly, the center of mass of the object is determined by a computing device, and the horizontal distance between the center of mass and the rotation center of the tower crane forearm is further calculated, and this distance is recorded as L;

[0080] Next, the weight of the object is measured by a weighing device and recorded as W;

[0081] Then, using the previously obtained distance L and distance P, a comprehensive distance D is obtained through a specific calculation formula; then according to the comprehensive distance D and weight W, the torque calculation formula in physical mechanics is used to calculate the corresponding torque M;

[0082] On this basis, according to the calculated torque M, the corresponding control parameters of the tower crane's rotary motor, such as the speed, are determined through the control algorithm;

[0083] Finally, the current working environment data of the tower crane, such as wind speed, is obtained through the environmental sensing device, and the previously determined control parameters are optimized and adjusted using real-time environmental data to ensure the safety and stability of the tower crane's rotation operation.

[0084] Through the above steps, the tower crane rotation control method of the present invention can greatly improve the safety of operations while ensuring operation efficiency, avoid mechanical failures or safety accidents caused by improper rotation operations, is applicable to various types of tower cranes, and has broad application prospects.

[0085] In some embodiments of the present application, obtaining the center of mass of an object includes:

[0086] Divide the object into several small parts and measure the mass of each small part, recorded as mi;

[0087] Determine the geometric center coordinates (x i ,y i ,z i ), according to the mass and geometric center coordinates of each small part, use the center of mass calculation formula to calculate the center of mass coordinates of the object (x cm ,y cm ,z cm );

[0088] The calculation formula for calculating the centroid coordinates is:

[0089]

[0090] Among them, ∑m i is the total mass of all the small parts.

[0091] It can be seen that in order to accurately obtain the center of mass of the object, this embodiment takes the following steps: First, the entire object is carefully divided into multiple small parts or areas. Next, each small part or area is carefully weighed to obtain their respective weights, which we record as mi. Subsequently, we need to determine the geometric center coordinates of each small part or area in three-dimensional space, and these coordinates are represented by (xi, yi, zi). After obtaining the mass of each small part and their geometric center coordinates, we can use a specific calculation formula to calculate the center of mass coordinates of the entire object. In this formula, Σ represents the sum of all small parts, and m represents the center of mass of the entire object. i represents the mass of each small part, and M represents the total mass of all small parts. By calculating in this way, we can get the coordinates of the center of mass of the object (x cm ,y cm ,z cm ), thus completing the acquisition of the centroid.

[0092] It can be understood that the beneficial effect of this embodiment is to provide a method for accurately obtaining the center of mass of an object. By dividing the object into several small parts, measuring the mass and geometric center coordinates of each small part, and then summarizing them using the center of mass calculation formula, the accurate center of mass coordinates (x cm ,y cm ,z cm ). This method can greatly improve the accuracy of center of mass calculation and provide strong support for accurate calculation in related fields. At the same time, since the total mass of all small parts is taken into account, the calculation results are more comprehensive and reliable.

[0093] In some embodiments of the present application, when calculating the distance between the center of mass and the rotation center of the tower crane front arm, it includes:

[0094] Get the position coordinates of the rotation center (x 0 ,y 0 ,z 0 );

[0095] According to the position coordinates of the rotation center (x 0 ,y 0 ,z 0 ) and the centroid coordinates (x cm ,y cm ,z cm ), calculate the distance L between the center of mass and the rotation center of the tower crane forearm, the calculation formula is:

[0096]

[0097] It can be seen that in order to accurately calculate the distance between the center of mass and the rotation center of the tower crane forearm, this embodiment implements a series of steps, specifically including: first, it is necessary to obtain the position coordinates of the rotation center, which is the basis for calculation. The position coordinates of the rotation center are usually expressed as (x 0 ,y 0 ,z 0 ), where x 0 ,y 0 and z 0 They represent the horizontal coordinate, vertical coordinate and height coordinate of the rotation center in three-dimensional space. Next, we need to calculate the rotation center position coordinate (x 0 ,y 0 ,z 0 ) and the coordinates of the center of mass (x cm ,y cm ,z cm ) to perform a series of calculations. The centroid coordinates (x cm ,y cm ,z cm ) represents the position of the mass center of the tower crane forearm in three-dimensional space. Then, through the coordinates of the above two points, the distance L between the mass center and the rotation center of the tower crane forearm can be calculated. Through the above steps, the distance L between the mass center and the rotation center of the tower crane forearm can be obtained, which is of great significance for the operation and control of the tower crane.

[0098] It can be understood that the beneficial effect of this embodiment is that it provides a method for accurately calculating the distance between the center of mass and the rotation center of the tower crane forearm, which helps to more accurately evaluate the stability and working efficiency of the tower crane. In addition, this method not only improves the accuracy of the calculation, but also can reduce the potential risks caused by calculation errors in actual operation, thereby ensuring the safety and stability of the tower crane operation.

[0099] In some embodiments of the present application, when calculating the comprehensive distance D according to the distance L and the distance P, and calculating the moment M according to the comprehensive distance D and the weight W, it includes:

[0100] The comprehensive distance D is calculated according to the following formula:

[0101]

[0102] Calculate the moment M according to the following formula:

[0103] M = W·D.

[0104] It can be seen that the present embodiment adopts an innovative calculation method to determine the comprehensive distance D, which is mainly based on two basic distances L and P. First, the comprehensive distance D is solved according to a specific calculation formula, which may involve complex mathematical operations on L and P to ensure that an accurate and reliable comprehensive distance value is obtained. Then, another calculation formula is used to calculate the moment M based on the obtained comprehensive distance D and the weight W of the object. The calculation formula for calculating the moment M can reflect the intrinsic connection between the moment M and the comprehensive distance D and the weight W. Through this method, not only can the accurate value of the moment M be obtained, but also the scientificity and rationality of the entire calculation process can be ensured.

[0105] It can be understood that the beneficial effect of this embodiment is to provide an efficient and accurate method for calculating the moment M, which is particularly suitable for scenarios where multiple factors (distance and weight) need to be considered. This method effectively integrates two or more factors that affect the moment by introducing the concept of comprehensive distance D, thereby simplifying the calculation process and improving the calculation accuracy. In addition, this method also has strong flexibility and scalability, and the calculation formula can be adjusted and optimized according to actual needs to meet the calculation needs in different scenarios.

[0106] In practical applications, the method of this embodiment can be widely used in various occasions where torque calculation is required, such as mechanical engineering, physics research, aerospace and other fields. It should be pointed out that although the method of this embodiment has many advantages, in practical applications, it is still necessary to pay attention to the unification and conversion of units during the calculation process to avoid calculation errors caused by different units.

[0107] In summary, this embodiment provides a method for calculating torque based on distance and weight, which simplifies the calculation process and improves the calculation accuracy by introducing the concept of comprehensive distance D. The method has strong flexibility and scalability, can be widely used in various occasions where torque calculation is required, and provides strong support for research and application in related fields.

[0108] In some embodiments of the present application, when determining the control parameters of the tower crane slewing motor according to the calculated torque M, it includes:

[0109] Obtain the vertical distance between the highest point of the object and the forearm of the tower crane, recorded as Lx, and compare the vertical distance Lx with the preset vertical distance value Lt;

[0110] When the vertical distance Lx is greater than the vertical distance preset value Lt, the torque M is adjusted according to the vertical distance Lx, and the adjusted torque is recorded as Ma, and then the control parameters of the tower crane rotary motor are determined according to the torque Ma;

[0111] When the vertical distance Lx is not greater than the preset vertical distance value, the torque M is not adjusted, and the control parameters of the tower crane rotary motor are determined according to the torque M;

[0112] Wherein, the control parameters include rotation speed and rotation angle.

[0113] It is understandable that in order to accurately determine the control parameters of the tower crane slewing motor in this embodiment, we will perform a series of analyses and adjustments based on the calculated torque M. The specific steps include: first, measuring and obtaining the vertical distance between the highest point of the object and the top of the tower crane forearm, and marking this distance as Lx. Next, compare and analyze this vertical distance Lx with a pre-set vertical distance reference value Lt; this step is to determine the size relationship between Lx and Lt.

[0114] If the measured vertical distance Lx is greater than the preset vertical distance value Lt, the torque M will be adjusted accordingly based on the actual vertical distance Lx. The adjusted torque will be marked as Ma. After the adjustment of the torque M, we will use this new torque Ma to determine the control parameters of the tower crane slewing motor. These control parameters include but are not limited to the slewing speed and slewing angle of the slewing motor. The selection and adjustment of these parameters are based on the calculation results of the torque Ma.

[0115] When the measured vertical distance Lx does not exceed the preset vertical distance value Lt, we will not make any adjustments to the torque M. In this case, we will directly determine the control parameters of the tower crane slewing motor based on the original calculated torque M. Whether adjusted or used directly, these control parameters will guide the operation of the tower crane slewing motor to ensure its safety and efficiency.

[0116] The control parameters mentioned above, such as slewing speed and slewing angle, are very important parts in the operation of tower cranes. They are directly related to the operating performance and operation accuracy of the tower crane, so in actual operation, they need to be carefully adjusted and controlled according to the actual situation. Through such an embodiment, it can be seen that by measuring and adjusting the relationship between the vertical distance and the moment, the working efficiency and safety of the tower crane can be very effectively improved.

[0117] In some embodiments of the present application, when the vertical distance Lx is greater than the preset vertical distance value Lt, the moment M is adjusted according to the vertical distance Lx, and the adjusted moment is recorded as Ma, including:

[0118] The torque adjustment factor k is calculated by the following formula:

[0119]

[0120] According to the adjustment coefficient k and the moment M, the adjusted moment Ma is calculated by the following formula:

[0121] Ma=M·k.

[0122] It is understandable that, in the present embodiment, if the vertical distance Lx exceeds the preset vertical distance threshold Lt, the torque M will be adjusted accordingly according to the vertical distance Lx, and the adjusted torque will be recorded as Ma. This process includes determining the torque adjustment coefficient k through a specific calculation formula, and the coefficient k is a key variable, which will directly affect the adjustment range and effect of the torque M.

[0123] After the torque adjustment coefficient k is determined, the adjusted torque Ma will be determined by another specific calculation formula using the coefficient k and the original torque M. This calculation formula is equally important because it will determine how the torque M is adjusted according to the torque adjustment coefficient k, thereby ensuring the normal operation and performance stability of the system or equipment.

[0124] Through these two calculation steps, it can be ensured that when the vertical distance Lx exceeds the preset value Lt, the torque M can be properly adjusted so that the torque Ma can meet the actual operation requirements. This process not only improves the flexibility of the system or equipment, but also ensures good performance under various operating conditions.

[0125] In some embodiments of the present application, when determining the control parameters of the tower crane slewing motor according to the torque M, it includes:

[0126] According to the torque M and the efficiency factor e, the motor torque z is calculated by the following formula:

[0127] z = M·e;

[0128] According to the moment of inertia j and the motor torque z, the rotation speed w is calculated by the following formula:

[0129]

[0130] It can be understood that in order to accurately control the slewing motor of the tower crane, this embodiment adopts a method of determining the control parameters based on the torque M, which involves the following steps:

[0131] First, we use a specific formula to calculate the motor’s torque z based on two key parameters: torque M and efficiency factor e. This calculation process is crucial because it is directly related to whether the motor can efficiently convert energy and ensure the stability and reliability of the rotating system.

[0132] Next, after obtaining the motor torque z, it is necessary to further determine the tower crane's rotation speed w. This step is completed by comprehensively considering the moment of inertia j and the motor torque z. We use another calculation formula to calculate the rotation speed w, which ensures that the tower crane's rotation speed can be maintained at the optimal state under different load and operating conditions.

[0133] In summary, through these two calculation steps, the parameters of the tower crane slewing motor can be effectively controlled according to the torque M, thereby achieving precise regulation of the slewing speed. This method not only improves the operational flexibility and efficiency of the tower crane, but also ensures the safety and stability of the work, meeting the needs of a series of engineering applications.

[0134] In some embodiments of the present application, when the control parameters of the tower crane slewing motor are determined according to the torque M, it also includes:

[0135] The rotation angle θ(t) within time t is calculated according to the following formula:

[0136]

[0137] Among them, w 0 is the initial angular velocity; θ 0 is the initial angle.

[0138] In some specific implementation cases, in order to accurately control the slewing motor of a tower crane, we not only consider the key factor of torque M, but also involve a series of control parameters. The determination process of these parameters includes but is not limited to the following steps:

[0139] First, the slewing angle θ(t) of the tower crane is calculated within a given time t based on a specific calculation formula. In this formula, w0 represents the initial angular velocity, which describes the rotation speed of the tower crane's slewing motor when it starts; θ0 represents the initial angle, which refers to the position angle of the tower crane at the beginning of the calculation. In addition, the acceleration a in the formula is an important parameter, which reflects the degree of speed change of the slewing motor during operation. By adjusting the value of a, we can achieve detailed control of the slewing speed, so that the tower crane can perform the slewing action smoothly and accurately.

[0140] Through the above calculation, the expected slewing angle θ(t) of the tower crane in any given time t can be obtained. In this way, the control parameters of the motor can be adjusted according to the difference between the actual required slewing angle and the current slewing angle to ensure that the tower crane can accurately complete the slewing task. This process not only improves the efficiency of the operation, but also greatly improves the safety of the operation, which meets the high requirements of modern industrial production for equipment control accuracy and safety.

[0141] In some embodiments of the present application, obtaining real-time environmental data and adjusting control parameters according to the real-time environmental data include:

[0142] The real-time environmental data includes wind speed Vwind and wind direction θwind. According to the wind speed Vwind and wind direction θwind, the wind load Fwind is calculated by the following calculation formula:

[0143]

[0144] Among them, ρ is the air density; A is the frontal area of ​​the object; Cd is the drag coefficient;

[0145] Preset the maximum wind load Fmax and the minimum wind load Fmin, and compare the maximum wind load Fmax with the wind load Fwind;

[0146] When the maximum wind load Fmax is greater than the wind load Fwind, and the minimum wind load Fmin is less than the wind load Fwind, the rotation speed is adjusted according to the maximum wind load Fmax and the wind load Fwind to obtain a new rotation speed wn;

[0147] When the maximum wind load Fmax is less than or equal to the wind load Fwind, the tower crane stops rotating;

[0148] Among them, the rotation speed is adjusted according to the wind load Fwind and calculated by the following formula:

[0149]

[0150] wn =w·(1-ε).

[0151] It is understandable that the present embodiment first needs to obtain real-time environmental data, which are essential for adjusting control parameters. Specifically, these real-time environmental data include wind speed Vwind and wind direction θwind. The acquisition of wind speed Vwind and wind direction θwind has a direct impact on the subsequent calculation of wind load Fwind.

[0152] After obtaining the wind load Fwind, the maximum wind load Fmax and the minimum wind load Fmin need to be pre-set in order to compare the wind load Fwind. This step is to ensure the stable operation of the tower crane and prevent the tower crane from being adversely affected by excessive or insufficient wind load.

[0153] Next, the maximum wind load Fmax needs to be compared with the wind load Fwind. If the maximum wind load Fmax is greater than the wind load Fwind, and the minimum wind load Fmin is less than the wind load Fwind, it means that the current wind load Fwind is within a reasonable range. At this time, the rotation speed needs to be adjusted according to the maximum wind load Fmax and the wind load Fwind to obtain a new rotation speed wn.

[0154] When the maximum wind load Fmax is less than or equal to the wind load Fwind, it means that the current wind load Fwind has exceeded the maximum wind load that the tower crane can withstand. At this time, the tower crane should stop rotating to ensure the safe operation of the tower crane.

[0155] In general, by acquiring environmental data in real time, calculating the wind load Fwind, and comparing it with the preset maximum wind load Fmax and minimum wind load Fmin, the rotation speed of the tower crane can be adjusted according to the comparison results, thereby ensuring the stable operation of the tower crane under various environmental conditions.

[0156] In some embodiments of the present application, when real-time environmental data is obtained and control parameters are adjusted according to the real-time environmental data, the following steps are also included:

[0157] Obtain the distance dx from the wind load action point to the rotation center, and calculate the wind load moment Mwind based on the distance dx and the wind load Fwind. The calculation formula is:

[0158] Mwind=Fwind·dx;

[0159] The comprehensive moment Mtotal is calculated based on the wind load moment Mwind and moment M. The calculation formula is:

[0160] Mtotal=M+Mwind;

[0161] The rotation speed θr that should be reduced is calculated based on the comprehensive torque Mtotal. The calculation formula is:

[0162]

[0163] The final rotation speed θl is calculated based on the rotation speed θr that should be reduced. The calculation formula is:

[0164] θl=θ(t)-θr.

[0165] It is understandable that in order to achieve the optimal operation of the system in this embodiment, we will collect environmental data in real time. In the process of adjusting the control parameters according to these real-time environmental data, we also need to perform the following steps:

[0166] First, we obtain the distance from the wind load action point to the center of rotation, denoted as dx. This is an important physical quantity because it directly affects the degree of influence of the wind load on the system. Next, we use this distance dx and the size of the wind load Fwind to calculate the torque generated by the wind load, denoted as Mwind. Then, the comprehensive torque Mtotal needs to be calculated. The comprehensive torque Mtotal is obtained by superimposing the wind load torque Mwind and the torque generated by the torque M. Next, it is necessary to calculate the rotation speed θr that should be reduced based on the comprehensive torque Mtotal. Finally, the final rotation speed θl is calculated based on the rotation speed θr that should be reduced.

[0167] Through the above steps, the control parameters can be adjusted according to the real-time environmental data, so that the system can operate stably in various environments.

[0168] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.

[0169] The present application is described with reference to flowcharts and / or block diagrams of methods, devices (systems) and computer program products according to embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0170] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0171] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0172] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A slewing control method for a tower crane, It is characterized in that include: When the tower crane forearm suspends an object and rotates, obtain the distance between the object and the slewing support, which is recorded as P; Get the center of mass of the object and calculate the distance between the center of mass and the rotation center of the tower crane forearm, denoted as L; Get the weight of the object, denoted as W; Calculate a comprehensive distance D according to the distance L and the distance P, and calculate a moment M according to the comprehensive distance D and the weight W; According to the calculated torque M, the control parameters of the tower crane's slewing motor are determined; Acquire real-time environmental data and adjust control parameters according to the real-time environmental data.

2. The slewing control method for a tower crane according to claim 1, It is characterized in that When obtaining the center of mass of an object, include: Divide the object into several small parts and measure the mass of each small part, recorded as mi; Determine the geometric center coordinates (x i ,y i ,z i ), according to the mass and geometric center coordinates of each small part, use the center of mass calculation formula to calculate the center of mass coordinates of the object (x cm ,y cm ,z cm ); The calculation formula for calculating the centroid coordinates is: Among them, ∑m i is the total mass of all the small parts.

3. The slewing control method for a tower crane according to claim 2, It is characterized in that When calculating the distance between the center of mass and the center of rotation of the tower crane forearm, include: Get the position coordinates of the rotation center (x 0 ,y 0 ,z 0 ); According to the position coordinates of the rotation center (x 0 ,y 0 ,z 0 ) and the centroid coordinates (x cm ,y cm ,z cm ), calculate the distance L between the center of mass and the rotation center of the tower crane forearm, the calculation formula is:

4. The slewing control method for a tower crane according to claim 1, It is characterized in that When calculating the comprehensive distance D according to the distance L and the distance P, and calculating the moment M according to the comprehensive distance D and the weight W, it includes: The comprehensive distance D is calculated according to the following formula: Calculate the moment M according to the following formula: M = W·D.

5. The slewing control method for a tower crane according to claim 1, It is characterized in that According to the calculated torque M, the control parameters of the tower crane slewing motor are determined, including: Obtain the vertical distance between the highest point of the object and the forearm of the tower crane, recorded as Lx, and compare the vertical distance Lx with the preset vertical distance value Lt; When the vertical distance Lx is greater than the vertical distance preset value Lt, the torque M is adjusted according to the vertical distance Lx, and the adjusted torque is recorded as Ma, and then the control parameters of the tower crane rotary motor are determined according to the torque Ma; When the vertical distance Lx is not greater than the preset vertical distance value, the torque M is not adjusted, and the control parameters of the tower crane rotary motor are determined according to the torque M; Wherein, the control parameters include rotation speed and rotation angle.

6. The slewing control method for a tower crane according to claim 5, It is characterized in that When the vertical distance Lx is greater than the vertical distance preset value Lt, the moment M is adjusted according to the vertical distance Lx, and the adjusted moment is recorded as Ma, including: The torque adjustment factor k is calculated by the following formula: According to the adjustment coefficient k and the moment M, the adjusted moment Ma is calculated by the following formula: Ma=M·k.

7. The slewing control method for a tower crane according to claim 5, It is characterized in that When determining the control parameters of the tower crane slewing motor according to the torque M, it includes: According to the torque M and the efficiency factor e, the motor torque z is calculated by the following formula: z = M·e; According to the moment of inertia j and the motor torque z, the rotation speed w is calculated by the following formula:

8. The slewing control method for a tower crane according to claim 7, It is characterized in that When determining the control parameters of the tower crane slewing motor according to the torque M, it also includes: The rotation angle θ(t) within time t is calculated according to the following formula: Among them, w 0 is the initial angular velocity; θ 0 is the initial angle.

9. The slewing control method for a tower crane according to claim 8, It is characterized in that Acquiring real-time environmental data and adjusting control parameters according to the real-time environmental data include: The real-time environmental data includes wind speed Vwind and wind direction θwind. According to the wind speed Vwind and wind direction θwind, the wind load Fwind is calculated by the following calculation formula: Among them, ρ is the air density; A is the frontal area of ​​the object; Cd is the drag coefficient; Preset the maximum wind load Fmax and the minimum wind load Fmin, and compare the maximum wind load Fmax with the wind load Fwind; When the maximum wind load Fmax is greater than the wind load Fwind, and the minimum wind load Fmin is less than the wind load Fwind, the rotation speed is adjusted according to the maximum wind load Fmax and the wind load Fwind to obtain a new rotation speed wn; when the maximum wind load Fmax is less than or equal to the wind load Fwind, the tower crane stops rotating; Among them, the rotation speed is adjusted according to the wind load Fwind and calculated by the following formula: w n =w·(1-ε)。 10. The slewing control method for a tower crane according to claim 9, It is characterized in that Acquiring real-time environmental data and adjusting control parameters according to the real-time environmental data also includes: Obtain the distance dx from the wind load action point to the rotation center, and calculate the wind load moment Mwind based on the distance dx and the wind load Fwind. The calculation formula is: Mwind=Fwind·dx; The comprehensive moment Mtotal is calculated based on the wind load moment Mwind and moment M. The calculation formula is: Mtotal=M+Mwind; The rotation speed θr that should be reduced is calculated based on the comprehensive torque Mtotal. The calculation formula is: The final rotation speed θl is calculated based on the rotation speed θr that should be reduced. The calculation formula is: θl=θ(t)-θr.

Citation Information

Cited By

  • Tower crane amplitude variation-rotation linkage self-adaptive control method for high wind load environment

    CN120348859A