Intelligent linkage rapid pollution management and control system for underground water well

Through the intelligent linkage of groundwater wells, the intelligent linkage wells and overall control system can be used to realize real-time monitoring and dynamic repair of LNAPL pollution, solving the problems of pollution monitoring lag and repair solutions in the existing technology, reducing pollution migration and environmental risks improve processing efficiency.

CN118929831AActive Publication Date: 2024-11-12CHINA PETROLEUM & CHEMICAL CORP +1

Patent Information

Application Number
CN202310537987.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-12
Publication Date
2024-11-12
Estimated Expiration
2043-05-12

AI Technical Summary

Technical Problem

It is difficult for the existing technology to quickly monitor and effectively deal with LNAPL pollution in groundwater of petroleum and petrochemical enterprises, and the existing restoration plans are mostly fixed and cannot be flexibly adjusted according to pollution changes, resulting in high pollution migration and environmental risks.

Method used

Design an intelligent linkage rapid pollution control system for groundwater wells. Through the combination of intelligent linkage wells, general control system, biological agent dosing device, pollution detection device and repair of internal wells, real-time monitoring and dynamic repair of LNAPL pollution can be realized, and automatic division is achieved. Respond to the area and carry out different types of repair measures.

Benefits of technology

It has achieved rapid response and flexible adjustment to LNAPL pollution, reduced pollution migration and environmental risks, reduced labor costs and repair time, and improved the timeliness and efficiency of pollution treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118929831A_ABST
    Figure CN118929831A_ABST
Patent Text Reader

Abstract

The invention provides an intelligent linkage rapid pollution management and control system for an underground water well, and the system comprises an underground water well system which comprises a plurality of intelligent linkage wells disposed in a target area, and generates a pollution generation signal and marks the current intelligent linkage well as a polluted well when the intelligent linkage wells monitor target pollutants; and the master control system is used for determining a response area according to the pollution generation signals and the position information of the polluted wells, dividing the intelligent linkage wells in the response area into a preparation group, a processing group and a monitoring group, and respectively transmitting a medicament putting instruction, a pollution repairing instruction and a pollution monitoring instruction to the preparation group, the processing group and the monitoring group. According to the invention, high automation of monitoring and repairing is realized, rapid response to LNAPL pollution can be realized, and repairing adjustment can be carried out according to pollution change.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of groundwater pollution, and in particular to a groundwater well intelligent linkage rapid pollution control system. Background Art

[0002] Groundwater LNAPL (light non-aqueous phase liquids) pollution is widespread in petroleum and petrochemical enterprises. Due to its high concentration, LNAPL is easily adsorbed in the soil, forming a source of continuous release. After entering the aquifer, the pollution is easy to migrate with the water, affecting a wide range. The oil blooms produced can easily cause adverse social impacts. Therefore, it is very important to control and repair LNAPL pollution.

[0003] At present, the discovery of LNAPL pollution in groundwater of petroleum and petrochemical enterprises is mainly based on regular groundwater sampling and testing, combining the pollution concentration to determine the presence of LNAPL or using a bele pipe to lift the groundwater, and judging whether there is a NAPL phase by the pollution on the inner wall of the bele pipe. This method is relatively delayed in the discovery of LNAPL, and is only an irregular detection. It cannot effectively warn when pollution occurs, and it is impossible to take remediation measures. At present, the groundwater-related facilities of enterprises are mainly groundwater monitoring wells. Remediation measures such as in-situ reaction walls and chemical oxidant injections must be based on a complete remediation plan and require a large amount of groundbreaking. For operating enterprises, the safety risks and remediation costs are high, and the remediation plan often requires a period of time for expert demonstration. Once established, it is difficult to adjust it. It takes a long time, and the treatment of LNAPL is not timely enough. Therefore, it is critical to establish an integrated system for LNAPL monitoring and remediation.

[0004] In view of the problems of the prior art, the present invention provides a groundwater well intelligent linkage rapid pollution control system. Summary of the invention

[0005] In order to overcome the defects of the prior art, the present invention provides a groundwater well intelligent linkage rapid pollution control system, the control system comprising:

[0006] A groundwater well system, which includes a plurality of intelligent linkage wells arranged in a target area. When the intelligent linkage wells detect target pollutants, a pollution occurrence signal is generated and the current intelligent linkage well is marked as a polluted well;

[0007] A general control system is used to determine a response area based on the pollution occurrence signal and the location information of the pollution well, divide the intelligent linkage wells in the response area into a preparation group, a treatment group and a monitoring group, and transmit agent delivery instructions, pollution remediation instructions and pollution monitoring instructions to the preparation group, the treatment group and the monitoring group respectively.

[0008] According to one embodiment of the present invention, the intelligent linkage well includes: a monitoring outer well and a repair inner well, wherein the side wall of the monitoring outer well is provided with an LNAPL monitoring and early warning device, which is used to continuously monitor the target pollutants in the groundwater and generate the pollution occurrence signal after the target pollutants are monitored, wherein the target pollutants are light non-aqueous phase liquids.

[0009] According to one embodiment of the present invention, a biological agent dosing device is provided at the bottom of the side wall of the monitoring outer well, which is used to inject biological agents into the groundwater in the monitoring outer well through a spraying device according to the agent delivery instruction, wherein the biological agent is a preparation that promotes biodegradation.

[0010] According to one embodiment of the present invention, a pollution detection device is provided on the side wall of the monitoring outer well, which is used to perform regular detection of groundwater according to the pollution monitoring instruction and transmit the regular detection results to the general control system.

[0011] According to one embodiment of the present invention, an extraction pump is provided on the side wall of the monitoring outer well, which is used to extract the groundwater in the monitoring outer well according to the pollution remediation instruction, and the extracted groundwater is injected into the remediation inner well through the pollution detection device, and the target pollutants in the groundwater are treated through the remediation inner well.

[0012] According to one embodiment of the present invention, the inner wall of the repair inner well is composed of two rows of rotatable repair layers, one side of the repair layer is a gravity initial separation layer, and the other side of the repair layer is an adsorption layer, wherein the gravity initial separation layer is composed of a plurality of L-shaped baffles arranged in sequence along the inner wall, and the adsorption layer is composed of a plurality of downwardly inclined baffles arranged in sequence along the inner wall, and the downwardly inclined baffle is composed of an upper adsorption sponge and a lower support plate, and the L-shaped baffle is spaced apart from the downwardly inclined baffle.

[0013] According to one embodiment of the present invention, a baffle control device is provided on the outer wall of the remediation inner well, which is used to start the remediation layer according to the pollution remediation instruction, wherein the remediation layer rotates to a specific point after being started, and after the groundwater pumped out by the extraction pump enters the remediation inner well, it is firstly gravity-separated through the gravity primary separation layer to obtain an upper NAPL phase liquid and a lower residual liquid, and the upper NAPL phase liquid enters the adsorption layer, and the pollutants in the upper NAPL phase liquid are adsorbed by the adsorption layer, and the lower residual liquid returns to the remediation outer well to be injected into the remediation inner well again through the extraction pump, so as to realize pollution circulation treatment.

[0014] According to one embodiment of the present invention, the overall control system comprises:

[0015] The database module is used to store the locations of groundwater wells in the target area, the plant layout in the target area, and the hydrogeological conditions in the target area.

[0016] According to one embodiment of the present invention, the overall control system comprises:

[0017] The groundwater well grouping response module is used to determine the response area, and divide the intelligent linkage wells in the response area into the preparation group, the treatment group and the monitoring group, wherein the group length D of each group along the water flow direction is determined based on the permeability coefficient, hydraulic gradient and control time, and the pollution well is taken as the center O and grouped to both sides, and the upstream area of ​​the pollution well is separated by the group length D. The intelligent linkage wells in the area are used as the preparation group, and the area where the contaminated wells are located The intelligent linkage well in the processing group is used as the processing group, and the downstream area of ​​the contaminated well The intelligent linkage wells within the well serve as the monitoring group.

[0018] According to one embodiment of the present invention, the overall control system comprises:

[0019] The rapid assessment module, based on the pollution status data fed back by the intelligent linkage wells, delineates all areas that exceed the groundwater risk control value, thereby determining the health risk of personnel in the target area, and performs trend analysis based on the real-time monitoring results of historical pollutants, determines the time it takes to reach the nearest sensitive receptor in the direction of groundwater flow, and issues early warnings for subsequent pollution levels based on the length of time.

[0020] According to one embodiment of the present invention, the management and control system further includes a display system, which includes:

[0021] The display module is used to display the latest detected polluted wells, the grouping of surrounding groundwater wells, the distribution of human health risks, the detection data of each period, and the risk warning results.

[0022] The early warning module is used to send the pollution occurrence signal and the risk early warning result to a preset smart mobile device.

[0023] According to another aspect of the present invention, there is also provided a method for intelligent linkage rapid pollution control of groundwater wells, which is performed by a system as described in any one of the above items, and the method comprises the following steps:

[0024] By using the groundwater well system including a plurality of intelligent linkage wells arranged in the target area, when the intelligent linkage well detects the target pollutant, a pollution occurrence signal is generated and the current intelligent linkage well is marked as a polluted well;

[0025] The overall control system determines the response area based on the pollution occurrence signal and the location information of the pollution well, divides the intelligent linkage wells in the response area into a preparation group, a treatment group and a monitoring group, and transmits drug delivery instructions, pollution remediation instructions and pollution monitoring instructions to the preparation group, the treatment group and the monitoring group respectively.

[0026] According to one embodiment of the present invention, the method comprises the following steps:

[0027] Real-time monitoring of target pollutants in groundwater through the intelligent linkage wells in the target area;

[0028] When the intelligent linkage well detects the target pollutant, the pollution occurrence signal is generated and the current intelligent linkage well is marked as the polluted well;

[0029] Taking the contaminated well as the center and the group length as the interval, the intelligent linkage wells in the response area are divided into the preparation group, the processing group and the monitoring group;

[0030] Transmitting the agent delivery instruction, the pollution remediation instruction and the pollution monitoring instruction to the preparation group, the treatment group and the monitoring group respectively;

[0031] The preparation group injects the biological agent into the groundwater through the injection device according to the agent delivery instruction, wherein the biological agent is a preparation that promotes biodegradation;

[0032] The treatment group extracts groundwater from the monitoring outer well according to the pollution remediation instruction, injects the extracted groundwater into the remediation inner well through the pollution detection device, and treats the target pollutants in the groundwater through the remediation inner well;

[0033] The monitoring group performs regular inspections on groundwater according to the pollution monitoring instructions, and transmits the regular inspection results to the general control system.

[0034] According to another aspect of the present invention, a storage medium is provided, which contains a series of instructions for executing the method steps as described in any one of the above.

[0035] The present invention provides a groundwater well intelligent linkage rapid pollution control system, which has the following advantages over the prior art: the prior art mainly relies on regular water quality testing for monitoring LNAPL, or uses a bele tube for inspection when water quality is obviously abnormal, and the existing patent documents are also focused on proposing a complete remediation plan after the pollution is discovered, and the remediation plan is mostly deterministic and cannot be effectively adjusted according to changes in pollution. Pollution remediation is also focused on a single remediation technology, and the entire process mostly requires groundbreaking and expert demonstration before it can be carried out, so it is very easy to delay the processing time and cause the migration of pollution. The present invention has a high degree of automation in monitoring and remediation. Based on the transformation of existing monitoring wells, it can achieve a rapid response to LNAPL pollution, and make remediation adjustments according to pollution changes, and conduct simple evaluations, effectively reducing health and environmental risks before implementing a large remediation plan, which is of great significance.

[0036] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0038] Figure 1 A schematic diagram of grouping of a groundwater well intelligent linkage rapid pollution control system according to an embodiment of the present invention is shown;

[0039] Figure 2 A schematic diagram of the structure of a groundwater well intelligent linkage rapid pollution control system according to an embodiment of the present invention is shown;

[0040] Figure 3 A flowchart of a method for intelligent linkage rapid pollution control of groundwater wells according to an embodiment of the present invention is shown;

[0041] Figure 4 A flowchart of the steps of a method for intelligent linkage and rapid pollution control of groundwater wells according to another embodiment of the present invention is shown.

[0042] In the accompanying drawings, the same reference numerals are used for the same components. In addition, the accompanying drawings are not drawn according to the actual scale. DETAILED DESCRIPTION

[0043] To make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention are further described in detail below with reference to the accompanying drawings.

[0044] The risk of groundwater pollution in petroleum and petrochemical sites is high, and according to the results of previous pollution surveys, groundwater LNAPL pollution is relatively common. There are many sensitive receptors around enterprises. If LNAPL pollution is not effectively controlled, it is very easy to cause adverse environmental and social impacts. For companies in production, large-scale remediation projects have high safety risks, and require a large number of expert demonstrations before implementation, which takes a long time and easily leads to rapid migration of pollution.

[0045] At present, there are monitoring and remediation devices in the prior art, but most of them are designed as complete remediation solutions. Often, the entire device cannot be changed after being arranged in a certain position, and there are few monitoring and remediation systems for LNAPL. For example, the prior art CN112570434A proposes a soil and groundwater remediation method for in-situ remediation, which obtains information on the scope of soil and groundwater to be remediated, the current status of pollution, and the remediation target in advance; determines the technical parameters of the in-situ injection well injection remediation system according to the scope of soil and groundwater to be remediated, including the number of injection wells, the radius of influence of the agent, the diameter of the injection well, the injection pressure, and the agent dosage ratio, and then builds the in-situ injection well according to the parameters; creates a groundwater monitoring well; injects an alkali-activated sodium persulfate solution into the built in-situ injection well, so that the agent diffuses to the entire contaminated area under the migration of groundwater, and reacts with organic matter in the soil and groundwater through the migration of groundwater to degrade pollutants in the contaminated area. However, the prior art mainly introduces the parameter calculation method for in-situ injection of reagents and sets up a downstream groundwater monitoring well. It is a complete set of remediation solutions, does not involve automatic monitoring content, and plans a single solution for a single pollution situation. There is no change in internal facilities, and it is impossible to form a flexible and variable experimental plan according to changes in the pollution area. However, the remediation method of the prior art is only in-situ injection, and there is no change in the remediation method for changes in different locations of the pollution plume (pollution halo or pollution plume), and there is no change in the injection well and the monitoring well.

[0046] The prior art CN113843267A has established a groundwater remediation system based on a groundwater well group. The groundwater remediation system includes a groundwater monitoring well group, a groundwater pumping well group, a groundwater remediation well group, a water quality analysis center and a data processing center; the monitoring wells in the groundwater monitoring well group are connected to the main pumping pipe through a pumping branch pipe, a comprehensive water quality monitoring probe is arranged in the monitoring well, and an atmospheric pressure monitoring probe is arranged on the ground outside the monitoring well; the water quality analysis center receives the water quality monitoring signal of the comprehensive water quality monitoring probe, analyzes the water quality monitoring signal and sends the analysis result to the data processing center; the data processing center performs in-depth processing on the water quality monitoring signal and outputs the result to the groundwater pumping well group and the groundwater remediation well group. However, this prior art also belongs to a complete set of remediation solutions. In the process of implementing the remediation solution, only the changes in process parameters are involved, and no changes in the remediation solution are involved. The monitored items are also mainly used for the evaluation of pollution effects rather than the discovery and early warning of pollution, and the problem of delayed pollution response cannot be solved. The three types of wells in this prior art cannot be converted to each other, and the content of monitoring is also the common five parameters and other indicators, which cannot achieve rapid monitoring and early warning of pollution.

[0047] Prior art CN114417474A provides a PRB repair system with monitoring function, which includes a permeation reaction wall module, a groundwater monitoring module and a control terminal; the permeation reaction module includes a first watertight wall, a second watertight wall and a reaction wall assembly, the first watertight wall and the second watertight wall are respectively located on both sides of the reaction wall assembly, and the two ends of the reaction wall assembly are respectively detachably connected to the first watertight wall and the second watertight wall; the groundwater monitoring module is arranged near the permeation reaction module and is used to obtain water quality status information near the permeation reaction module, the groundwater monitoring module is connected to the control terminal in communication, and the water quality status information is transmitted to the control terminal; the control terminal analyzes the environmental risk situation near the groundwater monitoring module according to the water quality status information near the permeation reaction module obtained. However, the monitoring purpose of the prior art is still to evaluate the repair results, rather than to detect pollution quickly, so it is impossible to respond to pollution quickly, and the prior art still cannot achieve rapid changes in pollution, and the repair facilities cannot be adjusted once installed, the workload of groundbreaking is large, and the safety risk is also great.

[0048] Prior art CN111633016B provides an integrated device and method for monitoring and repairing urban groundwater, including a device base, a first support plate fixedly mounted on the top of the device base, a second support plate fixedly mounted on one side of the first support plate, a rotating shaft rotatably connected to one side of the first support plate, a wire drum fixedly connected to the outer wall of the rotating shaft, a suspension rope wound on the outer wall of the wire drum, one end of the rotating shaft passes through the second support plate and is fixedly connected to a crank, and a sleeve plate sleeved on the outer wall of the rotating shaft is provided between the crank and the second support plate. However, this prior art is mainly aimed at the field of urban groundwater, and is mainly used for pollution detection and response to heavy metal pollution. Although the technical field is similar to that involved in this application, the objects to be detected by the two are completely different.

[0049] In summary, although there are many existing technologies involving the remediation of organically contaminated groundwater, there are few technologies for rapid monitoring and remediation of LNAPL. Most of them are complete remediation solutions that cannot be flexibly and automatically adjusted. Once the facilities are fixed, they cannot be changed, and the remediation facilities are relatively simple. In view of the above-mentioned defects of the existing technology, the present invention tries to combine the existing conditions to propose a system that can quickly monitor LNAPL pollution and automatically take measures, and realize dynamic adjustment according to changes in the pollution status, reduce labor costs, and can quickly respond to pollution, reducing the risk of environmental incidents caused by long-term leakage and migration of pollution.

[0050] Figure 1 A schematic diagram of a grouping of an intelligent linkage rapid pollution control system for groundwater wells according to an embodiment of the present invention is shown. The present invention integrates monitoring and repair, can realize automatic rapid pollution detection and response, does not require a lot of manual work, and is flexible and variable. It can effectively provide decision-making time for large-scale repair projects and effectively control current pollution. It is very important for pollution control of petroleum and petrochemical enterprises and reducing the impact of pollution on the environment and human body.

[0051] A groundwater well intelligent linkage rapid pollution control system includes: a groundwater well system and a general control system. The groundwater well system includes a plurality of intelligent linkage wells set in a target area. When the intelligent linkage well detects the target pollutant, a pollution occurrence signal is generated and the current intelligent linkage well is marked as a polluted well. The general control system is used to determine the response area based on the pollution occurrence signal and the location information of the polluted well, divide the intelligent linkage wells in the response area into a preparation group, a treatment group and a monitoring group, and transmit the agent delivery instructions, pollution remediation instructions and pollution monitoring instructions to the preparation group, the treatment group and the monitoring group respectively.

[0052] In one embodiment, Figure 2As shown, the intelligent linkage well includes: a monitoring outer well and a repair inner well, wherein an LNAPL monitoring and early warning device is installed on the side wall of the monitoring outer well, which is used to continuously monitor the target pollutants in the groundwater and generate a pollution occurrence signal after the target pollutants are monitored, wherein the target pollutant is a light non-aqueous phase liquid (LNAPL). Specifically, the LNAPL monitoring and early warning device uses ultraviolet fluorescence to continuously monitor the target pollutants in the groundwater, which is resistant to interference and not prone to contamination. Furthermore, in order to save resources, except when pollution occurs, only the LNAPL monitoring and early warning device in the entire management and control system is always working, and other devices only start working after pollution occurs and are in standby mode on a daily basis.

[0053] In one embodiment, Figure 2 As shown, a biological agent dosing device is provided at the bottom of the side wall of the monitoring outer well, which is used to inject biological agents into the groundwater in the monitoring outer well through the injection device according to the agent injection instruction, wherein the biological agent is a preparation that promotes biodegradation. Specifically, the preparation group upstream of the pollution receives the agent injection instruction, and injects biological agents that can promote biodegradation into the groundwater in the monitoring outer well through the biological agent injection device, and the biological agent slowly increases the biodegradation rate as the groundwater flows downstream. Furthermore, the biological agent injection device is composed of biological agents and injection devices. Among them, biological agents include slow-release oxygen materials, indigenous flora, etc.

[0054] In one embodiment, Figure 2 As shown, a pollution detection device is set on the side wall of the monitoring outer well, which is used to conduct regular inspections of groundwater according to pollution monitoring instructions and transmit the regular inspection results to the overall control system. Specifically, the monitoring group downstream of the pollution receives the pollution monitoring instructions, conducts regular inspections of groundwater through the pollution detection device, and the inspection data is automatically uploaded to the database module of the overall control system. Furthermore, in order to save resources, the pollution detection device only starts the inspection after receiving the pollution monitoring instruction when pollution occurs.

[0055] In one embodiment, Figure 2 As shown, an extraction pump is provided on the side wall of the monitoring outer well, which is used to extract the groundwater in the monitoring outer well according to the pollution remediation instruction, and the extracted groundwater is injected into the remediation inner well through the pollution detection device, and the target pollutants in the groundwater are treated by remediating the inner well. Specifically, the treatment group where the pollution is located receives the pollution remediation instruction, and extracts the groundwater in the monitoring outer well through the extraction pump, so as to treat the target pollutants in the groundwater by remediating the inner well.

[0056] In one embodiment, Figure 2As shown, the inner wall of the repair inner well is composed of two rows of rotatable repair layers, one side of the repair layer is a gravity initial separation layer, and the other side of the repair layer is an adsorption layer, wherein the gravity initial separation layer is composed of a plurality of L-shaped baffles arranged in sequence along the inner wall, and the adsorption layer is composed of a plurality of downwardly inclined baffles arranged in sequence along the inner wall, and the downwardly inclined baffle is composed of an upper layer of adsorption sponge and a lower layer of support plate, and the L-shaped baffle is arranged at intervals with the downwardly inclined baffle. Specifically, the inner wall is composed of two rows of rotatable repair layers, one side is an adsorption layer, which is composed of an upper layer of specific adsorption sponge and a lower layer of support plate, and the adsorption sponge can be renewed after adsorption saturation to achieve the continuous effectiveness of the device, and the other side is a gravity initial separation layer, which is L-shaped, and the groundwater entering the repair inner well first enters the gravity initial separation layer, and the substances with low density in the LNAPL can slowly stay there, and the upper NAPL phase liquid overflows into the adsorption layer after initial separation, achieving effective pollution removal, and the remaining groundwater enters the next layer, and the cycle is repeated, and finally the pollution is effectively adsorbed, and the remaining groundwater returns to the repair outer well.

[0057] In one embodiment, Figure 2 As shown, a baffle control device is provided on the outer wall of the inner well for repair, which is used to start the repair layer according to the pollution repair instruction, wherein the repair layer rotates to a specific point after being started, and after the groundwater pumped out by the extraction pump enters the inner well for repair, it is first separated by gravity through the gravity primary separation layer to obtain the upper NAPL phase liquid and the lower residual liquid, and the upper NAPL phase liquid enters the adsorption layer, and the pollutants in the upper NAPL phase liquid are adsorbed by the adsorption layer, and the lower residual liquid returns to the outer well for repair, and is injected into the inner well for repair again through the extraction pump, so as to realize the pollution circulation treatment. Specifically, the repair layer is controlled by the baffle control device suspended on the outer wall of the inner well for repair. Under normal conditions, the repair layer is placed vertically downward along the side wall, and no repair treatment is performed. When pollution occurs, the general control system divides the intelligent linkage wells, and the intelligent linkage wells divided into the treatment group start the repair layer through the baffle control device, and the repair layer rotates to a specific point and begins to function.

[0058] In one embodiment, the overall control system includes: a database module, which is used to store the location of groundwater wells in the target area, the plant layout of the target area, and the hydrogeological conditions of the target area. Specifically, the data stored in the database module includes but is not limited to the basic conditions of the plant such as the plant layout, real-time groundwater monitoring data, hydrogeological conditions of the plant, etc., and a port is opened for manual addition of well locations, etc. The real-time data is stored for a period of 2 years, and the abnormal time is recorded after an abnormal value is found and stored in key partitions.

[0059] In one embodiment, the overall control system includes: a groundwater well grouping response module, which is used to determine the response area, The intelligent linkage wells in the well are divided into a preparation group, a treatment group and a monitoring group. The group length D of each group along the water flow direction is determined based on the permeability coefficient, hydraulic gradient and control time. The pollution well is taken as the center O and divided into two groups on both sides. The group length D is used as the interval. The intelligent linkage wells in the area are used as the reserve group, and the area where the polluted wells are located The intelligent linkage wells in the well are used as the treatment group to pollute the downstream area of ​​the well. The intelligent linkage wells in the wells are used as monitoring groups. Figure 1 As shown, when an abnormal value is found in the automatic daily detection of a certain intelligent linkage well in the target area, the groundwater well grouping response module groups the intelligent linkage wells in the response area with the contaminated well as the center. Further, the group length D along the water flow direction is calculated, and the group length of each group along the water flow direction is calculated according to the formula D=K×I×T, where K represents the permeability coefficient; I represents the hydraulic gradient; and T represents the control time. In one embodiment, the enterprise determines the time when the pollution may occur based on experience and previous production and maintenance conditions, and assigns T according to the acceptable pollution treatment time.

[0060] In one embodiment, the overall control system includes: a rapid assessment module, which, based on the pollution status data fed back by the intelligent linkage well, delineates all areas that exceed the groundwater risk control value, thereby determining the health risk of personnel in the target area, and based on the historical real-time monitoring results of pollutants, performs trend analysis, determines the time to reach the sensitive receptor closest to the groundwater flow direction, and issues an early warning for subsequent pollution levels based on the length of time. Specifically, the rapid assessment module analyzes human health risks based on the pollution status data, and focuses on the inhalation risk level, delineates all areas that exceed the groundwater risk control value, and determines the health risk to factory employees. And based on the real-time monitoring results of pollutants in the previous periods, a trend analysis is performed through no less than 8 periods of detection data, the time to reach the sensitive receptor closest to the groundwater flow direction is determined, and the subsequent pollution level is warned based on the length of time.

[0061] In the present invention, the locations of groundwater wells, plant layout, and hydrogeological conditions are entered into a database module in advance, and real-time groundwater monitoring data is collected. After data processing and analysis, the intelligent linkage wells are grouped according to the locations of target pollutants through the groundwater well grouping response module, and corresponding response instructions are given. The current pollution status is evaluated in real time through the rapid assessment module, so as to quickly grasp the pollution situation.

[0062] In one embodiment, Figure 2As shown, the management and control system also includes a display system, which includes: a display module and an early warning module. Among them, the display module is used to display the latest detected contaminated wells, the grouping of surrounding groundwater wells, the distribution of human health risks, the detection data of each period, and the risk early warning results. The early warning module is used to send the pollution occurrence signal and the risk early warning results to the preset smart mobile device. Specifically, the display system has the dual functions of display and early warning, which can display the location of the latest LNAPL-contaminated groundwater wells, the grouping of surrounding groundwater wells, the distribution of human health risks in the field, the detection data of each period, and the risk early warning results. After pollution occurs, an alarm is issued in time, and a signal is sent to the preset management personnel's mobile phone.

[0063] like Figure 1 As shown, the present invention groups the pollution detection wells on both sides with the group length D as the interval, and divides the intelligent linkage wells into a preparation group, a treatment group, and a monitoring group. The preparation group upstream of the pollution mainly uses preparations that can promote biodegradation, including slow-release oxygen materials, indigenous flora, etc. The treatment group where the pollution is located mainly performs rapid gravity initial separation and adsorption of target pollutants. The monitoring group downstream of the pollution mainly monitors risks for a long time by increasing the monitoring frequency.

[0064] In one embodiment, when it is detected that the number of intelligent linkage wells in the target area increases, the intelligent linkage wells are automatically updated and the corresponding modules are automatically started, and the grouping and evaluation warning are all changed in real time.

[0065] The main feature of the present invention is that it integrates monitoring and repair. It has a simple structure but a high degree of automation. It can be modified on the basis of the existing monitoring well. A repair inner well is added to the existing monitoring well, and an extraction pump is placed on the side wall of the existing monitoring well. The water pumped out by the extraction pump passes through the pollution detection device and enters the repair inner well. A biological agent dosing device is placed at the bottom of the side wall of the existing monitoring well, and a spray device is used for dosing when necessary. An LNAPL monitoring and early warning device is hung on the side wall of the existing monitoring well, and the signal is transmitted back to the main control system after pollution is detected.

[0066] Lightweight non-dissolved phase (LNAPL) is widely present in groundwater of petroleum and petrochemical enterprises, and its discovery is often delayed. Once discovered, it cannot be quickly handled. The present invention proposes an organic matter remediation system based on pollution plume (pollution plume pollution halo or pollution plume), including a total control system, a display system and a groundwater well system. By transforming and linking the existing groundwater monitoring wells in the entire plant area (target area), after LNAPL pollution occurs in any water well (transformed intelligent linkage well) according to real-time monitoring, the total control system automatically analyzes and divides and classifies the transformed intelligent linkage wells, and different types of water wells respond differently, thereby realizing rapid discovery and disposal of pollution, and automatically repeating the partitioning process according to changes in the pollution situation, and starting the corresponding module. Water wells in different locations are efficiently used for different remediation measures, and dynamic adjustment can be achieved. No complicated manual processing is required throughout the process. The remediation inner well equipped with an extraction pump, a biological agent dosing device, and an adsorption layer in the transformed intelligent linkage well can make full use of the existing monitoring wells and save costs. The present invention can provide convenience for daily environmental management of petroleum and petrochemical enterprises, reduce the possibility of pollution out of the factory, and reduce the occurrence of environmental incidents.

[0067] Figure 3 A flowchart of the steps of a method for intelligent linkage rapid pollution control of groundwater wells according to an embodiment of the present invention is shown.

[0068] like Figure 3 As shown, in step S301, through a groundwater well system including multiple intelligent linkage wells set in the target area, when the intelligent linkage well detects the target pollutant, a pollution occurrence signal is generated and the current intelligent linkage well is marked as a polluted well. Specifically, according to the pollution control requirements of the enterprise itself, a groundwater well system is established downstream of the easily polluted land of the petroleum and petrochemical enterprise, or based on the existing groundwater monitoring well, it is repaired and transformed, and a groundwater extraction pump, a biological agent dosing device, an LNAPL monitoring and early warning device, and a pollution detection device are installed, and then placed in the repair well to form a ready-to-use intelligent linkage well. The location, depth and other information of the intelligent linkage wells within the enterprise are all stored in the general control system. Daily, only real-time monitoring of LNAPL is required through the LNAPL monitoring and early warning device, and other devices are in standby mode. When the LNAPL monitoring and early warning device of a certain intelligent linkage well finds an abnormality, the location information of the current intelligent linkage well is immediately fed back. The general control system automatically classifies the surrounding wells according to the preset calculation method, and divides them into a preparatory group, a processing group, and a monitoring group. The wells in different groups respond to different types and start rapid pollution treatment.

[0069] like Figure 3As shown, in step S302, the overall control system determines the response area based on the pollution occurrence signal and the location information of the polluted wells, divides the intelligent linkage wells in the response area into a preparation group, a treatment group and a monitoring group, and transmits the agent delivery instructions, pollution remediation instructions and pollution monitoring instructions to the preparation group, the treatment group and the monitoring group respectively. Specifically, the overall control system makes a rapid prediction of pollution based on the trend of the detection results of the treatment process, guides the parameters of the remediation measures, and delineates the areas to be covered in the field in combination with the simple human health risk assessment results, guides the enterprise to quickly deal with human health risks, and automatically updates the groundwater well grouping and automatically starts the corresponding module when the number of groundwater wells in the LNAPL phase increases. The grouping and assessment warning are all real-time changes. The whole process has a high level of automation, effectively repairs pollution, and gives enterprises time to repair pollution. If a large-scale remediation project is required, the plan can continue to be determined through expert demonstration.

[0070] The present invention transforms and links the existing groundwater wells in the target area, automatically classifies the transformed intelligent linkage wells according to the real-time NAPL phase detection results, and responds to the pollution status respectively to achieve pollution zoning control, and conducts basic human health assessment according to the concentration distribution, and frames the toxic areas of volatilization in combination with the groundwater risk control value, guides enterprises to cover, and predicts pollution in combination with concentration changes, and the final results are displayed in real time on the display system. The present invention uses intelligent means to capture the imperceptible high-concentration groundwater LNAPL phase pollution, and responds quickly, with full automation, without the need for complex human monitoring and processing, effectively improving the efficiency of handling leakage accidents.

[0071] Figure 4 A flowchart of the steps of a method for intelligent linkage and rapid pollution control of groundwater wells according to another embodiment of the present invention is shown.

[0072] like Figure 4 As shown, in step S401, the target pollutants in the groundwater are monitored in real time through the intelligent linkage wells in the target area. Specifically, according to the pollution control requirements of petroleum and petrochemical enterprise A, the existing groundwater monitoring wells downstream of the tank area of ​​enterprise A are repaired and renovated, and groundwater extraction pumps, biological agent dosing devices, LNAPL monitoring and early warning equipment, and pollution detection devices are installed. Then, they are placed in the repaired inner wells to form intelligent linkage wells in a ready state. The location, depth and other information of the intelligent linkage wells within the enterprise, the plant layout, hydrogeological conditions, groundwater levels, etc. are all stored in the general control system. Daily real-time monitoring of LNAPL is carried out only through LNAPL monitoring and early warning equipment, and other devices are in standby mode. The monitoring data is stored for a period of 2 years, and abnormal values ​​are permanently stored separately.

[0073] like Figure 4As shown, in step S402, when the smart linkage well detects the target pollutant, a pollution occurrence signal is generated and the current smart linkage well is marked as a polluted well. Specifically, one day, the LNAPL monitoring and early warning equipment of the W3 smart linkage well found an abnormality and immediately fed back the location information of W3 to the overall control system.

[0074] like Figure 4 As shown, in step S403, the intelligent linkage wells in the response area are divided into a preparatory group, a processing group, and a monitoring group, with the contaminated well as the center and the group length as the interval. Specifically, the overall control system automatically classifies the wells around W3 into a preparatory group (W1, W2), a processing group (W3, W4), and a monitoring group (W5, W6) according to the preset calculation method: the nearby device was just overhauled 6 months ago and no contamination was found, so according to the formula D=K×I×T, the group interval is calculated to be 15m.

[0075] like Figure 4 As shown, in step S404, the reagent delivery instruction, pollution remediation instruction and pollution monitoring instruction are transmitted to the preparation group, the treatment group and the monitoring group respectively. Specifically, the intelligent linkage wells in different groups perform different types of responses and start rapid pollution treatment.

[0076] like Figure 4 As shown, in step S405, the preparation group injects biological agents into the groundwater through the injection device according to the agent injection instruction, wherein the biological agent is a preparation that promotes biodegradation. Specifically, W1 and W2 start the biological agent injection device and use the internal injection device to inject the slow-release oxygen material.

[0077] like Figure 4 As shown, in step S406, the processing group extracts the groundwater in the monitoring outer well according to the pollution remediation instruction, and injects the extracted groundwater into the remediation inner well through the pollution detection device, and treats the target pollutants in the groundwater through the remediation inner well. Specifically, W3 and W4 start the groundwater extraction pump, extract the groundwater and then inject it back into the remediation inner well, the remediation layer of the remediation inner well rotates and is fixed at a position where one layer is high and one side is low, and the groundwater containing LNAPL flows through the gravity initial separation layer for simple gravity separation, and then the LNAPL overflowing from the upper layer flows into the adsorption layer for rapid adsorption, and the remaining groundwater returns to the original well for circulation treatment.

[0078] like Figure 4 As shown, in step S407, the monitoring group performs regular detection of groundwater according to the pollution monitoring instruction, and transmits the regular detection results to the overall control system. Specifically, W5 and W6 start the groundwater pollution detection device, perform water extraction detection 3 times a day, and feed back the results to the overall control system.

[0079] Furthermore, the display system shows the location of the latest contaminated wells with LNAPL contamination, the grouping of surrounding groundwater wells, the distribution of human health risks in the field, and the detection data of each period. The overall control system makes a rapid prediction of pollution based on the trend of the detection results of the last 10 treatment processes, and finds that the pollution concentration is gradually decreasing, no new LNAPL has appeared, and the human health risks are also within the controllable range. Therefore, there is no need to adjust the existing well grouping. When the detection concentration is within the standard range, the response can be stopped and the state can be returned to the ready state to prepare for the next response.

[0080] The purpose of the present invention is to establish a rapid response system for LNAPL contamination of groundwater that is prone to occur in petroleum and petrochemical enterprises. On the basis of existing monitoring wells, repair devices such as inner well repair and inner wall hanging part extraction are placed. When LNAPL is detected, the overall control system receives the signal and starts automatic analysis and calculation. The intelligent linkage wells in the plant area (target area) are classified into a preparation group, a processing group, and a monitoring group and instructions are issued. Different groups of intelligent linkage wells respond differently to quickly deal with the pollution. At the same time, the overall control system conducts a quick and simple analysis of the risk of pollution to guide the basic emergency measures of the enterprise. The whole process is highly automated, which can reduce the risk of pollution leaving the plant due to the failure to detect pollution in time, and does not require complex human monitoring and processing.

[0081] In one embodiment, according to the pollution control requirements of petroleum and petrochemical enterprise B, the existing groundwater monitoring wells downstream of the sewage treatment pool of enterprise B are repaired and renovated, and groundwater extraction pumps, biological agent dosing devices, LNAPL monitoring and early warning equipment, and pollution detection devices are installed. Then, they are placed in the repaired well to form a smart linkage well in a ready state. Since there are few groundwater wells, new wells are built. The location, depth and other information of the smart linkage wells within the enterprise, the layout of the plant, the hydrogeological conditions, the groundwater level, etc. are all stored in the general control system. On a daily basis, real-time monitoring of LNAPL is carried out only through the LNAPL monitoring and early warning equipment, and other devices are in standby mode. The monitoring data is stored for a period of 2 years, and abnormal values ​​are permanently stored separately. One day, the LNAPL monitoring and early warning equipment of the W5 intelligent linkage well found an abnormality and immediately fed back the location information of W5 to the main control system. The system used the preset calculation method: the nearby device had just completed maintenance one month ago and no pollution was found. Therefore, according to the formula D=K×I×T, the grouping interval was calculated to be 5m, and the wells around W5 were automatically classified into the preparation group (W1, W3), the treatment group (W5), and the monitoring group (W2, W6). Different groups of intelligent linkage wells respond in different ways and start rapid pollution treatment. W1 and W3 start the biological agent dosing device and use the internal injection device to add bacterial agent materials; W5 starts the groundwater extraction pump to extract groundwater and then inject it back into the repair well. The repair layer of the repair well rotates and is fixed at a position where one layer is high and one side is low. The groundwater containing LNAPL flows through the gravity initial separation layer for simple gravity separation. The LNAPL overflowing from the upper layer flows into the adsorption layer for rapid adsorption. The remaining groundwater returns to the original well for circulation treatment; W2 and W6 start the groundwater pollution detection device, conduct water extraction detection every 2 days, and feed back the results to the overall control system. The display system shows the location of the latest contaminated wells with LNAPL pollution, the grouping of surrounding groundwater wells, the distribution of human health risks in the field, and the detection data of each period. The total control system made a rapid prediction of pollution based on the trend of the detection results of the last 10 treatment processes. It was found that the pollution concentration had not decreased significantly and new LNAPL appeared in W2. Therefore, the existing situation was regrouped, that is, the preparation group remained unchanged, the treatment groups W2 and W5, the monitoring groups became W6 and W7, and the corresponding response facilities were changed. After evaluation, it was found that the risks to human health were also within the controllable range. Therefore, there was no need to adjust the existing well grouping. When the detection concentration is within the standard range, the response can be stopped and the state of preparation can be returned to prepare for the next response.

[0082] In one embodiment, according to the pollution control requirements of petroleum and petrochemical enterprise C, the existing groundwater monitoring wells downstream of the sewage treatment pool of enterprise C are repaired and renovated, and groundwater extraction pumps, biological agent dosing devices, LNAPL monitoring and early warning equipment, and pollution detection devices are installed. Then, they are placed in the repaired inner well to form a smart linkage well in a ready state. Since there are few groundwater wells, new wells are built. The location, depth and other information of the smart linkage wells within the enterprise, the layout of the plant, the hydrogeological conditions, the groundwater level, etc. are all stored in the general control system. On a daily basis, real-time monitoring of LNAPL is carried out only through the LNAPL monitoring and early warning equipment, and other devices are in standby mode. The monitoring data is stored for a period of 2 years, and abnormal values ​​are permanently stored separately. One day, the LNAPL monitoring and early warning equipment of the W5 intelligent linkage well found an abnormality and immediately fed back the location information of W5 to the main control system. The system used the preset calculation method: the nearby device had just completed maintenance 24 months ago and no pollution was found. Therefore, according to the formula D=K×I×T, the grouping interval was 15m. However, combined with the company's acceptable range, 12m downstream is the factory boundary, so the grouping interval was calculated to be 12m. The wells around W5 were automatically classified into the preparation group (W1, W3), the treatment group (W5), and the monitoring group (W2, W6). Different groups of intelligent linkage wells respond in different ways and start rapid pollution treatment. W1 and W3 start the biological agent dosing device and use the internal injection device to add bacterial agent materials; W5 starts the groundwater extraction pump to extract groundwater and then inject it back into the repair well. The repair layer of the repair well rotates and is fixed at a position where one layer is high and one side is low. The groundwater containing LNAPL flows through the gravity initial separation layer for simple gravity separation. The LNAPL overflowing from the upper layer flows into the adsorption layer for rapid adsorption. The remaining groundwater returns to the original well for circulation treatment; W2 and W6 start the groundwater pollution detection device, conduct water extraction detection every 5 days, and feed back the results to the overall control system. The display system shows the location of the contaminated wells with the latest LNAPL pollution, the grouping of surrounding groundwater wells, the distribution of human health risks in the field, and the detection data of each period. The total control system made a rapid pollution prediction based on the trend of the detection results of the recent 12 treatment processes and found that the pollution concentration had not decreased significantly and new LNAPL appeared in W2. Therefore, the existing situation was regrouped, that is, the preparation group remained unchanged, the treatment groups were W2 and W5, the monitoring groups were changed to W6 and W7, and the corresponding response facilities were changed. After evaluation, it was changed to 5m around W2. 2 The scope of human health risks is harmful. Therefore, the display system prompts the location of human health risks and prompts to carry out film coating treatment. After a long period of monitoring, if it is found that the pollution is not effectively removed, the system prompts to carry out other remediation plans, and the enterprise contacts professional remediation companies and experts to design the remediation project.

[0083] The intelligent linkage rapid pollution control system for groundwater wells provided by the present invention can also be used in conjunction with a computer-readable storage medium, on which a computer program is stored, and the computer program is executed to run a method for intelligent linkage rapid pollution control of groundwater wells. The computer program can run computer instructions, which include computer program codes, which can be in source code form, object code form, executable file, or some intermediate form, etc.

[0084] Computer-readable storage media may include: any entity or device that can carry computer program code, recording media, USB flash drives, mobile hard disks, magnetic disks, optical disks, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signals, telecommunication signals, and software distribution media, etc.

[0085] It should be noted that the content contained in computer-readable storage media can be appropriately increased or decreased based on the requirements of legislation and patent practices in the jurisdiction. For example, in some jurisdictions, based on legislation and patent practices, computer-readable storage media do not include electrical carrier signals and telecommunications signals.

[0086] In summary, the present invention provides a groundwater well intelligent linkage rapid pollution control system, which has the following advantages compared with the prior art: the prior art mainly relies on regular water quality testing for monitoring LNAPL, or uses a bele tube for inspection when the water quality is obviously abnormal, and the existing patent documents are also focused on proposing a complete remediation plan after the pollution is discovered, and the remediation plan is mostly deterministic and cannot be effectively adjusted according to the change of pollution. The pollution remediation is also focused on a single remediation technology, and the entire process mostly requires groundbreaking and expert demonstration before it can be carried out, so it is very easy to delay the processing time and cause the migration of pollution. The present invention has carried out a high degree of automation of monitoring and remediation. Based on the transformation of existing monitoring wells, it can achieve a rapid response to LNAPL pollution, and make remediation adjustments according to pollution changes, and conduct simple evaluations, which effectively reduce health and environmental risks before implementing a large remediation plan, which is of great significance.

[0087] It should be understood that the embodiments disclosed in the present invention are not limited to the specific structures, processing steps or materials disclosed herein, but should be extended to equivalent substitutions of these features understood by ordinary technicians in the relevant field. It should also be understood that the terms used herein are only used for the purpose of describing specific embodiments and are not meant to be limiting.

[0088] In the description of the present invention, unless otherwise specified, "plurality" means two or more than two; the orientations or positional relationships indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0089] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0090] Certain terms are used throughout this application document to indicate specific system components. As those skilled in the art will recognize, different names can usually be used to indicate the same components, so this application document is not intended to distinguish those components that are only different in name but not in function. In this application document, the terms "comprise", "include" and "have" are used in an open form, and therefore should be interpreted as meaning "including but not limited to...". In addition, the terms "substantially", "substantially" or "approximately" that may be used in this article relate to the tolerances of the corresponding terms accepted by the industry. The term "coupling" as may be used in this article includes direct coupling and indirect coupling via other components, elements, circuits, or modules, wherein for indirect coupling, the components, elements, circuits, or modules between them do not change the information of the signal but can adjust its current level, voltage level, and / or power level. Inferred coupling (for example, one of the elements is coupled to another element by inference) includes direct and indirect coupling between two elements in the same way as "coupling".

[0091] The "one embodiment" or "embodiment" mentioned in the specification means that the specific features, structures or characteristics described in conjunction with the embodiment are included in at least one embodiment of the present invention. Therefore, the phrases "one embodiment" or "embodiment" appearing in various places throughout the specification do not necessarily refer to the same embodiment.

[0092] The embodiments of the present invention are given for the purpose of illustration and description, and are not intended to be exhaustive or to limit the invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.

[0093] Although the embodiments disclosed in the present invention are as above, the contents described are only embodiments adopted for facilitating the understanding of the present invention and are not intended to limit the present invention. Any technician in the technical field to which the present invention belongs can make any modifications and changes in the form and details of the implementation without departing from the spirit and scope disclosed in the present invention, but the patent protection scope of the present invention shall still be subject to the scope defined in the attached claims.

Claims

1. An intelligent linkage rapid pollution control system for groundwater wells, characterized in that: The control system includes: A groundwater well system, which includes a plurality of intelligent linkage wells arranged in a target area. When the intelligent linkage wells detect target pollutants, a pollution occurrence signal is generated and the current intelligent linkage well is marked as a polluted well; A general control system is used to determine a response area based on the pollution occurrence signal and the location information of the pollution well, divide the intelligent linkage wells in the response area into a preparation group, a treatment group and a monitoring group, and transmit agent delivery instructions, pollution remediation instructions and pollution monitoring instructions to the preparation group, the treatment group and the monitoring group respectively.

2. The intelligent linkage rapid pollution control system for groundwater wells according to claim 1, characterized in that: The intelligent linkage well includes: a monitoring outer well and a repair inner well, wherein the side wall of the monitoring outer well is provided with an LNAPL monitoring and early warning device, which is used to continuously monitor the target pollutants in the groundwater and generate the pollution occurrence signal after the target pollutants are monitored, wherein the target pollutants are light non-aqueous phase liquids.

3. The intelligent linkage rapid pollution control system for groundwater wells according to claim 2, characterized in that: A biological agent dosing device is arranged at the bottom of the side wall of the monitoring outer well, which is used to inject biological agents into the groundwater in the monitoring outer well through a spraying device according to the agent delivery instruction, wherein the biological agent is a preparation that promotes biodegradation.

4. A groundwater well intelligent linkage rapid pollution control system as claimed in claim 2 or 3, characterized in that: A pollution detection device is arranged on the side wall of the monitoring outer well, which is used to perform regular detection of groundwater according to the pollution monitoring instruction and transmit the regular detection result to the general control system.

5. The intelligent linkage rapid pollution control system for groundwater wells according to claim 4, characterized in that: An extraction pump is provided on the side wall of the monitoring outer well, which is used to extract the groundwater in the monitoring outer well according to the pollution remediation instruction. The extracted groundwater is injected into the remediation inner well through the pollution detection device, and the target pollutants in the groundwater are treated through the remediation inner well.

6. The intelligent linkage rapid pollution control system for groundwater wells according to claim 5, characterized in that: The inner wall of the repair inner well is composed of two rows of rotatable repair layers, one side of the repair layer is a gravity initial separation layer, and the other side of the repair layer is an adsorption layer, wherein the gravity initial separation layer is composed of a plurality of L-shaped baffles arranged in sequence along the inner wall, and the adsorption layer is composed of a plurality of downwardly inclined baffles arranged in sequence along the inner wall, and the downwardly inclined baffle is composed of an upper adsorption sponge and a lower support plate, and the L-shaped baffle is spaced apart from the downwardly inclined baffle.

7. The intelligent linkage rapid pollution control system for groundwater wells according to claim 6, characterized in that: A baffle control device is provided on the outer wall of the inner repair well, which is used to start the repair layer according to the pollution repair instruction, wherein the repair layer rotates to a specific point after being started, and after the groundwater pumped out by the extraction pump enters the inner repair well, it is first gravity-separated through the gravity primary separation layer to obtain an upper NAPL phase liquid and a lower residual liquid, and the upper NAPL phase liquid enters the adsorption layer, and the pollutants in the upper NAPL phase liquid are adsorbed by the adsorption layer, and the lower residual liquid returns to the outer repair well to be injected into the inner repair well again through the extraction pump to realize pollution circulation treatment.

8. An intelligent linkage rapid pollution control system for groundwater wells according to any one of claims 1 to 7, characterized in that: The overall control system comprises: The database module is used to store the locations of groundwater wells in the target area, the plant layout in the target area, and the hydrogeological conditions in the target area.

9. An intelligent linkage rapid pollution control system for groundwater wells according to any one of claims 1 to 8, characterized in that: The overall control system comprises: The groundwater well grouping response module is used to determine the response area, and divide the intelligent linkage wells in the response area into the preparation group, the treatment group and the monitoring group, wherein the group length D of each group along the water flow direction is determined based on the permeability coefficient, hydraulic gradient and control time, and the pollution well is taken as the center O and grouped to both sides, and the upstream area of ​​the pollution well is separated by the group length D. The intelligent linkage wells in the area are used as the preparation group, and the area where the contaminated wells are located The intelligent linkage well in the processing group is used as the processing group, and the downstream area of ​​the contaminated well The intelligent linkage wells within the well serve as the monitoring group.

10. An intelligent linkage rapid pollution control system for groundwater wells according to any one of claims 1 to 9, characterized in that: The overall control system comprises: The rapid assessment module, based on the pollution status data fed back by the intelligent linkage wells, delineates all areas that exceed the groundwater risk control value, thereby determining the health risk of personnel in the target area, and performs trend analysis based on the real-time monitoring results of historical pollutants, determines the time it takes to reach the nearest sensitive receptor in the direction of groundwater flow, and issues early warnings for subsequent pollution levels based on the length of time.

11. An intelligent linkage rapid pollution control system for groundwater wells according to any one of claims 1 to 10, characterized in that: The control system also includes a display system, which includes: The display module is used to display the latest detected polluted wells, the grouping of surrounding groundwater wells, the distribution of human health risks, the detection data of each period, and the risk warning results. The early warning module is used to send the pollution occurrence signal and the risk early warning result to a preset smart mobile device.

12. A method for rapid pollution control of groundwater wells with intelligent linkage, characterized in that: Executed by the system according to any one of claims 1 to 11, the method comprises the following steps: By using the groundwater well system including a plurality of intelligent linkage wells arranged in the target area, when the intelligent linkage well detects the target pollutant, a pollution occurrence signal is generated and the current intelligent linkage well is marked as a polluted well; The overall control system determines the response area based on the pollution occurrence signal and the location information of the pollution well, divides the intelligent linkage wells in the response area into a preparation group, a treatment group and a monitoring group, and transmits drug delivery instructions, pollution remediation instructions and pollution monitoring instructions to the preparation group, the treatment group and the monitoring group respectively.

13. A method for intelligent linkage rapid pollution control of groundwater wells as claimed in claim 12, characterized in that: The method comprises the following steps: Real-time monitoring of target pollutants in groundwater through the intelligent linkage wells in the target area; When the intelligent linkage well detects the target pollutant, the pollution occurrence signal is generated and the current intelligent linkage well is marked as the polluted well; Taking the contaminated well as the center and the group length as the interval, the intelligent linkage wells in the response area are divided into the preparation group, the processing group and the monitoring group; Transmitting the agent delivery instruction, the pollution remediation instruction and the pollution monitoring instruction to the preparation group, the treatment group and the monitoring group respectively; The preparation group injects the biological agent into the groundwater through the injection device according to the agent delivery instruction, wherein the biological agent is a preparation that promotes biodegradation; The treatment group extracts groundwater from the monitoring outer well according to the pollution remediation instruction, injects the extracted groundwater into the remediation inner well through the pollution detection device, and treats the target pollutants in the groundwater through the remediation inner well; The monitoring group performs regular inspections on groundwater according to the pollution monitoring instructions, and transmits the regular inspection results to the general control system.

14. A storage medium, characterized in that: It contains a series of instructions for executing the method steps as claimed in any one of claims 12-13.

Citation Information

Patent Citations

  • Method and device for monitoring pollution of riverside water source well, electronic equipment and storage medium

    CN113159710A

  • In-situ remediation method for polluted soil and underground water

    CN114309053A

  • Method for analyzing spatial distribution of benzene series in underground water of polluted site based on pollution plume

    CN114354786A

  • Ground improvement structure

    JP2020200755A

  • Iot-based system for measurement of contamination distribution of contaminated groundwater through real-time monitoring of contamination degree of contaminated groundwater well for control of contaminated groundwater purification device and prediction of purification period based on measurement result

    US20210179446A1

Cited By

  • Underground water vertical circulation aeration repair system

    CN119735314A