Fabricated bridge prefabricated pier column component structure and mounting method thereof
By setting up mortise and tenon structures on the sides of the hollow plate beam and using epoxy glue, the problem of difficulty in ensuring the quality of the hollow plate beam hinge joint structure during pouring and the sealing of the bridge is achieved, and the stable connection and sealing of the bridge is improved. Construction efficiency and overall performance of the bridge.
Patent Information
- Application Number
- CN202411177247.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-12
AI Technical Summary
The existing hollow plate beam hinge joint structure is prone to stagnation during pouring, and the pouring quality is difficult to guarantee. The concrete shrinkage leads to the unsolid bonding surface and the seal is not tight and it is easy to leak water, resulting in damage to the bridge structure and uncomfortable driving. .
Prefabricated pier column structure of prefabricated bridges is adopted. By setting a mortise and tenon structure on the sides of the hollow plate beam instead of the traditional hinge joint, trapezoidal protrusions and grooves are used to combine epoxy glue and prestressed steel bars to achieve tightness between the beams and slabs. Connect and seal to avoid on-site pouring of concrete.
The construction process is simplified, the stability and durability of the connection are improved, the contact surface falloff caused by the shrinkage of the hinge concrete is avoided, the strength and sealing of the bridge are ensured, and the construction cost and complexity are reduced.
Smart Images

Figure CN118932836A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of assembled bridges and relates to a prefabricated pier column component structure of an assembled bridge and an installation method thereof. Background Art
[0002] Among the bridges in service in my country, small span bridges account for a high proportion, and hollow slab beams are a commonly used structural form in small span bridges. Compared with cast-in-place wet joint box beams and T beams, hollow slab beams have the characteristics of simple prefabrication, convenient erection, relatively small height span, and low cost.
[0003] At present, most hollow slab beams are connected by tongue-and-groove hinge joints, which have the following disadvantages: large-diameter aggregates are easily stuck in the hinge joints during pouring, and the pouring quality is difficult to ensure; the hinge joints and the hollow slab beam interface are difficult to effectively connect due to shrinkage of concrete; and water leakage is prone to occur due to loose sealing of the hinge joints. From a national perspective, most bridges that have been in service for a while have varying degrees of damage to the hinge joints, which not only affects the overall performance of the bridge, which may cause the hollow slab beam to be stressed on a single plate, but also affects the driving comfort.
[0004] In view of the current problems that the construction quality of the hinged joint structure of hollow slab beams is difficult to ensure and the structural reliability is not high, there are mainly the following hinged joint structures to solve the above problems:
[0005] 1. Clamps are arranged on both sides of the hollow slab beams, and the elastic force of the springs of the clamping plate devices is used to provide lateral restraint force, so that the lateral connection between the hollow slab beams is closer.
[0006] The equipment used in this method is an external facility and does not require changes to the original structure, but the structure is difficult to fix with a splint and its durability is poor.
[0007] 2. The steel bars in the hinged joint use connecting steel bars with anchor plates. By crossing the connecting steel bars in the hinged joint and adding anchor plates on both sides, the shear resistance and integrity of the hinged joint of the hollow slab beam are increased.
[0008] This structure is still a traditional tongue-and-groove hinged joint in essence. Although it has been strengthened in structure, it still cannot avoid the common problems of traditional hinged joints.
[0009] 3. Use I-beams instead of hinged joints to connect adjacent hollow slab beams. Use the notches on both sides of the I-beams to insert them into the sides of the hollow slab beams so that they bear force together with the hollow slabs, thereby increasing the shear force transmission capacity between the hollow slab beams.
[0010] Although this method can improve the problems of traditional hinged joints, it is difficult to prefabricate and cannot guarantee the reliability of the connection between the concrete and the I-beam at the connection. In addition, the cost of this method is also relatively high.
[0011] 4. Use hinged joints with shear connection structures, install shear bolts and PBL shear keys on the sides of prefabricated hollow slab beams, pour concrete in the hinged joints, and rely on the connection of the shear keys to transfer shear force between the hollow slab beams, so that they are subjected to force as a whole.
[0012] Although this method can improve the connection performance and durability of the hinged joint, it is difficult to prefabricate because it requires the longitudinal arrangement of steel plates, shear studs and PBL shear keys, and the shear connection device between the hinged joints may affect the pouring quality of the concrete in the hinged joints. Summary of the invention
[0013] In view of this, the present invention provides a prefabricated pier component structure for an assembled bridge and an installation method thereof in order to solve the problems that during the casting of the hinged joints of existing bridges, large-diameter aggregates are easily stuck in the hinged joints, making it difficult to ensure the casting quality; the hinged joint and the hollow slab beam interface are difficult to effectively combine due to the shrinkage of concrete; and water leakage is likely to occur due to the loose sealing of the hinged joints.
[0014] In order to achieve the above object, the present invention provides the following technical solutions:
[0015] An assembled bridge prefabricated pier column component structure, comprising:
[0016] Two supporting mechanisms, two connecting mechanisms and a bridge mechanism, the bridge mechanism is located on the top of the two supporting mechanisms, the two supporting mechanisms are used to support the bridge mechanism, the connecting mechanism is located on the top of the supporting mechanisms, and the connecting mechanism is used to fix the bridge mechanism;
[0017] The supporting mechanism includes a bridge pier, a supporting block and a placement groove, wherein the supporting block is fixedly connected to the top of the bridge pier, the placement groove is opened on the top of the supporting block, and a supporting component for supporting the bridge mechanism is arranged inside the placement groove;
[0018] The connection mechanism includes a connection top plate, and a connection assembly for connecting the support mechanism and the bridge mechanism is arranged inside the connection top plate;
[0019] The bridge structure includes a plurality of first hollow beam plates and a second hollow beam plate, a second trapezoidal groove is provided on both sides of the first hollow beam plates, a trapezoidal protrusion is provided on both sides of the second hollow beam plates, the trapezoidal protrusion and the second trapezoidal groove are used in combination, the first hollow beam plates and the second hollow beam plates are arranged alternately, sealing anchor concrete is provided on both sides of the plurality of first hollow beam plates and the second hollow beam plates, a first trapezoidal groove is provided on one side where the two sealing anchor concretes are close to each other, the first trapezoidal groove and the trapezoidal protrusion are used in combination, and the same group of reinforcing components for improving strength are provided between the plurality of first hollow beam plates and the second hollow beam plates;
[0020] The bottoms of the second hollow beam plate and the first hollow beam plate are both provided with transverse grooves, the bottoms of the transverse grooves are provided with interconnected positioning circular holes, and the interiors of the transverse grooves are provided with blocking components for blocking the positioning circular holes.
[0021] Furthermore, the support assembly includes a plurality of sealing blocks fixedly connected to the inner wall of the bottom of the placement groove, the top of the sealing block is fixedly connected with a positioning rod, and the plurality of positioning rods and the plurality of positioning circular holes are used in combination.
[0022] Furthermore, the connecting component includes a connecting middle plate fixedly connected to the bottom of the connecting top plate, the bottom of the connecting middle plate is fixedly connected to the connecting bottom plate, a rectangular groove is opened on the top of the support block, the rectangular groove is used in conjunction with the connecting bottom plate, a plurality of vertical casting holes are opened on the top of the connecting top plate, a plurality of second inclined casting holes are opened on both sides of the connecting bottom plate, the second inclined casting holes are connected with the vertical casting holes, the inner walls on both sides of the placement groove are opened with first inclined casting holes, the first inclined casting holes are connected with the second inclined casting holes.
[0023] Furthermore, the reinforcement component includes a plurality of second reserved transverse prestressed holes opened inside the first hollow beam and the second hollow beam, epoxy glue is arranged between the first hollow beam and the second hollow beam and between the sealing anchor concrete and the second hollow beam, a plurality of first reserved transverse prestressed holes are reserved inside the epoxy glue, the same transverse fine-rolled threaded steel prestressed steel bar is arranged inside the second reserved transverse prestressed holes and the first reserved transverse prestressed holes, prestressed steel bar anchors are arranged at both ends of the transverse fine-rolled threaded steel prestressed steel bar, a plurality of circular grooves are opened on one side of the sealing anchor concrete, and the circular grooves are used in conjunction with the prestressed steel bar anchor.
[0024] Furthermore, the blocking assembly includes a sliding baffle slidably connected to the inner wall of one side of the transverse groove, two symmetrically arranged circular grooves are opened on one side of the sliding baffle, and the same spring is fixedly connected between the inner wall of one side of the circular groove and the inner wall of one side of the transverse groove, and the sliding baffle is used in conjunction with the sealing block.
[0025] Furthermore, inclined grooves are provided on both sides of the sliding baffle, and a triangular block is fixedly connected to one side of the sealing anchor concrete, and the triangular block is used in conjunction with the inclined grooves.
[0026] Furthermore, a strip-shaped connecting block and a U-shaped connecting block are respectively fixedly connected to both sides of the sliding baffle, and the strip-shaped connecting block and the U-shaped connecting block are clamped with each other.
[0027] Furthermore, a second strip notch is opened on both sides of the top of the anchoring concrete, a first strip notch is opened on both sides of the top of the second hollow beam slab, a fourth strip notch is opened on both sides of the top of the first hollow beam slab, and a third strip notch is set on both sides of the top of the second strip notch. The second strip notch, the first strip notch, the fourth strip notch and the third strip notch are all used in conjunction with the connecting top plate.
[0028] A method for installing a prefabricated pier column component structure of an assembled bridge, specifically comprising the following steps:
[0029] S1. Prefabricated hollow slab: When prefabricating the first hollow beam slab and the second hollow beam slab at the prefabrication site, set the trapezoidal protrusion and the second trapezoidal groove of the side formwork according to the structural dimensions respectively; set up steel bars and set stress-bearing steel bars in the concrete of the groove and the protrusion, install the reserved longitudinal and transverse prestressed ducts during prefabrication, and pour concrete; tension the longitudinal prestressed steel bars and store the beams;
[0030] S2, on-site installation: transport beams to the site; hoist side beams; hoist the second beam in order from one side to the other; evenly apply epoxy glue in the joint between the first and second beams, and compact the two beams from the side to make them tightly combined; repeat in sequence; insert the transverse fine-rolled threaded steel prestressed steel bars into the first reserved transverse prestressed channel and the second reserved transverse prestressed channel; tension the prestressed steel, grout after tensioning is completed, and use multiple prestressed steel anchors to seal the anchors;
[0031] S3. Install the connecting mechanism between the two bridge mechanisms, and pour concrete into the vertical casting hole. At this time, the concrete can be discharged into the placement groove through the second casting inclined hole and the first casting inclined hole, thereby improving the stability of the overall connection of the connecting mechanism, the supporting mechanism and the bridge mechanism.
[0032] The beneficial effects of the present invention are:
[0033] 1. The present invention discloses a prefabricated pier component structure for an assembled bridge. A mortise and tenon structure is arranged on the side of a hollow slab beam to replace a traditional tongue-and-groove hinged joint structure. The shear force is transmitted by the mortise and tenon structure. Compared with the traditional structure, there is no need to cast the hinged joint concrete between the hollow slab beams, thus avoiding the problem of difficulty in ensuring the quality of the hinged joint cast on site. Since there is no hinged joint structure, there is no need to worry about the contact surface falling off caused by the shrinkage of the hinged joint concrete. Since epoxy glue is applied to the mortise and tenon joints, rainwater cannot penetrate into the gap, thus solving the problem of water seepage. This method simplifies the on-site construction process. There is no need to cast concrete on site. The prefabricated hollow slab beam can be directly hoisted into place to form a bridge.
[0034] 2. Compared with the arrangement of plywood on both sides of the hollow slab beam, the prefabricated pier column component structure of an assembled bridge disclosed by the present invention directly adopts transverse tensioning prestressed steel bars, does not require complicated devices, and has greatly improved reliability. Compared with the use of connecting steel bars with anchor plates in the hinged joint, the device structure is simpler and the construction is more convenient; compared with the use of I-beams to replace the hinged joint, although both of them have eliminated the hinged joint structure, thus avoiding some problems of the traditional tongue-and-groove hinged joint, the mortise and tenon structure can be prefabricated and assembled piece by piece, while the method of using I-beams to replace the hinged joint can only be prefabricated and hoisted as a whole, which requires lifting equipment. Therefore, the construction of the hollow slab using the mortise and tenon structure is relatively simple and the cost is relatively low. Compared with the use of hinged joints with shear connection structures, the force transmission path of this structure is clearer, the reliability of the structure is improved, and the construction is relatively more convenient.
[0035] 3. The prefabricated pier component structure of an assembled bridge disclosed in the present invention is convenient to construct. Through the prefabricated first hollow beam and second hollow beam, as well as a special supporting mechanism and connecting mechanism, the bridge can be assembled quickly and accurately, which significantly improves the construction efficiency.
[0036] The design of the trapezoidal protrusion and the second trapezoidal groove of the bridge mechanism enhances the connection stability between the beams and slabs, while simplifying the on-site installation process.
[0037] 4. The structural strength and stability of the prefabricated pier components of an assembled bridge disclosed in the present invention are improved. The ingenious design of the sealing blocks and sliding baffles not only maintains the stability of the bridge structure during transportation and installation, but also effectively fills the gap after installation, thereby enhancing the strength of the overall structure.
[0038] The provision of the vertical casting hole, the second inclined casting hole and the first inclined casting hole of the connecting mechanism allows concrete pouring, further strengthens the connection between the connecting mechanism, the supporting mechanism and the bridge mechanism, and improves the overall stability.
[0039] 5. The prefabricated bridge pier component structure disclosed in the present invention has strong adaptability and sustainability. The structure is suitable for a variety of bridge construction scenarios, especially areas that require rapid construction or areas with heavy traffic that need to resume traffic as soon as possible. The use of prefabricated components reduces on-site wet work, which is beneficial to environmental protection. At the same time, the replaceability of components also enhances the maintainability and service life of the bridge.
[0040] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:
[0042] Figure 1 A three-dimensional structural schematic diagram of a prefabricated pier column component structure of an assembled bridge proposed by the present invention;
[0043] Figure 2 A schematic diagram of a three-dimensional exploded structure of a prefabricated pier component structure of an assembled bridge proposed by the present invention;
[0044] Figure 3 A three-dimensional structural schematic diagram of a supporting mechanism and a connecting mechanism in a prefabricated pier component structure of an assembled bridge proposed by the present invention;
[0045] Figure 4 It is a schematic diagram of the exploded structure of the supporting mechanism and the connecting mechanism in the prefabricated pier component structure of an assembled bridge proposed by the present invention;
[0046] Figure 5 A schematic diagram of the three-dimensional structure of a first casting inclined hole and a second casting inclined hole in a prefabricated pier component structure of an assembled bridge proposed by the present invention;
[0047] Figure 6 A schematic diagram of the three-dimensional structure of a prefabricated bridge pier component structure proposed by the present invention after the first hollow beam and the second hollow beam are installed;
[0048] Figure 7 A schematic diagram of the three-dimensional structure of a first hollow beam and anchor concrete in a prefabricated pier component structure of an assembled bridge proposed by the present invention;
[0049] Figure 8 It is a schematic diagram of the exploded structure of the first hollow beam plate and the second hollow beam plate in the prefabricated pier column component structure of an assembled bridge proposed by the present invention;
[0050] Fig. 9 A schematic diagram of the three-dimensional structure of a first hollow beam and a second hollow beam in a prefabricated pier component structure of an assembled bridge proposed by the present invention;
[0051] Fig.10 A schematic diagram of the three-dimensional structure of a sliding baffle in a prefabricated pier component structure of an assembled bridge proposed by the present invention.
[0052] In the figure: 1. Support mechanism; 101. Bridge pier; 102. Support block; 103. Placement slot; 104. Positioning rod; 105. Block; 106. First pouring inclined hole; 107. Rectangular slot; 2. Connection mechanism; 201. Connecting top plate; 202. Casting vertical hole; 203. Connecting middle plate; 204. Connecting bottom plate; 205. Second pouring inclined hole; 3. Bridge mechanism; 301. First hollow beam plate; 302. First strip notch; 303. Second hollow beam plate; 304. Epoxy glue; 305. Sealing anchor concrete; 306. Second strip notch; 307 , the third strip notch; 308, the fourth strip notch; 309, the first reserved transverse prestressed channel; 310, the prestressed steel bar anchor; 311, the transverse fine-rolled threaded steel prestressed steel bar; 312, the circular groove; 313, the first trapezoidal groove; 314, the trapezoidal protrusion; 315, the second trapezoidal groove; 316, the second reserved transverse prestressed channel; 317, the triangular block; 318, the transverse groove; 319, the sliding baffle; 320, the positioning circular hole; 321, the inclined groove; 322, the U-shaped connecting block; 323, the spring; 324, the circular groove; 325, the strip connecting block. DETAILED DESCRIPTION
[0053] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.
[0054] Reference Figure 1-10 A prefabricated pier component structure of an assembled bridge, a bridge mechanism 3 is located on the top of two supporting mechanisms 1, the two supporting mechanisms 1 are used to support the bridge mechanism 3, a connecting mechanism 2 is located on the top of the supporting mechanisms 1, and the connecting mechanism 2 is used to fix the bridge mechanism 3.
[0055] The supporting mechanism 1 includes a pier 101, a supporting block 102 and a placement groove 103. The supporting block 102 is fixedly connected to the top of the pier 101. The placement groove 103 is opened at the top of the supporting block 102. A supporting component for supporting the bridge mechanism 3 is arranged inside the placement groove 103. The supporting component includes a plurality of sealing blocks 105 fixedly connected to the inner wall of the bottom of the placement groove 103. A positioning rod 104 is fixedly connected to the top of the sealing block 105. The plurality of positioning rods 104 and the plurality of positioning circular holes 320 are used in combination.
[0056] The connecting mechanism 2 includes a connecting top plate 201, and a connecting component for connecting the supporting mechanism 1 and the bridge mechanism 3 is arranged inside the connecting top plate 201. The connecting component includes a connecting middle plate 203 fixedly connected to the bottom of the connecting top plate 201, and the bottom of the connecting middle plate 203 is fixedly connected to the connecting bottom plate 204. A rectangular groove 107 is provided on the top of the support block 102, and the rectangular groove 107 is used in conjunction with the connecting bottom plate 204. A plurality of vertical casting holes 202 are provided on the top of the connecting top plate 201, and a plurality of second inclined casting holes 205 are provided on both sides of the connecting bottom plate 204, and the second inclined casting holes 205 are connected to the vertical casting holes 202. The inner walls of both sides of the placement groove 103 are provided with first inclined casting holes 106, and the first inclined casting holes 106 are connected to the second inclined casting holes 205. After the bridge mechanism 3 is installed, multiple Each sealing block 105 can fill the gap between the horizontal groove 318 and the sliding baffle 319, thereby ensuring the strength of the device, and the connecting bottom plate 204 can be inserted into the interior of the rectangular groove 107. At this time, the second casting inclined hole 205 is in contact between the two bridge mechanisms 3 to fill the gap between the two bridge mechanisms 3, and the connecting top plate 201 can be moved to the interior of the first strip notch 302, the fourth strip notch 308, the third strip notch 307 and the second strip notch 306, thereby further improving the connection stability of the bridge mechanism 3, and concrete can be poured into the interior of the casting vertical hole 202. At this time, the concrete can be discharged into the interior of the placement groove 103 through the second casting inclined hole 205 and the first casting inclined hole 106, thereby improving the stability of the overall connection of the connecting mechanism 2, the supporting mechanism 1 and the bridge mechanism 3.
[0057] The bridge structure 3 includes a plurality of first hollow beam plates 301 and a second hollow beam plate 303. The first hollow beam plates 301 are provided with a second trapezoidal groove 315 on both sides. The second hollow beam plates 303 are provided with a trapezoidal protrusion 314 on both sides. The trapezoidal protrusion 314 and the second trapezoidal groove 315 are used in conjunction with each other. The first hollow beam plates 301 and the second hollow beam plates 303 are arranged alternately. Sealing anchor concrete 305 is provided on both sides of the plurality of first hollow beam plates 301 and the second hollow beam plates 303. The first trapezoidal groove 313 is provided on the side where the two sealing anchor concretes 305 are close to each other. The first trapezoidal groove 313 and the trapezoidal protrusion 314 are used in conjunction with each other. The same group of reinforcing components for improving strength are arranged between the plurality of first hollow beam plates 301 and the second hollow beam plates 303, and the reinforcing components include a plurality of second reserved transverse prestressed holes 316 opened inside the first hollow beam plates 301 and the second hollow beam plates 303. Epoxy glue 304 is arranged between the first hollow beam plates 301 and the second hollow beam plates 303 and between the sealing anchor concrete 305 and the second hollow beam plates 303. The epoxy glue 304 is reserved with a plurality of first reserved transverse prestressed holes 309, the second reserved transverse prestressed holes 316 and the first reserved transverse prestressed holes The same transverse fine-rolled threaded steel prestressed steel bar 311 is arranged inside 309, and prestressed steel bar anchors 310 are arranged at both ends of the transverse fine-rolled threaded steel prestressed steel bar 311. A plurality of circular grooves 312 are opened on one side of the sealing anchor concrete 305, and the circular grooves 312 are used in conjunction with the prestressed steel bar anchors 310. The beam is transported to the site; the side beam is hoisted; the second beam is hoisted from one side to the other side; epoxy glue 304 is evenly applied to the joint between the first and second beams, and the two beams are compacted from the side to make them tightly combined; the cycle is repeated in sequence; the transverse fine-rolled threaded steel prestressed steel bar 311 is inserted into the first reserved The transverse prestressed channel 309 and the second reserved transverse prestressed channel 316 are used for prestressing. After the prestressing is completed, grouting is performed, and anchoring is performed using multiple prestressed steel bar anchors 310. During installation, the multiple first hollow beam slabs 301 and the multiple second hollow beam slabs 303 are first hoisted in sequence above the support mechanism 1. At this time, the sliding baffle 319 blocks the positioning circular hole 320, and the positioning circular hole 320 will not be engaged with the positioning rod 104. The multiple second hollow beam slabs 303 and the first hollow beam slab 301 can complete the installation process. After the installation is completed, the anchoring concrete 305 is installed on both sides.
[0058] The bottom of the second hollow beam plate 303 and the first hollow beam plate 301 are both provided with a transverse groove 318, and a communicating positioning circular hole 320 is provided at the bottom of the transverse groove 318. A blocking component for blocking the positioning circular hole 320 is provided inside the transverse groove 318, and the blocking component includes a sliding baffle 319 slidably connected to the inner wall of one side of the transverse groove 318, and one side of the sliding baffle 319 is provided with two symmetrically arranged circular grooves 324, and the inner wall of one side of the circular groove 324 is connected to the transverse groove 318. A same spring 323 is fixedly connected between the inner walls of one side of 8, the sliding baffle 319 is used in conjunction with the sealing block 105, and inclined grooves 321 are provided on both sides of the sliding baffle 319. A triangular block 317 is fixedly connected to one side of the sealing anchor concrete 305, and the triangular block 317 is used in conjunction with the inclined groove 321. A strip connecting block 325 and a U-shaped connecting block 322 are fixedly connected on both sides of the sliding baffle 319, respectively, and the strip connecting block 325 and the U-shaped connecting block 322 are snap-connected.
[0059] A second strip notch 306 is provided on both sides of the top of the anchoring concrete 305, a first strip notch 302 is provided on both sides of the top of the second hollow beam slab 303, a fourth strip notch 308 is provided on both sides of the top of the first hollow beam slab 301, and a third strip notch 307 is provided on both sides of the top of the second strip notch 306. The second strip notch 306, the first strip notch 302, the fourth strip notch 308 and the third strip notch 307 are all used in conjunction with the connecting top plate 201. At this time, the triangular block 317 on one side of the anchoring concrete 305 can conflict with the inclined groove 321. Since multiple first hollow beam slabs 301 and second hollow beam slabs 303 are connected, multiple The strip-shaped connecting block 325 is engaged with the U-shaped connecting block 322. At this time, multiple sliding baffles 319 are connected to each other to form a whole. The triangular block 317 is in conflict with the inclined groove 321. At this time, the triangular block 317 drives the sliding baffle 319 to move horizontally. The sliding baffle 319 squeezes the spring 323 and pushes the spring 323 into the interior of the circular groove 324. At this time, the sliding baffle 319 moves to the inner wall of one side of the transverse groove 318. At this time, the positioning circular hole 320 is leaked out, and multiple first hollow beam plates 301 and second hollow beam plates 303 fall as a whole and enter the interior of the placement groove 103. At this time, the positioning rod 104 is engaged with the positioning circular hole 320 to complete the installation process of the bridge mechanism 3.
[0060] The method for installing a prefabricated pier column component structure of an assembled bridge specifically comprises the following steps:
[0061] S1. Prefabricated hollow slab: When prefabricating the first hollow beam slab 301 and the second hollow beam slab 303 at the prefabrication site, the trapezoidal protrusion 314 and the second trapezoidal groove 315 of the side form are respectively set according to the structural dimensions; steel bars are set up and stress-bearing steel bars are set in the concrete of the groove and the protrusion, and the reserved longitudinal and transverse prestressed ducts are installed during prefabrication, and concrete is poured; the longitudinal prestressed steel bars are tensioned, and the beams are stored;
[0062] S2, on-site installation: transport the beam to the site; hoist the side beam; hoist the second beam in the order from one side to the other; evenly apply epoxy glue 304 in the joint between the first and second beams, and compact the two beams from the side to make them tightly combined; cycle in sequence; insert the transverse fine-rolled threaded steel prestressed steel bar 311 into the first reserved transverse prestressed hole 309 and the second reserved transverse prestressed hole 316; perform prestressing, grouting after the tensioning is completed, and use multiple prestressed steel bar anchors 310 for anchoring;
[0063] During installation, the plurality of first hollow beam plates 301 and the plurality of second hollow beam plates 303 are sequentially hoisted above the support mechanism 1. Since the sliding baffle 319 blocks the positioning circular hole 320 at this time, the positioning circular hole 320 will not be engaged with the positioning rod 104, so that the plurality of second hollow beam plates 303 and the first hollow beam plate 301 can complete the installation process. After the installation is completed, the sealing anchor concrete 305 is installed on both sides.
[0064] At this time, the triangular block 317 on one side of the anchor concrete 305 can conflict with the inclined groove 321. Since the plurality of first hollow beam plates 301 and the second hollow beam plates 303 are connected, the plurality of strip connecting blocks 325 are engaged with the U-shaped connecting blocks 322. At this time, the plurality of sliding baffles 319 are connected to each other to form a whole. The triangular block 317 conflicts with the inclined groove 321. At this time, the triangular block 317 drives the sliding baffle 319 to move laterally. The sliding baffle 319 squeezes the spring 323, and the spring 323 enters the inside of the circular groove 324. At this time, the sliding baffle 319 moves to the inner wall of one side of the transverse groove 318. At this time, the positioning circular hole 320 is leaked, and the plurality of first hollow beam plates 301 and the second hollow beam plates 303 fall as a whole and enter the inside of the placement groove 103. At this time, the positioning rod 104 is engaged with the positioning circular hole 320, completing the installation process of the bridge mechanism 3.
[0065] S3. After the bridge mechanism 3 is installed, multiple sealing blocks 105 can fill the gap between the horizontal groove 318 and the sliding baffle 319, thereby ensuring the strength of the device, and the connecting bottom plate 204 can be inserted into the interior of the rectangular groove 107. At this time, the second casting inclined hole 205 is in contact between the two bridge mechanisms 3 to fill the gap between the two bridge mechanisms 3, and the connecting top plate 201 can be moved to the interior of the first strip notch 302, the fourth strip notch 308, the third strip notch 307 and the second strip notch 306, thereby further improving the connection stability of the bridge mechanism 3, and concrete can be poured into the interior of the casting vertical hole 202. At this time, the concrete can be discharged into the interior of the placement groove 103 through the second casting inclined hole 205 and the first casting inclined hole 106, thereby improving the stability of the overall connection of the connecting mechanism 2, the supporting mechanism 1 and the bridge mechanism 3.
[0066] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.
Claims
1. A prefabricated pier column component structure of an assembled bridge, characterized in that: include: Two supporting mechanisms (1), two connecting mechanisms (2) and a bridge mechanism (3), wherein the bridge mechanism (3) is located on top of the two supporting mechanisms (1), the two supporting mechanisms (1) are used to support the bridge mechanism (3), the connecting mechanism (2) is located on top of the supporting mechanisms (1), and the connecting mechanism (2) is used to fix the bridge mechanism (3); The support mechanism (1) comprises a bridge pier (101), a support block (102) and a placement groove (103); the support block (102) is fixedly connected to the top of the bridge pier (101); the placement groove (103) is opened at the top of the support block (102); and a support component for supporting the bridge mechanism (3) is arranged inside the placement groove (103); The connection mechanism (2) comprises a connection top plate (201), and a connection component for connecting the support mechanism (1) and the bridge mechanism (3) is arranged inside the connection top plate (201); The bridge structure (3) comprises a plurality of first hollow beam plates (301) and second hollow beam plates (303), both sides of the first hollow beam plates (301) are provided with second trapezoidal grooves (315), both sides of the second hollow beam plates (303) are provided with trapezoidal protrusions (314), the trapezoidal protrusions (314) and the second trapezoidal grooves (315) are used in combination, the first hollow beam plates (301) and the second hollow beam plates (303) are arranged in an alternating manner, both sides of the plurality of first hollow beam plates (301) and the second hollow beam plates (303) are provided with sealing anchor concrete (305), the sides of the two sealing anchor concretes (305) close to each other are provided with first trapezoidal grooves (313), the first trapezoidal grooves (313) and the trapezoidal protrusions (314) are used in combination, and the same group of reinforcing components for improving strength are arranged between the plurality of first hollow beam plates (301) and the second hollow beam plates (303); The bottoms of the second hollow beam plate (303) and the first hollow beam plate (301) are both provided with transverse grooves (318), the bottoms of the transverse grooves (318) are provided with interconnected positioning circular holes (320), and a sealing component for sealing the positioning circular holes (320) is arranged inside the transverse grooves (318).
2. The prefabricated pier component structure of an assembled bridge according to claim 1, characterized in that: The support assembly comprises a plurality of sealing blocks (105) fixedly connected to the inner wall of the bottom of the placement groove (103), the top of the sealing block (105) is fixedly connected to a positioning rod (104), and the plurality of positioning rods (104) and the plurality of positioning circular holes (320) are used in combination.
3. The prefabricated pier column component structure of an assembled bridge according to claim 2, characterized in that: The connection assembly comprises a connection middle plate (203) fixedly connected to the bottom of the connection top plate (201); the bottom of the connection middle plate (203) is fixedly connected to a connection bottom plate (204); a rectangular groove (107) is provided on the top of the support block (102); the rectangular groove (107) is used in conjunction with the connection bottom plate (204); a plurality of vertical casting holes (202) are provided on the top of the connection top plate (201); a plurality of second inclined casting holes (205) are provided on both sides of the connection bottom plate (204); the second inclined casting holes (205) are connected to the vertical casting holes (202); the inner walls of both sides of the placement groove (103) are provided with first inclined casting holes (106); the first inclined casting holes (106) are connected to the second inclined casting holes (205).
4. The prefabricated pier component structure of an assembled bridge according to claim 3, characterized in that: The reinforcement component includes a plurality of second reserved transverse prestressed holes (316) opened inside the first hollow beam plate (301) and the second hollow beam plate (303); epoxy glue (304) is arranged between the first hollow beam plate (301) and the second hollow beam plate (303) and between the sealing and anchoring concrete (305) and the second hollow beam plate (303); a plurality of first reserved transverse prestressed holes (309) are reserved inside the epoxy glue (304); the same transverse fine-rolled threaded steel prestressed steel bar (311) is arranged inside the second reserved transverse prestressed holes (316) and the first reserved transverse prestressed holes (309); both ends of the transverse fine-rolled threaded steel prestressed steel bar (311) are arranged with prestressed steel bar anchors (310); a plurality of circular grooves (312) are opened on one side of the sealing and anchoring concrete (305); the circular grooves (312) are used in conjunction with the prestressed steel bar anchors (310).
5. The prefabricated pier component structure of an assembled bridge according to claim 4, characterized in that: The blocking assembly comprises a sliding baffle (319) slidably connected to the inner wall of one side of the transverse groove (318); two symmetrically arranged circular grooves (324) are provided on one side of the sliding baffle (319); a same spring (323) is fixedly connected between the inner wall of one side of the circular groove (324) and the inner wall of one side of the transverse groove (318); the sliding baffle (319) is used in conjunction with the sealing block (105).
6. The prefabricated pier component structure of an assembled bridge according to claim 5, characterized in that: Both sides of the sliding baffle (319) are provided with inclined grooves (321), and one side of the sealing anchor concrete (305) is fixedly connected with a triangular block (317), and the triangular block (317) is used in conjunction with the inclined groove (321).
7. The prefabricated bridge pier component structure according to claim 5, characterized in that: A strip-shaped connection block (325) and a U-shaped connection block (322) are respectively fixedly connected to the two sides of the sliding baffle (319), and the strip-shaped connection block (325) and the U-shaped connection block (322) are clamped together.
8. The prefabricated pier column component structure of an assembled bridge according to claim 4, characterized in that: The sealing anchor concrete (305) is provided with a second strip-shaped notch (306) on both sides of the top, the second hollow beam slab (303) is provided with a first strip-shaped notch (302) on both sides of the top, the first hollow beam slab (301) is provided with a fourth strip-shaped notch (308) on both sides of the top, and the second strip-shaped notch (306) is provided with a third strip-shaped notch (307) on both sides of the top. The second strip-shaped notch (306), the first strip-shaped notch (302), the fourth strip-shaped notch (308) and the third strip-shaped notch (307) are all used in conjunction with the connecting top plate (201).
9. The method for installing a prefabricated bridge pier component structure according to any one of claims 4 to 8, characterized in that: The specific steps include: S1, prefabricating hollow slabs: when prefabricating the first hollow beam slab (301) and the second hollow beam slab (303) at the prefabrication site, respectively set the trapezoidal protrusion (314) and the second trapezoidal groove (315) of the side form according to the structural dimensions; set up steel bars and set stress-bearing steel bars in the concrete of the groove and the protrusion, install the reserved longitudinal and transverse prestressed ducts during prefabrication, and pour concrete; tension the longitudinal prestressed steel bars and store the beams; S2, on-site installation: transport the beam to the site; hoist the side beam; hoist the second beam in the order from one side to the other side; evenly apply epoxy glue (304) in the joint between the first and second beams, and compact the two beams from the side to make them tightly combined; Cycle in sequence; insert the transverse fine-rolled threaded steel prestressed steel bar (311) into the first reserved transverse prestressed hole (309) and the second reserved transverse prestressed hole (316); perform prestressing, grouting after the tensioning is completed, and use multiple prestressed steel bar anchors (310) to seal the anchors; S3. Install the connection mechanism (2) between the two bridge mechanisms (3), and pour concrete into the interior of the vertical casting hole (202). At this time, the concrete can be discharged into the interior of the placement groove (103) through the second casting inclined hole (205) and the first casting inclined hole (106), thereby improving the stability of the overall connection of the connection mechanism (2), the support mechanism (1) and the bridge mechanism (3).