Underground diaphragm wall construction process and construction equipment
By inserting prefabricated pile walls in underground continuous wall construction and controlling their depth, the problem of steel or sheet piles is solved, the integrity and sealing of the construction are improved, and the emmembrane resistance and construction efficiency are improved.
Patent Information
- Application Number
- CN202310529287.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-11
- Publication Date
- 2024-11-12
AI Technical Summary
In the existing underground continuous wall construction technology, steel or sheet piles are prone to pour after sinking into the underground trough, affecting integrity and sealing, resulting in a decrease in permeability.
By inserting prefabricated pile walls in the underground groove, the insertion depth is 1.01 to 1.5 times the depth of the underground groove, ensuring that the prefabricated pile walls are not easy to tilt, and there is no need to adjust the verticality after the insertion is completed, simplifying the construction process.
It improves the integrity and sealing of underground continuous walls, avoids water seepage, and saves construction time and costs.
Smart Images

Figure CN118932984A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground continuous wall construction, in particular to an underground continuous wall construction process and construction equipment. Background Art
[0002] With the acceleration of urbanization, the density of buildings is increasing, the number of deep foundation pit projects is increasing, and the requirements for foundation pit support engineering in high water level areas are getting higher and higher. The existing chain knife continuous wall technology uses a chain saw type tool box to vertically drive into the stratum, and then make horizontal lateral movements. At the same time, the chain drives the tool to make up and down rotational movements, mix the original soil, pour cement slurry and put in steel or sheet piles to form a water stop wall with a certain strength and thickness. It has the advantages of large construction depth, the maximum depth can reach 80m, and it has a wide range of applications and good integrity.
[0003] However, in the process of placing the steel sections or sheet piles, after the pile driving equipment sinks the steel sections or sheet piles into the underground trench, the pile driving equipment needs to sink the steel sections or sheet piles that were last clamped by the pile driving equipment into the underground trench. When the pile driving equipment releases the steel sections or sheet piles and moves to the next pile driving position to avoid the pile driving equipment, the steel sections or sheet piles are only placed in the underground trench and are prone to tipping to one side in the thickness direction, resulting in adjacent steel sections or sheet piles not being on the same horizontal line in the horizontal direction, and also affecting the effective vertical docking of the steel sections or sheet piles, thereby affecting the integrity and sealing of the underground continuous wall, thereby reducing the impermeability of the underground continuous wall. Summary of the invention
[0004] The purpose of the present invention is to provide an underground continuous wall construction process and construction equipment to solve the problem of low impermeability of the underground continuous wall.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] Underground continuous wall construction technology, including:
[0007] Grooving step: processing the underground trench to a predetermined depth at a predetermined construction location by using the groove forming equipment of a composite pile driver;
[0008] Pile driving step: Use the pile driving equipment of the composite pile driver to drive the prefabricated pile wall which is continuously spliced horizontally and / or vertically in the underground trench, and make the driving depth of the prefabricated pile wall 1.01 to 1.5 times of the depth of the underground trench.
[0009] Compared with the prior art, the beneficial effects of the present invention are: by inserting a prefabricated pile wall in an underground trench to form an underground continuous wall, and when inserting the prefabricated pile wall, the insertion depth of the prefabricated pile wall is controlled to be 1.01 to 1.5 times the depth of the underground trench, so that the part of the prefabricated pile wall located at the lower end of the underground trench is clamped, the prefabricated pile wall is not easy to tilt to one side in the thickness direction, and adjacent prefabricated pile walls can be roughly on the same horizontal line in the horizontal direction, which is convenient for the docking between adjacent prefabricated pile walls, further ensuring the integrity and sealing of the underground continuous wall to avoid water seepage in the underground continuous wall. And after the insertion is completed, there is no need to adjust the verticality of the prefabricated pile wall, saving the construction time and cost of the underground continuous wall.
[0010] Preferably, the grooving step comprises:
[0011] Grooving steps: Grooving equipment opens underground grooves at predetermined locations;
[0012] Among them, the grooving step includes a cutting device extension step: the cutting device of the grooving equipment is excavated vertically at a predetermined position to form an underground groove, until the head box of the cutting device is separated from the cutting box in the underground groove after excavation is impossible, and the cutting device is moved to the cutting box placement hole to connect the head box to the cutting box in the cutting box placement hole; returning to the predetermined position again to connect the cutting box connected to the head box with the cutting box in the underground groove, and extending the cutting chain of the cutting device, and continuing the vertical excavation action; repeating the above steps to vertically excavate an underground groove with a depth required by the design; cutting step: the grooving equipment moves horizontally to form a continuous underground groove.
[0013] Preferably, in the pile driving step, the precast pile wall is placed in the pile driving device of the pile driving equipment and clamped by the pile driving device, and the pile driving device moves vertically to drive the precast pile wall to sink into the underground groove; when the pile driving device moves vertically downward to the maximum distance, the pile clamping device of the pile driving equipment clamps the precast pile wall, and the pile driving device moves vertically upward and clamps the precast pile wall again to drive the precast pile wall to continue to sink into the underground groove, and the above pile driving operation is continued until the precast pile wall sinks to a preset position;
[0014] And / or, the grooving step further comprises:
[0015] On-site steps: The underground continuous wall construction equipment arrives at the horizontal outside of the predetermined position according to the design requirements;
[0016] Pre-grooving step: The grooving equipment opens a cutting box placement hole on the horizontal outer side of the predetermined position.
[0017] Preferably, in the pile driving step, after the precast pile wall is sunk to a preset position, the pile clamping device clamps the precast pile wall and the pile driving device clamps and drives another precast pile wall to move down and connect with the precast pile wall, and then the pile driving operation and the docking operation are repeated until the precast pile wall is sunk to the required design depth.
[0018] Preferably, the longitudinal width of the underground trench is greater than the thickness of the precast pile wall, and when the precast pile wall is sunk, the median line of the precast pile wall in the thickness direction is flush with the median line of the underground trench in the longitudinal width direction;
[0019] And / or, the insertion depth of the precast pile wall is 1.15 to 1.45 times the depth of the underground trench.
[0020] Another object of the present invention is to provide underground continuous wall construction equipment, characterized in that the underground continuous wall construction equipment is equipment used in the underground continuous wall construction process described in any one of claims 1 to 5, and the underground continuous wall construction equipment includes: a pile driver foundation, a trenching device and a pile sinking device installed on the pile driver foundation;
[0021] The grooving equipment includes a cutting device and a lifting device. The cutting device includes a detachably connected head box, a cutting box, a tail box, and an extendable cutting chain. The head box, the cutting box, and the tail box all include a detachably connected connector. The head box is provided with a driving sprocket connected to a rotary power source and a cutting chain to drive the cutting chain to rotate around the connector. The tail box is provided with a driven sprocket connected to the cutting chain. The lifting device is connected to the head box to drive the cutting device or the head box to rise and fall.
[0022] The pile driving equipment comprises a pile driving device, a pile clamping device located below the pile driving device, and a lifting device connected to the pile driving device.
[0023] Compared with the prior art, the beneficial effects of the present invention are as follows: the pile driver foundation can drive the trenching equipment and the pile sinking equipment to move horizontally, the cutting device of the trenching equipment is driven by the lifting device of the trenching equipment to dig the trench vertically downward, and when the cutting device is vertically excavated to a preset depth, the cutting device can be driven by the pile driver foundation to cut horizontally to form an underground trench. During the vertical excavation process, the cutting device can increase the sprocket frame composed of the head box, the cutting box, and the tail box by continuously connecting a new cutting box between the head box and the tail box to adapt to the preset grooving depth, and the cutting chain of the cutting device can be extended to adapt to the increased sprocket frame. The cutting chain is wound around the driving sprocket and the driven sprocket, and the rotary power source can drive the driving sprocket to rotate to drive the cutting chain to rotate around the sprocket frame to cut the soil, and the rotary power source can be one or a combination of a hydraulic motor, an electric motor, and a pneumatic motor.
[0024] Preferably, the head box further comprises: a tensioning member, a mounting frame for mounting the tensioning member and the connecting body, the tensioning member comprises: a lifting plate for mounting the driving sprocket, and a lifting drive for connecting and driving the lifting plate to lift;
[0025] And / or, an adaptive positioning assembly is provided between adjacent connecting bodies, the positioning assembly comprises a positioning groove and a positioning protrusion respectively provided on adjacent connecting bodies, and the adjacent connecting bodies are connected by bolts;
[0026] And / or, the cutting device is provided with a grouting channel;
[0027] And / or, connecting plates for hanging the cutting chain to extend the cutting chain are provided on both lateral sides of the connecting body;
[0028] And / or, the cutting chain includes a plurality of link units and a plurality of connecting shafts, two adjacent link units are fixed by the connecting shafts, the link unit includes at least one pair of chain track segments, a through channel for soil discharge is formed between the two chain track segments in the same pair, and a plurality of cutters are arranged at equal intervals on the outer peripheral surface of the cutting chain.
[0029] Preferably, the pile driving device and / or the pile clamping device comprises a pile clamping box, a pile clamping space for the prefabricated pile wall to vertically pass through is formed in the middle of the pile clamping box, a pile holding assembly is arranged adjacent to the pile clamping space on the pile clamping box, the pile holding assembly comprises a clamping member and a clamping drive for driving the clamping member to move; the lifting device is connected to the pile clamping box of the pile driving device.
[0030] Preferably, a guide member is provided at the upper end of the pile-pressing device, and the guide member comprises a receiving tube, a positioning pin, a guide plate facing the pile clamping space, and an adjusting tube integrally formed with the guide plate and disposed in the receiving tube;
[0031] The adjusting cylinder and / or the accommodating cylinder is provided with a group of pin holes, and the adjusting cylinder is connected to the accommodating cylinder via a positioning pin.
[0032] Preferably, the underground continuous wall construction equipment further comprises: a deflection member disposed on the pile driver foundation and connected to the trenching device, the deflection member comprising a cross hinge, and the deflection angle of the trenching device is greater than or equal to -5° and less than 5°;
[0033] And / or, the lifting device includes a lifting column and a lifting drive installed on the pile driver foundation, the pile pressing device or the cutting device is movably connected to the lifting column, and the lifting drive is connected to and drives the pile pressing device or the cutting device to move vertically along the lifting column. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a three-dimensional structural schematic diagram of underground continuous wall construction equipment;
[0035] Figure 2 It is a schematic diagram of the three-dimensional structure of the trough forming equipment;
[0036] Figure 3 It is a schematic diagram of the three-dimensional structure of the pile driving equipment;
[0037] Figure 4 for Figure 3 A partial enlarged view of the middle A;
[0038] Figure 5 It is a structural schematic diagram of the trough forming equipment from another perspective;
[0039] Figure 6 It is a structural schematic diagram of the sprocket frame;
[0040] Figure 7 It is a schematic diagram of the structure of the cutting box;
[0041] Figure 8 This is a structural diagram of the cutting box from another perspective;
[0042] Fig. 9 It is a schematic diagram of the structure of the cutting chain;
[0043] Fig.10 for Fig. 9 A partial enlarged view of point B in the middle;
[0044] Fig.11 It is a structural schematic diagram of the tail box;
[0045] Fig.12 It is a structural schematic diagram of a lifting column;
[0046] Fig.13 This is a structural diagram of the lifting column from another perspective.
[0047] In the figure: 1. Soil layer; 2. Cutting box placement hole; 3. Pile driver foundation;
[0048] 51. cutting box; 52. head box; 53. tail box; 54. driven sprocket; 55. connecting plate; 56. grouting channel; 57. positioning convex block; 58. positioning groove; 59. transmission gear; 510. rotary power source; 511. driving sprocket; 512. lifting plate; 513. connector; 514. slurry outlet;
[0049] 61. Lifting column; 612. Positioning slot; 613. Positioning block; 62. Lifting drive; 63. Guide block seat; 64. Guide slide block; 65. Tensioning cylinder;
[0050] 7. Cutting chain; 71. Cutting tool; 72. Chain track section; 73. Connecting shaft;
[0051] 81. Pile clamp box; 82. Clamping member; 83. Guide plate; 84. Accommodating cylinder; 85. Positioning pin; 86. Adjusting cylinder;
[0052] 9. Underground trough. DETAILED DESCRIPTION
[0053] In order to enable those skilled in the art to better understand the solution of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0054] In this article, the terms "upper, lower, inside, outside" and the like are established based on the positional relationships shown in the drawings. The corresponding positional relationships may also change depending on the drawings, and therefore cannot be understood as absolute limitations on the scope of protection; moreover, relational terms such as "first" and "second" and the like are merely used to distinguish one component from another with the same name, and do not necessarily require or imply any actual relationship or order between these components.
[0055] The transverse direction is the length direction of the underground trench 9 , the longitudinal direction is the width direction of the underground trench 9 , and the vertical direction is the depth direction of the underground trench 9 .
[0056] Embodiment 1
[0057] like Figure 1 As shown, the present invention provides an underground continuous wall construction process, including a grooving step and a pile insertion step, wherein in the grooving step, an underground groove 9 is processed to a predetermined depth at a predetermined construction position by a grooving device of a composite pile driver, and the composite pile driver then drives the grooving device to cut horizontally to form the underground groove 9. In the pile insertion step, in the process of the composite pile driver driving the grooving device to cut horizontally to form the underground groove 9, a prefabricated pile wall that is continuously spliced horizontally and / or vertically is inserted in the underground groove 9 by the pile sinking device of the composite pile driver, and the insertion depth of the prefabricated pile wall is 1.01 to 1.5 times the depth of the underground groove 9.
[0058] Specifically, when the underground trench 9 is horizontally opened by the trenching equipment of the composite pile driver, the pile sinking equipment of the composite pile driver inserts piles at the first one or more than the first two prefabricated pile wall insertion stations opened by the trenching equipment, that is, the construction of the underground trench 9 is carried out while the insertion of the prefabricated pile wall is carried out. And when the prefabricated pile wall is inserted to the bottom of the underground trench 9, it continues to press down to reach an insertion depth of 1.01 to 1.5 times the depth of the underground trench 9.
[0059] In detail, the underground continuous wall is formed by inserting the prefabricated pile wall in the underground groove 9, and when inserting the prefabricated pile wall, the insertion depth of the prefabricated pile wall is controlled to be 1.01 to 1.5 times the depth of the underground groove 9, so that the part of the prefabricated pile wall located at the lower end of the underground groove 9 is clamped, and the prefabricated pile wall is not easy to tilt to one side in the thickness direction. The adjacent prefabricated pile walls can be roughly on the same horizontal line in the horizontal direction, which is convenient for the connection between the adjacent prefabricated pile walls, further ensuring the integrity and sealing of the underground continuous wall to avoid water seepage in the underground continuous wall. And after the insertion is completed, there is no need to adjust the verticality of the prefabricated pile wall, saving the construction time and cost of the underground continuous wall.
[0060] After testing, in order to ensure that the prefabricated pile wall is not easy to tilt to one side in the thickness direction after being inserted, to ensure the verticality of the prefabricated pile wall, and to balance the construction difficulty of the insertion of the prefabricated pile wall, it is preferred that the insertion depth of the prefabricated pile wall is 1.15 to 1.4 times the depth of the underground trench 9, and it is more preferred that the insertion depth of the prefabricated pile wall is 1.25 to 1.3 times the depth of the underground trench 9.
[0061] Furthermore, the longitudinal width of the underground trench 9 is greater than the thickness of the precast pile wall. When the precast pile wall is sunk, the median line of the precast pile wall in the thickness direction is flush with the median line of the underground trench 9 in the longitudinal width direction. Preferably, the longitudinal width of the underground trench 9 is 1.2 to 1.5 times the thickness of the precast pile wall. During the pile insertion process, the trenching equipment continues to cut horizontally. Since the mud in the underground trench 9 is continuously stirred during the horizontal cutting process of the trenching equipment, the mud on both sides of the precast pile wall is also stirred, thereby avoiding mud sedimentation, making the mud on both sides of the precast pile wall tend to be uniform, and enhancing the integrity of the underground continuous wall after formation.
[0062] Furthermore, the trenching step includes an arrival step, a pre-trenching step and a trenching step. In the arrival step, the underground continuous wall construction equipment arrives at the lateral outer side of the predetermined position according to the design requirements; in the pre-trenching step, the trenching equipment opens a cutting box placement hole 2 at the lateral outer side of the predetermined position, and hoists at least one section of the cutting box 51 into the cutting box placement hole 2. In the trenching step, the trenching equipment moves to the predetermined position and opens the underground trench 9 at the predetermined position.
[0063] Specifically, the grooving step includes a cutting device extension step and a cutting step. In the cutting device extension step, the cutting device of the grooving equipment is vertically excavated at a predetermined position to form an underground groove 9 until it is unable to excavate further. The cutting chain 7 is loosened and disassembled, and the disassembled cutting chain 7 is hung on the cutting box 51 in the groove, and the head box 52 of the cutting device is separated from the cutting box 51 in the underground groove 9, and the cutting device is moved to the cutting box placement hole 2 position, so that the head box 52 is connected to the cutting box 51 in the cutting box placement hole 2. In this process, the cutting box 51 and the tail box 53 in the underground groove 9 are maintained in the groove position by a crane so that they do not move along the groove. Vertically sinking; the composite pile driver drives the cutting device connected to the cutting box 51 in the cutting box placement hole 2 to return to the predetermined position again so that the cutting box 51 connected to the head box 52 is connected to the cutting box 51 in the underground groove 9, and the cutting chain 7 of the cutting device is extended, the extended cutting chain 7 is wound around the cutting device, and the cutting chain 7 is tensioned, and then the vertical excavation action is continued. In this process, a new cutting box 51 is hoisted into the cutting box placement hole 2 by the crane again; repeat the above steps to vertically excavate the underground groove 9 with a depth of the design required depth; in the cutting step, the trenching equipment moves horizontally under the drive of the composite pile driver to form a continuous underground groove 9.
[0064] Furthermore, in the pile driving step, the precast pile wall is placed in the pile driving device of the pile driving equipment by means of a crane or other equipment and is clamped by the pile driving device, or the pile driving equipment is moved to the precast pile wall and the precast pile wall is clamped by the pile driving device; and the pile driving device moves vertically to drive the precast pile wall to sink into the underground groove 9; when the pile driving device moves vertically downward to the maximum stroke, the pile clamping device of the pile driving equipment clamps the precast pile wall, and the pile driving device no longer clamps the precast pile wall and moves vertically upward to the maximum stroke and then clamps the precast pile wall again to drive the precast pile wall to continue to sink into the underground groove 9, and the above-mentioned pile driving operation is continued until the precast pile wall cannot sink, that is, the pile driving device clamps the vertical upper end of the precast pile wall and moves downward to the maximum stroke. Preferably, at this time, the insertion depth of the precast pile wall is 1.01 to 1.5 times the depth of the underground groove 9; thereafter, the pile clamping device and the pile driving device release the precast pile wall at the same time, and the precast pile wall is completely pressed into the preset position by the pile delivery device. In addition, during the process of the precast pile wall being sunk into the underground trench 9, the verticality of the precast pile wall can be ensured by the clamping of the pile pressing device and the pile clamping device.
[0065] When the precast pile wall includes at least two precast pile walls spliced with each other in the vertical direction, in the pile sinking step, after the precast pile wall sinks to the point where it cannot sink any further, the pile clamping device clamps the precast pile wall and the pile pressing device clamps and drives another precast pile wall to move downward and connects the vertical lower end of the other precast pile wall with the vertical upper end of the precast pile wall clamped by the pile clamping device, and then repeats the pile sinking operation and the docking operation until the precast pile wall cannot sink any further, and preferably, at this time, the insertion depth of the precast pile wall at the lowest end is 1.01 to 1.5 times the depth of the underground trench 9; and then the precast pile wall is pressed into the preset position by the pile driver.
[0066] Embodiment 2
[0067] In this embodiment, the same parts as those in the first embodiment are given the same figure marks, and the same text descriptions are omitted.
[0068] like Figure 1 , 2 As shown in Figures 5 and 6, the present invention further discloses an underground continuous wall construction equipment, which is the equipment used in the underground continuous wall construction process in Example 1. The underground continuous wall construction equipment includes: a pile driver foundation 3, a grooving device and a pile sinking device installed on the pile driver foundation 3; wherein the grooving device includes a cutting device and a lifting device, the cutting device includes a detachably connected head box 52, a cutting box 51, a tail box 53, and an extendable cutting chain 7, the head box 52, the cutting box 51 and the tail box 53 all include a detachably connected connecting body 513, the head box 52 is provided with a driving sprocket 511 connected to a rotary power source 510 and the cutting chain 7 to drive the cutting chain 7 to rotate around the connecting body 513, the tail box 53 is provided with a driven sprocket 54 connected to the cutting chain 7, the lifting device is connected to the head box 52 to drive the cutting device or the head box 52 to rise and fall; the pile sinking equipment includes a pile pressing device, a pile clamping device located below the pile pressing device, and a lifting device connected to the pile pressing device.
[0069] Specifically, the pile driver foundation 3 can drive the trenching equipment and the pile sinking equipment to move horizontally / vertically. The cutting device of the trenching equipment is driven by the lifting device of the trenching equipment to dig vertically downward to form an underground trench 9. When the cutting device digs vertically to a preset depth, the cutting device can cut horizontally to form a continuous underground trench 9 under the drive of the pile driver foundation 3. During the vertical digging process, the cutting device can increase the sprocket frame composed of the connector 513 of the head box 52, the cutting box 51, and the tail box 53 by continuously connecting a new cutting box 51 between the head box 52 and the tail box 53 to adapt to the preset trenching depth, and the cutting chain 7 of the cutting device can be extended to adapt to the increased sprocket frame. The cutting chain 7 is wound around the driving sprocket 511 and the driven sprocket 54. The rotary power source 510 can drive the driving sprocket 511 to rotate to drive the cutting chain 7 to rotate around the sprocket frame to cut the soil. Preferably, there are two rotary power sources 510 to provide sufficient power. The rotary power source 510 can be one or a combination of hydraulic motors, electric motors, and pneumatic motors.
[0070] like Figure 2 , 5As shown, further, the head box 52 also includes: a tensioner, a mounting frame for installing the tensioner and the connector 513, the tensioner includes: a lifting plate 512 for installing the driving sprocket 511, and a lifting drive 62 that connects and drives the lifting plate 512 to lift and lower; preferably, the rotary power source 510 is installed on the lifting plate 512, and the rotary power source 510 and the driving sprocket 511 are staggered, and a transmission gear 59 is arranged between the rotary power source 510 and the driving sprocket 511, and the rotary power source 510 drives the driving sprocket 511 to rotate through the transmission gear 59, and the rotary power source 510 and the driving sprocket 511 are staggered to avoid an overly compact structure. The mounting frame is provided with a square hole running through in the longitudinal direction, and the lifting plate 512 is placed in the square hole. The lifting drive 62 connected to the lifting plate 512 is a tensioning cylinder 65. The end of the tensioning cylinder 65 away from the output end is connected to the head box 52 or the pile driver foundation 3. The output end of the tensioning cylinder 65 is connected to the lifting plate 512. The lifting drive 62 drives the lifting plate 512 to move up (or down) to drive the driving sprocket 511 to move up (or down), so that the distance between the driving sprocket 511 and the driven wheel increases (or decreases), thereby driving the cutting chain 7 wound between the driving sprocket 511 and the driven sprocket 54 to be tensioned (loosened).
[0071] like Figure 7 , 8 As shown, further, an adaptive positioning assembly is provided between adjacent connecting bodies 513, and the positioning assembly includes positioning grooves 58 and positioning protrusions 57 respectively provided on adjacent connecting bodies 513, and adjacent connecting bodies 513 are connected by bolts; preferably, a positioning groove 58 is provided at the vertical lower end of the connecting body 513 of the head box 52 and the cutting box 51, and a positioning protrusion 57 is provided at the vertical upper end of the connecting body 513 of the tail box 53 and the cutting box 51. During the splicing process of the connecting bodies 513, the positioning between the two adjacent connecting bodies 513 is achieved by inserting the positioning protrusion 57 into the positioning groove 58. After the connecting bodies 513 are positioned, the two adjacent connecting bodies 513 are connected together by bolts to form a spliced sprocket frame.
[0072] like Figure 7 , 8 As shown in Figures 11, further, the cutting device is provided with a grouting channel 56; the grouting channel 56 is used to spray water or slurry during the process of the cutting chain 7 cutting the soil, which is beneficial to cutting and stirring the soil, thereby improving the vertical excavation efficiency of the cutting device and the quality of the underground continuous wall. In this embodiment, the slurry can be a liquid in which one or more substances selected from the group consisting of silt, cement, adhesive, gelling agent, curing agent, and expansion agent are mixed in water. Preferably, the grouting channel 56 is placed in the connector 513, the grouting channel of the head box 52 is connected to a grouting pump, and the tail box 53 is provided with a slurry outlet 514 and the slurry outlet 514 is connected to the grouting channel 56 in the tail box 53.
[0073] like Figure 7 , 8 As shown, further, connecting plates 55 are provided on both lateral sides of the connecting body 513 to facilitate hanging the existing cutting chain 7 when extending the cutting chain 7 to prevent the cutting chain 7 from falling into the underground groove 9; preferably, a plurality of pin holes are provided on the connecting plate 55, and the cutting chain 7 is hung by inserting the pins for hanging the cutting chain 7 into the pin holes of the connecting plate 55, and a plurality of pin holes are provided to prevent individual pin holes from being blocked by soil.
[0074] like Fig. 9 , 10 As shown, further, the cutting chain 7 includes a plurality of link units and a plurality of connecting shafts 73, two adjacent link units are fixed by the connecting shafts 73, the link unit includes at least one pair of chain track segments 72, a through channel for soil discharge is formed between the two chain track segments 72 of the same pair, and a plurality of cutters 71 are arranged at equal intervals on the outer peripheral surface of the cutting chain 7. During the rotary motion, the cutting chain 7 cuts the soil through the plurality of cutters 71 on its outer peripheral surface, and the cutting chain 7 is formed by the connecting shafts 73 and the link units, so that the number of segments of the cutting chain 7 is easy to adjust to adapt to different sprocket frame lengths, and the soil discharge channel formed by the two chain track segments 72 provides space for the soil inside the chain track segment 72 to be thrown out, so as to prevent the soil from accumulating inside the chain track segment 72 and affecting the transmission between it and the driving sprocket 511.
[0075] like Figure 3 , 4 As shown, further, the pile-pressing device and / or the pile-clamping device includes a pile-clamping box 81, the middle part of which is formed with a pile-clamping space for the precast pile wall to pass vertically, and the pile-clamping box 81 is provided with a pile-holding assembly adjacent to the pile-clamping space, and the pile-holding assembly includes a clamping member 82 and a clamping drive for driving the clamping member 82 to move; the lifting device is connected to the pile-clamping box 81 of the pile-pressing device, and the clamping drive can drive the clamping member 82 to move toward the pile-clamping space to clamp the precast pile wall, and the clamping drive is one of an oil cylinder and an electric cylinder, and conversely, the clamping drive can also drive the clamping member 82 to move away from the pile-clamping space to loosen the precast pile wall. The pile-clamping box 81 of the pile-pressing device can move back and forth vertically up and down driven by the lifting device, thereby driving the clamped precast pile wall to sink into the underground trough 9. The pile clamping boxes 81 of the pile driving device and the pile clamping device are aligned or slightly deviated, and the pile clamping spaces inside them are also aligned or slightly deviated, which limits the verticality of the precast pile wall to a larger extent, so that the precast pile wall is inserted vertically during the pile insertion process.
[0076] like Figure 3 , 4As shown, further, a guide member is provided at the vertical upper end of the pile clamp box 81 of the pile pressing device, and the guide member includes a receiving tube 84, a positioning pin 85, a guide plate 83 facing the pile clamping space, and an adjustment tube 86 integrally formed with the guide plate 83 and placed in the receiving tube 84;
[0077] The adjusting tube 86 and / or the accommodating tube 84 are provided with a group of pin holes, and the adjusting tube 86 is connected to the accommodating tube 84 through a positioning pin 85; the guide plate 83 includes a parallel section parallel to the clamping member 82 and an inclined section integrally formed with the parallel section and inclined in a direction away from the clamping space, and is used to guide the prefabricated pile wall. For prefabricated pile walls of different specifications, the relative position of the adjusting tube 86 and the accommodating tube 84 can be adjusted to change the position of the guide plate 83, thereby adapting to prefabricated pile walls of different specifications and sizes.
[0078] like Figure 1 , 2 3, further, the lifting device includes a lifting column 61 and a lifting drive 62 installed on the pile driver foundation 3, the pile pressing device or the cutting device is movably connected to the lifting column 61, and the lifting drive 62 is connected to and drives the pile pressing device or the cutting device to move vertically along the lifting column 61. Preferably, the pile clamping box 81 of the pile pressing device is provided with at least one set of guide wheels rollingly matched with the guide surface at a position opposite to the guide surface of the lifting column 61, so as to adapt to the lifting column 61, so that the pile clamping box 81 of the pile pressing device can stably move under the guidance of the lifting column 61, and ensure the verticality when inserting the pile. Preferably, the lifting plate 512 and / or the head box 52 are provided with a guide slider 64 adapted to the lifting column 61 of the cutting device, and the head box 52 is provided with a guide block seat 63, and the guide block seat 63 is also provided with a guide slider 64 adapted to the lifting column 61 of the cutting device, so that the head box 52 and / or the lifting plate 512 can slide stably along the lifting column 61 under the action of the lifting drive 62, and the movement direction of the head box 52 and / or the lifting plate 512 is limited, so that when vertical grooving is performed, the cutting device can cut a vertical groove.
[0079] Embodiment 3
[0080] The same parts as those in the first and second embodiments are given the same reference numerals, and the same text descriptions are omitted.
[0081] Compared with the first and second embodiments, the underground continuous wall construction equipment provided in this embodiment has the following different structural design: the underground continuous wall construction equipment also includes: a deflection member arranged on the pile driver foundation 3 and connected to the groove forming device, the deflection member includes a cross hinge, and the deflection angle of the groove forming device is greater than or equal to -5° and less than 5°; preferably, the groove forming device swings through the lifting drive 62 of the cutting device, the lifting drive 62 of the cutting device includes two oil cylinders, the output ends of the two oil cylinders are connected to the cutting device, and since the extension lengths of the output ends of the two oil cylinders can be different, the groove forming device can be deflected, and the groove forming device can be deflected, so that during the horizontal cutting process, the cutting device can actively apply pressure to the groove wall to increase the cutting efficiency, and the cutting device can be deflected during the horizontal cutting process to take out the stones in the groove, so as to avoid the stones sinking to the bottom and affecting the integrity of the underground continuous wall. The deflection angle of the groove forming device is greater than or equal to -5° and less than 5° to avoid interference between the groove forming device and the pile driver foundation 3, and preferably, the deflection angle of the groove forming device is greater than or equal to -3° and less than 3°.
[0082] Embodiment 4
[0083] The same parts in this embodiment as those in Embodiments 1, 2 and 3 are given the same figure marks, and the same text descriptions are omitted.
[0084] like Fig.12 , 13 As shown, compared with the first, second and third embodiments, the underground continuous wall construction equipment provided in this embodiment has such a different structural design: the vertical upper end of the lifting column 61 of the cutting device is provided with a positioning block 613, and the vertical lower end of the lifting column 61 of the cutting device is provided with a positioning groove 612 adapted to the positioning block 613, and the lifting columns 61 of the two adjacent cutting devices are connected by bolts; because the vertical height of the lifting column 61 of the cutting device limits the vertical movement range of the cutting device, it further affects the assembly of the cutting box 51, that is, the vertical height of the cutting box 51 to be spliced must be less than the vertical height of the lifting column 61. In view of this, this embodiment provides a splicable lifting column 61 to enhance the applicability of the cutting device. When the trench depth of the underground trench 9 is large, under the premise of ensuring that the composite pile driver will not overturn, the vertical height of the lifting column 61 can be appropriately increased, so that a longer cutting box 51 can be used, thereby saving construction time.
[0085] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
Claims
1. An underground continuous wall construction process, characterized in that: include: Grooving step: processing the underground trench to a predetermined depth at a predetermined construction location by using the groove forming equipment of a composite pile driver; Pile driving step: Use the pile driving equipment of the composite pile driver to drive the prefabricated pile wall which is continuously spliced horizontally and / or vertically in the underground trench, and make the driving depth of the prefabricated pile wall 1.01 to 1.5 times of the depth of the underground trench.
2. The underground continuous wall construction process according to claim 1, characterized in that: The grooving steps include: Grooving steps: Grooving equipment opens underground grooves at predetermined locations; Among them, the grooving step includes a cutting device extension step: the cutting device of the grooving equipment is excavated vertically at a predetermined position to form an underground groove, until the head box of the cutting device is separated from the cutting box in the underground groove after excavation is impossible, and the cutting chain is disassembled, and the cutting device is moved to the cutting box placement hole to connect the head box to the cutting box in the cutting box placement hole; returning to the predetermined position again to connect the cutting box connected to the head box with the cutting box in the underground groove, and extending the cutting chain of the cutting device, and continuing the vertical excavation action; repeating the above steps to vertically excavate an underground groove with a depth required by the design; cutting step: the grooving equipment moves horizontally to form a continuous underground groove.
3. The underground continuous wall construction process according to claim 1 or 2, characterized in that: In the pile driving step, the precast pile wall is placed in the pile driving device of the pile driving equipment and clamped by the pile driving device, and the pile driving device moves vertically to drive the precast pile wall to sink into the underground trench; when the pile driving device moves vertically downward to the maximum range, the pile clamping device of the pile driving equipment clamps the precast pile wall, and the pile driving device moves vertically upward and clamps the precast pile wall again to drive the precast pile wall to continue to sink into the underground trench, and the above-mentioned pile driving operation is continued until the precast pile wall sinks to the preset position.
4. The underground continuous wall construction process according to claim 3, characterized in that: In the pile driving step, after the precast pile wall is sunk to the preset position, the pile clamping device clamps the precast pile wall and the pile driving device clamps and drives another precast pile wall to move down and connect with the precast pile wall. Then the pile driving operation and docking operation are repeated until multiple precast pile walls are sunk into the underground trench to form a continuous wall according to the design requirements.
5. The underground continuous wall construction process according to claim 1, characterized in that: The longitudinal width of the underground trench is greater than the thickness of the precast pile wall. When the precast pile wall is sunk, the median line of the precast pile wall in the thickness direction is flush with the median line of the underground trench in the longitudinal width direction. and / or, the insertion depth of the precast pile wall is 1.15 to 1.45 times the depth of the underground trench; And / or, the grooving step further comprises: On-site steps: The underground continuous wall construction equipment arrives at the lateral outside of the predetermined position according to the design requirements; Pre-grooving step: The grooving equipment opens a cutting box placement hole on the horizontal outer side of the predetermined position.
6. Underground continuous wall construction equipment, characterized in that: The underground continuous wall construction equipment is the equipment used in the underground continuous wall construction process described in any one of claims 1 to 5, and the underground continuous wall construction equipment includes: a pile driver foundation, a trenching device and a pile sinking device installed on the pile driver foundation; The grooving equipment includes a cutting device and a lifting device. The cutting device includes a detachably connected head box, a cutting box, a tail box, and an extendable cutting chain. The head box, the cutting box, and the tail box all include a detachably connected connector. The head box is provided with a driving sprocket connected to a rotary power source and a cutting chain to drive the cutting chain to rotate around the connector. The tail box is provided with a driven sprocket connected to the cutting chain. The lifting device is connected to the head box to drive the cutting device or the head box to rise and fall. The pile driving equipment comprises a pile driving device, a pile clamping device located below the pile driving device, and a lifting device connected to the pile driving device.
7. The underground continuous wall construction equipment according to claim 6, characterized in that: The head box further comprises: a tensioning member, a mounting frame for mounting the tensioning member and the connecting body, the tensioning member comprises: a lifting plate for mounting the driving sprocket, and a lifting drive for connecting and driving the lifting plate to lift; And / or, an adaptive positioning assembly is provided between adjacent connecting bodies, the positioning assembly comprises a positioning groove and a positioning protrusion respectively provided on adjacent connecting bodies, and the adjacent connecting bodies are connected by bolts; And / or, the cutting device is provided with a grouting channel; And / or, connecting plates for hanging the cutting chain to extend the cutting chain are provided on both lateral sides of the connecting body; And / or, the cutting chain includes a plurality of link units and a plurality of connecting shafts, two adjacent link units are fixed by the connecting shafts, the link unit includes at least one pair of chain track segments, a through channel for soil discharge is formed between the two chain track segments in the same pair, and a plurality of cutters are arranged at equal intervals on the outer peripheral surface of the cutting chain.
8. The underground continuous wall construction equipment according to claim 6, characterized in that: The pile-driving device and / or the pile-clamping device comprises a pile-clamping box, a pile-clamping space for the prefabricated pile wall to vertically pass through is formed in the middle of the pile-clamping box, a pile-holding assembly is arranged adjacent to the pile-clamping space on the pile-clamping box, and the pile-holding assembly comprises a clamping member and a clamping drive for driving the clamping member to move; the lifting device is connected to the pile-clamping box of the pile-driving device.
9. The underground continuous wall construction equipment according to claim 6, characterized in that: A guide member is provided at the upper end of the pile pressing device, and the guide member includes a receiving tube, a positioning pin, a guide plate facing the pile clamping space, and an adjusting tube integrally formed with the guide plate and disposed in the receiving tube; The adjusting cylinder and / or the accommodating cylinder is provided with a group of pin holes, and the adjusting cylinder is connected to the accommodating cylinder via a positioning pin.
10. The underground continuous wall construction equipment according to any one of claims 7 to 9, characterized in that: The underground continuous wall construction equipment further includes: a deflection member disposed on the pile driver foundation and connected to the troughing device, the deflection member includes a cross hinge, and the deflection angle of the troughing device is greater than or equal to -5° and less than 5°; And / or, the lifting device includes a lifting column and a lifting drive installed on the pile driver foundation, the pile pressing device or the cutting device is movably connected to the lifting column, and the lifting drive is connected to and drives the pile pressing device or the cutting device to move vertically along the lifting column.