Coaxial cooling water pipe quasi-form arrangement method for controlling construction temperature of mass concrete block

By using coaxial cooling water pipes in large volume concrete blocks in an isothermal form, the cooling water flows from the highest point to the lowest point for heat exchange, the problems of uneven temperature and construction space occupation in the prior art are solved, and the temperature is achieved Even cooling and construction efficiency are improved.

CN118933010APending Publication Date: 2024-11-12SINOHYDRO BUREAU 12 CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202310514317.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-09
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the construction of large-volume concrete blocks, the existing cooling water pipe layout cannot effectively and uniformly reduce the temperature, resulting in uneven temperature, affecting construction efficiency and progress, and the cooling water pipe layout occupies construction space, increasing costs.

Method used

Coaxial cooling water pipes are arranged in the isothermal form of the temperature field. The cooling water flows from the highest temperature to the lowest temperature, and heat exchange is carried out through the channels between the inner and outer tubes to achieve uniform cooling of the temperature field, and the cooling water flows from Enter and exit the same end to avoid occupying the intermediate platform.

Benefits of technology

The uniform temperature reduction of large-volume concrete blocks is achieved, the cost of cooling measures is saved, construction efficiency is improved, construction space is not occupied, and construction progress is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933010A_ABST
    Figure CN118933010A_ABST
Patent Text Reader

Abstract

The invention relates to a coaxial cooling water pipe quasi-form arrangement method for controlling the construction temperature of a mass concrete block, which comprises the following steps of: arranging a coaxial cooling water pipe along an isotherm form, and transporting cooling water to the tail end of the coaxial cooling water pipe by utilizing an inner pipe of the coaxial cooling water pipe in a heat preservation manner, namely, the highest temperature of the center of the mass concrete block; the cooling water flows out to the initial end of the coaxial cooling water pipe through the circulation channel between the inner pipe and the outer pipe, and the cooling water in the circulation channel between the inner pipe and the outer pipe exchanges heat with the concrete through the pipe wall of the outer pipe to achieve the purpose of reducing the temperature of the concrete.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of mass concrete block construction, in particular to temperature control during mass concrete block construction, and specifically to a pseudo-morphological arrangement method of coaxial cooling water pipes for controlling the construction temperature of mass concrete blocks. Background Art

[0002] In the prior art, there are large-volume concrete blocks, such as the concrete foundation of wind power, the pier of the bridge, the concrete foundation of the chimney, and the water inlet block of the turbine of the hydropower station. In the construction of these large-volume concrete blocks, heat will be released during the curing process of concrete pouring. Due to the large volume of the large-volume concrete blocks, the heat is not easy to dissipate and is accumulated, resulting in excessive temperature of the large-volume concrete blocks during the pouring process, which leads to severe thermal expansion of the concrete, and large cracks will be generated after the later cold shrinkage and curing. In order to control the temperature rise of the concrete during the construction process to not exceed the limit, water pipes are usually buried before the concrete pouring of the large-volume concrete blocks, and water is passed through the water pipes to cool them down.

[0003] For example, in a large volume concrete block of a truncated cone structure, such as the concrete foundation of a wind turbine or chimney, Figure 1 and 2 As shown, the wind power concrete foundation 20 adopts a conical structure with a middle platform. In the prior art, a single-channel cooling water pipe is used for cooling. The cooling water pipe is usually arranged in an arch (snake) shape or an annular shape.

[0004] Among them, the arch arrangement, such as Fig.11 As shown, the water pipe 60 arranged in an arch shape enters from the low temperature of the edge of the concrete foundation and then exits from the low temperature of the other edge of the concrete foundation, that is, the cooling water enters from one end of the inlet and flows out from the other end of the outlet. The temperature is low when entering the concrete foundation, and the temperature of the heat taken away from the concrete foundation is high when flowing out. However, the temperature field of the truncated cone concrete foundation is high in the middle and low at the edge. The arrangement of the cooling water pipe causes the direction of the cooling water to not match the concrete temperature field well. For example, the low temperature of the cooling water at the inlet end is low at the edge of the concrete foundation, and a small amount of heat is taken away and further flows into the central area with high temperature. The cooling water has absorbed part of the heat and cannot well reduce the temperature at the high temperature center, so that the temperature of the high temperature place cannot be kept within the limit, and the cooling effect cannot be achieved. At the same time, the temperature of the cooling water at the outlet end is very high, and the concrete at the edge cannot be cooled. Finally, it is impossible to control the temperature of the wind power concrete foundation to be uniform. In order to ensure that the temperature of the high temperature place does not exceed the limit, other measures are often adopted (such as pre-cooling measures, and then reducing the pouring temperature of the concrete), which increases costs and reduces construction efficiency.

[0005] The circular arrangement, such as Fig.12, the single-channel cooling water pipe is arranged in a ring on the concrete foundation, and the cooling water enters the single-channel cooling water pipe from the center of the wind power concrete foundation where the temperature is the highest, that is, the middle platform 201, and flows out from the edge of the wind power concrete foundation. The cooling water has a low temperature when entering and a high heat absorption temperature when flowing out. The temperature field of the concrete is high in the middle and low on the edge. Therefore, the temperature field formed by the cooling water arranged in a ring can match the temperature field of the concrete well, offset each other, and the temperature field formed is more uniform.

[0006] However, whether it is a bow-shaped (snake-shaped) arrangement or a ring-shaped arrangement, water needs to be supplied from the inlet end of the single-channel cooling water pipe and discharged from the outlet end of the cooling water pipe, requiring two operating platforms for use, which greatly affects the operating space of the concrete foundation construction. Especially in the ring-shaped arrangement, the cooling water needs to enter the cooling water pipe from the center of the wind power concrete foundation. The layout of the water supply system and the cooling water pipe occupies the position of the middle platform construction of the concrete foundation, affecting the construction of the upper part of the concrete foundation and the progress of the project, especially when the water cooling time is long.

[0007] In fact, in the construction of large-volume concrete blocks, it is not easy to pass cooling water from the middle of the large-volume concrete blocks because the large-volume concrete blocks are very large in size, occupy a very large area, and need to be built to a very high height. It is necessary to build a platform in the middle of the large-volume concrete block to place the water supply equipment. The platform occupies a considerable area in the middle of the construction, and its height must exceed the height of the large-volume concrete block. The water supply equipment needs to be transported to the middle platform. Therefore, it not only occupies the construction operation space of the entire large-volume concrete block, but also requires additional platform construction, which increases a lot of material and labor costs and affects the progress of the entire project.

[0008] Therefore, the above problems also exist in the remaining large-volume concrete blocks. First, the arrangement of cooling water pipes in the large-volume concrete blocks cannot make the entire large-volume concrete blocks form a relatively uniform temperature after cooling; second, the highest temperature point of the large-volume concrete blocks is usually located in the middle position. After the cooling water pipes are arranged, the water inlet is located in the middle position for water intake, which affects the operating space in the middle and upper parts of the large-volume concrete blocks, hinders construction, and affects the progress of the project. Summary of the invention

[0009] In order to solve the above technical problems, the present invention proposes a method for controlling the temperature of a large-volume concrete block by utilizing coaxial cooling water pipes in combination with isotherms of a temperature field to arrange the water in a pseudo-temperature line shape. The coaxial cooling water pipes are arranged in the form of isopotential lines. In combination with the coaxial cooling water pipes, water can be introduced at the edge of the large-volume concrete block and transported to the highest temperature point of the temperature field, and the cooling water is circulated from the highest temperature point to the lowest temperature point along the shape of the isotherms, so that the highest temperature of the concrete and the lowest temperature of the cooling water offset each other, the secondary high temperature of the concrete and the secondary low temperature of the cooling water offset each other, and so on, until the secondary temperature of the concrete and the temperature of the cooling water are similar or the same, the concrete is effectively cooled, and the temperature field of the concrete after cooling is uniform, so that the temperature of the entire large-volume concrete block is effectively not exceeded.

[0010] Specifically, cooling water is directly sent to the highest temperature point of the temperature field at the initial end of the inner tube of the coaxial cooling water pipe arranged in a pseudo-shape, that is, the highest temperature point of the large-volume concrete block. The cooling water then flows back to the initial end of the outer tube through the channel between the inner tube and the outer tube of the coaxial cooling water pipe, that is, the initial end of the coaxial cooling water pipe. When the cooling water flows back, it absorbs heat in the concrete and the water temperature rises. The water temperature at the end of the outer tube of the coaxial cooling water pipe is low, that is, the highest temperature point of the large-volume concrete block, and the water temperature at the initial end of the outer tube of the coaxial cooling water pipe is high, that is, the lowest temperature point of the large-volume concrete block. The two offset each other, so that the temperature field after cooling is uniform, and the temperature of the entire large-volume concrete block is effectively not exceeded.

[0011] The cooling water flows in and out from the same end of the coaxial cooling water pipe, and the inlet end and the outlet end of the coaxial cooling water pipe are located at the edge of the large-volume concrete block, so that the construction of the upper part of the large-volume concrete block is not affected during the water cooling period, thereby improving the efficiency of the construction of the large-volume concrete block.

[0012] The present invention provides a pseudo-morphological arrangement method for coaxial cooling water pipes for controlling the construction temperature of a large-volume concrete block, comprising a coaxial cooling water pipe, wherein the coaxial cooling water pipe is a coaxial sleeve structure of an inner pipe and an outer pipe, and the coaxial cooling water pipe is formed by connecting multiple sections of inner pipes and multiple sections of outer pipes, the inner pipe end of the coaxial cooling water pipe end is fluidically connected with the outer pipe end, and the outer pipe end is sealed; water enters the inner pipe initial end of the initial end of the coaxial cooling water pipe, and water is discharged from the outer pipe initial end of the initial end of the coaxial cooling water pipe; the inner pipe is made of a heat-insulating material, and the outer pipe is made of a heat-dissipating material; wherein the following steps are specifically included:

[0013] S1 calculates and analyzes the temperature field of large-volume concrete blocks of different shapes by finite element method according to the design size of the large-volume concrete blocks, and obtains multiple isotherms according to the temperature field and the temperature reduction gradient;

[0014] S2 arranges the coaxial cooling water pipes according to the multiple isotherms: on the same horizontal layer, the ends of the coaxial cooling water pipes are placed at the center of the isotherms of the highest temperature in the temperature field, and are arranged along the isotherms from the highest temperature point of the temperature field to the lowest temperature point.

[0015] A further technical solution is that isotherms are multiple closed loops arranged from high temperature to low temperature in the temperature field.

[0016] In the present invention, according to the design requirements of the large-volume concrete block, the temperature field of the large-volume concrete block is calculated by the finite element software MIDAS / CIVIL, and a plurality of isotherms of the temperature field are obtained, and the temperature of the isotherms decreases from the center to the edge temperature. Among them, the density of the isotherms can be set according to the temperature level and cost control. For example, one isotherm is arranged for every one degree difference, and the isotherms are equally spaced. If they are arranged with a difference of one degree, the temperature difference between two adjacent isotherms is one degree. For another example, the isotherms are arranged with a difference of two degrees, and the isotherms are equally spaced, and the temperature difference between two adjacent isotherms is two degrees. Therefore, on the same large-volume concrete block, the isotherms with a difference of one degree are denser, and the isotherms with a difference of two degrees are sparser.

[0017] The coaxial cooling water pipe of the present invention is arranged in a simulated manner, that is, the coaxial cooling water pipe is arranged from the highest temperature point and the lowest temperature point along the isotherm of high temperature to the isotherm of low temperature.

[0018] A further technical solution is that a plurality of groups of coaxial cooling water pipes can be arranged on the same large-volume concrete block according to the isotherm shape.

[0019] A further technical solution is: the large-volume concrete block is a truncated cone structure, the isotherms are distributed in a circular ring from the center to the outside, and step S2 includes: (1) the end of the coaxial cooling water pipe is extended from the inside to the outside at the center of the first circular temperature line to between the first circular temperature line and the second circular temperature line, and the coaxial cooling water pipe is arranged in a circular ring with the same shape as the isotherms; (2) when the coaxial cooling water pipe is almost surrounded by one circle, the coaxial cooling water pipe is extended from the inside to the outside to between the second circular temperature line and the third circular temperature line, and the coaxial cooling water pipe is arranged in a circular ring with the same shape as the isotherms; (3) the arrangement method of step (2) is repeated until the coaxial cooling water pipe is arranged in a circular ring to the horizontal plane between the penultimate circular temperature line and the penultimate circular temperature line; (4) when the coaxial cooling water pipe is almost surrounded by one circle, the coaxial cooling water pipe is extended outward to the outside of the large-volume concrete block.

[0020] A further technical solution is: the large-volume concrete block is a square or rectangular structure, the isotherms are distributed in a square or rectangular shape from the center to the outside, and step S2 includes: (1) the end of the coaxial cooling water pipe is extended from the center of the first square or rectangular annular temperature line from the inside to the outside to between the first annular temperature line and the second annular temperature line, and the coaxial cooling water pipe is arranged in a square or rectangular ring line with the same shape as the isotherms; (2) when the coaxial cooling water pipe is nearly surrounded by one circle, the coaxial cooling water pipe is extended from the inside to the outside. (3) Repeat the arrangement of step (2) until the coaxial cooling water pipe is arranged in a circle to the horizontal plane between the first to last square or rectangular ring temperature line and the second to last square or rectangular ring temperature line; (4) When the coaxial cooling water pipe is arranged in a circle, extend the coaxial cooling water pipe outward to the outside of the large concrete block.

[0021] A further technical solution is: the large-volume concrete block is a special-shaped structure, and the isotherms are distributed in a special shape from the highest temperature point to the lowest temperature point. Step S2 includes: (1) placing the end of the coaxial cooling water pipe at the center of the highest temperature line, extending the coaxial cooling water pipe from the inside to the outside, and arranging the coaxial cooling water pipe in a special shape with the same shape as the isotherms; (2) after the coaxial cooling water pipe is arranged at the isotherm with the lowest temperature, extending the coaxial cooling water pipe outward to the outside of the large-volume concrete block.

[0022] The coaxial cooling water pipe is arranged in the form of an isotherm, and then the inner pipe of the coaxial cooling water pipe is used to transport the cooling water to the end of the coaxial cooling water pipe, that is, the highest temperature in the center of the large-volume concrete block, and then flows out to the initial end of the coaxial cooling water pipe through the flow channel between the inner pipe and the outer pipe. The cooling water in the flow channel between the inner pipe and the outer pipe exchanges heat with the concrete through the outer pipe wall to achieve the purpose of lowering the temperature of the concrete; the cooling water flows in the form of a pseudo-isotherm, which can maximize the heat exchange between the cooling water and the concrete, thereby achieving more efficient cooling; and combined with the structure of the coaxial cooling water pipe, the cooling water flows from the highest temperature to the lowest temperature to cool down, so that the temperature field is uniform after cooling down. In addition, the cooling water enters and flows out from the initial end of the coaxial cooling water pipe, and the initial end of the coaxial cooling water pipe is located at the outer edge of the large-volume concrete block, leaving the middle position of the large-volume concrete block empty, which is convenient for the upper engineering construction of the concrete foundation and speeds up the progress of the project.

[0023] A further technical solution is: in step S2, the coaxial cooling water pipes can be arranged in multiple layers from top to bottom according to the temperature field; each layer is spaced 1.5-2 meters apart.

[0024] A further technical solution is that the end of the outer tube protrudes from the end of the inner tube, and a flow channel is provided between the end of the outer tube and the end of the inner tube.

[0025] A further technical solution is: a sealing cap is provided at the end of the outer tube, the sealing cap seals the end of the outer tube; and the sealing cap does not contact the end of the inner tube.

[0026] A further technical solution is: the initial end of the inner tube protrudes from the initial end of the outer tube, and the initial end of the outer tube forms a seal with the side wall of the inner tube.

[0027] A further technical solution is that the initial end of the outer tube is connected to the side wall of the inner tube through another sealing cover and seals the outer tube.

[0028] A further technical solution is: a plurality of support rings are arranged between the inner tube and the outer tube, and the support rings are of a circular ring structure.

[0029] A further technical solution is that the circular ring is evenly provided with a plurality of through holes along the circumferential direction.

[0030] A further technical solution is: the diameter of the center hole in the center of the ring is the same as the diameter of the outer wall of the inner tube; the outer diameter of the support ring is the same as the inner diameter of the outer tube.

[0031] A further technical solution is: the outer tube is a steel tube and the inner tube is a PVC tube.

[0032] A further technical solution is: the multiple outer tubes are fixedly connected by pipe joints, and the multiple inner tubes are connected by welding.

[0033] The present invention also provides a method for controlling the construction temperature of a large-volume concrete block by using the pseudo-morphological arrangement method of the coaxial cooling water pipes of the present invention, comprising the following steps:

[0034] A: The coaxial cooling water pipe pseudo-morphological arrangement method of the present invention is used to arrange the coaxial cooling water pipes of the large concrete block;

[0035] B: Install the steel bars and formwork of the large-volume concrete blocks simultaneously with step A;

[0036] C: pouring concrete to form a large concrete block;

[0037] D: The cooling water in the water supply system continuously enters the inner tube through the initial end of the inner tube of each layer of the coaxial cooling water pipe, flows into the end of the inner tube at the highest temperature point of the temperature field, then flows from the end of the inner tube to the end of the outer tube, flows back to the initial end of the outer tube through the channel between the inner tube and the outer tube, and finally flows back to the water supply system;

[0038] E: When the temperature of the large concrete block cools to the required value, stop the cooling water from entering the initial end of the inner pipe;

[0039] F: Pour pressurized cement slurry into the coaxial cooling water pipe to seal the cooling water pipe.

[0040] A further technical solution is: in step D, the water inlet at the initial end of the inner tube and the water outlet at the initial end of the outer tube of the coaxial cooling water pipe are connected to the water outlet and water inlet of the water supply system respectively.

[0041] Beneficial effects of the present invention:

[0042] The coaxial cooling water pipes with water inlet and outlet at the same end of the present invention are arranged in a pseudo-shape according to the isotherms from high temperature to low temperature of the temperature field, so that the cooling water flows along the temperature field from high to low. The temperature of the cooling water is effectively combined with the temperature of the temperature field to dissipate heat, so that the temperature of the temperature field is uniform, and the temperature of the entire large-volume concrete block is effectively within the limit, saving the cost of taking measures for the uneven temperature field after cooling; and the cooling water inlet and outlet are at the same place and located at the edge of the large-volume concrete block, without the need to build an additional platform for middle water inlet, and without occupying the operating space in the middle part or upper part of the large-volume concrete block, and does not hinder the construction of the middle part and upper part of the foundation during water cooling, thereby ensuring the construction progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a structural diagram of a truncated cone concrete foundation.

[0044] Figure 2 yes Figure 1 AA section diagram of the truncated cone concrete foundation.

[0045] Figure 3 It is a schematic diagram of the pseudo-configuration arrangement of coaxial cooling water pipes in one layer of a truncated cone-shaped concrete foundation in the present invention.

[0046] Figure 4 It is a schematic diagram of the pseudo-configuration arrangement of coaxial cooling water pipes of another layer of the truncated cone concrete foundation in the present invention.

[0047] Figure 5 yes Figure 3 and Figure 4 BB section diagram of a truncated cone-shaped concrete foundation with coaxial cooling water pipes arranged in a simulated form.

[0048] Figure 6 It is a schematic diagram of the connection between the coaxial cooling water pipes arranged in a pseudo-shape on one layer of the truncated cone-shaped concrete foundation of the present invention and the water supply system.

[0049] Figure 7 It is a schematic diagram of another pseudo-configuration arrangement of coaxial cooling water pipes of a truncated cone-shaped concrete foundation in the present invention.

[0050] Figure 8It is a schematic diagram of the structure of the coaxial cooling water pipe.

[0051] Fig. 9 It is a structural schematic diagram of the support ring.

[0052] Fig.10 It is a schematic diagram of the BB section of the support ring.

[0053] Fig.11 It is a schematic diagram of the arch-shaped arrangement of single-channel cooling water pipes on a truncated cone concrete foundation in the prior art.

[0054] Fig.12 It is a schematic diagram of the annular arrangement of single-channel cooling water pipes on a truncated cone concrete foundation in the prior art.

[0055] Fig.13 It is a schematic diagram of the arched arrangement of single-channel cooling water pipes for a square large-volume concrete block in the prior art.

[0056] Fig.14 It is a schematic diagram of the annular arrangement of single-channel cooling water pipes for a square large-volume concrete block in the prior art.

[0057] Fig.15 It is a schematic diagram of the pseudo-morphological arrangement of coaxial cooling water pipes for a square mass concrete block.

[0058] Fig.16 It is a schematic diagram of the pseudo-morphological arrangement of coaxial cooling water pipes for a rectangular mass concrete block.

[0059] Fig.17 It is a schematic diagram of the pseudo-morphological arrangement of coaxial cooling water pipes for a polygonal massive concrete block.

[0060] Fig.18 It is a schematic diagram of a rectangular mass concrete block with two sets of coaxial cooling water pipes arranged in a pseudo-morphological manner.

[0061] Fig.19 It is a schematic diagram of the pseudo-morphological arrangement of multiple groups of coaxial cooling water pipes for irregular large-volume concrete blocks.

[0062] Fig. 20 It is a schematic diagram of the pseudo-morphological arrangement of multiple groups of coaxial cooling water pipes for another special-shaped large-volume concrete block.

[0063] In the figure: 10, coaxial cooling water pipe, 1, inner pipe, 2, outer pipe, 3, support ring, 4, flow channel between the end of the inner pipe and the end of the outer pipe, 5, flow channel between the inner pipe and the outer pipe, 11, initial end of the inner pipe, 12, end of the inner pipe, 13, water inlet at the initial end of the inner pipe, 21, initial end of the outer pipe, 22, initial end of the outer pipe, 23, water outlet at the initial end of the outer pipe, 31, through hole, 32, center hole of the support ring, 20, truncated cone concrete foundation, 50, temperature field, 51, first annular temperature line, 52, second annular temperature line, 53, third annular temperature line, arched layout line 60, water supply system 40, water inlet 41, water outlet 42; square mass concrete block 210, rectangular mass concrete block 220, special-shaped mixed mass concrete block 230, another special-shaped mass concrete block 240, polygonal mass concrete block 260. DETAILED DESCRIPTION

[0064] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.

[0065] In the description of the present invention, it should be noted that the orientations or positional relationships indicated by terms such as "center", "up", "down", "left", "right", "vertical", "horizontal", "inside" and "outside" are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the invention.

[0066] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0067] like Figure 8 As shown, the coaxial cooling water pipe provided by the present invention comprises an inner pipe 1 and an outer pipe 2, wherein the outer pipe 2 is coaxially sleeved on the inner pipe 1, so that a flow channel 5 is formed between the inner wall of the outer pipe 2 and the outer wall of the inner pipe 1, and the flow channel 5 is used for the flow of cooling water.

[0068] The coaxial cooling water pipe of the present invention is fed with water (cooling water) through the initial end 11 of the inner tube. After the water flows into the inner tube end 12, it is transferred to the outer tube end 22 through the flow channel 4 between the inner tube end and the outer tube end, and then flows along the flow channel 5 between the inner tube and the outer tube. Therefore, the outer tube end 22 needs to be sealed and the inner tube end 12 is connected to the outer tube end 22. In a specific embodiment, a cover can be provided at the outer tube end 22, and the cover seals the outer tube end 22; or, in other embodiments, the outer tube end is directly sealed with the outer tube integral structure. At the same time, in order to ensure that the inner tube end 12 is connected with the outer tube end 22, in one embodiment, the outer tube end 22 protrudes from the inner tube end 12, and when the cover seals the outer tube end 22, it does not contact the inner tube end 12, thereby forming a water flow flow channel 4 at the inner tube end 12, the outer tube end 22 and the cover, and the flow channel 4 allows the water flow to be transferred from the inner tube to the flow channel 5 formed by the inner tube and the outer tube. In some embodiments, the sealing cap may be a pipe plugging piece, which is fixed and sealed to the end of the outer pipe by welding or threading.

[0069] The water flowing between the inner tube and the outer tube is discharged from the coaxial cooling water tube after flowing to the outer tube initial end 21. In some embodiments, the inner tube initial end 11 protrudes from the outer tube initial end 21, and the outer tube initial end 21 is sealed on the side wall of the inner tube initial end 11. Specifically, another cover is connected to the side wall of the inner tube initial end 11 and seals the outer tube. The outer tube initial end 21 is provided with a water outlet 23, and the water outlet 23 is used to discharge the water in the flow channel 5 between the inner tube and the outer tube. The inner tube initial end 11 is provided with a water inlet 13 for introducing cooling water.

[0070] The material of the outer tube 2 can be a thin-walled steel tube, more specifically, a flexible snake-skin steel tube, and the material of the inner tube 1 can be a PVC hose or a high-density polyethylene (HDPE) tube. Since the thermal conductivity of the steel tube is large, while the thermal conductivity of the PVC hose is small, the cooling effect of the cooling water on the outer wall of the outer tube is good when it flows in the cavity between the outer tube and the inner tube, and the water temperature of the cooling water in the process of being delivered to the cooling point at the end of the tube through the inner tube is less affected by the hot water reflux between the tubes due to the PVC or high-density polyethylene (HDPE) material of the inner tube.

[0071] The length of the coaxial cooling water pipe of the present invention can be set as needed. For example, when a longer pipe length is required, it can be extended. Multiple outer pipes and multiple inner pipes can be bonded together by glue, and then the ends of the outer pipes can be sealed, and the initial ends of the outer pipes can be sealed on the outer walls of the initial ends of the inner pipes. The connections of the multiple outer pipes 2 can be fixedly connected by pipe joints or welded, and the connections of the multiple inner pipes can be connected by welding or bonding. For example, when the outer pipe material can be a thin-walled steel pipe and the inner pipe material is a PVC hose, the outer pipe 2 is connected by rib welding or joint pipe screw connection, and the inner pipe 1 is connected by plastic welding. In some specific embodiments, the multiple outer pipes and the multiple inner pipes are connected to form an annular structure, such as Figure 4 and Figure 8 Two different annular arrangements of coaxial cooling water tubes are shown.

[0072] In the present invention, Fig. 9 and Fig.10 As shown, a support ring 3 is provided between the inner tube 1 and the outer tube 2. A plurality of support rings 3 can be provided, and the plurality of support rings 3 are sleeved on the inner tube 1 at intervals. The support ring 3 is a circular ring structure, and a plurality of through holes 31 are distributed on the circular ring. In a specific embodiment, the circular ring is evenly provided with a plurality of through holes along the circumferential direction. Water can flow along the length of the tube in the cavity 9 through the through holes 31. The diameter of the center hole 32 in the center of the circular ring is the same as the diameter of the outer wall of the inner tube 1; the outer diameter of the support ring 3 is the same as the inner diameter of the outer tube 2.

[0073] In the present invention, the inner pipe of the coaxial cooling water pipe is used for water inlet, and the outer pipe is used for water outlet. The cooling water is kept at a relatively low temperature and is transported to the highest temperature point. According to the temperature field isotherms of the annular large-volume concrete block, the shape of the foundation is as follows: Figure 1-Figure 20 As shown, by arranging coaxial cooling water pipes around the isotherms, effective temperature cooling of the annular large-volume concrete blocks can be achieved, and the intermediate working space for construction can be ensured, thereby effectively improving the efficiency of temperature cooling and large-volume concrete block construction.

[0074] In the present invention, the temperature of the large-volume concrete blocks during the construction process is cooled by arranging the large-volume concrete blocks in a pseudo-morphological manner according to the isotherms of the temperature field 50 through coaxial cooling water pipes 10. Specifically, firstly, according to the design dimensions of the large-volume concrete blocks, the temperature field of large-volume concrete blocks of different forms is calculated and analyzed by the finite element method, and a plurality of isotherms are obtained according to the temperature field according to the temperature reduction gradient; secondly, the coaxial cooling water pipes are arranged according to the plurality of isotherms: on the same horizontal layer, the end of the coaxial cooling water pipe is placed at the center of the isotherm of the highest temperature of the temperature field, and starting from the highest temperature point of the temperature field, the pipes are arranged along the isotherms toward the lowest temperature point. In some embodiments, the temperature field of the large-volume concrete blocks is calculated by the finite element software MIDAS / CIVIL, and the isotherms are arranged according to the temperature field, such as Figure 1 and Figure 15-20 As shown in Figure 2, different large-volume concrete block structures have different isotherm shapes. Figure 1 The isothermal lines 50 showing the truncated cone concrete foundation 20 (such as a wind power foundation and a chimney foundation) are multiple gradually increasing closed circular rings. Fig.15 The isotherms of a square mass concrete block 210 (such as a bridge pier) are shown as a plurality of gradually increasing closed square rings. Fig.16 The isotherms of a rectangular massive concrete block 220 (such as a bridge pier) are shown as a plurality of gradually increasing closed rectangular rings. Fig.17 The isotherms showing the polygonal massive concrete block 260 are multiple closed polygonal rings that gradually increase in size, and Fig.19 and 20 The isotherms of the special-shaped closed ring of the special-shaped massive concrete block 230 / 240 (turbine intake block of a hydroelectric power station) are shown.

[0075] The temperature of the isotherms decreases from the center to the edge. In addition, the density of the isotherms can be set according to the temperature and cost control. For example, if one isotherm is arranged for every one degree difference, the isotherms are equally spaced, and the temperature difference between two adjacent isotherms is one degree. For another example, if the isotherms are arranged for a difference of two degrees, the isotherms are equally spaced, and the temperature difference between two adjacent isotherms is two degrees. On the same large concrete block, isotherms with a difference of one degree are denser, and isotherms with a difference of two degrees are sparser.

[0076] In the present invention, a plurality of groups of coaxial cooling water pipes can be arranged in the same large-volume concrete block according to the isothermal line shape. Fig.18 In the example, because the total length of the rectangular large-volume concrete block is too long, the length direction of the isotherm is long, so two groups of coaxial water pipes are arranged. The two groups of coaxial water pipes also let water in from the edge and flow out from the highest temperature in the center for cooling. Fig.19 and Fig. 20 For large-volume concrete blocks, multiple groups of coaxial water pipes are arranged according to the direction of the isotherms and the specific large-volume concrete blocks. These multiple groups of coaxial water pipes all intake water from the edge and flow out from the highest temperature in the center for cooling.

[0077] The coaxial cooling water pipes 10 can be arranged in multiple layers from top to bottom according to the temperature field of the large-volume concrete block; each layer is spaced 1.5-2 meters apart. Generally, when the height of the large-volume concrete block is greater than 3 meters, multiple layers of coaxial cooling water pipes are arranged to ensure effective cooling of the entire large-volume concrete block.

[0078] In some specific embodiments, Figure 1-7As shown, the large-volume concrete block is a truncated cone structure, and the isotherms are distributed in a circular ring from the center to the outside. When arranging the coaxial cooling water pipe: (1) the end of the coaxial cooling water pipe extends from the center of the first circular temperature line from the inside to the outside to between the first circular temperature line and the second circular temperature line, and the coaxial cooling water pipe is arranged in a circular ring with the same shape as the isotherms; (2) when the coaxial cooling water pipe is almost surrounded by one circle, the coaxial cooling water pipe is extended from the inside to the outside to between the second circular temperature line and the third circular temperature line, and the coaxial cooling water pipe is arranged in a circular ring with the same shape as the isotherms; (3) the arrangement method of step (2) is repeated until the coaxial cooling water pipe is arranged in a circular ring to the horizontal plane between the penultimate circular temperature line and the penultimate circular temperature line; (4) when the coaxial cooling water pipe is almost surrounded by one circle, the coaxial cooling water pipe is extended outward to the outside of the large-volume concrete block.

[0079] In some other embodiments, the large-volume concrete block is a square or rectangular structure, the isotherms are distributed in a square or rectangular shape from the center to the outside, and when the coaxial cooling water pipe is arranged: (1) the end of the coaxial cooling water pipe extends from the center of the first square or rectangular annular temperature line from the inside to the outside to between the first annular temperature line and the second annular temperature line, and the coaxial cooling water pipe is arranged in a square or rectangular ring line with the same shape as the isotherms; (2) when the coaxial cooling water pipe is nearly surrounded by one circle, the coaxial cooling water pipe is extended from the inside to the outside. (3) Repeat the arrangement of step (2) until the coaxial cooling water pipe is arranged in a circle to the horizontal plane between the first to last square or rectangular ring temperature line and the second to last square or rectangular ring temperature line; (4) When the coaxial cooling water pipe is arranged in a circle, extend the coaxial cooling water pipe outward to the outside of the large concrete block.

[0080] In some other embodiments, the large-volume concrete block is a special-shaped structure, and the isotherms are distributed in a special shape from the highest temperature point to the lowest temperature point. When arranging the coaxial cooling water pipe: (1) the end of the coaxial cooling water pipe is placed at the center of the highest temperature line, and the coaxial cooling water pipe is extended from the inside to the outside and arranged in a special-shaped line with the same shape as the isotherms; (2) after the coaxial cooling water pipe is arranged to the isotherm with the lowest temperature, the coaxial cooling water pipe is extended outward to the outside of the large-volume concrete block.

[0081] In the present invention, a method for controlling the construction temperature of a large volume concrete block is provided by using a coaxial cooling water pipe pseudo-configuration arrangement. Figure 1-7 As shown, the following steps are included:

[0082] A: The coaxial cooling water pipe 10 of the massive concrete block 20 is arranged by the coaxial cooling water pipe pseudo-morphological arrangement method of the present invention;

[0083] B: Install the steel bars of the massive concrete block 20 and the formwork of the massive concrete block simultaneously with step A;

[0084] C: pouring concrete to form a large concrete block 20;

[0085] D: The water inlet 11 at the initial end of the inner tube 1 of the coaxial cooling water pipe 10 and the water outlet 13 at the initial end of the outer tube 2 are connected to the water outlet 42 and the water inlet 41 of the water supply system 40 respectively, and the cooling water in the water supply system continuously enters the inner tube through the initial end of the inner tube of each layer of the coaxial cooling water pipe, flows into the end of the inner tube at the highest temperature point of the temperature field, and then flows from the end of the inner tube to the end of the outer tube, flows back to the initial end of the outer tube through the channel between the inner tube and the outer tube, and finally flows back to the water supply system;

[0086] E: When the temperature of the large concrete block 20 cools to the required value, stop the cooling water from entering the initial end of the inner pipe;

[0087] F: Pour pressurized cement slurry into the coaxial cooling water pipe to seal the cooling water pipe.

[0088] In a specific embodiment, in a large-volume truncated cone-shaped large-volume concrete block construction project of a certain wind power plant, the large-volume concrete block has a diameter of 24930mm and a height of 3300mm. The temperature field of the large-volume concrete block is calculated and analyzed according to the finite element software MIDAS / CIVIL, and a circular temperature line with a temperature difference of 1 degree is obtained. According to the size of the large-volume concrete block and the temperature field data, a coaxial cooling water pipe is made, wherein the outer pipe 2 is made of steel with a wall thickness of 3.0mm and a diameter of φ50mm, the inner pipe 1 is made of high-density polyethylene (HDPE) with an outer diameter of φ32mm and an inner diameter of 30mm, and the support ring 3 is a 10mm thick plastic sheet arranged at a spacing of 300mm, and the support ring 3 is provided with a water hole 31 with a diameter of 6mm in the annular direction. The design arranges a two-layer coaxial cooling water pipe loop, with a spacing of 1.5m between the two layers. The coaxial cooling water pipe is arranged in a circular shape from inside to outside between every two circular temperature lines, with a horizontal spacing of 1.5m. The coaxial cooling water pipe is 1.8m away from the edge of the large-volume concrete block and 0.9m away from the upper and lower edges. After the burial is completed, the concrete construction is carried out. After the construction is completed, the initial ends of the inner and outer pipes of the coaxial cooling water pipe are respectively connected to the cooling water supply system, and the inner pipe of the coaxial cooling water pipe is continuously filled with water. The temperature of the large-volume concrete block is monitored in real time.

[0089] According to the temperature monitoring results, the coaxial cooling water pipes arranged in a quasi-isothermal shape have a significant cooling effect on the construction of the truncated cone-shaped large-volume concrete blocks in this project. The temperature of the entire truncated cone-shaped large-volume concrete block is uniform and exceeds the temperature limit by 30 degrees.

[0090] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A method for arranging coaxial cooling water pipes in a pseudo-morphological manner for controlling the construction temperature of a large-volume concrete block, characterized in that: The invention comprises a coaxial cooling water pipe, wherein the coaxial cooling water pipe is a coaxial sleeve structure of an inner pipe and an outer pipe, and the coaxial cooling water pipe is formed by connecting multiple sections of inner pipes and multiple sections of outer pipes, the inner pipe end of the coaxial cooling water pipe end is fluidically connected with the outer pipe end, and the outer pipe end is sealed; water enters the inner pipe initial end of the coaxial cooling water pipe initial end, and water is discharged from the outer pipe initial end of the coaxial cooling water pipe initial end; the inner pipe is made of a heat-insulating material, and the outer pipe is made of a heat-dissipating material; wherein the following steps are specifically included: S1 calculates and analyzes the temperature field of large-volume concrete blocks of different shapes by finite element method according to the design size of the large-volume concrete blocks, and obtains multiple isotherms according to the temperature field and the temperature reduction gradient; S2 arranges the coaxial cooling water pipes according to the multiple isotherms: on the same horizontal layer, the ends of the coaxial cooling water pipes are placed at the center of the isotherms of the highest temperature in the temperature field, and are arranged along the isotherms from the highest temperature point of the temperature field to the lowest temperature point.

2. The method for arranging coaxial cooling water pipes in a pseudo-morphological manner for controlling the construction temperature of a large-volume concrete block according to claim 1 is characterized in that: Isotherms are multiple closed loops arranged from high temperature to low temperature in the temperature field.

3. The method for arranging coaxial cooling water pipes in a pseudo-morphological manner for controlling the construction temperature of a large-volume concrete block according to claim 1 is characterized in that: The same large-volume concrete block can be arranged with multiple groups of coaxial cooling water pipes according to the isothermal line shape.

4. The method for arranging coaxial cooling water pipes in a pseudo-morphological manner for controlling the construction temperature of a large-volume concrete block according to claim 1 is characterized in that: The large-volume concrete block is a truncated cone structure, and the isotherms are distributed in a circular ring from the center to the outside. Step S2 includes: (1) the end of the coaxial cooling water pipe is extended from the inside to the outside at the center of the first circular temperature line to between the first circular temperature line and the second circular temperature line, and the coaxial cooling water pipe is arranged in a circular ring with the same shape as the isotherms; (2) when the coaxial cooling water pipe is almost surrounded by one circle, the coaxial cooling water pipe is extended from the inside to the outside to between the second circular temperature line and the third circular temperature line, and the coaxial cooling water pipe is arranged in a circular ring with the same shape as the isotherms; (3) the arrangement method of step (2) is repeated until the coaxial cooling water pipe is arranged in a circular ring to the horizontal plane between the penultimate circular temperature line and the penultimate circular temperature line; (4) when the coaxial cooling water pipe is almost surrounded by one circle, the coaxial cooling water pipe is extended outward to the outside of the large-volume concrete block.

5. The method for arranging coaxial cooling water pipes in a pseudo-morphological manner for controlling the construction temperature of a large-volume concrete block according to claim 1 is characterized in that: The large-volume concrete block is a square or rectangular structure, and the isotherms are distributed in a square or rectangular shape from the center to the outside. Step S2 includes: (1) the end of the coaxial cooling water pipe is extended from the center of the first square or rectangular annular temperature line from the inside to the outside to between the first annular temperature line and the second annular temperature line, and the coaxial cooling water pipe is arranged in a square or rectangular ring line with the same shape as the isotherms; (2) when the coaxial cooling water pipe is almost surrounded by one circle, the coaxial cooling water pipe is extended from the inside to the outside to between the second square or rectangular annular temperature line and the third square or rectangular annular temperature line, and the coaxial cooling water pipe is arranged in a square or rectangular ring line with the same shape as the isotherms; (3) the arrangement method of step (2) is repeated until the coaxial cooling water pipe is arranged in a ring line to the horizontal plane between the first to last square or rectangular annular temperature line and the second to last square or rectangular annular temperature line; (4) when the coaxial cooling water pipe is almost surrounded by one circle, the coaxial cooling water pipe is extended outward to the outside of the large-volume concrete block.

6. The method for arranging coaxial cooling water pipes in a pseudo-morphological manner for controlling the construction temperature of a large-volume concrete block according to claim 1, characterized in that: In step S2, the coaxial cooling water pipes may be arranged in multiple layers from top to bottom according to the temperature field; each layer is spaced 1.5-2 meters apart.

7. The method for arranging coaxial cooling water pipes in a pseudo-morphological manner for controlling the construction temperature of a large-volume concrete block according to any one of claims 1 to 6, characterized in that: The end of the outer tube is sealed, the end of the outer tube protrudes from the end of the inner tube, and a flow channel is provided between the ends of the outer tube and the inner tube; the initial end of the inner tube protrudes from the initial end of the outer tube, and the initial end of the outer tube forms a seal with the side wall of the inner tube.

8. The method for arranging coaxial cooling water pipes in a pseudo-morphological manner for controlling the construction temperature of a large concrete block according to claim 7, characterized in that: A plurality of support rings are arranged between the inner tube and the outer tube, and the support rings are of a circular ring structure; The circular ring is evenly provided with a plurality of through holes along the circumferential direction.

9. The method for arranging coaxial cooling water pipes in a pseudo-morphological manner for controlling the construction temperature of a large-volume concrete block according to claim 1, characterized in that: The outer tube is a flexible steel tube, and the inner tubes are all PVC tubes; multiple outer tubes are fixedly connected by pipe joints, and multiple inner tubes are connected by welding.

10. A method for controlling the construction temperature of a large concrete block using the pseudo-morphological arrangement method of coaxial cooling water pipes as described in claims 1 to 9, characterized in that: The following steps are involved: A: The coaxial cooling water pipes of the large concrete block are arranged by the coaxial cooling water pipe pseudo-morphological arrangement method described in claims 1 to 7; B: Install the steel bars and formwork of the large-volume concrete blocks simultaneously with step A; C: pouring concrete to form a large concrete block; D: The cooling water in the water supply system continuously enters the inner tube through the initial end of the inner tube of each layer of the coaxial cooling water pipe, flows into the end of the inner tube at the highest temperature point of the temperature field, then flows from the end of the inner tube to the end of the outer tube, flows back to the initial end of the outer tube through the channel between the inner tube and the outer tube, and finally flows back to the water supply system; E: When the temperature of the large concrete block cools to the required value, stop the cooling water from entering the initial end of the inner pipe; F: Pour pressurized cement slurry into the coaxial cooling water pipe to seal the cooling water pipe.

Citation Information

Cited By

  • Roller compacted concrete pouring temperature control method

    CN120622950A