Steel sheet pile cofferdam applying tension anchors and construction method

By setting up ring beams and concrete continuous walls in steel sheet pile cofferdams, applying prestress with tension anchors, and monitoring and adjusting prestress through measurement modules, the problem of insufficient fixation effect in the prior art is solved, and the structure of the cofferdam is improved Strength and resistance to external forces.

CN118933035APending Publication Date: 2024-11-12CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411056431.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-12

Smart Images

  • Figure CN118933035A_ABST
    Figure CN118933035A_ABST
Patent Text Reader

Abstract

The invention relates to a steel sheet pile cofferdam applying pulling anchors and a construction method, and belongs to the technical field of cofferdam construction, the steel sheet pile cofferdam comprises a cofferdam body and the pulling anchors, the cofferdam body is defined by a plurality of steel pipe piles, any two adjacent steel pipe piles are attached to each other and arranged in parallel, a plurality of ring beams are arranged in the cofferdam body, and the ring beams are connected with the pulling anchors. The shapes of the outer sides of the ring beams are consistent with the shape of the radial section of the inner side of the cofferdam body, the ring beams are attached to the inner wall of the cofferdam body, and the ring beams are sequentially arranged in the direction perpendicular to the ground; a concrete continuous wall is arranged on one side of the cofferdam body, a plurality of pull anchors are arranged on the cofferdam body, one end of any pull anchor is connected with the ring beam located on the uppermost layer, and the other end of any pull anchor is connected with the concrete continuous wall; the fixing device has the characteristic of good fixing effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of cofferdam construction, and in particular relates to a steel sheet pile cofferdam using anchors and a construction method. Background Art

[0002] Cofferdam construction refers to the use of various supporting tools and materials to surround one or more areas in the water or in tidal sea areas to form a temporary closed engineering space for underwater or intertidal engineering construction.

[0003] In rivers with complex engineering geology and hydrological conditions, the main pier cap is often buried deep underground and may be subjected to turbulent water flow, and is subject to large external loads such as soil and water flow. This puts forward strict requirements on the cofferdam structure that can adapt to complex geological and hydrological conditions and withstand soil pressure and water pressure at the same time. For example, anchoring is introduced as a reinforcement method. For example, Chinese patent CN215105430U discloses a steel pipe pile anchor combined cofferdam in a tidal river section, including two rows of steel pipe piles, each row of steel pipe piles is connected to a steel plate, and each row of steel pipe piles is also connected to a tie beam; a lower fill layer, an anti-collapse layer are arranged from bottom to top between the two rows of steel plates. , middle fill layer, tension steel bars and upper fill layer; the anti-collapse layer includes steel mesh and formwork bag cloth connected to the steel mesh; after the formwork bag cloth and steel mesh are laid, continue to backfill the weir body to ▽1.0 meter at low tide, and then anchor the upstream and downstream steel pipe piles of the cofferdam to stabilize them; it can better overcome the difficulties of limited construction time for tidal river filling, large loss of filling soil, and difficulty in forming cofferdams; however, in the above scheme, the steel pipe pile cofferdam is stabilized only by anchoring, and the anchoring is not used to apply prestress to the steel pipe pile cofferdam, and the fixing effect is insufficient. Therefore, a steel sheet pile cofferdam and construction method using anchoring with good fixing effect are needed. Summary of the invention

[0004] In order to solve the above problems existing in the prior art, the present invention provides a steel sheet pile cofferdam using pull anchors and a construction method, which has the characteristics of good fixing effect.

[0005] The purpose of the present invention can be achieved through the following technical solutions:

[0006] A steel sheet pile cofferdam using anchors, comprising a cofferdam body and anchors, wherein the cofferdam body is formed by enclosing a plurality of steel pipe piles, any two adjacent steel pipe piles are mutually fitted and arranged in parallel, a plurality of ring beams are arranged in the cofferdam body, the shapes of the outer sides of the plurality of ring beams are consistent with the radial cross-sectional shapes of the inner sides of the cofferdam body, the plurality of ring beams are fitted with the inner wall of the cofferdam body, and the plurality of ring beams are arranged in sequence along a direction perpendicular to the ground;

[0007] A continuous concrete wall is arranged on one side of the cofferdam body, and a plurality of anchors are arranged on the cofferdam body. One end of any anchor is connected to the ring beam at the uppermost layer, and the other end of any anchor is connected to the continuous concrete wall.

[0008] As a preferred technical solution of the present invention, it also includes a measuring module, which is used to measure the angles of a plurality of steel pipe piles, and the measuring module sends out an alarm signal when the angle exceeds a threshold range.

[0009] As a preferred technical solution of the present invention, the measuring module is used to measure the angle θ of a plurality of steel pipe piles. The measuring module is pre-input with a threshold range [θ1, θ2]. The measuring module sends an alarm signal when the angle data exceeds the threshold range.

[0010] As a preferred technical solution of the present invention, the tension anchor is used to apply tension to the uppermost ring beam.

[0011] As a preferred technical solution of the present invention, the tension anchor is used to apply a tension force of magnitude F to the ring beam of the uppermost layer;

[0012] Wherein, F=[(θ1+θ2) / 2] / θ×F0, and F0 is a preset reference tension value.

[0013] As a preferred technical solution of the present invention, the measuring module is provided with a control panel, and the control panel is used to display the angles of a plurality of steel pipe piles.

[0014] The present invention also provides a construction method for a steel sheet pile cofferdam using a pull anchor, which is applicable to the above-mentioned steel sheet pile cofferdam using a pull anchor, step 1: using a 100t crawler crane DZ-280 vibrating hammer to install and drive steel pipe piles;

[0015] Step 2: Use a submersible pump to pump water from the cofferdam, excavate and desilt after pumping, and install the second internal support.

[0016] Step 3: Fill the cofferdam with water until the water level is the same as that outside the cofferdam.

[0017] Step 4: Excavate and desilt the cofferdam to the designed position, and directly pour the bottom concrete using the dry hole pouring method to form it in one pouring. The general principle of the bottom of the steel cofferdam is: pour the concrete from all sides to the middle.

[0018] Step 5: After the bottom concrete reaches the designed strength, pump water out of the cofferdam and install the third layer of internal support.

[0019] The beneficial effects of the present invention are:

[0020] (1) By setting up a measurement module to measure the angle, the probability of steel pipe pile tilting is reduced, and the ability to resist external forces and structural strength are improved;

[0021] (2) By adjusting the prestress of the anchor according to the inclination of the steel pipe pile, when the steel pipe pile itself is inclined in a few cases, the influence of the anchor itself on the structural strength of the cofferdam body is reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0023] Figure 1 It is a side view structural schematic diagram of the present invention;

[0024] Figure 2 It is a top view schematic diagram of the present invention.

[0025] Description of main component symbols:

[0026] In the figure: 1. cofferdam body; 11. steel pipe piles; 12. ring beam; 2. anchor; 21. continuous wall. DETAILED DESCRIPTION

[0027] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation methods, structures, features and effects of the present invention are described in detail below in conjunction with the accompanying drawings and preferred embodiments.

[0028] See also Figure 1-2 A steel sheet pile cofferdam using anchors comprises a cofferdam body 1 and anchors 2. The cofferdam body 1 is composed of a plurality of steel pipe piles 11. Any two adjacent steel pipe piles 11 are arranged in close proximity to each other. All the steel pipe piles 11 constituting the cofferdam body 1 are arranged parallel to each other. Specifically, the steel cofferdam body 1 is a hollow quadrangular prism. The quadrangular prism steel cofferdam is arranged perpendicular to the ground after being formed.

[0029] When the cofferdam body 1 is formed, first prepare a plurality of locking steel pipe piles 11, use a crane to lift one of the locking steel pipe piles 11 to the insertion point for pile insertion, ensure that the locking buckle is aligned with the target position when the pile is inserted, and then lightly hammer the locking steel pipe pile 11. After the pile is inserted into place, lift and insert another steel pipe pile 11 until the plurality of steel pipe piles 11 are surrounded to form a hollow quadrangular prism structure perpendicular to the ground;

[0030] After a plurality of steel pipe piles 11 form the cofferdam body 1, since the cofferdam body 1 is in the shape of a hollow quadrangular prism, there is no additional structure in the cofferdam body 1. When the cofferdam body 1 is subjected to external force, it can only use its own structure to resist the external force to avoid deformation, and the structural strength is low. In order to set an additional supporting structure in the cofferdam body 1, a plurality of ring beams 12 are set in the cofferdam body 1, and the shapes of the plurality of ring beams 12 are consistent with the radial cross-sectional shape of the cofferdam body 1;

[0031] Specifically, each ring beam 12 is a rectangular frame structure, with a surface parallel to the ground as a reference surface, and the shape of the outer side of the rectangular frame is consistent with the projection shape of the inner side of the cofferdam body 1 on the reference surface. At this time, the shape of the outer side of the ring beam 12 is consistent with the radial cross-sectional shape of the inner side of the cofferdam body 1, that is, each ring beam 12 can be arranged in close contact with the inner wall of the cofferdam body 1 when arranged parallel to the ground;

[0032] When a plurality of ring beams 12 are arranged in the cofferdam body 1, it is equivalent to arranging a plurality of reinforcement frames in the cofferdam body 1. When the cofferdam body 1 is subjected to external force, the plurality of ring beams 12 resist the external force to avoid deformation, thereby improving the structural strength of the cofferdam body 1.

[0033] Specifically, a plurality of ring beams 12 are arranged in sequence in a direction perpendicular to the ground. In this embodiment, there are three ring beams 12.

[0034] In rivers with complex engineering geology and hydrological conditions, the cofferdam body 1 is often buried deep underground and may be subjected to turbulent water flow, and is subject to large external loads such as soil and water flow. In order to further strengthen the structural strength of the cofferdam, a concrete continuous wall 21 is arranged on one side of the cofferdam body 1, and the cofferdam body 1 is provided with a plurality of anchors 2, one end of any anchor 2 is connected to the ring beam 12 at the uppermost layer, and the other end of any anchor 2 is connected to the concrete continuous wall 21;

[0035] Specifically, the anchor 2 is made of high-quality rolled threaded steel. After the ring beam 12 is arranged, one end of each anchor 2 is connected to the uppermost ring beam 12, and the other end of each anchor 2 is connected to the concrete continuous wall 21. After the anchor 2 is set, a hydraulic jack is used to apply pre-tension to the anchor 2. At this time, the anchor 2 can apply prestress to the ring beam 12, further improving the structural strength of the cofferdam body 1.

[0036] During the process of driving the steel pipe pile 11, when the driving angle of the steel pipe pile 11 is not perpendicular to the ground, there is a probability that the steel pipe pile 11 will be tilted more easily, resulting in a decrease in the ability to resist external forces, and then a decrease in the structural strength. In order to improve the structural strength of the cofferdam body 1, a measuring module is also included. The measuring module is used to measure the angle of a plurality of steel pipe piles 11. The measuring module sends an alarm signal when the angle exceeds a threshold range;

[0037] Specifically, the measuring module includes at least two theodolites. When inserting the steel pipe pile 11, the operator uses the two theodolites to control it in two directions without the guide frame limit. At the same time, optionally, in order to prevent the plane displacement of the center line of the lock buckle, a clamping plate is provided at the lock mouth of the steel pipe pile 11 in the direction of piling to prevent the displacement of the steel pipe.

[0038] Subsequently, the measurement module is used to measure the angle θ of several steel pipe piles 11. The measurement module determines once a second whether the angle data exceeds the pre-input threshold range [θ1, θ2] by comparison. When the judgment result is no, it means that the angle data exceeds the threshold range, and the measurement module sends an alarm signal.

[0039] By providing a measuring module to measure the angle, the probability of the steel pipe pile 11 being tilted is reduced, and the ability to resist external forces and the structural strength are improved.

[0040] In actual use, there is a probability that the angle of the steel pipe pile 11 exceeds the threshold range, but the steel pipe pile 11 itself still has a certain inclination. When the steel pipe pile 11 is inclined, when the anchor 2 applies too much prestress to the ring beam 12, there is a probability that the inclination of the steel pipe pile 11 is aggravated, reducing the overall structural strength of the cofferdam. In order to adjust the prestress of the anchor 2 with the inclination of the steel pipe pile 11, the anchor 2 is used to apply a tensile force of F to the uppermost ring beam 12, where F = [(θ1+θ2) / 2] / θ×F0, and F0 is a preset reference tension value;

[0041] (θ1+θ2) / 2 is the standard angle value. In this embodiment, the standard angle value is 90°. When θ deviates greatly from the standard angle value, it means that the steel pipe pile 11 has a large inclination. At this time, the value of [(θ1+θ2) / 2] / θ decreases and is less than 1. The value of F=[(θ1+θ2) / 2] / θ×F0 decreases, and the prestress of the anchor 2 is reduced when the inclination angle of the steel pipe pile 11 is large. Similarly, when θ deviates less from the standard angle value, it means that the steel pipe pile 11 has a small inclination. At this time, the value of [(θ1+θ2) / 2] / θ increases and is close to 1. The value of F=[(θ1+θ2) / 2] / θ×F0 increases, and the prestress of the anchor 2 is restored to the standard value when the inclination angle of the steel pipe pile 11 is large.

[0042] By adjusting the prestress of the anchor 2 according to the inclination of the steel pipe pile 11 , when the steel pipe pile 11 itself is inclined in a few cases, the influence of the anchor 2 itself on the structural strength of the cofferdam body 1 is reduced.

[0043] The present invention also provides a construction method of a steel sheet pile cofferdam using a pull anchor 2, which is applicable to the above-mentioned steel sheet pile cofferdam using a pull anchor 2, step 1: using a 100t crawler crane DZ-280 vibrating hammer to install and drive the steel pipe pile 11;

[0044] Step 2: Use a submersible pump to pump water from the cofferdam, excavate and desilt after pumping, and install the second internal support.

[0045] Step 3: Fill the cofferdam with water until the water level is the same as that outside the cofferdam.

[0046] Step 4: Excavate and desilt the cofferdam to the designed position, and directly pour the bottom concrete using the dry hole pouring method to form it in one pouring. The general principle of the bottom of the steel cofferdam is: pour the concrete from all sides to the middle.

[0047] Step 5: After the bottom concrete reaches the designed strength, pump water out of the cofferdam and install the third layer of internal support.

[0048] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A steel sheet pile cofferdam using anchors, characterized in that: It comprises a cofferdam body and a pull anchor, wherein the cofferdam body is formed by enclosing a plurality of steel pipe piles, any two adjacent steel pipe piles are mutually fitted and arranged in parallel, a plurality of ring beams are arranged in the cofferdam body, the shapes of the outer sides of the plurality of ring beams are consistent with the radial cross-section shape of the inner side of the cofferdam body, the plurality of ring beams are fitted with the inner wall of the cofferdam body, and the plurality of ring beams are arranged in sequence along a direction perpendicular to the ground; A continuous concrete wall is arranged on one side of the cofferdam body, and a plurality of anchors are arranged on the cofferdam body. One end of any anchor is connected to the ring beam at the uppermost layer, and the other end of any anchor is connected to the continuous concrete wall.

2. A steel sheet pile cofferdam using anchors according to claim 1, characterized in that: It also includes a measuring module, which is used to measure the angles of a plurality of steel pipe piles, and sends out an alarm signal when the angle exceeds a threshold range.

3. A steel sheet pile cofferdam using anchors according to claim 2, characterized in that: The measuring module is used to measure the angle θ of a plurality of steel pipe piles. The measuring module is pre-input with a threshold range [θ1, θ2]. The measuring module sends out an alarm signal when the angle data exceeds the threshold range.

4. The steel sheet pile cofferdam using anchors according to claim 3 is characterized by: The tension anchor is used to apply tension to the ring beam of the uppermost layer.

5. The steel sheet pile cofferdam using anchors according to claim 3 is characterized by: The tension anchor is used to apply a tension force of magnitude F to the ring beam of the uppermost layer; Wherein, F=[(θ1+θ2) / 2] / θ×F0, and F0 is a preset reference tension value.

6. The steel sheet pile cofferdam using anchors according to claim 5, characterized in that: The measuring module is provided with a control panel, and the control panel is used to display the angles of a plurality of steel pipe piles.

7. A construction method for a steel sheet pile cofferdam using anchors, applicable to the steel sheet pile cofferdam using anchors as claimed in any one of claims 1 to 6, characterized in that: The following steps are involved: Step 1: Use a 100t crawler crane DZ-280 vibratory hammer to install and drive steel pipe piles; Step 2: Use a submersible pump to pump water from the cofferdam, excavate and desilt after pumping, and install the second internal support; Step 3: Fill the cofferdam with water until the water level is the same as the water level outside the cofferdam; Step 4: Excavate and desilt the cofferdam to the designed position, and directly pour the bottom concrete using the dry hole pouring method to form it in one pouring. The general principle of the bottom of the steel cofferdam is: concrete is poured from all sides to the middle; Step 5: After the bottom concrete reaches the designed strength, pump water out of the cofferdam and install the third layer of internal support.