Construction technology for tall wall body of refrigeration house building with inner heat preservation layer
Through the combination of inverted triangle concrete wall structure and regular triangle brick wall protective layer, the problems of weathering collapse of the internal insulation structure of tall walls and vulnerability to external insulation are solved, more efficient insulation effect and stability are achieved, and the insulation layer is extended. Service life.
Patent Information
- Application Number
- CN202411254847.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-12
AI Technical Summary
The inner insulation structure of tall walls is weak in weathering and collapse, and the existing outer insulation structure is easy to be damaged, making it difficult to effectively improve the service life of the insulation layer.
An inverted triangle concrete wall structure is adopted, and insulation layer and protective layer are reserved at the top and bottom of the concrete wall. A regular triangular brick wall is used as the protective layer, and a foam insulation layer is set in the middle to ensure the stability and insulation effect of the concrete structure.
It extends the service life of the tall wall insulation layer, improves the stability and insulation effect, has reasonable design, high usage efficiency, and has wide promotion value.
Smart Images

Figure CN118933200A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a wall construction process, in particular to a high wall construction process of a cold storage building with an inner thermal insulation layer. Background Art
[0002] General wall insulation is to set the insulation layer on the outside of the wall, which has the advantage of good insulation effect, but its disadvantages are also very obvious. Since the insulation layer is relatively thin and the material is generally insulation cotton, it is easy to be damaged after bumps or strong winds, and the service life is unstable. In order to increase the service life of the insulation layer, internal insulation structure is now advocated, but the internal insulation structure of tall walls will cause greater challenges. Although setting the insulation layer inside the wall increases the insulation effect, the protective layer of the brick-concrete structure covering the outside of the insulation layer is prone to weathering and collapse due to its thin thickness, so it is necessary to improve the construction of the internal insulation structure of tall walls. Summary of the invention
[0003] In order to overcome the shortcomings in the background technology, the present invention discloses a construction process for the tall wall of a cold storage building with an inner insulation layer. The cross-section of the tall cold storage concrete wall is set to an inverted triangle structure, and positions for the insulation layer and the protective layer are reserved between the top and bottom of the concrete wall. A brick wall with a cross-section of an equilateral triangle is used as a protective layer, and a foam insulation layer is arranged between the concrete wall and the triangular brick wall protective layer. This achieves the purpose of ensuring that the concrete structure is arranged in an inverted triangle without affecting its structural performance, and that the equilateral triangle structure of the triangular brick wall protective layer increases stability under the clamping of the concrete wall.
[0004] In order to achieve the above-mentioned object of the invention, the present invention adopts the following technical scheme: A construction process for a tall wall of a cold storage building with an inner insulation layer comprises the following steps: Step 1: Dig concrete pile foundation trenches: dig four pile foundation trenches connected end to end on the base surface to form a square structure; Step 2, making a concrete wall steel bar support frame in the pile foundation trench: tying a steel bar support frame of a square structure on the pile foundation trench of the square structure, the steel bar support frame includes an inverted triangular steel bar frame with an inverted triangular structure in cross section, the side of the inverted triangular steel bar frame located inside the pile foundation trench of the square structure is a straight side, the side of the inverted triangular steel bar frame located outside the pile foundation trench of the square structure is a hypotenuse, a pile trench steel bar frame is provided at the bottom of the inverted triangular steel bar frame, the pile trench steel bar frame is placed in the pile foundation trench, an upper protruding horizontal steel bar frame extending to the outside of the pile foundation trench of the square structure is provided at the top of the hypotenuse of the inverted triangular steel bar frame, a lower protruding horizontal steel bar frame extending to the outside of the pile foundation trench of the square structure and having its bottom in contact with the base surface is provided at the bottom of the hypotenuse of the inverted triangular steel bar frame, and the outer edges of the upper protruding horizontal steel bar frame and the lower protruding horizontal steel bar frame are flush; Step 3, making tension steel bars on the steel bar support: a plurality of tension steel bars are arranged at intervals on the hypotenuse of the inverted triangle steel bar frame between the upper protruding horizontal steel bar frame and the lower protruding horizontal steel bar frame, and the ends of the tension steel bars are located within the outer edges of the upper protruding horizontal steel bar frame and the lower protruding horizontal steel bar frame and are arranged transversely; Step 4: Install the template on the side of the steel bar support: Install the template on the side of the steel bar support frame exposed on the base surface and the bottom of the protruding horizontal steel bar frame; Step 5, pouring concrete and removing the formwork: pouring concrete along the top of the upper protruding horizontal steel bar frame, the inverted triangle steel bar frame and the lower protruding horizontal steel bar frame, and removing the formwork after the concrete is dried and cured. The steel bar support frame forms a concrete wall, the inverted triangle steel bar frame forms an inverted triangle concrete frame, the upper protruding horizontal steel bar frame forms an upper protruding horizontal concrete frame, the lower protruding horizontal steel bar frame forms a lower protruding horizontal concrete frame, and the pile trench steel bar frame forms a concrete pile foundation; Step 6: Hanging a net on the outer slope of the concrete wall: Hanging a plastic net frame on the oblique side of the inverted triangle concrete frame between the upper protruding horizontal concrete frame and the lower protruding horizontal concrete frame provided on the concrete wall, and the plastic net frame is supported on a number of tension steel bars; Step 7: Spray insulation material on the grid and the tensioning steel bars: Spray insulation material on the plastic grid and smooth it to form a foam insulation layer, and also spray insulation material on the tensioning steel bars; Step 8: Make the roof and floor: Make the base surface of the area enclosed by the square pile foundation ditch flat and pour concrete to form the indoor floor, and cover the roof on the top of the square concrete wall; Step 9. Cover the outside of the insulation layer with a brick wall protective layer: Wrap the outside of the foam insulation layer between the upper protruding horizontal concrete frame and the lower protruding horizontal concrete frame with tension steel bars and lay bricks with staggered joints to form a triangular brick wall protective layer.
[0005] In the construction process of the tall wall of the cold storage building with the inner insulation layer, after the excavation of the pile foundation trench is completed in step 1, the pit wall is compacted with a tamping machine.
[0006] In the construction process of the tall wall of the cold storage building with an inner insulation layer, the upper protruding horizontal steel frame, the lower protruding horizontal steel frame, the pile groove steel frame and the inverted triangle steel frame are connected by wire bundling or welding in step 2.
[0007] In the construction process of the tall wall of the cold storage building with an inner insulation layer, the connection methods of the multiple pulling steel bars and the inverted triangle steel bar frame in step three are wire bundling or welding.
[0008] In the construction process of the tall wall of the cold storage building with an inner insulation layer, in step three, the steel support frame and the plurality of tension steel bars are all painted with anti-rust paint after being connected.
[0009] In the construction process of the tall wall of the cold storage building with an inner insulation layer, the material of the template in step 4 is wood; or aluminum alloy.
[0010] In the construction process of the tall wall of the cold storage building with the inner insulation layer, the material of the foam insulation layer in step seven is a polyurethane foaming agent.
[0011] In the construction process of the tall wall of the cold storage building with an inner insulation layer, the thickness of the foam insulation layer in step seven is 60-80 mm, and the thickness of the pulling steel bar spray insulation material is 20 mm.
[0012] In the construction process of tall walls of cold storage buildings with inner insulation layers, the bricks used in the triangular brick wall protective layer in step nine are hollow bricks; or foamed cement bricks.
[0013] Due to the adoption of the above technical solution, the present invention has the following beneficial effects: The high wall construction process of a cold storage building with an inner insulation layer described in the present invention is achieved by setting the cross-section of the high cold storage concrete wall to an inverted triangle structure, reserving positions for the insulation layer and the protective layer between the top and the bottom of the concrete wall, using a brick wall with an equilateral triangle cross-section as a protective layer, and arranging a foam insulation layer between the concrete wall and the triangular brick wall protective layer, so that the inverted triangle arrangement of the concrete structure does not affect its structural performance, and the equilateral triangle structure of the triangular brick wall protective layer increases the stability under the clamping of the concrete wall; the present invention has reasonable design, high utilization efficiency, good insulation effect, effectively prolongs the service life of the high wall insulation layer, and has wide promotion value. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a flow chart of the construction steps of the present invention; Figure 2 It is a structural schematic diagram of construction step 1 of the present invention; Figure 3 It is a structural schematic diagram of the construction steps of the present invention from another angle; Figure 4 It is a structural schematic diagram of the construction step 2 of the present invention; Figure 5 It is a structural schematic diagram of construction step three of the present invention; Figure 6 It is a structural schematic diagram of construction step 4 of the present invention; Figure 7 This is a structural schematic diagram of construction step five of the present invention; Figure 8 It is a structural schematic diagram of construction step six of the present invention; Fig. 9 This is a structural schematic diagram of construction step seven of the present invention; Fig.10It is a structural schematic diagram of construction step eight of the present invention; Fig.11 It is a structural schematic diagram of construction step nine of the present invention.
[0015] In the figure: 1. Pile foundation trench; 2. Base surface; 3. Upper protruding horizontal steel bar frame; 4. Inverted triangle steel bar frame; 5. Lower protruding horizontal steel bar frame; 6. Steel bar support frame; 7. Pile trench steel bar frame; 8. Pulling steel bars; 9. Formwork; 10. Upper protruding horizontal concrete frame; 11. Inverted triangle concrete frame; 12. Lower protruding horizontal concrete frame; 13. Concrete wall; 14. Concrete pile foundation; 15. Plastic grid; 16. Foam insulation layer; 17. Roof; 18. Indoor floor; 19. Triangular brick wall protective layer. DETAILED DESCRIPTION
[0016] The present invention can be explained in more detail by the following examples, the present invention is not limited to the following examples, and the purpose of disclosing the present invention is to protect all changes and improvements within the scope of the present invention; Combined with Figures 1 to 11 The high wall construction process of the cold storage building with an inner insulation layer comprises the following steps: Step 1: excavate concrete pile foundation trenches: dig four pile foundation trenches 1 connected end to end on the base surface 2 to form a square structure. After the excavation of the pile foundation trenches 1 is completed, use a tamping machine to compact the pit wall; Step 2, making a concrete wall steel bar support frame in the pile foundation trench: tying a steel bar support frame 6 of a square structure on the pile foundation trench 1 of a square structure, the steel bar support frame 6 includes an inverted triangular steel bar frame 4 with an inverted triangular structure in cross section, the inverted triangular steel bar frame 4 is located in the pile foundation trench 1 of the square structure. One side of the straight side is the inverted triangular steel bar frame 4, and one side of the hypotenuse is the inverted triangular steel bar frame 4 located outside the pile foundation trench 1 of the square structure. A pile trench steel bar frame 7 is provided at the bottom of the inverted triangular steel bar frame 4, and the pile trench steel bar frame 7 is placed in the pile foundation trench 1, and an upper protruding horizontal steel bar frame 3 extending to the outside of the pile foundation trench 1 of the square structure is provided at the top of the hypotenuse of the inverted triangular steel bar frame 4, and a lower protruding horizontal steel bar frame 5 extending to the outside of the pile foundation trench 1 of the square structure and having the bottom and the base surface 2 attached is provided at the bottom of the hypotenuse of the inverted triangular steel bar frame 4, the outer edges of the upper protruding horizontal steel bar frame 3 and the lower protruding horizontal steel bar frame 5 are flush, and the upper protruding horizontal steel bar frame 3, the lower protruding horizontal steel bar frame 5, the pile trench steel bar frame 7 and the inverted triangular steel bar frame 4 are connected by wire bundling or welding respectively; Step 3, making tension steel bars on the steel bar support: a plurality of tension steel bars 8 are arranged at intervals on the hypotenuse of the inverted triangle steel bar frame 4 between the upper protruding horizontal steel bar frame 3 and the lower protruding horizontal steel bar frame 5, and the ends are located within the outer edges of the upper protruding horizontal steel bar frame 3 and the lower protruding horizontal steel bar frame 5 and are arranged transversely. The connection methods of the plurality of tension steel bars 8 and the inverted triangle steel bar frame 4 are respectively wire bundling or welding. After the steel bar support frame 6 and the plurality of tension steel bars 8 are connected, anti-rust paint is applied to them. Step 4: Install the template on the side of the steel bar support: Install the template 9 on the side of the steel bar support frame 6 exposed on the base surface 2 and the bottom of the protruding horizontal steel bar frame 3. The material of the template 9 is wood; or aluminum alloy; Step 5, pouring concrete and removing the formwork: pouring concrete along the top of the upper protruding horizontal steel bar frame 3, the inverted triangle steel bar frame 4 and the lower protruding horizontal steel bar frame 5, and removing the formwork 9 after the concrete is dried and cured, the steel bar support frame 6 forms a concrete wall 13, the inverted triangle steel bar frame 4 forms an inverted triangle concrete frame 11, the upper protruding horizontal steel bar frame 3 forms an upper protruding horizontal concrete frame 10, the lower protruding horizontal steel bar frame 5 forms a lower protruding horizontal concrete frame 12, and the pile trench steel bar frame 7 forms a concrete pile foundation 14; Step 6: Hanging a net on the outer slope of the concrete wall: Hang a plastic net frame 15 on the hypotenuse of the inverted triangle concrete frame 11 between the upper protruding horizontal concrete frame 10 and the lower protruding horizontal concrete frame 12 provided on the concrete wall 13, and the plastic net frame 15 is supported on a plurality of tension steel bars 8; Step 7, spraying insulation material on the grid and the pulling steel bar: spraying insulation material on the plastic grid 15 and flattening it to form a foam insulation layer 16, and also spraying insulation material on the pulling steel bar 8, the foam insulation layer 16 is made of polyurethane foaming agent, the thickness of the foam insulation layer 16 is 60-80mm, and the thickness of the insulation material sprayed on the pulling steel bar 8 is 20mm; Step 8: Making the roof and floor: Smooth the base surface 2 of the area enclosed by the square pile foundation trench 1 and pour concrete to form the indoor floor 18, and cover the roof 17 on the top of the square concrete wall 13; Step nine, covering the outside of the insulation layer with a brick wall protective layer: Wrap the tension steel bars 8 on the outside of the foam insulation layer 16 between the upper protruding horizontal concrete frame 10 and the lower protruding horizontal concrete frame 12, and lay bricks with staggered joints to form a triangular brick wall protective layer 19. The bricks used in the triangular brick wall protective layer 19 are hollow bricks; or foamed cement bricks.
[0017] Parts of the present invention not described in detail are prior art.
Claims
1. A construction process for tall walls of cold storage buildings with an inner insulation layer, characterized in that: The following steps are involved: Step 1: excavating concrete pile foundation trenches: digging four pile foundation trenches (1) connected end to end on the base surface (2) to form a square structure; Step 2, making a concrete wall steel bar support frame in the pile foundation trench: tying a square steel bar support frame (6) on the square pile foundation trench (1), the steel bar support frame (6) comprising an inverted triangular steel bar frame (4) with an inverted triangular cross section, the side of the inverted triangular steel bar frame (4) located inside the square pile foundation trench (1) being a straight side, the side of the inverted triangular steel bar frame (4) located outside the square pile foundation trench (1) being a hypotenuse, a pile trench steel bar frame (7) being provided at the bottom of the inverted triangular steel bar frame (4), the pile trench steel bar frame (7) being placed in the pile foundation trench (1), an upper protruding transverse steel bar frame (3) extending toward the outside of the square pile foundation trench (1) being provided at the top of the hypotenuse of the inverted triangular steel bar frame (4), a lower protruding transverse steel bar frame (5) extending toward the outside of the square pile foundation trench (1) and having its bottom in contact with the base surface (2) being provided at the bottom of the hypotenuse of the inverted triangular steel bar frame (4), the outer edges of the upper protruding transverse steel bar frame (3) and the lower protruding transverse steel bar frame (5) being flush with each other; Step 3: Making tension steel bars on the steel bar support: a plurality of tension steel bars (8) are arranged at intervals on the oblique side of the inverted triangle steel bar frame (4) between the upper protruding transverse steel bar frame (3) and the lower protruding transverse steel bar frame (5), the ends of which are located within the outer edges of the upper protruding transverse steel bar frame (3) and the lower protruding transverse steel bar frame (5) and are arranged transversely; Step 4: Installing the template on the side of the steel bar support: Installing the template (9) on the side of the steel bar support frame (6) exposed from the base surface (2) and on the bottom of the protruding horizontal steel bar frame (3); Step 5, pouring concrete and removing the formwork: pouring concrete along the top of the upper protruding horizontal steel bar frame (3), the inverted triangle steel bar frame (4) and the lower protruding horizontal steel bar frame (5), and removing the formwork (9) after the concrete is dried and cured, the steel bar support frame (6) forms a concrete wall (13), the inverted triangle steel bar frame (4) forms an inverted triangle concrete frame (11), the upper protruding horizontal steel bar frame (3) forms an upper protruding horizontal concrete frame (10), the lower protruding horizontal steel bar frame (5) forms a lower protruding horizontal concrete frame (12), and the pile trench steel bar frame (7) forms a concrete pile foundation (14); Step 6: Hanging a net on the outer inclined surface of the concrete wall: Hanging a plastic net frame (15) on the inclined side of the inverted triangle concrete frame (11) between the upper protruding horizontal concrete frame (10) and the lower protruding horizontal concrete frame (12) provided on the concrete wall (13), and the plastic net frame (15) is supported on a plurality of tension steel bars (8); Step 7: Spraying insulation material on the grid and the tensioning steel bars: Spraying insulation material on the plastic grid (15) and smoothing it to form a foam insulation layer 16, and also spraying insulation material on the tensioning steel bars (8); Step 8: Making the roof and floor: Smooth the base surface (2) of the area enclosed by the square pile foundation trench (1) and pour concrete to form the indoor floor (18), and cover the roof (17) on top of the square concrete wall (13); Step 9: Cover the insulation layer with a brick wall protective layer: Wrap the foam insulation layer 16 between the upper protruding horizontal concrete frame (10) and the lower protruding horizontal concrete frame (12) with the tension steel bars (8) and lay bricks with staggered joints to form a triangular brick wall protective layer (19).
2. The construction process of a tall wall of a cold storage building with an inner insulation layer according to claim 1 is characterized by: After the excavation of the pile foundation trench (1) in step 1 is completed, the pit wall is compacted using a tamping machine.
3. The construction process of a tall wall of a cold storage building with an inner insulation layer according to claim 1 is characterized by: Step 2 The upper protruding transverse reinforcement frame (3), the lower protruding transverse reinforcement frame (5), the pile trench reinforcement frame (7) and the inverted triangle reinforcement frame (4) are connected by steel wire bundling or welding.
4. The construction process of a tall wall of a cold storage building with an inner insulation layer according to claim 1 is characterized by: In step 3, the connection methods of the plurality of tension steel bars (8) and the inverted triangle steel bar frame (4) are respectively wire tying or welding.
5. The construction process of a tall wall of a cold storage building with an inner insulation layer according to claim 1 is characterized by: In step 3, the steel bar support frame (6) and the plurality of tension steel bars (8) are all painted with anti-rust paint after being connected.
6. The construction process of a tall wall of a cold storage building with an inner insulation layer according to claim 1 is characterized by: The material of the template (9) in step 4 is wood; or aluminum alloy.
7. The construction process of a tall wall of a cold storage building with an inner insulation layer according to claim 1 is characterized by: In step seven, the foam insulation layer 16 is made of polyurethane foaming agent.
8. The construction process of a tall wall of a cold storage building with an inner insulation layer according to claim 1 is characterized by: In step 7, the thickness of the foam insulation layer 16 is 60-80 mm, and the thickness of the insulation material sprayed on the tension steel bar (8) is 20 mm.
9. The construction process of a tall wall of a cold storage building with an inner insulation layer according to claim 1 is characterized by: The bricks used for the triangular brick wall protective layer (19) in step nine are hollow bricks; or foamed cement bricks.