Construction process of high wall of cold storage building with inner insulation layer

By designing an inverted triangular concrete wall structure and an equilateral triangular brick wall protective layer, the problem of easy damage and weathering collapse of the insulation structure inside tall walls was solved, thus improving the insulation effect and structural stability.

CN118933200BActive Publication Date: 2026-11-24HENAN NO 3 CONSTR GRP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411254847.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2026-11-24
Estimated Expiration
2044-09-09

AI Technical Summary

Technical Problem

The internal insulation structure of tall walls is prone to weathering and collapse of the protective layer, while the existing external insulation structure is easily damaged and has an unstable service life.

Method used

The structure adopts an inverted triangular concrete wall structure, with an internal equilateral triangular brick wall protective layer and a foam insulation layer. The structural stability is enhanced by setting a foam insulation layer between the concrete wall and the brick wall, and the external structure is covered with a triangular brick wall protective layer.

Benefits of technology

It improves the thermal insulation effect and service life of tall walls, enhances the structural stability, and extends the service life of the insulation layer.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933200B_ABST
    Figure CN118933200B_ABST
Patent Text Reader

Abstract

A construction process for tall walls of cold storage buildings with internal insulation layers is disclosed, comprising the following steps: excavating concrete pile foundation trenches; constructing concrete wall steel reinforcement support frames within the pile foundation trenches; fabricating tie bars on the steel reinforcement support frames; installing formwork on the sides of the steel reinforcement support frames; pouring concrete and removing the formwork; hanging mesh on the outer sloping surface of the concrete wall; spraying insulation material onto the mesh frame and tie bars; constructing the roof and ground; and covering the insulation layer with a brick wall protective layer. This invention sets the cross-section of the tall cold storage concrete wall as an inverted triangular structure, reserving space between the top and bottom of the concrete wall for the insulation and protective layers. A brick wall with an equilateral triangular cross-section is used as the protective layer, and a foam insulation layer is placed between the concrete wall and the triangular brick wall protective layer. This achieves the purpose of increasing the stability of the equilateral triangular structure of the triangular brick wall protective layer under the support of the concrete wall.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a wall construction process, and more particularly to a construction process for tall walls of cold storage buildings with internal insulation layers. Background Technology

[0002] Traditional wall insulation typically places the insulation layer on the exterior of the wall, offering the advantage of good insulation performance. However, its disadvantages are also significant. Because the insulation layer is relatively thin and usually made of insulation cotton, it is easily damaged by impacts or strong winds, resulting in an unstable service life. To increase the service life of the insulation layer, internal insulation structures are now more recommended. However, internal insulation structures for tall walls present considerable challenges. Although placing the insulation layer inside the wall increases the insulation effect, the protective layer of the brick-concrete structure covering the insulation layer is prone to weathering and collapse due to its thinness. Therefore, it is necessary to improve the construction of internal insulation structures for tall walls. Summary of the Invention

[0003] To overcome the shortcomings of the prior art, this invention discloses a construction process for tall walls of cold storage buildings with internal insulation layers. By setting the cross-section of the tall cold storage concrete wall as an inverted triangular structure, and reserving space for insulation and protective layers between the top and bottom of the concrete wall, a brick wall with an equilateral triangular cross-section is used as the protective layer. A foam insulation layer is set between the concrete wall and the triangular brick wall protective layer. This achieves the purpose of ensuring that the inverted triangular arrangement of the concrete structure does not affect its structural performance, and that the equilateral triangular structure of the triangular brick wall protective layer increases stability under the support of the concrete wall.

[0004] To achieve the aforementioned objective, the present invention employs the following technical solution: A construction process for tall walls of cold storage buildings with internal insulation layers includes the following steps: Step 1: Excavate concrete pile foundation trenches: Excavate four interconnected pile foundation trenches on the foundation surface to form a square structure; Step 2: Constructing a concrete wall reinforcement support frame in the pile foundation trench: A square reinforcement support frame is tied to the square pile foundation trench. The reinforcement support frame includes an inverted triangular reinforcement frame with an inverted triangular cross-section. The side of the inverted triangular reinforcement frame located inside the square pile foundation trench is a straight side, and the side of the inverted triangular reinforcement frame located outside the square pile foundation trench is a hypotenuse. A pile trench reinforcement frame is provided at the bottom of the inverted triangular reinforcement frame. The pile trench reinforcement frame is placed inside the pile foundation trench. At the top of the hypotenuse of the inverted triangular reinforcement frame, there is an upper protruding horizontal reinforcement frame extending outward from the square pile foundation trench. At the bottom of the hypotenuse of the inverted triangular reinforcement frame, there is a lower protruding horizontal reinforcement frame extending outward from the square pile foundation trench and with its bottom in contact with the base surface. The outer edges of the upper and lower protruding horizontal reinforcement frames are flush. Step 3: Fabricate tie bars on the steel bar support frame: On the hypotenuse of the inverted triangular steel bar frame located between the upper and lower protruding horizontal steel bar frames, set several tie bars at intervals with their ends inside the outer edges of the upper and lower protruding horizontal steel bar frames and arranged laterally. Step 4: Install formwork on the side of the rebar support frame: Erect formwork on the side of the rebar support frame located on the exposed base surface and on the bottom surface of the upper protruding horizontal rebar frame. Step 5: Concrete pouring and formwork removal: Pour concrete along the top of the upper protruding horizontal steel reinforcement frame, the inverted triangular steel reinforcement frame, and the lower protruding horizontal steel reinforcement frame. After the concrete has dried and cured, remove the formwork. The steel reinforcement support frame forms a concrete wall, the inverted triangular steel reinforcement frame forms an inverted triangular concrete frame, the upper protruding horizontal steel reinforcement frame forms an upper protruding horizontal concrete frame, the lower protruding horizontal steel reinforcement frame forms a lower protruding horizontal concrete frame, and the pile trench steel reinforcement frame forms a concrete pile foundation. Step 6: Hang the mesh on the outer slope of the concrete wall: Hang the plastic mesh frame on the slope of the inverted triangular concrete frame located between the upper and lower protruding horizontal concrete frames on the concrete wall. The plastic mesh frame is supported on several tie bars. Step 7: Spray insulation material onto the space frame and tie bars: Spray insulation material onto the plastic space frame and smooth it to form a foam insulation layer. Also spray insulation material onto the tie bars. Step 8: Roof and ground construction: Level the base surface of the area enclosed by the pile foundation trench of the square structure and pour concrete to form the indoor floor. Cover the roof on top of the concrete wall of the square structure. Step 9: Cover the insulation layer with a brick wall protective layer: Wrap the foam insulation layer located between the upper and lower protruding horizontal concrete frames with staggered brickwork to form a triangular brick wall protective layer.

[0005] In the construction process of the tall walls of the cold storage building with internal insulation layer, after the pile foundation trench is excavated in step one, the pit wall is compacted with a ramming machine.

[0006] In the construction process of the tall walls of the cold storage building with internal insulation layer, the connection methods of the upper protruding horizontal steel bar frame, the lower protruding horizontal steel bar frame, the pile trench steel bar frame and the inverted triangular steel bar frame in step two are wire binding or welding, respectively.

[0007] In the construction process of the tall walls of the cold storage building with internal insulation layer, the connection methods of the multiple tie bars and the inverted triangular steel bar frame in step three are wire binding or welding, respectively.

[0008] In the construction process of the tall walls of the cold storage building with internal insulation layer, after the steel support frame and multiple tie steel bars are connected in step three, they are all coated with anti-rust paint.

[0009] In the construction process of the tall walls of the cold storage building with internal insulation layer, the template material in step four is wood or aluminum alloy.

[0010] In the construction process of the tall walls of the cold storage building with internal insulation layer, the material of the foam insulation layer in step seven is polyurethane foaming agent.

[0011] In the construction process of the tall walls of the cold storage building with internal insulation layer, the thickness of the foam insulation layer in step seven is 60-80mm, and the thickness of the insulation material sprayed on the reinforcing steel is 20mm.

[0012] In the construction process of the tall walls of the cold storage building with internal insulation layer, the bricks used for the triangular brick wall protective layer in step nine are hollow bricks or foamed cement bricks.

[0013] Due to the adoption of the above technical solution, the present invention has the following beneficial effects: The construction process for tall walls of cold storage buildings with internal insulation layers described in this invention involves setting the cross-section of the tall concrete walls of the cold storage to an inverted triangular structure, reserving space between the top and bottom of the concrete walls for insulation and protective layers, using brick walls with equilateral triangular cross-sections as the protective layer, and placing a foam insulation layer between the concrete wall and the triangular brick wall protective layer. This achieves the purpose of ensuring that the inverted triangular arrangement of the concrete structure does not affect its structural performance, and that the equilateral triangular structure of the triangular brick wall protective layer increases stability under the support of the concrete wall. This invention is rationally designed, highly efficient, and provides good insulation, effectively extending the service life of the insulation layer of tall walls, and has broad application value. Attached Figure Description

[0014] Figure 1 This is a flowchart of the construction steps of the present invention; Figure 2 This is a structural schematic diagram of the first construction step of the present invention; Figure 3 This is a structural schematic diagram of one of the construction steps of the present invention from one angle; Figure 4 This is a structural schematic diagram of the second construction step of the present invention; Figure 5 This is a structural schematic diagram of the third construction step of the present invention; Figure 6 This is a structural schematic diagram of the fourth construction step of the present invention; Figure 7 This is a structural schematic diagram of step five of the construction process of the present invention; Figure 8 This is a structural schematic diagram of construction step six of the present invention; Figure 9 This is a structural schematic diagram of construction step seven of the present invention; Figure 10This is a structural schematic diagram of construction step eight of the present invention; Figure 11 This is a structural schematic diagram of construction step nine of the present invention.

[0015] In the diagram: 1. Pile foundation trench; 2. Base surface; 3. Upper protruding horizontal steel reinforcement frame; 4. Inverted triangular steel reinforcement frame; 5. Lower protruding horizontal steel reinforcement frame; 6. Steel reinforcement support frame; 7. Pile trench steel reinforcement frame; 8. Tie steel reinforcement; 9. Formwork; 10. Upper protruding horizontal concrete frame; 11. Inverted triangular concrete frame; 12. Lower protruding horizontal concrete frame; 13. Concrete wall; 14. Concrete pile foundation; 15. Plastic mesh frame; 16. Foam insulation layer; 17. Roof; 18. Indoor floor; 19. Triangular brick wall protective layer. Detailed Implementation

[0016] The present invention can be explained in more detail through the following embodiments. The present invention is not limited to the following embodiments. The purpose of disclosing the present invention is to protect all changes and modifications within the scope of the present invention. Combined with appendix Figures 1-11 The construction process for the tall walls of a cold storage building with an internal insulation layer includes the following steps: Step 1: Excavate concrete pile foundation trenches: On the base surface 2, excavate four pile foundation trenches 1 connected end to end to form a square structure. After the pile foundation trenches 1 are excavated, use a soil rammer to compact the pit walls. Step 2: Constructing a concrete wall reinforcement support frame in the pile foundation trench: A square reinforcement support frame 6 is tied to the square pile foundation trench 1. The reinforcement support frame 6 includes an inverted triangular reinforcement frame 4 with an inverted triangular cross-section. The inverted triangular reinforcement frame 4 has a straight side on the inner side of the square pile foundation trench 1 and a sloping side on the outer side of the square pile foundation trench 1. A pile trench reinforcement frame 7 is provided at the bottom of the inverted triangular reinforcement frame 4 and is placed inside the pile foundation trench 1. An upper protruding horizontal reinforcement frame 3 is provided at the top of the sloping side of the inverted triangular reinforcement frame 4 and extends outward to the square pile foundation trench 1. A lower protruding horizontal reinforcement frame 5 is provided at the bottom of the sloping side of the inverted triangular reinforcement frame 4 and extends outward to the square pile foundation trench 1 and is attached to the base surface 2 at the bottom. The outer edges of the upper protruding horizontal reinforcement frame 3 and the lower protruding horizontal reinforcement frame 5 are flush. The upper protruding horizontal reinforcement frame 3, the lower protruding horizontal reinforcement frame 5, the pile trench reinforcement frame 7 and the inverted triangular reinforcement frame 4 are connected by wire binding or welding, respectively. Step 3: Fabricate tie bars on the steel bar support frame: On the hypotenuse of the inverted triangular steel bar frame 4 located between the upper protruding horizontal steel bar frame 3 and the lower protruding horizontal steel bar frame 5, several tie bars 8 are set at intervals with their ends located inside the outer edge of the upper protruding horizontal steel bar frame 3 and the lower protruding horizontal steel bar frame 5 and are arranged horizontally. The multiple tie bars 8 and the inverted triangular steel bar frame 4 are connected by wire binding or welding. After the steel bar support frame 6 and the multiple tie bars 8 are connected, they are all coated with anti-rust paint. Step 4: Install templates on the side of the steel reinforcement support frame: Install templates 9 on the side of the steel reinforcement support frame 6 located on the exposed base surface 2 and on the bottom of the upper protruding horizontal steel reinforcement frame 3. The templates 9 are made of wood or aluminum alloy. Step 5: Concrete pouring and formwork removal: Pour concrete along the top of the upper protruding horizontal steel reinforcement frame 3, the inverted triangular steel reinforcement frame 4, and the lower protruding horizontal steel reinforcement frame 5. After the concrete has dried and cured, remove the formwork 9. The steel reinforcement support frame 6 forms a concrete wall 13, the inverted triangular steel reinforcement frame 4 forms an inverted triangular concrete frame 11, the upper protruding horizontal steel reinforcement frame 3 forms an upper protruding horizontal concrete frame 10, the lower protruding horizontal steel reinforcement frame 5 forms a lower protruding horizontal concrete frame 12, and the pile trench steel reinforcement frame 7 forms a concrete pile foundation 14. Step 6: Hanging mesh on the outer slope of the concrete wall: Hanging plastic mesh frame 15 on the slope of the inverted triangular concrete frame 11 located between the upper protruding horizontal concrete frame 10 and the lower protruding horizontal concrete frame 12 provided in the concrete wall 13. The plastic mesh frame 15 is supported on several tension steel bars 8. Step 7: Spray insulation material onto the space frame and tie bars: Spray insulation material onto the plastic space frame 15 and smooth it to form a foam insulation layer 16. Spray insulation material onto the tie bars 8 as well. The foam insulation layer 16 is made of polyurethane foaming agent and has a thickness of 60-80mm. The thickness of the insulation material sprayed onto the tie bars 8 is 20mm. Step 8: Roof and ground construction: Level the base surface 2 of the area enclosed by the square pile foundation trench 1 and pour concrete to form the indoor ground 18. Cover the top of the square concrete wall 13 with the roof 17. Step 9: Cover the insulation layer with a brick wall protective layer: Wrap the foam insulation layer 16 located between the upper protruding horizontal concrete frame 10 and the lower protruding horizontal concrete frame 12 with tensile steel bars 8 and staggered brickwork to form a triangular brick wall protective layer 19. The bricks used for the triangular brick wall protective layer 19 are hollow bricks or foamed cement bricks.

[0017] The parts of this invention not described in detail are prior art.

Claims

1. A construction technique for tall walls of cold storage buildings with internal insulation layers, characterized in that, Includes the following steps: Step 1: Excavate concrete pile foundation trenches: excavate four pile foundation trenches (1) connected end to end on the base surface (2) to form a square structure; Step 2: Construct a concrete wall steel reinforcement support frame in the pile foundation trench: Tie a square steel reinforcement support frame (6) on the square pile foundation trench (1). The steel reinforcement support frame (6) includes an inverted triangular steel reinforcement frame (4) with an inverted triangular cross section. The side of the inverted triangular steel reinforcement frame (4) located inside the square pile foundation trench (1) is a straight side, and the side of the inverted triangular steel reinforcement frame (4) located outside the square pile foundation trench (1) is a sloping side. A pile trench steel reinforcement frame (7) is provided at the bottom of the inverted triangular steel reinforcement frame (4). The pile trench steel reinforcement frame (7) is placed inside the pile foundation trench (1). An upper protruding horizontal steel reinforcement frame (3) is provided at the top of the sloping side of the inverted triangular steel reinforcement frame (4) extending to the outside of the square pile foundation trench (1). A lower protruding horizontal steel reinforcement frame (5) is provided at the bottom of the sloping side of the inverted triangular steel reinforcement frame (4) extending to the outside of the square pile foundation trench (1) and fitting the bottom with the base surface (2). The outer edges of the upper protruding horizontal steel reinforcement frame (3) and the lower protruding horizontal steel reinforcement frame (5) are flush. Step 3: Make tie bars on the steel bar support frame: On the hypotenuse of the inverted triangular steel bar frame (4) located between the upper protruding horizontal steel bar frame (3) and the lower protruding horizontal steel bar frame (5), set several tie bars (8) with their ends located inside the outer edge of the upper protruding horizontal steel bar frame (3) and the lower protruding horizontal steel bar frame (5) and set horizontally. Step 4: Install templates on the side of the steel reinforcement support frame: Install templates (9) on the side of the steel reinforcement support frame (6) located on the exposed base surface (2) and on the bottom of the upper protruding horizontal steel reinforcement frame (3). Step 5: Concrete pouring and formwork removal: Pour concrete along the top of the upper protruding horizontal steel bar frame (3), the inverted triangular steel bar frame (4) and the lower protruding horizontal steel bar frame (5). After the concrete has dried and cured, remove the formwork (9). The steel bar support frame (6) forms a concrete wall (13), the inverted triangular steel bar frame (4) forms an inverted triangular concrete frame (11), the upper protruding horizontal steel bar frame (3) forms an upper protruding horizontal concrete frame (10), the lower protruding horizontal steel bar frame (5) forms a lower protruding horizontal concrete frame (12), and the pile trench steel bar frame (7) forms a concrete pile foundation (14). Step 6: Hanging mesh on the outer slope of the concrete wall: Hang a plastic mesh frame (15) on the slope of the inverted triangular concrete frame (11) located between the upper protruding horizontal concrete frame (10) and the lower protruding horizontal concrete frame (12) on the concrete wall (13). The plastic mesh frame (15) is supported on several tension bars (8). Step 7: Spray insulation material on the space frame and tie bars: Spray insulation material on the plastic space frame (15) and smooth it to form a foam insulation layer (16), and also spray insulation material on the tie bars (8); Step 8: Roof and ground construction: The base surface (2) of the area enclosed by the square pile foundation trench (1) is leveled and concrete is poured to form the indoor ground (18). The roof (17) is covered on top of the concrete wall (13) of the square structure. Step 9: Cover the insulation layer with a brick wall protective layer: Wrap the foam insulation layer (16) located between the upper protruding horizontal concrete frame (10) and the lower protruding horizontal concrete frame (12) with tie bars (8) and lay bricks in a staggered manner to form a triangular brick wall protective layer (19).

2. The construction process for tall walls of cold storage buildings with internal insulation layers according to claim 1, characterized in that: After the excavation of the pile foundation trench (1) in step one is completed, the pit wall is compacted with a ramming machine.

3. The construction process for tall walls of cold storage buildings with internal insulation layers according to claim 1, characterized in that: In step two The upper protruding horizontal steel bar frame (3), the lower protruding horizontal steel bar frame (5), the pile trench steel bar frame (7), and the inverted triangular steel bar frame (4) are connected by wire binding or welding, respectively.

4. The construction process for tall walls of cold storage buildings with internal insulation layers according to claim 1, characterized in that: In step three, the connection methods for the multiple tension bars (8) and the inverted triangular steel bar frame (4) are wire binding or welding, respectively.

5. The construction process for tall walls of cold storage buildings with internal insulation layers according to claim 1, characterized in that: After the steel bar support frame (6) and multiple tie bars (8) are connected in step three, they are all coated with anti-rust paint.

6. The construction process for tall walls of cold storage buildings with internal insulation layers according to claim 1, characterized in that: In step four, the template (9) is made of wood or aluminum alloy.

7. The construction process for tall walls of cold storage buildings with internal insulation layers according to claim 1, characterized in that: In step seven, the foam insulation layer (16) is made of polyurethane foaming agent.

8. The construction process for tall walls of cold storage buildings with internal insulation layers according to claim 1, characterized in that: In step seven, the thickness of the foam insulation layer (16) is 60-80mm, and the thickness of the insulation material sprayed on the reinforcing bar (8) is 20mm.

9. The construction process for tall walls of cold storage buildings with internal insulation layers according to claim 1, characterized in that: The bricks used in the triangular brick wall protective layer (19) in step nine are hollow bricks or foamed cement bricks.

Citation Information

Patent Citations

  • Construction method of subway station interface connection structure

    CN118292490A

  • Quick mounting system for formwork support of heat supply basement

    CN217205303U