Reinforcing method for fabricated concrete floor system and roof

By adding outer ring beams to the outer ring of prefabricated buildings to connect with walls and concrete floors and roofs, the problems of insufficient support length and weak connection are solved, and reinforcement of home-free construction is achieved, and structural integrity and earthquake resistance are improved. performance.

CN118933395APending Publication Date: 2024-11-12BEIJING XUANWU ANGU TECHNOLOGY CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411282406.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing prefabricated concrete floor and roof are insufficient in the support length and weak connection of the board ends, resulting in poor structural integrity. Traditional reinforcement methods require household construction, affecting the normal use of residents.

Method used

Added jacket ring beams at the outer ring height of the prefabricated building to effectively connect with the wall and concrete floors and roofs. The jacket ring beams are formed through mechanical drilling, grouting and concrete pouring to achieve reinforcement and avoid household construction .

Benefits of technology

No home construction is required, which enhances the integrity and seismic resistance of the structure, reduces the disturbance of construction to residents' lives, and improves the horizontal stiffness and connection strength of the building and roof.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933395A_ABST
    Figure CN118933395A_ABST
Patent Text Reader

Abstract

The invention discloses a reinforcing method for a fabricated concrete floor system and a fabricated concrete roof, and relates to the technical field of building reinforcement, the reinforcing method comprises the following steps: step S100, fixedly and additionally arranging an outer sleeve ring beam at a high wall body of an outer ring layer of a fabricated building; and step S200, carrying out large earthquake elastic-plastic calculation, re-checking the damage of the fabricated building under the large earthquake, and controlling the damage within a standard allowable range. According to the reinforcing method for the fabricated concrete floor system and the fabricated concrete roof, home entry is not needed, the outer lantern ring beams are additionally arranged at the floor height positions of all layers of the outer circle of the fabricated building in an outdoor construction mode, the outer lantern ring beams are effectively connected with the wall body of the fabricated building, the fabricated concrete floor system and the fabricated concrete roof, and the reinforcing effect is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building reinforcement, and in particular to a reinforcement method for assembled concrete floor slabs and roof slabs. Background Art

[0002] Prefabricated concrete floor and roof, that is, using precast concrete panels (referred to as precast panels or hollow panels, etc.) as the floor and roof panels of the house. Precast panels are mostly used as floor and roof in masonry structures. In addition, building structures such as cast-in-place and external hanging, cast-in-place and external masonry also mostly use precast panels as floor and roof. These structures usually have problems such as insufficient support length of precast panels (not meeting the requirements of the specifications) or weak connection of the board ends of the precast panels, and poor structural integrity.

[0003] To address this problem, traditional reinforcement methods include reinforced concrete slab wall reinforcement, adding angle steel to the bottom of the slab, etc. These reinforcement methods all require home construction, which has a significant impact on the normal use of residents. Therefore, it is urgent to design a method for reinforcing prefabricated concrete floors and roofs that can effectively avoid home construction. Summary of the invention

[0004] The purpose of the present invention is to provide a reinforcement method for prefabricated concrete floor slabs and roof slabs to solve the problems existing in the above-mentioned prior art. The method does not require entering the house. Through outdoor construction, an outer ring beam is added to the floor height position of each layer of the outer circle of the prefabricated building. The outer ring beam is effectively connected to the wall of the prefabricated building and the prefabricated concrete floor slabs and roof slabs, thereby achieving the reinforcement effect.

[0005] To achieve the above object, the present invention provides the following solutions:

[0006] The present invention provides a method for reinforcing an assembled concrete floor and roof, comprising the following steps:

[0007] Step S100, fixing and adding an outer ring beam at the outer wall of the prefabricated building, wherein the outer ring beam is effectively connected to the outer side of the wall and the ends of the prefabricated concrete floor and roof;

[0008] Step S200, perform large earthquake elastoplastic calculations to verify the damage of prefabricated buildings under large earthquakes and control it within the allowable range of the code.

[0009] Optionally, the prefabricated building is a masonry structure, and step S100 includes:

[0010] Step S101, mechanical drilling is used in the transverse wall of the floor where the supporting length of the prefabricated concrete floor and roof is insufficient and no ring beam is provided, or the original ring beam does not meet the requirements of the specification, and the construction is carried out layer by layer from top to bottom;

[0011] Step S102, inserting a connecting piece into the drilled hole;

[0012] Step S103, sealing both ends of the borehole and reserving a grouting port, injecting slurry into the borehole through the grouting port using a high-pressure grouting machine; after the slurry injection is completed, the grouting port is sealed;

[0013] Step S104, after the slurry is finally set, an outer sleeve ring beam is added and fixedly connected to the end of the connecting piece.

[0014] Optionally, the prefabricated building is an internally cast and externally hung structure or an internally cast and externally masonry structure, and the step S100 includes:

[0015] Step S101, supporting the outer ring of the floor where the connection nodes of the assembled concrete floor and roof are weak, and tying the steel bars;

[0016] Step S102, pouring concrete at the formwork to form an outer ring beam.

[0017] Optionally, the inner side of the outer ring beam is effectively connected to the outer wall of the prefabricated building.

[0018] Optionally, the connecting member may be a steel tie rod, with both ends of the connecting member extending out of the borehole and connected to the outer sleeve ring beam.

[0019] Optionally, the step S104 includes: after the slurry is finally set, tying steel bars on the outside of the wall, connecting the ends of the connectors to the tied steel bars; supporting formwork at the steel bar tying positions and pouring concrete to form an outer ring beam.

[0020] Optionally, the slurry is a material such as high-performance concrete or mortar, and its strength should not be less than the strength of prefabricated building materials. When the prefabricated building is a masonry structure, the slurry strength should not be less than the strength of the original masonry structure material. For example, polymer mortar is an optional slurry.

[0021] Optionally, step S300 is also included, and the construction content is inspected and accepted after all steps are completed.

[0022] Optionally, when the prefabricated building is a masonry structure, the optional method for effectively connecting the outer ring beam to the wall body includes caulking, etc. The specific method is: a caulking is opened at the connection position between the outer side of the wall body and the outer ring beam, and when the concrete of the outer ring beam is poured, it is poured together with the caulking.

[0023] Optionally, when the prefabricated building is an internally cast and externally hung structure, the optional methods for effectively connecting the outer ring beam to the wall include anchoring. The specific method is as follows: the wall is roughened at the location where the outer ring beam is added, and anchoring is installed. The outer end of the anchoring is fixedly connected to the steel bars of the outer ring beam. When the connection strength is insufficient, the inner end of the anchor is directly connected to the prefabricated concrete floor and roof. When the connection strength is sufficient, the inner end of the anchor is not directly connected to the prefabricated concrete floor and roof, and the two are indirectly connected by concrete. The inner end of the anchor is implanted in the cast-in-place concrete at the connection between the upper and lower walls. When the concrete of the outer ring beam is poured, it is poured together with the roughened part.

[0024] Compared with the prior art, the present invention has achieved the following technical effects:

[0025] The present invention only sets an outer ring beam at the wall of the outer layer of the prefabricated building, and the outer ring beam is effectively connected with the wall of the prefabricated building and the prefabricated concrete floor and roof, so as to realize the reinforcement of the prefabricated concrete floor and roof, and it is not necessary to reinforce the surface layer of the indoor and peripheral walls according to the traditional reinforcement method, so as to avoid the impact on the interior decoration and the use space. The construction can be completed outdoors, avoiding the construction in the house, and greatly reducing the disturbance of the construction to the life of the residents. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0027] Figure 1 It is a plan view of the first embodiment of the reinforcement method of the assembled concrete floor and roof of the present invention;

[0028] Figure 2 for Figure 1 AA section view;

[0029] Figure 3 for Figure 2 BB cross-section diagram;

[0030] Figure 4 This is a schematic diagram of the connection between the outer ring beam and the wall of the first embodiment;

[0031] Figure 5 It is a plan view of the second embodiment of the reinforcement method of the assembled concrete floor and roof of the present invention;

[0032] Figure 6 for Figure 5 CC profile of ;

[0033] Figure 7 This is a schematic diagram of the connection between the outer ring beam and the wall of the second embodiment.

[0034] Explanation of the reference numerals: 1 - outer ring beam; 2 - first connecting member; 3 - transverse wall; 4 - outer longitudinal wall; 5 - drilling hole; 6 - slurry; 7 - assembled concrete floor and roof; 8 - inner wall; 9 - outer wall, 10 - caulking, 11 - roughening, 12 - second connecting member. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] The purpose of the present invention is to provide a reinforcement method for prefabricated concrete floors and roofs to solve the problems existing in the above-mentioned prior art. No need to enter the house, through outdoor construction, an outer ring beam is added at the floor height position of each layer of the outer circle of the prefabricated building. The outer ring beam is effectively connected with the wall of the prefabricated building and the prefabricated concrete floor and roof, thereby achieving the reinforcement effect.

[0037] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0038] The masonry structures or cast-in-place and external hanging, cast-in-place and external masonry structures known to the inventor all have problems such as insufficient supporting length of prefabricated concrete floors and roofs, weak connection of the plate ends of prefabricated concrete floors and roofs, and poor structural integrity.

[0039] To address this problem, the inventors have known reinforcement methods such as reinforced concrete slab wall reinforcement method and slab bottom reinforcement method, all of which require home construction and have a significant impact on the normal use of residents. In particular, the slab wall reinforcement method has a large surface layer thickness, occupies the original building space, and has low resident satisfaction.

[0040] refer to Figure 1 to Figure 7In order to solve the above problems, the present invention provides a reinforcement method for prefabricated concrete floor and roof, comprising the following steps: step S100, fixing and adding an outer ring beam 1 at the wall of the outer layer height of the prefabricated building, the outer ring beam 1 including tied steel bars as a preliminary frame, and pouring concrete at the steel bars by formwork to finally form the outer ring beam 1 structure; step S200, performing large earthquake elastoplastic calculation, reviewing the damage of the prefabricated building under the large earthquake, and controlling it within the allowable range of the specification, large earthquake elastoplastic analysis refers to the use of finite element software to calculate and verify the seismic performance of the structure under rare earthquakes, which is a mature existing technology; the specification involved in the present invention can be based on the "Technical Code for Concrete Structures of High-rise Buildings" JGJ3, and the corresponding performance level can be determined according to the selected seismic performance target and damaged parts, which belongs to the known technology. The present invention only needs to add an outer ring beam 1 at the floor height position of each layer of the outer circle of the original structure to constrain the assembled concrete floor and roof 7, and no door-to-door construction is required; the outer ring beam 1 is effectively connected to the wall of the original structure and the end of the assembled concrete floor and roof 7, constraining the assembled concrete floor and roof 7 from the outside, improving the horizontal stiffness of the assembled concrete floor and roof 7, enhancing the integrity of the original structure, and greatly reducing the risk of the assembled concrete floor and roof 7 spreading or falling off under a large earthquake. The assembled concrete floor and roof 7 reinforced by this method have greatly reduced deformation under the action of a large earthquake, and the tensile damage at the joints of the assembled concrete floor and roof 7 is greatly reduced. The present invention has a wide range of applications and is suitable for various structural forms such as masonry structures, cast-in-place and external hanging structures, and cast-in-place and external masonry structures.

[0041] Embodiment 1

[0042] refer to Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown, the prefabricated building in this embodiment is a masonry structure, the supporting length of the prefabricated concrete floor and roof 7 is insufficient, and its wall includes a transverse wall 3 and an outer longitudinal wall 4. The construction method of this embodiment includes:

[0043] Step S101, firstly, a machine is used to drill holes 5 in the transverse wall 3 of the floor where the supporting length of the assembled concrete floor slab and roof slab 7 is insufficient (does not meet the requirements of the specification) and no ring beam is provided, or the original ring beam does not meet the requirements of the specification. The holes 5 are arranged horizontally in the transverse wall 3. The machine used for drilling the holes 5 is a well-known mature technology and will not be described in detail. The drilling is carried out layer by layer from top to bottom.

[0044] Step S102, after the drilling hole 5 is completed, the first connecting member 2 is inserted into the drilling hole 5, and both ends of the first connecting member 2 extend out of the drilling hole 5. The first connecting member 2 can be a steel tie rod, etc.;

[0045] Step S103, seal both ends of the borehole 5, and reserve a grouting port, and use a high-pressure grouting machine to inject slurry 6 into the borehole 5 through the grouting port; after the slurry 6 is injected, the grouting port is sealed; the slurry 6 can be made of high-performance concrete or mortar and other materials, and the strength should not be less than the strength of the original masonry structure material. Polymer mortar is an optional material. In this example, polymer mortar is used as slurry 6.

[0046] Step S104, after the slurry 6 is finally set, the steel bars of the outer ring beam 1 are tied, and the end of the first connecting member 2 is connected to the steel bars in the outer ring beam 1;

[0047] Step S105, support the formwork at the place where the steel bars are tied, and finally pour the concrete at the place where the outer ring beam 1 is supported. A caulking joint 10 is opened at the connection position between the outer side of the wall and the outer ring beam 1. When the concrete of the outer ring beam 1 is poured, it is poured together with the inside of the caulking joint 10, so that after the outer ring beam 1 is poured, it is effectively connected with the wall, thereby improving its reinforcement effect.

[0048] Step S106: After all steps are completed, the construction content is inspected and accepted.

[0049] Embodiment 2

[0050] refer to Figure 5 , Figure 6 and Figure 7 As shown, the prefabricated building in this embodiment is an internally cast external hanging structure or an internally cast external masonry structure. The connection nodes between the prefabricated concrete floor slab and roof slab 7 and the wall are weak, and the structural integrity is poor. The wall includes an inner wall 8 and an outer wall 9. The inner wall 8 is generally a cast-in-place concrete wall, and the outer wall 9 is a prefabricated concrete slab wall or a masonry wall arranged outside the inner wall 8. The outer ring beam 1 is arranged outside the outer wall 9. The construction method of this embodiment includes:

[0051] Step S101, supporting the outer ring formwork of the floor where the connection node of the assembled concrete floor and roof 7 is weak, and tying the steel bars to serve as the frame of the outer ring beam 1;

[0052] Step S102, pouring concrete at the formwork to form an outer ring beam 1. In this embodiment, the wall is roughened 11 at the location where the outer ring beam 1 is added, and a second connector 12 is inserted. An embedded bar is an optional second connector. This example adopts an embedded bar connection. The outer end of the second connector 12 is fixedly connected to the steel bars of the outer ring beam 1. When the connection strength is insufficient, the inner end of the second connector 12 is directly connected to the prefabricated concrete floor and roof 7. When the connection strength is sufficient, the inner end of the second connector 12 is not directly connected to the prefabricated concrete floor and roof 7. The two are indirectly connected by concrete. The inner end of the second connector 12 is implanted in the cast-in-place concrete at the connection of the upper and lower outer walls 9 to reinforce the prefabricated concrete floor and roof 7. When the concrete of the outer ring beam 1 is poured, it is poured together with the roughened 11, so that the outer ring beam 1 is effectively connected to the wall, improving the reinforcement effect.

[0053] The present invention uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A reinforcement method for assembled concrete floor and roof. Features: The steps include: Step S100, fixing and adding an outer ring beam at the outer layer wall of the prefabricated building; Step S200, perform large earthquake elastoplastic calculations to verify the damage of prefabricated buildings under large earthquakes and control it within the allowable range of the code.

2. The reinforcement method for assembled concrete floor and roof according to claim 1, Features: The prefabricated building is a masonry structure, and the step S100 includes: Step S101, mechanical drilling is used in the transverse wall of the floor where the supporting length of the prefabricated concrete floor and roof is insufficient and no ring beam is provided, or the original ring beam does not meet the requirements of the specification, and the construction is carried out layer by layer from top to bottom; Step S102, inserting a connecting piece into the drilled hole; Step S103, sealing both ends of the borehole and reserving a grouting port, injecting slurry into the borehole through the grouting port using a high-pressure grouting machine; after the slurry injection is completed, the grouting port is sealed; Step S104, after the slurry is finally set, an outer sleeve ring beam is added and fixedly connected to the end of the connecting piece.

3. The reinforcement method for assembled concrete floor and roof according to claim 1, Features: The prefabricated building is a cast-in-place and external-hanging structure or a cast-in-place and external-building structure, and the step S100 comprises: Step S101, supporting the outer ring of the floor where the connection nodes of the assembled concrete floor and roof are weak, and tying the steel bars; Step S102, pouring concrete at the formwork to form an outer ring beam.

4. The reinforcement method for assembled concrete floor and roof according to claim 1, Features: The inner side of the outer sleeve ring beam is effectively connected to the outer wall of the prefabricated building.

5. The reinforcement method for assembled concrete floor and roof according to claim 2, Features: The connecting piece is a steel pull rod, and both ends of the connecting piece extend out of the drill hole and are connected to the outer sleeve ring beam.

6. The reinforcement method for assembled concrete floor and roof according to claim 2, Features: The step S104 includes: after the slurry is finally set, tying steel bars on the outside of the wall, connecting the ends of the connectors to the tied steel bars; supporting formwork at the steel bar tying positions and pouring concrete to form an outer ring beam.

7. The reinforcement method for assembled concrete floor and roof according to claim 2, Features: The slurry is a high-performance concrete or mortar material, and its strength is not less than that of prefabricated building materials.

8. The reinforcement method for assembled concrete floor and roof according to claim 1, Features: The step S300 is also included, and the construction content is inspected and accepted after all the steps are completed.

9. The reinforcement method for assembled concrete floor and roof according to claim 6, Features: A caulking joint is provided at the connection position between the outer side of the wall and the outer ring beam. When the concrete of the outer ring beam is poured, it is poured together with the caulking joint.

10. The reinforcement method of the assembled concrete floor and roof according to claim 3, Features: The wall is roughened at the position where the outer ring beam is added, and embedded steel bars are installed. The outer end of the embedded steel bars is fixedly connected to the steel bars of the outer ring beam. When the connection strength is insufficient, the inner end of the embedded steel bars is directly connected to the prefabricated concrete floor and roof. When the connection strength is sufficient, the inner end of the embedded steel bars is not directly connected to the prefabricated concrete floor and roof, and the two are indirectly connected by concrete. The inner end of the embedded steel bars is implanted in the cast-in-place concrete at the connection between the upper and lower walls. When the concrete of the outer ring beam is poured, it is poured together with the roughened area.

Citation Information

Patent Citations

  • Earthquake resistant reinforcing method of subsequently added ring beams, constructive columns and steel pulling rods in existing building

    CN103758362A

  • Reinforcing construction method of masonry structural building

    CN106567554A

  • Reinforcing structure additionally provided with ring beam for existing brick masonry building structure

    CN219411947U

  • Building enclosure structure

    WO2018205646A1

  • Post-tensioned prestressed assembly-style system of concrete framework and shock-resistant and energy-dissipating components, and construction method

    WO2019056717A1