Deviation rectifying and reinforcing device for wind power tower drum of wind power plant
By using tower support steel plates, guide sleeves, threaded rods and other components in the wind power tower correction and reinforcement device, combined with the design of drive jacks and after-loading rods, the problems of cumbersome operation and low correction accuracy are solved, and the wind power tower is realized Efficient and precise fixation of deviation correction.
Patent Information
- Application Number
- CN202411152043.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing wind power tower correction and reinforcement device has cumbersome operation and low correction accuracy, which is prone to sliding between the column support steel members and the tower support steel members.
Reinforcement components including tower support steel plate, guide sleeve, threaded rod, ball, prestressed anchor bolt, support seat, deviation correction positioning ring and fan foundation are adopted to achieve lifting of the deviation correction positioning ring by driving the jack and after-loading rod, and drive the The tower main body performs a deviation correction action, and fixes the correction position through a threaded connection between the threaded rod and the guide sleeve.
The operating steps are simplified, the correction accuracy is improved, the sliding of the correction position is avoided, and the accuracy and stability of the wind power tower correction is ensured.
Smart Images

Figure CN118934469A_ABST
Abstract
Description
Technical field:
[0001] The invention relates to a reinforcement device, in particular to a deviation correction reinforcement device for a wind power tower in a wind farm, and belongs to the technical field of wind power generation. Background technology:
[0002] New energy wind power generation energy storage equipment is an indispensable part of the wind power generation system. They are responsible for storing the electricity generated by wind power generation so that it can be released when needed. The principle of wind power generation is to use wind power to drive the windmill blades to rotate, and then increase the speed of rotation through the speed increaser to drive the generator to generate electricity. With the large-scale development of wind farms, the difficulties and problems of wind turbines in the construction process have been gradually exposed, one of which is the horizontality control of the wind turbine foundation ring.
[0003] A known Chinese public invention (publication number: CN116043934A) discloses a correction and reinforcement device and method for the connection structure between the foundation and the tower of a foundation ring type wind turbine, which is transmitted to the column support steel member through high-strength friction bolts, and is transmitted to the foundation pedestal through the bottom steel plate and prestressed anchor bolts, and each step of the transmission path can be visually detected, which is conducive to continuous observation of the condition of the foundation connection members in the later operation and maintenance, and clear judgment of the problem link; it uses high-strength friction bolts to lock and fix the overlapping area of the column support steel member and the tower support steel member, but in actual correction, it is necessary to tighten and fix multiple bolts multiple times, which is cumbersome to operate, and it uses friction force to fix the tower body, which is prone to sliding in the overlapping area of the column support steel member and the tower support steel member, thereby affecting the correction accuracy. For this reason, a wind farm wind turbine tower correction and reinforcement device is proposed. Summary of the invention:
[0004] The object of the present invention is to provide a wind farm wind tower correction and reinforcement device to solve one of the problems raised in the above background technology.
[0005] The present invention is implemented by the following technical scheme: a wind farm wind power tower correction reinforcement device, comprising a reinforcement assembly, wherein the reinforcement assembly comprises a tower support steel plate, a first reinforcing rib, a guide sleeve, a threaded rod, a first sphere, four prestressed anchor bolts, a column support steel plate, a support seat, a cross plate, a spherical groove and a tower body, a correction positioning ring and a wind turbine foundation;
[0006] The bottom end of the tower body is fixedly connected to the top end of the correction positioning ring by bolts, the correction positioning ring is located inside the wind turbine foundation and is connected by anchor bolts, the column support steel plate is fixedly connected to the upper surface of the wind turbine foundation by four prestressed anchor bolts, the support seat is fixedly connected to the upper surface of the column support steel plate, the spherical groove is opened on the upper surface of the support seat, the first sphere is fixedly connected to the bottom end of the threaded rod, the guide sleeve is fixedly connected to the inside of the cross plate, the cross plate is fixedly connected to the outer side wall of the tower support steel plate, and the first reinforcement rib is fixedly connected to the outer side wall of the cross plate and the outer side wall of the tower support steel plate.
[0007] As a further preferred embodiment of the present technical solution: the tower support steel plate is fixedly connected to the bottom of the outer wall of the tower body, the threaded rod is threadedly connected to the inner wall of the guide sleeve, and the position of the guide sleeve corresponds to the position of the support seat.
[0008] As a further preferred embodiment of the present technical solution: the outer wall of the first sphere is in contact with the inner wall of the spherical groove, and the inner diameter of the spherical groove is greater than the outer diameter of the first sphere.
[0009] As a further preferred embodiment of the present technical solution: flange connections are provided at the bottom of the tower body and the top of the deviation correction positioning ring, the tower body is fixedly connected to the deviation correction positioning ring via the flange connection, and the column supporting steel plate is located outside the deviation correction positioning ring.
[0010] As a further preferred embodiment of the technical solution: the top end of the threaded rod is fixedly connected to a driving head, and the interior of the driving head is slidably connected to a force adding rod.
[0011] As a further preferred embodiment of the technical solution: a deviation correction component is arranged inside the tower body, and the deviation correction component includes a U-shaped seat, a jack, a limiting sleeve, a supporting bottom plate, an arc groove and a second sphere;
[0012] The U-shaped seat is located outside the connection between the tower body and the correction positioning ring, the inner top wall of the U-shaped seat is in contact with the lower surface of the connection part of the correction positioning ring, the jack is installed inside the limiting sleeve, the limiting sleeve is fixedly connected to the upper surface of the supporting base plate, the arc groove is opened on the lower surface of the U-shaped seat, and the second sphere is fixedly connected to the top of the jack.
[0013] As a further preferred embodiment of the present technical solution: the outer wall of the second sphere is in contact with the inner wall of the arc-shaped groove, and the supporting bottom plate is in contact with the upper surface of the fan foundation.
[0014] As a further preferred embodiment of the technical solution: the deviation correction assembly further includes a limit screw, two guide rods and a limit plate;
[0015] The limiting screw rod is threadedly connected to the inside of the U-shaped seat, the two guide rods are symmetrically slidably connected to the inside of the U-shaped seat, and the lower surface of the limiting plate is attached to the upper surface of the connecting part of the tower body.
[0016] As a further preferred embodiment of the present technical solution: the bottom end of the limiting screw rod is rotatably connected to the upper surface of the limiting plate, and the bottom ends of the two guide rods are symmetrically fixedly connected to the upper surface of the limiting plate.
[0017] As a further preferred embodiment of the technical solution: the outer side wall of the limiting sleeve is symmetrically fixedly connected with two second reinforcing ribs, and the second reinforcing ribs are fixedly connected to the supporting bottom plate.
[0018] Advantages of the present invention: the present invention drives the top end of the jack to lift the connecting part of the correction positioning ring upward, and the connecting part of the correction positioning ring drives the tower body, thereby realizing the correction action of the tower body, and the driving head is driven to rotate by the force rod, and the driving head drives the threaded rod to rotate. Since the threaded rod is threadedly connected with the guide sleeve, the threaded rod drives the first sphere to contact the support seat. At this time, the threaded rod is supported by the support seat, and the tower body is supported by the tower support steel plate, so that the correction position can be fixed. Compared with the prior art, the operation steps are simplified, and there is no sliding after the correction position is fixed, thereby ensuring the correction accuracy. Description of the drawings:
[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 It is a structural schematic diagram of a wind farm wind tower correction and reinforcement device of the present invention;
[0021] Figure 2 is a cross-sectional view of the present invention;
[0022] Figure 3 It is a schematic diagram of the structure of the reinforcement component of the present invention;
[0023] Figure 4 It is a schematic diagram of the support base structure of the present invention;
[0024] Figure 5 It is a schematic diagram of the connection between the deviation correction component and the deviation correction positioning ring of the present invention;
[0025] Figure 6 It is a schematic diagram of the structure of the correction component of the present invention;
[0026] Figure 7 It is a schematic diagram of the U-shaped seat structure of the present invention;
[0027] Figure 8 It is a schematic diagram of the limiting sleeve structure of the present invention.
[0028] In the figure: 101, reinforcement assembly; 11, tower support steel plate; 12, booster rod; 13, drive head; 14, first reinforcement rib; 15, guide sleeve; 16, threaded rod; 17, first sphere; 18, prestressed anchor bolt; 19, column support steel plate; 20, support seat; 21, cross plate; 22, spherical groove; 23, tower body; 24, correction positioning ring; 25, wind turbine foundation; 301, correction assembly; 31, U-shaped seat; 32, limit screw; 33, guide rod; 34, limit plate; 35, jack; 36, limit sleeve; 37, support bottom plate; 38, arc groove; 39, second sphere; 40, second reinforcement rib. Specific implementation method:
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] Example
[0031] See also Figure 1-8 The present invention provides a technical solution: a wind power tower correction and reinforcement device for a wind farm, comprising a reinforcement component 101, the reinforcement component 101 comprising a tower support steel plate 11, a first reinforcing rib 14, a guide sleeve 15, a threaded rod 16, a first sphere 17, four prestressed anchor bolts 18, a column support steel plate 19, a support seat 20, a cross plate 21, a spherical groove 22 and a tower body 23, a correction positioning ring 24 and a wind turbine foundation 25;
[0032] The bottom end of the tower body 23 is fixedly connected to the top end of the correction positioning ring 24 by bolts. The correction positioning ring 24 is located inside the wind turbine foundation 25 and is connected by anchor bolts. The column support steel plate 19 is fixedly connected to the upper surface of the wind turbine foundation 25 by four prestressed anchor bolts 18. The support seat 20 is fixedly connected to the upper surface of the column support steel plate 19. The spherical groove 22 is opened on the upper surface of the support seat 20. The first sphere 17 is fixedly connected to the bottom end of the threaded rod 16. The guide sleeve 15 is fixedly connected to the inside of the cross plate 21. The cross plate 21 is fixedly connected to the outer wall of the tower support steel plate 11. The first reinforcement rib 14 is fixedly connected to the outer wall of the cross plate 21 and the outer wall of the tower support steel plate 11.
[0033] In this embodiment, specifically: the tower support steel plate 11 is fixedly connected to the bottom of the outer wall of the tower body 23, the threaded rod 16 is threadedly connected to the inner wall of the guide sleeve 15, the position of the guide sleeve 15 corresponds to the position of the support seat 20, the position of the threaded rod 16 can be limited by the guide sleeve 15, and when the threaded rod 16 is rotated, the threaded rod 16 is displaced in the guide sleeve 15.
[0034] In this embodiment, specifically: the outer wall of the first sphere 17 is in contact with the inner wall of the spherical groove 22, and the inner diameter of the spherical groove 22 is larger than the outer diameter of the first sphere 17. When correcting and fixing, the first sphere 17 moves downward into the spherical groove 22 and contacts with the spherical groove 22. At this time, the first sphere 17 and the threaded rod 16 can be supported by the support seat 20, thereby achieving fixation of the correction position.
[0035] In this embodiment, specifically: flange connecting parts are provided at the bottom of the tower body 23 and the top of the correcting positioning ring 24, the tower body 23 is fixedly connected to the correcting positioning ring 24 through the flange connecting parts, and the column supporting steel plate 19 is located outside the correcting positioning ring 24. By lifting the connecting part of the correcting positioning ring 24, the connecting part of the correcting positioning ring 24 drives the tower body 23, thereby realizing the correction action of the tower body 23.
[0036] In the present embodiment, specifically: the top end of the threaded rod 16 is fixedly connected with a driving head 13, and the inside of the driving head 13 is slidably connected with a force rod 12, so that the threaded rod 16 can be conveniently driven by the force rod 12. When the deviation correction position is fixed, the force rod 12 drives the driving head 13 to rotate, and the driving head 13 drives the threaded rod 16 to rotate. Since the threaded rod 16 is threadedly connected to the guide sleeve 15, the threaded rod 16 drives the first sphere 17 to contact the support seat 20. At this time, the threaded rod 16 is supported by the support seat 20, and the tower support steel plate 11 supports the tower body 23, so that the deviation correction position can be fixed.
[0037] In this embodiment, specifically: a deviation correction component 301 is arranged inside the tower body 23, and the deviation correction component 301 includes a U-shaped seat 31, a jack 35, a limiting sleeve 36, a supporting bottom plate 37, an arc groove 38 and a second sphere 39;
[0038] The U-shaped seat 31 is located outside the connection between the tower body 23 and the correction positioning ring 24, the inner top wall of the U-shaped seat 31 is fitted to the lower surface of the connection part of the correction positioning ring 24, the jack 35 is installed inside the limiting sleeve 36, the limiting sleeve 36 is fixedly connected to the upper surface of the support base plate 37, the arc groove 38 is opened on the lower surface of the U-shaped seat 31, the second sphere 39 is fixedly connected to the top of the jack 35, the outer side wall of the second sphere 39 is fitted to the inner side wall of the arc groove 38, and the support base plate 37 is fitted to the upper surface of the wind turbine foundation 25. By aligning the top of the jack 35 with the arc groove 38, and then driving the top of the jack 35 to lift the connection part of the correction positioning ring 24 upward, the connection part of the correction positioning ring 24 drives the tower body 23, and then the correction action of the tower body 23 can be realized.
[0039] In this embodiment, specifically: the deviation correction component 301 also includes a limit screw 32, two guide rods 33 and a limit plate 34;
[0040] The limiting screw rod 32 is threadedly connected to the inside of the U-shaped seat 31, and the two guide rods 33 are symmetrically slidably connected to the inside of the U-shaped seat 31. The lower surface of the limiting plate 34 is attached to the upper surface of the connecting portion of the tower body 23. The bottom end of the limiting screw rod 32 is rotatably connected to the upper surface of the limiting plate 34. The bottom ends of the two guide rods 33 are symmetrically fixedly connected to the upper surface of the limiting plate 34. The outer side wall of the limiting sleeve 36 is symmetrically fixedly connected to two second reinforcing ribs 40, and the second reinforcing ribs 40 are fixedly connected to the supporting bottom plate 37.
[0041] By sleeved the U-shaped seat 31 on the connection between the tower body 23 and the deviation correction positioning ring 24, and then rotating the limit screw 32, the limit screw 32 pushes the limit plate 34 to move downward, and the limit plate 34 clamps the connection between the tower body 23. The position of the U-shaped seat 31 is fixed. When lifting and correcting the deviation, the second sphere 39 contacts the U-shaped seat 31 through the arc groove 38, thereby increasing the contact area with the connection between the deviation correction positioning ring 24 and avoiding deformation of the connection between the deviation correction positioning ring 24.
[0042] Working principle or structural principle, when in use, use steel structure glue to bond the tower support steel plate 11 to the outer wall of the tower body 23, level the surface of the wind turbine foundation 25, and then use prestressed anchor bolts 18 to fix the column support steel plate 19 to the surface of the wind turbine foundation 25, so that the position of the support seat 20 corresponds to the position of the threaded rod 16, and then the U-shaped seat 31 is sleeved on the connection between the tower body 23 and the deviation correction positioning ring 24, and the limit screw 32 is rotated. The limit screw 32 pushes the limit plate 34 to move downward, and the limit plate 34 clamps the connection part of the tower body 23, and the position of the U-shaped seat 31 is fixed. The support base plate 37 is pushed close to the inner wall of the deviation correction positioning ring 24, so that the top of the jack 35 is aligned with the arc groove 38, and then the top of the jack 35 is driven to lift the connecting part of the deviation correction positioning ring 24 upward. At this time, the deviation correction positioning ring 24 is corrected under the action of external force. After the deviation correction is completed, the driving head 13 is driven by the force rod 12, and the driving head 13 drives the threaded rod 16 to rotate. The threaded rod 16 drives the first sphere 17 to enter the spherical groove 22. The threaded rod 16 contacts the support seat 20 through the first sphere 17, so that the deviation correction position can be fixed. After grouting construction, the deviation correction can be completed.
[0043] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A wind farm wind tower correction and reinforcement device, characterized in that: The invention comprises a reinforcement assembly (101), wherein the reinforcement assembly (101) comprises a tower support steel plate (11), a first reinforcing rib (14), a guide sleeve (15), a threaded rod (16), a first sphere (17), four prestressed anchor bolts (18), a column support steel plate (19), a support seat (20), a transverse plate (21), a spherical groove (22), a tower body (23), a deviation correction and positioning ring (24), and a wind turbine foundation (25); The bottom end of the tower body (23) is fixedly connected to the top end of the deviation correction positioning ring (24) by bolts. The deviation correction positioning ring (24) is located inside the wind turbine foundation (25) and is connected by anchor bolts. The column support steel plate (19) is fixedly connected to the upper surface of the wind turbine foundation (25) by four prestressed anchor bolts (18). The support seat (20) is fixedly connected to the upper surface of the column support steel plate (19). The spherical groove (22) is opened on the upper surface of the support seat (20). The first sphere (17) is fixedly connected to the bottom end of the threaded rod (16). The guide sleeve (15) is fixedly connected to the inside of the cross plate (21). The cross plate (21) is fixedly connected to the outer wall of the tower support steel plate (11). The first reinforcing rib (14) is fixedly connected to the outer wall of the cross plate (21) and the outer wall of the tower support steel plate (11).
2. A wind farm wind tower correction and reinforcement device according to claim 1, characterized in that: The tower support steel plate (11) is fixedly connected to the bottom of the outer wall of the tower body (23), and the threaded rod (16) is threadedly connected to the inner wall of the guide sleeve (15), and the position of the guide sleeve (15) corresponds to the position of the support seat (20).
3. A wind farm wind tower correction and reinforcement device according to claim 2, characterized in that: The outer wall of the first sphere (17) is fitted to the inner wall of the spherical groove (22), and the inner diameter of the spherical groove (22) is greater than the outer diameter of the first sphere (17).
4. A wind farm wind tower correction and reinforcement device according to claim 3, characterized in that: The bottom of the tower body (23) and the top of the deviation correction positioning ring (24) are both provided with flange connection parts, the tower body (23) is fixedly connected to the deviation correction positioning ring (24) via the flange connection parts, and the column support steel plate (19) is located outside the deviation correction positioning ring (24).
5. A wind farm wind tower correction and reinforcement device according to claim 4, characterized in that: The top end of the threaded rod (16) is fixedly connected to a driving head (13), and the interior of the driving head (13) is slidably connected to a force-adding rod (12).
6. A wind farm wind tower correction and reinforcement device according to claim 5, characterized in that: A deviation correction component (301) is arranged inside the tower body (23), and the deviation correction component (301) comprises a U-shaped seat (31), a jack (35), a limiting sleeve (36), a supporting bottom plate (37), an arc groove (38) and a second sphere (39); The U-shaped seat (31) is located outside the connection between the tower body (23) and the deviation correction positioning ring (24); the inner top wall of the U-shaped seat (31) is in contact with the lower surface of the connection of the deviation correction positioning ring (24); the jack (35) is installed inside the limiting sleeve (36); the limiting sleeve (36) is fixedly connected to the upper surface of the supporting base plate (37); the arc groove (38) is provided on the lower surface of the U-shaped seat (31); and the second sphere (39) is fixedly connected to the top of the jack (35).
7. A wind farm wind tower correction and reinforcement device according to claim 6, characterized in that: The outer wall of the second sphere (39) is in contact with the inner wall of the arc-shaped groove (38), and the supporting base plate (37) is in contact with the upper surface of the fan foundation (25).
8. A wind farm wind tower correction and reinforcement device according to claim 7, characterized in that: The deviation-correcting assembly (301) further comprises a limiting screw rod (32), two guide rods (33) and a limiting plate (34); The limiting screw rod (32) is threadedly connected to the inside of the U-shaped seat (31), the two guide rods (33) are symmetrically slidably connected to the inside of the U-shaped seat (31), and the lower surface of the limiting plate (34) is in contact with the upper surface of the connecting portion of the tower body (23).
9. A wind farm wind tower correction and reinforcement device according to claim 8, characterized in that: The bottom end of the limiting screw rod (32) is rotatably connected to the upper surface of the limiting plate (34), and the bottom ends of the two guide rods (33) are symmetrically fixedly connected to the upper surface of the limiting plate (34).
10. A wind farm wind tower correction and reinforcement device according to claim 9, characterized in that: Two second reinforcing ribs (40) are symmetrically and fixedly connected to the outer side wall of the limiting sleeve (36), and the second reinforcing ribs (40) are fixedly connected to the supporting bottom plate (37).
Citation Information
Cited By
Tower drum base anchor plate structure of wind driven generator
CN120027021A