Gas-based shaft furnace process carbon dioxide capture and finished product storage system coupling method
By combining the high-purity CO2 generated by the carbon dioxide capture system with nitrogen, it serves as the passivation medium of the storage system, and adopts sealing design and automatic control logic, the problems of high nitrogen consumption and instability of iron oxide storage are solved, and carbon dioxide resources are realized effective utilization and stable passivation of iron oxide.
Patent Information
- Application Number
- CN202411187115.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-12
AI Technical Summary
In the existing gas-based vertical furnace process, the regenerated gas generated by the carbon dioxide capture system cannot be effectively utilized, resulting in unstable consumption of large amounts of nitrogen and iron oxide storage, posing safety hazards, and causing waste of carbon dioxide resources.
By combining the regenerated gas (CO2 volume ratio > 95%) generated by the carbon dioxide capture system with nitrogen, it is used to ensure uniform gas injection and stable pressure by using sealing design and automatic control logic, and mechanical defogging is set up as a passivation medium for storage systems. The device removes water mist from the gas, reduces nitrogen consumption and improves oxygen content control.
It realizes the effective utilization of carbon dioxide resources, reduces nitrogen consumption, ensures stable passivation and storage of iron oxide, and reduces media costs and safety risks.
Smart Images

Figure CN118936111A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of gas-based vertical furnace process finished product storage design and application technology, and more specifically discloses a method for coupling a gas-based vertical furnace process carbon dioxide capture and finished product storage system. Background Art
[0002] The gas-based vertical furnace process mainly uses high-temperature, high-pressure reducing gas to countercurrently contact pellets or lump ore inside the vertical furnace to produce gas-solid reaction to preheat, reduce and carburize the pellets or lump ore, and then cool it to produce cold direct reduced iron (CDRI). CDRI is transported to the product storage system through the transfer system for storage.
[0003] When pellets or lump ore are reduced to CDRI, they also form a porous and loose structure with a high specific surface area. After contact with air, CDRI is very likely to undergo a slow oxidation reaction to generate heat and spontaneous combustion, which affects product quality and poses a safety hazard.
[0004] In order to eliminate potential safety hazards, CDRI uses nitrogen to replace air after entering the storage system to control the oxygen content in the finished product warehouse for passivation. During passivation, the controlled oxygen content contacts the surface of CDRI and undergoes a slow oxidation reaction to form a thin layer of iron oxide to isolate further reaction of oxygen, thereby ensuring the safety of CDRI storage. After the passivation is qualified, it is sent to downstream users for use. A large amount of nitrogen is consumed during the passivation process. The existing storage system layout is attached. Figure 1 .
[0005] The existing storage system control logic is only associated with the system pressure, and the high / low pressure interlocks the closing / opening of the gas injection valve. Because the system is not designed to be sealed, the system pressure remains low, resulting in continuous consumption of nitrogen, and the gas injection valve is not interlocked with the oxygen content, so the controllable oxygen content cannot be guaranteed, and the CDRI passivation effect is unstable.
[0006] The reducing gas reduces the pellets to produce 5-15% (volume ratio) CO 2 , CO 2 The carbon dioxide is removed from the process gas through the carbon dioxide capture system to form decarbonized regeneration gas, which contains CO 2 (>95%V) and a small amount of nitrogen, water and other impurity gases. Limited by the small amount of impurity gases, the direct use of regenerated gas is limited and the utilization rate is low. A large amount of direct emissions causes a waste of carbon resources. The emissions of the existing carbon dioxide capture system are shown in the attached Figure 2 . Summary of the invention
[0007] The present invention provides a method for coupling carbon dioxide capture in a gas-based vertical furnace process with a finished product storage system, which can solve the problems raised in the above-mentioned background technology.
[0008] To solve the above technical problems, according to one aspect of the present invention, more specifically, a method for coupling a gas-based vertical furnace process carbon dioxide capture and a finished product storage system comprises the following steps:
[0009] S1. Using N 2 With CO 2 Gas-stable medium properties, the regeneration gas (CO 2 Volume ratio>95%) for processing, and then enter the storage system for product passivation;
[0010] S2. The typical storage system is a silo with a sealed design. There is a material loading and unloading valve on the top and bottom of the silo. When the valve is closed, it isolates the external atmosphere and maintains a slight positive pressure in the storage system. A set of gas injection pipes are set on the top and bottom of the cylinder. To ensure uniform gas injection without dead zones, the injection ports are evenly distributed around the circumference of the cylinder. The gas injection point is designed to prevent material accumulation. A pressure regulating valve and a safety valve are set on the top of the silo. The regulating valve adjusts the pressure according to the set pressure. When the system is over-pressurized, the safety valve releases the gas into the dust removal system for dust removal and release.
[0011] S3. Dust removal points are set outside the silo loading and unloading valves for dust removal; the coupling layout of the carbon dioxide capture system and the finished product storage system is shown in the attached Figure 4 ;
[0012] S4. The original nitrogen pipeline of the storage system and the chimney of the carbon dioxide capture system are retained to avoid the mutual influence between the carbon dioxide capture system and the storage system during shutdown or maintenance. The gas pipeline is shut off and switched by gate valves;
[0013] S5. A set of gas injection valves (attached) is installed on the gas injection pipe system of the storage system. Figure 3 ); It is mainly composed of a flow regulating valve, a flow limiting orifice, a cut-off valve and a check valve, which can meet the needs of large flow purging during loading and unloading and small flow replacement during seal passivation:
[0014] S6. The shut-off valve is kept open. When the storage system is loading or unloading, the flow control valve adjusts the regeneration gas flow rate for large-flow purge. When the storage system meets the seal passivation conditions, the flow control valve is closed, and the flow limiting orifice provides a small flow of gas for replacement. The flow limiting orifice is selected according to the replacement flow rate.
[0015] S7. To realize the automatic operation of the storage system, a set of automatic control logic is set up. See the attached interlocking Figure 5 .
[0016] Furthermore, in the step S1, a mechanical demister is provided to demister the regeneration gas generated by the carbon dioxide capture system, thereby eliminating small liquid droplets carried in the gas and preventing the regeneration gas from carrying liquid water and coming into contact with CDRI to cause an uncontrollable violent oxidation reaction.
[0017] Furthermore, in step S2, the loading and unloading valves are selected to be one-way sealing valves facing outward from the system.
[0018] Furthermore, in step S7, the automatic control logic steps are as follows:
[0019] When the storage system receives external loading / unloading signals, the loading / unloading valve opens, and at the same time, the upper and lower gas injection flow regulating valves of the storage system automatically open for large-flow purge. When the loading / unloading is completed, the loading / unloading valve closes, and the upper and lower gas injection flow regulating valves close;
[0020] When the passivation is qualified, the discharge valve is allowed to operate, and the system pressure and oxygen content will also interlock the lower gas injection flow valve:
[0021] When the system pressure is lower than the low setting value or the oxygen content is higher than the high setting value, the lower gas injection flow valve opens; when the system pressure rises to the high setting value and the oxygen content is lower than the low setting value, the lower gas injection flow valve closes;
[0022] When the system pressure is high and the oxygen content is low, the interlocking upper and lower gas injection valve groups shut off the valves to stop the passivation replacement.
[0023] The beneficial effects of the coupling method of the gas-based vertical furnace process carbon dioxide capture and finished product storage system of the present invention are:
[0024] In the present invention, the regeneration gas of the carbon dioxide capture system directly discharged is recovered to replace the nitrogen used for passivation of the storage system product. Under the premise of not affecting the passivation effect, the nitrogen used for passivation is no longer used, reducing the nitrogen consumption by 7.79 million m3 per year. 3 / year, reducing media costs by 3.21 million yuan / year.
[0025] In the present invention, the sealed, automatically controlled storage system provides pressure stability, O 2 The passivation environment with stable ingredients ensures the passivation effect of the product. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The present invention is further described in detail below with reference to the accompanying drawings and specific implementation methods.
[0027] Figure 1 Provide process layout diagram for storage system of existing products;
[0028] Figure 2 Emission process layout diagram for existing CO2 capture system;
[0029] Figure 3 The process layout diagram of the valve group for gas injection piping in the storage system;
[0030] Figure 4 Layout diagram for coupling the CO2 capture system with the finished product storage system;
[0031] Figure 5 This is a logic diagram for automatic control of a storage system based on the passivation effect. DETAILED DESCRIPTION
[0032] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.
[0033] According to the attached Figure 1-5 , provides a method for coupling carbon dioxide capture in a gas-based shaft furnace process with a finished product storage system, characterized in that it includes the following steps:
[0034] S1. Using N 2 With CO 2 Gas-stable medium properties, the regeneration gas (CO 2 Volume ratio>95%) for processing, and then enter the storage system for product passivation;
[0035] S2. The typical storage system is a silo with a sealed design. There is a material loading and unloading valve on the top and bottom of the silo. The loading and unloading valves are one-way sealing valves from the system to the outside. When the valve is closed, it isolates the external atmosphere and maintains a slight positive pressure in the storage system. A set of gas injection pipes are set on the top and bottom of the cylinder. To ensure uniform gas injection without dead zones, the injection ports are evenly distributed around the circumference of the cylinder. The gas injection point is designed to prevent material accumulation. A pressure regulating valve and a safety valve are set on the top of the silo. The regulating valve adjusts the pressure according to the set pressure. When the system is over-pressurized, the safety valve releases the pressure to the dust removal system for dust removal and release.
[0036] S3. Dust removal points are set outside the silo loading and unloading valves for dust removal; the coupling layout of the carbon dioxide capture system and the finished product storage system is shown in the attached Figure 4 ;
[0037] S4. The original nitrogen pipeline of the storage system and the chimney of the carbon dioxide capture system are retained to avoid the mutual influence between the carbon dioxide capture system and the storage system during shutdown or maintenance. The gas pipeline is shut off and switched by gate valves;
[0038] S5. A set of gas injection valves (attached) is installed on the gas injection pipe system of the storage system. Figure 3); It is mainly composed of a flow regulating valve, a flow limiting orifice, a cut-off valve and a check valve, which can meet the needs of large flow purging during loading and unloading and small flow replacement during seal passivation:
[0039] S6. The shut-off valve is kept open. When the storage system is loading or unloading, the flow control valve adjusts the regeneration gas flow rate for large-flow purge. When the storage system meets the seal passivation conditions, the flow control valve is closed, and the flow limiting orifice provides a small flow of gas for replacement. The flow limiting orifice is selected according to the replacement flow rate.
[0040] S7. To realize the automatic operation of the storage system, a set of automatic control logic is set up. See the attached interlocking Figure 5 When the storage system receives an external loading / unloading signal, the loading / unloading valve opens, and at the same time, the upper and lower gas injection flow regulating valves of the storage system automatically open for large-flow purge. When the loading / unloading is completed, the loading / unloading valve closes, and the upper and lower gas injection flow regulating valves close;
[0041] When the passivation is qualified, the discharge valve is allowed to operate, and the system pressure and oxygen content will also interlock the lower gas injection flow valve:
[0042] When the system pressure is lower than the low setting value or the oxygen content is higher than the high setting value, the lower gas injection flow valve opens; when the system pressure rises to the high setting value and the oxygen content is lower than the low setting value, the lower gas injection flow valve closes;
[0043] When the system pressure is high and the oxygen content is low, the interlocking upper and lower gas injection valve groups shut off the valves to stop the passivation replacement.
[0044] In this embodiment, a new storage system process configuration and automatic control logic are configured to create a stable atmospheric pressure, oxygen-controlled passivation environment for CDRI passivation; the regeneration gas generated by the carbon dioxide system is dried to remove water mist in the gas. This method optimizes the nitrogen piping system of the storage system to adapt to the different flow requirements of the passivation gas when the storage system is sealed and the loading and unloading conditions change. In addition, this method optimizes the sealing of the existing storage system to isolate the possible air inhalation of the storage system and reduce the consumption of passivation gas.
[0045] In this embodiment, the processing method in step S1 is to set up a mechanical demister to demist the regeneration gas generated by the carbon dioxide capture system, eliminate small liquid droplets carried in the gas, and prevent the regeneration gas from carrying liquid water and contacting CDRI to cause uncontrollable violent oxidation reaction.
[0046] The working principle of this device is:
[0047] This method combines the medium characteristics of the carbon dioxide system and the storage system: the carbon dioxide in the passivated nitrogen and the regenerated gas has high stability and does not react with CDRI. An innovative method for coupling the carbon dioxide capture and storage system is proposed, which uses the regenerated gas to replace the nitrogen used for passivation to reduce the nitrogen consumption of the product passivation and turn the regenerated gas into treasure.
[0048] The electrical components that appear in this article are all electrical components that exist in reality.
[0049] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present invention also fall within the protection scope of the present invention.
Claims
1. A method for coupling carbon dioxide capture and finished product storage system in a gas-based shaft furnace process, characterized in that: The following steps are involved: S1. Using the stable medium properties of N2 and CO2 gases, the regeneration gas generated by the carbon dioxide capture system is processed and then enters the storage system for product passivation; S2. The typical storage system is a silo with a sealed design. There is a material loading and unloading valve on the top and bottom of the silo. When the valve is closed, it isolates the external atmosphere and maintains a slight positive pressure in the storage system. A set of gas injection pipes are set on the top and bottom of the cylinder. To ensure uniform gas injection without dead zones, the injection ports are evenly distributed around the circumference of the cylinder. The gas injection point is designed to prevent material accumulation. A pressure regulating valve and a safety valve are set on the top of the silo. The regulating valve adjusts the pressure according to the set pressure. When the system is over-pressurized, the safety valve releases the gas into the dust removal system for dust removal and release. S3. Dust removal points are set outside the silo loading and unloading valves to remove dust; S4. The original nitrogen pipeline of the storage system and the chimney of the carbon dioxide capture system are retained, and the gas pipeline is cut off and switched by gate valves; S5. A set of gas injection valve group is installed on the gas injection pipe system of the storage system, which is mainly composed of flow regulating valve, flow limiting orifice plate, cut-off valve and check valve, which can meet the large flow purge during loading and unloading and small flow replacement during seal passivation: S6. The shut-off valve is kept open. When the storage system is loading or unloading, the flow control valve adjusts the regeneration gas flow rate for large-flow purge. When the storage system meets the seal passivation conditions, the flow control valve is closed, and the flow limiting orifice provides a small flow of gas for replacement. The flow limiting orifice is selected according to the replacement flow rate. S7. Set up a set of automatic control logic.
2. The method for coupling a gas-based vertical furnace process carbon dioxide capture and a finished product storage system according to claim 1, characterized in that: In step S1, a mechanical demister is provided to demister the regeneration gas generated by the carbon dioxide capture system and eliminate small liquid droplets carried in the gas.
3. The method for coupling a gas-based vertical furnace process carbon dioxide capture and a finished product storage system according to claim 1, characterized in that: In step S2, the loading and unloading valves are one-way sealing valves facing outward from the system.
4. The method for coupling a gas-based vertical furnace process carbon dioxide capture and a finished product storage system according to claim 1, characterized in that: In step S7, the automatic control logic steps are as follows: When the storage system receives external loading / unloading signals, the loading / unloading valve opens, and at the same time, the upper and lower gas injection flow regulating valves of the storage system automatically open for large-flow purge. When the loading / unloading is completed, the loading / unloading valve closes, and the upper and lower gas injection flow regulating valves close; When the passivation is qualified, the discharge valve is allowed to operate, and the system pressure and oxygen content will also interlock the lower gas injection flow valve: When the system pressure is lower than the low setting value or the oxygen content is higher than the high setting value, the lower gas injection flow valve opens; when the system pressure rises to the high setting value and the oxygen content is lower than the low setting value, the lower gas injection flow valve closes; When the system pressure is high and the oxygen content is low, the interlocking upper and lower gas injection valve groups shut off the valves to stop the passivation replacement.