Constructional engineering investigation informatization integrated supervision equipment and use method thereof
By using dual survey ropes and grating monitors in integrated supervision equipment for information-based supervision of construction engineering surveys, the problem of vulnerability to traditional pull-rope displacement monitoring is solved, and high-precision and efficient displacement monitoring is achieved to ensure data authenticity and equipment Safety.
Patent Information
- Application Number
- CN202411052858.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional pull-rope displacement monitoring methods are susceptible to human interference and tampering, resulting in inaccurate monitoring data and lack of a fast and effective identification mechanism, which affects the accuracy and efficiency of displacement monitoring.
A comprehensive supervision equipment for information-based surveys of construction engineering was designed. Through the combination of double survey ropes and survey platforms, the anti-interference axis and grating monitoring parts are used to monitor and verify the authenticity of displacement data in real time to ensure the accuracy and credibility of data. .
It improves the accuracy and efficiency of displacement monitoring, enhances the reliability and credibility of data, can quickly identify human interference behavior, ensures the authenticity and credibility of the monitoring data, and ensures the safe and stable operation of the drilling equipment.
Smart Images

Figure CN118936269A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction engineering investigation, and in particular to a construction engineering investigation information integrated monitoring device and a use method thereof. Background Art
[0002] Construction engineering survey refers to the activities of identifying, analyzing, and evaluating the geological, geographical environmental characteristics and geotechnical conditions of the construction site according to the requirements of the construction project, and compiling construction engineering survey documents to facilitate engineering construction based on the address environment. In the fields of geological survey, construction monitoring, bridge maintenance, etc., displacement monitoring is a key link to ensure the safety and stability of the structure.
[0003] Accurate displacement monitoring data is the basis for assessing the safety of building structures. By collecting and analyzing data through information technology, it is possible to promptly detect small deformations or movements of structures and predict potential safety risks, so as to take reinforcement or repair measures in advance to prevent structural failure or collapse and ensure the safety of construction projects. This data can be fed back into the building design and construction process to help engineers and construction personnel understand the actual response and performance of the structure and further optimize the design and construction plans. This helps reduce design defects and construction errors and improve the quality and efficiency of construction projects.
[0004] The informatization of construction engineering survey improves the accuracy of displacement monitoring data, which is of great significance in ensuring structural safety, optimizing design and construction, improving maintenance management level, reducing costs and risks, and promoting technological progress in the industry.
[0005] A Chinese patent with publication number CN110159250B discloses an information-based integrated supervision device for geotechnical engineering survey, including a data box, a drilling rig, a drilling inductive sensor, a drilling hydraulic sensor, a drilling rope sensor, a drilling bracket and a drilling GPS element. The data box has a collector and a communication element. The drilling inductive sensor, the drilling GPS element, the drilling hydraulic sensor and the drilling rope sensor transmit the monitored data to the collector, and the collector sends the collected data to a background supervision center through the communication element; the drilling inductive sensor cooperates with the welding needle to monitor the rotation speed of the drilling rig, the drilling rope sensor monitors the drilling depth of the drilling rig, the drilling GPS element locates the drilling hole position, and the drilling hydraulic sensor monitors the working status of the drilling rig, thereby realizing information-based integrated supervision and fully automated supervision of geotechnical engineering survey.
[0006] However, this traditional rope-type displacement monitoring method has obvious limitations. This method relies on the change in the length of the rope to reflect the displacement, but this method is susceptible to human interference and tampering, because the operator can easily interfere with or falsify the rope, resulting in inaccurate monitoring data. In addition, the lack of a fast and effective recognition mechanism for the interference behavior of the rope by traditional monitoring equipment makes it difficult to verify the authenticity of the data, which in turn affects the accuracy and efficiency of displacement monitoring. Summary of the invention
[0007] The purpose of the present invention is to provide an information-based integrated supervision device for construction engineering surveys, which overcomes the obvious limitations of the information-based integrated supervision device for construction engineering surveys in the prior art. The length change of the pull rope is easily subject to human interference and tampering, resulting in inaccurate monitoring data. At the same time, the monitoring equipment also lacks rapid and effective identification of pull rope interference behavior, making it difficult to verify the authenticity of the data, thereby affecting the accuracy and efficiency of displacement monitoring.
[0008] In order to achieve the above object, the technical solution adopted by the present invention to solve the technical problem is: An information-based integrated monitoring device for construction engineering survey is designed. By fixing the movement position of the survey platform to the drill bit of the drilling equipment and monitoring the displacement of the survey platform after the hydraulic system moves, it can accurately reflect the actual movement of the drilling equipment, which helps to timely discover the failure or abnormality of the drilling equipment and ensure the safe and stable operation of the drilling equipment. The specific plan is as follows: A construction engineering survey information integrated monitoring device comprises a housing, and side panels arranged on the left and right sides of the housing, a displacement linkage component is arranged between the side panels on both sides, and a displacement display panel located on the outer side of the side panels is connected to the displacement linkage component; The displacement linkage assembly is connected with a survey rope 1 and a survey rope 2 for surveying the depth of the drilling hole, and the free ends of the survey rope 1 and the survey rope 2 penetrate the shell and are connected with a survey platform, and the survey platform is located below the shell; An anti-interference shaft is provided on the front side of the displacement linkage assembly, and the first survey rope and the second survey rope are wound around the anti-interference shaft.
[0009] Preferably, the displacement linkage assembly comprises a central shaft, a large gear, a rope roller, a bearing, a linkage shaft and a small gear, and the central shaft is rotatably connected to the middle of the side plates on both sides through the bearing; The large gear is arranged in the middle of the central axis, the rope rollers are arranged on both sides of the large gear, and the fixed ends of the survey rope 1 and the survey rope 2 are respectively wound on the rope rollers on both sides; The linkage shaft is rotatably connected between the side plates at both sides and is located at the lower side of the central shaft. The pinion gear is arranged on the linkage shaft and meshes with the large gear. The displacement display plate is arranged at the outer end of the linkage shaft.
[0010] Preferably, a displacement pointer is connected to the end of the linkage shaft, the displacement pointer is located outside the displacement display disk, and the displacement pointer connecting end is located at the center of the displacement display disk, and the free end of the displacement pointer faces the outside of the edge of the displacement display disk.
[0011] Preferably, the displacement display disk is provided with a sensor counter for recording the number of rotations of the displacement pointer.
[0012] Preferably, the middle part of the anti-interference shaft is rotatably connected with symmetrical rollers 1 and 2, and the free ends of the survey rope 1 and the survey rope 2 pass through the rollers 1 and 2 respectively; Grating monitoring components for monitoring displacement are respectively provided on the outer sides of the first roller and the second roller, and the grating monitoring components rotate synchronously with the first roller and the second roller.
[0013] Preferably, the two ends of the survey platform are respectively connected to the free ends of the survey rope 1 and the survey rope 2, and the middle part of the survey platform is connected to the drill bit of the drilling equipment through a connecting shaft; The four corners of the survey platform are also provided with GPS positioning components for monitoring its vertical state.
[0014] A method for using a construction engineering survey information integrated supervision device comprises the following steps: S1. The survey platform is installed in a vertical state at the drill bit of the drilling equipment through a connecting shaft, and the survey platform is driven into the borehole by the drill bit during the survey and drilling process of the construction project; S2. Use the survey platform to drive the survey rope 1 and the survey rope 2 to unfold from the wound rope rollers through the rollers 1 and 2 on the anti-interference shaft, and monitor the vertical state of the survey platform in real time through the GPS positioning component; S3. The displacement lengths of the two sets of survey ropes are recorded and displayed by the number of rotations of the displacement pointer on the displacement display disk. At the same time, the displacements of the two sets of survey ropes passing through the two sets of rollers are recorded according to the grating monitoring components on both sides of the equipment; S4, transmitting the displacement data information of the two groups of survey ropes recorded by the displacement display panel and the grating monitoring element to the background monitoring center respectively; S5. The background monitoring center identifies the transmitted displacement data information and determines the interference situation through the deviation of the displacement data information; S6. Filter and obtain real monitoring data.
[0015] Preferably, the displacement display disk and the grating monitoring element are both provided with communication elements, and the communication elements are used to transmit the collected data information to a background monitoring center.
[0016] The beneficial effects of the present invention are: 1. The design of the present invention not only solves the problems existing in traditional rope-type displacement monitoring, but also promotes the innovation of displacement monitoring technology and industry development. By accurately monitoring the displacement of two sets of survey ropes, the monitoring accuracy and efficiency are improved; at the same time, by enhancing the verification capability of data authenticity, the reliability and credibility of monitoring data are improved, which will have a positive impact on technological progress and industry development in the fields of geological exploration, building monitoring, bridge maintenance, etc.
[0017] 2. In the present invention, the double survey ropes are combined with the survey platform. Through the combined design of two sets of survey ropes and the survey platform, when the ropes are manually interfered with, the movement speeds of the two sets of survey ropes cannot be kept consistent, which will cause the speeds of the two rollers to be one fast and one slow, thereby causing a large deviation from the distance formed by the survey ropes on the displacement display disk. This mechanism can quickly identify and record human interference behavior, thereby enhancing the ability to verify the authenticity of the data.
[0018] 3. The grating monitoring element and displacement linkage assembly provided in the present invention can monitor the movement status of the two groups of survey ropes in real time, and verify the authenticity of the data by comparing the angular positioning of the two groups of survey ropes and the survey platform, which can effectively prevent human interference and fraud, and ensure the authenticity and credibility of the monitoring data.
[0019] 4. The present invention can accurately reflect the actual movement of the drilling equipment by fixing the moving position of the survey platform to the drill bit of the drilling equipment and monitoring the displacement of the survey platform after the hydraulic system moves. This helps to timely discover faults or abnormal conditions of the drilling equipment and ensure the safe and stable operation of the drilling equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the overall structure of a construction engineering survey information integrated supervision device of the present invention; Figure 2 It is a right view of a construction engineering survey information integrated supervision device of the present invention; Figure 3 It is a left view of a construction engineering survey information integrated supervision device of the present invention; Figure 4 This is a bottom view of a construction engineering survey information integrated monitoring device of the present invention; Figure 5 for Figure 4 Schematic diagram of the cross section at AA in the middle; Figure 6 This is a schematic diagram of the internal structure of a construction engineering survey information integrated supervision device of the present invention; Figure 7 It is a front view of the internal structure of a construction engineering survey information integrated monitoring device of the present invention; Figure 8 It is a schematic diagram of the installation of a displacement linkage component in a construction engineering survey information integrated monitoring device of the present invention; Fig. 9 A diagram showing the connection relationship between a displacement linkage component and a survey rope in a construction engineering survey information integrated monitoring device of the present invention; Fig.10 The present invention is a schematic structural diagram of an anti-interference axis in an information-based integrated monitoring device for construction engineering survey.
[0021] In the figure: 1-housing; 11-through slot; 2-side plate; 3-displacement linkage assembly; 31-center axis; 32-large gear; 33-rope roller; 34-bearing; 35-linkage shaft; 36-small gear; 4-displacement display panel; 41-displacement pointer; 42-sensor counter; 5-survey platform; 51-GPS positioning part; 52-connecting shaft; 6-anti-interference shaft; 61-roller one; 62-roller two; 63-grating monitoring part; 7-survey rope one; 8-survey rope two. DETAILED DESCRIPTION
[0022] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0023] In the following description, a large number of specific details are set forth in order to provide a thorough understanding of the present invention. However, it is apparent to one of ordinary skill in the art that these specific details are not necessarily employed to practice the present invention. In other embodiments, in order to avoid obscuring the present invention, well-known structures, circuits, materials, or methods are not specifically described.
[0024] Throughout the specification, references to "one embodiment," "an embodiment," "an example," or "an example" mean that a particular feature, structure, or characteristic described in conjunction with the embodiment or example is included in at least one embodiment of the present invention. Therefore, the phrases "one embodiment," "an embodiment," "an example," or "an example" appearing in various places throughout the specification do not necessarily all refer to the same embodiment or example. In addition, particular features, structures, or characteristics may be combined in one or more embodiments or examples in any suitable combination and / or sub-combination. In addition, it will be appreciated by those of ordinary skill in the art that the figures provided herein are for illustrative purposes and that the figures are not necessarily drawn to scale. The term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.
[0025] In the description of the present invention, the directions or positional relationships indicated by terms such as “front”, “rear”, “left”, “right”, “up”, “down”, “vertical”, “horizontal”, “high”, “low”, “inside” and “outside” are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they should not be understood as limiting the scope of protection of the present invention.
[0026] like Figure 1-10 As shown, the present invention provides an information-based integrated monitoring device for construction engineering survey, comprising a housing 1, and side panels 2 arranged on the left and right sides of the housing 1. The housing 1 and the side panels 2 on both sides constitute a protective housing of the device, which can effectively protect the internal components to prevent them from being damaged or interfered with by external factors. A displacement linkage component 3 is arranged between the side panels 2 on both sides. The displacement linkage component 3 is connected to a displacement display panel 4 located on the outside of the side panels 2. The displacement linkage component 3 is connected to a survey rope 1 7 and a survey rope 2 8 for surveying the depth of a drilling hole. The free ends of rope 1 7 and survey rope 2 8 pass through a through slot 11 provided on the shell 1 and are connected to a survey platform 5, which is located below the shell 1. The survey platform 5 is used to drive the displacement linkage assembly 3 to operate through survey rope 1 7 and survey rope 2 8, so that survey rope 1 7 and survey rope 2 8 are released from the shell 1. During the release process of survey rope 1 7 and survey rope 2 8, the displacement of survey rope 1 7 and survey rope 2 8 is recorded and collected on the displacement display panel 4, and the depth of the hole drilled by the drilling equipment is measured according to the displacement of survey rope 1 7 and survey rope 2 8.
[0027] An anti-interference shaft 6 is provided on the front side of the displacement linkage component 3, and the survey rope 1 7 and the survey rope 2 8 are passed around the anti-interference shaft 6. With the assistance of the anti-interference shaft 6 and the displacement display disk 6, it can effectively identify whether there is interference or falsification, ensure the authenticity of the monitoring data information, and realize the supervision capability and anti-interference identification capability of the integrated supervision of the construction engineering survey information.
[0028] In the above scheme, the displacement linkage assembly 3 includes a central shaft 31, a large gear 32, a rope roller 33, a bearing 34, a linkage shaft 35 and a pinion 36. The central shaft 31 is rotatably connected to the middle of the side plates 2 on both sides through the bearing 34. The large gear 32 is arranged in the middle of the central shaft 31 and can rotate with the rotation of the central shaft 31. The rope roller 33 is arranged on both sides of the large gear 32. The fixed ends of the survey rope 1 7 and the survey rope 2 8 are respectively wound on the rope rollers 33 on both sides. The traction of the survey rope 1 7 and the survey rope 2 8 is used to drive the rope roller 33 to rotate, thereby driving the rotation of the central shaft 31. The linkage shaft 35 is rotatably connected between the side plates 2 on both sides and is located on the lower side of the central shaft 31. The pinion 36 is arranged on the linkage shaft 35, and the pinion 36 is meshed with the large gear 32. The displacement display disk 4 is arranged at the outer end of the linkage shaft 35, and the linkage shaft 35 can be driven to rotate through the matching relationship between the pinion 36 and the large gear 32, thereby recording the displacement of the survey rope 1 7 and the survey rope 2 8 on the displacement display disk 4.
[0029] As an optimization technical solution of the present invention, the survey rope 1 7 and the survey rope 2 8 are wound on the rope roller 33, and are released in the process of being pulled and unfolded by the survey platform 5. Through the gradual release of the survey rope 1 7 and the survey rope 2 8, the displacement of the two groups of survey ropes can be recorded in real time on the displacement display disk 4, thereby obtaining the depth of the hole drilled by the drilling equipment.
[0030] In the above scheme, the end of the linkage shaft 35 is connected to a displacement pointer 41, which is located outside the displacement display disk 4, and the connection end of the displacement pointer 41 is located at the center of the displacement display disk 4, and the free end of the displacement pointer 41 faces the outside of the edge of the displacement display disk 4.
[0031] As an optimization technical solution of the present invention, the displacement pointer 41 is connected to the end of the linkage shaft 35, and can rotate therewith, and the number of rotations is recorded. Then, the actual displacement of the survey rope 1 7 and the survey rope 2 8 can be directly obtained by multiplying the recorded number of rotations by the circumference of the pinion 36.
[0032] In the above scheme, a sensor counter 42 for recording the number of rotations of the displacement pointer 41 is provided on the displacement display disk 4.
[0033] As an optimization technical solution of the present invention, the sensor counter 42 can accurately record the number of rotations of the displacement pointer 41, and the displacement of the two groups of survey ropes can be obtained by combining the circumference of the small gear 36 connected to the linkage shaft 35.
[0034] In the above scheme, the middle part of the anti-interference shaft 6 is rotatably connected with symmetrical roller one 61 and roller two 62, the free ends of the survey rope one 7 and survey rope two 8 pass through roller one 61 and roller two 62 respectively, and the outer sides of roller one 61 and roller two 62 are respectively provided with grating monitoring components 63 for monitoring displacement, and the grating monitoring components 63 rotate synchronously with roller one 61 and roller two 62.
[0035] As an optimization technical solution of the present invention, the anti-interference shaft 6 is used to identify human interference during the monitoring process and improve the accuracy of the monitoring information. Roller 1 61 and roller 2 62 are rotatably connected at both ends of the anti-interference shaft 6, and the survey rope 1 7 and survey rope 2 8 are respectively carried on roller 1 61 and roller 2 62. When the survey rope 1 7 and survey rope 2 8 are pulled, roller 1 61 and roller 2 62 can be driven to rotate respectively. Grating monitoring components 63 that rotate synchronously with roller 1 61 and roller 2 62 are respectively provided on the outer sides of roller 1 61 and roller 2 62. The number of rotations recorded by the grating monitoring component 63 and then multiplied by the circumference of roller 1 61 and roller 2 62 can obtain the actual displacement of survey rope 1 7 and survey rope 2 8 in real time.
[0036] Secondly, roller one 61 and roller two 62 on the anti-interference shaft 6 can monitor the movement status of the two groups of survey ropes in real time, and can judge the interference situation through the angle change of the survey platform 5 in the vertical direction. When the survey rope is interfered with manually, the movement speeds of survey rope one 7 and survey rope two 8 cannot be kept consistent, which will cause the speeds of roller one 61 and roller two 62 to be one fast and one slow, thereby causing a large deviation from the displacement measured by the survey rope of the displacement display disk 4. This mechanism can quickly identify and record human interference behavior, thereby enhancing the ability to verify the authenticity of the data.
[0037] The grating monitoring element 63 is used to detect the displacement of the survey rope 1 7 and the survey rope 2 8, and to measure the linear displacement of the survey rope 1 7 and the survey rope 2 8 by the angular displacement conversion method (wherein, when the measured value is linear displacement, an indirect measurement method can be used to measure the angular displacement and then convert it into linear displacement). For example, the odometer of a car obtains the mileage of the car by measuring the number of wheel revolutions and then multiplying it by the circumference.
[0038] In the above scheme, the two ends of the survey platform 5 are respectively connected to the free ends of the survey rope 1 7 and the survey rope 2 8, the middle part of the survey platform 5 is connected to the drill bit of the drilling equipment through the connecting shaft 52, and the four corners of the survey platform 5 are also provided with GPS positioning parts 51 for monitoring its vertical state.
[0039] As an optimization technical solution of the present invention, the survey platform 5 is installed on the drill bit part of the drilling equipment through the connecting shaft 52. When the survey platform 5 enters the borehole along with the drill bit part, it maintains a vertical and horizontal state. When one of the survey ropes is interfered with by humans, the survey platform 5 will rotate around the connecting shaft 52, causing the survey platform 5 to deflect in the vertical direction, and determine its position in real time through the GPS positioning component 51 and upload data information, identify abnormal data information in the background supervision center, so as to timely obtain the interference situation and supervise the monitoring process in real time, which can effectively avoid human interference or tampering during the monitoring process, and also avoid false information, obtain true and accurate data information, and ensure the safety of the construction project.
[0040] A method for using a construction engineering survey information integrated supervision device comprises the following steps: S1. Install the survey platform 5 in a vertical state at the drill bit of the drilling equipment through the connecting shaft 52. During the survey and drilling process of the construction project, the survey platform 5 is driven into the borehole by the drill bit, and the interference during the monitoring process is identified according to the vertical and horizontal states of the survey platform 5. S2, using the survey platform 5 to drive the survey rope 1 7 and the survey rope 2 8 to unfold from the wound rope roller 33 through the roller 1 61 and the roller 2 62 on the anti-interference shaft 6, and monitor the vertical state of the survey platform 5 in real time through the GPS positioning member 51; S3, recording and displaying the displacement length of the two groups of survey ropes by the number of rotations of the displacement pointer 41 on the displacement display disk 4, and at the same time, recording the displacement of the two groups of survey ropes passing through the two groups of rollers according to the grating monitoring components 63 on both sides of the equipment, wherein the displacement length and displacement are realized by first measuring the angular displacement and then converting it into a linear displacement; S4, transmitting the displacement data information of the two groups of survey ropes recorded by the displacement display plate 4 and the grating monitoring element 63 to the background monitoring center respectively; S5. The background monitoring center identifies the transmitted displacement data information and determines the interference situation through the deviation of the displacement data information; S6. Filter and obtain real monitoring data.
[0041] In the above scheme, the displacement display disk 4 and the grating monitoring element 63 are both provided with communication elements, and the communication elements are used to transmit the collected data information to the background monitoring center.
[0042] As an optimization technical solution of the present invention, during the monitoring process, the communication element can send the displacement data information monitored in real time by the displacement display disk 4 and the grating monitoring element 63 to the background supervision center, so as to monitor the operation status of the drill bit in real time, realize the accuracy of the information integrated supervision of the construction engineering survey, and effectively avoid the occurrence of human interference and fraud.
[0043] Specific implementation cases: Traditional rope-type displacement monitoring is prone to data falsification due to human interference or tampering during surveys, and the monitoring equipment cannot quickly identify it. For this reason, the survey platform 5 of the device can be installed on the drill bit of the drilling equipment through the connecting shaft 52, and enter the borehole in a vertical and horizontal state along with the drill bit.
[0044] As the survey platform 5 descends with the drill bit, the survey rope 1 7 and the survey rope 2 8 are pulled and released from the rope roller 33 of the displacement linkage assembly 3. In the process of the survey rope 1 7 and the survey rope 2 8 being released from the rope roller 33, the central shaft 31 is driven to rotate on the bearing 34 on the side plate 2, thereby driving the large gear 32 to rotate, and then utilizing the matching relationship between the large gear 32 and the small gear 36 to drive the small gear 36 to rotate, and the small gear 36 drives the linkage shaft 35 to rotate, thereby driving the displacement pointer 41 set at the end of the linkage shaft 35 to rotate on the displacement display disk 4, and the number of rotations of the displacement pointer 41 is recorded by the sensor counter 42. The displacement amount of the survey rope 1 7 and the survey rope 2 8 released can be obtained by multiplying the number of rotations by the circumference of the small gear 36, and then the depth of the borehole can be obtained.
[0045] In order to prevent human interference or fraud, the device is equipped with two sets of survey ropes and matching anti-interference shafts 6. The two sets of survey ropes are respectively connected to the two sides of the survey platform 5. As the drill bit part descends in the borehole, the survey platform 5 remains vertical and horizontal. The GPS positioning parts 51 set at the four corners of the survey platform 5 are used for real-time monitoring. The monitored data information is uploaded to the background supervision center in real time and synchronously, and the interference is timely identified according to the abnormal data information.
[0046] At the same time, the survey rope 1 7 and the survey rope 2 8 will drive the roller 1 61 and the roller 2 62 connected at both ends of the anti-interference shaft 6 to rotate at different speeds respectively. Then, the grating monitoring device 63 is provided on the outside of the roller 1 61 and the roller 2 62 to record and upload the number of rotations in the same time in real time. The displacement of the survey rope 1 7 and the survey rope 2 8 is calculated by multiplying the number of rotations by the circumference of the roller. According to the deviation of the calculation results, human interference or falsification in the survey process can be identified.
[0047] Finally, when the two sets of survey ropes are kept vertically in a horizontal state, the displacement of the survey ropes effectively descending on the survey platform 5 is used as the accurate depth of the borehole to eliminate the possibility of human interference or falsification, improve the accuracy of monitoring displacement data information, and also enhance the ability to verify the authenticity of the data, providing strong guarantee for the safety, efficiency and sustainable development of construction projects.
[0048] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A construction engineering survey information integrated monitoring device, comprising a housing (1), and side panels (2) arranged on the left and right sides of the housing (1), Features: A displacement linkage assembly (3) is provided between the side panels (2) at both sides, and the displacement linkage assembly (3) is connected to a displacement display panel (4) located outside the side panels (2); The displacement linkage assembly (3) is connected to a survey rope 1 (7) and a survey rope 2 (8) for surveying the depth of a borehole, and the free ends of the survey rope 1 (7) and the survey rope 2 (8) pass through the housing (1) and are connected to a survey platform (5), and the survey platform (5) is located below the housing (1); An anti-interference shaft (6) is provided on the front side of the displacement linkage assembly (3), and the first survey rope (7) and the second survey rope (8) are passed around the anti-interference shaft (6).
2. A construction engineering survey information integrated monitoring device according to claim 1, Features: The displacement linkage assembly (3) comprises a central shaft (31), a large gear (32), a rope roller (33), a bearing (34), a linkage shaft (35) and a small gear (36); the central shaft (31) is rotatably connected to the middle of the side plates (2) on both sides via the bearing (34); The large gear (32) is arranged in the middle of the central shaft (31), the rope rollers (33) are arranged on both sides of the large gear (32), and the fixed ends of the survey rope 1 (7) and the survey rope 2 (8) are respectively wound around the rope rollers (33) on both sides; The linkage shaft (35) is rotatably connected between the side plates (2) at both sides and is located below the central shaft (31); the pinion gear (36) is arranged on the linkage shaft (35); and the pinion gear (36) is meshed with the large gear (32); The displacement display disk (4) is arranged at the outer end of the linkage shaft (35).
3. A construction engineering survey information integrated monitoring device according to claim 2, Features: The end of the linkage shaft (35) is connected to a displacement pointer (41), the displacement pointer (41) is located outside the displacement display disk (4), and the connection end of the displacement pointer (41) is located at the center of the displacement display disk (4), and the free end of the displacement pointer (41) faces the outside of the edge of the displacement display disk (4).
4. The construction engineering survey information integrated monitoring device according to claim 3, Features: The displacement display disk (4) is provided with a sensor counter (42) for recording the number of rotations of the displacement pointer (41).
5. The construction engineering survey information integrated monitoring equipment according to claim 1, Features: The middle part of the anti-interference shaft (6) is rotatably connected to a symmetrical roller 1 (61) and a roller 2 (62), and the free ends of the survey rope 1 (7) and the survey rope 2 (8) pass through the roller 1 (61) and the roller 2 (62) respectively; Grating monitoring components (63) for monitoring displacement are respectively provided on the outer sides of the roller one (61) and the roller two (62); the grating monitoring components (63) rotate synchronously with the roller one (61) and the roller two (62).
6. The construction engineering survey information integrated monitoring equipment according to claim 1, Features: The two ends of the survey platform (5) are respectively connected to the free ends of the survey rope 1 (7) and the survey rope 2 (8), and the middle part of the survey platform (5) is connected to the drill bit of the drilling equipment through a connecting shaft (52); The survey platform (5) is also provided with GPS positioning components (51) at the four corners for monitoring its vertical state.
7. A method for using an information-based integrated monitoring device for construction engineering survey, It is characterized in that The following steps are involved: S1. The survey platform (5) is installed in a vertical state on the drill bit of the drilling equipment through the connecting shaft (52), and the survey platform (5) is driven into the drill hole by the drill bit during the survey and drilling process of the construction project; S2, using the survey platform (5) to drive the survey rope 1 (7) and the survey rope 2 (8) to be unwound from the wound rope roller (33) via the roller 1 (61) and the roller 2 (62) on the anti-interference shaft (6), and monitoring the vertical state of the survey platform (5) in real time through the GPS positioning member (51); S3, recording and displaying the displacement lengths of the two sets of survey ropes by the number of rotations of the displacement pointer (41) on the displacement display plate (4), and at the same time, recording the displacements of the two sets of survey ropes passing through the two sets of rollers according to the grating monitoring components (63) on both sides of the equipment; S4, transmitting the displacement data information of the two groups of survey ropes recorded by the displacement display panel (4) and the grating monitoring element (63) to the background monitoring center; S5. The background monitoring center identifies the transmitted displacement data information and determines the interference situation through the deviation of the displacement data information; S6. Filter and obtain real monitoring data.
8. A method for using a construction engineering survey information integrated monitoring device according to claim 7, Features: The displacement display disk (4) and the grating monitoring element (63) are both provided with communication elements, and the communication elements are used to transmit the collected data information to a background monitoring center.