Multi-hammer linkage synchronism test system and evaluation method for hydraulic vibratory hammers

Through the hydraulic vibration hammer multi-hammer linkage synchronization test system, the data is collected using vibration acceleration and speed sensors, and parameters such as evaluating eccentric torque are solved, the synchronization control problem of hydraulic vibration hammer linkage system is reduced, the risk of jitter and hidden dangers are improved, and the engineering is improved Application security.

CN118936943APending Publication Date: 2024-11-12CCCC SHANGHAI HARBOR ENG DESIGN & RES INST
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411013596.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing hydraulic vibration hammer multi-hammer linkage system has phase differences in synchronization control, which leads to serious vibration hammer shaking, and may even cause major hidden dangers such as pile body tear, and lacks effective testing and evaluation methods to optimize the solution.

Method used

A hydraulic vibration hammer multi-hammer linkage synchronization test system was designed. Data was collected through vibration acceleration sensors and speed sensors, and combined with data acquisition, testing, sorting, analysis and evaluation modules, calculating and evaluating eccentric torque, excitation force, and converting amplitude. and vibration damping coefficient to ensure synchronization is controlled within the standard range of ±5%.

Benefits of technology

It effectively reduces the shaking of the vibrating hammer, reduces the hidden danger of pile body tearing, ensures the synchronization control of the hydraulic vibrating hammer, and improves the safety and controllability of engineering applications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118936943A_ABST
    Figure CN118936943A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-hammer linkage synchronism test system for hydraulic vibratory hammers, and the system comprises a data collection module which is used for collecting the vibration frequency, rotation frequency and amplitude data of different parts of the vibratory hammers; the data testing module is used for testing according to the collected vibration frequency, rotation frequency and amplitude data and obtaining related parameters; the data arrangement module is used for carrying out arrangement according to the vibration acceleration obtained by testing to obtain a vibration acceleration-time curve; the data analysis module is used for analyzing the period of the vibration acceleration curve, obtaining the vibration frequency according to the relation between the period and the rotation frequency, obtaining an amplitude-time curve through quadratic integration of the vibration acceleration-time curve, and outputting the amplitude-time curve. And eccentric torque, exciting force, conversion amplitude and damping coefficient parameters are obtained according to an amplitude-time curve. The invention further discloses a multi-hammer linkage synchronism evaluation method for the hydraulic vibration hammers. And it is effectively ensured that the hydraulic vibration hammer is always kept at a small synchronous control phase difference.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a hydraulic vibration hammer multi-hammer linkage synchronization testing system and an evaluation method. Background Art

[0002] As offshore projects such as offshore wind power and offshore deepwater slope embankments develop towards larger and larger installed capacity and deeper water depths, the diameter and depth of single piles are also increasing. Among them, super-large diameter steel cylinders, as a technology for quickly constructing deepwater slope embankments, have many advantages such as fast construction speed, strong water-proofing, and good stability. Therefore, super-large diameter steel cylinder slope embankments have been used in major national projects such as the Hong Kong-Zhuhai-Macao Project and the Shenzhen-Zhongshan Channel. At present, the diameter of large-diameter steel cylinders that have been successfully implemented in China has reached 22m and the height has reached about 60m. A single vibrating hammer obviously cannot meet the needs of current engineering applications in terms of hammering force and furniture clamping. Therefore, the engineering industry has proposed a solution to use multiple hydraulic vibrating hammers in series to drive super-large diameter steel cylinders. In the second phase of the Yangtze River Estuary Control Project, my country used 4 APE400 hydraulic vibrating hammers to vibrate and sink large concrete cylinders for the first time. In the Hong Kong-Zhuhai-Macao Project and the Shenzhen-Zhongshan Channel Project, 8 APE600 vibrating hammers were used for sinking.

[0003] However, multi-hammer linkage is very difficult both in terms of scheme design and implementation. At present, the relevant technology is mainly in the hands of several foreign vibratory hammer manufacturers with a monopoly position. my country's independent substitution is of great significance to enhancing my country's independent control in major projects.

[0004] At present, the linkage of multiple vibratory hammers mainly adopts the synchronous control scheme of three systems: mechanical (bearing and gear system), hydraulic system, and electrical control system to ensure its synchronization. However, there is usually a certain phase difference. Too large a phase difference will affect the attenuation of the exciting force, the vibratory hammer will vibrate violently, and even cause major hidden dangers such as pile tearing. Therefore, how to test and evaluate the synchronization of the system after multiple vibratory hammers are connected in parallel, and optimize and improve the scheme according to the test results, is one of the core difficulties in mastering this technology.

[0005] Therefore, a hydraulic vibration hammer multi-hammer linkage synchronization testing system and evaluation method are provided. Summary of the invention

[0006] The purpose of the present invention is to overcome the existing defects and provide a hydraulic vibratory hammer multi-hammer linkage synchronization testing system and evaluation method. According to the obtained frequency, amplitude, and exciting force data, its synchronization is tested and evaluated, which effectively ensures that the hydraulic vibratory hammer always maintains a smaller synchronization control phase difference.

[0007] The technical solution to achieve the above purpose is:

[0008] A hydraulic vibration hammer multi-hammer linkage synchronization test system according to one embodiment of the present invention comprises:

[0009] Vibrating hammer end:

[0010] Data acquisition module, used to collect vibration frequency, rotation frequency and amplitude data of different parts of the vibratory hammer;

[0011] PC:

[0012] The data testing module is used to test the collected vibration frequency, rotation frequency and amplitude data and obtain relevant parameters;

[0013] A data sorting module is used to sort the vibration acceleration obtained from the test to obtain a vibration acceleration-time curve;

[0014] The data analysis module is used to analyze the period of the vibration acceleration curve, obtain the vibration frequency according to the relationship between the period and the rotation frequency, obtain the amplitude-time curve by quadratic integration of the vibration acceleration-time curve, and obtain the eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters according to the amplitude-time curve;

[0015] The evaluation module is used to evaluate whether the deviation of the vibration frequency and the converted amplitude is controlled within a standard of ±5% based on the obtained eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters.

[0016] Preferably, the data acquisition module includes:

[0017] Multiple vibration acceleration sensors are installed at the vibrator and bearing of the vibration hammer to collect vibration frequency and amplitude data at the vibrator and bearing;

[0018] The speed sensor is installed at the linkage shaft of the vibrating hammer to collect the rotation frequency of the vibrating hammer;

[0019] The acceleration and strain signal dynamic acquisition box is used to collect the vibration frequency and amplitude data collected by the vibration acceleration sensor and the rotation frequency of the vibration hammer collected by the rotation speed sensor, and forward them to the data testing module.

[0020] Preferably, the acceleration and strain signal dynamic acquisition box is connected to the PC via wired connection.

[0021] Preferably, the acceleration and strain signal dynamic acquisition box is connected to the PC via wireless.

[0022] Preferably, the data analysis module includes:

[0023] A first analysis unit is used to analyze the period of the vibration acceleration curve and obtain the vibration frequency according to the relationship between the period and the rotation frequency;

[0024] The second analysis unit is used to obtain an amplitude-time curve by performing a quadratic integration on the vibration acceleration-time curve;

[0025] The calculation unit is used to obtain the eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters according to the amplitude-time curve.

[0026] A method for evaluating the synchronization of multiple hammer linkage of a hydraulic vibratory hammer according to the second aspect of the present invention comprises:

[0027] Step S1, collecting vibration frequency, rotation frequency, and amplitude data of different parts of the vibration hammer;

[0028] Step S2, testing is performed according to the collected vibration frequency, rotation frequency, and amplitude data, and relevant parameters are obtained;

[0029] Step S3, sorting out the vibration acceleration obtained from the test to obtain a vibration acceleration-time curve;

[0030] Step S4, analyzing the period of the vibration acceleration curve, and obtaining the vibration frequency according to the relationship between the period and the rotation frequency;

[0031] Step S5, obtaining an amplitude-time curve by performing a quadratic integration on the vibration acceleration-time curve;

[0032] Step S6, obtaining eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters according to the amplitude-time curve;

[0033] Step S7, evaluating whether the deviation of the vibration frequency and the converted amplitude is controlled within a standard of ±5% based on the obtained eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters.

[0034] Preferably, in step S1, the vibration frequency and amplitude data at the vibrator and the bearing are collected by means of a plurality of vibration acceleration sensors installed at the vibrator and the bearing of the vibratory hammer, the rotation frequency of the vibratory hammer is collected by means of a speed sensor installed at the linkage shaft of the vibratory hammer, and the vibration frequency, amplitude data and rotation frequency are collected by means of an acceleration and strain signal dynamic collection box and forwarded to the PC.

[0035] Preferably, in step S6, the eccentric moment is converted according to the following formula:

[0036] M=Am s ×10 -3 ;

[0037] Where M is the eccentric moment, A is the amplitude, m sis the mass of the vibratory hammer;

[0038] Then, the exciting force calculation formula is as follows:

[0039]

[0040] In the formula, F is the exciting force, n is the rotation frequency;

[0041] The conversion amplitude calculation formula is as follows:

[0042]

[0043] In the formula, A c is the vibration amplitude of the vibrating hammer, m c is the mass of the vibration system;

[0044] The vibration reduction coefficient is calculated as follows:

[0045] ψ=A1 / A;

[0046] Where ψ is the vibration reduction coefficient, and A1 is the reduction value of the actual working amplitude compared to the theoretical amplitude.

[0047] The beneficial effects of the present invention are as follows: the present invention collects vibration frequency, rotation frequency and amplitude data of different parts of the vibration hammer; performs tests according to the collected vibration frequency, rotation frequency and amplitude data, and obtains relevant parameters; performs sorting according to the vibration acceleration obtained in the test to obtain a vibration acceleration-time curve; analyzes the period of the vibration acceleration curve, and obtains the vibration frequency according to the relationship between the period and the rotation frequency; obtains the amplitude-time curve by quadratic integration of the vibration acceleration-time curve; obtains eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters according to the amplitude-time curve; evaluates whether the deviation of the vibration frequency and converted amplitude of the standard control of ±5% is met according to the obtained eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters; the present invention effectively ensures that the hydraulic vibration hammer always maintains a small synchronous control phase difference, reduces the occurrence of major hidden dangers such as severe shaking of the vibration hammer and even tearing of the pile body. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 It is a module diagram of a hydraulic vibration hammer multi-hammer linkage synchronization test system of the present invention;

[0049] Figure 2 It is a specific module diagram of the data acquisition module in the present invention;

[0050] Figure 3 It is a specific module diagram of the data analysis module in the present invention;

[0051] Figure 4 The present invention is a flow chart of a method for evaluating the synchronization of multiple hammer linkage of a hydraulic vibratory hammer. DETAILED DESCRIPTION

[0052] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0053] The present invention will be further described below in conjunction with the accompanying drawings.

[0054] In view of the control problem of phase difference in multi-hammer linkage piling, in addition to the synchronization design of the mechanical gear system, hydraulic system, and electrical system during system design, it is particularly important to test and evaluate the synchronization of the system linkage before linkage piling. The present invention adopts a vibration acceleration sensor and a speed sensor, which are respectively installed on the exciter, the bearing, and the linkage shaft. The eccentric torque, exciting force, phase difference and other parameters are calculated based on the vibration frequency, rotation frequency and amplitude obtained by the test, and the control effect of the synchronization of the multi-hammer linkage is evaluated.

[0055] like Figure 1 As shown, a hydraulic vibration hammer multi-hammer linkage synchronization test system includes: a data acquisition module 1, a data testing module 2, a data sorting module 3, a data analysis module 4 and an evaluation module 5.

[0056] Vibrating hammer end:

[0057] The data acquisition module 1 is used to collect the vibration frequency, rotation frequency and amplitude data of different parts of the vibratory hammer.

[0058] like Figure 2 As shown, the data acquisition module 1 includes: a vibration acceleration sensor 11, a rotation speed sensor 12 and an acceleration and strain signal dynamic acquisition box 13.

[0059] A plurality of vibration acceleration sensors 11 are installed at the vibrator and bearing of the vibration hammer to collect vibration frequency and amplitude data at the vibrator and bearing.

[0060] The rotation speed sensor 12 is installed at the linkage shaft of the vibrating hammer and is used to collect the rotation frequency of the vibrating hammer.

[0061] In the embodiment, the acquisition frequency of the vibration acceleration sensor 11 and the rotation speed sensor 12 is not less than 512 Hz.

[0062] The acceleration and strain signal dynamic acquisition box 13 is used to collect the vibration frequency and amplitude data collected by the vibration acceleration sensor 11 and the rotation frequency of the vibration hammer collected by the rotation speed sensor 12, and forward them to the data testing module 2.

[0063] In the embodiment, the acceleration and strain signal dynamic acquisition box 13 is connected to the PC via wired connection.

[0064] In another embodiment, the acceleration and strain signal dynamic acquisition box 13 is connected to the PC via wireless.

[0065] PC:

[0066] The data testing module 2 is used to perform testing based on the collected vibration frequency, rotation frequency, and amplitude data, and obtain relevant parameters.

[0067] The data sorting module 3 is used to sort the vibration acceleration obtained from the test to obtain a vibration acceleration-time curve.

[0068] The data analysis module 4 is used to analyze the period of the vibration acceleration curve, obtain the vibration frequency according to the relationship between the period and the rotation frequency, obtain the amplitude-time curve by quadratic integration of the vibration acceleration-time curve, and obtain the eccentric torque, exciting force, converted amplitude and vibration reduction coefficient parameters according to the amplitude-time curve.

[0069] like Figure 3 As shown, the data analysis module 4 includes: a first analysis unit 41 , a second analysis unit 42 and a calculation unit 43 .

[0070] The first analysis unit 41 is used to analyze the period of the vibration acceleration curve and obtain the vibration frequency according to the relationship between the period and the rotation frequency.

[0071] The second analysis unit 42 is used to obtain an amplitude-time curve by performing a second integration on the vibration acceleration-time curve.

[0072] The calculation unit 43 is used to obtain the eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters according to the amplitude-time curve.

[0073] The evaluation module 5 is used to evaluate whether the deviation of the vibration frequency and the converted amplitude is controlled within a standard of ±5% based on the obtained eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters.

[0074] like Figure 4 As shown, a method for evaluating the synchronization of multiple hammer linkage of hydraulic vibratory hammers includes:

[0075] Step S1, collecting vibration frequency, rotation frequency, and amplitude data of different parts of the vibration hammer.

[0076] In the embodiment, the vibration frequency and amplitude data of the vibrator and the bearing are collected by means of a plurality of vibration acceleration sensors 11 installed at the vibrator and the bearing of the vibratory hammer, the rotation frequency of the vibratory hammer is collected by means of a speed sensor 12 installed at the linkage shaft of the vibratory hammer, and the vibration frequency, amplitude data and rotation frequency are collected by means of an acceleration and strain signal dynamic collection box 13 and forwarded to the PC.

[0077] Step S2, testing is performed based on the collected vibration frequency, rotation frequency, and amplitude data, and relevant parameters are obtained.

[0078] Step S3, sorting out the vibration acceleration obtained from the test to obtain a vibration acceleration-time curve.

[0079] Step S4, analyzing the period of the vibration acceleration curve, and obtaining the vibration frequency according to the relationship between the period and the rotation frequency.

[0080] Step S5, obtaining an amplitude-time curve by performing a quadratic integration on the vibration acceleration-time curve.

[0081] Step S6, obtaining the eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters according to the amplitude-time curve.

[0082] In the embodiment, the eccentric moment is converted as follows:

[0083] M=Am s ×10 -3 ;

[0084] Where M is the eccentric moment, A is the amplitude, m s is the mass of the vibratory hammer;

[0085] Then, the exciting force calculation formula is as follows:

[0086]

[0087] In the formula, F is the exciting force, n is the rotation frequency;

[0088] The conversion amplitude calculation formula is as follows:

[0089]

[0090] In the formula, A c is the vibration amplitude of the vibrating hammer, m c is the mass of the vibration system;

[0091] The vibration reduction coefficient is calculated as follows:

[0092] ψ=A1 / A;

[0093] Where ψ is the vibration reduction coefficient, and A1 is the reduction value of the actual working amplitude compared to the theoretical amplitude.

[0094] Step S7, evaluating whether the deviation of the vibration frequency and the converted amplitude is controlled within a standard of ±5% based on the obtained eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters.

[0095] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the technical solutions described in the above embodiments may still be modified, or some or all of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A hydraulic vibration hammer multi-hammer linkage synchronization test system, characterized in that: include: Vibrating hammer end: Data acquisition module, used to collect vibration frequency, rotation frequency and amplitude data of different parts of the vibratory hammer; PC: The data testing module is used to test the collected vibration frequency, rotation frequency and amplitude data and obtain relevant parameters; A data sorting module is used to sort the vibration acceleration obtained from the test to obtain a vibration acceleration-time curve; The data analysis module is used to analyze the period of the vibration acceleration curve, obtain the vibration frequency according to the relationship between the period and the rotation frequency, obtain the amplitude-time curve by quadratic integration of the vibration acceleration-time curve, and obtain the eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters according to the amplitude-time curve; The evaluation module is used to evaluate whether the deviation of the vibration frequency and the converted amplitude is controlled within a standard of ±5% based on the obtained eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters.

2. A hydraulic vibration hammer multi-hammer linkage synchronization test system according to claim 1, characterized in that: The data acquisition module comprises: Multiple vibration acceleration sensors are installed at the vibrator and bearing of the vibration hammer to collect vibration frequency and amplitude data at the vibrator and bearing; The speed sensor is installed at the linkage shaft of the vibrating hammer to collect the rotation frequency of the vibrating hammer; The acceleration and strain signal dynamic acquisition box is used to collect the vibration frequency and amplitude data collected by the vibration acceleration sensor and the rotation frequency of the vibration hammer collected by the rotation speed sensor, and forward them to the data testing module.

3. A hydraulic vibration hammer multi-hammer linkage synchronization test system according to claim 2, characterized in that: The acceleration and strain signal dynamic acquisition box is connected to the PC via wired connection.

4. A hydraulic vibration hammer multi-hammer linkage synchronization test system according to claim 2, characterized in that: The acceleration and strain signal dynamic acquisition box is connected to the PC via wireless.

5. The hydraulic vibration hammer multi-hammer linkage synchronization test system according to claim 1 is characterized in that: The data analysis module includes: A first analysis unit is used to analyze the period of the vibration acceleration curve and obtain the vibration frequency according to the relationship between the period and the rotation frequency; The second analysis unit is used to obtain an amplitude-time curve by performing a quadratic integration on the vibration acceleration-time curve; The calculation unit is used to obtain the eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters according to the amplitude-time curve.

6. An evaluation method for a hydraulic vibration hammer multi-hammer linkage synchronization test system according to claim 1, characterized in that: include: Step S1, collecting vibration frequency, rotation frequency, and amplitude data of different parts of the vibration hammer; Step S2, testing is performed according to the collected vibration frequency, rotation frequency, and amplitude data, and relevant parameters are obtained; Step S3, sorting out the vibration acceleration obtained from the test to obtain a vibration acceleration-time curve; Step S4, analyzing the period of the vibration acceleration curve, and obtaining the vibration frequency according to the relationship between the period and the rotation frequency; Step S5, obtaining an amplitude-time curve by performing a quadratic integration on the vibration acceleration-time curve; Step S6, obtaining eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters according to the amplitude-time curve; Step S7, evaluating whether the deviation of the vibration frequency and the converted amplitude is controlled within a standard of ±5% based on the obtained eccentric moment, exciting force, converted amplitude and vibration reduction coefficient parameters.

7. A method for evaluating the synchronization of multiple hydraulic vibratory hammer linkage according to claim 6, characterized in that: In the step S1, the vibration frequency and amplitude data of the vibrator and the bearing are collected by installing multiple vibration acceleration sensors at the vibrator and the bearing of the vibratory hammer, the rotation frequency of the vibratory hammer is collected by the speed sensor installed at the linkage shaft of the vibratory hammer, and the vibration frequency, amplitude data and rotation frequency are collected by the acceleration and strain signal dynamic acquisition box and forwarded to the PC.

8. A method for evaluating the synchronization of multiple hydraulic vibratory hammer linkage according to claim 6, characterized in that: In step S6, the eccentric moment is converted as follows: M=Am s ×10 -3 ; Where M is the eccentric moment, A is the amplitude, m s is the mass of the vibratory hammer; Then, the exciting force calculation formula is as follows: In the formula, F is the exciting force, n is the rotation frequency; The conversion amplitude calculation formula is as follows: In the formula, A c is the vibration amplitude of the vibrating hammer, m c is the mass of the vibration system; The vibration reduction coefficient is calculated as follows: ψ=A1 / A; Where ψ is the vibration reduction coefficient, and A1 is the reduction value of the actual working amplitude compared to the theoretical amplitude.

Citation Information

Cited By

  • Multi-hydraulic-column type edge trimmer control system based on operation synchronism detection

    CN121477788A