A fuel cell high temperature testing device and process
By designing a fuel cell high-temperature testing device that uses arc furnace heating and air-hydrogen mixing test, the problem of limited testing conditions in the prior art is solved, and a more comprehensive evaluation of fuel cell performance is achieved.
Patent Information
- Application Number
- CN202411426346.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2025-02-21
- Estimated Expiration
- 2044-10-14
AI Technical Summary
The existing fuel cell testing devices have limited testing conditions for fuel cells, making it difficult to comprehensively evaluate the performance of fuel cells.
A high-temperature test device for fuel cells is designed, and the fuel cell is heated and heated by heating blocks in the arc furnace body. Combined with a mixed test of air and hydrogen, the performance of fuel cells can be evaluated more comprehensively.
The high-temperature test and gas mixing test of the device can be more comprehensively evaluated, improving the accuracy and comprehensiveness of the test.
Smart Images

Figure CN118938029B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of fuel cell testing, and in particular to a fuel cell high-temperature testing device and process. Background Art
[0002] A fuel cell is a chemical device that converts the chemical energy of a fuel directly into electrical energy. It is also called an electrochemical generator. It is the fourth power generation technology after hydroelectric power generation, thermal power generation and atomic power generation. Fuel cells need to undergo high-temperature testing before mass production to verify their reliability.
[0003] The patent with application number CN202022263797.8 discloses a hydrogen fuel cell test box, including a test box body, a water outlet, a telescopic spring and a support plate. A limiting structure is arranged on one side of the interior of the installation slot. The limiting structure includes a handle, an adjustment rod, a limiting baffle, a connecting groove and an extrusion plate. The limiting baffle is fixed on the outer surface of the adjustment rod, and an extrusion plate is fixed on one side of the adjustment rod. The other side of the adjustment rod is fixed with a handle. By installing an extrusion plate on one side of the interior of the installation slot, the extrusion plate is in direct contact with the battery, and can directly contact with the battery to squeeze and fix the battery, thereby realizing the limiting fixation of batteries of different sizes.
[0004] The above-mentioned test chamber can perform high-temperature tests on fuel cells. The operation test of the fuel cell requires the introduction of air and hydrogen. The temperature, flow rate and humidity of the air and hydrogen have a great influence on the performance of the fuel cell. However, the above-mentioned test chamber has limited conditions for fuel cell testing and it is difficult to test the fuel cell comprehensively. Therefore, we propose a high-temperature test device and process for fuel cell. Summary of the invention
[0005] The purpose of the present invention is to address the deficiencies of the prior art and to provide a fuel cell high-temperature testing device, in which the fuel cell is heated by a heating block in an arc-shaped furnace body, air enters along an air inlet pipe, passes through an air pressure reducing valve and enters the fuel cell along an air ventilation pipe for testing, and the generated steam is discharged into a mixing chamber through a steam exhaust pipe and a pipe a, so that the steam is mixed with hydrogen, and the mixed gas enters the fuel cell for testing, so that the fuel cell can be tested more comprehensively.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A fuel cell high temperature test device comprises a frame, an air inlet and outlet mechanism and a hydrogen inlet and outlet mechanism are arranged on the frame, a heating boiler mechanism is arranged on one side of the frame; a fan and an alarm light are arranged on the top of the frame;
[0008] The air intake and exhaust mechanism includes an air intake pipe, an air flow controller, an air pressure reducing valve, an air heat exchanger, an air inlet pressure sensor, and an air inlet temperature sensor, wherein the air flow controller, the air pressure reducing valve, the air heat exchanger, the air inlet pressure sensor, and the air inlet temperature sensor are installed on the air intake pipe;
[0009] An air exhaust pipe, an air outlet temperature sensor, an air outlet pressure sensor, an air pressure regulating valve, an air radiator and an air tail exhaust pipe are arranged in the frame, and the air outlet temperature sensor, the air outlet pressure sensor, the air pressure regulating valve, the air radiator and the air tail exhaust pipe are installed on the exhaust pipe.
[0010] The hydrogen inlet and outlet mechanism comprises a hydrogen inlet pipe, a hydrogen flow controller, a hydrogen pressure reducing valve, and a mixing chamber. The hydrogen inlet pipe is connected to the mixing chamber, and the hydrogen flow controller and the hydrogen pressure reducing valve are installed on the hydrogen inlet pipe.
[0011] The frame is provided with a water tank, a circulating water pump, a water circulating radiator and a steam generating mechanism. The steam generating mechanism is connected with the mixing chamber through a pipeline a. A steam flow controller is provided on the pipeline a.
[0012] The mixing chamber is provided with a mixture inlet pipe, and the mixture inlet pipe is provided with a mixture inlet pressure sensor and a mixture inlet temperature sensor;
[0013] The frame is provided with a mixture discharge pipe, a mixture pressure regulating valve, a mixture radiator, and a mixture tail discharge pipe. The mixture discharge pipe is connected with the mixture pressure regulating valve, the mixture radiator, and the mixture tail discharge pipe. The mixture discharge pipe is provided with a mixture outlet pressure sensor and a mixture outlet temperature sensor.
[0014] The steam generating mechanism comprises: a tank body, which is mounted on the frame; a conical protective plate, which is mounted on the bottom of the tank body; an isolation ring, which is mounted on the conical protective plate; a baffle, which is mounted on the isolation ring; a steam exhaust pipe, one end of which is arranged on the baffle, and the other end of which enters the isolation ring, is bent in the conical protective plate, and then passes through the tank body along the isolation ring; a circulating bending pipe, a plurality of which are mounted on the conical protective plate; and a cleaning component for cleaning the inner wall of the circulating bending pipe is provided on the tank body.
[0015] The cleaning assembly comprises a shell mounted on the outside of the tank body, a circular ring is rotatably arranged in the shell; a fixed sleeve is mounted on the circular ring, a sliding tube is slidably arranged in the fixed sleeve, a connecting tube is mounted on the sliding tube, a rotating sleeve a is rotatably arranged at one end of the connecting tube, a rotating driving member d is mounted on one side of the sliding tube, a rotating sleeve b is mounted at the output end of the rotating driving member d, the rotating sleeve a is connected to the rotating sleeve b by a belt drive, and a square groove is opened in the rotating sleeve a;
[0016] A flexible strip is slidably arranged in the square groove, a flexible ball is installed at one end of the flexible strip, a plurality of connecting nails are arranged on the outer side of the flexible ball, and an adjusting and winding component is arranged on the sliding tube.
[0017] The adjusting and winding assembly comprises a fixing plate mounted on the fixing sleeve, a mounting sleeve is mounted on the fixing plate, a mounting plate is mounted on the sliding tube, a bolt is rotatably provided on the mounting plate, and the bolt is threadedly connected to the mounting sleeve;
[0018] An L-shaped frame is installed on the sliding tube, a support plate is installed on the L-shaped frame, a rotating driving member e is installed on the support plate, a winding shaft is installed on the output end of the rotating driving member e, two baffle circular plates are installed on the winding shaft, and the other end of the flexible strip is wound on the winding shaft.
[0019] A circular groove is provided in the reel, a liquid flow groove is provided in the flexible strip, the reel is connected to the water pump via a pipe b; the water pump injects water into the flexible ball via the pipe b, the circular groove and the liquid flow groove; the connecting pipe is connected to the water pump via a pipe c, and the water pump injects water into the connecting pipe via the pipe c.
[0020] The heating boiler mechanism comprises a workbench arranged on one side of the frame, a placing table is arranged on the workbench, an L-shaped bracket is installed on the workbench, a connecting rod is installed on the L-shaped bracket, two arc-shaped furnace bodies are rotatably arranged on the connecting rod, and a heating block is arranged in the arc-shaped furnace body.
[0021] The beneficial effects of the present invention are:
[0022] (1) The present invention heats the fuel cell by means of a heating block in the arc-shaped furnace body. Air enters the furnace through an air intake pipe, passes through an air pressure reducing valve, and enters the fuel cell through an air ventilation pipe for testing. The generated steam is discharged into the mixing chamber through a steam exhaust pipe and a pipe a, and the steam is mixed with hydrogen. The mixed gas enters the fuel cell for testing, and the fuel cell can be tested more comprehensively.
[0023] (2) The present invention heats the circulating curved pipe by flame, so that the water in the circulating curved pipe is heated and boiled and then flows upward. At the same time, the water in the tank enters the circulating curved pipe, forming a circulating flow of water to stir the water, thereby enhancing the heating effect on the water and facilitating the generation of steam. At the same time, the flame also heats the steam exhaust pipe in the conical protective plate, heating the steam in the steam exhaust pipe and enhancing the steam output effect.
[0024] (3) The present invention injects water into the flexible ball through the pipe b, the circular groove, and the liquid flow groove, so that the flexible ball expands and becomes larger, and drives the connecting pins to contact the inner surface wall of the circulating bending pipe. The rotating driving member e drives the reel to reel the flexible strip, and drives the connecting pins on the flexible ball to slide in the circulating bending pipe. The connecting pins scratch the dirt on the inner surface wall of the circulating bending pipe, so that the dirt is broken and convenient for subsequent cleaning.
[0025] (4) The present invention drives the flexible ball along the sliding tube to enter the top of the circulating bending tube, drives the flexible ball to expand and become larger so that the surface of the flexible ball elastically contacts the inner surface wall of the circulating bending tube, drives the reel to reel the flexible strip, and drives the flexible ball in elastic contact with the inner surface wall of the circulating bending tube to clean the broken dirt on the inner surface wall of the circulating bending tube. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the first overall structure of the present invention;
[0027] Figure 2 It is a schematic diagram of the second overall structure of the present invention;
[0028] Figure 3 This is a schematic diagram of the air intake and exhaust mechanism structure of the present invention;
[0029] Figure 4 This is a schematic diagram of the structure of the hydrogen inlet and outlet mechanism of the present invention from a first angle;
[0030] Figure 5 This is a second angle structural schematic diagram of the hydrogen inlet and outlet mechanism of the present invention;
[0031] Figure 6 It is a schematic diagram of the structure of the steam generating mechanism of the present invention;
[0032] Figure 7 It is a cross-sectional structural schematic diagram of the steam generating mechanism of the present invention;
[0033] Figure 8 This is a schematic diagram of the cleaning component structure of the present invention;
[0034] Fig. 9 This is a schematic diagram of the structure of some parts of the cleaning assembly of the present invention;
[0035] Fig.10This is a schematic diagram of the baffle plate and flexible strip structure of the present invention;
[0036] Fig.11 This is a schematic diagram of the structure of the flexible ball and connecting nails of the present invention;
[0037] Fig.12 It is a cross-sectional schematic diagram of a conical protection plate and a circulating bending pipe of the present invention;
[0038] Fig.13 This is a schematic diagram of the first motion state of the flexible ball of the present invention;
[0039] Fig.14 This is a schematic diagram of the second motion state of the flexible ball of the present invention;
[0040] Fig.15 It is a schematic diagram of the round convex structure of the present invention;
[0041] Fig.16 It is a schematic diagram of the structure of the heating boiler mechanism of the present invention.
[0042] The accompanying drawings of the present application are marked as follows: 1. frame; 100. fan; 101. warning light; 2. air intake and exhaust mechanism; 201. air intake pipe; 202. air flow controller; 203. air pressure reducing valve; 204. air heat exchanger; 205. air inlet pressure sensor; 206. air inlet temperature sensor; 207. exhaust pipe; 208. air outlet temperature sensor; 209. air outlet pressure sensor; 210. air pressure regulating valve; 211. air radiator; 212. air tail exhaust pipe; 3. hydrogen intake and exhaust mechanism; 300. water tank ; 301, hydrogen inlet pipe; 302, hydrogen flow controller; 303, hydrogen pressure reducing valve; 304, mixing chamber; 305, circulating water pump; 306, water circulation radiator; 307, pipeline a; 308, steam flow controller; 309, mixture inlet pipe; 310, mixture inlet pressure sensor; 311, mixture inlet temperature sensor; 312, mixture discharge pipe; 313, mixture pressure regulating valve; 314, mixture radiator; 315, mixture tail pipe; 316, mixture outlet pressure sensor; 317, mixture outlet temperature sensor degree sensor; 4, heating boiler mechanism; 401, workbench; 402, placing table; 403, L-shaped bracket; 404, connecting rod; 405, arc furnace body; 406, air ventilation pipe; 407, hydrogen ventilation pipe; 5, steam generating mechanism; 500, base; 5001, flame nozzle; 501, tank body; 502, conical protective plate; 503, isolation ring; 504, baffle; 505, steam discharge pipe; 506, circulation bending pipe; 51, cleaning component; 511, shell; 512, ring; 513, fixed sleeve; 514, sliding pipe; 51 5. Connecting pipe; 516. Rotating sleeve a; 5161. Square groove; 517. Rotating drive member d; 518. Rotating sleeve b; 519. Flexible strip; 5191. Liquid flow groove; 5192. Round bump; 520. Flexible ball; 521. Connecting nail; 53. Adjusting and winding assembly; 531. Fixing plate; 532. Mounting sleeve; 533. Mounting plate; 534. Bolt; 535. L-shaped frame; 536. Support plate; 537. Rotating drive member e; 538. Winding shaft; 5381. Round groove; 539. Round baffle plate; 540. Pipeline b; 541. Pipeline c. DETAILED DESCRIPTION
[0043] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0044] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0045] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0046] Embodiment 1: Figure 1-Figure 16 As shown, this embodiment provides a fuel cell high temperature test device, including a frame 1, an air intake and exhaust mechanism 2 and a hydrogen intake and exhaust mechanism 3 are provided on the frame 1, a heating boiler mechanism 4 is provided on one side of the frame 1; a fan 100 and an alarm light 101 are provided on the top of the frame 1;
[0047] like Fig.16 As shown, the heating boiler mechanism 4 includes a workbench 401 arranged on one side of the frame 1, a placing table 402 is arranged on the workbench 401, an L-shaped bracket 403 is installed on the workbench 401, a connecting rod 404 is installed on the L-shaped bracket 403, two arc-shaped furnace bodies 405 are rotatably arranged on the connecting rod 404, a heating block is arranged in the arc-shaped furnace body 405, two air ventilation pipes 406 and two hydrogen ventilation pipes 407 are arranged on the arc-shaped furnace body 405, and the two arc-shaped furnace bodies 405 are connected by a locking assembly. It should be noted that: the locking assembly adopts an existing mechanism to achieve a locking effect, and no detailed description is given here;
[0048] In this embodiment, the arc furnace body 405 is opened, the fuel cell is placed on the placement table 402, two air ventilation pipes 406 and two hydrogen ventilation pipes 407 are connected to the fuel cell, the arc furnace body 405 is closed, and the heating block in the arc furnace body 405 heats the fuel cell.
[0049] like Figure 1-Figure 3As shown, the air intake and exhaust mechanism 2 includes an air intake pipe 201, an air flow controller 202, an air pressure reducing valve 203, an air heat exchanger 204, an air inlet pressure sensor 205, and an air inlet temperature sensor 206. The air flow controller 202, the air pressure reducing valve 203, the air heat exchanger 204, the air inlet pressure sensor 205, and the air inlet temperature sensor 206 are installed on the air intake pipe 201; an air exhaust pipe 207, an air outlet temperature sensor 208, an air outlet pressure sensor 209, an air pressure regulating valve 210, an air radiator 211 and an air tail exhaust pipe 212 are provided in the frame 1. The air outlet temperature sensor 208, the air outlet pressure sensor 209, the air pressure regulating valve 210, the air radiator 211, and the air tail exhaust pipe 212 are installed on the exhaust pipe 207. The air intake pipe 201 is connected to an air ventilation pipe 406, and the air exhaust pipe 207 is connected to another air ventilation pipe 406.
[0050] In this embodiment, air enters along the air intake pipe 201, passes through the air pressure reducing valve 203, the air flow controller 202, and the air heat exchanger 204, and then enters the fuel cell along an air ventilation pipe 406, and then passes through another air ventilation pipe 406 to be discharged to the air exhaust pipe 207, and then passes through the air pressure regulating valve 210 and the air radiator 211 and is discharged from the air tail exhaust pipe 212; the air pressure reducing valve 203 regulates the air path pressure, the air flow controller 202 regulates the air path flow, the air heat exchanger 204 dissipates heat to the air, the air inlet pressure sensor 205 monitors the air inlet pressure, and the air inlet temperature sensor 206 monitors the air inlet temperature;
[0051] like Figure 1-Figure 5 As shown, the hydrogen inlet and outlet mechanism 3 includes a hydrogen inlet pipe 301, a hydrogen flow controller 302, a hydrogen pressure reducing valve 303, and a mixing chamber 304. The hydrogen inlet pipe 301 is connected to the mixing chamber 304, and the hydrogen flow controller 302 and the hydrogen pressure reducing valve 303 are installed on the hydrogen inlet pipe 301;
[0052] A water tank 300, a circulating water pump 305, a water circulating radiator 306 and a steam generating mechanism 5 are provided on the frame 1. The steam generating mechanism 5 is connected to the mixing chamber 304 through a pipe a307. A steam flow controller 308 is provided on the pipe a307. The circulating water pump 305 pumps water in the water tank 300 into the steam generating mechanism 5.
[0053] A mixture inlet pipe 309 is provided on the mixing chamber 304, and a mixture inlet pressure sensor 310 and a mixture inlet temperature sensor 311 are provided on the mixture inlet pipe 309; a mixture outlet pipe 312, a mixture pressure regulating valve 313, a mixture radiator 314 and a mixture tail exhaust pipe 315 are provided on the frame 1, and the mixture outlet pipe 312 is connected with the mixture pressure regulating valve 313, the mixture radiator 314 and the mixture tail exhaust pipe 315, and a mixture outlet pressure sensor 316 and a mixture outlet temperature sensor 317 are provided on the mixture outlet pipe 312; the mixture inlet pipe 309 is connected with a hydrogen ventilation pipe 407, and the mixture outlet pipe 312 is connected with another hydrogen ventilation pipe 407.
[0054] In this embodiment, hydrogen enters along the hydrogen inlet pipe 301, passes through the hydrogen pressure reducing valve 303, the hydrogen flow controller 302, the mixing chamber 304, and the mixture inlet pipe 309, and then enters the fuel cell along a hydrogen vent pipe 407, and then passes through another hydrogen vent pipe 407 to be discharged to the mixture discharge pipe 312, and then passes through the mixture pressure regulating valve 313, the mixture radiator 314, and then is discharged through the mixture tail exhaust pipe 315; it should be noted that: flame combustion treatment can be performed when the mixture tail exhaust pipe 315 discharges gas.
[0055] The hydrogen pressure reducing valve 303 adjusts the hydrogen line pressure, the hydrogen flow controller 302 adjusts the hydrogen line flow, the mixture radiator 314 dissipates heat for hydrogen, the mixture inlet pressure sensor 310 monitors the hydrogen inlet pressure, and the mixture inlet temperature sensor 311 monitors the hydrogen inlet temperature.
[0056] Embodiment 2: Figure 6-Figure 15 As shown, the components identical or corresponding to those in the first embodiment are marked with the corresponding reference numerals in the first embodiment. For the sake of simplicity, only the differences from the first embodiment are described below. The second embodiment differs from the first embodiment in that:
[0057] like Figure 6-Figure 15As shown, the steam generating mechanism 5 comprises: a tank body 501, the tank body 501 is mounted on the frame 1, a base 500 is provided at the bottom of the tank body 501, and a plurality of flame spray nozzles 5001 are provided on the base 500; a conical protective plate 502, the conical protective plate 502 is mounted at the bottom of the tank body 501; an isolating ring 503, the isolating ring 503 is mounted on the conical protective plate 502; a baffle 504, the baffle 504 is mounted on the isolating ring 503; a steam exhaust pipe 505, one end of the steam exhaust pipe 505 is provided on the baffle 504, and the other end thereof enters the isolating ring 503 and is bent in the conical After entering the protective plate 502, it passes through the tank body 501 along the isolation ring 503; a circulating bent pipe 506, multiple circulating bent pipes 506 are installed on the conical protective plate 502; a cleaning component 51 for cleaning the inner wall of the circulating bent pipe 506 is provided on the tank body 501, and the flamethrower 5001 sprays flames. This is a conventional technical means and will not be explained in detail here. In addition, it needs to be explained: as to why the cleaning component 51 is set, it is because a layer of dirt will adhere to the inner surface wall of the circulating bent pipe 506 over time. If it is not removed, it will affect the generation of steam in the tank body 501.
[0058] In this embodiment, the circulating water pump 305 pumps the water in the water tank 300 into the tank body 501, and the flame nozzle 5001 sprays flames to heat the conical protective plate 502 and the circulating curved pipe 506, thereby heating the water in the tank body 501 to generate steam, and the steam is discharged into the mixing chamber 304 through the steam discharge pipe 505 and the pipeline a307, so that the steam is mixed with hydrogen, and the mixed gas enters the fuel cell for testing;
[0059] It should be noted that: Fig.12 As shown, the flame heats the circulating curved pipe 506, so that the water flow in the circulating curved pipe 506 is heated and boiled and then flows upward. At the same time, the water flow in the tank body 501 enters the circulating curved pipe 506, forming a circulating flow of water flow to stir the water flow, thereby enhancing the heating effect of the water flow and facilitating the generation of steam. At the same time, the flame also heats the steam discharge pipe 505 in the conical protective plate 502, heats the steam in the steam discharge pipe 505, and enhances the steam output effect.
[0060] like Figure 6-Figure 15As shown, the cleaning component 51 includes a shell 511 installed on the outside of the tank body 501, and a circular ring 512 is rotatably provided in the shell 511; a fixed sleeve 513 is installed on the circular ring 512, and a sliding tube 514 is slidably provided in the fixed sleeve 513, and a connecting tube 515 is installed on the sliding tube 514, and a rotating sleeve a516 is rotatably provided at one end of the connecting tube 515, a rotating driving member d517 is installed on one side of the sliding tube 514, and a rotating sleeve b518 is installed at the output end of the rotating driving member d517, and the rotating sleeve a516 and the rotating sleeve b518 are connected by a belt drive, and a square groove 5161 is opened in the rotating sleeve a516; a flexible strip 519 is slidably provided in the square groove 5161, and the square groove 5161 and the flexible strip 519 are sealed, and a flexible ball 520 located in the sliding tube 514 is installed at one end of the flexible strip 519, and a plurality of connecting nails 521 are provided on the outside of the flexible ball 520, and an adjusting winding component 53 is provided on the sliding tube 514.
[0061] In this embodiment, the ring 512 is rotated to make the sliding tube 514 correspond to the bottom position of one of the circulating bending tubes 506, and the bolt 534 is rotated with a wrench. According to the principle of thread transmission, the sliding tube 514 is driven to slide inward, and the front end of the sliding tube 514 is driven to insert into the bottom of the circulating bending tube 506 (the state is as shown in FIG. Fig.13 shown);
[0062] The water pump injects water into the connecting pipe 515 through the pipe c541, and the water flows along the connecting pipe 515 and the sliding pipe 514 into the tank 501, driving the flexible ball 520 in the sliding pipe 514 to move along the sliding pipe 514 and the circulating curved pipe 506, so that the flexible ball 520 moves to the top of the circulating curved pipe 506 (the state is as shown in FIG. Fig.14 as shown).
[0063] like Figure 6-Figure 15 As shown, the adjusting and winding assembly 53 includes a fixing plate 531 mounted on the fixing sleeve 513, a mounting sleeve 532 is mounted on the fixing plate 531, a mounting plate 533 is mounted on the sliding tube 514, a bolt 534 is rotatably provided on the mounting plate 533, and the bolt 534 is threadedly connected to the mounting sleeve 532;
[0064] An L-shaped frame 535 is installed on the sliding tube 514, a support plate 536 is installed on the L-shaped frame 535, a rotating driving member e537 is installed on the support plate 536, a winding shaft 538 is installed on the output end of the rotating driving member e537, two baffle circular plates 539 are installed on the winding shaft 538, and the other end of the flexible strip 519 is wound on the winding shaft 538.
[0065] A circular groove 5381 is provided in the winding shaft 538, a liquid groove 5191 is provided in the flexible strip 519, and the winding shaft 538 is connected to the water pump via a pipe b540; the water pump injects water into the flexible ball 520 via the pipe b540, the circular groove 5381, and the liquid groove 5191; the connecting pipe 515 and the water pump are connected via a pipe c541, and the water pump injects water into the connecting pipe 515 via the pipe c541; it should be noted that: during the movement of the flexible ball 520 along the sliding tube 514 and the circular bending tube 506, the rotating driving member e537 drives the winding shaft 538 to rotate to unwind the flexible strip 519.
[0066] In this embodiment, the water pump injects water into the flexible ball 520 through the pipe b540, the circular groove 5381, and the liquid groove 5191, so that the flexible ball 520 expands and becomes larger, driving the connecting nail 521 to contact the inner surface wall of the circulating bending pipe 506, and the rotating driving member e537 drives the reel 538 to reel the flexible strip 519, driving the connecting nail 521 on the flexible ball 520 to slide in the circulating bending pipe 506, and the connecting nail 521 scratches the dirt on the inner surface wall of the circulating bending pipe 506 to break the dirt for subsequent cleaning. This step can be repeated many times;
[0067] It should be noted that: when the connecting pin 521 on the flexible ball 520 is driven to slide in the circulating curved tube 506, the rotating driving member d517 drives the rotating sleeve a516 to rotate (reciprocatingly), driving the flexible strip 519 to rotate, and then drives the connecting pin 521 on the flexible ball 520 to rotate (reciprocatingly) during the sliding process in the circulating curved tube 506, thereby enhancing the dirt crushing effect; in addition, a plurality of round protrusions 5192 are provided in the liquid groove 5191, and when the flexible strip 519 is rotated, twisted, and squeezed, it is ensured that water can always flow normally in the liquid groove 5191;
[0068] In this embodiment, the flexible ball 520 is driven along the sliding tube 514 to enter the top of the circulating bending tube 506, and the flexible ball 520 is driven to expand and become larger so that the surface of the flexible ball 520 is in elastic contact with the inner surface wall of the circulating bending tube 506, and the winding shaft 538 is driven to wind up the flexible strip 519, and the flexible ball 520 in elastic contact with the inner surface wall of the circulating bending tube 506 is driven to wipe and clean the broken dirt on the inner surface wall of the circulating bending tube 506.
[0069] Embodiment 3: This embodiment provides a test process of a fuel cell high temperature test device, comprising the following steps:
[0070] Step 1, placement process: open the arc furnace body 405, place the fuel cell on the placement table 402, connect two air ventilation pipes 406 and two hydrogen ventilation pipes 407 to the fuel cell, close the arc furnace body 405, and the heating block in the arc furnace body 405 heats the fuel cell;
[0071] Step 2, air introduction and discharge process: air enters along the air intake pipe 201, passes through the air pressure reducing valve 203, the air flow controller 202, and the air heat exchanger 204, and then enters the fuel cell along an air ventilation pipe 406, and then passes through another air ventilation pipe 406 to be discharged to the air exhaust pipe 207, passes through the air pressure regulating valve 210 and the air radiator 211, and then is discharged from the air tail exhaust pipe 212;
[0072] Step 3, hydrogen introduction and discharge process: hydrogen enters along the hydrogen inlet pipe 301, passes through the hydrogen pressure reducing valve 303, the hydrogen flow controller 302, the mixing chamber 304, the mixture inlet pipe 309, and then enters the fuel cell along a hydrogen vent pipe 407, and then passes through another hydrogen vent pipe 407 to be discharged to the mixture discharge pipe 312, and then passes through the mixture pressure regulating valve 313, the mixture radiator 314, and then is discharged through the mixture tail exhaust pipe 315;
[0073] Step 4, steam generation process: the circulating water pump 305 pumps the water in the water tank 300 into the tank body 501, the flame nozzle 5001 sprays flames to heat the conical protective plate 502 and the circulating curved pipe 506, and then heats the water in the tank body 501 to generate steam, and the steam is discharged into the mixing chamber 304 through the steam discharge pipe 505 and the pipeline a307, so that the steam is mixed with hydrogen, and the mixed gas enters the fuel cell for testing;
[0074] Step 5, position adjustment process: rotate the ring 512 so that the sliding tube 514 corresponds to the bottom position of one of the circulating bending tubes 506, use a wrench to rotate the bolt 534, according to the principle of thread transmission, drive the sliding tube 514 to slide inward, drive the front end of the sliding tube 514 to insert into the bottom of the circulating bending tube 506 (the state is as follows Fig.13 shown);
[0075] The water pump injects water into the connecting pipe 515 through the pipe c541, and the water flows along the connecting pipe 515 and the sliding pipe 514 into the tank 501, driving the flexible ball 520 in the sliding pipe 514 to move along the sliding pipe 514 and the circulating curved pipe 506, so that the flexible ball 520 moves to the top of the circulating curved pipe 506 (the state is as shown in FIG. Fig.14 shown);
[0076] Step 6, scoring process: the water pump injects water into the flexible ball 520 through the pipe b540, the circular groove 5381, and the liquid groove 5191, so that the flexible ball 520 expands and becomes larger, driving the connecting nail 521 to contact the inner surface wall of the circulating bending pipe 506, and the rotating driving member e537 drives the reel 538 to reel the flexible strip 519, driving the connecting nail 521 on the flexible ball 520 to slide in the circulating bending pipe 506, and the connecting nail 521 scores the dirt on the inner surface wall of the circulating bending pipe 506 to break the dirt for subsequent cleaning;
[0077] Step seven, cleaning process: drive the flexible ball 520 along the sliding tube 514 into the top of the circulating bending tube 506, drive the flexible ball 520 to expand and become larger so that the surface of the flexible ball 520 is in elastic contact with the inner surface wall of the circulating bending tube 506, drive the winding shaft 538 to wind up the flexible strip 519, and drive the flexible ball 520 in elastic contact with the inner surface wall of the circulating bending tube 506 to clean the broken dirt on the inner surface wall of the circulating bending tube 506.
[0078] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A fuel cell high temperature testing device, comprising a frame (1), characterized in that: The frame (1) is provided with an air intake and exhaust mechanism (2) and a hydrogen intake and exhaust mechanism (3), and a heating boiler mechanism (4) is provided on one side of the frame (1); a fan (100) and an alarm light (101) are provided on the top of the frame (1); The air intake and exhaust mechanism (2) comprises an air intake pipe (201), an air flow controller (202), an air pressure reducing valve (203), an air heat exchanger (204), an air inlet pressure sensor (205), and an air inlet temperature sensor (206); the air flow controller (202), the air pressure reducing valve (203), the air heat exchanger (204), the air inlet pressure sensor (205), and the air inlet temperature sensor (206) are installed on the air intake pipe (201); An air exhaust pipe (207), an air outlet temperature sensor (208), an air outlet pressure sensor (209), an air pressure regulating valve (210), an air radiator (211), and an air tail exhaust pipe (212) are provided in the frame (1); the air outlet temperature sensor (208), the air outlet pressure sensor (209), the air pressure regulating valve (210), the air radiator (211), and the air tail exhaust pipe (212) are installed on the exhaust pipe (207); The hydrogen inlet and outlet mechanism (3) comprises a hydrogen inlet pipe (301), a hydrogen flow controller (302), a hydrogen pressure reducing valve (303), and a mixing chamber (304); the hydrogen inlet pipe (301) is in communication with the mixing chamber (304); the hydrogen flow controller (302) and the hydrogen pressure reducing valve (303) are installed on the hydrogen inlet pipe (301); The frame (1) is provided with a water tank (300), a circulating water pump (305), a water circulating radiator (306) and a steam generating mechanism (5); the steam generating mechanism (5) is connected to the mixing chamber (304) via a pipe a (307); and a steam flow controller (308) is provided on the pipe a (307).
2. A fuel cell high temperature testing device according to claim 1, characterized in that: The mixing chamber (304) is provided with a mixture inlet pipe (309), and the mixture inlet pipe (309) is provided with a mixture inlet pressure sensor (310) and a mixture inlet temperature sensor (311); The frame (1) is provided with a mixture discharge pipe (312), a mixture pressure regulating valve (313), a mixture radiator (314), and a mixture tail discharge pipe (315); the mixture discharge pipe (312) is in communication with the mixture pressure regulating valve (313), the mixture radiator (314), and the mixture tail discharge pipe (315); and the mixture discharge pipe (312) is provided with a mixture outlet pressure sensor (316) and a mixture outlet temperature sensor (317).
3. A fuel cell high temperature testing device according to claim 2, characterized in that: The steam generating mechanism (5) comprises: A tank body (501), the tank body (501) being mounted on the frame (1), a base (500) being provided at the bottom of the tank body (501), and a plurality of flame spray nozzles (5001) being provided on the base (500); A conical protective plate (502), the conical protective plate (502) being installed at the bottom of the tank body (501); an isolating ring (503), the isolating ring (503) being mounted on the conical protective plate (502); a baffle (504), the baffle (504) being mounted on the isolation ring (503); a steam exhaust pipe (505), one end of the steam exhaust pipe (505) being arranged on the baffle (504), and the other end of the steam exhaust pipe (505) entering the isolation ring (503), being bent inside the conical protective plate (502), and then passing through the tank body (501) along the isolation ring (503); A circulating bending pipe (506), wherein a plurality of the circulating bending pipes (506) are installed on the conical protection plate (502); The tank body (501) is provided with a cleaning component (51) for cleaning the inner wall of the circulating curved pipe (506).
4. A fuel cell high temperature testing device according to claim 3, characterized in that: The cleaning assembly (51) comprises a shell (511) mounted on the outside of the tank body (501), a circular ring (512) being rotatably provided in the shell (511); a fixing sleeve (513) being mounted on the circular ring (512), a sliding tube (514) being slidably provided in the fixing sleeve (513), a connecting tube (515) being mounted on the sliding tube (514), a rotating sleeve a (516) being rotatably provided at one end of the connecting tube (515), a rotating driving member d (517) being mounted on one side of the sliding tube (514), a rotating sleeve b (518) being mounted at the output end of the rotating driving member d (517), the rotating sleeve a (516) being connected to the rotating sleeve b (518) via a belt transmission, and a square groove (5161) being provided in the rotating sleeve a (516); A flexible strip (519) is slidably disposed in the square groove (5161); a flexible ball (520) located in the sliding tube (514) is installed at one end of the flexible strip (519); a plurality of connecting pins (521) are disposed on the outside of the flexible ball (520); and an adjusting and winding assembly (53) is disposed on the sliding tube (514).
5. A fuel cell high temperature testing device according to claim 4, characterized in that: The adjusting and winding assembly (53) comprises a fixing plate (531) mounted on the fixing sleeve (513), a mounting sleeve (532) being mounted on the fixing plate (531), a mounting plate (533) being mounted on the sliding tube (514), a bolt (534) being rotatably provided on the mounting plate (533), and the bolt (534) being threadedly connected to the mounting sleeve (532); An L-shaped frame (535) is mounted on the sliding tube (514), a support plate (536) is mounted on the L-shaped frame (535), a rotating driving member e (537) is mounted on the support plate (536), a winding shaft (538) is mounted on the output end of the rotating driving member e (537), two baffle circular plates (539) are mounted on the winding shaft (538), and the other end of the flexible strip (519) is wound on the winding shaft (538).
6. A fuel cell high temperature testing device according to claim 5, characterized in that: A circular groove (5381) is provided in the reel (538), a liquid-discharging groove (5191) is provided in the flexible strip (519), and the reel (538) is connected to the water pump via a pipe b (540); the water pump injects water into the flexible ball (520) via the pipe b (540), the circular groove (5381), and the liquid-discharging groove (5191); The connecting pipe (515) is connected to the water pump via a pipe c (541), and the water pump injects water into the connecting pipe (515) via the pipe c (541).
7. A fuel cell high temperature testing device according to claim 6, characterized in that: The heating boiler mechanism (4) comprises a workbench (401) arranged on one side of the frame (1), a placing table (402) being arranged on the workbench (401), an L-shaped bracket (403) being installed on the workbench (401), a connecting rod (404) being installed on the L-shaped bracket (403), two arc-shaped furnace bodies (405) being rotatably arranged on the connecting rod (404), and a heating block being arranged inside the arc-shaped furnace body (405); The arc-shaped furnace body (405) is provided with two air ventilation pipes (406) and two hydrogen ventilation pipes (407).
8. The test process of a fuel cell high temperature test device according to claim 7, characterized in that: The following steps are involved: Step 1, placement process: open the arc furnace body (405), place the fuel cell on the placement table (402), connect two air ventilation pipes (406) and two hydrogen ventilation pipes (407) to the fuel cell, close the arc furnace body (405), and heat the fuel cell with the heating block in the arc furnace body (405); Step 2, air introduction and discharge process: air enters along the air intake pipe (201), passes through the air pressure reducing valve (203), the air flow controller (202), and the air heat exchanger (204), and then enters the fuel cell along an air ventilation pipe (406), and then passes through another air ventilation pipe (406) to be discharged to the air exhaust pipe (207), passes through the air pressure regulating valve (210), the air radiator (211), and then is discharged from the air tail exhaust pipe (212); Step 3, hydrogen introduction and discharge process: hydrogen enters along the hydrogen inlet pipe (301), passes through the hydrogen pressure reducing valve (303), the hydrogen flow controller (302), the mixing chamber (304), the mixture inlet pipe (309), and then enters the fuel cell along a hydrogen ventilation pipe (407), and then passes through another hydrogen ventilation pipe (407) to be discharged to the mixture discharge pipe (312), and then passes through the mixture pressure regulating valve (313), the mixture radiator (314), and then is discharged through the mixture tail exhaust pipe (315); Step 4, steam generation process: the circulating water pump (305) pumps the water in the water tank (300) into the tank body (501), the flame nozzle (5001) sprays flames to heat the conical protection plate (502) and the circulating curved pipe (506), thereby heating the water in the tank body (501) to generate steam, and the steam is discharged into the mixing chamber (304) through the steam discharge pipe (505) and the pipe a (307), so that the steam is mixed with hydrogen, and the mixed gas enters the fuel cell for testing; Step 5, position adjustment process: rotate the ring (512) so that the sliding tube (514) corresponds to the bottom position of one of the circulating bending tubes (506), use a wrench to rotate the bolt (534), according to the principle of thread transmission, drive the sliding tube (514) to slide inward, and drive the front end of the sliding tube (514) to insert into the bottom of the circulating bending tube (506); The water pump injects water into the connecting pipe (515) through the pipe c (541), and the water flows along the connecting pipe (515) and the sliding pipe (514) into the tank body (501), driving the flexible ball (520) in the sliding pipe (514) to move along the sliding pipe (514) and the circulating bending pipe (506), so that the flexible ball (520) moves to the top of the circulating bending pipe (506); Step 6: Scratching process: The water pump injects water into the flexible ball (520) through the pipe b (540), the circular groove (5381), and the liquid flow groove (5191), so that the flexible ball (520) expands and becomes larger, driving the connecting pin (521) to contact the inner surface wall of the circulating bending tube (506), driving the reel (538) to reel the flexible strip (519), driving the connecting pin (521) on the flexible ball (520) to slide in the circulating bending tube (506), and the connecting pin (521) scratches the dirt on the inner surface wall of the circulating bending tube (506), so that the dirt is broken and it is convenient for subsequent cleaning; Step 7, cleaning process: drive the flexible ball (520) along the sliding tube (514) into the top of the circulating bending tube (506), drive the flexible ball (520) to expand and become large so that the surface of the flexible ball (520) elastically contacts the inner surface wall of the circulating bending tube (506), drive the reel (538) to reel the flexible strip (519), and drive the flexible ball (520) in elastic contact with the inner surface wall of the circulating bending tube (506) to clean the broken dirt on the inner surface wall of the circulating bending tube (506).
Citation Information
Patent Citations
Test box for testing hydrogen fuel cell
CN213633111U
Fuel cell hydrogen cycle test system
CN113067018A
Fuel cell system test bench
CN113540508A