Workshop information physical monitoring management system

Through the workshop information physical monitoring and management system, the machine tool failure time node is predicted and maintenance needs is prompted, which solves the problem of maintenance in the existing technology and improves the production efficiency and convenience of maintenance management.

CN118938758APending Publication Date: 2024-11-12DEJIGU (SHANGHAI) INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411146986.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the existing real-time three-dimensional visual virtual monitoring system, it is difficult for managers to accurately grasp the maintenance intervals of the machine tool system, resulting in inconvenience in maintenance, which may lead to machine tool failures that affect production efficiency and increase costs.

Method used

Design a workshop information physical monitoring and management system, which predicts the failure time nodes of the machine tool system by inputting basic information, obtaining order information and historical processing data, and prompts the managers whether they need to process the target parts in real-time three-dimensional visual virtual monitoring. Maintenance, provide maintenance personnel and contact information.

Benefits of technology

It improves the convenience and efficiency of managers in maintaining machine tools, reduces the possibility that machine tool failures affect production, and ensures the normal operation of the machine tool system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118938758A_ABST
    Figure CN118938758A_ABST
Patent Text Reader

Abstract

The invention relates to a workshop information physical monitoring management system, which relates to the field of workshop monitoring technology, and mainly comprises the following steps: S1, inputting basic information, and associating and numbering a physical workshop, a machine tool in the physical workshop and maintenance personnel corresponding to each system of the machine tool; s2, demand information is acquired, and order information and a processing technological process corresponding to the order information are acquired; s3, machine tool historical machining data involved in the process information is called, and predicted fault time nodes of all systems in the machine tool are predicted; and S4, calculating whether the predicted fault time node of each system in the machine tool is within the time period of machining the target part by the machine tool or not, and if the predicted fault time node of the system is within the time period of machining the target part by the machine tool. According to the invention, the convenience of managing personnel to arrange maintenance personnel to maintain the machine tool can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of workshop monitoring technology, and in particular to a workshop information-physical monitoring and management system. Background Art

[0002] With the continuous integration and application of new-generation information technology (Internet of Things, big data, cloud computing, mobile Internet, artificial intelligence, etc.) in the manufacturing industry, the development of intelligent manufacturing models and systems that run through the entire life cycle of the product and have attributes such as self-perception / self-learning / self-decision-making / self-execution / self-adaptation has become an important direction for the current transformation and upgrading of the global manufacturing industry in order to meet the development needs of the manufacturing industry such as socialization, personalization, flexibility, service, and intelligence.

[0003] Among them, workshop visualization, as an important technology in intelligent manufacturing, has received more and more attention and attention in recent years. The essential difference between real-time 3D visualization virtual monitoring and video monitoring lies in two points: the first difference is that the physical scene displayed by real-time 3D visualization virtual monitoring in the control terminal is realized through 3D modeling technology, so it is called "virtual monitoring"; the second difference is that real-time 3D visualization virtual monitoring is driven by real-time data to reflect the physical status and performance of each device, while video monitoring can only show the appearance characteristics of each device.

[0004] In the existing technology, real-time 3D visualization virtual monitoring mainly consists of machine tool client, communication module, and server. The machine tool client mainly includes the machine tool acquisition module, which is composed of various sensors installed on the machine tool for monitoring the processing status of the machine tool, such as temperature monitoring unit, humidity monitoring unit, counting unit, etc.; the various data collected by the machine tool acquisition module are transmitted to the server through the communication module, and the server matches the processing status of the machine tool in the workshop to the model in the real-time 3D visualization virtual monitoring. In the actual production and processing process, relevant personnel can log in to the server, query, operate, and retrieve the processing status and accumulated running time of the machine tool in the workshop through the control terminal.

[0005] In the existing real-time 3D visualization virtual monitoring, managers can only monitor the real-time working conditions of machine tools by calling the machine tool model in the server. In order to ensure the normal operation of machine tools in the physical workshop and avoid the impact of various system failures in the machine tools during the processing of parts, managers usually need to arrange maintenance personnel to maintain various systems of machine tools at fixed time intervals. However, as the cumulative operating time of machine tools in the workshop increases, the machine tools gradually age, and it is difficult for managers to accurately grasp the intervals and time nodes for maintaining various systems in the machine tools, causing management inconvenience. Summary of the invention

[0006] In order to improve the convenience for managers to arrange maintenance personnel to maintain machine tools, the present application provides a workshop information-physical monitoring and management system.

[0007] The workshop information physical monitoring and management system provided in this application adopts the following technical solutions:

[0008] A workshop information physical monitoring and management system includes the following steps:

[0009] S1. Input basic information and associate numbers between the physical workshop, the machine tools in the physical workshop, and the maintenance personnel corresponding to each system of the machine tools;

[0010] S2. Obtaining demand information, order information and the processing flow corresponding to the order information;

[0011] S3, retrieve the historical processing data of the machine tool involved in the process information, and predict the predicted failure time node of each system in the machine tool;

[0012] S4. Whether the predicted failure time node of each system in the computer tool is within the time period when the machine tool processes the target parts. If the predicted failure time node of the system is within the time period when the machine tool processes the target parts, the management personnel is prompted to arrange maintenance personnel to maintain the system before processing the target parts; if not, the management personnel is prompted not to arrange maintenance personnel to maintain the system before processing the target parts.

[0013] By adopting the above technical solution, in the actual production and processing process, the management system can predict the predicted fault time nodes of each system of the machine tool in the physical workshop, and by comparing the time required for the machine tool to process the target part, it can be determined whether the predicted fault time node is within the target part processing time period: if there is a system fault time node within the target part processing time period, before the target part processing process is carried out, the real-time three-dimensional visual virtual monitoring prompts the management personnel through the control terminal of the system number required for the machine tool maintenance, the maintenance personnel of the maintenance system, and the contact information of the maintenance personnel, and the system in the machine tool can be maintained before the machine tool starts processing; if the system fault time nodes are not within the processing time period of the target part, the control terminal of the real-time three-dimensional visual virtual monitoring prompts the management personnel that the system in the machine tool does not need to be maintained. By calculating the predicted fault time nodes of each system in the machine tool and combining the real-time three-dimensional visual virtual monitoring, it is convenient for the management personnel to intuitively arrange the maintenance operations of different systems of the machine tool, and at the same time, it can reduce the occurrence of system failures in the machine tool during the process of machine tool processing parts, which affects production efficiency and causes cost waste. In addition, by storing the maintenance personnel corresponding to the machine tool system and the maintenance personnel's contact information in the server, when the system is displayed as needing maintenance, the management personnel can quickly contact the maintenance personnel to maintain the system through the maintenance personnel and their contact information displayed on the control terminal of real-time three-dimensional visual virtual monitoring, which can further improve the convenience and efficiency of the management personnel in maintaining the workshop machine tools.

[0014] Preferably, S2 comprises the following steps:

[0015] S21, test-process the parts to obtain ta,

[0016] Among them, ta represents the time required for the machine tool to process a single part, in h;

[0017] S22, determine n,

[0018] Where n represents the number of parts required for the order, in pieces;

[0019] S23, calculate tb according to the formula tb = n·ta,

[0020] Where tb represents the time required for the machine tool to complete the processing of the target part, in units of h.

[0021] By adopting the above technical solution, since the specifications of parts in a unified batch are the same, the time required to process a single part can be obtained through trial processing, and since the number of parts to be processed is known, the total time required for the tool to complete the processing of the target part can be calculated according to tb=n·ta.

[0022] Preferably, S3 comprises the following steps:

[0023] S31, obtaining historical fault information of each system in the machine tool, wherein the historical fault information includes the average fault interval time data of each system in the machine tool operation history over the years and the cumulative operation time tc corresponding to the machine tool when the most recent fault occurred;

[0024] S32, extracting the trend item in the mean time interval between failures data of previous years by using the STL algorithm, and obtaining the mean time interval between failures data after removing the seasonal item;

[0025] S33. Calculate the predicted value of the average time interval between system failures in the next year based on the average time interval between failures data after removing the seasonal term by using the quadratic exponential smoothing method.

[0026] S34, based on the time node tc of the cumulative running time corresponding to the most recent fault occurrence and the predicted value of the average fault interval time The predicted time point when the computing system will fail;

[0027] According to the formula Calculate the value of ty;

[0028] Where: ty represents the cumulative runtime nodes of the system predicted to fail in the next year, in hours;

[0029] N is a positive integer greater than or equal to 1, and is used to represent the sequence number of the cumulative running time node where the system is predicted to fail in the next year.

[0030] By adopting the above technical solution, according to the formula The actual cumulative running time of the machine tool system can be measured to be Failure will occur due to tc, is a known value, which can achieve the technical effect of predicting the time node when the computing system fails. In the process of predicting the average failure interval time of previous years, the STL algorithm is used to process the average failure interval time data of previous years in advance, and the average failure interval time data of previous years can be decomposed into seasonal items, trend items and random items. Since the quadratic exponential smoothing method is for sequences with trends but no seasonality, the average failure interval time data of trend items is extracted by the STL algorithm, and then the average failure interval time data of trend items is calculated by the quadratic exponential smoothing method, which can improve the prediction of the quadratic exponential smoothing method. accuracy.

[0031] Preferably, S33 comprises the following steps:

[0032] S331. Calculate the exponential smoothing value of the average interval time between failures of the system trend item

[0033]

[0034] S332. Calculate the quadratic exponential smoothing value of the average interval time between failures of the system trend item

[0035]

[0036] S333. Calculate the predicted value of the mean time interval between failures

[0037] By adopting the above technical solution, based on the trend item mean failure interval time data, an exponential smoothing value is calculated Secondary exponential smoothing value The predicted value of mean time between failures can be calculated

[0038] Preferably, S331 is specifically:

[0039] The exponential smoothing value is calculated according to the following formula

[0040]

[0041] Where:

[0042] y1, y2, and y3 represent the average failure interval time values ​​of the previous three years in the historical average failure interval time data after removing the seasonal term, in units of h;

[0043] yt represents the historical average interval duration of failures after removing the seasonal term, in hours;

[0044] Represents the exponential smoothing value of the previous year, in units of h;

[0045] α1 represents a weighting coefficient in the calculation formula of the first-order exponential smoothing value, and α1 is set to 0.9.

[0046] Preferably, S332 is specifically:

[0047] Pick As the initial value, based on the first exponential smoothing value data, the second exponential smoothing value is calculated according to the following formula

[0048]

[0049] Where:

[0050] α2 represents the weighting coefficient in the calculation formula of the quadratic smoothing value, and α2 is 0.9;

[0051] Represents the double exponential smoothing value of the previous year, in h.

[0052] Preferably, S333 is specifically:

[0053]

[0054] Where:

[0055] Indicates the predicted value of the mean time between failures in one year, in hours.

[0056] Preferably, S4 comprises the following steps:

[0057] S41, obtaining the time node corresponding to the accumulated running time of the machine tool when the target part processing starts, and marking it as t0;

[0058] S42. Calculate whether ty is in the interval [t0, t0+tb). If ty is in the interval [t0, t0+tb), execute S5; if ty is not in the interval [t0, t0+tb), execute S6.

[0059] By adopting the above technical solution, since the total time tb required to process the target part and the time node t0 corresponding to the cumulative running time of the machine tool when the target part processing starts are known, the time period for the machine tool to process the target part can be calculated as [t0, t0+tb).

[0060] In summary, the workshop information-physical monitoring and management system of the present application includes at least one of the following beneficial technical effects:

[0061] 1. During the actual production and processing process, the management system can predict the predicted failure time nodes of each system of the machine tools in the physical workshop. By comparing the time required for the machine tools to process the target parts, it can be determined whether the predicted failure time node is within the target part processing time period: If there is a system failure time node within the target part processing time period, before the target part processing process is carried out, the real-time 3D visual virtual monitoring prompts the management personnel through the control terminal the system number of the machine tool that needs maintenance, the maintenance personnel of the system, and the contact information of the maintenance personnel, so that the system in the machine tool can be maintained before the machine tool starts processing; if the system failure time nodes are not within the target part processing time period, the control terminal of the real-time 3D visual virtual monitoring prompts It shows the management personnel that the system in the machine tool does not need maintenance; by calculating the predicted failure time nodes of each system in the machine tool and combining it with real-time 3D visualization virtual monitoring, the management personnel can intuitively arrange the maintenance operations of different systems of the machine tool, and at the same time reduce the situation in which the system in the machine tool fails during the machine tool processing process, which affects the production efficiency and causes cost waste; by storing the maintenance personnel corresponding to the system of the machine tool and the contact information of the maintenance personnel in the server, when the system is displayed as needing maintenance, the management personnel can quickly contact the maintenance personnel to maintain the system through the maintenance personnel and their contact information displayed on the control terminal of real-time 3D visualization virtual monitoring, which can further improve the convenience and efficiency of the management personnel in maintaining the workshop machine tools;

[0062] 2. During the calculation process, the average failure interval time data of previous years are processed in advance by the STL algorithm, and the average failure interval time data of previous years can be decomposed into seasonal items, trend items and random items. Since the quadratic exponential smoothing method is for sequences with trends but no seasonality, the average failure interval time data of trend items is extracted by the STL algorithm, and then the average failure interval time data of trend items is calculated by the quadratic exponential smoothing method, which can improve the accuracy of the quadratic exponential smoothing method prediction. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] Figure 1 It is a schematic diagram of an embodiment of the present application for demonstrating the main steps of the management system.

[0064] Figure 2 It is a schematic diagram of an embodiment of the present application for demonstrating the main principles of the management system.

[0065] Figure 3 This is a data graph of the average time interval between failures of a servo drive system on a CNC machine tool from 2012 to 2023, which is used in an embodiment of the present application;

[0066] Figure 4The embodiment of the present application is used to display the trend item average fault interval time data obtained after the trend item processing of the annual average fault interval time data from 2012 to 2023;

[0067] Figure 5 This is a chart used in the embodiment of the present application to display the predicted values ​​of the average time interval between failures over the years;

[0068] Figure 6 It is a schematic diagram of an embodiment of the present application for displaying a comparison between a trend item mean time interval between failures waveform and a mean time interval between failures prediction waveform. DETAILED DESCRIPTION

[0069] The following combination Figure 1-Figure 6 This application is described in further detail.

[0070] Example 1

[0071] The present application embodiment discloses a workshop information physical monitoring and management system. Figure 1 The management system mainly includes the following steps: S1. Input basic information, associate and number the physical workshop, the machine tools in the physical workshop, and the maintenance personnel corresponding to each system of the machine tools: number the physical workshop, the machine tools in the physical workshop, and the systems in the machine tools respectively, determine the maintenance personnel corresponding to each system of each machine tool, and store the maintenance personnel corresponding to each system and the contact information of the maintenance personnel in the server; S2. Obtain demand information, obtain order information and the processing process corresponding to the order information: obtain order information, match the parts required to complete the order, determine the machine tool for processing the parts, and calculate the time required for the machine tool to process all parts; S3. Retrieve the historical processing data of the machine tool involved in the process information, and predict the predicted failure time of each system in the machine tool. Point: obtain the predicted failure time node of each system in the machine tool; S4, calculate whether the predicted failure time node of each system in the computer tool is within the time period of the machine tool processing the target part. If the predicted failure time node of the system is within the time period of the machine tool processing the target part, the management personnel is prompted to arrange maintenance personnel to maintain the system before processing the target part. The management personnel is prompted to arrange maintenance operations before processing the target part through the display on the control terminal, and the system to be maintained, the maintenance personnel corresponding to the system, and the contact information of the maintenance personnel are displayed at the same time; if not, the management personnel is prompted that there is no need to arrange maintenance personnel to maintain the system before processing the target part. The management personnel is prompted through the display on the control terminal that there is no need to maintain each system on the machine tool before processing the target part.

[0072] During the actual production and processing process, the management system can predict the predicted failure time nodes of each system of the machine tools in the physical workshop. By comparing the time required for the machine tools to process the target parts, it can be determined whether the predicted failure time node is within the target part processing time period: If there is a system failure time node within the target part processing time period, before the target part processing process is carried out, the real-time three-dimensional visual virtual monitoring prompts the management personnel through the control terminal the system number of the machine tool that needs maintenance, the maintenance personnel who maintain the system, and the contact information of the maintenance personnel, so that the system in the machine tool can be maintained before the machine tool starts processing; if the system failure time nodes are not within the target part processing time period, the control terminal of the real-time three-dimensional visual virtual monitoring prompts the management personnel that the system in the machine tool does not need maintenance.

[0073] By calculating the predicted failure time nodes of each system in the machine tool and combining it with real-time 3D visual virtual monitoring, managers can intuitively arrange maintenance operations for different systems of the machine tool. At the same time, it can reduce the occurrence of system failures in the machine tool during the process of machine tool processing parts, which affects production efficiency and causes cost waste.

[0074] In addition, by storing the maintenance personnel corresponding to the machine tool system and the maintenance personnel's contact information in the server, when the system is displayed as needing maintenance, the management personnel can quickly contact the maintenance personnel to maintain the system through the maintenance personnel and their contact information displayed on the control terminal of real-time three-dimensional visual virtual monitoring, which can further improve the convenience and efficiency of the management personnel in maintaining the workshop machine tools.

[0075] Wherein, S2 includes the following steps:

[0076] S21, test-process the parts to obtain ta,

[0077] Among them, ta represents the time required for the machine tool to process a single part, in h;

[0078] S22, determine n,

[0079] Where n represents the number of parts required for the order, in pieces;

[0080] S23, calculate tb according to the formula tb = n·ta,

[0081] Where tb represents the time required for the machine tool to complete the processing of the target part, in units of h.

[0082] Since the specifications of parts in the same batch are the same, the time required to process a single part can be obtained through trial processing. And since the number of parts to be processed is known, the total time required for the tool to complete the processing of the target part can be calculated according to tb=n·ta.

[0083] In an embodiment of the present application, real-time three-dimensional visual virtual monitoring is applied in a milling workshop, and management personnel monitor and manage multiple CNC machine tools in the milling workshop through a control terminal of real-time three-dimensional visual virtual monitoring.

[0084] Among them, S3 includes the following steps:

[0085] S31, obtaining historical fault information of each system in the machine tool, the historical fault information including the average fault interval time data of each system in the machine tool operation history over the years, and the cumulative operation time tc corresponding to the machine tool when the most recent fault occurred;

[0086] S32, extracting the trend item in the mean time interval between failures data of previous years by using the STL algorithm, and obtaining the mean time interval between failures data after removing the seasonal item;

[0087] S33. Calculate the predicted value of the average time interval between system failures in the next year based on the average time interval between failures data after removing the seasonal term by using the quadratic exponential smoothing method.

[0088] S34, based on the time node tc of the cumulative running time corresponding to the most recent fault occurrence and the predicted value of the average fault interval time The predicted time point when the computing system will fail;

[0089] According to the formula Calculate the value of ty;

[0090] Where: ty represents the cumulative runtime nodes of the system predicted to fail in the next year, in hours;

[0091] N is a positive integer greater than or equal to 1, and is used to represent the sequence number of the cumulative running time node where the system is predicted to fail in the next year.

[0092] According to the formula The actual cumulative running time of the machine tool system can be measured to be Failure will occur due to tc, is a known value, which can achieve the technical effect of predicting the time node when the computing system fails.

[0093] Reference Figure 2 , is the basic principle diagram of step S3, in the calculation In the process of predicting the average failure interval time of previous years, the STL algorithm is used to process the average failure interval time data of previous years in advance, and the average failure interval time data of previous years can be decomposed into seasonal items, trend items and random items. Since the quadratic exponential smoothing method is for sequences with trends but no seasonality, the average failure interval time data of trend items is extracted by the STL algorithm, and then the average failure interval time data of trend items is calculated by the quadratic exponential smoothing method, which can improve the prediction of the quadratic exponential smoothing method. accuracy.

[0094] Reference Figure 3 The actual mean time between failures of the servo drive system of the CNC machine tool from 2012 to 2023 is analyzed by the STL algorithm. Figure 2 The waveform in is decomposed to obtain Figure 4 The trend item Fault Mean Time Interval waveform shown is composed of Figure 4 It can be seen that with the increase of the cumulative operating time of the machine tool, the mean time between failures tends to be gradually shortened.

[0095] Wherein, S33 comprises the following steps:

[0096] S331. Calculate the exponential smoothing value of the average interval time between failures of the system trend item

[0097]

[0098] S332. Calculate the quadratic exponential smoothing value of the average interval time between failures of the system trend item

[0099]

[0100] S333. Calculate the predicted value of the mean time interval between failures

[0101] Based on the trend item mean failure interval data, an exponential smoothing value is calculated. Secondary exponential smoothing value The predicted value of mean time between failures can be calculated

[0102] Among them, S331 is specifically:

[0103] The exponential smoothing value is calculated according to the following formula

[0104]

[0105] Where:

[0106] y1, y2, and y3 represent the average failure interval time values ​​of the previous three years in the historical average failure interval time data after removing the seasonal term, in units of h;

[0107] yt represents the historical average interval duration of failures after removing the seasonal term, in hours;

[0108] Represents the exponential smoothing value of the previous year, in units of h;

[0109] α1 represents a weighting coefficient in the calculation formula of the first-order exponential smoothing value, and α1 is set to 0.9.

[0110] Among them, S332 is specifically:

[0111] Pick As the initial value, based on the first exponential smoothing value data, the second exponential smoothing value is calculated according to the following formula

[0112]

[0113] Where:

[0114] α2 represents the weighting coefficient in the calculation formula of the quadratic smoothing value, and α2 is 0.9;

[0115] Represents the double exponential smoothing value of the previous year, in h.

[0116] S333 is specifically:

[0117]

[0118] Where:

[0119] Indicates the predicted value of the mean time between failures in one year, in hours.

[0120] Reference Figure 5 In the embodiment of the present application, the trend item average interval time of the servo drive system of the CNC machine tool is shown in the chart. According to the chart data, the first exponential smoothing value and the second exponential smoothing value are calculated in turn. According to the first exponential smoothing value, the second exponential smoothing value and the predicted value of the year The calculation formula can be used to calculate the predicted value of the mean time between failures in the next year.

[0121] In the embodiment of the present application, when the servo drive system of the CNC machine tool fails for the last time, the accumulated running time of the CNC machine tool is tc=18637h. Figure 5 and Figure 6, the mean time between failures in 2024 is 746h. It is predicted that the servo drive system of the CNC machine tool will fail when the cumulative operating time reaches: (18637+1·746)h, (18637+2·746)h, (18637+3·746)h... in 2024.

[0122] In the embodiment of the present application, S4 includes the following steps:

[0123] S41, obtaining the time node corresponding to the accumulated running time of the machine tool when the target part processing starts, and marking it as t0;

[0124] S42. Calculate whether ty is in the interval [t0, t0+tb). If ty is in the interval [t0, t0+tb), execute S5; if ty is not in the interval [t0, t0+tb), execute S6.

[0125] Since the total time tb required to process the target part and the time node t0 corresponding to the cumulative running time of the machine tool when the target part processing starts are known, the time period for the machine tool to process the target part can be calculated as [t0, t0+tb).

[0126] Here, assuming that the time required for a CNC machine tool to process a single part is ta=0.06h, and assuming that 1000 parts are needed to complete an order, the time required to complete the processing of the target part is tb=1000·0.06=60h.

[0127] In the embodiment of the present application, the time node t0 of the cumulative running time when the CNC machine tool processes the target part is 20084h, and the time interval for the CNC machine tool to process the target part is [20084, 20144). According to calculation, the second predicted fault occurrence time node 18637+2·746=20129h of the servo drive system of the CNC machine tool is within the processing time interval of the machine tool processing the target part. Therefore, the management system prompts the management personnel through the control terminal of real-time three-dimensional visual virtual monitoring to arrange the maintenance personnel responsible for maintaining the servo drive system to maintain the servo drive system before processing the target part. At the same time, the management system displays the contact information of the maintenance personnel through the control terminal of real-time three-dimensional visual virtual monitoring.

[0128] The implementation principle of a workshop information physical monitoring management system in the embodiment of the present application is as follows: during the actual production and processing process, the management system can predict the predicted fault time nodes of each system of the machine tool in the physical workshop, and by comparing the time required for the machine tool to process the target part, it can be determined whether the predicted fault time node is within the target part processing time period: if there is a system fault time node within the target part processing time period, before the target part processing process is carried out, the real-time three-dimensional visual virtual monitoring prompts the management personnel through the control terminal the system number required for the machine tool maintenance, the maintenance personnel for the maintenance system, and the contact information of the maintenance personnel, and the system in the machine tool can be maintained before the machine tool starts processing; if the system fault time nodes are not within the processing time period of the target part, the control terminal of the real-time three-dimensional visual virtual monitoring prompts the management personnel that the system in the machine tool does not need to be maintained. By calculating the predicted fault time nodes of each system in the machine tool and combining the real-time three-dimensional visual virtual monitoring, it is convenient for the management personnel to intuitively arrange the maintenance operations of different systems of the machine tool, and at the same time, it can reduce the occurrence of system failures in the machine tool during the process of machine tool processing parts, which affects production efficiency and causes cost waste. In addition, by storing the maintenance personnel corresponding to the machine tool system and the maintenance personnel's contact information in the server, when the system is displayed as needing maintenance, the management personnel can quickly contact the maintenance personnel to maintain the system through the maintenance personnel and their contact information displayed on the control terminal of real-time three-dimensional visual virtual monitoring, which can further improve the convenience and efficiency of the management personnel in maintaining the workshop machine tools.

[0129] Example 2

[0130] In the embodiment of the present application, a sliding average algorithm is used to remove seasonal items from the historical average fault interval duration data.

[0131] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A workshop information physical monitoring and management system, characterized in that: The following steps are involved: S1. Input basic information and associate numbers between the physical workshop, the machine tools in the physical workshop, and the maintenance personnel corresponding to each system of the machine tools; S2. Obtaining demand information, order information and the processing flow corresponding to the order information; S3, retrieve the historical processing data of the machine tool involved in the process information, and predict the predicted failure time node of each system in the machine tool; S4. Whether the predicted failure time node of each system in the computer tool is within the time period when the machine tool processes the target parts. If the predicted failure time node of the system is within the time period when the machine tool processes the target parts, the management personnel is prompted to arrange maintenance personnel to maintain the system before processing the target parts; if not, the management personnel is prompted not to arrange maintenance personnel to maintain the system before processing the target parts.

2. A workshop information physical monitoring and management system according to claim 1, characterized in that: S2 includes the following steps: S21, test-process the parts to obtain ta, Among them, ta represents the time required for the machine tool to process a single part, in h; S22, determine n, Where n represents the number of parts required for the order, in pieces; S23, calculate tb according to the formula tb = n·ta, Where tb represents the time required for the machine tool to complete the processing of the target part, in units of h.

3. A workshop information physical monitoring and management system according to claim 2, characterized in that: S3 includes the following steps: S31, obtaining historical fault information of each system in the machine tool, wherein the historical fault information includes the average fault interval time data of each system in the machine tool operation history over the years, and the cumulative operation time tc corresponding to the machine tool when the most recent fault occurred; S32, extracting the trend item in the mean time interval between failures data of previous years by using the STL algorithm, and obtaining the mean time interval between failures data after removing the seasonal item; S33. Calculate the predicted value of the average time interval between system failures in the next year based on the average time interval between failures data after removing the seasonal term by using the quadratic exponential smoothing method. S34, based on the time node tc of the cumulative running time corresponding to the most recent fault occurrence and the predicted value of the average fault interval time The predicted time point when the computing system will fail; According to the formula Calculate the value of ty; Where: ty represents the cumulative runtime nodes of the system predicted to fail in the next year, in hours; N is a positive integer greater than or equal to 1, and is used to represent the sequence number of the cumulative running time node where the system is predicted to fail in the next year.

4. A workshop information physical monitoring and management system according to claim 3, characterized in that: S33 includes the following steps: S331. Calculate the exponential smoothing value of the average interval time between failures of the system trend item S332. Calculate the quadratic exponential smoothing value of the average interval time between failures of the system trend item S333. Calculate the predicted value of the mean time interval between failures 5. A workshop information physical monitoring and management system according to claim 4, characterized in that: S331 is as follows: The exponential smoothing value is calculated according to the following formula Where: y1, y2, and y3 represent the average failure interval time values ​​of the previous three years in the historical average failure interval time data after removing the seasonal term, in units of h; yt represents the historical average interval duration of failures after removing the seasonal term, in hours; Represents the exponential smoothing value of the previous year, in units of h; α1 represents the weighting coefficient in the calculation formula of the first-order exponential smoothing value, and α1 is set to 0.

9.

6. A workshop information physical monitoring and management system according to claim 5, characterized in that: S332 is specifically: Pick As the initial value, based on the first exponential smoothing value data, the second exponential smoothing value is calculated according to the following formula Where: α2 represents the weighting coefficient in the calculation formula of the quadratic smoothing value, and α2 is 0.9; Represents the double exponential smoothing value of the previous year, in h.

7. A workshop information physical monitoring and management system according to claim 6, characterized in that: S333 is specifically: Where: Indicates the predicted value of the mean time between failures in one year, in hours.

8. The workshop information physical monitoring and management system according to claim 7, characterized in that: S4 includes the following steps: S41, obtaining the time node corresponding to the accumulated running time of the machine tool when the target part processing starts, and marking it as t0; S42. Calculate whether ty is in the interval [t0, t0+tb). If ty is in the interval [t0, t0+tb), execute S5; if ty is not in the interval [t0, t0+tb), execute S6.