High-precision small-power electronic load
The detection unit obtains the input voltage and ambient temperature, calculates the compensation parameters and adjusts the duty cycle signal, solves the problem of lowering the accuracy of the electronic load at different temperatures, and achieves more accurate load simulation and stability, and adapts to environmental changes.
Patent Information
- Application Number
- CN202410965245.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-12
AI Technical Summary
The accuracy of existing electronic loads is reduced under different temperature environments, which affects the accuracy of battery test results.
By setting the detection unit to obtain the input voltage and ambient temperature, calculate the compensation parameters, iteratively optimize the temperature compensation amount, adjust the duty cycle signal to generate the control signal, and output it to the load analog power switch tube, realize temperature compensation, improve the accuracy of the electronic load and stability.
Improve the accuracy and stability of electronic loads at different temperatures, reduce the impact of temperature on battery measurement accuracy, and provide more accurate load simulation conditions.
Smart Images

Figure CN118939064A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electronic loads, and more specifically to a high-precision low-power electronic load. Background Art
[0002] The battery industry has played an increasingly important role in the global energy transformation and development of new energy vehicles in recent years. With the increasing awareness of reducing greenhouse gas emissions and environmental protection around the world, new energy vehicles and their core components, power batteries, have received great attention and rapid development. The industry has a lot of policy support and market demand, and technological innovation has also developed rapidly.
[0003] Among the related industrial products of power batteries, electronic load, also known as electronic load in English, is an electronic component that can accurately detect load voltage and precisely adjust load current by controlling the internal power or conduction amount of transistors. It can simulate the load conditions under actual working conditions during battery debugging and testing. Electronic loads simulate different load conditions to evaluate their discharge characteristics and lifespan, helping to test and evaluate the stability, efficiency and reliability of batteries. The simulation process of electronic loads can help optimize battery design and improve battery performance to ensure that the battery can meet performance requirements in actual use. For battery manufacturers, these are crucial to the development and production of batteries.
[0004] The accuracy of electronic loads is affected by a variety of environmental factors, including temperature. The electronic components and sensors inside electronic loads are very sensitive to temperature changes. Generally, the measurement accuracy is highest at room temperature, while too high or too low temperatures may cause the performance of electronic components to degrade, thus affecting the accuracy of electronic loads and causing errors. Electronic loads are electronic devices that simulate load conditions and are used for battery testing. Reduced accuracy of electronic loads directly leads to reduced accuracy of battery test results. Summary of the invention
[0005] In order to overcome the disadvantage that the accuracy of the existing electronic load is reduced due to the influence of the environment, the present invention provides a high-precision low-power electronic load.
[0006] The technical solution of the present invention is as follows:
[0007] A high-precision low-power electronic load, comprising a control unit, a control unit
[0008] Acquire the input voltage of the electronic load input by the power supply and the current ambient temperature, and acquire the input voltage and the current ambient temperature through a detection unit arranged between the electronic load and the power supply;
[0009] Set compensation parameters including ambient temperature coefficient and input voltage parameters;
[0010] Perform iterative optimization calculation according to the compensation parameters and obtain optimized compensation parameters;
[0011] Calculate and obtain the temperature compensation amount according to the optimized compensation parameters, current ambient temperature, and input voltage;
[0012] Calculate the duty cycle according to the temperature compensation amount and obtain a new duty cycle;
[0013] A duty cycle control signal is generated based on the new duty cycle, and the duty cycle control signal is output to the load simulation power switch tube.
[0014] The above-mentioned high-precision low-power electronic load,
[0015] The compensation parameters are
[0016] θ=[A,B],
[0017] Among them, θ is the compensation parameter, which is a parameter matrix containing the ambient temperature coefficient and the input voltage parameter.
[0018] A is the input voltage parameter,
[0019] B is the ambient temperature coefficient,
[0020] The temperature compensation is
[0021] u(θ,U in ,T)=θ[U in ,T] T =[A,B][U in ,T] T ,
[0022] Among them, u(θ,U in ,T) is the temperature compensation amount obtained by compensation parameters, input voltage and current ambient temperature,
[0023] θ is the compensation parameter,
[0024] U in is the input voltage of the electronic load, that is, the input voltage of the power switch tube used for load simulation in the electronic load.
[0025] T is the current ambient temperature of the electronic load.
[0026] Updated duty cycle calculation formula
[0027] D N =D+u(θ,U in ,T),
[0028] D N is the new duty cycle calculated after temperature compensation,
[0029] D is the original duty cycle,
[0030] u(θ,U in ,T) is the temperature compensation amount.
[0031] The values of the input voltage parameter and the ambient temperature parameter in the compensation parameters can be initialized through experimental calibration or data provided by the manufacturer. If there is no ready-made data, some empirical values or uniformly distributed random numbers can be used for initialization. Through the iterative learning process, the input voltage parameter and the ambient temperature parameter can also be continuously optimized. Therefore, the values can be obtained according to actual needs or experience.
[0032] In this embodiment, the two values of the input voltage parameter and the ambient temperature parameter are obtained through experiments. The electronic loads of the same batch and model are used as experimental objects, and the actual output (output power or output current) of the electronic loads is detected under different ambient temperatures and different input voltages, and the input voltage parameter and the ambient temperature parameter are obtained by collecting data and fitting.
[0033] Furthermore, the iterative update formula of the compensation parameters is:
[0034] θ k+1 =θ k -λ·(▽ 2 J(θ k )) -1 dk,
[0035] Among them, θ k+1 is the compensation parameter updated iteratively,
[0036] θ k is the compensation parameter of the current iteration step k,
[0037] λ is a custom non-zero positive gain coefficient used to control the step size of each iteration.
[0038] (▽ 2 J(θ k )) is the objective function J(θ) with compensation parameter θ k The inverse of the second-order partial derivative matrix at ,
[0039] J(θ) is the objective function,
[0040] dk is the gradient direction.
[0041] λ is a custom non-zero positive gain coefficient, usually 0<λ<2. According to the requirements, the gain coefficient can be obtained based on experience or previous similar problems, or a value can be arbitrarily selected and then iterated several times. If each iteration reduces the compensation parameter value, the value of λ can be increased. If the compensation parameter value increases, the value of λ needs to be reduced. λ is used to control the convergence of the iterative update of the compensation parameter, and its setting needs to satisfy ||θk+1 ||<θ k ||, under the above conditions, the value of λ can be increased arbitrarily to reduce the number of iterative calculations.
[0042] The objective function refers to an optimization purpose function. In the present invention, the objective function may be to ensure that the duty cycle signal of the power switch tube is accurate, or to maintain a stable output voltage and current of the electronic load under the condition of ambient temperature changes, or to accurately simulate the required load power, or to accurately simulate the required load current. Select any of the above purposes to establish a function formula of the objective parameter with the current ambient temperature and input voltage.
[0043] In this embodiment, the objective function is to accurately simulate the required load power, and the objective function is established based on this. Specifically,
[0044] The error of the objective function is defined as the difference between the actual output power and the required power, that is, the error term e P =P out -P a , where e P is the error term, P out is the actual output power of the electronic load, P a The power required.
[0045] Select an error measurement method to quantify the target error, such as using the square of the target error as the error measurement method, that is, the square error e P 2 .
[0046] Construct the objective function, based on the error quantification determined by the error measurement method, set multiple sampling points, and count the errors between the actual values of all sampling points and the target values. If the square error measurement method is used, the objective function is
[0047]
[0048] The above-mentioned high-precision low-power electronic load also includes
[0049] Load simulation unit, used to simulate traditional linear loads and nonlinear loads, receive DC power from the power supply, and perform continuous regulation and precise control of current;
[0050] The energy feedback unit feeds the remaining electric energy back to the grid at unity power factor, receives the DC power output by the previous stage, performs inversion and controls the harmonic content of the grid-connected current.
[0051] Furthermore, the load simulation unit includes
[0052] The front-end LC filter circuit receives DC power from the power supply and filters out high-frequency harmonics of the input current to ensure the continuity of the input current and maintain current stability;
[0053] The full-bridge converter receives the current processed by the front-end LC filter circuit, boosts the input current and implements soft switching technology to reduce switching losses, achieving electrical isolation and boosting.
[0054] Furthermore, the front-end LC filter circuit includes
[0055] Input filter inductor receives DC current from the power supply, performs current smoothing to reduce current fluctuations, and suppresses ripple and noise in the input current;
[0056] The input filter capacitor receives the current after inductor filtering, stabilizes the voltage and maintains current continuity, further reducing the ripple of the input current.
[0057] Furthermore, the full-bridge converter includes
[0058] The load simulates the power switch tube, receives the PWM signal from the control strategy, performs switching action to adjust the output current, and controls the on and off of the current to achieve soft switching;
[0059] The resonant inductor receives the current from the front-end LC filter circuit, resonates to reduce switching losses, and cooperates with the power switch tube to achieve zero voltage switching;
[0060] The compensation capacitor receives the output voltage of the full-bridge converter, stores and releases energy to optimize the duty cycle, and compensates for the loss of duty cycle of the transformer secondary voltage.
[0061] Furthermore, the energy feedback unit includes
[0062] The grid-connected inverter is used to receive direct current from the load simulation unit, invert the direct current and convert it into alternating current synchronized with the grid, and the output current is in phase with the grid voltage;
[0063] The filter is used to receive the output current of the grid-connected inverter, filter out the high-frequency harmonics generated during the inversion process, and suppress the harmonics to meet the grid-connected standards.
[0064] Furthermore, the grid-connected inverter includes
[0065] The grid-connected power switch tube receives the modulation signal from the control strategy, performs switching action to generate current synchronized with the grid, and controls the flow direction of the current according to the PWM signal;
[0066] The filter inductor on the inverter side receives the energy from the DC bus capacitor and performs current smoothing to reduce current fluctuations and reduce the ripple of the inverter output current;
[0067] The grid-connected side filter inductor receives the current from the inverter side filter inductor, performs harmonic suppression, and filters out high-frequency harmonics in the grid-connected current to improve the quality of the power connected to the grid.
[0068] Furthermore, the filter includes
[0069] The filter capacitor receives current from the grid-connected inverter, compensates for reactive power to reduce the impact on system capacity, and forms an LC filter with the inverter-side filter inductor.
[0070] The present invention according to the above scheme has the beneficial effect that:
[0071] 1. The present invention improves the accuracy and stability of the electronic load when it works at different temperatures through compensation parameters and iterative optimization calculations, so that the electronic load can adapt to changes in ambient temperature and reduce the impact of temperature on battery measurement accuracy, thereby providing more accurate load simulation conditions.
[0072] 2. The present invention uses a post-regulation method to monitor the output current and output power, define the error between the two and the required value, and establish an objective function to perform iterative shrinkage calculations. It can be adjusted and optimized according to different application requirements, has good flexibility and scalability, and can also be precisely controlled for different optimization purposes. BRIEF DESCRIPTION OF THE DRAWINGS
[0073] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0074] Figure 1 It is a flow chart of the control algorithm of the control unit.
[0075] Figure 2 Schematic diagram of the structure of the electronic load of the present invention. DETAILED DESCRIPTION
[0076] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0077] A high-precision low-power electronic load, such as Figure 1 As shown, it includes a control unit, a control unit
[0078] Acquire the input voltage of the electronic load input by the power supply and the current ambient temperature, and acquire the input voltage and the current ambient temperature through a detection unit arranged between the electronic load and the power supply;
[0079] Set compensation parameters including ambient temperature coefficient and input voltage parameters;
[0080] Perform iterative optimization calculation according to the compensation parameters and obtain optimized compensation parameters;
[0081] Calculate and obtain the temperature compensation amount according to the optimized compensation parameters, current ambient temperature, and input voltage;
[0082] Calculate the duty cycle according to the temperature compensation amount and obtain a new duty cycle;
[0083] A duty cycle control signal is generated based on the new duty cycle, and the duty cycle control signal is output to the load simulation power switch tube.
[0084] The compensation parameters are
[0085] θ=[A,B],
[0086] Among them, θ is the compensation parameter, which is a parameter matrix containing the ambient temperature coefficient and the input voltage parameter.
[0087] A is the input voltage parameter,
[0088] B is the ambient temperature coefficient,
[0089] The temperature compensation is
[0090] u(θ,U in ,T)=θ[U in ,T] T =[A,B][U in ,T] T ,
[0091] Among them, u(θ,U in ,T) is the temperature compensation amount obtained by compensation parameters, input voltage and current ambient temperature,
[0092] θ is the compensation parameter,
[0093] U in is the input voltage of the electronic load, that is, the input voltage of the power switch tube used for load simulation in the electronic load.
[0094] T is the current ambient temperature of the electronic load.
[0095] Updated duty cycle calculation formula
[0096] D N =D+u(θ,U in ,T),
[0097] D N is the new duty cycle calculated after temperature compensation,
[0098] D is the original duty cycle,
[0099] u(θ,U in ,T) is the temperature compensation amount.
[0100] The values of the input voltage parameter and the ambient temperature parameter in the compensation parameters can be initialized through experimental calibration or data provided by the manufacturer. If there is no ready-made data, some empirical values or uniformly distributed random numbers can be used for initialization. Through the iterative learning process, the input voltage parameter and the ambient temperature parameter can also be continuously optimized. Therefore, the values can be obtained according to actual needs or experience.
[0101] In this embodiment, the two values of the input voltage parameter and the ambient temperature parameter are obtained through experiments. The electronic loads of the same batch and model are used as experimental objects, and the actual output (output power or output current) of the electronic loads is detected under different ambient temperatures and different input voltages, and the input voltage parameter and the ambient temperature parameter are obtained by collecting data and fitting.
[0102] The iterative update formula of compensation parameters is:
[0103] θ k+1 =θ k -λ·(▽ 2 J(θ k )) -1 dk,
[0104] Among them, θ k+1 is the compensation parameter updated iteratively,
[0105] θ k is the compensation parameter of the current iteration step k,
[0106] λ is a custom non-zero positive gain coefficient used to control the step size of each iteration.
[0107] (▽ 2 J(θ k )) is the objective function J(θ) with compensation parameter θ k The inverse of the second-order partial derivative matrix at ,
[0108] J(θ) is the objective function,
[0109] dk is the gradient direction,
[0110] λ is a custom non-zero positive gain coefficient, usually 0<λ<2. According to the requirements, the gain coefficient can be obtained based on experience or previous similar problems, or a value can be arbitrarily selected and then iterated several times. If each iteration reduces the compensation parameter value, the value of λ can be increased. If the compensation parameter value increases, the value of λ needs to be reduced. λ is used to control the convergence of the iterative update of the compensation parameter, and its setting needs to satisfy ||θ k+1 ||<θ k ||, under the above conditions, the value of λ can be increased arbitrarily to reduce the number of iterative calculations.
[0111] The objective function refers to an optimization purpose function. In the present invention, the objective function may be to ensure that the duty cycle signal of the power switch tube is accurate, or to maintain a stable output voltage and current of the electronic load under the condition of ambient temperature changes, or to accurately simulate the required load power, or to accurately simulate the required load current. Select any of the above purposes to establish a function formula of the objective parameter with the current ambient temperature and input voltage.
[0112] In this embodiment, the objective function is to accurately simulate the required load power, and the objective function is established based on this. Specifically,
[0113] The error of the objective function is defined as the difference between the actual output power and the required power, that is, the error term e P =P out -P a , where e P is the error term, P out is the actual output power of the electronic load, P a The power required.
[0114] Select an error measurement method to quantify the target error, such as using the square of the target error as the error measurement method, that is, the square error e P 2 .
[0115] Construct the objective function, based on the error quantification determined by the error measurement method, set multiple sampling points, and count the errors between the actual values of all sampling points and the target values. If the square error measurement method is used, the objective function is
[0116]
[0117] like Figure 2 As shown, the load simulation unit is used to simulate traditional linear loads and nonlinear loads, receive DC power from a power source, and continuously adjust and accurately control the current;
[0118] The energy feedback unit feeds the remaining electric energy back to the grid at unity power factor, receives the DC power output by the previous stage, performs inversion and controls the harmonic content of the grid-connected current.
[0119] Load simulation unit includes
[0120] The front-end LC filter circuit receives DC power from the power supply and filters out high-frequency harmonics of the input current to ensure the continuity of the input current and maintain current stability;
[0121] The full-bridge converter receives the current processed by the front-end LC filter circuit, boosts the input current and implements soft switching technology to reduce switching losses, achieving electrical isolation and boosting.
[0122] The front-end LC filter circuit includes
[0123] Input filter inductor receives DC current from the power supply, performs current smoothing to reduce current fluctuations, and suppresses ripple and noise in the input current;
[0124] The input filter capacitor receives the current after inductor filtering, stabilizes the voltage and maintains current continuity, further reducing the ripple of the input current.
[0125] The full-bridge converter includes
[0126] The load simulates the power switch tube, receives the PWM signal from the control strategy, performs switching action to adjust the output current, and controls the on and off of the current to achieve soft switching;
[0127] The resonant inductor receives the current from the front-end LC filter circuit, resonates to reduce switching losses, and cooperates with the power switch tube to achieve zero voltage switching;
[0128] The compensation capacitor receives the output voltage of the full-bridge converter, stores and releases energy to optimize the duty cycle, and compensates for the loss of duty cycle of the transformer secondary voltage.
[0129] The load simulation unit obtains control command signals from the main control module. These command signals include the required load power, current setting point, voltage setting point, etc. According to the received control command signals, the load simulation unit uses PWM (pulse width modulation) technology to adjust the duty cycle of the PWM signal to control the switching state of the switching device, accurately control the current passing through the load, thereby adjusting the load current and voltage to achieve simulation of the power supply output characteristics.
[0130] The inductor L and capacitor C in the front-end LC filter circuit work together to smooth the current waveform and suppress current fluctuations. The inductor L is used to limit the rapid changes in current, and the capacitor C is used to absorb high-frequency fluctuations in the current, jointly ensuring the accuracy of load simulation and the stability of the system. The front-end LC filter circuit filters out high-frequency noise in the input current, ensures the stability and continuity of the current, and provides a high-quality current source for the full-bridge converter.
[0131] The full-bridge converter uses zero voltage switching technology to reduce switching losses and improve efficiency. The full-bridge converter precisely controls the switching moment of the switch tube to achieve precise regulation of the output current to meet the requirements of the load current.
[0132] In this embodiment, the full-bridge converter includes a first power switch tube, a second power switch tube, a third power switch tube and a fourth power switch tube. Each power switch tube corresponds to a diode in parallel. The first power switch tube corresponds to the first diode in parallel, the second power switch tube corresponds to the second diode in parallel, the third power switch tube corresponds to the third diode in parallel, and the fourth power switch tube corresponds to the fourth diode in parallel.
[0133] Energy feedback unit includes
[0134] The grid-connected inverter is used to receive direct current from the load simulation unit, invert the direct current and convert it into alternating current synchronized with the grid, and the output current is in phase with the grid voltage;
[0135] The filter is used to receive the output current of the grid-connected inverter, filter out the high-frequency harmonics generated during the inversion process, and suppress the harmonics to meet the grid-connected standards.
[0136] Grid-connected inverter includes
[0137] The grid-connected power switch tube receives the modulation signal from the control strategy, performs switching action to generate current synchronized with the grid, and controls the flow direction of the current according to the PWM signal;
[0138] The filter inductor on the inverter side receives the energy from the DC bus capacitor and performs current smoothing to reduce current fluctuations and reduce the ripple of the inverter output current;
[0139] The grid-connected side filter inductor receives the current from the inverter side filter inductor, performs harmonic suppression, and filters out high-frequency harmonics in the grid-connected current to improve the quality of the power connected to the grid.
[0140] Filters include
[0141] The filter capacitor receives current from the inverter, compensates for reactive power to reduce the impact on system capacity, and forms an LC filter with the filter inductor on the inverter side.
[0142] The energy feedback unit receives the DC power from the load simulation unit and the synchronous grid connection instruction issued by the main control module. The power switch device of the DC / AC inverter in the energy feedback unit performs switching operations according to the PWM signal, converts the received DC power into AC power synchronized with the grid, and inputs the converted AC power into the grid. Among them, the main control module adjusts the PWM signal according to the real-time data of the grid voltage to ensure that the AC power output by the DC / AC inverter is of the same frequency and phase as the grid voltage, realizes effective energy feedback, reduces energy loss during the test, realizes the recycling of electric energy, and meets the requirements of modern energy conservation and environmental protection. In addition, the energy feedback unit also includes an LCL filter to filter out high-frequency harmonics generated during the inversion process and improve the quality of electric energy connected to the grid.
[0143] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A high-precision low-power electronic load, It is characterized in that Including control unit, control unit Acquire the input voltage of the electronic load input by the power supply and the current ambient temperature, and acquire the input voltage and the current ambient temperature through a detection unit arranged between the electronic load and the power supply; Set compensation parameters including ambient temperature coefficient and input voltage parameters; Perform iterative optimization calculation according to the compensation parameters and obtain optimized compensation parameters; Calculate and obtain the temperature compensation amount according to the optimized compensation parameters, current ambient temperature, and input voltage; Calculate the duty cycle according to the temperature compensation amount and obtain a new duty cycle; A duty cycle control signal is generated based on the new duty cycle, and the duty cycle control signal is output to the load simulation power switch tube.
2. According to the high-precision low-power electronic load described in claim 1, It is characterized in that The compensation parameters are θ=[A,B], Among them, θ is the compensation parameter, which is a parameter matrix containing the ambient temperature coefficient and the input voltage parameter. A is the input voltage parameter, B is the ambient temperature coefficient, The temperature compensation is u(θ,U in ,T)=θ[U in ,T] T =[A,B][U in ,T] T , Among them, u(θ,U in ,T) is the temperature compensation amount obtained by compensation parameters, input voltage and current ambient temperature, θ is the compensation parameter, U in is the input voltage of the electronic load, that is, the input voltage of the power switch tube used for load simulation in the electronic load. T is the current ambient temperature of the electronic load. Updated duty cycle calculation formula D N =D+u(θ,U in ,T), D N is the new duty cycle calculated after temperature compensation, D is the original duty cycle, u(θ,U in ,T) is the temperature compensation amount.
3. According to the high-precision low-power electronic load described in claim 1, It is characterized in that The iterative update formula of compensation parameters is: Among them, θ k+1 is the compensation parameter updated iteratively, θ k is the compensation parameter of the current iteration step k, λ is a custom non-zero positive gain coefficient used to control the step size of each iteration. is the objective function J(θ) under the compensation parameter θ k The inverse of the second-order partial derivative matrix at , J(θ) is the objective function, dk is the gradient direction.
4. According to the high-precision low-power electronic load described in claim 1, It is characterized in that Also includes Load simulation unit, used to simulate traditional linear loads and nonlinear loads, receive DC power from the power supply, and perform continuous regulation and precise control of current; The energy feedback unit feeds the remaining electric energy back to the grid at unity power factor, receives the DC power output by the previous stage, performs inversion and controls the harmonic content of the grid-connected current.
5. According to the high-precision low-power electronic load described in claim 4, It is characterized in that Load simulation unit includes The front-end LC filter circuit receives DC power from the power supply and filters out high-frequency harmonics of the input current to ensure the continuity of the input current and maintain current stability; The full-bridge converter receives the current processed by the front-end LC filter circuit, boosts the input current and implements soft switching technology to reduce switching losses, achieving electrical isolation and boosting.
6. According to the high-precision low-power electronic load described in claim 5, It is characterized in that The front-end LC filter circuit includes Input filter inductor receives DC current from the power supply, performs current smoothing to reduce current fluctuations, and suppresses ripple and noise in the input current; The input filter capacitor receives the current after inductor filtering, stabilizes the voltage and maintains current continuity, further reducing the ripple of the input current.
7. According to the high-precision low-power electronic load described in claim 5, It is characterized in that The full-bridge converter includes The load simulates the power switch tube, receives the PWM signal from the control strategy, performs switching action to adjust the output current, and controls the on and off of the current to achieve soft switching; The resonant inductor receives the current from the front-end LC filter circuit, resonates to reduce switching losses, and cooperates with the power switch tube to achieve zero voltage switching; The compensation capacitor receives the output voltage of the full-bridge converter, stores and releases energy to optimize the duty cycle, and compensates for the loss of duty cycle of the transformer secondary voltage.
8. According to the high-precision low-power electronic load described in claim 4, It is characterized in that Energy feedback unit includes The grid-connected inverter is used to receive direct current from the load simulation unit, invert the direct current and convert it into alternating current synchronized with the grid, and the output current is in phase with the grid voltage; The filter is used to receive the output current of the grid-connected inverter, filter out the high-frequency harmonics generated during the inversion process, and suppress the harmonics to meet the grid-connected standards.
9. According to the high-precision low-power electronic load described in claim 8, It is characterized in that Grid-connected inverter includes The grid-connected power switch tube receives the modulation signal from the control strategy, performs switching action to generate current synchronized with the grid, and controls the flow direction of the current according to the PWM signal; The filter inductor on the inverter side receives the energy from the DC bus capacitor and performs current smoothing to reduce current fluctuations and reduce the ripple of the inverter output current; The grid-connected side filter inductor receives the current from the inverter side filter inductor, performs harmonic suppression, and filters out high-frequency harmonics in the grid-connected current to improve the quality of the power connected to the grid.
10. According to the high-precision low-power electronic load described in claim 8, It is characterized in that The filter includes a filter capacitor, which receives current from the grid-connected inverter, compensates for reactive power to reduce the impact on system capacity, and forms an LC filter with the inverter-side filter inductor.
Citation Information
Cited By
Power grid compensation device, transformer substation system and power grid compensation control method
CN119853065A
Power grid compensation device, substation system and power grid compensation control method
CN119853065B
