Database establishment method and device, equipment, readable storage medium and program product
By calculating the distance information and ground height of dense transmission channels, establishing an evaluation database, analyzing the probability of lightning strikes and optimizing the layout, the problem of insufficient lightning resistance of dense transmission channels is solved, and the stability and disaster resistance of the power system are improved.
Patent Information
- Application Number
- CN202411043406.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-12
AI Technical Summary
The lightning resistance assessment of dense transmission channels is not yet perfect, resulting in a serious impact on the stability of the power system. It is necessary to improve the lightning resistance of dense transmission channels.
By calculating the distance information of each tower to other lines and the ground height of the wires, a database is established to evaluate the lightning protection of the lines, analyze the probability of lightning strikes, and formulate protection strategies, optimize equipment layout and ground system, and improve the reliability of the power system. and disaster resilience.
By regularly updating and analyzing the information in the database, preventive maintenance and real-time monitoring can be achieved, potential problems can be discovered in a timely manner, minimize the impact of lightning strikes on transmission channels, and improve the stability and disaster resilience of the overall power system.
Smart Images

Figure CN118939632A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of ultra-high voltage power transmission technology, and in particular to a database establishment method, device, equipment, readable storage medium and program product. Background Art
[0002] Dense transmission channels refer to important and dense transmission channel sections in the power system, usually composed of two or more UHV DC lines, with an average width of 300 to 400 meters, and a minimum gap of no more than 100 meters between adjacent lines. According to the latest requirements of the National Energy Administration, dense transmission channels refer to those with a width of less than 600 meters, containing at least two UHV DC lines or at least five important transmission lines of 500 kV and above. These channels are part of important transmission systems, capable of carrying large amounts of power loads and ensuring the stable operation of power systems.
[0003] Most of the dense transmission channels are important ultra-high voltage transmission lines with voltage levels of 500kV and above. Once a lightning strike occurs, it may trigger a chain reaction and seriously affect the stability of the system. Therefore, strict safety assessment is required to ensure its stable operation.
[0004] At present, the research on lightning resistance assessment of dense transmission channels is still incomplete. Therefore, how to improve the lightning resistance of dense transmission channels has become an urgent problem to be solved. Summary of the invention
[0005] Based on this, it is necessary to provide a database establishment method, device, equipment, readable storage medium and program product that can improve the lightning resistance of dense transmission channels in response to the above technical problems.
[0006] In a first aspect, the present application provides a method for establishing a database, comprising:
[0007] For each tower, based on the tower's geographical location and the line on which the tower is located, calculate the distance information between the tower and other lines;
[0008] For each line, determine the height of each wire in the line above the ground;
[0009] Based on the distance information and the height above the ground, a database is established; wherein the database is used to evaluate the lightning protection of the line.
[0010] In one embodiment, the distance information between the pole tower and other lines is calculated based on the geographical location of the pole tower and the line where the pole tower is located, including:
[0011] Based on the geographical location of the tower, a vertical projection line perpendicular to the line where the tower is located is determined, and multiple intersection points of the vertical projection line and other lines are obtained;
[0012] For each intersection point, the distance information between the intersection point and the tower is calculated.
[0013] In one embodiment, the above-mentioned calculation of the distance information between the intersection point and the tower includes:
[0014] According to the first line segment and the second line segment, determine the information of the central angle formed by the first line segment and the second line segment; wherein the first line segment is a line connecting the geographical location of the intersection point and the center of the earth; and the second line segment is a line connecting the geographical location of the tower and the center of the earth;
[0015] Calculate the distance information based on the center angle information and the radius of the earth.
[0016] In one embodiment, the determining the height of each wire in the line above the ground includes:
[0017] Obtain the hanging point height, span length and maximum sag of the line;
[0018] Calculate the height above the ground based on the hanging point height, span length and maximum sag.
[0019] In one embodiment, the above-mentioned calculation of the height above the ground according to the hanging point height, the span length and the maximum sag includes:
[0020] Substitute the distance from any point in the line to the tower into the preset relationship to calculate the height above the ground; the relationship is used to characterize the corresponding relationship between the height above the ground and the hanging point height, span length and maximum sag.
[0021] In one embodiment, the method further comprises:
[0022] Get the lightning trip rate of the line;
[0023] Based on the database and lightning tripping rate, the shielding failure tripping rate of the line is evaluated.
[0024] In a second aspect, the present application also provides a database establishment device, comprising:
[0025] A distance information calculation module is used to calculate the distance information between each tower and other lines based on the geographical location of the tower and the line where the tower is located;
[0026] A height-to-ground determination module is used to determine the height-to-ground of each wire in each line;
[0027] The database establishment module is used to establish a database based on distance information and height above the ground; wherein the database is used to evaluate the lightning protection performance of the line.
[0028] In a third aspect, the present application further provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:
[0029] For each tower, based on the tower's geographical location and the line on which the tower is located, calculate the distance information between the tower and other lines;
[0030] For each line, determine the height of each wire in the line above the ground;
[0031] Based on the distance information and the height above the ground, a database is established; wherein the database is used to evaluate the lightning protection of the line.
[0032] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the following steps are implemented:
[0033] For each tower, based on the tower's geographical location and the line on which the tower is located, calculate the distance information between the tower and other lines;
[0034] For each line, determine the height of each wire in the line above the ground;
[0035] Based on the distance information and the height above the ground, a database is established; wherein the database is used to evaluate the lightning protection of the line.
[0036] In a fifth aspect, the present application further provides a computer program product, including a computer program, which implements the following steps when executed by a processor:
[0037] For each tower, based on the tower's geographical location and the line on which the tower is located, calculate the distance information between the tower and other lines;
[0038] For each line, determine the height of each wire in the line above the ground;
[0039] Based on the distance information and the height above the ground, a database is established; wherein the database is used to evaluate the lightning protection of the line.
[0040] The above-mentioned database establishment method, device, equipment, readable storage medium and program product calculate the distance information of the tower from other lines for each tower based on the geographical location of the tower and the line where the tower is located; for each line, determine the height of each wire in the line to the ground; establish a database based on the distance information and the height to the ground; wherein the database is used to evaluate the lightning protection of the line. In this method, since the database includes distance information and height to the ground, the distance information and the height to the ground can be used to evaluate the probability of lightning strikes, analyze the possibility of each part being affected by lightning strikes, and then formulate targeted protection strategies and emergency plans. In addition, the establishment of a database is also helpful to predict the specific impact of lightning strikes on power equipment and lines, thereby optimizing the layout of equipment and the ground wire system, and improving the reliability and disaster resistance of the overall power system. By regularly updating and analyzing the information in the database, preventive maintenance and real-time monitoring can be achieved, potential problems can be discovered in time, and necessary repair measures can be taken, thereby minimizing the impact of lightning strikes on the transmission channel. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0042] Figure 1 is an internal structure diagram of a computer device in one embodiment;
[0043] Figure 2 A schematic diagram of a flow chart of a method for establishing a database in one embodiment;
[0044] Figure 3 A schematic diagram of a flow chart of a method for establishing a database in another embodiment;
[0045] Figure 4 A diagram showing an arrangement of power transmission lines in an actual situation in another embodiment;
[0046] Figure 5 A schematic diagram of a flow chart of a method for establishing a database in another embodiment;
[0047] Figure 6 A schematic diagram of a flow chart of a method for establishing a database in another embodiment;
[0048] Figure 7 A schematic diagram of line sag in a plain area in another embodiment;
[0049] Figure 8A schematic diagram of a flow chart of a method for establishing a database in another embodiment;
[0050] Fig. 9 A structural block diagram of a database establishment device in an embodiment. DETAILED DESCRIPTION
[0051] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0052] In an exemplary embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as shown in FIG. Figure 1 As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data in the process of establishing a database. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for establishing a database is implemented.
[0053] Those skilled in the art will understand that Figure 1 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0054] In an exemplary embodiment, Figure 2 As shown, a database establishment method is provided, which is applied to Figure 1 The computer device in is taken as an example to illustrate, including the following steps 201 to 203.
[0055] in:
[0056] Step 201: for each pole tower, based on the geographical location of the pole tower and the line where the pole tower is located, calculate the distance information between the pole tower and other lines.
[0057] Among them, poles and towers usually refer to structures that support power lines or telecommunication equipment. They are used to support power lines, fiber optic cables or wireless communication equipment to transmit power or communication signals from one location to another.
[0058] In the embodiment of the present application, first, the computer device can obtain the longitude and latitude coordinates of each tower through the global positioning system or other geographic positioning tools. Secondly, the computer device can determine the communication line to which each tower belongs by the line number. Next, for each tower, the computer device calculates the distance information between it and other lines. For example, the Pythagorean theorem of a right triangle can be used to calculate the distance information between the tower and other lines.
[0059] Step 202: for each line, determine the height of each wire in the line above the ground.
[0060] In the embodiment of the present application, first, the computer device uses the engineering drawings or line layout diagrams of the power system to obtain the expected height above the ground of each wire in each power line at the initial construction stage. Next, the computer device can analyze the aging parameters and historical data of each wire in the power system to obtain the changed height above the ground, such as the age of the wire, environmental conditions (such as humidity, climate), load conditions, etc. These factors may cause the actual height above the ground of the wire to be different from the expected height at the initial design.
[0061] Next, the expected height-to-ground data obtained initially is added to the changed height-to-ground data to determine the height-to-ground of each wire in the line.
[0062] Step 203, establishing a database based on the distance information and the height above the ground; wherein the database is used to evaluate the lightning protection performance of the line.
[0063] In an embodiment of the present application, first, in order to store the distance information and height above the ground data of the line, the computer device needs to select a suitable database management system, such as SQLite or MySQL.
[0064] Secondly, the computer equipment needs to design the table structure of the database in order to effectively store and manage data. This mainly involves creating two core tables:
[0065] (1) Tower table: Contains tower-related information, such as unique identifier, geographic location (longitude and latitude), and distance information between each tower and other lines.
[0066] (2) Height meter: records the height above the ground of each wire in the line.
[0067] Next, use the selected database management system to create these two tables in SQL statements or graphical management tools. Then, insert the collected distance information and height above ground data into the corresponding tables through the data import tool. Finally, use SQL query statements to perform various data query operations, such as retrieving the location information of a specific tower and its corresponding line height above ground.
[0068] In the above database establishment method, for each tower, based on the geographical location of the tower and the line where the tower is located, the distance information of the tower from other lines is calculated; for each line, the height of each wire in the line to the ground is determined; based on the distance information and the height to the ground, a database is established; wherein the database is used to evaluate the lightning protection of the line. In this method, since the database includes distance information and height to the ground, the distance information and the height to the ground can be used to evaluate the probability of lightning strikes, analyze the possibility of each part being affected by lightning strikes, and then formulate targeted protection strategies and emergency plans. In addition, the establishment of a database is also helpful to predict the specific impact of lightning strikes on power equipment and lines, thereby optimizing the layout of equipment and the grounding system, and improving the reliability and disaster resistance of the overall power system. By regularly updating and analyzing the information in the database, preventive maintenance and real-time monitoring can be achieved, potential problems can be discovered in a timely manner, and necessary repair measures can be taken, thereby minimizing the impact of lightning strikes on the transmission channel.
[0069] In an exemplary embodiment, Figure 3 As shown, step 203 "calculating the distance information between the tower and other lines based on the geographical location of the tower and the line where the tower is located" includes steps 301 to 302. Among them:
[0070] Step 301, based on the geographical location of the tower, determine a vertical projection line perpendicular to the line where the tower is located, and obtain multiple intersection points between the vertical projection line and other lines.
[0071] In the embodiment of the present application, according to the location of the pole tower and the direction of the line, a vertical projection line perpendicular to the line where the pole tower is located is determined. Then, for each calculated vertical projection line, its intersection with other lines is found. Figure 4 As shown, taking tower A as the reference, the line connecting A1 and A2 is the vertical projection line, and A1 and A2 are the intersection points.
[0072] Step 302: For each intersection point, calculate the distance information between the intersection point and the tower.
[0073] In the embodiment of the present application, for each intersection point, a suitable distance formula (such as the Euclidean distance formula) is used to calculate the distance between the intersection point and the tower.
[0074] For example, see Figure 4 As shown in the figure, assuming that the coordinates of point A are (x1, y1) and the coordinates of point A1 are (x2, y2), the distance information between the intersection and the tower is:
[0075] In the above embodiment, the obtained distance information can be used to understand the spatial relationship between the tower and the surrounding lines, providing necessary spatial data support for the planning and maintenance of the power system, which helps to optimize the design of the power system and improve its safety and reliability.
[0076] In an exemplary embodiment, Figure 5 As shown, step 302 "calculating the distance information between the intersection point and the tower" includes steps 501 to 502. Among them:
[0077] Step 501: Determine information of a central angle formed by a first line segment and a second line segment according to the first line segment and the second line segment.
[0078] The first line segment is a line connecting the geographical location of the intersection point and the center of the earth; the second line segment is a line connecting the geographical location of the tower and the center of the earth.
[0079] In an embodiment of the present application, the computer device calculates the central angle information between the first line segment and the second line segment using the spherical geometric characteristics of the earth.
[0080] The specific process of calculating the central angle information is shown in formula (1):
[0081] θ=sin(MLatA)sin(MLatB)cos(MLonA-MLonB)
[0082] +cos(MLatA)cos(MLatB)(1)
[0083] In formula (1), θ is the central angle information, MLatA is the longitude coordinate of the tower, MLatB is the longitude coordinate of the intersection, MLonA is the latitude coordinate of the tower, and MLonB is the latitude coordinate of the intersection.
[0084] Step 502, calculating distance information according to the center angle information and the radius of the earth.
[0085] In the embodiment of the present application, after calculating the center angle information, the computer device further uses the earth radius and the center angle information to calculate the distance information between the tower and the intersection point.
[0086] The specific process of calculating distance information is shown in formula (2):
[0087] distance=πRarccos(θ) / 180 (2)
[0088] In formula (2), distance is the distance information, and Rarc is the radius of the earth.
[0089] In the above embodiment, the computer device can determine the distance information between the tower and the intersection based on the geographic location data and the spherical geometry calculation method. The distance information has important analytical value for the design and spatial planning of the power system, especially when evaluating the risk of lightning strikes and other safety factors.
[0090] In an exemplary embodiment, Figure 6 As shown, step 202 "determining the height of each wire in the line to the ground" includes steps 601 to 602. Among them:
[0091] Step 601, obtaining the hanging point height, span length and maximum sag of the line.
[0092] Among them, the hanging point height refers to the vertical distance between the power line or cable and the ground. The span length refers to the horizontal distance between adjacent towers. The maximum sag refers to the maximum vertical drop distance of the power line or cable between two towers.
[0093] In an embodiment of the present application, a computer device obtains the hanging point height, span length and maximum sag of the line.
[0094] Step 602, calculate the height above the ground according to the hanging point height, the span length and the maximum sag.
[0095] The height above the ground refers to the actual height of the power line or cable relative to the ground.
[0096] In the embodiment of the present application, when calculating the height above the ground, the computer device first considers the sum of the hanging point height and the maximum sag. This sum represents the total drop distance of the power line or cable when crossing the span length, that is, the sum of the hanging point height and the maximum sag.
[0097] Next, in order to determine the actual height of the power line or cable relative to the ground (height above ground), the computer equipment will subtract half of the span length from this total descent distance to obtain the height above ground.
[0098] In the above embodiment, by calculating the height above the ground, the structural design of the line can be optimized, and its wind resistance and stability can be improved, thereby ensuring reliable power supply of the power grid.
[0099] In an exemplary embodiment, step 602 of "calculating the height above the ground according to the hanging point height, the span length and the maximum sag" includes:
[0100] Substitute the distance from any point in the line to the tower into the preset relationship to calculate the height above the ground; the relationship is used to characterize the corresponding relationship between the height above the ground and the hanging point height, span length and maximum sag.
[0101] In an embodiment of the present application, the distance from any point in the line to the tower is substituted into a preset relationship to calculate the height above the ground; the relationship is used to characterize the correspondence between the height above the ground and the hanging point height, the span length and the maximum sag.
[0102] In some embodiments, see Figure 7 As shown, the specific process of calculating the height above the ground is shown in formula (3):
[0103]
[0104] In formula (3), h cx is the height above the ground, H c is the hanging point height, f c is the maximum sag, l is the span length, and x is the distance from any point to the tower.
[0105] In the above embodiments, more accurate data can be provided for the power system by using a calculation method based on a preset relationship and combining measurements and data in actual scenarios.
[0106] In an exemplary embodiment, Figure 8 As shown, the method also includes:
[0107] Step 801, obtaining the lightning trip rate of the line.
[0108] Among them, the lightning trip rate usually refers to the probability of a line tripping due to lightning activity within a specific time.
[0109] In the embodiment of the present application, first, the computer device accesses a database storing data related to lightning trip rate. These databases may include information such as the frequency of historical lightning events, line characteristics (such as length, height, etc.), and geographical location. Next, the computer device calculates the lightning trip rate of the line based on the data in the database and statistical methods.
[0110] Step 802: Evaluate the shielding failure tripping rate of the line based on the database and the lightning tripping rate.
[0111] Among them, the shielding failure tripping rate refers to the probability that when a lightning strike occurs, the power system is not directly affected by the lightning strike but is indirectly tripped due to the shielding failure effect.
[0112] In the embodiment of the present application, after the lightning tripping rate is obtained, the computer device further uses the lightning tripping rate and the database obtained in the above embodiment to evaluate the shielding failure tripping rate.
[0113] In the above embodiment, by evaluating the lightning trip rate and the shielding failure trip rate, the key factors affecting the stability and reliability of the line can be identified. These analysis results can be used to formulate targeted lightning protection measures and improve line design to improve its lightning resistance and reduce the trip rate.
[0114] It should be understood that, although the steps in the flowcharts involved in the above embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above embodiments may include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0115] Based on all the above embodiments, a method for establishing a database is also provided, the method comprising:
[0116] Step 1: For each pole tower, based on the geographical location of the pole tower and the line on which the pole tower is located, calculate the distance information between the pole tower and other lines.
[0117] Step 2: For each line, obtain the hanging point height, span length and maximum sag of the line.
[0118] Step 3, substitute the distance from any point in the line to the tower into the preset relationship to calculate the height above the ground; the relationship is used to characterize the corresponding relationship between the height above the ground and the hanging point height, the span length and the maximum sag.
[0119] Step 4: Based on the geographical location of the tower, determine a vertical projection line that is perpendicular to the line where the tower is located, and obtain multiple intersection points between the vertical projection line and other lines.
[0120] Step 5, for each intersection, determine the central angle information formed by the first line segment and the second line segment according to the first line segment and the second line segment; wherein the first line segment is the line connecting the geographical location of the intersection and the center of the earth; the second line segment is the line connecting the geographical location of the tower and the center of the earth.
[0121] Step 6, calculate the distance information based on the center angle information and the radius of the earth.
[0122] Step 7, obtaining the lightning tripping rate of the line.
[0123] Step 8: Based on the database and the lightning tripping rate, the shielding failure tripping rate of the line is evaluated.
[0124] Based on the same inventive concept, the embodiment of the present application also provides a database establishment device for implementing the database establishment method involved above. The implementation solution provided by the device to solve the problem is similar to the implementation solution recorded in the above method, so the specific limitations in one or more database establishment device embodiments provided below can refer to the limitations on the database establishment method above, and will not be repeated here.
[0125] In an exemplary embodiment, Fig. 9 As shown, a database establishment device is provided, including: a distance information calculation module 901, a height-to-ground determination module 902 and a database establishment module 703, wherein:
[0126] The distance information calculation module 901 is used to calculate the distance information between each tower and other lines based on the geographical location of the tower and the line where the tower is located;
[0127] A height-to-ground determination module 902 is used to determine the height-to-ground of each wire in each line;
[0128] The database establishment module 903 is used to establish a database based on the distance information and the height above the ground; wherein the database is used to evaluate the lightning protection performance of the line.
[0129] In an exemplary embodiment, a database establishment device is also provided. The above-mentioned database establishment module 703 is specifically used to determine the vertical projection line that is perpendicular to the line where the tower is located based on the geographical location of the tower, and obtain multiple intersection points between the vertical projection line and other lines; for each intersection point, calculate the distance information between the intersection point and the tower.
[0130] In an exemplary embodiment, a database establishment device is also provided, and the above-mentioned database establishment module 903 is specifically used to determine the central angle information formed by the first line segment and the second line segment based on the first line segment and the second line segment; wherein the first line segment is a line connecting the geographical location of the intersection and the center of the earth; the second line segment is a line connecting the geographical location of the tower and the center of the earth; and the distance information is calculated based on the central angle information and the radius of the earth.
[0131] In an exemplary embodiment, a database establishment device is also provided, and the above-ground height determination module 902 is specifically used to obtain the hanging point height, span length and maximum sag of the line; and calculate the height above the ground based on the hanging point height, span length and maximum sag.
[0132] In an exemplary embodiment, a database establishment device is also provided, and the above-ground height determination module 902 is specifically used to substitute the distance from any point in the line to the pole tower into a preset relationship to calculate the height above the ground; the relationship is used to characterize the correspondence between the height above the ground and the hanging point height, the span length and the maximum sag.
[0133] In an exemplary embodiment, a database establishment device is also provided, the device further comprising:
[0134] A lightning trip rate acquisition module is used to acquire the lightning trip rate of the line;
[0135] The evaluation module is used to evaluate the shielding failure tripping rate of the line based on the database and the lightning tripping rate.
[0136] Each module in the above-mentioned database establishment device can be implemented in whole or in part by software, hardware or a combination thereof. Each module can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute operations corresponding to each module.
[0137] In an exemplary embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the following steps are implemented:
[0138] For each tower, based on the tower's geographical location and the line on which the tower is located, calculate the distance information between the tower and other lines;
[0139] For each line, determine the height of each wire in the line above the ground;
[0140] Based on the distance information and the height above the ground, a database is established; wherein the database is used to evaluate the lightning protection of the line.
[0141] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0142] Based on the geographical location of the tower, a vertical projection line perpendicular to the line where the tower is located is determined, and multiple intersection points of the vertical projection line and other lines are obtained;
[0143] For each intersection point, the distance information between the intersection point and the tower is calculated.
[0144] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0145] According to the first line segment and the second line segment, determine the information of the central angle formed by the first line segment and the second line segment; wherein the first line segment is a line connecting the geographical location of the intersection point and the center of the earth; and the second line segment is a line connecting the geographical location of the tower and the center of the earth;
[0146] Calculate the distance information based on the center angle information and the radius of the earth.
[0147] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0148] Obtain the hanging point height, span length and maximum sag of the line;
[0149] Calculate the height above the ground based on the hanging point height, span length and maximum sag.
[0150] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0151] Substitute the distance from any point in the line to the tower into the preset relationship to calculate the height above the ground; the relationship is used to characterize the corresponding relationship between the height above the ground and the hanging point height, span length and maximum sag.
[0152] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0153] Get the lightning trip rate of the line;
[0154] Based on the database and lightning tripping rate, the shielding failure tripping rate of the line is evaluated.
[0155] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:
[0156] For each tower, based on the tower's geographical location and the line on which the tower is located, calculate the distance information between the tower and other lines;
[0157] For each line, determine the height of each wire in the line above the ground;
[0158] Based on the distance information and the height above the ground, a database is established; wherein the database is used to evaluate the lightning protection of the line.
[0159] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0160] Based on the geographical location of the tower, a vertical projection line perpendicular to the line where the tower is located is determined, and multiple intersection points of the vertical projection line and other lines are obtained;
[0161] For each intersection point, the distance information between the intersection point and the tower is calculated.
[0162] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0163] According to the first line segment and the second line segment, determine the information of the central angle formed by the first line segment and the second line segment; wherein the first line segment is a line connecting the geographical location of the intersection point and the center of the earth; and the second line segment is a line connecting the geographical location of the tower and the center of the earth;
[0164] Calculate the distance information based on the center angle information and the radius of the earth.
[0165] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0166] Obtain the hanging point height, span length and maximum sag of the line;
[0167] Calculate the height above the ground based on the hanging point height, span length and maximum sag.
[0168] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0169] Substitute the distance from any point in the line to the tower into the preset relationship to calculate the height above the ground; the relationship is used to characterize the corresponding relationship between the height above the ground and the hanging point height, span length and maximum sag.
[0170] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0171] Get the lightning trip rate of the line;
[0172] Based on the database and lightning tripping rate, the shielding failure tripping rate of the line is evaluated.
[0173] In one embodiment, a computer program product is provided, comprising a computer program, which, when executed by a processor, implements the following steps:
[0174] For each tower, based on the tower's geographical location and the line on which the tower is located, calculate the distance information between the tower and other lines;
[0175] For each line, determine the height of each wire in the line above the ground;
[0176] Based on the distance information and the height above the ground, a database is established; wherein the database is used to evaluate the lightning protection of the line.
[0177] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0178] Based on the geographical location of the tower, a vertical projection line perpendicular to the line where the tower is located is determined, and multiple intersection points of the vertical projection line and other lines are obtained;
[0179] For each intersection point, the distance information between the intersection point and the tower is calculated.
[0180] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0181] According to the first line segment and the second line segment, determine the information of the central angle formed by the first line segment and the second line segment; wherein the first line segment is a line connecting the geographical location of the intersection point and the center of the earth; and the second line segment is a line connecting the geographical location of the tower and the center of the earth;
[0182] Calculate the distance information based on the center angle information and the radius of the earth.
[0183] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0184] Obtain the hanging point height, span length and maximum sag of the line;
[0185] Calculate the height above the ground based on the hanging point height, span length and maximum sag.
[0186] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0187] Substitute the distance from any point in the line to the tower into the preset relationship to calculate the height above the ground; the relationship is used to characterize the corresponding relationship between the height above the ground and the hanging point height, span length and maximum sag.
[0188] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0189] Get the lightning trip rate of the line;
[0190] Based on the database and lightning tripping rate, the shielding failure tripping rate of the line is evaluated.
[0191] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.
[0192] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.
[0193] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A method for establishing a database, It is characterized in that The method comprises: For each pole tower, based on the geographical location of the pole tower and the line on which the pole tower is located, calculate the distance information between the pole tower and other lines; For each of the lines, determining the height of each wire in the line above the ground; A database is established based on the distance information and the height above the ground; wherein the database is used to evaluate the lightning protection performance of the line.
2. The method according to claim 1, It is characterized in that The calculating the distance information between the pole tower and other lines based on the geographical location of the pole tower and the line where the pole tower is located includes: Based on the geographical location of the tower, determine a vertical projection line perpendicular to the line where the tower is located, and obtain a plurality of intersection points between the vertical projection line and the other lines; For each of the intersection points, the distance information between the intersection point and the tower is calculated.
3. The method according to claim 2, It is characterized in that The calculating the distance information between the intersection point and the tower includes: Determine the information of the central angle formed by the first line segment and the second line segment according to the first line segment and the second line segment; wherein the first line segment is a line connecting the geographical location of the intersection point and the center of the earth; and the second line segment is a line connecting the geographical location of the tower and the center of the earth; The distance information is calculated according to the center angle information and the radius of the earth.
4. The method according to claim 1, It is characterized in that Determining the height of each wire in the line relative to the ground includes: Obtaining the hanging point height, span length and maximum sag of the line; The height above the ground is calculated according to the hanging point height, the span length and the maximum sag.
5. The method according to claim 4, It is characterized in that The calculating the height above the ground according to the hanging point height, the span length and the maximum sag comprises: Substitute the distance from any point in the line to the tower into a preset relationship to calculate the height above the ground; the relationship is used to characterize the corresponding relationship between the height above the ground and the hanging point height, the span length and the maximum sag.
6. The method according to any one of claims 1 to 5, It is characterized in that The method further comprises: Obtaining a lightning trip rate of the line; Based on the database and the lightning strike trip rate, the shielding failure trip rate of the line is evaluated.
7. A database building device, It is characterized in that The device comprises: A distance information calculation module, used for calculating, for each tower, the distance information between the tower and other lines based on the geographical location of the tower and the line where the tower is located; A height-to-ground determination module, used for determining the height-to-ground of each wire in the line for each of the lines; A database establishment module is used to establish a database based on the distance information and the height above the ground; wherein the database is used to evaluate the lightning protection performance of the line.
8. A computer device comprising a memory and a processor, wherein the memory stores a computer program. It is characterized in that When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.
9. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
10. A computer program product comprising a computer program, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.