Building engineering construction quality evaluation method, system, medium and equipment

By establishing a multi-level index system and fuzzy set theory and performing language weighted average processing, the fuzzy problem of natural language evaluation in construction quality evaluation of construction projects is solved, and the precise evaluation and sorting of construction quality is achieved.

CN118940975AInactive Publication Date: 2024-11-12SHANDONG JIANZHU UNIV

Patent Information

Application Number
CN202411426373.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-14
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing construction quality evaluation methods for construction projects are highly vague in the description of performance indicators, and they cannot standardize and quantify natural language, resulting in inaccurate and effective evaluation.

Method used

A multi-level index system is adopted, and the membership function and fuzzy rules are set through hierarchical analysis method and fuzzy set theory, and the language weighted average processing is carried out, which is converted into specific data to achieve accurate evaluation of construction quality.

Benefits of technology

It enhances the rationality and accuracy of construction quality evaluation, solves the problems of ambiguity and uncertainty, and provides more accurate and effective evaluation results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118940975A_ABST
    Figure CN118940975A_ABST
Patent Text Reader

Abstract

The invention provides a building engineering construction quality evaluation method and system, a medium and equipment, and relates to the technical field of building engineering, and the method comprises the steps: obtaining a plurality of indexes in a building engineering construction quality evaluation system, building a hierarchical relation, and enabling the indexes to comprise a first-level index, a second-level index and a third-level index; carrying out weight language word coding on the plurality of indexes, and determining the weight of each index through an analytic hierarchy process; constructing a type-2 fuzzy set for each index, and setting a membership function of the type-2 fuzzy set; a fuzzy rule is set, weights are distributed to indexes of the same level according to weight language word coding, membership degrees of the same level are obtained, then the obtained membership degrees of all the first-level indexes are integrated, a language weighted average method is adopted, and a type-2 fuzzy set of the whole building engineering construction quality is obtained. And performing defuzzification processing on the type-2 fuzzy set to obtain a construction quality evaluation result. The problem of high-order fuzziness in performance index description can be effectively solved, and the rationality and scientificity of evaluation are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building engineering, and in particular to a method, system, medium and equipment for evaluating the construction quality of a building engineering. Background Art

[0002] Energy conservation and emission reduction are key measures to promote economic structural adjustment, transform development patterns, and achieve sustainable economic and social development. Quality supervision of the construction process not only helps managers make wise decisions, but also effectively reduces energy consumption. Accurate evaluation of construction quality plays a vital role in ensuring building safety, earthquake resistance and reinforcement projects. However, in the evaluation process, the consideration of performance indicators is indispensable.

[0003] If we only rely on numerical quantification for evaluation, although the operation is simple, this method is not rigorous for some performance indicators. Since people are accustomed to using natural language to describe and analyze problems, traditional numerical and symbolic calculation theories are not applicable in decision-making and evaluation fields involving a large number of qualitative descriptions. The current research on construction quality assessment methods still has certain irrationalities, lack of explanatory power, and high ambiguity in the description of performance indicators. It is impossible to standardize and quantify the natural language of performance indicators to accurately and effectively evaluate the construction quality of construction projects. Summary of the invention

[0004] In order to overcome the problems existing in the above-mentioned prior art such as the high ambiguity in the description of performance indicators, and the shortcomings of being unable to standardize and quantify the natural language of performance indicator considerations and thus accurately and effectively evaluate the construction quality of construction projects, the main purpose of the present invention is to provide a construction project construction quality assessment method, system, medium and equipment.

[0005] To achieve the above object, the present invention adopts the following technical scheme, a construction quality assessment method of a building project, comprising the following steps: Acquire multiple indicators in the construction quality evaluation system of the building project and establish a hierarchical relationship, wherein the indicators include primary indicators, secondary indicators and tertiary indicators; The weighted language words are encoded for the plurality of the indicators, and the weight of each indicator is determined by the hierarchical analysis method; a type-II fuzzy set is constructed for each indicator, and its membership function is set; Fuzzy rules are set, and the membership of each third-level indicator is obtained according to the weighted language words and the weight of each third-level indicator; according to the fuzzy rules, the membership of the third-level indicator is transferred to the second-level indicator, and the language weighted average processing is performed with the weight of the second-level indicator to obtain the membership of the second-level indicator; according to the fuzzy rules, the membership of the second-level indicator is transferred to the first-level indicator, and the language weighted average processing is performed with the weight of the first-level indicator to obtain the membership of the first-level indicator; The membership degrees of all primary indicators are integrated, and the linguistic weighted average method is adopted to obtain the type-II fuzzy set of the construction quality of the entire construction project. The type-II fuzzy set is defuzzified to obtain the construction quality evaluation result.

[0006] Also includes: Converting the construction quality assessment result into specific data, using the centroid of the type-2 fuzzy set as a decoding output to obtain the specific data; The construction qualities of multiple building projects to be evaluated are sorted according to the specific values ​​obtained by decoding to obtain a ranking of the construction quality of the building projects.

[0007] The first-level indicators include foundation and pile foundation engineering, structural engineering and installation engineering; The secondary indicators include foundation engineering, pile foundation engineering, concrete engineering, steel structure engineering, masonry engineering, underground waterproofing engineering, decoration and renovation engineering, building water supply and drainage and heating engineering, ventilation and air conditioning engineering, elevator engineering and intelligent building engineering; The three-level indicators include performance testing, quality records, dimensional deviation and limit measurement, and visual quality.

[0008] The fuzzy rules are set, and weights are assigned to each third-level indicator according to the weight language word coding to obtain the membership degree of each third-level indicator. The formula is as follows:

[0009] Among them, the language value of the third-level evaluation index weight is (k=1,2,3,4,5), the score of the building quality to be judged under each three-level indicator is ; is the number of third-level indicators traversed when determining the second-level indicator. When i=1, =2, =5; when i=2, Ni=4, =5; when i=3, =6, =5; is the membership degree of the third-level indicator; According to the fuzzy rule, the membership of the third-level indicator is transferred to the second-level indicator, and the language weighted average processing is performed with the weight of the second-level indicator to obtain the membership of the second-level indicator. The formula is as follows:

[0010] The language value of the secondary evaluation index weight is , is the score of the building quality to be judged under each secondary indicator; hour, =2; when hour, =4; when hour, =6; is the membership degree of the secondary indicator; According to the fuzzy rule, the membership of the secondary index is transferred to the primary index, and the language weighted average processing is performed with the weight of the primary index to obtain the membership of the primary index. The formula is as follows:

[0011] Among them, the language value of the first-level evaluation index weight is , output is the membership degree of the first-level indicator.

[0012] The centroid of the type-2 fuzzy set is The center of mass is The formula is as follows:

[0013] in, For a type-2 fuzzy set The sampling points of the domain, M is the number of samples, Indicate point The membership function of and They represent the lower membership function and the upper membership function respectively.

[0014] A construction quality assessment system for a building project, comprising: An indicator acquisition module is used to acquire multiple indicators in the construction quality evaluation system of a building project and establish a hierarchical relationship, wherein the indicators include primary indicators, secondary indicators and tertiary indicators; The word calculation and type-II fuzzy module is used to perform weighted language word encoding on a plurality of the indicators, and determine the weight of each indicator through the hierarchical analysis method; construct a type-II fuzzy set for each indicator, and set its membership function; set fuzzy rules, and obtain the membership of each third-level indicator according to the weighted language words and the weight of each third-level indicator; according to the fuzzy rules, the membership of the third-level indicator is transferred to the second-level indicator, and the membership of each second-level indicator and its weight are subjected to language weighted average processing to obtain the membership of the second-level indicator; according to the fuzzy rules, the membership of the second-level indicator is transferred to the first-level indicator, and the membership of the first-level indicator is subjected to language weighted average processing to obtain the membership of the first-level indicator; The evaluation and analysis module integrates the membership of all primary indicators, adopts the language weighted average method to obtain the type II fuzzy set of the construction quality of the entire construction project, defuzzifies the type II fuzzy set, and obtains the construction quality evaluation result.

[0015] The evaluation structure sorting module is used to use the centroid of the type-2 fuzzy set as the decoding output to convert the construction quality evaluation results into specific values; according to the specific values ​​obtained by decoding, the construction qualities of multiple building projects to be evaluated are sorted to obtain the construction quality ranking of the building projects.

[0016] Compared with the prior art, the beneficial effects of the present invention are as follows: the evaluation method is divided into a word calculation and type II fuzzy module, a language weighted average method module and an indicator weight assignment module. In various decision-making and evaluation applications, people are accustomed to using natural language for description and analysis. The word calculation and type II fuzzy module can solve the high-order fuzziness and uncertainty problems existing in building quality evaluation. Adding the language weighted average method to this model can enhance the rationality of building quality evaluation. The indicator weight assignment module assigns weights to evaluation indicators of different levels to make the obtained fuzzy results more reasonable. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings described herein are used to provide further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.

[0018] Figure 1 It is a schematic diagram of the process framework of the present invention; Figure 2 It is a schematic diagram of a trapezoidal type II fuzzy set of the present invention; Figure 3 It is a schematic diagram of the construction quality assessment system of the building engineering of the present invention; Figure 4 It is a schematic diagram of the membership function of the weighted language word of the present invention; Figure 5 It is a schematic diagram of the membership function of the language words corresponding to the evaluation scores of the present invention; Figure 6 It is a schematic diagram of the process structure of the present invention. DETAILED DESCRIPTION

[0019] Since people are used to using natural language to describe and analyze problems, traditional numerical and symbolic computing theories are not applicable in decision-making and evaluation fields involving a large number of qualitative descriptions. The current research on construction quality assessment methods still has certain irrationalities, insufficient explanatory power, and high ambiguity in the description of performance indicators. It is impossible to standardize and quantify the natural language of performance indicators to accurately and effectively evaluate the construction quality of construction projects.

[0020] In order to overcome the above-mentioned shortcomings of the prior art, such as the high ambiguity in the description of performance indicators, the inability to standardize and quantify the natural language of performance indicators and thus accurately and effectively evaluate the construction quality of construction projects, the main purpose of the present invention is to provide a construction quality evaluation method, referring to Figure 6 , specifically including the following steps: Acquire multiple indicators in the construction quality evaluation system of the building project and establish a hierarchical relationship, wherein the indicators include primary indicators, secondary indicators and tertiary indicators; The weighted language words are encoded for the plurality of the indicators, and the weight of each indicator is determined by the hierarchical analysis method; a type-II fuzzy set is constructed for each indicator, and its membership function is set; Fuzzy rules are set, and the membership of each third-level indicator is obtained according to the weighted language words and the weight of each third-level indicator; according to the fuzzy rules, the membership of the third-level indicator is transferred to the second-level indicator, and the language weighted average processing is performed with the weight of the second-level indicator to obtain the membership of the second-level indicator; according to the fuzzy rules, the membership of the second-level indicator is transferred to the first-level indicator, and the language weighted average processing is performed with the weight of the first-level indicator to obtain the membership of the first-level indicator; The membership degrees of all primary indicators are integrated, and the linguistic weighted average method is adopted to obtain the type-II fuzzy set of the construction quality of the entire construction project. The type-II fuzzy set is defuzzified to obtain the construction quality evaluation result.

[0021] In order to achieve the ranking of the evaluation results, the centroid of the type-2 fuzzy set is used as the decoding output to convert the construction quality evaluation results into specific values; The construction qualities of multiple building projects to be evaluated are sorted according to the specific values ​​obtained by decoding to obtain a ranking of the construction quality of the building projects.

[0022] The present invention will be further described below in conjunction with the accompanying drawings and implementation modes.

[0023] Embodiment 1: See also Figure 1-Figure 5 , a new type of construction process engineering construction quality assessment method, is a construction engineering construction quality assessment system based on the type-two fuzzy word calculation method. It consists of three main core methods: word calculation and type-two fuzziness, language weighted average method, and weighted language coding. These three methods are based on type-two fuzziness, and word calculation methods are added to type-two fuzziness to form a perception calculation framework. One way of the word calculation engine in this framework is based on the perception reasoning method. This method uses language weighted average to integrate and obtain the output type-two fuzzy set. In the construction quality evaluation index system of construction engineering, it is divided into primary indicators, secondary indicators, and tertiary indicators. These indicators need to be assigned values, and weighted language word coding is used for assignment.

[0024] When evaluating the construction quality of a building project, the application of the type-two fuzzy word calculation method requires a hierarchical evaluation, and the steps are as follows: 1. First, the language weighted average method is used to evaluate the three-level indicators.

[0025] 2. Calculate the secondary indicators based on the tertiary results obtained.

[0026] 3. Combine the corresponding secondary results to get the building’s score under the primary indicator.

[0027] The present invention is divided into three modules: word calculation and type II fuzzy module, language weighted average method module, and index weight assignment module. The specific functions of each module in the system of the present invention are as follows: As for word computing and type-2 fuzzy, word computing is developed on the basis of language variables. It is a method of computing and reasoning with words instead of numbers. Word computing has made great progress in theory and application and is widely used in control and decision-making. It imitates people's use of natural language for reasoning, starting from the premise expressed in natural language to obtain the conclusion expressed in natural language. The perceptual computing framework is used to implement word computing of type-2 fuzzy sets. Perceptual computing mainly consists of four parts: codebook, encoder, word computing engine (CWW Engine) and decoder. Among them, the code is composed of the required language words and their corresponding type-2 fuzzy sets; the main function of the encoder is to map the input language words to the type-2 fuzzy sets in the codebook; the main function of the decoder is to calculate the centroid, similarity analysis and sorting of the type-2 fuzzy sets inferred by the word computing engine; and the word computing engine is the core structure of the perceptual computer, and its function is to realize the reasoning output.

[0028] In perceptual computing, type-2 fuzzy sets are the basic computing material. Type-2 fuzzy sets are an extension of classical fuzzy sets (type-1 fuzzy sets) and are used to better characterize the high-order uncertainty of language words. Type II fuzzy sets on It can be described by the type II membership function shown in formula (1), as follows: (1) in, is the primary membership of point x on the domain, u is the value of primary membership, The membership value that is the primary membership value is called the secondary membership value.

[0029] When type II fuzzy sets When all the sub-memberships of are 1, that is, , , in this case, it is called type II fuzzy set is an interval type-2 fuzzy set. It can be completely described by its upper membership function and lower membership function, and its upper and lower membership functions are recorded as and .

[0030] Trapezoidal type-2 fuzzy sets are one of the most commonly used type-2 fuzzy sets, such as Figure 2 As shown, the upper and lower membership functions of trapezoidal type II fuzzy sets are and As shown in (2).

[0031] (2) in, , is its height. For convenience, the trapezoidal type II fuzzy set is denoted as .

[0032] For the language weighted average method module, one approach of the word calculation engine is based on the perceptual reasoning method, which integrates and outputs the type-2 fuzzy set based on the general language weighted average.

[0033] Linguistic weighted average is an extension of the following classical fuzzy weighted average. The classical fuzzy weighted average is shown in (3): (3) in, is a type-one fuzzy set, N is the total number of indicators, representing the i The weights and values ​​corresponding to the indicators are output is also a type I fuzzy set. Usually, the following steps are used to Perform the calculation: 1) Calculate all type 1 fuzzy sets The cut set .

[0034] 2) Output type one fuzzy set The cut set ,in: (4) These two equations can be calculated using the KM algorithm or the enhanced EKM algorithm.

[0035] 3) The cut sets of are connected together to obtain the final output of the classical fuzzy weighted average. The definition of linguistic weighted average is shown in (5): (5) Among them, the output is also an interval type-2 fuzzy set, N is the total number of indicators.

[0036] According to the result in (3), the output interval type II fuzzy set of the linguistic weighted average is Determined by its upper and lower membership functions, its calculation can be done using the following formula: (6) in, It is the classic fuzzy weighted average.

[0037] For the indicator weight assignment module, the construction project construction quality assessment system is a comprehensive assessment involving all aspects and directions.

[0038] The construction quality assessment index system for construction projects mainly has three levels of standards. The first level of construction quality assessment indicators is composed of three standards, namely A1 foundation and pile foundation engineering, B1 structural engineering, and C1 installation engineering. The second level of construction quality assessment indicators is composed of A1-1 foundation engineering, A1-2 pile foundation engineering, B1-1 concrete engineering, B1-2 steel structure engineering, B1-3 masonry engineering, B1-4 underground waterproofing layer, C1-1 decoration and renovation engineering, C1-2 building water supply, drainage and heating engineering, C1-3 ventilation and air conditioning engineering, C1-4 elevator engineering, and C1-5 intelligent building engineering. The third level of construction quality assessment has the same standards, which is composed of construction site quality assurance conditions, performance testing, quality records, dimensional deviation and limit measurement, and visual quality. Based on the above, the construction quality assessment index system for construction projects is as follows: Figure 3 shown.

[0039] In the above-mentioned construction engineering construction quality evaluation index system, it is divided into first-level indicators, second-level indicators, and third-level indicators. The weights of these indicators need to be assigned, and usually specific numerical values ​​are assigned to these indicators. Therefore, it is more reasonable to use language value descriptions.

[0040] Seven language words are used to assign values ​​to the first-level indicators, second-level indicators, and third-level indicators, which are: Very Low (VL), Low (L), Medium Low (ML), Medium (M), Medium High (MH), High (H), Very High (VH). Here, the seven language words are corresponded by trapezoidal interval type II fuzzy sets, such as Figure 4 The parameters of the trapezoidal interval type-2 fuzzy sets corresponding to the 7 language words are shown in Table 1.

[0041] Table 1 Parameters of trapezoidal type-2 fuzzy sets corresponding to weighted language words

[0042] The indicators of the construction quality evaluation system of the building project in the present invention adopt the language word weights assigned in Table 2.

[0043] Table 2 Language word assignment of construction quality evaluation index weights

[0044] The indicators expressed by language values ​​are divided into five levels: Poor, Average, Good, Very Good, and Excellent. The trapezoidal type II fuzzy sets corresponding to these five language words are as follows: Figure 5 As shown, the parameters of the corresponding trapezoidal type-2 fuzzy set are shown in Table 3.

[0045] Table 3 Parameters of the trapezoidal type II fuzzy set of language words corresponding to the evaluation scores

[0046] Example 2 The assessment process for specific building quality includes: The first step is stratified evaluation. The language value of the first-level evaluation index weight is , representing foundation and pile engineering, structural engineering, and installation engineering respectively. The language value of the secondary evaluation index weight is , where the values ​​of j are 2, 4, and 5 in the three first-level indicators. The language value of the weight of the third-level evaluation indicator is ( k =1,2,3,4,5) respectively represent the quality assurance conditions of the construction site, performance testing, quality records, dimensional deviation and limit measurement, and visual quality. Assume that the score of the building quality to be judged under each of the three-level indicators is .

[0047] In the hierarchical evaluation process, fuzzy rules are set, and weights are assigned to each third-level indicator according to the weight language word coding to obtain the affiliation of each third-level indicator. That is, the evaluation results of the third-level indicators below each second-level indicator are integrated using the language weighted average algorithm, specifically: (7) Among them, the language value of the first-level evaluation index weight is , the language value of the secondary evaluation index weight is The language value of the third-level evaluation index weight is ( k =1,2,3,4,5), the score of the building quality to be judged under each three-level indicator is ;when hour, =2, =5; when hour, =4, =5; when hour, =6, =5.

[0048] According to the fuzzy rules, the membership of the third-level indicator is transferred to the second-level indicator, and the language weighted average processing is performed with the weight of the second-level indicator to obtain the membership of the second-level indicator. Then, the language weighted average algorithm is used to integrate the second-level indicators under each first-level indicator, specifically: (8) The language value of the secondary evaluation index weight is , is the score of the building quality to be judged under each secondary indicator; hour, =2; when hour, =4; when hour, =6; is the membership degree of the secondary indicator.

[0049] According to the fuzzy rules, the membership of the secondary index is transferred to the primary index, and the language weighted average is processed with the weight of the primary index to obtain the membership of the primary index; that is, the language weighted average algorithm can be used to obtain the integrated evaluation of the building under each primary index. On this basis, the linguistic weighted average algorithm is used for integration again to obtain the type II fuzzy set of the final evaluation output, that is, the type II fuzzy set of the construction quality of the entire building project, which is expressed as follows: (9) Among them, the language value of the first-level evaluation index weight is , output is the membership degree of the first-level indicator.

[0050] Defuzzify the type-2 fuzzy set to obtain the construction quality assessment result. If multiple buildings need to be compared and ranked, a decoder is required to achieve the output. The centroid of the type-2 fuzzy set can be used as the decoded output, and the centroid and its center can be used for ranking. The centroid of The center of mass is in: (10) in, For a type-2 fuzzy set The sampling points of the domain, M is the number of samples.

[0051] It should be noted that, in the present invention, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0052] The above embodiments are merely examples of the present invention and do not limit the protection scope of the present invention. All designs that are the same or similar to the present invention fall within the protection scope of the present invention.

Claims

1. A method for evaluating the construction quality of a building project. It is characterized in that The following steps are involved: Acquire multiple indicators in the construction quality evaluation system of the building project and establish a hierarchical relationship, wherein the indicators include primary indicators, secondary indicators and tertiary indicators; Carry out weighted language word coding for a plurality of the indicators, determine the weight of each indicator by means of hierarchical analysis method, construct a type II fuzzy set for each indicator, and set its membership function; Set fuzzy rules, and obtain the membership degree of each third-level indicator according to the weighted language words and the weight of each third-level indicator; According to the fuzzy rule, the membership of the third-level indicator is transferred to the second-level indicator, and the language weighted average processing is performed with the weight of the second-level indicator to obtain the membership of the second-level indicator; according to the fuzzy rule, the membership of the second-level indicator is transferred to the first-level indicator, and the language weighted average processing is performed with the weight of the first-level indicator to obtain the membership of the first-level indicator; The membership degrees of all primary indicators are integrated, and the linguistic weighted average method is adopted to obtain the type-II fuzzy set of the construction quality of the entire construction project. The type-II fuzzy set is defuzzified to obtain the construction quality evaluation result.

2. The construction quality assessment method of a building project as claimed in claim 1, It is characterized in that Also includes: Converting the construction quality assessment result into specific data, using the centroid of the type-2 fuzzy set as a decoding output to obtain the specific data; The construction qualities of multiple building projects to be evaluated are sorted according to the specific values ​​obtained by decoding to obtain a ranking of the construction quality of the building projects.

3. The construction quality assessment method of a building project as claimed in claim 1, It is characterized in that The first-level indicators include foundation and pile foundation engineering, structural engineering and installation engineering; The secondary indicators include foundation engineering, pile foundation engineering, concrete engineering, steel structure engineering, masonry engineering, underground waterproofing engineering, decoration and renovation engineering, building water supply and drainage and heating engineering, ventilation and air conditioning engineering, elevator engineering and intelligent building engineering; The three-level indicators include performance testing, quality records, dimensional deviation and limit measurement, and visual quality.

4. The construction quality assessment method of a building project as claimed in claim 1, It is characterized in that The fuzzy rules are set, and weights are assigned to each third-level indicator according to the weight language word coding to obtain the membership degree of each third-level indicator. The formula is as follows: ; Among them, the language value of the third-level evaluation index weight is (k=1,2,3,4,5), the score of the building quality to be judged under each three-level indicator is ; is the number of secondary indicators; is the number of third-level indicators traversed when determining the second-level indicator; when i=1, =2, =5; when i=2, =4, =5; when i=3, =6, =5; is the membership degree of the third-level indicator; According to the fuzzy rule, the membership of the third-level indicator is transferred to the second-level indicator, and the language weighted average processing is performed with the weight of the second-level indicator to obtain the membership of the second-level indicator. The formula is as follows: ; The language value of the secondary evaluation index weight is , is the score of the building quality to be judged under each secondary indicator; hour, =2; when hour, =4; when hour, =6; is the membership degree of the secondary indicator; According to the fuzzy rule, the membership of the secondary index is transferred to the primary index, and the language weighted average processing is performed with the weight of the primary index to obtain the membership of the primary index. The formula is as follows: ; Among them, the language value of the first-level evaluation index weight is , output is the membership degree of the first-level indicator.

5. The construction quality assessment method of a building project as claimed in claim 2, It is characterized in that The centroid of the type-2 fuzzy set is The center of mass is The formula is as follows: ; in, For type-2 fuzzy sets The sampling points of the domain, M is the number of samples, Indicate point The membership function of and They represent the lower membership function and the upper membership function respectively.

6. A construction quality assessment system for building engineering. It is characterized in that include: An indicator acquisition module is used to acquire multiple indicators in the construction quality evaluation system of a building project and establish a hierarchical relationship, wherein the indicators include primary indicators, secondary indicators and tertiary indicators; A word calculation and type-two fuzzy module is used to encode the weighted language words of the plurality of said indicators and determine the weight of each indicator by means of a hierarchical analysis method; Construct a type-II fuzzy set for each indicator and set its membership function; Set fuzzy rules, and obtain the membership degree of each third-level indicator according to the weighted language words and the weight of each third-level indicator; According to the fuzzy rule, the membership of the third-level indicator is transferred to the second-level indicator, and the language weighted average processing is performed with the weight of the second-level indicator to obtain the membership of the second-level indicator; according to the fuzzy rule, the membership of the second-level indicator is transferred to the first-level indicator, and the language weighted average processing is performed with the weight of the first-level indicator to obtain the membership of the first-level indicator; The evaluation and analysis module integrates the membership of all primary indicators, adopts the language weighted average method to obtain the type II fuzzy set of the construction quality of the entire construction project, defuzzifies the type II fuzzy set, and obtains the construction quality evaluation result.

7. The construction quality assessment system for a building project as claimed in claim 6, It is characterized in that Also includes: The evaluation structure sorting module is used to convert the construction quality evaluation results into specific values, use the centroid of the type-2 fuzzy set as the decoding output to obtain specific data; sort the construction qualities of multiple building projects to be evaluated according to the specific values ​​obtained by decoding, and obtain the construction quality ranking of the building projects.

8. A computer-readable storage medium, It is characterized in that The storage medium stores a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.

9. A computer device, It is characterized in that The method comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the method described in any one of claims 1 to 5 is implemented.

Citation Information

Patent Citations

  • Ball valve quality multistage fuzzy comprehensive evaluation method based on AHP and information entropy

    CN110135708A

  • Grouting quality comprehensive evaluation method based on analytic hierarchy process and variable fuzzy set theory

    CN113077177A

  • Standardized comprehensive fuzzy evaluation model for electric power engineering quality management

    CN113449981A

  • Building health monitoring method and system based on multi-feature factor integrated evaluation

    CN115936309A

  • Prestressed pipe pile construction quality evaluation method and construction quality monitoring system thereof

    CN117474374A

Cited By

  • Fault diagnosis method and device based on combination of diagnosis logic and fault tree

    CN119291360A

  • Method and device for comprehensively evaluating confidence coefficient of shaft coupling type whole vehicle in-loop simulation system

    CN121706604A