Forest resource data collaborative operation management system and method
By designing a forest resource data collaborative operation management system, the problems of low efficiency, complex operation and difficult data synchronization in traditional forest resource survey systems are solved, and the collaborative operation and data traceability of multiple people are realized, and the investigation efficiency and system adaptability are improved.
Patent Information
- Application Number
- CN202410996891.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-12
AI Technical Summary
Traditional forest resource survey systems have problems such as low investigation efficiency, complex operation, difficulty in data synchronization, difficulty in data sharing, and untraceable data processing. Most of them are stand-alone versions and cannot adapt to multi-task and multi-person collaborative operations.
A forest resource data collaborative operation management system was designed, including engineering management module, questionnaire management module, data encoding module, work group management module and data management module, supporting multiple people collaborative online operations to realize survey progress synchronization and real-time data integration , provides hierarchical questionnaire management, data issuance and recycling, and job log management.
It realizes the adaptability and flexibility of the multi-task system, improves investigation efficiency, ensures the reliability and convenience of data processing, supports multiple people to work together, avoids the situation where multiple people operate the same map, and realizes the data processing process. traceability of the entire process.
Smart Images

Figure HDA0004960485400000011 
Figure HDA0004960485400000021 
Figure HDA0004960485400000022
Abstract
Description
Technical Field
[0001] The invention belongs to the field of geographic information technology and relates to a forest resource data collaborative operation management system and method. Background Art
[0002] Forest resources, as the various tangible and intangible assets provided by forest ecosystems, are closely linked to biodiversity, climate change, and the ecological environment. The efficiency and quality of forest resource surveys are crucial for forest resource planning and management decisions. Traditional forestry surveys rely primarily on manual surveys, which are complex and inefficient, and result in cumbersome revisions.
[0003] With the development of information technologies such as high-resolution remote sensing, satellite positioning, and the Internet, forest resource surveys have established a forestry survey system using automated and information-based means, reducing the forest resource survey's dependence on manual labor, avoiding certain survey errors, and improving the efficiency of forestry resource surveys.
[0004] However, most of these forest resource survey systems are only stand-alone versions, and stand-alone surveys are conducted on mobile devices. They rely on plug-ins and / or third-party software, making them complex to operate and tedious to upgrade and maintain. The following problems still exist when conducting forest resource surveys: (1) Most of them are not universal and can only be used for surveys on a single survey task; (2) Survey data cannot be synchronized quickly and timely, and data synthesis can only be performed after the survey is completed, which is not convenient for unified management; (3) Data results between different survey tasks are difficult to share, data results conversion is difficult, the data processing process is not traceable, and multiple people may operate on the same map. Summary of the Invention
[0005] The technical problem solved by the present invention is to provide a forest resource data collaborative operation management system and method, which can support multi-person collaborative online operations, integrate indoor and outdoor operations, achieve synchronous survey progress, and integrate survey data in real time.
[0006] The present invention is achieved through the following technical solutions:
[0007] A forest resource data collaborative operation management system, comprising:
[0008] The project management module is used to create and manage survey projects, including the interface for creating new projects, searching, resetting, and displaying a list of established projects;
[0009] The questionnaire management module is used to establish questionnaires under the survey project, including configuring field information for the questionnaire and managing the questionnaire, setting questionnaire rules and managing relationships between tables, as well as extracting base map data.
[0010] Data coding module provides field configuration for establishing survey factors and manages them;
[0011] The work group management module creates a new survey work group for the current project and configures the work group personnel information;
[0012] The data management module is used to divide and distribute engineering data into tasks, and to visualize and edit the current survey project.
[0013] The new project is used to create a new survey project, fill in the project information to configure the base map for the new project; the project information includes the project name, project overview, responsible person, start date and end date; the established project information will be displayed in the list display interface of the established projects;
[0014] The search queries the established project information individually or in combination by project name, responsible person, project status and creation date;
[0015] The reset is to reset the information set by the user when searching to the initial state;
[0016] The list display interface of the established projects is to display the established project information on the web interface after clicking project management. The displayed information includes project name, project overview, responsible person, start date, end date, table information, work status, creator, creation date and operation.
[0017] Furthermore, in the table management module, the configuration field information is preset in the common field library of the current module, or an established field in the common field library is selected to be added;
[0018] The questionnaire management includes: creating a new questionnaire, searching, resetting and displaying a list of established questionnaires;
[0019] The creation of a new table is to create a questionnaire under the selected survey project, select the established survey project, table type, table code, table name and remarks to create the questionnaire;
[0020] The search is to search for the established survey table information, and can be queried by project name, table type, table name and creation date alone or in combination;
[0021] The reset is to reset the information set when searching the questionnaire to the initial state;
[0022] The list display of the established survey forms displays the established survey form information, including the table code, table name, table type, project, notes, creation time, creator, change record and operation, wherein the operation includes editing, deleting, viewing details and publishing layers of the established survey form;
[0023] If the list of established questionnaires shows that the established questionnaire is published, it can be used only after the questionnaire is published; if the display module shows that the questionnaire has been published, the published questionnaire can be displayed and used in the survey project;
[0024] Editing an established questionnaire is to manage its configuration information, including basic information, questionnaire field information, and layer styles. Basic information displays the basic information of the current questionnaire, including the project to which it belongs, table name, table code, table type, and notes.
[0025] The survey form field information is used to configure the survey fields of the current survey form, including adding new fields, adding commonly used fields, importing fields, managing groups, searching, resetting fields, and a list display interface for configured fields; the adding new fields is used to configure new survey fields for the current survey form; the adding commonly used fields uses pre-established field information; the importing fields are used to upload files in a specified format or import fields from other survey forms; the managing groups can view the field grouping information contained in the current survey form; the searching is to search for the added field information, and perform single or combined queries through the current table name, field grouping, field code, and field name; the field resetting is to reset the field setting information during the search to the initial state; the list display interface for configured fields displays the currently configured field list information, and the displayed information includes serial number, field code, field name, group name, field type, field length, number of decimal places, visibility, input method, code domain, unit, remarks, and field operations. Field operations can modify and delete information in the current field.
[0026] Furthermore, in the table management module, setting table rules is to set table rules for the questionnaires under different survey projects: select the project established in the system and add table filling rules to the questionnaire under the current project. Table rules are used for data quality inspection in actual surveys to prevent users from filling in the questionnaire incorrectly during the actual survey;
[0027] The established survey rules are displayed in the table filling rule interface, and the displayed information includes the serial number, rule name, creator, creation time, updater, update time and survey rule operation;
[0028] The above investigation rule operation can edit, view details and activate the established rules. If the established table rule is activated, it will be displayed that the rule has been activated. After activation, the current rule can be used.
[0029] In the table management module, the relationship management between tables is to associate the survey tables under the survey project:
[0030] Establish the subordinate relationship between survey forms. You can set up multiple main tables, and the subsidiary tables can only belong to one main table. After the subordinate relationship is established, the subsidiary tables in the survey can directly copy the field information of the main table.
[0031] In the table management module, base map data extraction is to import base map data or map the data in the corresponding survey project to the current project; for the same survey task, data mapping can be performed through data extraction when surveys are conducted in different years.
[0032] Furthermore, when configuring fields in the questionnaire, the data encoding module provides field configuration in an enumerated manner, directly calling the code domain established by the data encoding module;
[0033] It is done in the order of survey factor - code domain - coding information, with survey factor interface, code domain interface and coding information interface respectively; first add survey factor as the parent node, add code domain under the parent node, and finally select the current code domain to modify the coding information.
[0034] Furthermore, when creating a survey factor, a code domain is created with the survey factor as the parent node, or the parent node selects a code domain factor that has been added in the code domain interface; the code and name of the created code domain factor will be displayed in the coding information interface;
[0035] The survey factor interface includes add, import and list display of added survey factors; the add function is to add a new survey factor, click and enter the survey factor name to complete the addition; the import function is used to upload a file in a specified format to import the survey factor;
[0036] The code domain interface includes add, delete, and list display of added code domain factors; the add function is used to add a code domain under the selected parent node, and the current parent node name is displayed. Enter the factor code and factor name to complete the addition; the parent node can select the survey factor added in the survey factor interface, or select the code domain factor added in the code domain interface;
[0037] The coding information interface is used to display the code and name of the currently selected code domain factor.
[0038] Furthermore, the work group management module includes the functions of creating a new work group, searching, resetting and managing work groups;
[0039] The Create New Work Group function is used to create a work group under a survey project. Enter the work group name and select a project to complete the creation. The Search function allows users to search for information about established work groups. Single or combined queries can be performed by project name, work group name, team leader, and creation date. The Reset function resets the information set by the user during the search to its initial state.
[0040] The work group management interface displays information about established work groups, including the project to which they belong, the work group name, the number of work group members, notes, creator, creation time, and operations. The operations can be used to view detailed information about the selected work group, edit work group members, set team leader information, and delete the currently selected work group.
[0041] Furthermore, the data management module divides and distributes tasks by distributing data:
[0042] The project data with configured survey form information is sent to the designated work group, specifically including simple query, advanced query, task management, and view tools; the simple query can be searched by selecting the project name and entering keywords in the field list; the advanced query can be queried by combining field names, operators, and field values after selecting the project name, and multiple query conditions can be added at the same time; the task management can create survey tasks under the selected survey project, and send the created survey tasks to the designated work group for field surveys. The status and details of the created tasks can be viewed, and the tasks that have been sent can also be added; the view tool is used to view the current interface map;
[0043] The data management module performs visual display and editing of survey projects through data operations:
[0044] Includes project selection, task selection, layer selection, view tools and editing tools;
[0045] By selecting the project and the tasks created under the project through project selection, and then selecting the survey layer through layer selection, the vector diagram of the current task can be displayed on the data operation interface; the view tool is used to view the current interface map; the editing tools include selection, node drawing, node editing, digging, line and surface segmentation, line and surface trimming, attribute transfer, streaming drawing, patch merging, cropping, deletion, undo, restoration and patch operation records.
[0046] Furthermore, it also includes a job log management module for managing the operation records of the survey project; all operation records are displayed in the form of a list on the job log management interface, which can be searched according to needs; or the operation records can be exported to the local computer in the form of an Excel spreadsheet;
[0047] The job log management module includes exporting Excel tables, searching, resetting and job log management interfaces; the exporting Excel tables can export the operation log displayed on the current interface into an Excel table format; the searching is to search the operated job logs, and perform single or combined queries by project name, table name and operation date; the resetting is to reset the information set by the user when searching to the initial state; the job log management interface displays the operation records of the survey project, and the displayed information includes serial number, project name, table name, operator, operation time, operation type and operation details; the operation details can view the operator, operator account ID, operation time and operation content.
[0048] An operation method based on the forest resource data collaborative operation management system is characterized by comprising the following operations:
[0049] 1) New survey project:
[0050] Create a new project in the project management module and enter the required information in the pop-up window to complete the survey project creation. After the project is created, you can modify the project information through the editing function;
[0051] 2) Create a survey form for the project: Create a new table in the table management module and enter the required information in the pop-up window to complete the survey form creation. Configure the survey field information and table rules for the created survey form. If creating multiple survey forms, you can establish the relationship between the tables as needed.
[0052] 3) Import base map data: Extract base map data in the table management module, select the base map data required for the project and import it; or map the data in the corresponding survey project to the current project as the survey base map;
[0053] 4) Establish an investigation team: Create a new team through the team management module, enter the required information to complete the team creation, and add members to the created team according to the department members. After adding, you can set the team leader in the member list;
[0054] 5) Divide the survey tasks: distribute data in the data management module, create tasks, select the small class data to be surveyed for the current task, and complete the survey task creation;
[0055] 6) Survey task issuance: After the survey task is created and issued in step 5), select the survey work group and issue the survey task to the designated survey work group;
[0056] 7) Survey task recovery: select the survey project and survey task to be queried through the data management module, check the status of the current survey task, and the data of the completed survey will be displayed in the current interface in a list form;
[0057] 8) Survey data merging: Perform data operations through the data management module, select the survey project and survey task to be queried, and the completed survey data will be automatically merged into the current survey project;
[0058] Supports editing of survey data, and the edited data is saved in the system survey project;
[0059] 9) Generate the final result data and save it in the current project in the form of vector data.
[0060] Compared with the prior art, the present invention has the following beneficial technical effects:
[0061] This invention is adaptable to multiple survey task systems and incorporates a hierarchical survey form management module. While ensuring ease of use for the collaborative data management system, it can also meet the customization requirements of complex survey projects. It also supports an integrated online operation model for establishing, issuing, collecting, and managing survey tasks, achieving flexibility, efficiency, reliability, and convenience in operational surveys. This invention is not only user-friendly but also highly adaptable to different survey tasks.
[0062] The present invention establishes a flexible survey form configuration. Users can create survey forms, configure survey form fields, establish relationships between tables, etc. under the survey project to meet users' customized needs for different survey tasks; it has universal applicability to different survey tasks and supports multiple survey tasks to be carried out simultaneously.
[0063] This invention supports linkage with mobile survey terminals, achieving internal and external integration, synchronizing survey progress, and integrating survey data in real time for convenient unified management. It supports collaborative online work by multiple people and can be divided into different survey task areas according to small groups, avoiding the situation where multiple people operate on the same map at the same time, thereby improving survey efficiency. It also enables full traceability of the data processing process, and establishes survey work groups for management, with clear survey responsibilities. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] Figure 1 It is a structural diagram of the data collaborative operation management system;
[0065] Figure 2 It is a schematic diagram of the data collaborative operation process;
[0066] Figure 3 This is a schematic diagram of multi-person data collaboration. DETAILED DESCRIPTION
[0067] The present invention is further described in detail below with reference to the embodiments, which are intended to explain the present invention rather than to limit it.
[0068] According to the forest resource data operation process, the present invention designs a concise, reasonable and efficient collaborative operation process, and provides a forest resource data collaborative operation management system and method.
[0069] like Figure 1 As shown, a forest resource data collaborative operation management system includes:
[0070] The project management module is used to create and manage survey projects, including the interface for creating new projects, searching, resetting, and displaying a list of established projects;
[0071] The questionnaire management module is used to establish questionnaires under the survey project, including configuring field information for the questionnaire and managing the questionnaire, setting questionnaire rules and managing relationships between tables, as well as extracting base map data.
[0072] Data coding module provides field configuration for establishing survey factors and manages them;
[0073] The work group management module creates a new survey work group for the current project and configures the work group personnel information;
[0074] The data management module is used to divide and distribute engineering data into tasks, and to visualize and edit the current survey project.
[0075] like Figure 2 As shown, an operation method based on the forest resource data collaborative operation management system according to claim 1 includes the following operations:
[0076] 1) New survey project:
[0077] Create a new project in the project management module and enter the required information in the pop-up window to complete the survey project creation. After the project is created, you can modify the project information through the editing function;
[0078] 2) Create a survey form for the project: Create a new table in the table management module and enter the required information in the pop-up window to complete the survey form creation. Configure the survey field information and table rules for the created survey form. If creating multiple survey forms, you can establish the relationship between the tables as needed.
[0079] 3) Import base map data: Extract base map data in the table management module, select the base map data required for the project and import it; or map the data in the corresponding survey project to the current project as the survey base map;
[0080] 4) Establish an investigation team: Create a new team through the team management module, enter the required information to complete the team creation, and add members to the created team according to the department members. After adding, you can set the team leader in the member list;
[0081] 5) Divide the survey tasks: distribute data in the data management module, create tasks, select the small class data to be surveyed for the current task, and complete the survey task creation;
[0082] 6) Survey task issuance: After the survey task is created and issued in step 5), select the survey work group and issue the survey task to the designated survey work group;
[0083] 7) Survey task recovery: select the survey project and survey task to be queried through the data management module, check the status of the current survey task, and the data of the completed survey will be displayed in the current interface in a list form;
[0084] 8) Survey data merging: Perform data operations through the data management module, select the survey project and survey task to be queried, and the completed survey data will be automatically merged into the current survey project;
[0085] Supports editing of survey data, and the edited data is saved in the system survey project;
[0086] 9) Generate the final result data and save it in the current project in the form of vector data.
[0087] The following is a detailed description of each module.
[0088] The project management module is mainly used for the creation and management of survey projects, including new projects, search, reset and list display interface of established projects; the new project is used for users to create new survey projects. After clicking, the user fills in the project information and selects the map service. After clicking OK, the project is established. The project information that needs to be filled in includes: project name, project overview, responsible person, start date and end date. The established project information will be displayed in the list display interface of established projects for user viewing and processing; the search allows users to search for established project information, and can perform single or combined queries by project name, responsible person, project status and creation date; the reset is to reset the information set by the user when searching to the initial state; the list display interface of established projects is the established project information displayed on the Web interface after clicking project management. The displayed information includes project name, project overview, responsible person, start date, end date, table information, work status, creator, creation date and operation, among which the operation function can edit and delete established projects;
[0089] The table management module is used to create a survey form for the survey project and configure field information, table rules, and relationships between tables for the survey form. Users can also preset commonly used fields in the current module. The drop-down functions of the table management module include:
[0090] (1) Questionnaire management
[0091] The questionnaire management function includes creating a new table, searching, resetting and a list display interface for established questionnaires; the create new table button is used to create a questionnaire under the selected survey project, and users can select an established survey project, table type, table code, table name and notes to create a questionnaire; the search button allows users to search for established questionnaire information, and can perform single or combined queries by project name, table type, table name and creation date; the reset button resets the information set by the user when searching to the initial state; the list display interface of the established questionnaire is the established questionnaire information displayed on the web interface after clicking on questionnaire management, and the displayed information includes table code, table name, table type, project to which it belongs, notes, creation time, creator, change records and operations, among which the operation functions include editing, deleting, viewing details and publishing layers of the established questionnaire. If the user publishes the established questionnaire in the list display interface of the established questionnaire, the display module will show that the questionnaire has been published, and the published questionnaire can be displayed and used in the survey project;
[0092] The above-mentioned editing function of the established questionnaire is used to manage the configuration information of the established questionnaire, including basic information, field information and layer style; the basic information displays the basic information of the current questionnaire, including the project to which it belongs, table name, table code, table type and remarks;
[0093] The field information is used to configure the survey fields of the current survey form, including adding new fields, adding common fields, importing fields, managing groups, searching, resetting and displaying a list of configured fields; the new fields are used to configure new survey fields for the current survey form; the added common fields can directly select the pre-established field information in the common field management; the imported fields are used to upload files in a specified format or import fields from other survey forms. The import function supports uploading files in xls and xlxs formats. After clicking the import button, a template for the imported file will be provided in the upper right corner of the pop-up window to facilitate the user to import fields; the management group can be checked View the field grouping information contained in the current survey form; the search allows users to search for added field information, and can perform single or combined queries based on the current table name, field group, field code, and field name; the reset resets the information set by the user when searching to the initial state; the configured field list display interface displays the currently configured field list information, including the sequence number, field code, field name, group name, field type, field length, number of decimal places, visibility, input method, code field, unit, remarks, and operation, where the operation function can modify and delete the information in the current field;
[0094] The configured field list and name are used for single or combined query; the reset is to reset the information set by the user during the search to the initial state
[0095] (2) Form filling rules
[0096] The table filling rule function is used to set table rules for questionnaires under different survey projects. Users can select a project that has been established in the system and add table filling rules to the questionnaire under the current project. Table rules are used for data quality inspection in actual surveys to avoid users making mistakes in filling out questionnaires during actual surveys.
[0097] The established survey rules are displayed on the table filling rule interface, and the displayed information includes the serial number, rule name, creator, creation time, updater, update time and operation. The operations can edit, view details and activate the established rules. If the user completes the activation of the established table rule on the table rule display interface, the display module will show that the rule has been activated. After activation, the current rule can be used, helping users better identify the progress of table rule activation.
[0098] (3) Table relationship management
[0099] The inter-table relationship management can associate the survey tables under the survey project and establish the subordinate relationship between the survey tables. Multiple main tables can be set, and the subordinate tables can only belong to one main table. After the subordinate relationship is established, the field information of the main table can be directly copied from the subordinate tables in the actual survey work.
[0100] (4) Common field management
[0101] The commonly used fields management can pre-establish commonly used fields according to the requirements of different survey tasks. The established fields are displayed in the commonly used fields management interface. You can directly select to add commonly used fields to the survey form in the edit function of the established survey form to configure the fields;
[0102] (5) Data extraction
[0103] The data extraction supports the import of base map data or mapping data from other survey projects to the current project. For the same survey task, when surveys need to be conducted in different years, users can use data extraction to map data and avoid repeated configuration of questionnaires.
[0104] The data encoding module is used to provide enumeration options when configuring fields. When configuring fields in the questionnaire, if the input method is selected as enumeration, the code field created by the data encoding module can be directly called. The module performs data encoding in a multi-level form of "survey factor-code field-coding information". Users can create survey factors according to their needs and create code fields with the survey factors as parent nodes. The parent node can also select a code field factor added in the code field interface. The code and name of the created code field factor will be displayed in the coding information interface. The data encoding module includes a survey factor interface, a code field interface, and a coding information interface.
[0105] The above survey factor interface includes an add button, an import button, and a list of added survey factors; the add button is used to add a new survey factor. Click it and enter the survey factor name to complete the addition; the import button is used to upload a file in a specified format to import the survey factor. The import function supports uploading files in xls and xlxs formats. After clicking the import button, a template for the imported file will be provided in the upper right corner of the pop-up window to facilitate the user to import the survey factor;
[0106] The above code domain interface includes an add button, a delete button, and a list of added code domain factors. The add button is used to add a code domain under the selected parent node. After clicking add, a pop-up window will display the current parent node name. Enter the factor code and factor name to complete the addition. The parent node can select the survey factor added in the survey factor interface or the code domain factor added in the code domain interface.
[0107] The above coding information interface is used to display the code and name of the currently selected code domain factor;
[0108] The work group management module is used to create and manage survey work groups. Users can create new survey work groups in the current module and add selected investigators to the work group as needed. After adding, the team leader can be set in the member list. The created work group will be managed and displayed in the list display interface of the established projects, which is convenient for users to view and process.
[0109] The work group management module includes a new work group button, a search button, a reset button and a work group management interface; the new work group button is used to create a work group under the survey project, enter the work group name, select the project to complete the creation; the search button allows users to search for information about established work groups, and can perform single or combined queries by project name, work group name, group leader and creation date; the reset button resets the information set by the user when searching to the initial state; the work group management interface displays information about established work groups, including the project to which they belong, work group name, number of work group members, notes, creator, creation time and operations; the operations can be used to view detailed information of the selected work group, edit work group members, set group leader information, and delete the currently selected work group;
[0110] The data management module is mainly used to divide the project data into tasks and assign survey tasks to designated work groups. It supports viewing and editing the data uploaded to the Web after the survey is completed, making it convenient for users to more intuitively allocate data to the survey project and grasp the actual survey data.
[0111] Specifically, data distribution of the data management module
[0112] The main function of the data distribution is to distribute the engineering data with configured survey form information to the designated work group. The specific functions include simple query, advanced query, task management, and view tools. The simple query can be searched by selecting the project name and entering keywords in the field list. The advanced query can be queried by combining field names, operators and field values after selecting the project name. Multiple query conditions can be added at the same time to meet the query functions of different requirements, which is convenient for users to accurately search for engineering data. The task management can create survey tasks under the selected survey project and distribute the created survey tasks to the designated work group for field survey. Users can view the status and details of the created tasks and can also append to the tasks that have been distributed. The view tool is used to view the current interface map, so that users can clearly understand the task details, including 2 / 3D view conversion, zoom, pan, rotation, north direction, initial view, spatial query, coordinate positioning, measurement, refresh and layer management.
[0113] Specifically, the data operations of the data management module
[0114] The data operation function is used to view and edit the data uploaded to the Web end after the survey is completed, so that users can grasp the actual survey data more intuitively. The specific functions include project selection, task selection, layer selection, view tools and editing tools. The user first selects the project to be viewed and the task created under the project, and then selects the survey layer to display the vector map of the current task on the data operation interface, which is convenient for users to view and edit the survey task; the view tool is used to view the current interface map, so that users can clearly grasp the task details, including 2 / 3D view conversion, zoom, translation, rotation, north direction, initial view, spatial query, coordinate positioning, measurement, refresh and layer management; the editing tools include selection, node drawing, node editing, digging, line and surface segmentation, line and surface trimming, attribute transfer, streaming drawing, patch merging, cropping, deletion, undo, restoration and patch operation record, which are convenient for users to edit the vector patches under the current survey project;
[0115] Furthermore, it also includes a job log management module, which is mainly used to manage the operation records of the survey project. All operation records are displayed in the form of a list in the job log management interface. Users can search according to their needs, or export the operation records to the local computer in the form of an Excel spreadsheet.
[0116] The job log management module includes exporting Excel tables, searching, resetting and job log management interfaces; the exporting Excel table can export the operation log displayed on the current interface into an Excel table format, making it convenient for users to view the operation records of the survey project; the search button allows users to search for the operated job logs, and can perform single or combined queries by project name, table name and operation date; the reset button resets the information set by the user when searching to the initial state; the job log management interface displays the operation records of the survey project, and the displayed information includes serial number, project name, table name, operator, operation time, operation type and operation details; the operation details can view the operator, operator account ID, operation time and operation content.
[0117] Based on the above template, the present invention can achieve the following effects:
[0118] (1) The present invention supports multi-person collaborative online operations
[0119] Collaborative online work primarily refers to the data work module's ability to enable collaborative internal division of survey data. Specifically, multiple people can edit survey data simultaneously, and any changes made to the data, along with the person who made the changes, are recorded in the log management.
[0120] Collaboration is reflected in "multiple people at the same time", such as Figure 3As shown, 5 members can simultaneously perform data internal zoning (members are displayed next to the upper toolbar). The different colored blocks in the figure are the blocks currently being operated by different people.
[0121] The full-process traceability of the data processing is mainly reflected in the log management module. It can be specific to which project, which questionnaire, which person performed what operation (addition, modification, deletion, etc.) at what time. The specific modified map number and person ID can be viewed in the details.
[0122] An investigation working group will be established to manage the investigation, manage the investigators, and clarify the investigation responsibilities.
[0123] (2) This invention supports the division of survey projects
[0124] The division of the survey project is that when distributing data, small classes can be screened according to conditions and divided into different survey task areas according to small classes; the survey tasks are divided and distributed to designated work groups, and the distributed data will be displayed as distributed, and other people will see the distributed data when selecting, avoiding repeated data distribution; in this way, there will be no repeated investigation of the map blocks investigated by investigators, and it will avoid the situation where multiple people operate the same map block at the same time, thereby improving survey efficiency.
[0125] (3) The present invention can realize the online establishment, issuance and recovery of survey tasks
[0126] Internal surveys are conducted on the web (server) side, with surveys sent to mobile devices for investigation. After the investigation is completed, the data is uploaded online to the web side for data editing and management, completing the integrated internal and external survey workflow.
[0127] The progress of the synchronous survey is achieved through the data operation module, where you can view the data uploaded after the mobile survey is completed and edit the data; you can also view the status and details of the created tasks (not issued, issued, or returned) in the data distribution module; this allows for real-time integration of survey data for convenient unified management.
[0128] (4) The present invention establishes a flexible questionnaire configuration function. Users can create questionnaires, configure questionnaire fields, and establish relationships between tables under the survey project to meet the user's customized needs for different survey tasks;
[0129] For example, in a forest and grassland resource survey, there are tasks such as resource inventory and resource verification. For resource inventory, users can create a project, configure a survey form for the project, and configure the fields to be surveyed (e.g., plot type, area, etc.).
[0130] The same applies to resource verification, except that when configuring fields, the fields required for resource verification are used; for example, whether the sample plot area is accurate, whether the sample plot tree species are accurate, etc.
[0131] While existing surveys usually develop a single survey software for a specific survey task, which incurs significant capital and learning costs, the collaborative system of the present invention can satisfy user customization of various survey tasks, allowing a single software package to handle a wide range of survey tasks.
[0132] It is universally applicable to different survey tasks and supports multiple survey tasks to be carried out simultaneously.
[0133] The present invention designs a reasonable and efficient data collaborative operation method. A complete operation process is carried out using the following steps:
[0134] 1) New survey project
[0135] Open the project management module, click New Project, enter the information required in the pop-up window to complete the creation of the survey project. After the project is created, users can modify the project information through the editing function.
[0136] 2) Establish a survey form under the project
[0137] Open the Survey Management subfunction in the Table Management module, click Create New Table, and enter the required information in the pop-up window to complete the survey creation. Users need to configure the survey field information and table rules for the created survey form. If creating multiple survey forms, you can establish dependencies between the tables as needed.
[0138] After creating a survey form in the Survey Form Management sub-function under the Table Management module, click Edit to view the basic information of the survey form and configure field information for the current survey form. Users can configure field information by adding fields, importing fields, and adding commonly used fields. Already configured fields can be grouped and managed according to needs.
[0139] Click the Table Filling Rules sub-function under the Table Management module to configure table rules for the created survey form. Users can complete the establishment by clicking New Rule, entering the judgment conditions and judgment rules, and then activate the rule after establishment. After activation, the current rule takes effect. If multiple survey forms have been established under the current survey project, the relationships between tables can be associated according to user needs. Click Inter-table Relationship Management under the Table Management module to establish subsidiary relationships for the established survey forms by adding a main table and adding a subsidiary table. The subsidiary table can directly copy the attribute information of the main table.
[0140] 3) Import basemap data
[0141] Open the data extraction sub-function in the table management module, click data import, select the base map data required for the project and import it; it also supports mapping data from other survey projects to the current project as the survey base map.
[0142] 4) Establish an investigation team
[0143] Open the Work Group Management module, click New Work Group, and enter the required information to create the work group. On the work group display screen, click Edit and select members from the corresponding department under Organizational Structure to add members to the created work group. Once added, you can set the group leader in the member list.
[0144] 5) Divide the investigation tasks
[0145] Open the data distribution sub-function in the data management module, open the task management interface, click Create Task, check the small class data that needs to be surveyed for the current task, and complete the survey task creation.
[0146] 6) Investigation tasks are issued
[0147] After the survey task is created in step 5, click Send, select the survey work group, and send the survey task to the designated survey work group.
[0148] 7) Investigation mission recovery
[0149] Open the data operation sub-function in the data management module, select the survey project and survey task you want to query, and you can view the issuance status of the current survey task. The data of the completed survey will be displayed in the current interface in list form.
[0150] 8) Survey data consolidation
[0151] Open the data operation sub-function in the data management module, select the survey project and survey task you want to query, and the completed survey data will be automatically merged into the current survey project, making it easier for users to perform subsequent operations.
[0152] It supports editing of survey data. The edited data is saved in the system survey project, which is convenient for users to view and count data.
[0153] 9) Generate the final result data and save it in the current project in the form of vector data.
[0154] The above embodiments are used to illustrate the present invention rather than to limit the present invention. Any modification, equivalent substitution, improvement, etc. made to the present invention within the spirit of the present invention and the protection scope of the claims shall be included in the protection scope of the present invention.
Claims
1. A forest resource data collaborative operation management system, characterized in that: include: The project management module is used to create and manage survey projects, including the interface for creating new projects, searching, resetting and displaying a list of established projects; The questionnaire management module is used to establish the questionnaire under the survey project, including configuring field information for the questionnaire and managing the questionnaire, setting questionnaire rules and relationship management between tables, and extracting base map data; Data coding module, which provides field configuration for establishing survey factors and manages them; Work group management module, create a new survey work group for the current project and configure the work group personnel information; The data management module is used to divide and distribute engineering data into tasks, and to visualize and edit the current survey project.
2. The forest resource data collaborative operation management system according to claim 1, characterized in that: The new project is used to create a new survey project, fill in the project information to configure the base map for the new project; the project information includes the project name, project overview, responsible person, start date and end date; the established project information will be displayed in the list display interface of the established projects; The search queries the established project information by project name, responsible person, project status and creation date alone or in combination; The resetting is to reset the information set by the user when searching to the initial state; The list display interface of the established projects is to display the established project information on the Web interface after clicking on project management. The displayed information includes project name, project overview, responsible person, start date, end date, table information, work status, creator, creation date and operation.
3. The forest resource data collaborative operation management system according to claim 1, characterized in that: In the table management module, the configuration field information is preset in the common field library of the current module, or the established fields in the common fields are selected and added; The questionnaire management includes: creating a new questionnaire, searching, resetting and displaying a list of established questionnaires; The creating of a new table is to create a survey table under the selected survey project, select the established survey project, table type, table code, table name and remarks to create the survey table; The search is to search for the established survey table information, and can be queried by project name, table type, table name and creation date alone or in combination; The reset is to reset the information set when searching the questionnaire to the initial state; The list display of the established survey forms is to display the established survey form information, and the displayed information includes table code, table name, table type, project, remarks, creation time, creator, change record and operation, wherein the operation includes editing, deleting, viewing details and publishing layers of the established survey form; If the list of established questionnaires shows that the established questionnaire is published, it can be used only after the questionnaire is published; if the display module shows that the questionnaire has been published, the published questionnaire can be displayed and used in the survey project; Editing an established questionnaire is to manage the configuration information of the established questionnaire, including basic information, questionnaire field information and layer style; among them, basic information displays the basic information of the current questionnaire, including the project to which it belongs, table name, table code, table type and remarks; The survey form field information is used to configure the survey fields of the current survey form, including adding new fields, adding common fields, importing fields, managing groups, searching, resetting fields, and a list display interface of configured fields; the adding new fields is used to configure new survey fields for the current survey form; the adding common fields uses pre-established field information; the importing fields are used to upload files in a specified format or to import fields from other survey forms; the managing groups can view the field grouping information contained in the current survey form; the searching is to search for the added field information, and a single or combined query is performed through the current table name, field grouping, field code, and field name; the field resetting is to reset the field setting information during the search to the initial state; the list display interface of the configured fields displays the currently configured field list information, and the displayed information includes the sequence number, field code, field name, group name, field type, field length, number of decimal places, visibility, input method, code domain, unit, remarks, and field operation, and the field operation can modify and delete the information of the current field.
4. The forest resource data collaborative operation management system according to claim 1 or 3, characterized in that: In the table management module, setting the survey form rules is to set the table rules for the survey forms under different survey projects: select the project established in the system, and add the table filling rules to the survey form under the current project. The table rules are used for data quality inspection in the actual survey to avoid users filling in the survey form incorrectly in the actual survey; The established survey rules are displayed in the table filling rule interface, and the displayed information includes the serial number, rule name, creator, creation time, updater, update time and survey rule operation; The survey rule operation can edit, view details and activate the established rules; if the established table rule is activated, it will be displayed that the rule has been activated, and the current rule can be used after activation; In the table management module, the relationship management between tables is to associate the survey tables under the survey project: Establish the subordinate relationship between survey forms. You can set up multiple main tables, and the subsidiary tables can only belong to one main table. After the subordinate relationship is established, the subsidiary tables in the survey work can directly copy the field information of the main table. In the table management module, base map data extraction is to import base map data or map the data in the corresponding survey project to the current project; for the same survey task, when the survey is conducted in different years, data mapping can be performed through data extraction.
5. The forest resource data collaborative operation management system according to claim 1, characterized in that: When the data encoding module configures the fields in the questionnaire, the field configuration is provided in an enumerated manner, and the code domain established by the data encoding module is directly called; It is done in order of survey factor - code domain - coding information, and has survey factor interface, code domain interface and coding information interface respectively; first add survey factor as parent node, add code domain under the parent node, and finally select the current code domain to modify the coding information.
6. The forest resource data collaborative operation management system according to claim 5, characterized in that: When creating a survey factor, create a code domain with the survey factor as the parent node, or select the code domain factor that has been added in the code domain interface as the parent node; The code and name of the created code domain factor will be displayed in the coding information interface; The survey factor interface includes adding, importing and displaying a list of added survey factors; The adding is to add a new survey factor, click and enter the survey factor name to complete the adding; The import is used to upload a file in a specified format to import survey factors; The code domain interface includes adding, deleting and displaying a list of added code domain factors; the adding is used to add a code domain under a selected parent node, and display the current parent node name, and input the factor code and factor name to complete the addition; The parent node can select the survey factor added in the survey factor interface, or select the code domain factor added in the code domain interface; The coding information interface is used to display the code and name of the currently selected code domain factor.
7. The forest resource data collaborative operation management system according to claim 1, characterized in that: The work group management module includes creating a new work group, searching, resetting and managing work groups; The new work group is used to create a work group under the survey project. Enter the work group name and select the project to complete the creation; The search allows users to search for the established work group information, and can perform single or combined inquiries by project name, work group name, team leader and creation date; the reset resets the information set by the user when searching to the initial state; The work group management interface displays information about the established work groups, including the project to which they belong, the work group name, the number of people in the work group, notes, creator, creation time, and operations; the operations can be used to view detailed information about the selected work group, edit the work group members, set the team leader information, and delete the currently selected work group.
8. The forest resource data collaborative operation management system according to claim 1, characterized in that: The data management module divides and distributes tasks by distributing data: Send the project data with the questionnaire information configured to the designated work group, including simple query, advanced query, task management, and view tools; the simple query can be searched by selecting the project name and entering keywords in the field list; the advanced query can be searched by combining the field name, operator, and field value after selecting the project name, and multiple query conditions can be added at the same time; The task management can create survey tasks under the selected survey project, issue the created survey tasks to the designated work group for field survey, view the status and details of the created tasks, and add the issued tasks; the view tool is used to view the current interface map; The data management module performs visual display and editing of survey projects through data operations: Includes project selection, task selection, layer selection, view tools and editing tools; By selecting the project and the tasks created under the project, and then selecting the survey layer through layer selection, the vector diagram of the current task can be displayed on the data operation interface; the view tool is used to view the current interface map; the editing tools include selection, node drawing, node editing, digging, line and surface segmentation, line and surface trimming, attribute transfer, streaming drawing, spot merging, cropping, deletion, undo, restoration and spot operation records.
9. The forest resource data collaborative operation management system according to claim 1, characterized in that: It also includes a job log management module, which is used to manage the operation records of the survey project; all operation records are displayed in the job log management interface in a list format, and can be searched according to needs; or the operation records can be exported to the local computer in the form of an Excel spreadsheet; The job log management module includes exporting Excel tables, searching, resetting and job log management interfaces; The Excel table export can export the operation log displayed on the current interface into an Excel table format; The search is to search the operation logs that have been operated, and perform single or combined queries through project name, table name and operation date; the reset is to reset the information set by the user when searching to the initial state; the job log management interface displays the operation records of the survey project, and the displayed information includes serial number, project name, table name, operator, operation time, operation type and operation details; the operation details can view the operator, operator account ID, operation time and operation content.
10. An operation method based on the forest resource data collaborative operation management system according to claim 1, characterized in that: The following operations are included: 1) New survey project: Create a new project through the project management module, enter the information required in the pop-up window to complete the creation of the survey project, and modify the project information through the editing function after the project is created; 2) Create a survey form under the project: Create a new table through the table management module, enter the required information in the pop-up window to complete the survey form creation; and configure the survey field information and table rules for the created survey form. If multiple survey forms are created, the relationship between the tables can be established as required; 3) Import base map data: extract base map data in the table management module, select the base map data required for the project and import it; or map the data in the corresponding survey project to the current project as the survey base map; 4) Establish an investigation team: Create a new team through the team management module, enter the required information to complete the team creation, and add members to the created team corresponding to the members in the department. After adding, you can set the team leader in the member list; 5) Divide the survey tasks: distribute data in the data management module, create tasks, select the small class data that needs to be investigated in the current task, and complete the survey task creation; 6) Issuance of survey tasks: After the survey task is created and issued in step 5), select the survey work group and issue the survey task to the designated survey work group; 7) Survey task recovery: select the survey project and survey task to be queried through the data management module, check the status of the current survey task, and the completed survey data will be displayed in the current interface in a list form; 8) Survey data merging: Perform data operations through the data management module, select the survey project and survey task to be queried, and the completed survey data will be automatically merged into the current survey project; Supports editing of survey data, and the edited data is saved in the system survey project; 9) Generate the final result data and save it in the current project in the form of vector data.
