Image drawing method and device, equipment, storage medium and program product

By drawing project execution status images and adding accompanying images for delayed statuses, the problem of unintuitive project monitoring was solved, enabling a clear display of project status and convenient access to detailed data.

CN118941673APending Publication Date: 2024-11-12CCB FINTECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410973551.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Existing technologies for monitoring project progress are not intuitive enough and fail to clearly demonstrate the project's completion status.

Method used

By acquiring project data, a project execution status image is drawn, and an accompanying image is drawn next to the image based on the project's delay status, visually representing the number of projects and their delay status.

Benefits of technology

It enables intuitive monitoring of project status, allowing users to understand detailed data through simple operations, thus increasing the intuitiveness of project status management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941673A_ABST
    Figure CN118941673A_ABST
Patent Text Reader

Abstract

The invention provides an image drawing method and device, equipment, a storage medium and a program product, and belongs to the technical field of data processing and big data. Comprising the following steps: in response to a received drawing instruction sent by a control terminal, reading item data and determining a coordinate axis label; determining the number of projects which are put into production, the number of projects in implementation, the number of projects which are not scheduled, a first project delay state corresponding to each project in implementation and a second project delay state corresponding to each project which is not scheduled, which correspond to the target coordinate axis label; drawing a project execution state image according to the number of the projects which are put into production, the number of the projects in implementation and the number of the projects which are not scheduled; drawing an accompanying image according to the number of the projects put into production, the number of the projects in implementation, the first project delay state and the second project delay state; and in response to the received trigger signal, determining and outputting project state information according to the target project data corresponding to the trigger signal. The problem that the supervision mode of the current project processing state is not visual enough is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of data processing and big data technology, and in particular to an image rendering method, device, equipment, storage medium and program product. Background Art

[0002] With the development of society, the scale of each enterprise has gradually increased, the number of projects handled by the enterprise has also increased accordingly, and the difficulty of supervising the project processing status has gradually increased.

[0003] At present, in the prior art, the project processing status is usually supervised by displaying prompts.

[0004] However, the inventors have discovered that the prior art has at least the following technical problems: the current method for supervising the project processing status is not intuitive enough. Summary of the invention

[0005] The present application provides an image drawing method, device, equipment, storage medium and program product to solve the problem that the current supervision method of project processing status is not intuitive enough.

[0006] In the first aspect, the present application provides an image drawing method, comprising: in response to receiving a drawing instruction sent by a control terminal, reading project data and determining the coordinate axis label corresponding to the drawing instruction. According to the project data, the number of projects that have been put into production, the number of projects under implementation, the number of unscheduled projects, the first project postponement status corresponding to each project under implementation, and the second project postponement status corresponding to each unscheduled project are determined, wherein the target coordinate axis label is any coordinate axis label. According to the number of projects that have been put into production, the number of projects under implementation, and the number of unscheduled projects, a project execution status image corresponding to the target coordinate axis label is drawn. According to the number of projects that have been put into production, the number of projects under implementation, the first project postponement status, and the second project postponement status, an accompanying image corresponding to the target coordinate axis label is drawn. In response to receiving a trigger signal for a project execution status image or an accompanying image, the target project data corresponding to the trigger signal is determined; according to the target project data, the project status information is determined; and the project status information is output.

[0007] In a possible design, according to the number of projects that have been put into production, the number of projects under implementation, the postponement status of the first project, and the postponement status of the second project, an accompanying image corresponding to the target coordinate axis label is drawn, including: according to the postponement status of the first project, the number of first postponed projects and the number of first non-postponed projects are determined. Taking the number of projects that have been put into production as the starting point, sub-images of different colors are drawn with the number of first postponed projects and the number of first non-postponed projects to obtain the first accompanying image. According to the postponement status of the second project, the number of second postponed projects and the number of second non-postponed projects are determined. Taking the sum of the number of projects that have been put into production and the number of projects under implementation as the starting point, sub-images of different colors are drawn with the number of second postponed projects and the number of second non-postponed projects to obtain the second accompanying image.

[0008] In a possible design, after receiving a drawing instruction sent by a control terminal, reading the project data and determining the coordinate axis labels, the method further includes: determining at least one production time period and a target number of non-delayed projects and a target number of delayed projects corresponding to the production time period according to the project data. Drawing a project status image corresponding to the production time period according to the target number of non-delayed projects and the target number of delayed projects.

[0009] In a possible design, after receiving a drawing instruction sent by a control terminal, reading the project data and determining the coordinate axis labels, the method further includes: in response to receiving a project flow drawing instruction corresponding to the target project, obtaining the current time. Reading target project data corresponding to the target project in the project data. Reading at least one sub-stage of the target project in the target project data, the time range corresponding to the sub-stage, and the processing status corresponding to the sub-stage. Drawing a Gantt chart corresponding to the target project according to the current time, the sub-stage, the time range corresponding to the sub-stage, and the processing status corresponding to the sub-stage.

[0010] In one possible design, the time range includes a start time and an end time. Accordingly, according to the current time, the sub-stage, the time range corresponding to the sub-stage and the processing status corresponding to the sub-stage, a Gantt chart corresponding to the target project is drawn, including: according to the processing status of the target sub-stage, searching for a preset processing status and color correspondence to obtain the target display color. In the target Gantt chart image corresponding to the target sub-stage, the portion from the target start time to the current time is drawn as the target display color, wherein the target start time is the start time corresponding to the target sub-stage. In the target Gantt chart image, the portion from the current time to the target end time is drawn as a preset color, wherein the target end time is the end time corresponding to the target sub-stage.

[0011] In a possible design, after receiving the drawing instruction sent by the control terminal, reading the project data and determining the coordinate axis label, it also includes: in response to receiving the delay prediction instruction corresponding to the target project, obtaining the target project data corresponding to the target project. According to the target project data, calculating the delay expectation score. According to the delay expectation score, finding the correspondence between the preset delay expectation interval and the alarm level, and obtaining the alarm level corresponding to the target project. Outputting the alarm level.

[0012] In a possible design, the expected score of the delay is calculated according to the target project data, including: reading at least one characteristic data of the implementation cycle of the demand item, the number of collaborating parties, the number of delayed changes, the level of project personnel, the number of collaborative components, the number of project-related demand items, the working years of personnel, process delays and result delays in the target project data. The target characteristic data and the corresponding score calculation rules are used to determine the expected value corresponding to the target characteristic data, where the target characteristic data is any characteristic data. The expected value corresponding to each characteristic data is weighted and summed to obtain the expected score of the delay.

[0013] In a second aspect, the present application provides an image drawing device, comprising: a label determination module, for responding to receiving a drawing instruction sent by a control terminal, reading project data and determining a coordinate axis label corresponding to the drawing instruction; a first determination module, for determining, based on the project data, the number of projects that have been put into production, the number of projects that are being implemented, the number of unscheduled projects, the first project postponement status corresponding to each project that is being implemented, and the second project postponement status corresponding to each unscheduled project, corresponding to the target coordinate axis label, wherein the target coordinate axis label is any coordinate axis label; a first drawing module, for drawing a project execution status image corresponding to the target coordinate axis label based on the number of projects that have been put into production, the number of projects that are being implemented, and the number of unscheduled projects; and a second drawing module, for drawing an accompanying image corresponding to the target coordinate axis label based on the number of projects that have been put into production, the number of projects that are being implemented, the first project postponement status, and the second project postponement status.

[0014] In a third aspect, the present application provides an electronic device comprising: a processor, and a memory communicatively connected to the processor; the memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory, so that the processor executes the image drawing method described in the first aspect.

[0015] In a fourth aspect, the present application provides a computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the image drawing method described in the first aspect.

[0016] In a fifth aspect, the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the image drawing method described in the first aspect.

[0017] The image drawing method, device, equipment, storage medium and program product provided by the present application, after receiving the drawing instruction, read the project data and determine the coordinate axis label, determine the data required for drawing the image from the project data, and use the obtained data to draw a project execution status image representing the project quantity, and draw an accompanying image representing the deferred status next to the project execution status image according to the deferred status of the project, so that the deferred status of the project is intuitively represented next to the project execution status image, and the number of overdue projects and the proportion of overdue projects in the total number of projects are intuitively represented, and by responding to the trigger signal, the target project data corresponding to the trigger signal is obtained, and the project status information is determined from the target project data, and the project status information data is used to enable the user to understand the detailed data behind the image through simple operations, thereby increasing the intuitiveness of project status management and control. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0019] Figure 1 A schematic diagram of an application scenario of the image drawing method provided in an embodiment of the present application;

[0020] Figure 2 A schematic diagram of a flow chart of an image drawing method provided in an embodiment of the present application;

[0021] Figure 3 A schematic diagram of a project status image provided for an embodiment of the present application;

[0022] Figure 4 A schematic diagram of a project status image corresponding to a time period provided in an embodiment of the present application;

[0023] Figure 5 A Gantt chart diagram corresponding to the target project provided in the embodiment of the present application;

[0024] Figure 6 A schematic diagram of the structure of an image drawing device provided in an embodiment of the present application;

[0025] Figure 7 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application.

[0026] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0027] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.

[0028] With the continuous progress of society, the scale of enterprises is expanding, and as a result, the number of projects handled by enterprises has increased significantly, which has also made the supervision of project processing status more complex and challenging.

[0029] Under the current technical background, the common method for supervising project processing status is to display prompts. However, facing the increasingly complex project supervision needs, this method is difficult to intuitively reflect the completion status of each project.

[0030] In response to the above technical problems, the inventors proposed the following technical concept: by obtaining project data, a project execution status image is drawn based on the number of projects that have been put into production, the number of projects under implementation, and the number of projects not scheduled for production in the project data; and an accompanying image is drawn next to the execution status image based on the number of projects that have been put into production, the total number of each project, the number of non-delayed projects, and the number of delayed projects in the project data.

[0031] This application is applied to the scene of image drawing. The acquisition, transmission, storage, use, and processing of data in the technical solution of this application are in compliance with the relevant provisions of laws and regulations.

[0032] It should be noted that in the embodiments of the present application, certain software, components, models and other existing solutions in the industry may be mentioned, and they should be regarded as exemplary. Their purpose is only to illustrate the feasibility of implementing the technical solution of the present application, but it does not mean that the applicant has or will necessarily use the solution.

[0033] Figure 1 Schematic diagram of application scenarios of the image drawing method provided in the embodiment of the present application. Figure 1 In this scenario, it includes: a control terminal 101 and a server 102.

[0034] In a specific implementation process, the control terminal 101 may include a computer, a server, a tablet, a mobile phone, a PDA (Personal Digital Assistant), a notebook, etc., which can input data.

[0035] The server 102 can be implemented using a server or a cluster of multiple servers with more powerful processing capabilities and higher security. If possible, it can also be replaced by a computer, laptop, etc. with stronger computing power.

[0036] The connection between the server 102 and the control terminal 101 can be a wired connection or a wireless connection.

[0037] The server 102 is used to receive the instruction sent by the control terminal 101, read the project data, and draw the image according to the project data.

[0038] It is understandable that the structure illustrated in the embodiment of the present application does not constitute a specific limitation on the image drawing method. In other feasible implementations of the present application, the above architecture may include more or fewer components than shown in the figure, or combine certain components, or split certain components, or arrange the components differently, which can be determined according to the actual application scenario and is not limited here. Figure 1 The components shown may be implemented by hardware, software, or a combination of software and hardware.

[0039] The technical solution of the present application and how the technical solution of the present application solves the above-mentioned technical problems are described in detail below with specific embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. The embodiments of the present application will be described below in conjunction with the accompanying drawings.

[0040] Figure 2 A schematic diagram of the process flow of the image drawing method provided in the embodiment of the present application. The execution subject of the embodiment of the present application may be Figure 1 The server in the embodiment may also be a computer and / or a mobile phone, etc., and this embodiment does not impose any special restrictions on this. Figure 2 As shown, the method includes:

[0041] S201: In response to receiving a drawing instruction sent by a control terminal, reading project data and determining a coordinate axis label corresponding to the drawing instruction.

[0042] In this step, the drawing instruction may be received by receiving a data packet, a message, etc. The project data may be realized by reading data at a preset position, or by reading the project data at a position corresponding to the drawing instruction. Determining the coordinate axis label corresponding to the drawing instruction may include using the data type corresponding to the drawing instruction in the project data as the coordinate axis label; or searching for specific data in the project data according to the data type in the drawing instruction to obtain the coordinate axis label.

[0043] The data type is, for example, a field type or a department type; accordingly, the axis label may be the field type or the department type to which each item belongs. The drawing instruction may include the data type.

[0044] S202: According to the project data, determine the number of projects that have been put into production, the number of projects under implementation, the number of unscheduled projects, the first project postponement status corresponding to each project under implementation, and the second project postponement status corresponding to each unscheduled project corresponding to the target axis label, wherein the target axis label is any axis label.

[0045] In this step, it can include reading the target project data corresponding to the target coordinate axis label, and counting the attributes of each project in the target project data, such as whether it has been put into production, whether it is being implemented, whether it is a scheduled project, whether it has been postponed, etc. According to these attributes, the quantity is accumulated to obtain the number of projects that have been put into production, the number of projects that are being implemented, and the number of projects that have not been scheduled. The project postponement status can be obtained by reading the attributes in the project data. The first project postponement status can indicate whether the project under implementation has been postponed, and the second project postponement status can indicate whether the unscheduled project has been postponed.

[0046] S203: Draw a project execution status image corresponding to the target coordinate axis label according to the number of projects that have been put into production, the number of projects under implementation, and the number of projects that have not been scheduled for production.

[0047] In this step, it can include determining the number of projects that have been put into production as the image length of projects that have been put into production, determining the number of projects under implementation as the image length of projects under implementation, and determining the number of unscheduled projects as the image length of unscheduled projects; drawing images of different colors and splicing them according to the image lengths of projects that have been put into production, the image lengths of projects under implementation, and the image lengths of unscheduled projects, respectively, to obtain a project execution status image, or adding different colors to different parts of a unified image according to the image lengths of projects that have been put into production, the image lengths of projects under implementation, and the image lengths of unscheduled projects, to obtain a project execution status image.

[0048] S204: Draw an accompanying image corresponding to the target coordinate axis label according to the number of projects that have been put into production, the number of projects under implementation, the first project deferred status and the second project deferred status.

[0049] In this step, it may include determining the number of first deferred projects whose first project delay status is deferred, the number of first non-deferred projects whose first project delay status is not deferred, taking the number of projects that have been put into production as the starting point and the first number of deferred projects as the length to draw a first deferred accompanying image, taking the end point of the first deferred accompanying image as the new starting point and the first number of non-deferred projects as the length to draw the first non-deferred accompanying image, determining the number of second deferred projects whose second project delay status is deferred, the number of second non-deferred projects whose second project delay status is not deferred, taking the sum of the number of projects that have been put into production and the number of projects under implementation as the new starting point (or taking the end point of the first non-deferred accompanying image as the new starting point), drawing a second deferred accompanying image with the second number of deferred projects as the length, taking the end point of the second deferred accompanying image as the new starting point and the second non-deferred accompanying image with the second number of non-deferred projects as the length.

[0050] S205: In response to receiving a trigger signal for the project execution status image or the accompanying image, determining target project data corresponding to the trigger signal.

[0051] In this step, the trigger signal may include click, long press, hover, etc. The trigger signal corresponds to the pointer position, and the corresponding project execution status image or accompanying image is found by the pointer position, or a partial area in the project execution status image or accompanying image is found by the pointer position (for example, the corresponding area of ​​the put into production project, the corresponding area of ​​the project under implementation, or the corresponding area of ​​the unscheduled project in the project execution status image, and for example, the corresponding area of ​​the postponed project and the corresponding area of ​​the unpostponed project in the accompanying image), and the corresponding project data is read as the target project data according to the type of the image corresponding to the trigger signal (the project is a put into production project, the project is an under implementation project, the project is an unscheduled project, whether it is postponed, etc.).

[0052] S206: Determine project status information according to the target project data.

[0053] In this step, at least one of the data such as the number of overdue projects, the number of non-overdue projects, the total number of projects, the project undertaking departments, and the regions to which the project undertaking departments belong in the accumulated target project data can be included as the project status information.

[0054] S207: Output project status information.

[0055] This step may include displaying and outputting project status information, sending the project status information to a display terminal, and the like.

[0056] The output display method may include displaying the output in any of a bubble, a pop-up window, a floating window, and the like.

[0057] From the description of the above embodiments, it can be seen that the embodiments of the present application read the project data and determine the coordinate axis labels after receiving the drawing instructions, determine the data required for drawing the image from the project data, and use the obtained data to draw a project execution status image representing the number of projects, and draw an accompanying image representing the deferred status next to the project execution status image according to the deferred status of the project, so that the deferred status of the project is intuitively represented next to the project execution status image, and the number of overdue projects and the proportion of overdue projects in the total number of projects are intuitively represented, and by responding to the trigger signal, the target project data corresponding to the trigger signal is obtained, and the project status information is determined from the target project data. The project status information data is used to enable users to understand the detailed data behind the image through simple operations, thereby increasing the intuitiveness of project status management and control.

[0058] Figure 3 This is a schematic diagram of a project status image provided in an embodiment of the present application. Figure 3 As shown, the project execution status image schematic diagram includes a project execution status image, which shows the number of projects that have been put into production, the number of projects under implementation and the number of projects not scheduled for production. An accompanying image is displayed next to the image corresponding to the number of projects under implementation, indicating the number of deferred projects and the number of non-deferred projects corresponding to the projects under implementation. The accompanying image displayed next to the image corresponding to the number of projects under implementation indicates the number of deferred projects and the number of non-deferred projects corresponding to the projects under implementation.

[0059] In a possible implementation, in the above step S204, drawing the accompanying image corresponding to the target coordinate axis label according to the number of projects that have been put into production, the number of projects under implementation, the first project extension status, and the second project extension status includes:

[0060] S2041: Determine the number of first deferred projects and the number of first non-deferred projects according to the deferred status of the first project.

[0061] In this step, counting the number of projects whose first project extension status is extended in the project data as the first extended project number, and counting the number of projects whose first project extension status is not extended as the first non-extended project number.

[0062] S2042: Taking the number of projects that have been put into production as a starting point, drawing sub-images of different colors based on the number of first deferred projects and the number of first non-deferred projects, to obtain a first accompanying image.

[0063] In this step, it can include taking the number of projects that have been put into production as the minimum value of the first accompanying image and drawing a sub-image of the first color with the first number of deferred projects as the length, and after the sub-image of the first color, drawing a sub-image of the second color with the first number of non-deferred projects as the length to obtain the first accompanying image.

[0064] S2043: Determine the number of second deferred projects and the number of second non-deferred projects according to the deferred status of the second project.

[0065] This step is similar to the above step S2041 and will not be repeated here.

[0066] S2044: Taking the sum of the number of projects that have been put into production and the number of projects under implementation as a starting point, the second number of deferred projects and the second number of non-deferred projects are drawn as sub-images of different colors to obtain a second accompanying image.

[0067] In this step, the sum of the number of projects that have been put into production and the number of projects under implementation can be calculated, and the calculated sum is used as a starting point to draw the second accompanying image. The process of drawing the second accompanying image is similar to the process of drawing the first accompanying image in the above step S2042, and will not be repeated here.

[0068] From the description of the above embodiments, it can be seen that the embodiments of the present application determine the number of deferred projects and the number of non-deferred projects according to the deferred status of the projects, draw a first accompanying image and a second accompanying image at positions corresponding to the project execution status image according to the number of deferred projects and the number of non-deferred projects, and obtain a total accompanying image by combining the first accompanying image and the second accompanying image, so as to intuitively represent the deferred status corresponding to the number of projects being implemented and the number of unscheduled projects.

[0069] In a possible implementation, the order of drawing the first accompanying image and the second accompanying image can be reversed, and the drawing method of the number of projects put into production, the number of projects under implementation and the number of projects not scheduled for production can also be swapped, and the swapped schemes should also be within the protection scope of this scheme.

[0070] In a possible implementation, after the above step S201 responds to receiving the drawing instruction sent by the control terminal, reading the project data and determining the coordinate axis labels, it further includes:

[0071] S220: Determine, based on the project data, at least one production time period and a target number of non-delayed projects and a target number of delayed projects corresponding to the production time period.

[0072] In this step, the production time period can be determined by the time corresponding to the project data. For example, if the time corresponding to the project data is June at the latest, then the target non-delayed projects and target delayed projects with a production time period of June can be obtained. The number of target non-delayed projects and the number of target delayed projects in any month or time period before June can also be obtained.

[0073] Among them, the target number of non-delayed projects and the target number of delayed projects can be obtained by obtaining the project delay status of each project corresponding to the production time period in the project data, determining whether it is a non-delayed project or a delayed project, and accumulating them.

[0074] S221: Draw a project status image corresponding to the production time period according to the target number of non-delayed projects and the target number of delayed projects.

[0075] In this step, the process may include drawing a non-deferred image with a target non-deferred number as the length in the third color, and drawing a deferred project image with a target deferred number of items as the starting point at the end of the non-deferred image in the fourth color; or drawing a deferred image with a target deferred number as the length in the third color, and drawing a non-deferred image with a target non-deferred number of items as the starting point at the end of the deferred image in the fourth color. The deferred image and the non-deferred image together form the project status image.

[0076] Figure 4 This is a schematic diagram of the project status image corresponding to the time period provided in the embodiment of the present application. Figure 4 As shown, the delayed images and non-delayed images corresponding to different production time periods together constitute the project status image.

[0077] From the description of the above embodiment, it can be seen that the embodiment of the present application facilitates the supervision of the project delay status in each time period by drawing a project status image determined by the number of non-delayed projects and the number of delayed projects in different time periods.

[0078] In a possible implementation, the received drawing instruction is a drawing instruction by field (the drawing instruction includes an instruction to draw by field), a preset field is read, project data is read from a preset position, and project data corresponding to at least one preset field is determined. The number of projects that have been put into production, the number of projects under implementation, the number of unscheduled projects, the first project postponement status corresponding to each project under implementation, and the second project postponement status corresponding to each unscheduled project are counted from the project data. The sum of the number of projects that have been put into production, the number of projects under implementation, and the number of unscheduled projects is calculated, and the calculated sum is added to the preset value to obtain the length of the coordinate axis. The corresponding part of the project execution status bar is drawn from the number of projects that have been put into production, the number of projects under implementation, and the number of unscheduled projects, and the project execution status bar is obtained by combining them. The bars corresponding to the projects that have been put into production, the projects under implementation, and the unscheduled projects are distinguished by different colors. Draw an accompanying bar next to the project execution status bar, determine the first non-delayed number of the implemented projects that have not been delayed and the first deferred number of the implemented projects that have been delayed according to the first deferred status corresponding to the implemented projects, take the number of projects that have been put into production as the starting point, draw sub-bars corresponding to the first non-delayed number of projects and the first deferred number of projects in a preset order, take the sum of the number of projects that have been put into production and the number of implemented projects as the starting point, draw the sub-bar corresponding to the second deferred number of projects with the second deferred number, draw the corresponding sub-bar with the second non-delayed number of projects, and use all the sub-bars as accompanying bars. When the user's pointer hovers over the bar corresponding to the number of implemented projects in any field, obtain the target project data corresponding to the implemented projects in this field, process and obtain the characteristics of the target project data (such as which departments are responsible for the project, how many projects are corresponding to each department, the number of deferred projects of each department, the deferred ratio, etc.), obtain the project status information, and output the project status information.

[0079] In a possible implementation, in the above step S201, in response to receiving the drawing instruction sent by the control terminal, reading the project data and determining the coordinate axis labels, the method further includes:

[0080] S230: In response to receiving the project flow drawing instruction corresponding to the target project, obtaining the current time.

[0081] In this step, the project flow drawing instruction can be received by receiving a data packet or a message. The current time can be obtained by obtaining a timestamp.

[0082] S231: Read the target project data corresponding to the target project in the project data.

[0083] In this step, it may include reading data corresponding to the target project identifier in the project data; it may also include reading project data whose project name is the target project name in the project data, wherein the target project name is the project name of the target project.

[0084] S232: Read at least one sub-stage of the target project in the target project data, a time range corresponding to the sub-stage, and a processing status corresponding to the sub-stage.

[0085] In this step, it can include reading the data corresponding to the sub-stage field in the target project data to obtain at least one sub-stage of the target project; reading the sub-stage time range field in the target project data to obtain the time range corresponding to the sub-stage; reading the processing status field of each sub-stage in the target project data to obtain the processing status corresponding to each sub-stage.

[0086] The processing status may include completed, uncompleted, overdue, not overdue, general warning, severe warning, etc.

[0087] S233: Draw a Gantt chart corresponding to the target project according to the current time, the sub-stage, the time range corresponding to the sub-stage, and the processing status corresponding to the sub-stage.

[0088] In this step, the process may include searching for a preset correspondence between the processing state and the color according to the processing state to obtain the display color corresponding to the processing state. According to the time range corresponding to the sub-stage, an image corresponding to the sub-stage is drawn, and the part before the current time in the image is filled with the display color to obtain the Gantt chart corresponding to the target project.

[0089] From the description of the above embodiments, it can be seen that the embodiments of the present application obtain the current time and read the target project data corresponding to the target project in the project data, determine at least one sub-stage of the target project, the time range corresponding to the sub-stage, and the processing status corresponding to the sub-stage from the target project data, and draw a Gantt chart corresponding to the target project according to the current time, sub-stage, the time range corresponding to the sub-stage, and the processing status corresponding to the sub-stage, so as to intuitively display the execution status of each sub-stage in the target project, and facilitate supervision at the project level and sub-stage level.

[0090] In a possible implementation, the processing status corresponding to the above sub-stages can be obtained in advance using probes. Progress probes are set in the analysis, design, development and testing stages of the project. Once the probe determines a delay, it means that there is a delay in this stage. Different probes can be set for each stage. The specific setting rules of the probe are shown in Table 1.

[0091] Table 1 Schematic diagram of probe setting rules

[0092]

[0093]

[0094] Figure 5 A Gantt chart diagram corresponding to the target project provided in the embodiment of the present application. Figure 5 As shown, each sub-stage in the Gantt chart is displayed in a separate line. The current time is June 20th. The part before June 20th in the image corresponding to each sub-stage displays the color corresponding to the processing status.

[0095] In a possible implementation, the time range includes a start time and an end time.

[0096] Accordingly, in the above step S233, a Gantt chart corresponding to the target project is drawn according to the current time, the sub-stage, the time range corresponding to the sub-stage, and the processing status corresponding to the sub-stage, including:

[0097] S2331: According to the processing status of the target sub-stage, the preset processing status and color correspondence is searched to obtain the target display color.

[0098] In this step, the correspondence between the processing status and the color can be pre-calibrated by the staff and stored in a file, table or key-value pair format.

[0099] S2332: Draw the portion from the target start time to the current time in the target Gantt chart image corresponding to the target sub-stage as the target display color, wherein the target start time is the start time corresponding to the target sub-stage.

[0100] In this step, the part of the image from the start time to the current time may be drawn separately and filled with the target display color.

[0101] Specifically, it may include creating a rectangle from the start time to the current time and filling it with the target display color.

[0102] S2333: Draw the portion from the current time to the target end time in the target Gantt chart image as a preset color, where the target end time is the end time corresponding to the target sub-stage.

[0103] In this step, you can create a rectangle from the current time to the target end time and keep the default color, or set the color property of the rectangle to a preset color so that the part after the current time in the Gantt chart displays the preset color.

[0104] From the description of the above embodiments, it can be seen that the embodiment of the present application fills the part of the Gantt chart before the current time with the color corresponding to the processing status, and fills the Gantt chart after the current time with a preset color according to the processing status of the target sub-stage and the current time. This achieves the display of the project processing deadline and the distance from the current time to the processing deadline of the project, while also highlighting the project processing status, making project management more intuitive and increasing project management efficiency.

[0105] In a possible implementation, after the above step S201 responds to receiving the drawing instruction sent by the control terminal, reading the project data and determining the coordinate axis labels, it further includes:

[0106] S240: In response to receiving the extension prediction instruction corresponding to the target project, acquiring target project data corresponding to the target project.

[0107] In this step, the extension prediction instruction may include the name or identification of the target project, and the corresponding target project data is read according to the name or identification of the target project. The extension prediction instruction may be input by a staff member or sent by a terminal device.

[0108] S241: Calculate the expected score of extension based on the target project data.

[0109] In this step, the process may include searching for a corresponding scoring rule according to the type of the target project data, and using the scoring rule to determine the expected score of the extension corresponding to the target project data.

[0110] S242: According to the delay expectation score, find the corresponding relationship between the preset delay expectation interval and the alarm level to obtain the alarm level corresponding to the target project.

[0111] In this step, it may include searching for a corresponding delay expectation interval in the correspondence between the delay expectation interval and the alarm level according to the delay expectation score, determining the corresponding delay expectation interval as a target delay expectation interval, and searching for the alarm level corresponding to the target delay expectation interval.

[0112] Specifically, according to the delay expectation score, searching for the corresponding delay expectation interval in the correspondence between the delay expectation interval and the alarm level can include determining the delay expectation interval whose minimum value is less than the delay expectation score and whose maximum value is greater than the delay expectation score as the target delay expectation interval.

[0113] Among them, the correspondence between the expected delay score and the alarm level can be pre-written by the staff and can be stored in the format of files, tables, etc.

[0114] S243: Output alarm level.

[0115] In this step, the alarm level may be displayed and output, and the alarm level may be sent to the terminal device.

[0116] From the description of the above embodiments, it can be seen that the embodiments of the present application calculate the expected delay score based on the project data after receiving the delay prediction instruction, determine the alarm level based on the expected delay score, and output the alarm level, so as to predict the possibility of project delay during the project execution process, thereby facilitating the early control of the project delay status.

[0117] In a possible implementation, in the above step S241, calculating the delay expectation score according to the target project data includes:

[0118] S2411: Read at least one characteristic data of the target project data, including the implementation cycle of the requirement items, the number of collaborating parties, the number of delayed changes, the level of project personnel, the number of collaborative components, the number of project-related requirement items, the number of personnel working years, process delays and result delays.

[0119] In this step, the fields of requirement item implementation cycle, number of collaborating parties, number of deferred changes, project staff level, number of collaborative components, number of project-related requirement items, staff working experience, process delays, and result delays are used to find the corresponding data.

[0120] S2412: Using the target feature data and the corresponding score calculation rules, determine the expected value corresponding to the target feature data, where the target feature data is any feature data.

[0121] In this step, the score calculation rule may be pre-set and corresponds to the data type of the target feature data. According to the score calculation rule, the expected value corresponding to the feature data is calculated.

[0122] Among them, the target feature data and the corresponding score calculation rules are shown in Table 2.

[0123] S2413: Take the weighted sum of the expected values ​​corresponding to each feature data to obtain the extension expected score.

[0124] In this step, the weight value may be preset, corresponding to the type of feature data. The weight values ​​corresponding to each type of feature data are shown in Table 2.

[0125] From the description of the above embodiments, it can be seen that the embodiments of the present application read the characteristic data in the target project data, and use the characteristic data and the corresponding score calculation rules to determine the expected value corresponding to the target characteristic data, and obtain the expected extension score after weighted summation of the expected value, thereby realizing the calculation of the expected extension score by integrating different characteristic data, increasing the accuracy of the extension prediction, and facilitating the time limit control of the project.

[0126] Table 2 Schematic diagram of target feature data and corresponding score calculation rules

[0127]

[0128]

[0129] In Table 2, the implementation cycle of the requirement item indicates the proportion of the requirement items issued later than the requirement stabilization period, the number of collaborators indicates the number of personnel / organizations that collaborate on the project, the number of deferred changes indicates whether there have been multiple deferred changes, the level of the project personnel indicates the level of the project manager or whether he / she is involved in the project full-time, the number of collaborative components indicates the number of components that cooperate with more than n3 projects in the current period, the number of project-related requirement items indicates the number of requirement items associated with the project, and the number of personnel working years indicates the number of core project members with less than n4 years of working years or the number of non-full-time personnel. Process delay indicates the deviation ratio between the execution progress of application assembly test and user test cases and the planned progress. Result delay indicates the proportion of overdue and unsuccessful work in each stage.

[0130] Wherein, n1, n2, n3, n4 are preset positive integers, the second preset level and the third preset level are lower than the first preset level, the fourth preset level is lower than the second preset level and the third preset level. The first preset period is greater than the second preset period, and the second preset period is greater than the third preset period.

[0131] Figure 6 This is a schematic diagram of the structure of the image drawing device provided in the embodiment of the present application. Figure 6 As shown, the image drawing device 600 includes: a label determination module 601 , a first determination module 602 , a first drawing module 603 , a second drawing module 604 , a second determination module 605 , a third determination module 606 and an information output module 607 .

[0132] The label determination module 601 is used to read the project data and determine the coordinate axis label corresponding to the drawing instruction in response to receiving the drawing instruction sent by the control terminal;

[0133] A first determination module 602 is used to determine, according to the project data, the number of put into production projects, the number of projects under implementation, the number of unscheduled projects, the first project postponement status corresponding to each of the projects under implementation, and the second project postponement status corresponding to each of the unscheduled projects corresponding to the target coordinate axis label, wherein the target coordinate axis label is any coordinate axis label;

[0134] The first drawing module 603 is used to draw a project execution status image corresponding to the target coordinate axis label according to the number of projects that have been put into production, the number of projects under implementation, and the number of projects that have not been scheduled for production;

[0135] The second drawing module 604 is used to draw the accompanying image corresponding to the target coordinate axis label according to the number of projects that have been put into production, the number of projects under implementation, the postponement status of the first project and the postponement status of the second project.

[0136] A second determination module 605 is used to determine target project data corresponding to the trigger signal in response to receiving a trigger signal for the project execution status image or the accompanying image;

[0137] The third determination module 606 is used to determine the project status information according to the target project data;

[0138] Information output module 607, used to output project status information

[0139] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0140] In a possible implementation, the second drawing module 604 is used to determine the first number of deferred projects and the first number of non-deferred projects according to the postponement status of the first project; using the number of projects that have been put into production as a starting point, and drawing sub-images of different colors with the first number of deferred projects and the first number of non-deferred projects to obtain a first accompanying image; determining the second number of deferred projects and the second number of non-deferred projects according to the postponement status of the second project; using the sum of the number of projects that have been put into production and the number of projects under implementation as a starting point, and drawing sub-images of different colors with the second number of deferred projects and the second number of non-deferred projects to obtain a second accompanying image.

[0141] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0142] In a possible implementation, the image drawing device 600 further includes: a third drawing module 608 .

[0143] The third drawing module 608 is used to determine at least one production time period and the target number of non-delayed projects and the target number of delayed projects corresponding to the production time period based on the project data; and draw a project status image corresponding to the production time period based on the target number of non-delayed projects and the target number of delayed projects.

[0144] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0145] In a possible implementation, the image drawing apparatus 600 further includes: a Gantt chart drawing module 609 .

[0146] The Gantt chart drawing module 609 is used to obtain the current time in response to receiving a project process drawing instruction corresponding to the target project; read the target project data corresponding to the target project in the project data; read at least one sub-stage of the target project, the time range corresponding to the sub-stage, and the processing status corresponding to the sub-stage in the target project data; and draw the Gantt chart corresponding to the target project according to the current time, the sub-stage, the time range corresponding to the sub-stage, and the processing status corresponding to the sub-stage.

[0147] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0148] In a possible implementation, the time range includes a start time and an end time; the Gantt chart drawing module 609 is specifically used to find a preset processing status and color correspondence according to the processing status of the target sub-stage to obtain a target display color; the portion from the target start time to the current time in the target Gantt chart image corresponding to the target sub-stage is drawn as the target display color, wherein the target start time is the start time corresponding to the target sub-stage; the portion from the current time to the target end time in the target Gantt chart image is drawn as a preset color, wherein the target end time is the end time corresponding to the target sub-stage.

[0149] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0150] In a possible implementation, the image drawing device 600 further includes: an alarm output module 610 .

[0151] The alarm output module 610 is used to obtain the target project data corresponding to the target project in response to receiving the delay prediction instruction corresponding to the target project; calculate the delay expectation score based on the target project data; find the corresponding relationship between the preset delay expectation interval and the alarm level based on the delay expectation score, and obtain the alarm level corresponding to the target project; and output the alarm level.

[0152] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0153] In one possible implementation, the alarm output module 610 is specifically used to read at least one characteristic data of the target project data, including the implementation cycle of the requirement items, the number of collaborating parties, the number of deferred changes, the project personnel level, the number of collaborative components, the number of project-related requirement items, the personnel's working experience, the process delay and the result delay; use the target characteristic data and the corresponding score calculation rules to determine the expected value corresponding to the target characteristic data, where the target characteristic data is any characteristic data; and weightedly sum the expected values ​​corresponding to each characteristic data to obtain the expected score for the delay.

[0154] The device provided in this embodiment can be used to execute the technical solution of the above method embodiment. Its implementation principle and technical effect are similar, and this embodiment will not be repeated here.

[0155] In order to implement the above embodiment, the embodiment of the present application also provides an electronic device.

[0156] refer to Figure 7 , which shows a schematic diagram of the structure of an electronic device 700 suitable for implementing the embodiment of the present application, and the electronic device 700 may be a terminal device or a server. The terminal device may include but is not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, personal digital assistants (PDAs), tablet computers (Portable Android Devices, PADs), portable multimedia players (PMPs), vehicle terminals (such as vehicle navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 7 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0157] like Figure 7 As shown, the electronic device 700 may include a processor (e.g., a central processing unit, a graphics processor, etc.) 701, and a memory 702 connected to the processor in communication, which can perform various appropriate actions and processes according to the program stored in the memory 702, the computer execution instruction, or the program loaded from the storage device 708 to the random access memory (Random Access Memory, referred to as RAM) 703, to implement the image drawing method in any of the above embodiments, wherein the memory may be a read-only memory (Read Only Memory, referred to as ROM). In the RAM 703, various programs and data required for the operation of the electronic device 700 are also stored. The processing device 701, the memory 702, and the RAM 703 are connected to each other via a bus 704. An input / output (I / O) interface 705 is also connected to the bus 704.

[0158] Typically, the following devices may be connected to the I / O interface 705: input devices 706 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; output devices 707 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 708 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 709. The communication devices 709 may allow the electronic device 700 to communicate with other devices wirelessly or by wire to exchange data. Although Figure 7 The electronic device 700 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead.

[0159] In particular, according to an embodiment of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a computer-readable storage medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from the network through the communication device 709, or installed from the storage device 708, or installed from the memory 702. When the computer program is executed by the processing device 701, the above-mentioned functions defined in the method of the embodiment of the present application are executed.

[0160] It should be noted that the computer-readable storage medium mentioned above in the present application may be a computer-readable signal medium or a computer storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present application, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In the present application, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program code. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. The computer readable signal medium may also be any computer readable storage medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable storage medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.

[0161] The computer-readable storage medium may be included in the electronic device, or may exist independently without being installed in the electronic device.

[0162] The computer-readable storage medium carries one or more programs. When the one or more programs are executed by the electronic device, the electronic device executes the method shown in the above embodiment.

[0163] The computer program code for performing the operation of the present application can be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages, such as Java, Smalltalk, C++, and conventional procedural programming languages, such as "C" language or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on the remote computer, or entirely on the remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (e.g., using an Internet service provider to connect through the Internet).

[0164] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0165] The modules involved in the embodiments described in this application can be implemented by software or hardware. The name of the unit does not constitute a limitation on the module itself in some cases. For example, the first drawing module can also be described as a "project execution status image drawing module".

[0166] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0167] The present application also provides a computer-readable storage medium, which stores computer-executable instructions. When a processor executes the computer-executable instructions, the technical solution of the image drawing method in any of the above-mentioned embodiments is implemented. Its implementation principle and beneficial effects are similar to those of the image drawing method. Please refer to the implementation principle and beneficial effects of the image drawing method, which will not be repeated here.

[0168] In the context of the present application, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0169] The present application also provides a computer program product, including a computer program. When the computer program is executed by a processor, it implements the technical solution of the image drawing method in any of the above-mentioned embodiments. Its implementation principle and beneficial effects are similar to those of the image drawing method. Please refer to the implementation principle and beneficial effects of the image drawing method, and no further details will be given here.

[0170] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in this application (but not limited to) by each other to form a technical solution.

[0171] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the invention disclosed herein. The present application is intended to cover any modification, use or adaptation of the present application, which follows the general principles of the present application and includes common knowledge or customary techniques in the art that are not disclosed in the present application. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present application are indicated by the following claims.

[0172] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.

Claims

1. An image drawing method, characterized in that: include: In response to receiving a drawing instruction sent by the control terminal, reading the project data and determining a coordinate axis label corresponding to the drawing instruction; According to the project data, determine the number of put into production projects, the number of projects under implementation, the number of unscheduled projects, the first project extension status corresponding to each of the projects under implementation, and the second project extension status corresponding to each of the unscheduled projects corresponding to the target coordinate axis label, wherein the target coordinate axis label is any coordinate axis label; Draw a project execution status image corresponding to the target coordinate axis label according to the number of projects that have been put into production, the number of projects under implementation, and the number of projects that have not been scheduled for production; Draw an accompanying image corresponding to the target coordinate axis label according to the number of projects that have been put into production, the number of projects under implementation, the extension status of the first project, and the extension status of the second project; In response to receiving a trigger signal for the project execution status image or the accompanying image, determining target project data corresponding to the trigger signal; Determining project status information according to the target project data; Output the project status information.

2. The method according to claim 1, characterized in that Drawing the accompanying image corresponding to the target coordinate axis label according to the number of projects that have been put into production, the number of projects under implementation, the first project extension status, and the second project extension status includes: Determining the number of first deferred projects and the number of first non-deferred projects according to the deferred status of the first project; Taking the number of projects that have been put into production as a starting point, drawing sub-images of different colors based on the first number of deferred projects and the first number of non-deferred projects, to obtain a first accompanying image; Determining the number of second deferred projects and the number of second non-deferred projects according to the deferred status of the second project; Taking the sum of the number of projects that have been put into production and the number of projects under implementation as a starting point, sub-images of different colors are drawn with the second number of deferred projects and the second number of non-deferred projects to obtain a second accompanying image.

3. The method according to claim 1, characterized in that: After the step of reading the project data and determining the coordinate axis labels in response to receiving the drawing instruction sent by the control terminal, the method further includes: Determine, based on the project data, at least one production time period and the target number of non-delayed projects and the target number of delayed projects corresponding to the production time period; A project status image corresponding to the production time period is drawn according to the target number of non-delayed projects and the target number of delayed projects.

4. The method according to claim 1, characterized in that: After the step of reading the project data and determining the coordinate axis labels in response to receiving the drawing instruction sent by the control terminal, the method further includes: In response to receiving a project flow drawing instruction corresponding to the target project, obtaining a current time; Reading target project data corresponding to the target project in the project data; Reading at least one sub-stage of the target project, a time range corresponding to the sub-stage, and a processing status corresponding to the sub-stage in the target project data; A Gantt chart corresponding to the target project is drawn according to the current time, the sub-stage, the time range corresponding to the sub-stage, and the processing status corresponding to the sub-stage.

5. The method according to claim 4, characterized in that The time range includes a start time and an end time; Accordingly, drawing a Gantt chart corresponding to the target project according to the current time, the sub-stage, the time range corresponding to the sub-stage, and the processing status corresponding to the sub-stage includes: According to the processing status of the target sub-stage, the preset processing status and color correspondence is searched to obtain the target display color; Draw the portion from the target start time to the current time in the target Gantt chart image corresponding to the target sub-stage as the target display color, wherein the target start time is the start time corresponding to the target sub-stage; The portion from the current time to the target end time in the target Gantt chart image is drawn as a preset color, wherein the target end time is the end time corresponding to the target sub-stage.

6. The method according to any one of claims 1 to 5, characterized in that: After the step of reading the project data and determining the coordinate axis labels in response to receiving the drawing instruction sent by the control terminal, the method further includes: In response to receiving a delay prediction instruction corresponding to a target project, acquiring target project data corresponding to the target project; Calculate the expected score of extension based on the target project data; According to the delay expectation score, find the corresponding relationship between the preset delay expectation interval and the alarm level to obtain the alarm level corresponding to the target project; The alarm level is output.

7. The method according to claim 6, characterized in that Calculate the expected score of extension based on the target project data, including: Read at least one characteristic data of the implementation cycle of the requirement item, the number of collaborating parties, the number of delayed changes, the level of project personnel, the number of collaborative components, the number of project-related requirement items, the working years of personnel, process delay and result delay in the target project data; Using target feature data and corresponding score calculation rules, determining an expected value corresponding to the target feature data, wherein the target feature data is any feature data; The expected value corresponding to each characteristic data is weighted and summed to obtain the delay expected score.

8. An image drawing device, characterized in that: include: A label determination module, configured to read the project data and determine the coordinate axis label corresponding to the drawing instruction in response to receiving the drawing instruction sent by the control terminal; A first determination module is used to determine, according to the project data, the number of put into production projects, the number of projects under implementation, the number of unscheduled projects, the first project extension status corresponding to each of the projects under implementation, and the second project extension status corresponding to each of the unscheduled projects corresponding to the target coordinate axis label, wherein the target coordinate axis label is any coordinate axis label; A first drawing module is used to draw a project execution status image corresponding to the target coordinate axis label according to the number of projects that have been put into production, the number of projects under implementation and the number of projects that have not been scheduled for production; A second drawing module is used to draw an accompanying image corresponding to the target coordinate axis label according to the number of projects that have been put into production, the number of projects under implementation, the postponement status of the first project, and the postponement status of the second project; A second determination module, configured to determine target project data corresponding to the trigger signal in response to receiving a trigger signal for the project execution status image or the accompanying image; A third determination module, used to determine project status information according to the target project data; The information output module is used to output the project status information.

9. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory, so that the processor performs the image drawing method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, which are used to implement the image drawing method according to any one of claims 1 to 7 when executed by a processor.

11. A computer program product, characterized in that The invention comprises a computer program, which implements the image drawing method according to any one of claims 1 to 7 when being executed by a processor.