MPC-based expressway hard shoulder dynamic open decision-making method
Through the MPC-based hard shoulder dynamic open decision-making method, the METANET model and hard shoulder control system are used to optimize the opening time and duration of the highway hard shoulder, solving the problem of high computing complexity in the existing technology, and achieving high efficiency of the highway , safe pass decisions.
Patent Information
- Application Number
- CN202410934317.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-12
AI Technical Summary
In the prior art, the calculation complexity of the dynamic open control of highway hard shoulders is high, consumes a lot of computing resources and time, and it is difficult to make precise decisions between balancing traffic efficiency and traffic safety.
Using MPC-based highway hard road shoulder dynamic open decision-making method, we collect traffic flow data in real time to predict future traffic conditions, use lane-level METANET basic model and hard road shoulder dynamic open control system model to optimize the opening time and duration of hard road shoulder, combined with Passive efficiency and passive safety objective function make decisions.
It realizes the decision to efficiently and in real time in balancing traffic efficiency and traffic safety on highways, reduces computing resources and time consumption, and improves the operating efficiency and safety performance of highways.
Smart Images

Figure CN118942237A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of intelligent transportation, and in particular relates to a dynamic opening decision method for hard shoulders of highways based on MPC. Background Art
[0002] Hard shoulder refers to the shoulder part (including the curb) adjacent to the roadway and paved with a certain strength of the road surface structure. The "hard shoulder" is a lane marked with yellow lines on the right side of the highway. Its main function is to allow broken-down vehicles to park temporarily and to facilitate the passage of emergency vehicles in emergency situations.
[0003] The dynamic opening decision technology of the hard shoulder of highway is an active traffic management and control technology. It dynamically adjusts the use of the hard shoulder according to the current traffic status and the traffic condition prediction results for a period of time in the future, which can increase the effective traffic capacity of the highway, alleviate the congestion of the highway, and improve the operation efficiency of the highway. At the same time, this technology can also open or close the hard shoulder in time according to special circumstances such as accidents, construction, extreme weather, etc., improve the emergency response capability of the highway, reduce the accident risk of the highway, and improve the safety performance of the highway.
[0004] In existing research, genetic algorithms are mainly used to optimize the dynamic opening control decision of hard shoulders. For example, Ye Zhen used genetic algorithms and sliding time windows to predict and optimize the opening and closing problems of hard shoulders under different constraints and objective functions; Tang Jinjun et al. used genetic algorithms to solve the problem of minimizing the total travel time and total collision exposure time with dual constraints of open time and open space in the dynamic opening decision of hard shoulders. However, the computational complexity of genetic algorithms is high, and it consumes a lot of computing resources and time. Compared with genetic algorithms, model predictive control (MPC) is more suitable for real-time and dynamic control problems, and consumes less computing resources and time.
[0005] Patent document CN113034914A only considers traffic volume as a congestion evaluation indicator. When it is less than or equal to the preset threshold, there is no need to open the hard shoulder lane function; when it is greater than the preset threshold and there is no hard shoulder occupancy, the hard shoulder lane function can be opened. However, a single variable is difficult to accurately describe the traffic flow state, and this method cannot comprehensively consider road conditions and safety factors, and it is difficult to make decisions after balancing traffic efficiency and traffic safety benefits.
[0006] Therefore, there is an urgent need for a hard shoulder dynamic opening control decision-making method that fully considers the traffic conditions and driving safety of the highway, and is efficient and real-time, so as to assist traffic management personnel in managing the highway and thereby improve the highway's traffic capacity and service level. Summary of the invention
[0007] As an active traffic management method, the dynamic opening of the hard shoulder is not necessarily applicable to the current traffic conditions. Therefore, it is necessary to collect traffic flow information in real time, predict the traffic conditions in the future, and then determine whether to open the hard shoulder as a driving lane. If it is opened, it is necessary to further determine the timing and duration of the hard shoulder opening to ensure traffic operation efficiency. Therefore, the present invention proposes a dynamic opening decision method for the hard shoulder of a highway based on MPC, which aims to solve the problems of high computational complexity, large consumption of computing resources and time in the existing methods.
[0008] The present invention provides a method for dynamic opening decision of hard shoulder of highway based on MPC, comprising the following steps:
[0009] S1. Use the historical traffic flow data of the controlled road section and its upstream and downstream to calibrate the lane-level METANET basic model parameters, collect real-time traffic data, and predict the traffic flow, density and speed of the controlled road section and its upstream and downstream based on the calibrated lane-level METANET basic model;
[0010] S2. Analyze the real-time road conditions based on the predicted results of traffic flow, density and speed in step S1, determine whether the hard shoulder is open, determine whether the hard shoulder is occupied and whether there are special circumstances where the hard shoulder should not be opened, determine whether the hard shoulder is in a state where it is allowed to be opened, and determine whether the hard shoulder needs to be opened;
[0011] S3. Based on the lane-level METANET basic model calibrated in step S1, a hard shoulder dynamic opening control system model is established, and the hard shoulder dynamic opening control system model is used to optimize the opening timing and opening duration of the hard shoulder;
[0012] S4. Based on the opening timing and duration of the hard shoulder obtained in step S3, publish the hard shoulder dynamic control decision information.
[0013] Further, the step S2 includes the following sub-steps:
[0014] S2.1 Determine whether the hard shoulder is in a state where it can be opened;
[0015] I. Based on the video data and radar data, determine whether the hard shoulder of the hard shoulder controlled section is occupied at the current moment. If it is occupied, the hard shoulder is not allowed to be opened as a driving lane;
[0016] II. Based on the video data, radar data and event reporting data, determine whether there is a special event in the hard shoulder control section and its downstream at the current moment that does not allow the hard shoulder to be opened. If so, the hard shoulder is not allowed to be opened as a driving lane;
[0017] III. Based on video data, radar data and work arrangement notifications, determine whether there are special security situations in the hard shoulder control section and its downstream at the current moment that do not allow the hard shoulder to be opened. If so, the hard shoulder will not be allowed to be opened as a driving lane;
[0018] IV. Based on video data, radar data and predicted traffic flow, determine whether there is a slow-moving situation downstream of the hard shoulder controlled section at the current moment. If so, the hard shoulder is not allowed to be opened as a driving lane;
[0019] V. If none of the above four conditions exist, the hard shoulder is allowed to be used as a driving lane;
[0020] S2.2 If it is permitted to open the hard shoulder as a driving lane, obtain the road traffic flow information through the highway sensing equipment, and analyze whether the current road conditions require opening the hard shoulder as a driving lane in combination with the traffic flow, density and speed predicted in step S1;
[0021] I. Make sure the hard shoulder is in a state where it can be used as a driving lane, otherwise the hard shoulder will not be opened;
[0022] II. According to the basic road data or highway regulations, set the speed threshold ASL for opening the hard shoulder of the controlled section and the upstream slow-moving length threshold SRL of the controlled section. When the driving speed of the controlled section is lower than ASL and the upstream slow-moving length is greater than SRL, the hard shoulder is opened as a driving lane;
[0023] III. According to the basic road data or highway regulations, set the one-way traffic volume threshold (OTM) for opening the hard shoulder of the controlled section. When the one-way traffic volume of the controlled section is greater than OTM, open the hard shoulder as a driving lane;
[0024] IV. According to the basic road data or highway regulations, set the traffic continuous growth threshold TCG for opening the hard shoulder of the controlled section. When the traffic growth in two consecutive and equal time periods of the controlled section is greater than TCG, the hard shoulder is opened as a driving lane;
[0025] V. When construction and maintenance work occupies the inner lane of the main line on the hard shoulder controlled section, causing heavy traffic and slow movement, and the slow movement length is greater than the SRL, the hard shoulder is opened as a driving lane.
[0026] Further, the step S3 includes the following sub-steps:
[0027] S3.1 Based on the lane-level METANET basic model calibrated in step S1, i.e., the lane-level METANET macro traffic flow model, a hard shoulder dynamic open control system model is established;
[0028] The hard shoulder dynamic opening control system model includes the state equation and output equation of the hard shoulder dynamic opening control. The hard shoulder dynamic control system is expressed in state space form, and the general form is:
[0029]
[0030] y=Cx+Du
[0031] Among them, x is the state vector of the system, describing the state of the system at any point in time; u is the input vector of the system; y is the output vector of the system; A, B, C and D are the parameters of the system, which are used to describe the dynamic characteristics and control mechanism of the system;
[0032] Combined with the lane-level METANET macro traffic flow model, the density K, speed V and flow Q of the controlled section are used as system state variables, that is, x = [KVQ] T ; The traffic status of each lane including the hard shoulder is used as the system input variable, that is, u = [λ1λ2λ3], λ1 represents the traffic status of the left lane of the driving lane, λ2 represents the traffic status of the right lane of the driving lane, and λ3 represents the traffic status of the hard shoulder lane;
[0033] S3.2 Considering the traffic efficiency and traffic safety, establish the objective function J, consider the proportion of vehicle types involved in the traffic, and establish the corresponding constraint conditions;
[0034] Taking traffic efficiency and traffic safety as optimization goals, the total travel time is used to characterize traffic efficiency. When the total travel time is the smallest, the road traffic efficiency is the highest, and the collision exposure time is used to characterize traffic safety.
[0035] The calculation expression of total travel time TTT is as follows:
[0036] TTT z (t,j)=δ z ·Δt
[0037]
[0038] Where TTT z (t,j) represents the travel time of the zth vehicle in the tth cycle and the jth time step;
[0039] Indicates whether the i-th vehicle is in the controlled section; Δt represents the time step; N represents the number of participating vehicles; T represents the total execution time;
[0040] The calculation expression of total collision exposure time TET is as follows:
[0041]
[0042]
[0043] Where TET(t,j) represents the collision exposure time of all vehicles in the tth cycle and the jth time step;
[0044] represents the collision risk of the zth vehicle at the jth time step;
[0045] TTC stands for Time to Collision, which refers to the time it takes for two vehicles to collide after traveling in the same direction on the same route at their respective speeds. * represents the threshold of collision time;
[0046] The total travel time and the total collision exposure time are combined in a weighted manner as the overall optimization objective J, which is expressed as follows:
[0047]
[0048] In the formula, α ttt represents the weight of traffic efficiency index; β tet Indicates the weight of traffic safety index; TTT i (t,j) represents the total travel time of segment i in the tth cycle and the jth time step; TET i (t,j): total collision exposure time of road segment i in the tth cycle and the jth time step;
[0049] S3.3 Using the hard shoulder dynamic open control system model, predict the state and behavior of the hard shoulder dynamic open control system in the future;
[0050] I. Determine the time window and control time interval for predicting system behavior;
[0051] The sampling period of MPC is T, the order is k; the control period is T c =MT, which is an integer multiple of the sampling period, in order k c ; Prediction time domain N p , control time domain N c ;but:
[0052] μ(k),u(k)), where k c T c / T≤k≤(k c +1)T c / T
[0053] In the formula, μ(k) and u(k) are the basic parameters, interference parameters and control parameters of the kth sampling period, respectively, which can iterate the traffic flow parameters at time j+1;
[0054] II. At the new sampling time, the actual output of the controlled object is detected and compared with the predicted output based on the model, the error between the two is calculated, and the error information is used to correct the predicted result based on the model;
[0055] III. Based on the established objective function J, considering the proportion of vehicle types participating in the traffic, establishing corresponding constraints, using genetic algorithm to minimize the objective function J, and finding the optimal control signal parameter u(k c ); the optimal control signal parameter u(k c ) as the input variable; repeat the above steps until the set prediction step length N is reached p , the predicted time period is [kT,(k+N p -1)T] to achieve rolling optimization.
[0056] Furthermore, the optimization algorithm is one of linear quadratic programming, nonlinear optimization and genetic algorithm.
[0057] Beneficial effects:
[0058] Based on the basic conditions of the highway, a suitable traffic flow model is established to characterize the evolution law of traffic flow volume and speed, and based on this, the traffic conditions in the future are predicted, which helps to predict and control the traffic flow more accurately. In the dynamic opening decision process of the hard shoulder, MPC is used to handle high-dimensional and multi-variable control problems, and can quickly adapt and adjust in a dynamic environment. The present invention proposes a dynamic opening decision method for the hard shoulder of a highway based on MPC. This method considers efficiency constraints and safety constraints at the same time, balances traffic efficiency and traffic safety benefits, can flexibly control the opening and closing of the hard shoulder, and has good adaptability and real-time performance.
[0059] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] Figure 1 A flowchart of a method for dynamic opening decision of hard shoulder of a highway based on MPC according to the present invention;
[0061] Figure 2 Schematic diagram of lane-level METANET model;
[0062] Figure 3 This is the operating structure of the hard shoulder MPC control. DETAILED DESCRIPTION
[0063] In order to make the technical solutions, advantages and purposes of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the described embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work belong to the protection scope of this application.
[0064] like Figure 1 As shown, the present invention provides a method for dynamic opening decision of hard shoulder of highway based on MPC, comprising the following steps:
[0065] S1. Use the historical traffic flow data of the controlled road section and its upstream and downstream to calibrate the lane-level METANET basic model parameters, collect real-time traffic data, and predict the traffic flow, density and speed of the controlled road section and its upstream and downstream based on the calibrated lane-level METANET basic model;
[0066] The METANET model uses Taylor's formula and differential equation to discretize traffic flow parameters in time and space, and establishes a second-order relationship model between basic traffic flow parameters. Based on the classic METANET model, considering the differences in traffic flow parameters between lanes, it is improved to a lane-level METANET basic model, making it suitable for the study of dynamic opening control of hard shoulders. The model is as follows:
[0067] like Figure 2 As shown, the time is divided into n time steps of length Δt, and the sampling time is j = 1, 2, 3, ..., n. The road section is divided into m small sections of length Δx, then i = 1, 2, ..., m. The number of lanes in the controlled section is λ, then l = 1, 2, ..., λ. After division, the controlled section is divided into λ·m units, each unit can be expressed as (i, l). In order to ensure numerical stability, Δt·v f <Δx,v f is the free flow velocity. Taking the (i,l) unit as the research object, the following equation is satisfied:
[0068] ① Basic equation of three parameters of traffic flow:
[0069]
[0070] in: represents the flow from unit (i,l) into (i+1,l) at time j; represents the density of unit (i,l) at time j; Represents the velocity of unit (i,l) at time j.
[0071] ② Traffic flow conservation equation:
[0072]
[0073] in: The flow from the hard shoulder at unit (i, l) at time j; The flow rate merging into the hard shoulder of unit (i,l) at time j.
[0074] ③Dynamic velocity description equation:
[0075] This equation indicates that it takes a certain amount of time for the vehicle speed to adjust to the steady-state speed expected by the driver, and the speed is discretized.
[0076] Steady-state velocity, that is, the velocity-density basic diagram, when the density is When , the corresponding speed value;
[0077] τ: driver adjustment delay coefficient;
[0078] η: velocity-density relationship coefficient;
[0079] κ: elastic modulus, used to avoid Error caused by being too small;
[0080] τ, η, and κ are all determined by the characteristics of the road section, and their values are calibrated by studying the characteristics of road traffic flow.
[0081] The relaxation term reflects the driver's tendency to drive at a steady-state speed;
[0082] The convection term represents the speed change caused by the upstream cell vehicle entering the current cell;
[0083] The expectation term adjusts the speed of the current unit at the next moment by feeding back the changes in the density of downstream units.
[0084] ④Speed-density steady-state relationship equation:
[0085]
[0086] This equation describes the traffic flow characteristics of the unit (i, l) in a statistical sense. f : free stream velocity; kc: critical density; α: velocity-density basic diagram parameter.
[0087] S2. Based on the traffic flow, density and speed prediction results output in step S1, comprehensively consider the real-time road conditions and determine whether the hard shoulder is open. First, based on the real-time road monitoring data, determine whether the hard shoulder is occupied and whether there are special circumstances where the hard shoulder should not be opened, and determine whether the hard shoulder is in a state where it is allowed to be opened. Secondly, under the condition that the hard shoulder is allowed to be opened, based on the traffic flow prediction results, comprehensively consider the evolution of traffic flow, density and speed to determine whether the hard shoulder needs to be opened.
[0088] S2.1 When determining whether the hard shoulder is open, first determine whether the hard shoulder is in a state where it can be opened;
[0089] I. Based on the video data and radar data, determine whether the hard shoulder of the hard shoulder controlled section is occupied at the current moment. If it is occupied, the hard shoulder is not allowed to be opened as a driving lane;
[0090] II. Based on the video data, radar data and event reporting data, determine whether there is a special event in the hard shoulder control section and its downstream at the current moment that does not allow the hard shoulder to be opened. If so, the hard shoulder is not allowed to be opened as a driving lane;
[0091] III. Based on video data, radar data and work arrangement notifications, determine whether there are special security situations in the hard shoulder control section and its downstream at the current moment that do not allow the hard shoulder to be opened. If so, the hard shoulder will not be allowed to be opened as a driving lane;
[0092] IV. Based on video data, radar data and predicted traffic flow, determine whether there is a slow-moving situation downstream of the hard shoulder controlled section at the current moment. If so, the hard shoulder is not allowed to be opened as a driving lane;
[0093] V. If none of the above four conditions exist, the hard shoulder is allowed to be used as a driving lane;
[0094] S2.2 Where it is permitted to open the hard shoulder as a driving lane, obtain road traffic flow information through video, radar, ETC gantry and other highway sensing equipment, and combine traffic flow prediction flow, speed and density data to comprehensively consider whether the current road conditions require opening the hard shoulder as a driving lane;
[0095] I. Make sure the hard shoulder is in a state where it can be used as a driving lane, otherwise the hard shoulder will not be opened;
[0096] II. According to the basic road data or highway regulations, set the speed threshold ASL for opening the hard shoulder of the controlled section and the upstream slow-moving length threshold SRL of the controlled section. When the driving speed of the controlled section is lower than ASL and the upstream slow-moving length is greater than SRL, the hard shoulder is opened as a driving lane;
[0097] III. According to the basic road data or highway regulations, set the one-way traffic volume threshold (OTM) for opening the hard shoulder of the controlled section. When the one-way traffic volume of the controlled section is greater than OTM, open the hard shoulder as a driving lane;
[0098] IV. According to the basic road data or highway regulations, set the traffic continuous growth threshold TCG for opening the hard shoulder of the controlled section. When the traffic growth in two consecutive and equal time periods of the controlled section is greater than TCG, the hard shoulder is opened as a driving lane;
[0099] V. When construction and maintenance work occupies the inner lane of the main line on the hard shoulder controlled section, causing heavy traffic and slow movement, and the slow movement length is greater than the SRL, the hard shoulder is opened as a driving lane.
[0100] S3. Based on the lane-level METANET basic model calibrated in step S1, a hard shoulder dynamic opening control system model is established, and the hard shoulder dynamic opening control system model is used to optimize the opening timing and opening duration of the hard shoulder;
[0101] When the hard shoulder needs to be opened, the model predictive control method is used to optimize the opening time and opening duration of the hard shoulder. A dynamic opening control system model of the hard shoulder is established based on the lane-level METANET macro traffic flow model calibrated in step S1. The model contains information such as the opening state of the hard shoulder and system output. Considering traffic efficiency and traffic safety, the objective function J(x) is established, and considering information such as the proportion of vehicle types participating in the traffic, the corresponding constraints are established. Using the system model, the state and behavior of the dynamic opening control system of the hard shoulder in the future are predicted. Using a suitable optimization algorithm, such as a genetic algorithm, based on the predicted system behavior, the control input sequence that can optimally achieve the control target in the future is calculated. The optimization problem is solved by minimizing the objective function, and the optimal opening time and opening duration of the hard shoulder are determined based on the obtained traffic state function. In this process, ensure that the calculated control input sequence meets the system constraints.
[0102] S3.1 Based on the lane-level METANET basic model calibrated in step S1, i.e., the lane-level METANET macro traffic flow model, a hard shoulder dynamic open control system model is established;
[0103] The hard shoulder dynamic opening control system model includes the state equation and output equation of the hard shoulder dynamic opening control. The hard shoulder dynamic control system is expressed in state space form, and the general form is:
[0104]
[0105] y=Cx+Du
[0106] Among them, x is the state vector of the system, describing the state of the system at any point in time; u is the input vector of the system; y is the output vector of the system; A, B, C and D are the parameters of the system, which are used to describe the dynamic characteristics and control mechanism of the system;
[0107] Combined with the lane-level METANET macro traffic flow model, the density K, speed V and flow Q of the controlled section are used as system state variables, that is, x = [KVQ] T ; The traffic status of each lane including the hard shoulder is used as the system input variable, that is, u = [λ1λ2λ3], λ1 represents the traffic status of the left lane of the driving lane, λ2 represents the traffic status of the right lane of the driving lane, and λ3 represents the traffic status of the hard shoulder lane;
[0108] S3.2 Considering the traffic efficiency and traffic safety, establish the objective function J, consider the proportion of vehicle types involved in the traffic, and establish the corresponding constraint conditions;
[0109] Taking traffic efficiency and traffic safety as optimization goals, the total travel time is used to characterize traffic efficiency, which describes the travel time of all vehicles participating in this section of traffic passing through this section of road. When the total travel time is the smallest, the road traffic efficiency is the highest; the total collision exposure time is used to characterize traffic safety, which describes the total time that all vehicles participating in this section of traffic are in dangerous conditions when passing through this section of road, reflecting the safety status of the vehicles;
[0110] The calculation expression of total travel time TTT is as follows:
[0111] TTT z (t,j)=δ z ·Δt
[0112]
[0113] In the formula, TTT z (t,j) represents the travel time of the zth vehicle in the tth cycle and the jth time step;
[0114] Indicates whether the i-th vehicle is in the controlled section; Δt represents the time step; N represents the number of participating vehicles; T represents the total execution time;
[0115] The calculation expression of total collision exposure time TET is as follows:
[0116]
[0117]
[0118] Where TET(t,j) represents the collision exposure time of all vehicles in the tth cycle and the jth time step;
[0119] represents the collision risk of the zth vehicle at the jth time step;
[0120] TTC stands for Time to Collision, which refers to the time it takes for two vehicles to collide after traveling in the same direction on the same route at their respective speeds. * represents the threshold of collision time;
[0121] The total travel time and the total collision exposure time are combined in a weighted manner as the overall optimization objective J, which is expressed as follows:
[0122]
[0123] In the formula, α ttt represents the weight of traffic efficiency index; β tet Indicates the weight of traffic safety index; TTT i (t,j) represents the total travel time of segment i in the tth cycle and the jth time step; TET i (t,j): total collision exposure time of road segment i in the tth cycle and the jth time step;
[0124] S3.3 Determine the time window and control time interval for predicting system behavior, and predict the state and behavior of the hard shoulder dynamic open control system in the future based on the system model. Model Predictive Control (MPC) has three steps: multi-step prediction, feedback correction and rolling optimization. The operation structure of the hard shoulder MPC control is as follows: Figure 3 shown.
[0125] I. Determine the time window and control time interval for predicting system behavior;
[0126] Based on the lane-level METANET model, the density K, speed V and flow Q of the controlled road section are system state variables, and the traffic status of each lane including the hard shoulder is the system input variable. The MPC sampling period is T, the order is k; the control period is T c =MT, which is an integer multiple of the sampling period, in order k c ; Prediction time domain N p , control time domain N c .but:
[0127] μ(k),u(k)), where k c T c / T≤k≤(k c +1)T c / T
[0128] In the formula, μ(k) and u(k) are the basic parameters, interference parameters and control parameters of the kth sampling period, respectively, which can iterate the traffic flow parameters at time k+1 to achieve prediction;
[0129] II. At the new sampling time, the actual output of the controlled object is detected and compared with the predicted output based on the model, the error between the two is calculated, and the error information is used to correct the predicted result based on the model to more accurately reflect the actual state of the system;
[0130] III. Based on the established objective function J, considering the proportion of vehicle types participating in the traffic, establishing corresponding constraints, using genetic algorithm to minimize the objective function J, and finding the optimal control signal parameter u(k c ); the optimal control signal parameter u(k c ) as the input variable; repeat the above steps until the set prediction step length N is reached p , the predicted time period is [kT,(k+N p -1)T] to achieve rolling optimization.
[0131] S4. According to the opening time and duration of the hard shoulder obtained in step S3, the dynamic control decision information of the hard shoulder is released through variable information boards, broadcasting and other channels. Variable information boards are arranged at the starting point, middle point and end point of the controlled section, which can display the words "Small passenger cars in the XX direction can use the emergency lane to pass" to release the dynamic control decision information of the top shoulder to the driver. The broadcast can add information such as the opening duration of the hard shoulder based on the information displayed on the variable information board.
[0132] It is hereby declared that the above embodiments are only used to illustrate the technical solutions of the present invention and are not limiting. Although the present invention is described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solutions, which should be included in the scope of the claims of the present invention.
Claims
1. A dynamic opening decision method for hard shoulder of highway based on MPC, characterized in that: The following steps are involved: S1. Use the historical traffic flow data of the controlled road section and its upstream and downstream to calibrate the lane-level METANET basic model parameters, collect real-time traffic data, and predict the traffic flow, density and speed of the controlled road section and its upstream and downstream based on the calibrated lane-level METANET basic model; S2. Analyze the real-time road conditions based on the predicted results of traffic flow, density and speed in step S1, determine whether the hard shoulder is open, determine whether the hard shoulder is occupied and whether there are special circumstances where the hard shoulder should not be opened, determine whether the hard shoulder is in a state where it is allowed to be opened, and determine whether the hard shoulder needs to be opened; S3. Based on the lane-level METANET basic model calibrated in step S1, a hard shoulder dynamic opening control system model is established, and the hard shoulder dynamic opening control system model is used to optimize the opening timing and opening duration of the hard shoulder; S4. Based on the opening timing and duration of the hard shoulder obtained in step S3, publish the hard shoulder dynamic control decision information.
2. The MPC-based dynamic opening decision method for hard shoulder of highway according to claim 1 is characterized by: The step S2 comprises the following sub-steps: S2.1 Determine whether the hard shoulder is in a state where it can be opened; I. Based on the video data and radar data, determine whether the hard shoulder of the hard shoulder controlled section is occupied at the current moment. If it is occupied, the hard shoulder is not allowed to be opened as a driving lane; II. Based on the video data, radar data and event reporting data, determine whether there is a special event in the hard shoulder control section and its downstream at the current moment that does not allow the hard shoulder to be opened. If so, the hard shoulder is not allowed to be opened as a driving lane; III. Based on video data, radar data and work arrangement notifications, determine whether there are special security situations in the hard shoulder control section and its downstream at the current moment that do not allow the hard shoulder to be opened. If so, the hard shoulder will not be allowed to be opened as a driving lane; IV. Based on video data, radar data and predicted traffic flow, determine whether there is a slow-moving situation downstream of the hard shoulder controlled section at the current moment. If so, the hard shoulder is not allowed to be opened as a driving lane; V. If none of the above four conditions exist, the hard shoulder is allowed to be used as a driving lane; S2.2 If it is permitted to open the hard shoulder as a driving lane, obtain the road traffic flow information through the highway sensing equipment, and analyze whether the current road conditions require opening the hard shoulder as a driving lane in combination with the traffic flow, density and speed predicted in step S1; I. Make sure the hard shoulder is in a state where it can be used as a driving lane, otherwise the hard shoulder will not be opened; II. According to the basic road data or highway regulations, set the speed threshold ASL for opening the hard shoulder of the controlled section and the upstream slow-moving length threshold SRL of the controlled section. When the driving speed of the controlled section is lower than ASL and the upstream slow-moving length is greater than SRL, the hard shoulder is opened as a driving lane; III. According to the basic road data or highway regulations, set the one-way traffic volume threshold (OTM) for opening the hard shoulder of the controlled section. When the one-way traffic volume of the controlled section is greater than OTM, open the hard shoulder as a driving lane; IV. According to the basic road data or highway regulations, set the traffic continuous growth threshold TCG for opening the hard shoulder of the controlled section. When the traffic growth in two consecutive and equal time periods of the controlled section is greater than TCG, the hard shoulder is opened as a driving lane; V. When construction and maintenance work occupies the inner lane of the main line on the hard shoulder controlled section, causing heavy traffic and slow movement, and the slow movement length is greater than the SRL, the hard shoulder is opened as a driving lane.
3. The MPC-based dynamic opening decision method for hard shoulder of highway according to claim 2 is characterized by: The step S3 comprises the following sub-steps: S3.1 Based on the lane-level METANET basic model calibrated in step S1, i.e., the lane-level METANET macro traffic flow model, a hard shoulder dynamic open control system model is established; The hard shoulder dynamic opening control system model includes the state equation and output equation of the hard shoulder dynamic opening control. The hard shoulder dynamic control system is expressed in state space form, and the general form is: y=Cx+Du Among them, x is the state vector of the system, describing the state of the system at any point in time; u is the input vector of the system; y is the output vector of the system; A, B, C and D are the parameters of the system, which are used to describe the dynamic characteristics and control mechanism of the system; Combined with the lane-level METANET macro traffic flow model, the density K, speed V and flow Q of the controlled section are used as system state variables, that is, x = [KVQ] T ; The traffic status of each lane including the hard shoulder is used as the system input variable, that is, u = [λ1λ2λ3], λ1 represents the traffic status of the left lane of the driving lane, λ2 represents the traffic status of the right lane of the driving lane, and λ3 represents the traffic status of the hard shoulder lane; S3.2 Considering the traffic efficiency and traffic safety, establish the objective function J, consider the proportion of vehicle types involved in the traffic, and establish the corresponding constraint conditions; Taking traffic efficiency and traffic safety as optimization goals, the total travel time is used to characterize traffic efficiency. When the total travel time is the smallest, the road traffic efficiency is the highest, and the collision exposure time is used to characterize traffic safety. The calculation expression of total travel time TTT is as follows: TTT z (t,j)=δ z ·Δt Where TTT z (t,j) represents the travel time of the zth vehicle in the tth cycle and the jth time step; Indicates whether the i-th vehicle is in the controlled section; Δt represents the time step; N represents the number of participating vehicles; T represents the total execution time; The calculation expression of total collision exposure time TET is as follows: Where TET(t,j) represents the collision exposure time of all vehicles in the tth cycle and the jth time step; represents the collision risk of the zth vehicle at the jth time step; TTC stands for Time to Collision, which refers to the time it takes for two vehicles to collide after traveling in the same direction on the same route at their respective speeds. * represents the threshold of collision time; The total travel time and the total collision exposure time are combined in a weighted manner as the overall optimization objective J, which is expressed as follows: In the formula, α ttt represents the weight of traffic efficiency index; β tet Indicates the weight of traffic safety index; TTT i (t,j) represents the total travel time of segment i in the tth cycle and the jth time step; TET i (t,j): total collision exposure time of road segment i in the tth cycle and the jth time step; S3.3 Using the hard shoulder dynamic open control system model, predict the state and behavior of the hard shoulder dynamic open control system in the future; I. Determine the time window and control time interval for predicting system behavior; The sampling period of MPC is T, the order is k; the control period is T c =MT, which is an integer multiple of the sampling period, in order k c ; Prediction time domain N p , control time domain N c ;but: Among them, k c T c / T≤k≤(k c +1)T c / T In the formula, μ(k) and u(k) are the basic parameters, interference parameters and control parameters of the kth sampling period, respectively, which can iterate the traffic flow parameters at time k+1; II. At the new sampling time, the actual output of the controlled object is detected and compared with the predicted output based on the model, the error between the two is calculated, and the error information is used to correct the predicted result based on the model; III. Based on the established objective function J, considering the proportion of vehicle types participating in the traffic, establishing corresponding constraints, using genetic algorithm to minimize the objective function J, and finding the optimal control signal parameter u(k c ); the optimal control signal parameter u(k c ) as the input variable; repeat the above steps until the set prediction step length N is reached p , the predicted time period is [kT,(k+N p -1)T] to achieve rolling optimization.
4. The MPC-based dynamic opening decision method for hard shoulder of highway according to claim 3 is characterized by: The optimization algorithm is one of linear quadratic programming, nonlinear optimization and genetic algorithm.
Citation Information
Patent Citations
Expressway hard shoulder dynamic adjustment system and method thereof
CN113034914A
Method and system for dynamically using hard shoulder during highway construction
CN114241756A
Intelligent management and control system for hard shoulder open passage
CN115547076A
Variable speed limit and dynamic road shoulder cooperative control method, equipment and medium
CN118197083A
Road traffic control system, method, and electronic device
US20180336781A1
Cited By
Expressway hard shoulder opening management and control method based on artificial intelligence
CN119323889A
Emergency lane dynamic management method and system
CN119723878A
Highway hard shoulder management and control method, equipment and medium
CN119851480A
Expressway hard shoulder dynamic opening method and system based on NFGD model and simulation platform
CN120452186A
Cooperative management and control decision-making method for hard shoulder dynamic opening and upstream diversion of expressway
CN120580849A