Virtual synchronous generator parameter adaptive cooperative control method and system
By introducing virtual moment of inertia and damping coefficients into the inverter control algorithm, the characteristics of synchronous generators are simulated, and the adaptive collaborative control method for parameters of virtual synchronous generators is established, which solves the problem of frequency instability in the microgrid and improves system stability and frequency adjustment capability.
Patent Information
- Application Number
- CN202410995175.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-12
AI Technical Summary
Renewable energy power generation in microgrids cannot effectively stabilize the grid frequency and voltage due to lack of inertia and damping, resulting in instability in the system.
By introducing virtual moment of inertia and damping coefficients into the inverter control algorithm, the mechanical characteristics of the synchronous generator are simulated, and the adaptive collaborative control method for parameters of virtual synchronous generators is established. The rotor motion model and virtual speed regulator are used to determine the inverter. Control strategies to regulate frequency fluctuations.
It improves the inverter's ability to adjust system frequency fluctuations, improves the stability and frequency tracking performance of the microgrid, and can quickly recover to the rated frequency when load changes.
Smart Images

Figure CN118944122A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of power grid technology, and in particular to a method and system for adaptive coordinated control of virtual synchronous generator parameters. Background Art
[0002] As the energy crisis becomes increasingly serious, microgrids that use renewable energy as their main energy source have received sustained and widespread attention. Renewable energy is connected to the microgrid through power electronic equipment, which cannot provide support for the voltage and frequency stability of the microgrid due to its lack of inertia and damping. Summary of the invention
[0003] The embodiments of the present application provide a virtual synchronous generator parameter adaptive collaborative control method and system, which simulates the mechanical characteristics of the synchronous generator by introducing virtual rotational inertia and damping coefficient into the control algorithm of the inverter, thereby improving the inverter's ability to regulate system frequency fluctuations.
[0004] The embodiment of the present application proposes a virtual synchronous generator parameter adaptive coordinated control method, including:
[0005] According to the pole pair number of the virtual synchronous generator, a rotor motion model of the VSG is established, and a virtual speed regulator is established for the virtual synchronous generator;
[0006] Based on the established rotor motion model and the virtual speed regulator, an inverter control model is established to simulate the external characteristics of the synchronous generator using the established inverter control model;
[0007] According to the power angle characteristic curve and the angular frequency oscillation curve of the synchronous generator, the oscillation period is divided into a plurality of stages, and according to the established inverter control model, the parameter control strategy in the established inverter control model is determined;
[0008] The determined parameter control strategy is used to perform cooperative control.
[0009] Optionally, according to the pole pair number of the virtual synchronous generator, establishing the rotor motion model of the VSG includes:
[0010] When the number of pole pairs of the virtual synchronous generator is 1 and the electrical angular velocity is equal to the mechanical angular velocity, the established rotor motion model of the VSG satisfies:
[0011]
[0012] Where J is the moment of inertia, kg·m 2 ; T m 、T e are mechanical and electromagnetic torques, N·m; P m , P eare mechanical and electromagnetic power, kW; D is damping coefficient, N·m·s / rad; ω is angular frequency, rad / s; ω0 is rated angular frequency, δ is power angle, rad;
[0013] A virtual speed regulator is established for a virtual synchronous generator to meet the following requirements:
[0014] P m =P ref +K ω (ω0-ω)
[0015] Among them, P ref is the given reference active power; K ω is the power frequency modulation coefficient.
[0016] Optionally, establishing an inverter control model based on the established rotor motion model and the virtual speed regulator includes:
[0017] In the inverter control algorithm, the rotor motion model and the virtual speed regulator are introduced to satisfy:
[0018]
[0019]
[0020] Where τ is the first-order inertia time constant, s; m p is the active power-frequency droop coefficient.
[0021] Optionally, after establishing the inverter control model, it also includes:
[0022] Introduce secondary frequency modulation and introduce an integral link in the difference modulation link to track the frequency;
[0023] Based on the improved active power-frequency control structure, the improved frequency increment-active power increment transfer function is determined, and the small signal model near the equilibrium point is linearized to meet the following requirements:
[0024]
[0025] Optionally, according to the power angle characteristic curve and the angular frequency oscillation curve of the synchronous generator, the oscillation period is divided into multiple stages including:
[0026] During the oscillation period, the VSG rotor angular frequency ω is greater than the grid angular frequency ω g The part with dω / dt>0 is divided into the first stage;
[0027] During the oscillation period, the VSG rotor angular frequency ω is greater than the grid angular frequency ω g The part where dω / dt<0 is divided into the second stage;
[0028] During the oscillation period, the VSG rotor angular frequency ω is smaller than the grid angular frequency ω g The part with dω / dt>0 is divided into the third stage;
[0029] During the oscillation period, the VSG rotor angular frequency ω is smaller than the grid angular frequency ω g The part where dω / dt<0 is divided into the fourth stage;
[0030] According to the established inverter control model, determining the parameter control strategy in the established inverter control model includes:
[0031] In the first stage, the moment of inertia J is controlled to increase, and the damping coefficient D is controlled to increase;
[0032] In the second stage, the moment of inertia J is reduced and the damping coefficient D is increased;
[0033] In the third stage, the moment of inertia J is controlled to increase, and the damping coefficient D is controlled to increase;
[0034] In the fourth stage, the moment of inertia J is controlled to decrease, and the damping coefficient D is controlled to increase.
[0035] Optionally, according to the established inverter control model, determining a parameter control strategy in the established inverter control model further includes:
[0036] The exponential function of nonlinear e is used to control the change of the moment of inertia J, so that when |dω / dt| is large, the moment of inertia J is increased by a large margin on the basis of the steady-state value, and when |dω / dt| is small, the increase of J is reduced, satisfying:
[0037]
[0038] Where J0 is the steady-state value of the moment of inertia; k j is the adaptive adjustment coefficient of the moment of inertia; C j is the threshold value of |dω / dt|;
[0039] In each stage, a linear function is used to control the increase of the damping coefficient D based on the steady-state value D0 of the damping coefficient to meet the following requirements:
[0040] D=D0+k d |Dω|
[0041] Where D0 is the steady-state value of the damping coefficient; k d is the adaptive adjustment coefficient of the moment of inertia and damping coefficient.
[0042] Optionally, according to the established inverter control model, determining a parameter control strategy in the established inverter control model further includes:
[0043] A simplified VSG grid-connected model is established, and at the steady-state operating point (ω s ,δ s ,P es ) Linearize the established VSG rotor motion model to satisfy:
[0044]
[0045] Among them, ΔP e Active power increase To determine the linearization state of the VSG grid-connected system:
[0046]
[0047] According to the determined linearization state of the VSG grid-connected system, parameter selection of the moment of inertia J and the damping coefficient D is performed.
[0048] An embodiment of the present application further proposes a virtual synchronous generator parameter adaptive collaborative control system, including a processor and a memory, wherein the memory has a computer program, and when the computer program is executed by the processor, the steps of the virtual synchronous generator parameter adaptive collaborative control method as described above are implemented.
[0049] The control method of the present application introduces virtual rotational inertia and damping coefficient into the control algorithm of the inverter to simulate the mechanical characteristics of the synchronous generator, thereby improving the inverter's ability to regulate system frequency fluctuations.
[0050] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0052] Figure 1 An example of a three-phase voltage source inverter topology structure of the virtual synchronous generator parameter adaptive coordinated control method of this embodiment;
[0053] Figure 2 The basic process diagram of the virtual synchronous generator parameter adaptive coordinated control method of this embodiment is shown;
[0054] Figure 3This is an example of an active power-frequency control block diagram of the virtual synchronous generator parameter adaptive coordinated control method of this embodiment;
[0055] Figure 4 The power angle characteristic curve and angular frequency oscillation curve of the synchronous generator of the virtual synchronous generator parameter adaptive cooperative control method of this embodiment;
[0056] Figure 5 This is an example of the adaptive coordinated control principle of the moment of inertia and damping coefficient of the virtual synchronous generator parameter adaptive coordinated control method of this embodiment;
[0057] Figure 6a-6d They are schematic diagrams of small signal stability analysis results under different parameter changes of the virtual synchronous generator parameter adaptive cooperative control method of this embodiment;
[0058] Figure 7a-7c It is a comparison diagram of different control strategies for off-grid operation in a simulation example of the virtual synchronous generator parameter adaptive coordinated control method of this embodiment;
[0059] Figure 8a-8b This is a comparison diagram of different control strategies for grid-connected operation in a simulation example of the virtual synchronous generator parameter adaptive coordinated control method of this embodiment. DETAILED DESCRIPTION
[0060] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0061] VSG adopts a three-phase voltage source inverter structure, and its topology is as follows Figure 1 The DC side of the inverter is provided with DC voltage by the distributed power supply and energy storage unit, and after PWM modulation and LC filtering by the switch tube, the three-phase sinusoidal voltage is output, and then the grid-connected inductor L g Connected to the public connection point or power grid. The control part is the virtual synchronous generator control algorithm and voltage and current double closed loop control. Figure 1 Middle,U dc is the DC voltage, L f , R f They are filter inductance and resistance respectively, C is filter capacitor, L is filter g , R g They are the grid-side inductance and resistance, e L is the three-phase bridge arm voltage, i L is the three-phase bridge arm current, u ois the three-phase output voltage, i o is the three-phase output current, u g is the grid voltage, i g is the three-phase grid-connected current, u g is the grid voltage, P ref , Q ref , U ref ,ω ref are active, reactive, voltage, and angular frequency command values respectively, e is the internal electromotive force of VSG, u is r is the voltage reference value of the inner loop control, and m is the modulation signal.
[0062] The embodiment of the present application proposes a virtual synchronous generator parameter adaptive coordinated control method, including:
[0063] In step S201, a rotor motion model of the VSG is established according to the number of pole pairs of the virtual synchronous generator, and a virtual speed regulator is established for the virtual synchronous generator. In some embodiments, establishing a rotor motion model of the VSG according to the number of pole pairs of the virtual synchronous generator includes:
[0064] In a specific example, generator speed = number of magnetic pole pairs × frequency, and the number of magnetic pole pairs can be determined according to actual conditions. When the number of pole pairs of the virtual synchronous generator is 1 pair, and the electrical angular velocity is equal to the mechanical angular velocity, the established VSG rotor motion model satisfies:
[0065]
[0066] Where J is the moment of inertia, kg·m 2 ; T m 、T e are mechanical and electromagnetic torques, N·m; P m , P e are mechanical and electromagnetic power, kW; D is the damping coefficient, N·m·s / rad; ω is the angular frequency, rad / s; ω0 is the rated angular frequency, δ is the power angle, rad.
[0067] In order to make the virtual synchronous generator simulate the characteristics of the synchronous generator in the power system more accurately, a virtual speed regulator is established for the virtual synchronous generator to meet the following requirements:
[0068] P m =P ref +K ω (ω0-ω) (2)
[0069] Among them, P ref is the given reference active power; K ω is the power frequency modulation coefficient.
[0070] In step S202, an inverter control model is established based on the established rotor motion model and the virtual speed regulator, so as to simulate the external characteristics of the synchronous generator using the established inverter control model.
[0071] In some embodiments, establishing an inverter control model based on the established rotor motion model and the virtual speed regulator includes:
[0072] In the inverter control algorithm, the rotor motion model formula (1) and the virtual speed regulator formula (2) are introduced to obtain:
[0073]
[0074]
[0075] Where τ is the first-order inertia time constant, s; m p is the active power-frequency droop coefficient.
[0076] Introducing equation (1) into the control algorithm of the inverter provides inertia and damping support for the system; equation (2) enables the inverter to simulate the prime mover regulation and has primary frequency modulation characteristics; from equations (3) and (4), it can be seen that the closed-loop transfer function of the frequency increment with respect to the active power increment is a first-order inertia link, and the dynamic characteristics are given by J, D, K ω The steady-state error is determined by the three parameters D and K. ω Joint decision.
[0077] In step S203, the oscillation period is divided into multiple stages according to the power angle characteristic curve and the angular frequency oscillation curve of the synchronous generator, and the parameter control strategy in the established inverter control model is determined according to the established inverter control model.
[0078] In step S204, cooperative control is performed using the determined parameter control strategy.
[0079] The control method of the present application introduces virtual rotational inertia and damping coefficient into the control algorithm of the inverter to simulate the mechanical characteristics of the synchronous generator, thereby improving the inverter's ability to regulate system frequency fluctuations.
[0080] Based on the above embodiment, the virtual speed regulator simulates the primary frequency regulation of the synchronous generator, which belongs to differential frequency regulation. When a load component with a large change amplitude and a long change period appears in the microgrid, the frequency offset cannot be limited to a reasonable range by primary frequency regulation alone. At this time, it is necessary to introduce secondary frequency regulation, that is, to change the speed regulator characteristics and introduce an integral link in the differential regulation link (such as Figure 3 In some embodiments, after establishing the inverter control model, it also includes:
[0081] Introduce secondary frequency modulation and introduce an integral link in the difference modulation link to track the frequency;
[0082] Based on the improved active power-frequency control structure, the improved frequency increment-active power increment transfer function is determined, and the small signal model near the equilibrium point is linearized to meet the following requirements:
[0083]
[0084] When the active power is disturbed, the final value theorem shows that when t→∞:
[0085]
[0086] It can be concluded that when active power is disturbed, the power frequency controller with a frequency deviation integral feedback link can achieve zero-difference control of the frequency.
[0087] The improved parameter adaptive cooperative control principle is further explained below. The power angle characteristic curve and angular frequency oscillation curve of the synchronous generator are shown in Figure 4 In some embodiments, according to the power angle characteristic curve and the angular frequency oscillation curve of the synchronous generator, the oscillation period is divided into multiple stages, including:
[0088] During the oscillation period, the VSG rotor angular frequency ω is greater than the grid angular frequency ω g The part with dω / dt>0 is divided into the first stage;
[0089] During the oscillation period, the VSG rotor angular frequency ω is greater than the grid angular frequency ω g The part where dω / dt<0 is divided into the second stage;
[0090] During the oscillation period, the VSG rotor angular frequency ω is smaller than the grid angular frequency ω g The part with dω / dt>0 is divided into the third stage;
[0091] During the oscillation period, the VSG rotor angular frequency ω is smaller than the grid angular frequency ω g The part where dω / dt<0 is divided into the fourth stage.
[0092] According to the established inverter control model, determining the parameter control strategy in the established inverter control model includes:
[0093] In the first stage, the moment of inertia J is controlled to increase, and the damping coefficient D is controlled to increase;
[0094] In the second stage, the moment of inertia J is reduced and the damping coefficient D is increased;
[0095] In the third stage, the moment of inertia J is controlled to increase, and the damping coefficient D is controlled to increase;
[0096] In the fourth stage, the moment of inertia J is controlled to decrease, and the damping coefficient D is controlled to increase.
[0097] like Figure 4 In one oscillation cycle, there are four stages (i.e., 1 to 4 in the figure). In stage 1, the VSG rotor angular frequency ω is greater than the grid angular frequency ω g And dω / dt>0, at this time, the ω of VSG increases rapidly, and J needs to be increased to suppress the rapid increase of ω, but the increase of J will make σ% and t s becomes larger, so D is increased accordingly, thereby suppressing σ% and t s In stage 2, ω is still greater than ω g , but dω / dt<0, J should be reduced to make |dω / dt| larger, so that ω approaches ω faster. g , and D can be appropriately increased to obtain smaller σ% and t s The same is true for stages 3 and 4. The setting principles of J and D in different stages are shown in Table 1.
[0098] Table 1 Selection principles of J and D at different stages
[0099] stage dω / dt Δω J D 1 >0 >0 ↑ ↑ 2 <0 >0 ↓ ↑ 3 <0 <0 ↑ ↑ 4 >0 <0 ↓ ↑
[0100] By analyzing the impact of J and D on system performance and the characteristics within the oscillation period, in order to enable VSG to continuously adjust J and D according to the situation during off-grid, load switching or disturbance, so that σ% is reduced and a faster dynamic response can be obtained at the same time, the embodiment of the present application proposes a J and D parameter adaptive collaborative control strategy, the control block diagram is as follows Figure 5 shown.
[0101] In some embodiments, according to the established inverter control model, determining a parameter control strategy in the established inverter control model further includes:
[0102] The exponential function of nonlinear e is used to control the change of the moment of inertia J, so that when |dω / dt| is large, the moment of inertia J is increased by a large margin on the basis of the steady-state value, and when |dω / dt| is small, the increase of J is reduced, satisfying:
[0103]
[0104] Where J0 is the steady-state value of the moment of inertia; k j is the adaptive adjustment coefficient of the moment of inertia; C jFor the moment of inertia J, it is necessary to increase J in stages 1 and 3. Compared with the linear variation function of J adopted in other methods, the embodiment of the present application adopts the exponential function of nonlinear e, so that J has a greater variation rate.
[0105] In each stage, a linear function is used to control the increase of the damping coefficient D based on the steady-state value D0 of the damping coefficient to meet the following requirements:
[0106] D=D0+k d |Dω| (8)
[0107] Where D0 is the steady-state value of the damping coefficient; k d is the adaptive adjustment coefficient of the moment of inertia and the damping coefficient. In stage 2 and stage 4, a smaller steady-state value of the moment of inertia J0 is used. For D, according to the influence of D on the frequency dynamic performance, D should be as large as possible. The embodiment of the present application uses a linear function in all stages to increase the steady-state value of the damping coefficient D0, and the value changes according to |Δω|.
[0108] When VSG is operated off-grid, integral is added in the damping link; when VSG is operated on-grid, the grid provides voltage support and integral is cancelled in the damping link.
[0109] This embodiment further illustrates the parameter setting process, the impact of each parameter on the stability of the microgrid, and the simplified analysis model of VSG grid connection. Figure 1 As shown. In the figure, E∠δ is the VSG output voltage, U∠0 is the AC bus voltage, δ is the phase angle difference between the VSG and the AC bus, and Z is the line impedance. In some embodiments, according to the established inverter control model, determining the parameter control strategy in the established inverter control model also includes:
[0110] A simplified VSG grid-connected model is established, and at the steady-state operating point (ω s ,δ s ,P es ) Linearize the established VSG rotor motion model to satisfy:
[0111]
[0112] Where ΔP e Active power increase To determine the linearization state of the VSG grid-connected system:
[0113]
[0114] The characteristic equation is:
[0115]
[0116] According to the determined linearization state of the VSG grid-connected system, parameter selection of the moment of inertia J and the damping coefficient D is performed.
[0117] According to formula (11), the small signal stability analysis results under different parameter changes are as follows: Figure 6a-6d As shown. Figure 6a-6d Corresponding to D = 10N·m·s / rad, K ω =2500, J = 0.1~5kg·m 2 , J = 1kg·m 2 ,K ω =2500, D=0~50N·m·s / rad, J=1kg·m 2 ,D=10N·m·s / rad,K ω =0~5000, J=1kg·m 2 ,D=10N·m·s / rad,K ω =2500,k i =0~2000. Figure 6a It can be seen that when D and K ω Constant, as the moment of inertia J increases, the dominant pole gets closer to the origin of the coordinate system, and the system stability becomes worse, so the moment of inertia cannot be too large. Figure 6b , 6c It can be seen that when J is a constant value, as D and K ω As the absolute value of the real part of the pole increases, the system stability increases, the adjustment time becomes shorter, and the decay speed becomes faster. Figure 6b It can be seen that introducing the integral k i After that, the system poles are all on the left side of the imaginary axis, k i The larger the value is, the farther away from the real axis is, and the larger the overshoot is. It will not affect the stability of the system, but too large will cause power overshoot and affect the selection of other parameters. Therefore, the parameters of VSG can be reasonably set according to the actual situation, which is the advantage of VSG compared with traditional synchronous generators. The value of the parameter should comprehensively consider the capacity of the DC side energy storage battery, the dynamic response speed and the impact on the value of VSG parameters.
[0118] The embodiment of the present application also proposes a simulation case of a virtual synchronous generator parameter adaptive collaborative control method. In this example, a VSG simulation model is constructed in MATLAB / Simulink to perform simulation experimental analysis. The simulation parameters are shown in Table 2.
[0119] Table 2 Simulation parameters
[0120] Main circuit parameters Numeric Controller Parameters Numeric <![CDATA[DC bus voltage U dc / V]]> 700 <![CDATA[Regulation coefficient K ω > 2500 Filter inductance L / mH 2 <![CDATA[Control coefficient k j > 0.1 Filter capacitor C / uF 40 <![CDATA[Control coefficient k d > 10 <![CDATA[Rated alternating voltage U N / V]]> 220 <![CDATA[Control coefficient T j > 2.5 Rated frequency f / Hz 50 <![CDATA[Control coefficient T d > 0.5 <![CDATA[Moment of inertia J0 / (kg·m 2 )]]> 0.2 <![CDATA[Integration coefficient k i > 1200 <![CDATA[Damping coefficient D0 / (N·m·s / rad)]]> 10 <![CDATA[Switching frequency f sw / Hz]]> 10k
[0121] (1) Off-grid operation
[0122] A virtual synchronous machine with load is used, the simulation time is 1.6 seconds, the VSG reference active power is 10kW, the load active power is 5kW, at 0.5 seconds, the load suddenly increases to 15kW, at 1.0 seconds, the load suddenly decreases to 5kW.
[0123] Table 3 Parameter values of different control strategies
[0124] Control strategy Moment of inertia J Damping coefficient D <![CDATA[Integration coefficient k i > Traditional VSG control <![CDATA[J=J0]]> <![CDATA[D=D0]]> / J and D adaptive cooperative control Formula (7) Formula (8) 1200 Both J and D are fixed <![CDATA[J=J0]]> <![CDATA[D=D0]]> 1200 J changes and D is fixed Formula (7) <![CDATA[D=D0]]> 1200 J is fixed and D varies <![CDATA[J=J0]]> Formula (8) 1200
[0125] Under the above simulation conditions, droop control, traditional VSG control, and J and D adaptive coordinated control are verified respectively. The control parameter values of different control strategies are shown in Table 3. The active-frequency coefficient k of droop control is p =3.14×10 -5 , reactive power-voltage coefficient k q =6×10-6. Figure 7a-7c The frequency response waveforms under four control strategies are given. It can be seen that when the load suddenly changes, the droop control has almost no inertia, the frequency drops rapidly, and the deviation from the rated value is large, reaching 0.15Hz; using the traditional VSG control, the moment of inertia J and D damping coefficients are fixed values, which inject inertia into the system, can reduce the frequency change rate, and reach a new steady-state value after about 0.1 seconds, and the frequency deviation is about 0.13Hz; using the proposed parameter adaptive coordinated control strategy, by adding an integral to the VSG damping feedback link, when the load is disturbed, the frequency reaches the peak and then drops rapidly, gradually eliminating the frequency error, and finally recovers to the rated value. Obviously, the first two control strategies only achieve one frequency modulation, and cannot restore the system frequency to the rated value. There is a problem of large frequency deviation, and the frequency cannot be adjusted without difference. The improved parameter adaptive coordinated control strategy can achieve frequency adjustment without difference under VSG off-grid operation. Table 4 and Table 5 show the control performance under different strategies and the control performance under different working conditions.
[0126] Table 4 Control performance under different strategies
[0127]
[0128]
[0129] Table 5 Control performance under different working conditions
[0130] Working conditions Overshoot / % Peak time / s J and D adaptive co-variation 0.164 1.047 Both J and D are fixed 0.324 1.023 J changes and D is fixed 0.188 1.051 J is fixed and D varies 0.232 1.020
[0131] On the basis of adding integral to the damping link, simulation analysis is performed on four working conditions: adaptive change of J and D, fixed J and D, J change and fixed D, and fixed J and changing D. The results are as follows: Figure 8a , 8bAs shown. It can be seen that when the load changes suddenly, under different working conditions, after a period of adjustment, the system frequency can be restored to the rated value, but there are large differences in the control performance under various working conditions. When J is fixed, the system has the same moment of inertia and the frequency decrease rate is the same; when D is fixed, the system damping is the same and the frequency recovery rate is consistent. When both J and D are fixed, the adjustment time is the fastest, but the overshoot is the largest, which cannot meet the requirements of stable operation; changing a single parameter can improve the VSG control performance to a certain extent; J and D change adaptively, and in the first oscillation process, the overshoot is the smallest, and there is almost no overshoot during the frequency recovery process. The VSG control performance can be improved by dynamically changing the values of the control parameters, and the flexibility of VSG control can be better reflected by using J and D to change adaptively at the same time.
[0132] Depend on Figure 7c It can be seen that the parameter adaptive cooperative control strategy is adopted when k i = 0, which means that the integral link does not work, that is, it is the traditional VSG control, and there is a steady-state error in the frequency; when the integral coefficient k i When k increases, the frequency drop or rise rate is not affected, but the frequency deviation is reduced and the frequency recovery dynamic response process is significantly accelerated. i After reaching a certain value, there is overshoot in the frequency recovery process. By adding integration to the damping feedback link, the VSG can eliminate the steady-state error when operating off-grid.
[0133] (2) Grid-connected operation
[0134] A single virtual synchronous generator is connected to the grid, and the simulation time is 1.6 seconds. At 0.1 seconds, the VSG starts pre-synchronization, and at 0.4 seconds, the grid-connected switch is closed. The load active power is constant at 12kW. Before 0.7 seconds, the VSG reference active power is 2kW. At 0.7 seconds, the VSG reference active power suddenly increases to 12kW, and then suddenly drops to 2kW at 1.2 seconds. The proposed J and D adaptive coordinated control and traditional VSG control are simulated and verified respectively.
[0135] Figure 8a , 8b The step response curves of VSG output active power under two control methods are given. When the reference active power increases from 2kW to 12kW, the active overshoots of the two control strategies are 4.63% and 9.44%, respectively, as shown in Table 6.
[0136] Table 6 Active power overshoot of different control strategies
[0137] Control strategy Traditional VSG control J and D adaptive cooperative control Overshoot 9.44% 4.63%
[0138] Due to the use of fixed moment of inertia J and damping coefficient D, the traditional VSG control strategy cannot dynamically adjust the controller parameters according to the frequency change rate or frequency deviation, resulting in the maximum peak value of the first frequency oscillation, exceeding 0.2Hz, and obvious overshoot during the frequency recovery process; with the J and D adaptive collaborative control strategy, the frequency quickly rises to the peak value, the peak value of the first frequency oscillation is only 0.12Hz, and the overshoot is small during the recovery process.
[0139] An embodiment of the present application further proposes a virtual synchronous generator parameter adaptive collaborative control system, including a processor and a memory, wherein the memory has a computer program, and when the computer program is executed by the processor, the steps of the virtual synchronous generator parameter adaptive collaborative control method as described above are implemented.
[0140] In addition, although exemplary embodiments have been described herein, the scope includes any and all embodiments based on the present disclosure with equivalent elements, modifications, omissions, combinations (e.g., various embodiments intersecting schemes), adaptations or changes. It is not limited to the examples described in this specification or during the implementation of this application, and its examples will be interpreted as non-exclusive.
[0141] The above description is intended to be illustrative rather than restrictive. For example, the above examples (or one or more of them) can be used in combination with each other. For example, those of ordinary skill in the art may use other embodiments when reading the above description.
[0142] The above embodiments are merely exemplary embodiments of the present disclosure. Those skilled in the art may make various modifications or equivalent substitutions to the present invention within the essence and protection scope of the present disclosure, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present invention.
Claims
1. A virtual synchronous generator parameter adaptive coordinated control method, characterized in that: include: According to the pole pair number of the virtual synchronous generator, a rotor motion model of the VSG is established, and a virtual speed regulator is established for the virtual synchronous generator; Based on the established rotor motion model and the virtual speed regulator, an inverter control model is established to simulate the external characteristics of the synchronous generator using the established inverter control model; According to the power angle characteristic curve and the angular frequency oscillation curve of the synchronous generator, the oscillation period is divided into a plurality of stages, and according to the established inverter control model, the parameter control strategy in the established inverter control model is determined; The determined parameter control strategy is used to perform cooperative control.
2. The method for adaptive coordinated control of virtual synchronous generator parameters according to claim 1, characterized in that: According to the pole pair number of the virtual synchronous generator, the rotor motion model of the VSG is established including: When the number of pole pairs of the virtual synchronous generator is 1 and the electrical angular velocity is equal to the mechanical angular velocity, the established rotor motion model of the VSG satisfies: Where J is the moment of inertia, kg·m 2 ; T m , T e are mechanical and electromagnetic torques, N·m; P m , P e are mechanical and electromagnetic power, kW; D is damping coefficient, N·m·s / rad; ω is angular frequency, rad / s; ω0 is rated angular frequency, δ is power angle, rad; A virtual speed regulator is established for a virtual synchronous generator to meet the following requirements: P m =P ref +K ω (ω0-ω) Among them, P ref is the given reference active power; K ω is the power frequency modulation coefficient.
3. The method for adaptive coordinated control of virtual synchronous generator parameters according to claim 2, characterized in that: Based on the established rotor motion model and the virtual speed regulator, establishing an inverter control model includes: In the inverter control algorithm, the rotor motion model and the virtual speed regulator are introduced to satisfy: Where τ is the first-order inertia time constant, s; m p is the active power-frequency droop coefficient.
4. The method for adaptive coordinated control of virtual synchronous generator parameters according to claim 3, characterized in that: After the inverter control model is established, it also includes: Introduce secondary frequency modulation and introduce an integral link in the difference modulation link to track the frequency; Based on the improved active power-frequency control structure, the improved frequency increment-active power increment transfer function is determined, and the small signal model near the equilibrium point is linearized to meet the following requirements:
5. The method for adaptive coordinated control of virtual synchronous generator parameters according to claim 3, characterized in that: According to the power angle characteristic curve and angular frequency oscillation curve of the synchronous generator, the oscillation period is divided into multiple stages including: During the oscillation period, the VSG rotor angular frequency ω is greater than the grid angular frequency ω g The part with dω / dt>0 is divided into the first stage; During the oscillation period, the VSG rotor angular frequency ω is greater than the grid angular frequency ω g The part where dω / dt<0 is divided into the second stage; During the oscillation period, the VSG rotor angular frequency ω is smaller than the grid angular frequency ω g The part with dω / dt>0 is divided into the third stage; During the oscillation period, the VSG rotor angular frequency ω is smaller than the grid angular frequency ω g The part where dω / dt<0 is divided into the fourth stage; According to the established inverter control model, determining the parameter control strategy in the established inverter control model includes: In the first stage, the moment of inertia J is controlled to increase, and the damping coefficient D is controlled to increase; In the second stage, the moment of inertia J is reduced and the damping coefficient D is increased; In the third stage, the moment of inertia J is controlled to increase, and the damping coefficient D is controlled to increase; In the fourth stage, the moment of inertia J is controlled to decrease, and the damping coefficient D is controlled to increase.
6. The method for adaptive coordinated control of virtual synchronous generator parameters according to claim 5, characterized in that: According to the established inverter control model, determining the parameter control strategy in the established inverter control model also includes: The exponential function of nonlinear e is used to control the change of the moment of inertia J, so that when |dω / dt| is large, the moment of inertia J is increased by a large margin on the basis of the steady-state value, and when |dω / dt| is small, the increase of J is reduced, satisfying: Where J0 is the steady-state value of the moment of inertia; k j is the adaptive adjustment coefficient of the moment of inertia; C j is the threshold value of |dω / dt|; In each stage, a linear function is used to control the increase of the damping coefficient D based on the steady-state value D0 of the damping coefficient to meet the following requirements: D=D0+k d |Dω| Where D0 is the steady-state value of the damping coefficient; k d is the adaptive adjustment coefficient of the moment of inertia and damping coefficient.
7. The method for adaptive coordinated control of virtual synchronous generator parameters according to claim 6, characterized in that: According to the established inverter control model, determining the parameter control strategy in the established inverter control model also includes: A simplified VSG grid-connected model is established, and at the steady-state operating point (ω s ,δ s ,P es ) Linearize the established VSG rotor motion model to satisfy: Among them, ΔP e Active power increase To determine the linearization state of the VSG grid-connected system: According to the determined linearization state of the VSG grid-connected system, parameter selection of the moment of inertia J and the damping coefficient D is performed.
8. A virtual synchronous generator parameter adaptive coordinated control system, characterized in that: It comprises a processor and a memory, wherein the memory has a computer program, and when the computer program is executed by the processor, the steps of the virtual synchronous generator parameter adaptive collaborative control method as described in any one of claims 1 to 7 are implemented.
Citation Information
Cited By
Island micro-grid frequency control method based on unmanned intelligent power station