Optimization method of virtual power plant under source-network-load-storage cooperation
By adopting improved zebra algorithm and real-time peak-to-valley electricity price optimization in virtual power plants under the coordination of source and network load storage, the problem of electricity price not being considered in the operation mode of virtual power plants is solved, and the system is cost-effective and operating stability is achieved.
Patent Information
- Application Number
- CN202411003679.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing virtual power plants do not fully consider real-time peak and valley electricity prices in their operating mode, which limits the economics and operating efficiency of the system.
Under the coordination of source network load storage, an improved zebra algorithm is used to calculate the capacity configuration model, combined with real-time peak and valley electricity prices, the system operation mode is optimized to obtain the system's optimal capacity configuration solution.
It improves the economic and operating stability of the system, ensuring the efficiency of the hydrogen production process and the reliability of the power supply.
Smart Images

Figure CN118944156A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of renewable energy power generation and algorithm optimization, and relates to a price-constrained virtual power plant under the coordination of source, grid, load and storage; specifically, it relates to an optimization method for a virtual power plant under the coordination of source, grid, load and storage. Background Art
[0002] At present, hydrogen energy, as a clean, zero-carbon, long-term storage, flexible and efficient secondary energy, has high use value in many industries and fields. However, the current preparation of hydrogen energy still mostly relies on the reforming of fossil fuels. The hydrogen obtained by this preparation method usually contains impurities and there are still a lot of carbon emissions in the preparation process, which does not play a role in decarbonization. Therefore, the method of using renewable energy to produce hydrogen has emerged. Using renewable energy to produce hydrogen can not only solve the problem of grid-connected consumption of volatile wind and solar power, but also obtain hydrogen energy on the basis of reducing carbon emissions and promote the transformation of the power system. At the same time, source-grid-load-storage synergy technology has also become an important direction for the development of the power system. Virtual power plants achieve optimized operation and economic management of power systems by integrating various distributed energy resources. However, in the existing technology, the operation mode of virtual power plants often does not fully consider the impact of real-time peak and valley electricity prices, which limits the further improvement of system economy and operation efficiency. Summary of the invention
[0003] In view of the above problems, the purpose of the present invention is to address the problems existing in the prior art and propose an optimization method for a virtual power plant under the coordination of source, grid, load and storage. In the operation mode of the traditional grid-connected new energy hydrogen production system, the real-time peak and valley electricity prices are taken into consideration, and the improved zebra algorithm is used to calculate the capacity configuration model to obtain the optimal capacity configuration plan of the system, thereby ensuring the economical and efficient hydrogen production of the system, while taking into account its grid-connected operation stability and power supply reliability.
[0004] The technical solution of the present invention is: the optimization method of a virtual power plant under the coordination of source, grid, load and storage described in the present invention comprises the following steps:
[0005] Step (1): Collect the real-time wind speed, light, temperature and load data of the region, establish the mathematical model of the wind-solar combined hydrogen production system, and realize the flow power calculation of the virtual power plant;
[0006] Step (2): judging the system operation status, determining whether the system operation status is in a power shortage or power surplus, and determining the power purchase / sale and power supply / storage plan executed by the system according to the real-time segmented electricity price;
[0007] Step (3): Taking the system economic benefits, load shortage rate and operation stability as the optimization objectives, the zebra algorithm is used to calculate the fitness value of each optimization objective under the proposed control method taking into account the peak and valley electricity prices, so as to obtain the optimal capacity configuration plan of the system.
[0008] Furthermore, in step (1), the established wind-solar combined hydrogen production system includes a solar array panel, a wind turbine, a battery, a hydrogen production system, a fuel cell, a DC bus, a converter and a power control system;
[0009] The solar array panels are connected to the DC bus through a DC / DC converter.
[0010] The wind turbine generator is connected to the DC bus through the AC / DC converter.
[0011] The battery unit is connected to the DC bus through a DC / DC converter, and the DC bus supplies power to the hydrogen production system through a DC / DC converter. The hydrogen production system provides hydrogen load on the one hand and fuel for the fuel cell on the other hand.
[0012] The fuel cell is connected to the DC bus through a DC / DC converter.
[0013] The DC bus feeds power into the grid through a DC / AC converter.
[0014] The power control system operates to achieve power allocation.
[0015] Furthermore, in step (2), the power control system determines the system operation state, determines whether the system operation state is in a power shortage or power surplus, and determines the power purchase / sale and power supply / storage scheme executed by the system according to the real-time segmented electricity price. The scheme is specifically:
[0016] Model 1: If the system is in a power shortage state and the current period is the off-peak electricity price, the system will first purchase electricity from the grid to make up for the system power shortage and charge the battery unit to the upper limit;
[0017] Model 2: If the system is in a power shortage state and the current period is the peak electricity price, the system will first use the battery unit and fuel cell unit to make up for the power shortage. If the capacity of the battery unit and fuel cell unit is insufficient to meet the system power shortage, then purchase electricity from the grid;
[0018] Model 3: If the system is in a state of excess power and the current period is the off-peak electricity price, the overflow power will be supplied to the hydrogen production unit and battery charging first. If the hydrogen production unit and battery unit cannot absorb the excess power, the power will be sold to the grid.
[0019] Model 4: If the system is in a state of excess power and the current period is at peak electricity price, the overflow power will be sold to the grid according to the dispatch plan. If the overflow power exceeds the interconnection line exchange power limit, the excess power will be supplied to the hydrogen production unit for hydrogen production and battery charging. If there is still excess power, it will be abandoned.
[0020] Furthermore, in step (3), based on the established system mathematical model and the established system operation plan, with the system economic benefits, load shortage rate and operation stability as the optimization objectives, the zebra algorithm is used to calculate the fitness value of each optimization objective under the price constraint, so as to obtain the optimal capacity configuration plan of the system.
[0021] Furthermore, in step (3), the optimization objectives of the system economic benefit, load shortage rate and operation stability are specifically as follows:
[0022] The system economic benefit optimization target f1 is:
[0023] f1=w sell -w buy -w install -w hold
[0024] Where: w sell is the revenue from electricity and hydrogen sales of the system, w buy is the system electricity purchase cost, w install is the system construction cost, w hold The remaining value of the equipment after the system has run for the expected number of years;
[0025]
[0026] Where: n is the expected operating life of the system, w(n) = w0 + w m (n)+w a (n), w0 system initial construction cost, w m (n) is the equipment maintenance cost of the system in the nth year, w a (n) is the equipment renewal cost of the system in the nth year, and α is the annual discount rate of the system;
[0027] The system load shortage rate optimization target f2 is:
[0028]
[0029] Where: P load , P wind , P pv , P bat , P el and P fc They are load dispatching demand, wind turbine output, photovoltaic output, battery output, hydrogen production system output and fuel cell output respectively;
[0030] The system operation stability optimization target f3 is:
[0031]
[0032] Where: P net(t) is the actual grid-connected power of the system at time t, is the average power of the system grid-connected interconnection line; in summary, the objective function minF=f1+f2+f3.
[0033] Furthermore, in step (3), the specific solution steps for calculating the fitness value of each optimization target under the price restriction by using the zebra algorithm to obtain the optimal capacity configuration solution of the system are as follows:
[0034] 1): Establish and initialize the zebra population to form the initial population;
[0035] Generate a set of randomly distributed zebra position matrices as follows:
[0036]
[0037] Where X is the zebra population; X i is the i-th zebra; x ij is the j-th dimensional position of the i-th zebra; N is the total number of zebras in the zebra population; m is the dimension of the problem to be solved;
[0038] 2): Substitute the randomly generated zebra positions into the objective function for evaluation;
[0039] Each zebra represents a set of optimal solutions, i.e., the optimal capacity configuration;
[0040] 3): Update population members;
[0041] In the zebra algorithm, the best member of the population is considered to be the pioneer zebra, which leads other members to its search space in the population, that is, to find the most suitable P load , P wind , P pv , P bat , P el and P fc ; Therefore, the formula for updating the zebra's position during the foraging phase is as follows:
[0042]
[0043] In the formula, is the new position of the i-th zebra in the foraging phase, is its j-th dimension value; is the objective function value; PZ is the pioneer zebra, PZ j is the j-th dimension value; r is a random number uniformly distributed between [0,1]; I = round(1+rand), where rand is a random number uniformly distributed between [0,1];
[0044] 4): Update the positions of zebra population members in the search space;
[0045] When updating the position of the zebra, if the objective function value of the new position is smaller, the zebra will accept the new position; therefore, the formula for updating the position of the zebra in the search space is as follows:
[0046]
[0047] In the formula, is the new position of the i-th zebra in the search space, is its j-th dimension value; is the objective function value; t is the current number of iterations; T is the maximum number of iterations of the algorithm; R is a constant equal to 0.01; P s is a random number uniformly distributed between [0,1]; AZ is the state of the attacked zebra, AZ j is its j-th dimension value;
[0048] 5): Determine whether the termination condition is met;
[0049] If the termination condition is not met, return to step 3); if the constraint condition is met, go to step 6).
[0050] 6): Output the lowest objective function value, that is, the optimal P load , P wind , P pv , P bat , P el and P fc .
[0051] Furthermore, the algorithm is improved in 4) by introducing a chaotic reverse learning strategy to improve the zebra position; the algorithm is adaptively reduced in the early stage of iteration to search for the zebra position and improve the speed of finding the optimal position; the improved formula is as follows:
[0052] ω=tanh(2(1-t / T))
[0053]
[0054] In the formula, ω is the weight coefficient, tanh is the activation function, This is the new position of the improved zebra.
[0055] The beneficial effects of the present invention are: 1. Taking into account the peak and valley electricity prices, and adjusting the system operation mode according to the current real-time electricity prices, the economic efficiency of the system operation is improved; 2. Comprehensively considering the three optimization goals of system economic benefits, system operation stability and system load shortage rate, the final configuration plan ensures the economical and efficient hydrogen production of the system while improving the grid-connected operation stability and power supply reliability; 3. Using the zebra algorithm to solve the grid-connected new energy hydrogen production system, while improving the convergence speed, it ensures the accuracy of the required capacity configuration plan. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] Figure 1 It is a schematic diagram of the wind-solar combined hydrogen production system of the present invention;
[0057] Figure 2 It is a schematic diagram of the price-limited virtual power plant control method under the coordination of source, grid, load and storage proposed by the present invention;
[0058] Figure 3 It is a schematic diagram of the zebra algorithm flow proposed in the present invention. DETAILED DESCRIPTION
[0059] The specific technical scheme of the present invention is further described in detail below with reference to specific examples.
[0060] like Figure 1 As shown, the present invention proposes an optimization method for a virtual power plant under the coordination of source, grid, load and storage, comprising the following steps:
[0061] Step (1): Establish a mathematical model of the wind-solar combined hydrogen production system to calculate the system flow power;
[0062] Step (2): judging the system operation state, determining whether the system operation state is in a power shortage or power surplus, and determining the power purchase / sale and power supply / storage plan executed by the system according to the real-time segmented electricity price;
[0063] Step (3): Taking the system economic benefits, load shortage rate and operation stability as the optimization objectives, the zebra algorithm is used to calculate the fitness value of each optimization objective under the real-time segmented electricity price, so as to obtain the optimal capacity configuration plan of the system.
[0064] Furthermore, in step (1), the wind-solar combined hydrogen production system includes a solar array panel, a wind turbine, a battery, a hydrogen production system, a fuel cell, a DC bus, a converter, and a power control system;
[0065] The solar array panels are connected to the DC bus through a DC / DC converter.
[0066] The wind turbine generator is connected to the DC bus through the AC / DC converter.
[0067] The battery unit is connected to the DC bus through a DC / DC converter, and the DC bus supplies power to the hydrogen production system through a DC / DC converter. The hydrogen production system provides hydrogen load on the one hand and fuel for the fuel cell on the other hand.
[0068] The fuel cell is connected to the DC bus through a DC / DC converter.
[0069] The DC bus feeds power into the grid through a DC / AC converter.
[0070] The power control system operates to achieve power allocation.
[0071] Furthermore, the mathematical model of the wind-solar combined hydrogen production system includes:
[0072] Wind turbines:
[0073]
[0074] Where: P m is the fan output power, ρ is the air density, v is the natural undisturbed wind speed, R is the blade radius, C p is the wind energy conversion coefficient, λ is the tip speed ratio, and β is the blade pitch angle.
[0075] Photovoltaic array:
[0076]
[0077] Where: I PV is the photovoltaic cell output current, I ph is the photocurrent, I o is the photodiode reverse saturation current, U PV is the photovoltaic cell output voltage, R s is the series resistance, A is the diode PN junction curve constant, k = 1.38 × 10 -23 J / K is the Boltzmann constant, q = 1.6 × 10 -19 C is the electron charge, T is the operating temperature of the photovoltaic cell;
[0078] Battery pack:
[0079]
[0080] Where: E b is the battery terminal voltage, E0 is the no-load electromotive force, K is the polarization voltage, C max is the battery capacity, Q b is the discharge capacity, U em is the voltage amplitude in the exponential region, τ b is the exponential region time constant, i bis the battery current, SOC0 represents the initial state of charge of the battery;
[0081] Hydrogen production system:
[0082]
[0083] Where: U ohm is the ohmic voltage of the hydrogen production system, U act is the polarization voltage of the hydrogen production system, I el is the inductor current of the hydrogen production system, T el is the temperature of the hydrogen production system, r1 and r2 are the ohmic parameters of the electrolyte, a1, a2, a3, h1, h2, h3 are the electrode overvoltage parameters, A el is the electrode area;
[0084] Fuel Cell:
[0085] U fc =E Nernest -U act -U con -U ohm (7)
[0086] Where: U act is the fuel cell output voltage, E Nernest is the thermodynamic electromotive force, U act is the activation polarization overvoltage, U con is the concentration polarization overvoltage, U ohm is the ohmic polarization overvoltage.
[0087] Furthermore, in step (2), the power control system determines the system operation state, determines whether the system operation state is in power shortage or power surplus, and determines the power purchase / sale and power supply / storage plan executed by the system according to the real-time segmented electricity price. The plan is as follows: Figure 2 As shown, the details are as follows:
[0088] Model 1: If the system is in a power shortage state and the current period is the off-peak electricity price, the system will first purchase electricity from the grid to make up for the system power shortage and charge the battery unit to the upper limit;
[0089] Model 2: If the system is in a power shortage state and the current period is the peak electricity price, the system will first use the battery unit and fuel cell unit to make up for the power shortage. If the capacity of the battery unit and fuel cell unit is insufficient to meet the system power shortage, then purchase electricity from the grid;
[0090] Model 3: If the system is in a state of excess power and the current period is the off-peak electricity price, the overflow power will be supplied to the hydrogen production unit and battery charging first. If the hydrogen production unit and battery unit cannot absorb the excess power, the power will be sold to the grid.
[0091] Model 4: If the system is in a state of excess power and the current period is at peak electricity price, the overflow power will be sold to the grid according to the dispatch plan. If the overflow power exceeds the interconnection line exchange power limit, the excess power will be supplied to the hydrogen production unit for hydrogen production and battery charging. If there is still excess power, it will be abandoned.
[0092] In the picture: P pv is the photovoltaic output, P wind is the fan output, P load is the system load, P s is the system remaining power, SOC is the battery charge state, SOC min SOC is the lower limit of the battery's allowable state of charge. max SOC is the upper limit of the battery state of charge allowed by the battery. fc is the state of charge of the fuel cell, P el is the input power of the hydrogen production system, P elN is the rated input power of the hydrogen production system, P bat is the input / output power of the battery pack, P batN is the rated input / output power of the battery pack, P netmax The maximum exchange power allowed for the system tie line.
[0093] Furthermore, in step (3), based on the established system mathematical model and the established system operation plan, the system economic benefits, load shortage rate and operation stability are taken as the optimization objectives, and the specific calculation method is as follows:
[0094] The system economic benefit optimization target f1 is:
[0095] f1=w sell -w buy -w install -w hold (8)
[0096] Where: n is the expected operating life of the system, w sell is the revenue from electricity and hydrogen sales of the system, w buy is the system electricity purchase cost, w install is the system construction cost, w hold It is the remaining value of the equipment after the system has operated for the expected number of years.
[0097]
[0098] Where: w(n) = w0 + w m (n)+w a (n),w0 system initial construction cost,w m (n) is the equipment maintenance cost of the system in the nth year, wa (n) is the equipment renewal cost of the system in the nth year, and α is the annual discount rate of the system;
[0099] The system load shortage rate optimization target f2 is:
[0100]
[0101] Where: P load , P wind , P pv , P bat , P el and P fc They are load dispatching demand, wind turbine output, photovoltaic output, battery output, hydrogen production system output and fuel cell output respectively;
[0102] The system operation stability optimization target f3 is:
[0103]
[0104] Where: P net (t) is the actual grid-connected power of the system at time t, The mean exchange power of the system grid-connected tie line;
[0105] In summary, the objective function minF=f1+f2+f3.
[0106] Furthermore, in step (3), the zebra algorithm is used to calculate the fitness value of each optimization objective under the price constraint, so as to obtain the optimal capacity configuration scheme of the system. The specific solution steps are as follows: Figure 3 As shown, the details are as follows:
[0107] 1): Establish and initialize the zebra population to form an initial population; generate a set of randomly distributed zebra position matrices as follows:
[0108]
[0109] Where X is the zebra population; X i is the i-th zebra; x ij is the j-th dimensional position of the i-th zebra; N is the total number of zebras in the zebra population; m is the dimension of the problem to be solved;
[0110] 2) Bring the randomly generated zebra positions into the objective function for evaluation. Each zebra represents a set of optimal solutions, i.e., the optimal capacity configuration;
[0111] 3) Update the population members; in the zebra algorithm, the best member in the population is considered to be the pioneer zebra, which leads other members to its search space in the population, that is, to find the most suitable P load , P wind, P pv , P bat , P el and P fc ; Therefore, the formula for updating the zebra's position during the foraging phase is as follows:
[0112]
[0113] In the formula, is the new position of the i-th zebra in the foraging phase, is its j-th dimension value; is the objective function value; PZ is the pioneer zebra, PZ j is the j-th dimension value; r is a random number uniformly distributed between [0,1]; I = round(1+rand), where rand is a random number uniformly distributed between [0,1];
[0114] 4) Update the position of the zebra population members in the search space; when updating the position of the zebra, if the objective function value of the new position is smaller, then the zebra will accept the new position; therefore, the formula for updating the position of the zebra in the search space is as follows:
[0115]
[0116] In the formula, is the new position of the i-th zebra in the search space, is its j-th dimension value; is the objective function value; t is the current number of iterations; T is the maximum number of iterations of the algorithm; R is a constant equal to 0.01; P s is a random number uniformly distributed between [0,1]; AZ is the state of the attacked zebra, AZ j is its j-th dimension value;
[0117] 5) Determine whether the termination condition is met. If the termination condition is not met, return to step 3); if the constraint condition is met, go to step 6);
[0118] 6) Output the lowest objective function value, that is, the optimal P load , P wind , P pv , P bat , P el and P fc ;
[0119] Furthermore, the algorithm is improved in 4) by introducing a chaotic reverse learning strategy to improve the zebra position;
[0120] Adaptively reduce it in the early stage of algorithm iteration, so as to better search for zebra positions and improve the speed of finding the optimal position;
[0121] The improved formula is as follows:
[0122] ω=tanh(2(1-t / T))
[0123]
[0124] In the formula, ω is the weight coefficient, tanh is the activation function, This is the new position of the improved zebra.
[0125] The present invention proposes a virtual power plant optimization method under the coordination of source, grid, load and storage. Based on the operation mode of the traditional grid-connected new energy hydrogen production system, the virtual power plant takes the real-time peak and valley electricity prices into consideration and uses the improved zebra algorithm to calculate the capacity configuration model to obtain the optimal capacity configuration plan of the system. This can not only ensure the economical and efficient hydrogen production of the system, but also take into account the stability of grid-connected operation and the reliability of power supply.
[0126] Implementation scenario: The present invention provides an intelligent and precise virtual power plant power generation, energy storage and load control solution, which is mainly used in the integrated load side of power plants. In the actual working scenario of the integrated load side of power plants, this technology realizes real-time monitoring of the coordinated operation of source, grid, load and storage by integrating the integrated system of new energy power generation, energy storage and load control, and keenly captures the trend of load changes. Relying on precise data analysis and advanced mathematical modeling, this technology provides the operation team of the virtual power plant with real-time and accurate load shortage data, enabling them to significantly improve the economic benefits of the power plant while ensuring system stability and reliability.
[0127] Implementation case: The application of the present invention is not limited to the integrated load side of the power plant, and its flexibility enables it to adapt to a variety of application scenarios. For example, in the city-level wind and solar combined hydrogen production virtual power plant, efficient use of energy is the key to the city's economic benefits and sustainable development. By deploying this technology, key parameters such as power generation, energy storage and load shortage can be monitored in real time, and dynamic regulation can be achieved by in-depth analysis of the changing trends of these parameters and real-time electricity prices. In the face of system power shortage, the system will make intelligent decisions based on real-time electricity prices: during low electricity price periods, it will give priority to purchasing electricity from the power grid and charging the energy storage unit; during peak hours, it will use energy storage and fuel cell units to supplement power, and if necessary, supplement electricity from the power grid. On the contrary, when there is excess power, the system will intelligently choose whether to supply power to the hydrogen production unit, sell electricity to the power grid, or convert excess power into hydrogen energy storage based on the electricity price and the charging status of the energy storage unit. In addition, the application potential of this technology is also applicable to other cities with rich wind and solar energy resources. It not only plays an important role in electricity market transactions, but also provides strong technical support and security in the ancillary service market, bringing revolutionary changes to urban energy management.
Claims
1. A method for optimizing a virtual power plant under the coordination of source, grid, load and storage, characterized in that: The optimization steps are as follows: Step (1): Collect the real-time wind speed, light, temperature and load data of the region, establish the mathematical model of the wind-solar combined hydrogen production system, and realize the flow power calculation of the virtual power plant; Step (2): judging the system operation status, determining whether the system operation status is in a power shortage or power surplus, and determining the power purchase / sale and power supply / storage plan executed by the system according to the real-time segmented electricity price; Step (3): Taking the system economic benefits, load shortage rate and operation stability as the optimization objectives, the zebra algorithm is used to calculate the fitness value of each optimization objective under the proposed control method taking into account the peak and valley electricity prices, so as to obtain the optimal capacity configuration plan of the system.
2. The optimization method of a virtual power plant under source-grid-load-storage coordination according to claim 1 is characterized in that: In step (1), the established wind-solar combined hydrogen production system includes a solar array panel, a wind turbine, a battery, a hydrogen production system, a fuel cell, a DC bus, a converter and a power control system; The solar array panels are connected to the DC bus through a DC / DC converter. The wind turbine generator is connected to the DC bus through the AC / DC converter. The battery unit is connected to the DC bus through a DC / DC converter, and the DC bus supplies power to the hydrogen production system through a DC / DC converter. The hydrogen production system provides hydrogen load on the one hand and fuel for the fuel cell on the other hand. The fuel cell is connected to the DC bus through a DC / DC converter. The DC bus feeds power into the grid through a DC / AC converter. The power control system operates to achieve power allocation.
3. The optimization method of a virtual power plant under source-grid-load-storage coordination according to claim 1 is characterized in that: In step (2), the power control system determines the system operation status, determines whether the system operation status is in power shortage or power surplus, and determines the power purchase / sale and power supply / storage scheme executed by the system according to the real-time segmented electricity price, specifically: Model 1: If the system is in a power shortage state and the current period is the off-peak electricity price, the system will first purchase electricity from the grid to make up for the system power shortage and charge the battery unit to the upper limit; Model 2: If the system is in a power shortage state and the current period is the peak electricity price, the system will first use the battery unit and fuel cell unit to make up for the power shortage. If the capacity of the battery unit and fuel cell unit is insufficient to meet the system power shortage, then purchase electricity from the grid; Model 3: If the system is in a state of excess power and the current period is the off-peak electricity price, the overflow power will be supplied to the hydrogen production unit and battery charging first. If the hydrogen production unit and battery unit cannot absorb the excess power, the power will be sold to the grid. Model 4: If the system is in a state of excess power and the current period is at peak electricity price, the overflow power will be sold to the grid according to the dispatch plan. If the overflow power exceeds the interconnection line exchange power limit, the excess power will be supplied to the hydrogen production unit for hydrogen production and battery charging. If there is still excess power, it will be abandoned.
4. The optimization method of a virtual power plant under source-grid-load-storage coordination according to claim 1 is characterized in that: In step (3), the process of taking system economic benefits, load shortage rate and operation stability as optimization targets is specifically as follows: The system economic benefit optimization target f1 is: f1=w sell -w buy -w install -w hold Where: w sell is the revenue from electricity and hydrogen sales of the system, w buy is the system electricity purchase cost, w install is the system construction cost, w hold The remaining value of the equipment after the system has run for the expected number of years; Where: n is the expected operating life of the system, w(n) = w0 + w m (n)+w a (n), w0 system initial construction cost, w m (n) is the equipment maintenance cost of the system in the nth year, w a (n) is the equipment renewal cost of the system in the nth year, and α is the annual discount rate of the system; The system load shortage rate optimization target f2 is: Where: P load , P wind , P pv , P bat , P el and P fc They are load dispatching demand, wind turbine output, photovoltaic output, battery output, hydrogen production system output and fuel cell output respectively; The system operation stability optimization target f3 is: Where: P net (t) is the actual grid-connected power of the system at time t, is the average power of the system grid-connected tie line; In summary, the objective function minF=f1+f2+f3.
5. The optimization method of a virtual power plant under the coordination of source, grid, load and storage according to claim 1 is characterized in that: In step (3), the zebra algorithm is used to calculate the fitness value of each optimization target under the price constraint, and the solution steps for obtaining the optimal capacity configuration solution of the system are as follows: Step (3.1): Establish and initialize a zebra population to form an initial population; Step (3.2): Substitute the randomly generated zebra positions into the objective function for evaluation; where each zebra represents a set of optimal solutions, i.e., the optimal capacity configuration; Step (3.3): Update population members; Step (3.4): Update the positions of zebra population members in the search space; Step (3.5): Determine whether the termination condition is met; Step (3.6): Output the lowest objective function value, that is, the optimal P load , P wind , P pv , P bat , P el and P fc .
6. The optimization method of a virtual power plant under source-grid-load-storage coordination according to claim 5 is characterized in that: In step (3.1), a set of randomly distributed zebra position matrices is generated as follows: Where X is the zebra population; X i is the i-th zebra; x ij is the j-th dimensional position of the i-th zebra; N is the total number of zebras in the zebra population; m is the dimension of the problem to be solved.
7. The optimization method of a virtual power plant under the coordination of source, grid, load and storage according to claim 5 is characterized in that: In step (3.3), updating the population members is specifically: In the zebra algorithm, the best member of the population is considered to be the pioneer zebra, which leads other members to its search space in the population, that is, to find the most suitable P load , P wind , P pv , P bat , P el and P fc ; Therefore, the formula for updating the zebra's position during the foraging phase is as follows: In the formula, is the new position of the i-th zebra in the foraging phase, is its j-th dimension value; is the objective function value; PZ is the pioneer zebra, PZ j is its j-th dimension value; r is a random number uniformly distributed between [0,1]; I = round(1+rand), where rand is a random number uniformly distributed between [0,1].
8. The optimization method of a virtual power plant under the coordination of source, grid, load and storage according to claim 5 is characterized in that: The step (3.4) specifically comprises: When updating the position of the zebra, if the objective function value of the new position is smaller, the zebra accepts the new position; therefore, the formula for updating the position of the zebra in the search space is as follows: In the formula, is the new position of the i-th zebra in the search space, is its j-th dimension value; is the objective function value; t is the current number of iterations; T is the maximum number of iterations of the algorithm; R is a constant equal to 0.01; P s is a random number uniformly distributed between [0,1]; AZ is the state of the attacked zebra, AZ j is its j-th dimension value.
9. The optimization method of a virtual power plant under source-grid-load-storage coordination according to claim 5 is characterized in that: In step (3.5), determine whether the termination condition is met; if the termination condition is not met, return to step (3.3); if the constraint condition is met, go to step (3.6).
10. The optimization method of a virtual power plant under the coordination of source, grid, load and storage according to claim 5, characterized in that: The improved part of the algorithm is to improve (3.4), introduce the chaotic reverse learning strategy to improve the zebra position; adaptively reduce the early stage of algorithm iteration, so as to search the zebra position and improve the speed of finding the optimal position; the improved formula is as follows: ω=tanh(2(1-t / T)) In the formula, ω is the weight coefficient, tanh is the activation function, This is the new position of the improved zebra.
Citation Information
Patent Citations
Multi-region comprehensive energy system cooperative dispatching method based on energy consumption comfort
CN110535128A
Optimal configuration method for microgrid
CN110571868A
Capacity optimization configuration method for grid-connected optical storage micro-grid battery energy storage system
CN115706416A
Economic dispatching method for grid-connected combined cooling heating and power micro-grid system based on load demand response and double-layer adjustable robust optimization
CN115860413A
Multi-objective optimization scheduling method for active power distribution network containing distributed energy storage
CN116388288A
Cited By
Source network load storage scheduling method based on big data analysis
CN120710007A
Virtual power plant optimization control system based on source network load storage cooperation
CN121308079A