Method and device for receiving and sending information
By transmitting scheduling information in the 5G communication system, dynamically determining the frequency domain resources for downlink or uplink transmission, the problem of low utilization efficiency of frequency domain resources is solved, and the full utilization of resources and data transmission performance is achieved.
Patent Information
- Application Number
- CN202310524602.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-10
- Publication Date
- 2024-11-12
AI Technical Summary
In 5G communication systems, it is difficult to effectively determine and utilize frequency domain resources, resulting in inconsistent understanding of resource allocation by user equipment and base stations, affecting data transmission performance.
By transmitting the first and second information between the user equipment and the base station, dynamically schedule or semi-statically schedule the frequency domain resources, the frequency domain resources for downlink transmission or uplink transmission are determined to ensure effective utilization of resources.
Improve the consistency of user equipment and base stations in understanding resources, make full use of frequency domain resources, and improve data transmission performance.
Smart Images

Figure CN118945841A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of wireless communication technology, and more specifically, to a method and device for receiving and sending data and control information. Background Art
[0002] In order to meet the increased demand for wireless data communication services since the deployment of 4G communication systems, efforts have been made to develop improved 5G or quasi-5G communication systems. Therefore, 5G or quasi-5G communication systems are also referred to as "super 4G networks" or "post-LTE systems."
[0003] 5G communication systems are implemented in higher frequency (millimeter wave, mmWave) bands, such as the 60 GHz band, to achieve higher data rates. In order to reduce the propagation loss of radio waves and increase the transmission distance, beamforming, massive multiple-input multiple-output (MIMO), full-dimensional MIMO (FD-MIMO), array antennas, analog beamforming, and massive antenna technology are discussed in 5G communication systems.
[0004] In addition, in the 5G communication system, development of system network improvements is underway based on advanced small cells, cloud radio access networks (RAN), ultra-dense networks, device-to-device (D2D) communication, wireless backhaul, mobile networks, collaborative communications, coordinated multi-point (CoMP), receiving-end interference cancellation, etc.
[0005] In the 5G system, hybrid FSK and QAM modulation (FQAM) and sliding window superposition coding (SWSC) as advanced coding modulation (ACM), filter bank multi-carrier (FBMC), non-orthogonal multiple access (NOMA) and sparse code multiple access (SCMA), and smart metasurface (RIS, Reconfigurable Intelligent Surface) as advanced access technologies have been developed. Summary of the invention
[0006] According to one aspect of the present disclosure, a method performed by a user equipment (UE) in a wireless communication network is proposed, the method comprising: receiving first information, the first information being used to schedule first frequency domain resources including multiple second frequency domain resources; upon receiving second information, determining, based on the first information and the second information, from the multiple second frequency domain resources, second frequency domain resources for downlink transmission or uplink transmission scheduled by the first information, the second information comprising indication information for indicating that each of the multiple second frequency domain resources is a downlink frequency domain resource or an uplink frequency domain resource; and performing downlink transmission or uplink transmission on the determined second frequency domain resources.
[0007] In one example, when the first information schedules downlink transmission, the downlink frequency domain resources among the multiple second frequency domain resources indicated by the second information are used for the downlink transmission; or when the first information schedules uplink transmission, the uplink frequency domain resources among the multiple second frequency domain resources indicated by the second information are used for the uplink transmission.
[0008] In one example, when the first information schedules downlink transmission and the proportion of the downlink frequency domain resources indicated by the second information among the multiple second frequency domain resources is greater than or equal to a first threshold, the downlink frequency domain resources among the multiple second frequency domain resources indicated by the second information are used for the downlink transmission; or when the first information schedules uplink transmission and the proportion of the uplink frequency domain resources indicated by the second information among the multiple second frequency domain resources is greater than or equal to a second threshold, the uplink frequency domain resources among the multiple second frequency domain resources indicated by the second information are used for the uplink transmission.
[0009] In one example, when the first information schedules downlink transmission and the proportion of downlink frequency domain resources indicated by the second information in the multiple second frequency domain resources is less than a first threshold, the downlink transmission is not performed; or when the first information schedules uplink transmission and the proportion of uplink frequency domain resources indicated by the second information in the multiple second frequency domain resources is less than a second threshold, the uplink transmission is not performed.
[0010] In one example, the method further includes: in a case where the second information is not received, performing downlink transmission or uplink transmission on the multiple second frequency domain resources scheduled by the first information.
[0011] In one example, the method further includes: upon receiving the second information, performing downlink transmission or uplink transmission on the multiple second frequency domain resources scheduled by the first information.
[0012] In one example, the first information is scheduled via dynamic scheduling, semi-persistent scheduling, or configuration grant (CG); and / or the second information is dynamic information or semi-static information.
[0013] In one example, the first frequency domain resource is a resource block group (RBG), and the multiple second frequency domain resources include physical resource blocks (PRBs) or resource blocks (RBs).
[0014] According to one aspect of the present disclosure, a method executed by a user equipment UE in a wireless communication network is proposed, the method comprising: receiving a first message, the first message comprising first information and second information, the first information being used to schedule first frequency domain resources comprising multiple second frequency domain resources, the second information comprising indication information for indicating that each of the multiple second frequency domain resources is a downlink frequency domain resource or an uplink frequency domain resource; based on the first information and the second information, determining, from the multiple second frequency domain resources, a second frequency domain resource for downlink transmission or uplink transmission scheduled by the first information; and performing downlink transmission or uplink transmission on the determined second frequency domain resources.
[0015] In one example, the first message is received via downlink control information (DCI).
[0016] According to one aspect of the present disclosure, a method executed by a base station in a wireless communication network is proposed, the method comprising: sending first information, the first information being used to schedule first frequency domain resources including multiple second frequency domain resources; performing downlink transmission or uplink transmission on at least one second frequency domain resource among the multiple second frequency domain resources, wherein, when the second information is sent, the at least one second frequency domain resource is determined based on the first information and the second information, and the second information comprises indication information for indicating that each second frequency domain resource among the multiple second frequency domain resources is a downlink frequency domain resource or an uplink frequency domain resource.
[0017] In one example, the first information is scheduled via dynamic scheduling, semi-persistent scheduling, or configuration grant (CG); and / or the second information is dynamic information or semi-static information.
[0018] In one example, the first frequency domain resource is a resource block group (RBG), and the multiple second frequency domain resources include physical resource blocks (PRBs) or resource blocks (RBs).
[0019] According to one aspect of the present disclosure, a method executed by a base station in a wireless communication network is proposed, the method comprising: sending a first message, the first message comprising first information and second information, the first information being used to schedule first frequency domain resources comprising multiple second frequency domain resources, the second information comprising indication information for indicating that each of the multiple second frequency domain resources is a downlink frequency domain resource or an uplink frequency domain resource; performing downlink transmission or uplink transmission on at least one second frequency domain resource among the multiple second frequency domain resources, wherein the at least one second frequency domain resource is determined based on the first information and the second information.
[0020] In one example, the first message is sent via downlink control information (DCI).
[0021] According to one aspect of the present disclosure, a user equipment in a wireless communication network is provided, including a transceiver and a controller coupled to the transceiver, wherein the controller is configured to execute the method disclosed in the present application that can be executed by the user equipment.
[0022] According to one aspect of the present disclosure, a base station in a wireless communication network is provided, including a transceiver and a controller coupled to the transceiver, wherein the controller is configured to execute the method disclosed in the present application that can be executed by the base station.
[0023] Advantageous Effects of the Invention
[0024] By using the method and device proposed in the present application, it can be better ensured that the user equipment (UE) and the base station have the same understanding of the allocated resources, and the resources can be fully utilized as much as possible under the premise of ensuring the same understanding of the allocated resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The above and additional aspects and advantages of the present application will become clearer and easier to understand through the following description in conjunction with the accompanying drawings, in which:
[0026] Figure 1 An example wireless network according to various embodiments of the present disclosure is shown;
[0027] Figure 2a and Figure 2b Example wireless transmit and receive paths according to the present disclosure are shown;
[0028] Figure 3a An example user device according to the present disclosure is shown;
[0029] Figure 3b An example base station according to the present disclosure is shown;
[0030] Figure 4 shows the allocation of uplink and downlink transmission resources;
[0031] Figure 5 A flowchart of a method 500 performed by a UE according to an embodiment of the present disclosure is shown;
[0032] Figure 6 An example of determining available frequency domain resources according to an embodiment of the present disclosure is shown;
[0033] Figure 7 Another example of determining available frequency domain resources according to an embodiment of the present disclosure is shown;
[0034] Figure 8 A flowchart of a method 800 performed by a base station according to an embodiment of the present disclosure is shown;
[0035] Fig. 9 and Fig.10 The block diagrams respectively show a user equipment UE 900 and a base station 1000 according to an embodiment of the present disclosure. DETAILED DESCRIPTION
[0036] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the accompanying drawings. It should be noted that in the accompanying drawings, identical or similar elements are represented by identical or similar reference numerals as much as possible. In addition, detailed descriptions of known functions or configurations that may make the subject matter of the present disclosure unclear will be omitted.
[0037] When describing the embodiments of the present disclosure, descriptions related to technical contents that are well known in the art and not directly related to the present disclosure will be omitted. Such omission of unnecessary descriptions is to prevent the main idea of the present disclosure from being obscured and to convey the main idea more clearly.
[0038] For the same reason, in the accompanying drawings, some elements may be enlarged, omitted or schematically shown. In addition, the size of each element does not fully reflect the actual size. In the accompanying drawings, the same or corresponding elements have the same reference numerals.
[0039] By referring to the embodiments described in detail below in conjunction with the accompanying drawings, the advantages and features of the present disclosure and the ways to achieve them will become clear. However, the present disclosure is not limited to the embodiments set forth below, but can be implemented in various different forms. The following embodiments are provided only to fully disclose the present disclosure and inform those skilled in the art of the scope of the present disclosure, and the present disclosure is limited only by the scope of the attached claims. Throughout the specification, the same or similar reference numerals represent the same or similar elements.
[0040] Figure 1 An example wireless communication network 100 is shown in accordance with various embodiments of the present disclosure. Figure 1 The embodiment of the wireless communication network 100 shown in FIG. 1 is for illustration only. Other embodiments of the wireless communication network 100 may be used without departing from the scope of the present disclosure.
[0041] The wireless communication network 100 includes gNodeB (gNB) 101, gNB 102, and gNB 103. gNB 101 communicates with gNB 102 and gNB 103. gNB 101 also communicates with at least one Internet Protocol (IP) network 130, such as the Internet, a private IP network, or other data network.
[0042] Depending on the type of network, other well-known terms such as “base station (BS)” or “access point (AP)” can be used instead of “gNodeB” or “gNB”. For convenience, the terms “gNodeB” and “gNB” are used in this disclosure to refer to network infrastructure components that provide wireless access to remote terminals. In addition, depending on the type of network, other well-known terms such as “mobile station”, “subscriber station”, “remote terminal”, “wireless terminal” or “user device” can be used instead of “user equipment” or “UE”. For convenience, the terms “user equipment” and “UE” are used in this disclosure to refer to a remote wireless device that wirelessly accesses a gNB, whether the UE is a mobile device (such as a mobile phone or a smart phone) or a commonly thought of fixed device (such as a desktop computer or a vending machine).
[0043] The gNB 102 provides wireless broadband access to a network 130 for a first plurality of user equipments (UEs) within a coverage area 120 of the gNB 102. The first plurality of UEs includes a UE 111 that may be located in a small business (SB), a UE 112 that may be located in an enterprise (E), a UE 113 that may be located in a WiFi hotspot (HS), a UE 114 that may be located in a first residence (R), a UE 115 that may be located in a second residence (R), and a UE 116 that may be a mobile device (M) such as a cellular phone, a wireless laptop, a wireless PDA, etc. The gNB 103 provides wireless broadband access to the network 130 for a second plurality of UEs within a coverage area 125 of the gNB 103. The second plurality of UEs includes UE 115 and UE 116. In some embodiments, one or more of the gNBs 101-103 may be capable of communicating with each other and with the UEs 111-116 using 5G, Long Term Evolution (LTE), LTE-A, WiMAX, or other advanced wireless communication technologies.
[0044] The dashed lines illustrate the approximate extents of coverage areas 120 and 125, which are shown as approximately circular for purposes of illustration and explanation only. It should be clearly understood that coverage areas associated with gNBs, such as coverage areas 120 and 125, can have other shapes, including irregular shapes, depending on the configuration of the gNB and variations in the radio environment associated with natural and man-made obstacles.
[0045] As described in more detail below, one or more of gNB 101, gNB 102, and gNB 103 include a 2D antenna array as described in embodiments of the present disclosure. In some embodiments, one or more of gNB 101, gNB 102, and gNB 103 support codebook design and structure for a system with a 2D antenna array.
[0046] although Figure 1 An example of a wireless communication network 100 is shown, but Figure 1 Various changes may be made. For example, the wireless communication network 100 can include any number of gNBs and any number of UEs in any suitable arrangement. Also, gNB 101 can communicate directly with any number of UEs and provide those UEs with wireless broadband access to network 130. Similarly, each gNB 102-103 can communicate directly with network 130 and provide UEs with direct wireless broadband access to network 130. In addition, gNB 101, gNB 102, and / or gNB 103 can provide access to other or additional external networks, such as an external telephone network or other type of data network.
[0047] Figure 2a and Figure 2b A transmit path 200 and a receive path 250 in a wireless communication network according to various embodiments of the present disclosure are shown, respectively. In the following description, the transmit path 200 can be described as being implemented in a gNB (such as gNB 102), and the receive path 250 can be described as being implemented in a UE (such as UE 116). However, it should be understood that the receive path 250 can be implemented in a gNB and the transmit path 200 can be implemented in a UE. In some embodiments, the receive path 250 is configured to support codebook design and structure for a system having a 2D antenna array as described in embodiments of the present disclosure.
[0048] The transmit path 200 includes a channel coding and modulation block 205, a serial to parallel (S to P) block 210, an N-point inverse fast Fourier transform (IFFT) block 215, a parallel to serial (P to S) block 220, an add cyclic prefix block 225, and an upconverter (UC) 230. The receive path 250 includes a downconverter (DC) 255, a remove cyclic prefix block 260, a serial to parallel (S to P) block 265, an N-point fast Fourier transform (FFT) block 270, a parallel to serial (P to S) block 275, and a channel decoding and demodulation block 280.
[0049] In the transmit path 200, the channel coding and modulation block 205 receives a set of information bits, applies coding (such as low-density parity check (LDPC) coding), and modulates the input bits (such as using quadrature phase shift keying (QPSK) or quadrature amplitude modulation (QAM)) to generate a sequence of frequency-domain modulation symbols. The serial-to-parallel (S-to-P) block 210 converts (such as demultiplexes) the serial modulation symbols into parallel data to generate N parallel symbol streams, where N is the number of IFFT / FFT points used in the gNB 102 and the UE 116. The N-point IFFT block 215 performs an IFFT operation on the N parallel symbol streams to generate a time-domain output signal. The parallel-to-serial block 220 converts (such as multiplexes) the parallel time-domain output symbols from the N-point IFFT block 215 to generate a serial time-domain signal. The add cyclic prefix block 225 inserts a cyclic prefix into the time-domain signal. The up-converter 230 modulates (such as up-converts) the output of the add cyclic prefix block 225 to an RF frequency for transmission via a wireless channel. The signal can also be filtered at baseband before conversion to RF frequency.
[0050] The RF signal transmitted from gNB 102 arrives at UE 116 after passing through a wireless channel, and an operation opposite to that at gNB 102 is performed at UE 116. Downconverter 255 downconverts the received signal to a baseband frequency, and remove cyclic prefix block 260 removes the cyclic prefix to generate a serial time-domain baseband signal. Serial-to-parallel block 265 converts the time-domain baseband signal into a parallel time-domain signal. N-point FFT block 270 performs an FFT algorithm to generate N parallel frequency-domain signals. Parallel-to-serial block 275 converts the parallel frequency-domain signals into a sequence of modulated data symbols. Channel decoding and demodulation block 280 demodulates and decodes the modulated symbols to recover the original input data stream.
[0051] Each of gNBs 101-103 may implement a transmit path 200 similar to that for transmitting in the downlink to UEs 111-116 and may implement a receive path 250 similar to that for receiving in the uplink from UEs 111-116. Similarly, each of UEs 111-116 may implement a transmit path 200 for transmitting in the uplink to gNBs 101-103 and may implement a receive path 250 for receiving in the downlink from gNBs 101-103.
[0052] Figure 2a and Figure 2b Each of the components in can be implemented using hardware only, or a combination of hardware and software / firmware. As a specific example, Figure 2a and Figure 2bAt least some of the components in can be implemented with software, while other components can be implemented by configurable hardware or a combination of software and configurable hardware. For example, FFT block 270 and IFFT block 215 can be implemented as a configurable software algorithm, in which the value of the number of points N can be modified according to the implementation.
[0053] In addition, although described as using FFT and IFFT, this is illustrative only and should not be construed as limiting the scope of the present disclosure. Other types of transforms can be used, such as discrete Fourier transform (DFT) and inverse discrete Fourier transform (IDFT) functions. It should be understood that for DFT and IDFT functions, the value of variable N can be any integer (such as 1, 2, 3, 4, etc.), while for FFT and IFFT functions, the value of variable N can be any integer as a power of 2 (such as 1, 2, 4, 8, 16, etc.).
[0054] although Figure 2a and Figure 2b An example of a wireless transmit and receive path is shown, but the Figure 2a and Figure 2b Make various changes. For example, Figure 2a and Figure 2b The various components in can be combined, further subdivided or omitted, and additional components can be added according to specific needs. Figure 2a and Figure 2b It is intended to illustrate examples of the types of transmit and receive paths that can be used in a wireless network. Any other suitable architecture can be used to support wireless communications in a wireless network.
[0055] Figure 3a An example UE 116 is shown in accordance with various embodiments of the present disclosure. Figure 3a The embodiment of UE 116 shown in FIG. 1 is for illustration only, and Figure 1 UEs 111-115 can have the same or similar configurations. However, UEs have a variety of configurations, and Figure 3a The scope of the present disclosure is not limited to any particular implementation of the UE.
[0056] UE 116 includes antenna 305, radio frequency (RF) transceiver 310, transmit (TX) processing circuit 315, microphone 320, and receive (RX) processing circuit 325. UE 116 also includes speaker 330, processor / controller 340, input / output (I / O) interface 345, input device(s) 350, display 355, and memory 360. Memory 360 includes operating system (OS) 361 and one or more applications 362.
[0057] The RF transceiver 310 receives incoming RF signals from the antenna 305 transmitted by the gNB of the wireless network 100. The RF transceiver 310 downconverts the incoming RF signals to generate an intermediate frequency (IF) or baseband signal. The IF or baseband signal is sent to the RX processing circuit 325, where the RX processing circuit 325 generates a processed baseband signal by filtering, decoding and / or digitizing the baseband or IF signal. The RX processing circuit 325 sends the processed baseband signal to the speaker 330 (such as for voice data) or to the processor / controller 340 (such as for web browsing data) for further processing.
[0058] The TX processing circuit 315 receives analog or digital voice data from the microphone 320, or receives other outgoing baseband data (such as network data, email, or interactive video game data) from the processor / controller 340. The TX processing circuit 315 encodes, multiplexes, and / or digitizes the outgoing baseband data to generate a processed baseband or IF signal. The RF transceiver 310 receives the outgoing processed baseband or IF signal from the TX processing circuit 315 and up-converts the baseband or IF signal to an RF signal that is transmitted via the antenna 305.
[0059] The processor / controller 340 can include one or more processors or other processing devices and execute an OS 361 stored in the memory 360 to control the overall operation of the UE 116. For example, the processor / controller 340 can control the reception of forward channel signals and the transmission of reverse channel signals through the RF transceiver 310, the RX processing circuit 325, and the TX processing circuit 315 according to well-known principles. In some embodiments, the processor / controller 340 includes at least one microprocessor or microcontroller.
[0060] The processor / controller 340 is also capable of executing other processes and programs resident in the memory 360, such as operations for channel quality measurement and reporting of a system having a 2D antenna array as described in the embodiments of the present disclosure. The processor / controller 340 is capable of moving data into or out of the memory 360 as required by the execution process. In some embodiments, the processor / controller 340 is configured to execute an application 362 based on the OS 361 or in response to a signal received from a gNB or operator. The processor / controller 340 is also coupled to an I / O interface 345, where the I / O interface 345 provides the UE 116 with the ability to connect to other devices such as laptops and handheld devices. The I / O interface 345 is the communication path between these accessories and the processor / controller 340.
[0061] Processor / controller 340 is also coupled to input device(s) 350 and display 355. An operator of UE 116 can input data into UE 116 using input device(s) 350. Display 355 can be a liquid crystal display or other display capable of presenting text and / or at least limited graphics (such as from a website). Memory 360 is coupled to processor / controller 340. A portion of memory 360 can include random access memory (RAM), while another portion of memory 360 can include flash memory or other read-only memory (ROM).
[0062] although Figure 3a An example of UE 116 is shown, but it is possible to Figure 3a Make various changes. For example, Figure 3a The various components in can be combined, further subdivided, or omitted, and additional components can be added as required. As a specific example, processor / controller 340 can be divided into multiple processors, such as one or more central processing units (CPUs) and one or more graphics processing units (GPUs). In addition, although Figure 3a The UE 116 is shown configured as a mobile phone or smart phone, but the UE can be configured to operate as other types of mobile or stationary devices.
[0063] Figure 3b An example gNB 102 is shown in accordance with various embodiments of the present disclosure. Figure 3b The embodiment of the gNB 102 shown in FIG. is for illustration only, and Figure 1 Other gNBs can have the same or similar configurations. However, gNBs have a variety of configurations, and Figure 3b The scope of the present disclosure is not limited to any particular implementation of the gNB. It should be noted that gNB 101 and gNB 103 can include the same or similar structure as gNB 102.
[0064] like Figure 3b As shown in FIG. 1 , gNB 102 includes multiple antennas 370a-370n, multiple RF transceivers 372a-372n, transmit (TX) processing circuitry 374, and receive (RX) processing circuitry 376. In some embodiments, one or more of the multiple antennas 370a-370n include a 2D antenna array. gNB 102 also includes a controller / processor 378, a memory 380, and a backhaul or network interface 382.
[0065] The RF transceivers 372a-372n receive incoming RF signals from the antennas 370a-370n, such as signals transmitted by a UE or other gNB. The RF transceivers 372a-372n downconvert the incoming RF signals to generate IF or baseband signals. The IF or baseband signals are sent to the RX processing circuitry 376, which generates processed baseband signals by filtering, decoding, and / or digitizing the baseband or IF signals. The RX processing circuitry 376 sends the processed baseband signals to the controller / processor 378 for further processing.
[0066] The TX processing circuit 374 receives analog or digital data (such as voice data, network data, email, or interactive video game data) from the controller / processor 378. The TX processing circuit 374 encodes, multiplexes, and / or digitizes the outgoing baseband data to generate a processed baseband or IF signal. The RF transceivers 372a-372n receive the outgoing processed baseband or IF signals from the TX processing circuit 374 and up-convert the baseband or IF signals to RF signals that are transmitted via the antennas 370a-370n.
[0067] The controller / processor 378 can include one or more processors or other processing devices that control the overall operation of the gNB 102. For example, the controller / processor 378 can control the reception of forward channel signals and the transmission of reverse channel signals through the RF transceivers 372a-372n, the RX processing circuitry 376, and the TX processing circuitry 374 in accordance with well-known principles. The controller / processor 378 can also support additional functionality, such as more advanced wireless communication functionality. For example, the controller / processor 378 can perform a Blind Interference Sensing (BIS) process, such as performed through a Blind Interference Sensing (BIS) algorithm, and decode a received signal with an interference signal subtracted. The controller / processor 378 can support any of a variety of other functions in the gNB 102. In some embodiments, the controller / processor 378 includes at least one microprocessor or microcontroller.
[0068] The controller / processor 378 can also execute programs and other processes resident in the memory 380, such as a basic OS. The controller / processor 378 can also support channel quality measurement and reporting for systems with 2D antenna arrays as described in embodiments of the present disclosure. In some embodiments, the controller / processor 378 supports communications between entities such as web RTC. The controller / processor 378 can move data into or out of the memory 380 as needed by the executing process.
[0069] The controller / processor 378 is also coupled to a backhaul or network interface 382. The backhaul or network interface 382 allows the gNB 102 to communicate with other devices or systems via a backhaul connection or via a network. The backhaul or network interface 382 can support communication via any suitable (multiple) wired or wireless connections. For example, when the gNB 102 is implemented as part of a cellular communication system (such as a cellular communication system supporting 5G or new radio access technology or NR, LTE or LTE-A), the backhaul or network interface 382 can allow the gNB 102 to communicate with other gNBs via a wired or wireless backhaul connection. When the gNB 102 is implemented as an access point, the backhaul or network interface 382 can allow the gNB 102 to communicate with a larger network (such as the Internet) via a wired or wireless local area network or via a wired or wireless connection. The backhaul or network interface 382 includes any suitable structure that supports communication via a wired or wireless connection, such as an Ethernet or RF transceiver.
[0070] The memory 380 is coupled to the controller / processor 378. A portion of the memory 380 can include RAM, while another portion of the memory 380 can include flash memory or other ROM. In some embodiments, a plurality of instructions such as a BIS algorithm are stored in the memory. The plurality of instructions are configured to cause the controller / processor 378 to perform the BIS process and decode the received signal after subtracting at least one interference signal determined by the BIS algorithm.
[0071] As described in more detail below, the transmit and receive paths of the gNB 102 (implemented using the RF transceivers 372a-372n, the TX processing circuitry 374, and / or the RX processing circuitry 376) support aggregated communications with FDD cells and TDD cells.
[0072] although Figure 3b An example of a gNB 102 is shown, but the Figure 3b For example, gNB 102 can include any number of Figure 3b . As a specific example, the access point can include multiple backhaul or network interfaces 382, and the controller / processor 378 can support routing functions to route data between different network addresses. As another specific example, although shown as including a single instance of TX processing circuitry 374 and a single instance of RX processing circuitry 376, the gNB 102 can include multiple instances of each (such as one for each RF transceiver).
[0073] Exemplary embodiments of the present disclosure are further described below in conjunction with the accompanying drawings.
[0074] The text and drawings are provided as examples only to help readers understand the present disclosure. They are not intended and should not be interpreted as limiting the scope of the present disclosure in any way. Although certain embodiments and examples have been provided, it is obvious to those skilled in the art based on what is disclosed herein that the embodiments and examples shown may be changed without departing from the scope of the present disclosure.
[0075] Communication systems are usually divided into time division duplex (TDD) and frequency division duplex (FDD) systems. In a TDD system, a base station can configure the uplink and downlink attributes of different time resources on a carrier through semi-static signaling and dynamic signaling, namely, uplink transmission time slots / symbols, downlink transmission time slots / symbols, and flexible time slots / symbols. In an FDD system, a base station can respectively configure different time resources of an uplink carrier in a pair of uplink and downlink carriers as uplink transmission time slots / symbols or flexible time slots / symbols, and different time resources of a downlink carrier as downlink transmission time slots / symbols or flexible time slots / symbols.
[0076] Semi-static signaling can be high-level signaling. Dynamic signaling can be group-common downlink control information (DCI) that does not schedule physical downlink shared channels (PDSCH) and physical uplink shared channels (PUSCH). Dynamic signaling can also be DCI that schedules physical downlink shared channels (PDSCH) and physical uplink shared channels (PUSCH).
[0077] Compared with the FDD system, the time delay of uplink or downlink transmission in the TDD system is relatively large because the uplink and downlink transmission are time-division multiplexed. For example, according to an uplink and downlink configuration, in a 10 millisecond (ms) cycle, only a 1ms time slot is for uplink transmission, and the other time slots are for downlink transmission or flexible transmission, and the maximum delay of uplink transmission is 10ms. In order to reduce the transmission delay, it can be considered to divide part of the frequency domain resources in a carrier into uplink transmission and the other part of the resources into downlink transmission. In order to reduce the mutual influence of uplink and downlink transmission in the same carrier, the uplink and downlink interference can be reduced by means of protection interval.
[0078] In a wireless communication system, frequency domain resources within a time period (for example, one or more time slots, for example, one or more symbols (such as OFDM symbols), etc.) can be configured as uplink frequency domain resources, and can also be configured as downlink frequency domain resources. If the frequency domain resources for downlink transmission (or uplink transmission) are scheduled, how to determine the frequency domain resources actually used for downlink transmission (or uplink transmission) needs to be enhanced. For example, when the frequency domain resources within a time period are configured with uplink frequency domain resources and downlink frequency domain resources, and there are frequency domain resources that cannot be used for downlink transmission (or uplink transmission) in the frequency domain resources scheduled for downlink transmission (or uplink transmission), it is impossible to determine the frequency domain resources actually used for downlink transmission (or uplink transmission). In a wireless communication system, in order to determine the frequency domain resources that can be used for downlink transmission (or uplink transmission) in the frequency domain resources scheduled for downlink transmission (or uplink transmission) and further improve the full utilization of resources, the present application proposes a method for determining the frequency domain resources actually used for downlink transmission (or uplink transmission). Through the method proposed in the present application, the data transmission performance can be guaranteed and the resources can be fully utilized as much as possible under the premise of ensuring the data transmission performance.
[0079] In this application, on the UE side, uplink transmission may also be referred to as uplink sending, and downlink transmission may also be referred to as downlink reception; on the base station side, uplink transmission may also be referred to as uplink reception, and downlink transmission may also be referred to as downlink sending, and the naming is not limited in this application.
[0080] In a TDD system, the base station may indicate that a time slot or symbol (such as an OFDM symbol) is an uplink symbol, a downlink symbol, or a flexible transmission symbol. The UE determines the uplink / downlink transmission direction of each symbol / time slot of a carrier / service cell according to the indication of the base station. Usually, the same symbol of a carrier / service cell only supports transmission in one direction, that is, uplink transmission or downlink transmission, so the base station only needs to indicate the uplink / downlink transmission direction in the time dimension. The base station can indicate periodically, for example, by indicating periodic time slot configuration (Slot Configuration) through high-level signaling, or by indicating the time slot format (Slot Format) within a period of time through dynamic signaling (for example, downlink control information DCI), or by scheduling to indicate whether the scheduled resources are suitable for uplink transmission or downlink reception. The uplink and downlink attributes of each frequency domain resource in each time slot / symbol are determined by the time slot configuration / time slot format, where the uplink and downlink attributes include: for uplink transmission, for downlink transmission, or flexible transmission. Flexible time slots / symbols may be used for uplink transmission or downlink transmission, but can only be used for transmission in one direction at a certain moment.
[0081] In an FDD system, for an uplink carrier / service cell, the base station may indicate an uplink or flexible transmission symbol / time slot, and for a downlink carrier / service cell, the base station may indicate a downlink or flexible transmission symbol / time slot. The cell-common UL / DL information may include information on uplink and downlink attributes in the time dimension. The cell-common UL / DL information may be used to indicate a period, which time slots / symbols within the period are uplink, downlink or flexible time slots / symbols, respectively, and the indicated uplink and downlink attributes apply to all frequency domain resources within each time slot / symbol of this cell, that is, all frequency domain resources within the bandwidth of this carrier / service cell have the same uplink and downlink attributes within a time slot / symbol.
[0082] In order to allocate uplink and downlink transmission resources more efficiently, the granularity of uplink and downlink transmission resources can be further reduced from one symbol / time slot to part of the frequency domain resources within one symbol / time slot through configuration information, that is, different frequency domain resources in one symbol of a carrier / service cell can be allocated different transmission directions. The configuration information includes cell-common UL / DL information and / or UE-specific UL / DL information. The cell-common UL / DL information may include information on uplink and downlink attributes in the time dimension and the frequency domain dimension. The cell-common UL / DL information can be used to indicate which frequency domain resources of which time slots / symbols are uplink, downlink or flexible transmission resources. Alternatively, the common UL / DL information can be used to indicate which frequency domain resources of which time slots / symbols are uplink, downlink or cannot be used as transmission resources. The base station can also configure user-specific UL / DL information, for example, configure user-specific UL / DL information for each service cell of the UE, or configure user-specific UL / DL information for each bandwidth part (BWP) of the UE. Based on the configured UL / DL information, the UE can determine that within a symbol or time slot, part of the frequency domain resources are uplink transmission resources and part of the frequency domain resources are downlink transmission resources, such as Figure 4 As shown, it is also possible to determine that within a symbol or time slot, all frequency domain resources are uplink transmission resources, or it is also possible to determine that within a symbol or time slot, all frequency domain resources are downlink transmission resources. The configuration information may be semi-static signaling, ie, high-layer signaling.
[0083] In addition, dynamic signaling can also be used to indicate which frequency domain resources of which time slots / symbols are uplink, downlink, and guard band. For example, group-common downlink control information is used to indicate that part of the frequency domain resources of each time slot / symbol are uplink, downlink, and guard band. Alternatively, the DCI for dynamically scheduling PDSCH or PUSCH indicates that part of the frequency domain resources are uplink and downlink. For example, the frequency domain resources scheduled by the DCI for scheduling PDSCH are downlink resources, and the frequency domain resources scheduled by the DCI for scheduling PUSCH are uplink resources.
[0084] The frequency domain resources scheduled by the DCI for scheduling PDSCH or PUSCH can be determined by indicating the resource block group (RBG) by a bitmap, that is, the frequency domain resources of a BWP are divided into at least one RBG, and then 1 bit of information is used to indicate whether the RBG corresponding to the bit is scheduled. For example, when the bit is "0", the frequency domain resources in the RBG corresponding to the bit are not scheduled, and when the bit is "1", the frequency domain resources in the RBG corresponding to the bit are scheduled. The nominal RBG size of the BWP is P, and the size of the first and last RBGs in a BWP may be less than or equal to P, and the size of the RBGs other than the first and last RBGs in the BWP is equal to P. For example, a BWP contains 46 resource blocks (RBs) (or physical resource blocks (PRBs)), the nominal RBG size of the RBG is 4, and the BWP contains 12 RBGs, of which the size of the first RBG is 3, the size of the 12th RBG is 3, and the size of the remaining RBGs is 4. The 12 bits in the DCI are used to indicate frequency domain resource scheduling, which is called the frequency domain resource allocation (FDRA) field. The first bit in the frequency domain resource allocation field indicates the scheduling of the first RBG, the second bit in the frequency domain resource allocation field indicates the scheduling of the second RBG, and so on. The twelfth bit in the frequency domain resource allocation field indicates the scheduling of the twelfth RBG.
[0085] Figure 5 An exemplary flow chart of a method 500 for receiving a PDSCH and sending a PUSCH according to an embodiment of the present invention is shown. The method 500 is implemented at the UE side.
[0086] like Figure 5 As shown, in step S510, the UE determines the frequency domain resources used for receiving PDSCH or sending PUSCH based on the uplink and downlink frequency domain resource information used to indicate the uplink and downlink frequency domain resources (for example, the configuration / indication information used to indicate the uplink and downlink properties of part of the frequency domain resources within a symbol / time slot) and the information for scheduling PDSCH or PUSCH (for example, the DCI for scheduling PDSCH or PUSCH as described above).
[0087] In step S520, PDSCH is received or PUSCH is sent on the determined PDSCH reception frequency domain resources or PUSCH transmission frequency domain resources.
[0088] Specifically, in step S510, the uplink and downlink frequency domain resource information can be obtained by receiving semi-static signaling, and the semi-static information can be high-level signaling or media access layer signaling. The uplink and downlink frequency domain resource information can be obtained by receiving dynamic signaling, and the dynamic signaling can be group-common downlink control information (DCI) that does not schedule the physical downlink shared channel (PDSCH) and the physical uplink shared channel (PUSCH). The dynamic signaling can also be the DCI that schedules the physical downlink shared channel (PDSCH) or the physical uplink shared channel (PUSCH).
[0089] The following describes the methods for determining PDSCH resources when PDSCH is dynamically scheduled, semi-persistently scheduled (SPS) and configured grant (CG), respectively. Figure 6 and Figure 7 As shown. The following is an example of a method for determining PDSCH resources. It should be understood that the method described here can also be used for PUSCH, for example, by replacing the description of PDSCH with the description of PUSCH. In the present application, the description of various information and resources is not limited by their names. For example, the "scheduling information of PDSCH resources" described below and / or the "scheduling information of PUSCH resources" that can be obtained by replacing the description of PDSCH with the description of PUSCH, the information used to schedule frequency domain resources, for example, the scheduling information of PDSCH resources and the scheduling information of PUSCH resources, can both be referred to as "first information"; "uplink and downlink frequency domain resource information" can also be referred to as "second information"; "PDSCH resources" and / or the "PUSCH resources" that can be obtained by replacing the description of PDSCH with the description of PUSCH, "PDSCH resources" and "PUSCH resources" and other frequency domain resources can all be referred to as "first frequency domain resources"; "uplink and downlink frequency domain resources" can be referred to as "second frequency domain resources".
[0090] Embodiment 1:
[0091] Embodiment 1 describes a method for allocating PDSCH resources when PDSCH is dynamically scheduled.
[0092] Method 1:
[0093] The frequency domain resource for receiving the PDSCH is determined according to the uplink and downlink frequency domain resource information and the scheduling information of the PDSCH resource. Specifically, at least one of the following methods is included:
[0094] 1. When the uplink and downlink frequency domain resource information is obtained through semi-static information (for example, RRC message), the frequency domain resources that can be used for downlink transmission in the frequency domain resources of the scheduled PDSCH are determined based on the uplink and downlink frequency domain resource information, and the PDSCH is received on the determined frequency domain resources. Specifically:
[0095] If it is determined based on the uplink and downlink frequency domain resource information that part of the frequency domain resources of the scheduled PDSCH are downlink frequency domain resources, and part are uplink resources or protection frequency band resources or frequency domain resources that cannot be used for downlink reception, the UE only receives PDSCH on the downlink frequency domain resources in the frequency domain resources of the scheduled PDSCH, and the UE does not receive PDSCH on the uplink frequency domain resources or protection frequency band resources or frequency domain resources that cannot be used for downlink reception in the frequency domain resources of the scheduled PDSCH.
[0096] For example, a BWP contains 46 RBs, the nominal RBG size of an RBG is 4, and a BWP contains 12 RBGs, of which the size of the first RBG is 3, the size of the 12th RBG is 3, and the size of the remaining RBGs is 4. The 12 bits in the DCI are used to indicate frequency domain resource scheduling, which is called the frequency domain resource allocation (FDRA) field. The first bit in the frequency domain resource allocation field indicates the scheduling of the first RBG, the second bit in the frequency domain resource allocation field indicates the scheduling of the second RBG, and so on. The twelfth bit in the frequency domain resource allocation field indicates the scheduling of the twelfth RBG. The value of the 12 bits in a DCI that schedules a PDSCH is "001111000000", that is, the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG are scheduled, and the remaining 8 RBGs are not scheduled. It is determined through high-level signaling that the first to tenth PRBs among 46 PRBs (for example, uplink and downlink frequency domain resources) are located in the uplink frequency domain resources, and the eleventh to forty-sixth PRBs among the 46 PRBs are located in the downlink frequency domain resources. In this way, in the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG in the frequency domain resources of the scheduled PDSCH, the first PRB, the second PRB, and the third PRB in the third RBG are located in the uplink frequency domain resources, and the fourth PRB in the third RBG is located in the downlink frequency domain resources. The fourth RBG, the fifth RBG, and the sixth RBG of the scheduled PDSCH are located in the downlink frequency domain resources. At this time, the UE receives the PDSCH on the downlink frequency domain resources in the frequency domain resources of the scheduled PDSCH, that is, the fourth PRB in the third RBG and the fourth RBG, the fifth RBG, and the sixth RBG, and does not receive the PDSCH on the first PRB, the second PRB, and the third PRB in the third RBG in the uplink frequency domain resources in the frequency domain resources of the scheduled PDSCH.
[0097] If it is determined based on the uplink and downlink frequency domain resource information that all the frequency domain resources of the scheduled PDSCH are downlink frequency domain resources, the UE receives the PDSCH on all the frequency domain resources of the scheduled PDSCH.
[0098] For example, a BWP contains 46 RBs, the nominal RBG size of an RBG is 4, and a BWP contains 12 RBGs, of which the size of the first RBG is 3, the size of the 12th RBG is 3, and the size of the remaining RBGs is 4. The 12 bits in the DCI are used to indicate frequency domain resource scheduling, which is called the frequency domain resource allocation (FDRA) field. The first bit in the frequency domain resource allocation field indicates the scheduling of the first RBG, the second bit in the frequency domain resource allocation field indicates the scheduling of the second RBG, and so on. The twelfth bit in the frequency domain resource allocation field indicates the scheduling of the twelfth RBG. The value of the 12 bits in a DCI that schedules a PDSCH is "001111000000", that is, the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG are scheduled, and the remaining 8 RBGs are not scheduled. Through high-level signaling, it is determined that the first to forty-sixth PRBs of the 46 PRBs (for example, uplink and downlink frequency domain resources) are all located in the downlink frequency domain resources. At this time, the UE receives PDSCH on all frequency domain resources in the frequency domain resources of the scheduled PDSCH, that is, the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG.
[0099] By adopting this method, the base station and the UE can fully utilize the available frequency domain resources without causing different understandings of the available resources between the base station and the UE.
[0100] 2. When the uplink and downlink frequency domain resource information is obtained through dynamic information, the frequency domain resources that can be used for downlink transmission in the frequency domain resources of the scheduled PDSCH are determined based on the uplink and downlink frequency domain resource information, and the PDSCH is received on the determined frequency domain resources. Specifically:
[0101] If it is determined based on the uplink and downlink frequency domain resource information that part of the frequency domain resources of the scheduled PDSCH are downlink frequency domain resources, and part are uplink resources or protection frequency band resources or frequency domain resources that cannot be used for downlink reception, the UE only receives PDSCH on the downlink frequency domain resources in the frequency domain resources of the scheduled PDSCH, and the UE does not receive PDSCH on the uplink frequency domain resources or protection frequency band resources or frequency domain resources that cannot be used for downlink reception in the frequency domain resources of the scheduled PDSCH.
[0102] For example, a BWP contains 46 RBs, the nominal RBG size of an RBG is 4, and a BWP contains 12 RBGs, of which the size of the first RBG is 3, the size of the 12th RBG is 3, and the size of the remaining RBGs is 4. The 12 bits in the DCI are used to indicate frequency domain resource scheduling, which is called the frequency domain resource allocation (FDRA) field. The first bit in the frequency domain resource allocation field indicates the scheduling of the first RBG, the second bit in the frequency domain resource allocation field indicates the scheduling of the second RBG, and so on. The twelfth bit in the frequency domain resource allocation field indicates the scheduling of the twelfth RBG. The value of the 12 bits in a DCI that schedules a PDSCH is "001111000000", that is, the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG are scheduled, and the remaining 8 RBGs are not scheduled. It is determined through high-level signaling that the first to tenth PRBs among 46 PRBs (for example, uplink and downlink frequency domain resources) are located in the uplink frequency domain resources, and the eleventh to forty-sixth PRBs among the 46 PRBs are located in the downlink frequency domain resources. In this way, in the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG in the frequency domain resources of the scheduled PDSCH, the first PRB, the second PRB, and the third PRB in the third RBG are located in the uplink frequency domain resources, and the fourth PRB in the third RBG is located in the downlink frequency domain resources. The fourth RBG, the fifth RBG, and the sixth RBG of the scheduled PDSCH are located in the downlink frequency domain resources. At this time, the UE receives the PDSCH on the downlink frequency domain resources in the frequency domain resources of the scheduled PDSCH, that is, the fourth PRB in the third RBG and the fourth RBG, the fifth RBG, and the sixth RBG, and does not receive the PDSCH on the first PRB, the second PRB, and the third PRB in the third RBG in the uplink frequency domain resources in the frequency domain resources of the scheduled PDSCH.
[0103] If it is determined based on the uplink and downlink frequency domain resource information that all the frequency domain resources of the scheduled PDSCH are downlink frequency domain resources, the UE receives the PDSCH on all the frequency domain resources of the scheduled PDSCH.
[0104] For example, a BWP contains 46 RBs, the nominal RBG size of an RBG is 4, and a BWP contains 12 RBGs, of which the size of the first RBG is 3, the size of the 12th RBG is 3, and the size of the remaining RBGs is 4. The 12 bits in the DCI are used to indicate frequency domain resource scheduling, which is called the frequency domain resource allocation (FDRA) field. The first bit in the frequency domain resource allocation field indicates the scheduling of the first RBG, the second bit in the frequency domain resource allocation field indicates the scheduling of the second RBG, and so on. The twelfth bit in the frequency domain resource allocation field indicates the scheduling of the twelfth RBG. The value of the 12 bits in a DCI that schedules a PDSCH is "001111000000", that is, the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG are scheduled, and the remaining 8 RBGs are not scheduled. Through high-level signaling, it is determined that the first to forty-sixth PRBs of the 46 PRBs (for example, uplink and downlink frequency domain resources) are all located in the downlink frequency domain resources. At this time, the UE receives PDSCH on all frequency domain resources in the frequency domain resources of the scheduled PDSCH, that is, the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG.
[0105] By adopting this method, the base station and the UE can fully utilize the available frequency domain resources without causing different understandings of the available resources between the base station and the UE.
[0106] 3. When the uplink and downlink frequency domain resource information is obtained through dynamic information, the frequency domain resources of the dynamically scheduled PDSCH are in accordance with the preset or configured uplink and downlink frequency domain resource format, and the UE performs downlink transmission on the frequency domain resources of the scheduled PDSCH in the preset or configured uplink and downlink frequency domain resource format.
[0107] For example, one assumption may be that the frequency domain resources of the dynamically scheduled PDSCH are all downlink frequency domain resources. For example, the BWP contains 46 RBs, the nominal RBG size of the RBG is 4, and the BWP contains 12 RBGs, of which the size of the first RBG is 3, the size of the 12th RBG is 3, and the size of the remaining RBGs is 4. The 12 bits in the DCI are used to indicate frequency domain resource scheduling, which is called the frequency domain resource allocation (FDRA, Frequency Domain Resource Assignment) field. The first bit in the frequency domain resource allocation field indicates the scheduling of the first RBG, the second bit in the frequency domain resource allocation field indicates the scheduling of the second RBG, and so on. The twelfth bit in the frequency domain resource allocation field indicates the scheduling of the twelfth RBG. The value of the 12 bits in a DCI that schedules a PDSCH is "001111000000", that is, the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG are scheduled, and the remaining 8 RBGs are not scheduled.
[0108] Regardless of whether the uplink and downlink frequency domain resource information indicates through dynamic information that the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG are all downlink frequency domain resources or the dynamic information indicates that part of the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG are uplink frequency domain resources, the UE receives PDSCH on all frequency domain resources of the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG. In this way, the UE considers that all frequency domain resources dynamically scheduled are resources that can be used to receive PDSCH.
[0109] By adopting this method, the available frequency domain resources can be fully utilized.
[0110] 4. When the uplink and downlink frequency domain resource indication (eg, uplink and downlink frequency domain resource information) is not configured or the UE does not receive the uplink and downlink frequency domain resource indication (eg, uplink and downlink frequency domain resource information), the UE receives the PDSCH on the frequency domain resources of all dynamically scheduled PDSCHs.
[0111] In this method, the frequency domain resources of the dynamically scheduled PDSCH are in accordance with the preset or configured uplink and downlink frequency domain resource format. For example, one assumption may be that the frequency domain resources of the dynamically scheduled PDSCH are all downlink frequency domain resources. For example, the BWP contains 46 RBs, the nominal RBG size of the RBG is 4, and the BWP contains 12 RBGs, of which the size of the first RBG is 3, the size of the 12th RBG is 3, and the size of the remaining RBGs is 4. The 12 bits in the DCI are used to indicate frequency domain resource scheduling, which is called the frequency domain resource allocation (FDRA, Frequency Domain Resource Assignment) field. The first bit in the frequency domain resource allocation field indicates the scheduling of the first RBG, the second bit in the frequency domain resource allocation field indicates the scheduling of the second RBG, and so on. The twelfth bit in the frequency domain resource allocation field indicates the scheduling of the twelfth RBG. The 12-bit value in a DCI for scheduling PDSCH is "001111000000", that is, the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG are scheduled, and the remaining 8 RBGs are not scheduled. The UE receives PDSCH in all frequency domain resources of the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG. That is, the UE considers that all frequency domain resources scheduled dynamically are resources that can be used to receive PDSCH.
[0112] This method does not cause different understandings of available resources between the base station and the UE.
[0113] Method 2:
[0114] When the DCI for scheduling PDSCH transmission includes scheduling information of PDSCH resources (e.g., FDRA) and uplink and downlink frequency domain resource information, the UE determines the frequency domain resources for receiving PDSCH based on the uplink and downlink frequency domain resource information in the DCI for scheduling PDSCH transmission and the scheduling information of PDSCH resources.
[0115] One possible solution is that the UE receives high-level signaling configuration, obtains N uplink and downlink frequency domain resource configuration formats, and the number of bits of the uplink and downlink frequency domain resource information in the DCI for scheduling PDSCH resources is rounded up to N (log2(N)). For example, N is equal to 2, rounded up (log2(2)) is equal to 1, and when the bit value is "0", the uplink and downlink frequency domain resource configuration format is that the entire frequency domain is all downlink frequency domain resources; when the bit value is "1", the uplink and downlink frequency domain resource configuration format is that the first to tenth PRBs of the 46 PRBs in the entire frequency domain are located in the uplink frequency domain resources, and the eleventh to forty-sixth PRBs of the 46 PRBs are located in the downlink frequency domain resources.
[0116] When the value of 12 bits in the DCI scheduling PDSCH is "001111000000" and the bit value of the uplink and downlink frequency domain resource information in the DCI is "0", the uplink and downlink frequency domain resource configuration format is that the entire frequency domain is all downlink frequency domain resources, that is, the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG are scheduled, and the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG are all downlink resources. The UE receives PDSCH in all frequency domain resources of the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG.
[0117] When the value of 12 bits in the DCI for scheduling PDSCH is "001111000000" and the bit value of the uplink and downlink frequency domain resource information in the DCI is "1", the uplink and downlink frequency domain resource configuration format is that the first to tenth PRBs of the 46 PRBs in the entire frequency domain are located in the uplink frequency domain resources, and the eleventh to forty-sixth PRBs of the 46 PRBs are located in the downlink frequency domain resources, that is, the third RBG, the fourth RBG, the fifth RBG, and the sixth RBG are scheduled, and the fourth PRB in the third RBG is located in the downlink frequency domain resources, the fourth RBG, the fifth RBG, and the sixth RBG of the scheduled PDSCH are all located in the downlink frequency domain resources, and the UE receives PDSCH in the frequency domain resources of the fourth PRB, the fourth RBG, the fifth RBG, and the sixth RBG in the third RBG.
[0118] By adopting this method, the base station and the UE can fully utilize the available frequency domain resources without causing different understandings of the available resources between the base station and the UE.
[0119] Embodiment 2:
[0120] This embodiment describes a method for determining PDSCH resources when PDSCH is semi-persistent scheduling (SPS).
[0121] Method 1:
[0122] When the UE receives uplink and downlink frequency domain resource information, the UE determines the frequency domain resource for receiving the PDSCH according to the received uplink and downlink frequency domain resource information and the PDSCH resource indicated by the semi-persistent scheduling (SPS). For example, the UE receives the PDSCH in the PDSCH resource indicated by the SPS and in the downlink frequency domain resource indicated by the uplink and downlink frequency domain resource information; or
[0123] When the uplink and downlink frequency domain resource information is not configured or the UE does not receive the uplink and downlink frequency domain resource information, the UE receives the PDSCH in the PDSCH resource indicated by the SPS. Alternatively, when the uplink and downlink frequency domain resource information is not configured or the UE does not receive the uplink and downlink frequency domain resource information, the UE does not receive the PDSCH or the UE does not receive the PDSCH on the PDSCH resource indicated by the SPS.
[0124] Method 2:
[0125] When the UE receives the uplink and downlink frequency domain resource information, the UE determines the frequency domain resource for receiving the PDSCH according to the received uplink and downlink frequency domain resource information and the PDSCH resource indicated by the semi-persistent scheduling SPS. Specifically, at least one of the following methods is included:
[0126] When the proportion of the downlink frequency domain resources indicated by the uplink and downlink frequency domain resource information in the PDSCH resources indicated by the SPS is greater than or equal to a threshold, the UE receives the PDSCH in the PDSCH resources indicated by the SPS and in the downlink frequency domain resources indicated by the uplink and downlink frequency domain resource information;
[0127] When, in the PDSCH resources indicated by the SPS and the proportion of the downlink frequency domain resources indicated by the uplink and downlink frequency domain resource information in the indicated PDSCH resources is less than a threshold (for example, the downlink frequency domain resources indicated by the uplink and downlink frequency domain resource information received by the UE are insufficient for PDSCH reception), the UE does not receive the PDSCH or the UE does not receive the PDSCH on the PDSCH resources indicated by the SPS;
[0128] When the uplink and downlink frequency domain resource information is not configured or the UE does not receive the uplink and downlink frequency domain resource information, the UE determines the frequency domain resources for receiving PDSCH on the PDSCH resources indicated by the SPS; or, when the UE does not receive the uplink and downlink frequency domain resource information, the UE does not receive PDSCH or the UE does not receive PDSCH on the PDSCH resources indicated by the SPS.
[0129] In the second embodiment, the uplink and downlink frequency domain resource information may be obtained through semi-static information (eg, RRC, etc.) or through dynamic information (eg, DCI or MAC CE, etc.).
[0130] Embodiment three:
[0131] This embodiment describes a method for determining PDSCH resources when PDSCH is a configured grant (CG).
[0132] Method 1:
[0133] When the UE receives uplink and downlink frequency domain resource information, the UE determines the frequency domain resource for receiving the PDSCH according to the received uplink and downlink frequency domain resource information and the PDSCH resource indicated by the configured grant (CG). For example, the UE receives the PDSCH in the PDSCH resource indicated by the CG and in the downlink frequency domain resource indicated by the uplink and downlink frequency domain resource information; or
[0134] When the uplink and downlink frequency domain resource information is not configured or the UE does not receive the uplink and downlink frequency domain resource information, the UE receives the PDSCH in the PDSCH resource indicated by the CG. Alternatively, when the uplink and downlink frequency domain resource information is not configured or the UE does not receive the uplink and downlink frequency domain resource information, the UE does not receive the PDSCH or the UE does not receive the PDSCH on the PDSCH resource indicated by the CG.
[0135] Method 2:
[0136] When the UE receives the uplink and downlink frequency domain resource information, the UE determines the frequency domain resource for receiving the PDSCH according to the received uplink and downlink frequency domain resource information and the PDSCH resource indicated by the CG. Specifically, at least one of the following methods is included:
[0137] When the proportion of the downlink frequency domain resources indicated by the uplink and downlink frequency domain resource information in the PDSCH resources indicated by the CG is greater than or equal to a threshold, the UE receives the PDSCH in the PDSCH resources indicated by the CG and in the downlink frequency domain resources indicated by the uplink and downlink frequency domain resource information;
[0138] When the proportion of the downlink frequency domain resources indicated by the uplink and downlink frequency domain resource information in the indicated PDSCH resources is less than a threshold (for example, the downlink frequency domain resources indicated by the uplink and downlink frequency domain resource information received by the UE are insufficient for PDSCH reception), the UE does not receive the PDSCH or the UE does not receive the PDSCH on the PDSCH resources indicated by the CG;
[0139] When the uplink and downlink frequency domain resource information is not configured or the UE does not receive the uplink and downlink frequency domain resource information, the UE determines the frequency domain resources for receiving PDSCH on the PDSCH resources indicated by the CG; or, when the UE does not receive the uplink and downlink frequency domain resource information, the UE does not receive PDSCH or the UE does not receive PDSCH on the PDSCH resources indicated by the CG.
[0140] In the third embodiment, the uplink and downlink frequency domain resource information may be obtained through semi-static information (eg, RRC, etc.) or through dynamic information (eg, DCI or MAC CE, etc.).
[0141] In the above-mentioned embodiments one to three, there is no limitation on the order of receiving "uplink and downlink frequency domain resource information" and receiving "scheduling information of PDSCH resources", and the "uplink and downlink frequency domain resource information" can be received first, and then the "scheduling information of PDSCH resources"; or the "scheduling information of PDSCH resources" can be received first, and then the "uplink and downlink frequency domain resource information"; or the "uplink and downlink frequency domain resource information" and "scheduling information of PDSCH resources" can be received at the same time. Similarly, there is no limitation on the order in which the base station side sends the "uplink and downlink frequency domain resource information" and "scheduling information of PDSCH resources". In the present application, the reception (or transmission) of "uplink and downlink frequency domain resource information" and the reception (or transmission) of "scheduling information of PDSCH resources" can be rearranged to achieve the functions and effects disclosed in the present disclosure.
[0142] Figure 8 A flowchart of a method 800 executed by a base station according to an embodiment of the present disclosure is shown.
[0143] like Figure 8 As shown, in step S810, the base station sends uplink and downlink frequency domain resource information (for example, configuration / indication information for indicating uplink and downlink attributes of part of the frequency domain resources within a symbol / time slot) and information for scheduling PDSCH or PUSCH to the UE.
[0144] In step S820, the base station sends the PDSCH or receives the PUSCH on the frequency domain resources of the PDSCH or the frequency domain resources of the PUSCH determined by the UE based on the uplink and downlink frequency domain resource information and the information for scheduling the PDSCH or PUSCH.
[0145] Fig. 9 FIG. 9 shows the structure of a user equipment 900 according to an embodiment of the present disclosure. Fig. 9 As shown, the user equipment 900 includes a controller 910 and a transceiver 920, wherein the controller 910 is configured to execute the method performed by the user equipment disclosed in the present invention, and the transceiver 920 is configured to transmit and receive channels or signals.
[0146] Fig.10 1 shows the structure of the base station 1000 according to an embodiment of the present disclosure. Fig.10 As shown, the network device 1000 includes a controller 1010 and a transceiver 1020, wherein the controller 1010 is configured to execute the method performed by the network device disclosed in the present invention, and the transceiver 1020 is configured to transmit and receive channels or signals.
[0147] The various illustrative logical blocks, modules, and circuits described in the present disclosure may be implemented or executed with a general purpose processor, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic device, discrete gate or transistor logic, discrete hardware components, or any combination thereof designed to perform the functions described herein. A general purpose processor may be a microprocessor, but in an alternative, the processor may be any conventional processor, controller, microcontroller, or state machine. The processor may also be implemented as a combination of computing devices, such as a combination of a DSP and a microprocessor, a plurality of microprocessors, one or more microprocessors cooperating with a DSP core, or any other such configuration.
[0148] The steps of the method or algorithm described in the present disclosure can be directly embodied in hardware, in a software module executed by a processor, or in a combination of the two. The software module can reside in a RAM memory, a flash memory, a ROM memory, an EPROM memory, an EEPROM memory, a register, a hard disk, a removable disk, or any other form of storage medium known in the art. An exemplary storage medium is coupled to a processor so that the processor can read and write information from / to the storage medium. In an alternative, a storage medium can be integrated into a processor. The processor and the storage medium can reside in an ASIC. The ASIC can reside in a user terminal. In an alternative, the processor and the storage medium can reside in a user terminal as discrete components.
[0149] In one or more exemplary designs, the functions may be implemented in hardware, software, firmware, or any combination thereof. If implemented in software, the functions may be stored on or transmitted as one or more instructions or codes on a computer-readable medium. Computer-readable media include both computer storage media and communication media, the latter including any media that facilitates the transfer of a computer program from one place to another. Storage media may be any available media that can be accessed by a general or special purpose computer.
[0150] The descriptions set forth herein, in conjunction with the accompanying drawings, describe example configurations, methods, and apparatus, and do not represent all examples that may be implemented or within the scope of the claims. The term "example" as used herein means "used as an example, instance, or illustration," rather than "preferred" or "superior to other examples." The detailed description includes specific details for the purpose of providing an understanding of the described techniques. However, these techniques may be practiced without these specific details. In some cases, well-known structures and devices are shown in block diagram form to avoid obscuring the concepts of the described examples.
[0151] Although this specification contains a number of specific implementation details, these should not be interpreted as limitations on any invention or the scope of the claimed protection, but rather as descriptions of specific features of specific embodiments of specific inventions. Certain features described in this specification in the context of separate embodiments may also be implemented in combination in a single embodiment. On the contrary, the various features described in the context of a single embodiment may also be implemented separately in multiple embodiments or in any suitable sub-combination. In addition, although features may be described above as working in certain combinations, and even initially claimed as such, in some cases, one or more features from the claimed combination may be deleted from the combination, and the claimed combination may be directed to a sub-combination or a variation of the sub-combination.
[0152] It should be understood that the specific order or hierarchy of steps in the method of the present disclosure is an illustration of an exemplary process. Based on design preferences, it is understood that the specific order or hierarchy of steps in the method can be rearranged to achieve the functions and effects disclosed in the present disclosure. The attached method claims present the elements of various steps in an example order, and are not meant to be limited to the specific order or hierarchy presented, unless otherwise specifically stated. In addition, although elements can be described or claimed in singular form, plural numbers are also contemplated unless restrictions on the singular are explicitly stated. Therefore, the present disclosure is not limited to the examples shown, and any device for performing the functions described herein is included in various aspects of the present disclosure. In addition, the symbol " / " used in this application should be understood as "and / or".
[0153] The text and drawings are provided as examples only to help readers understand the present disclosure. They are not intended and should not be interpreted as limiting the scope of the present disclosure in any way. Although certain embodiments and examples have been provided, it is obvious to those skilled in the art based on what is disclosed herein that the embodiments and examples shown may be changed without departing from the scope of the present disclosure.
Claims
1. A method performed by a user equipment UE in a wireless communication network, the method include: receiving first information, where the first information is used to schedule first frequency domain resources including a plurality of second frequency domain resources; In the case of receiving the second information, determining, based on the first information and the second information, from the multiple second frequency domain resources, a second frequency domain resource for downlink transmission or uplink transmission scheduled by the first information, the second information including indication information for indicating that each of the multiple second frequency domain resources is a downlink frequency domain resource or an uplink frequency domain resource; Perform downlink transmission or uplink transmission on the determined second frequency domain resource.
2. The method according to claim 1, in, In a case where the first information schedules downlink transmission, a downlink frequency domain resource among the plurality of second frequency domain resources indicated by the second information is used for the downlink transmission; or In a case where the first information schedules uplink transmission, the uplink frequency domain resources among the plurality of second frequency domain resources indicated by the second information are used for the uplink transmission.
3. The method according to claim 1, in, When the first information schedules downlink transmission, and the proportion of the downlink frequency domain resources indicated by the second information in the multiple second frequency domain resources is greater than or equal to the first threshold, the downlink frequency domain resources in the multiple second frequency domain resources indicated by the second information are used for the downlink transmission; or When the first information schedules uplink transmission and the proportion of uplink frequency domain resources indicated by the second information in the multiple second frequency domain resources is greater than or equal to a second threshold, the uplink frequency domain resources in the multiple second frequency domain resources indicated by the second information are used for the uplink transmission.
4. The method according to claim 3, in, When the first information schedules downlink transmission and the proportion of the downlink frequency domain resources indicated by the second information in the multiple second frequency domain resources is less than a first threshold, the downlink transmission is not performed; or In a case where the first information schedules uplink transmission and the proportion of uplink frequency domain resources indicated by the second information in the plurality of second frequency domain resources is smaller than a second threshold, the uplink transmission is not performed.
5. The method according to claim 1, further comprising: include: In case the second information is not received, downlink transmission or uplink transmission is performed on the multiple second frequency domain resources scheduled by the first information.
6. The method according to claim 1, further comprising: include: When the second information is received, downlink transmission or uplink transmission is performed on the multiple second frequency domain resources scheduled by the first information.
7. The method according to any one of claims 1 to 6, in, The first information is scheduled by dynamic scheduling, semi-persistent scheduling, or configuration authorization CG scheduling; and / or The second information is dynamic information or semi-static information.
8. The method according to any one of claims 1 to 7, in, The first frequency domain resource is a resource block group RBG, and the multiple second frequency domain resources include physical resource blocks PRB or resource blocks RB.
9. A method performed by a user equipment UE in a wireless communication network, the method include: Receive a first message, where the first message includes first information and second information, the first information is used to schedule a first frequency domain resource including a plurality of second frequency domain resources, and the second information includes indication information for indicating that each of the plurality of second frequency domain resources is a downlink frequency domain resource or an uplink frequency domain resource; Based on the first information and the second information, determine, from the multiple second frequency domain resources, a second frequency domain resource for downlink transmission or uplink transmission scheduled by the first information; Perform downlink transmission or uplink transmission on the determined second frequency domain resource.
10. The method according to claim 9, in, The first message is received via downlink control information DCI.
11. A method performed by a base station in a wireless communication network, the method include: Sending first information, where the first information is used to schedule first frequency domain resources including a plurality of second frequency domain resources; performing downlink transmission or uplink transmission on at least one second frequency domain resource among the plurality of second frequency domain resources, In which, when the second information is sent, the at least one second frequency domain resource is determined based on the first information and the second information, and the second information includes indication information for indicating that each of the multiple second frequency domain resources is a downlink frequency domain resource or an uplink frequency domain resource.
12. The method according to claim 11, in, The first information is scheduled by dynamic scheduling, semi-persistent scheduling, or configuration authorization CG scheduling; and / or The second information is dynamic information or semi-static information.
13. The method according to claim 11 or 12, in, The first frequency domain resource is a resource block group RBG, and the multiple second frequency domain resources include physical resource blocks PRB or resource blocks RB.
14. A method performed by a base station in a wireless communication network, the method include: Sending a first message, where the first message includes first information and second information, the first information is used to schedule a first frequency domain resource including a plurality of second frequency domain resources, and the second information includes indication information for indicating that each of the plurality of second frequency domain resources is a downlink frequency domain resource or an uplink frequency domain resource; performing downlink transmission or uplink transmission on at least one second frequency domain resource among the plurality of second frequency domain resources, The at least one second frequency domain resource is determined based on the first information and the second information.
15. The method according to claim 14, in, The first message is sent via downlink control information DCI.
16. A user equipment in a wireless communication network, comprising a transceiver and a controller coupled to the transceiver, wherein the controller is configured to execute the method according to any one of claims 1 to 10.
17. A base station in a wireless communication network, comprising a transceiver and a controller coupled to the transceiver, wherein the controller is configured to execute the method according to any one of claims 11 to 15.
