Method for machining multiple holes in web plate at head of boom

Through the processing method of combining lathe and boring machine, combined with the use of mandrels and spacers, the problems of low efficiency and poor accuracy of multi-porous processing of webs on the head of the arm frame are solved, and efficient and low-cost coaxial multi-porous processing is achieved, ensuring that Accuracy of aperture and coaxiality.

CN118951613AActive Publication Date: 2024-11-15WUHAN MARINE MACHINERY PLANT

Patent Information

Application Number
CN202411098296.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-11-15
Estimated Expiration
2044-08-12

AI Technical Summary

Technical Problem

The prior art is difficult to efficiently process coaxial pores with high coaxiality and small diameter on the web of the head of the boom, resulting in low processing efficiency, high cost, and inaccurate pore diameter tolerance and position, affecting the normal operation of the crane. .

Method used

Using a combination of lathe and boring machine, first roughly process the pulley shaft installation hole and rope barrier rod installation hole on the lathe, then finish the process on the boring machine, use the mandrel and spacer to ensure coaxiality and spacing, and finally pass the eccentricity. The hole distance is adjusted to achieve high-precision aperture and coaxiality.

Benefits of technology

Improve processing efficiency, shorten processing cycle, reduce costs, and ensure the coaxiality and hole distance accuracy of rope barrier rod installation holes and pulley shaft installation holes, solving the low processing efficiency and poor accuracy in the prior art. question.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118951613A_ABST
    Figure CN118951613A_ABST
Patent Text Reader

Abstract

The invention discloses a method for machining multiple holes in a head web of an arm support. The method comprises the following steps that firstly, rough machining of a pulley shaft mounting hole and machining of a basic hole of a rope blocking rod mounting hole are conducted on a middle web; secondly, rough machining of a pulley shaft mounting hole is conducted on an outer side web; thirdly, the middle web and the outer side web are welded to the head of the arm support through a mandrel and a spacer bush; fourthly, pulley shaft mounting holes of the middle web and the outer web are subjected to finish machining; 5, machining a rope blocking rod mounting hole of the outer side web plate; sixthly, the eccentric distance between each middle web base hole and the corresponding outer side web rope blocking rod mounting hole is measured and calculated; seventhly, an eccentric sleeve is manufactured according to the eccentric distance and the hole diameter of the basic hole in the middle web; and 8, the eccentric bushings are embedded into the matched basic holes of the middle web one by one. Therefore, according to the design, coaxial multiple holes with high coaxiality and small diameters can be efficiently machined in the web plate at the head of the boom.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a multi-hole processing method, belonging to the technical field of crane component processing, and in particular to a multi-hole processing method for a boom head web. Background Art

[0002] The boom is an important component of crane equipment. Its head is equipped with multiple webs for installing pulleys in parallel. There are two groups of coaxial holes on the webs, one group is used to install the pulley shaft, and the other group is used to install the rope stopper of the wire rope. The coaxiality of each group of holes in the two groups of holes is required to be high, and at the same time, the hole spacing between the two groups of holes is required to be high. If the coaxiality cannot be guaranteed, it will affect the smooth installation of the pulley group and the rope stopper; if the hole spacing is out of tolerance, it will cause the wire rope to be too tight (when the hole spacing is too small) or too loose (when the hole spacing is too large) when passing through the space area formed by the pulley rope groove and the rope stopper; too tight will cause the wire rope to be squeezed and deformed, and even stuck or broken, and too loose will cause the wire rope to come off or be tangled, thereby affecting the normal operation of the crane. At present, the pulley shaft mounting hole and the rope stop rod mounting hole on the pulley belly of the boom head are processed on a large CNC boring machine. However, due to the small diameter of the rope stop rod mounting hole, the boring bar of the large CNC boring machine cannot pass through directly, and a special transitional slender tooling boring bar needs to be made to assist in the processing. However, the rigidity of the transitional slender tooling boring bar is poor, and it is easy to jitter during the processing. Therefore, the feed amount of the tool must be as small as possible during the boring process, which results in extremely low boring processing efficiency, long processing cycle, and high cost. At the same time, it also leads to poor aperture tolerance, position accuracy, and coaxiality of the rope stop rod mounting hole, and the hole distance with the pulley shaft mounting hole is out of tolerance.

[0003] The Chinese patent application with application number 202111539224.6 and application date December 15, 2021 discloses a synchronous boring method for a multi-hole arm structure. The laser tracker and the wireless intelligent probe are used to accurately locate and mark the hole system required for fine machining of the structural parts, and then the boring equipment is used to perform rough boring of the structural parts after concentric positioning. The laser tracker is used for secondary precision re-measurement and fine-tuning in the process, and finally the hole system is fine-machined, thereby realizing the use of equipment to complete the hole system machining of large arm structures. It has the advantages of reasonable process, simple operation, high machining accuracy and quality, and has a greater cost advantage than the large-scale special equipment processing method, but it still has the following defects:

[0004] This design cannot efficiently process coaxial multiple holes with high coaxiality and small diameter on the web of the boom head.

[0005] The information disclosed in this background technology section is only intended to increase the understanding of the overall background of this patent application, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art already known to ordinary technicians in this field. Summary of the invention

[0006] The purpose of the present invention is to overcome the defects and problems in the prior art that it is impossible to efficiently process coaxial multiple holes with high coaxiality and small diameter on the web of the boom head, and to provide a processing method that can efficiently process coaxial multiple holes with high coaxiality and small diameter on the web of the boom head.

[0007] To achieve the above purpose, the technical solution of the present invention is: a method for processing multiple holes in the web of the boom head includes the following steps:

[0008] Step 1: The boom head web includes several middle webs and two outer webs; first, fix the middle webs in groups on a lathe, and then, according to the drawings, mark the center lines of the pulley shaft mounting holes and the rope stop rod mounting holes on the middle webs fixed as one, and then, based on the center lines of the pulley shaft mounting holes, perform rough machining of the pulley shaft mounting holes on the middle webs fixed as one; based on the center lines of the rope stop rod mounting holes, perform basic hole machining of the rope stop rod mounting holes on the middle webs fixed as one, and remove the middle webs after machining is completed;

[0009] Step 2: First, fix the two outer webs as a group on the lathe, and then, according to the drawing, carve the center line of the pulley shaft mounting hole on the outer web, and then, based on the center line of the pulley shaft mounting hole on the outer web, perform rough machining of the pulley shaft mounting hole on the two outer webs fixed as one, and remove the two outer webs after machining;

[0010] Step 3: First, use a number of mandrels and a number of spacers to string together the above-mentioned middle webs that have been processed into one piece, then align the middle webs that have been stringed together with the boom head, and then weld them to the boom head one by one until all the middle webs are welded, and then remove the mandrels and spacers; then use a number of mandrels and a number of spacers to string together the above-mentioned outer webs that have been processed and the welded middle webs, and after determining the position, respectively weld the two outer webs to the outermost left side and the outermost right side of the middle web;

[0011] Step 4: First, take the rough-machined pulley shaft mounting hole as a reference, and respectively carve the theoretical contour lines of the pulley shaft mounting hole on the outer end surfaces of the two outer webs according to the drawings, and then take the carved center position line of the pulley shaft mounting hole and the theoretical contour line as a reference, complete the fine machining of the pulley shaft mounting holes on the multiple middle webs and the two outer webs in one clamping process on the boring machine, and stop the fine machining when the inner hole diameter of the pulley shaft mounting hole meets the requirements of the drawings;

[0012] Step 5: First, based on the processed pulley shaft mounting hole as a reference and in combination with the drawing, respectively carve the center position line and the outline line of the drawing of the rope stopper rod mounting hole on the outer end surfaces of the two outer webs, and then respectively use the center position line and the outline line of the rope stopper rod mounting hole carved on the outer webs as a reference to respectively process the rope stopper rod mounting holes on the two outer webs. After the processing is completed, stop processing the rope stopper rod mounting holes on the outer webs;

[0013] Step 6: first, using the rope-stopping rod mounting holes on the two processed outer webs as references, measure the center position of the basic hole on each middle web one by one, and then calculate the measured distances between the center of the basic hole on each middle web and the center of the rope-stopping rod mounting hole on the outer web according to the measured center position of the basic hole on the middle web and the center position of the rope-stopping rod mounting holes on the two outer webs; finally, compare the center distances one by one with their theoretical distance values ​​to obtain the eccentricity of the basic hole on each middle web relative to the rope-stopping rod mounting hole on the outer web;

[0014] Step 7: According to the eccentricity of the basic hole on each of the intermediate webs relative to the rope retaining rod mounting hole on the outer webs, and the aperture of each basic hole, an eccentric sleeve adapted to each intermediate web is manufactured respectively;

[0015] Step 8: Install the eccentric sleeve into the corresponding base hole of the middle web.

[0016] In the first step, the rough machining of the pulley shaft mounting holes on the multiple intermediate webs fixed as one piece refers to: turning the positions of the pulley shaft mounting holes on the multiple intermediate webs fixed as one piece on a lathe until the single-side machining allowance of the pulley shaft mounting holes on the multiple intermediate webs reaches 4.5-10 mm, and then stopping the rough machining of the pulley shaft mounting holes on the intermediate webs;

[0017] In the first step, the basic hole processing of the rope stopper rod mounting holes on the multiple pieces of the intermediate webs fixed as one body refers to: turning the positions of the rope stopper rod mounting holes on the multiple pieces of the intermediate webs fixed as one body on a lathe until the diameter of the processed holes is 8-10 mm larger than the theoretical diameter of the rope stopper rod mounting holes in the drawings, and then stopping the processing, and the processed holes are the basic holes;

[0018] In the second step, the rough machining of the pulley shaft mounting holes on the two outer webs fixed as one refers to: turning the positions of the pulley shaft mounting holes on the two outer webs fixed as one on a lathe until the single-sided machining allowance of the pulley shaft mounting holes on the two outer webs fixed as one reaches 4.5-10mm, and then stopping the rough machining of the pulley shaft mounting holes on the outer webs.

[0019] In the fourth step, completing the fine machining of the pulley shaft mounting holes on the multiple middle webs and the two outer webs during one clamping process on the boring machine means: during one clamping process on the boring machine, the boring bar is passed through the rough-machined pulley shaft mounting holes on the multiple middle webs and the two outer webs, and the boring machine drives the boring bar to rotate at a position close to the pulley shaft mounting holes to perform fine machining on the pulley shaft mounting holes on the multiple middle webs and the two outer webs.

[0020] In the fifth step, the rope-stopping rod mounting holes on the two outer webs are processed separately, and after the processing is completed, the processing of the rope-stopping rod mounting holes on the outer webs is stopped, which means: firstly, the rope-stopping rod mounting holes on one outer web are processed by boring, and when the diameter of the rope-stopping rod mounting holes on one outer web reaches the requirements of the drawing, the processing of the rope-stopping rod mounting holes on this outer web is stopped, and then the rope-stopping rod mounting holes on the other outer web are processed by boring, and when the diameter of the rope-stopping rod mounting holes on the other outer web reaches the requirements of the drawing, the processing of the rope-stopping rod mounting holes on the other outer web is stopped.

[0021] In the third step, the mandrel includes a first mandrel and a second mandrel, the diameter of the first mandrel matches the aperture of the basic hole, and the diameter of the first mandrel is 0.5-1.5 mm smaller than the aperture of the basic hole;

[0022] The diameter of the second spindle matches the hole diameter of the pulley shaft mounting hole, and the diameter of the second spindle is 0.5-1.5 mm smaller than the hole diameter of the pulley shaft mounting hole;

[0023] The number of the spacers is the same as the number of intervals between the middle webs, and the axial length of the spacers is the same as the spacing between two adjacent middle webs required by the drawings.

[0024] In the third step, the step of first using a plurality of mandrels and a plurality of spacers to string together the above-mentioned intermediate webs after processing means: firstly passing the matching first mandrel through the basic holes and spacers on all the intermediate webs in sequence, the spacers are placed at the basic holes of the intermediate webs and clamped between the adjacent intermediate webs, and at the same time, passing the matching second mandrel through the pulley shaft mounting holes of all the intermediate webs in sequence;

[0025] In the third step, the use of a plurality of mandrels and a plurality of spacers to string together the two processed outer webs and the welded middle webs means: spot welding a plurality of spacers on adjacent middle webs, and at the same time, passing the second mandrel through the pulley shaft mounting holes of the outer web on the left, all the middle webs, and the outer web on the right in sequence.

[0026] In the sixth step, the distance between the center of the basic hole on each intermediate web and the center of the rope stop rod mounting hole on the outer web is calculated one by one, which means: taking the outer web rope stop rod mounting hole as a reference, drawing a cross center line, and measuring the distance from four symmetrical points of the basic hole on the intermediate web to the rope stop rod mounting hole, the distances from two longitudinally symmetrical points to the rope stop rod mounting hole are L1 and L2 respectively, and the distances from two transversely symmetrical points to the rope stop rod mounting hole are L3 and L4 respectively;

[0027] In the sixth step, the center distances are finally compared with their theoretical distance values ​​one by one to obtain the eccentricity of the basic hole on each middle web relative to the rope stop rod mounting hole on the outer web: the vertical distance between the basic hole of the middle web and the center of the rope stop rod mounting hole of the outer web is (L1-L2) / 2, the horizontal distance between the basic hole of the middle web and the center of the rope stop rod mounting hole of the outer web is (L3-L4) / 2, and the eccentricity

[0028] In the seventh step, the eccentric sleeve includes an eccentric sleeve inner hole and an outer cylindrical surface;

[0029] The eccentricity of the inner hole of the eccentric sleeve is equal to the eccentricity of the basic hole on the corresponding intermediate web relative to the mounting hole of the rope stopper on the outer web, and the diameter and tolerance of the inner hole of the eccentric sleeve are the same as the diameter and tolerance of the mounting hole of the rope stopper required by the drawing;

[0030] The outer circumferential surface matches the hole diameter of the corresponding basic hole on the middle web.

[0031] In the eighth step, embedding the eccentric sleeve into the basic hole of the corresponding intermediate web means that the eccentric sleeve and the basic hole of the corresponding intermediate web are interference fit, firstly, the theoretical cooling time of the eccentric sleeve is calculated according to the interference fit between the outer cylindrical surface and the basic hole, then the eccentric sleeve is cooled according to the theoretical cooling time, and then the cooled eccentric sleeves are embedded one by one into the basic holes of the corresponding intermediate web, and when the eccentric sleeve returns to normal temperature, the eccentric sleeve and the basic hole of the intermediate web are interference fit.

[0032] Cooling the eccentric sleeves according to the theoretical cooling time and then fitting the cooled eccentric sleeves into the basic holes of the corresponding intermediate webs one by one means: placing the eccentric sleeves into a heat preservation box filled with a coolant for cooling, taking out the eccentric sleeves after the cooling time is reached, and fitting them into the basic holes of the corresponding intermediate webs;

[0033] The interference fit between the outer cylindrical surface of the eccentric sleeve and the basic hole is 0.02-0.04mm.

[0034] Compared with the prior art, the present invention has the following beneficial effects:

[0035] 1. A method for processing multiple holes in the web of a boom head, comprising the following steps: the first step: rough machining of the pulley shaft mounting hole and the basic hole machining of the rope stop rod mounting hole of the middle web fixed as one, the second step: rough machining of the pulley shaft mounting hole of the outer web fixed as one, the third step: welding the middle web and the outer web to the boom head respectively by using a mandrel and a spacer, the fourth step: fine machining of the pulley shaft mounting holes of multiple middle webs and two outer webs, the fifth step: machining of the rope stop rod mounting holes of the outer web, the sixth step: measuring and calculating the basic holes of each middle web and the rope stop rod of each outer web. The eccentricity of the rope rod mounting hole, the seventh step: make an eccentric sleeve according to the eccentricity and the aperture of the basic hole on the middle web, the eighth step: embed the eccentric sleeves one by one into the basic holes of the corresponding middle webs, in the first and second steps, turn the position of the pulley shaft mounting hole of the middle web or the outer web on a lathe until the single-sided machining allowance of the pulley shaft mounting hole reaches 4.5-10mm, stop the rough machining of the pulley shaft mounting hole, turn the position of the rope rod mounting hole on the middle web on a lathe until the diameter of the basic hole is 8-10mm larger than the theoretical diameter of the drawing, and then stop machining, in the fourth step, During the last clamping process of the boring machine, the boring machine drives the boring bar to rotate to fine-process the pulley shaft mounting holes on the multiple intermediate webs and the two outer webs. In the fifth step, the rope-stop rod mounting hole on one outer web is first processed by boring. When the diameter of the rope-stop rod mounting hole on this side reaches the requirements of the drawing, the processing of the rope-stop rod mounting hole on this outer web is stopped. Then the rope-stop rod mounting hole on the other outer web is processed by boring. When the diameter of the rope-stop rod mounting hole on the other side reaches the requirements of the drawing, the processing of the rope-stop rod mounting hole on the other outer web is stopped. When applied, multiple intermediate webs are rough-processed in groups on a lathe before welding. The pulley shaft mounting holes on the web and two outer webs and the basic holes of the rope stop rod mounting holes on the middle web are then finely processed on a boring machine for the pulley shaft mounting holes of multiple middle webs and two outer webs, and then the rope stop rod mounting holes of the outer webs are processed on a boring machine. Because the lathe has a fast turning speed and high group processing efficiency, and the boring machine processing can improve the accuracy of the aperture, the lathe and the boring machine are combined to improve the processing efficiency, shorten the processing cycle, and thus reduce the processing cost. At the same time, due to the use of a mandrel and a spacer during welding, the pulley shaft mounting holes of all webs and the rope stop rod mounting holes of the middle web have high coaxiality. Therefore, the present invention can not only process rope stop rod mounting holes with high coaxiality and precise aperture, but also greatly improve the processing efficiency and reduce the processing cost.

[0036] 2. In a method for processing a multi-hole web of a boom head, in the third step, the spindle includes a first spindle and a second spindle, the diameter of the first spindle matches the aperture of the basic hole, the diameter of the second spindle matches the aperture of the pulley shaft mounting hole, the number of the spacers is the same as the number of intervals of the intermediate webs, the axial length of the spacers is the same as the spacing between two adjacent intermediate webs required by the drawing, firstly, the matching first spindle is passed through the basic holes and spacers on all the intermediate webs in turn, the spacers are placed at the basic holes of the intermediate webs and sandwiched between adjacent intermediate webs, and at the same time, the matching second spindle is passed through the After the pulley shaft mounting hole is completed with the welding of the middle web, several spacers are spot welded on the adjacent middle webs. At the same time, the second mandrel is sequentially passed through the pulley shaft mounting holes of the outer web on the left, all the middle webs, and the outer web on the right to complete the welding of the outer webs. When applied, several mandrels and several spacers are first used to string together multiple middle webs and weld them one by one to the boom head. Then, several mandrels and several spacers are used again to weld the two outer webs to the outermost sides of the middle web of the boom head. The use of mandrels can ensure the coaxiality of the basic holes of the pulley shaft mounting hole and the rope stop rod mounting hole, and the use of spacers can ensure the spacing between multiple adjacent middle webs. Therefore, the present invention can not only ensure the coaxiality of the rope stop rod mounting hole and the pulley shaft mounting hole, but also ensure the spacing between adjacent middle webs.

[0037] 3. In a method for processing a multi-hole web of a boom head, in the sixth step, with the outer web rope stop rod mounting hole as a reference, a cross center line is drawn to measure the distances from the four symmetrical points of the basic hole of the middle web to the rope stop rod mounting hole, the distances from the two longitudinally symmetrical points to the rope stop rod mounting hole are L1 and L2 respectively, the distances from the two transversely symmetrical points to the rope stop rod mounting hole are L3 and L4 respectively, the vertical distance between the basic hole of the middle web and the center of the rope stop rod mounting hole of the outer web is (L1-L2) / 2, the horizontal distance between the basic hole of the middle web and the center of the rope stop rod mounting hole of the outer web is (L3-L4) / 2, and the eccentricity is In the seventh step, the eccentric sleeve includes an eccentric sleeve inner hole and an outer cylindrical surface; the eccentric distance of the eccentric sleeve inner hole is equal to the eccentric distance of the basic hole on the matching middle web relative to the rope stop rod mounting hole on the outer web, the diameter and tolerance of the eccentric sleeve inner hole are the same as the diameter and tolerance of the rope stop rod mounting hole required by the drawing, the outer cylindrical surface matches the aperture of the basic hole on the matching middle web, the eccentric sleeve and the basic hole of the matching middle web are interference fit, and the cooled eccentric sleeves are embedded one by one into the matching middle web. In the basic hole of the web, the interference fit between the outer cylindrical surface of the eccentric sleeve and the basic hole is 0.02-0.04mm; when applied, the eccentric sleeve of the basic hole on the middle web that matches the basic hole of the rope-stopping rod is made according to the basic hole diameter of the rope-stopping rod installation hole and the measured eccentricity of the basic hole on the middle web relative to the rope-stopping rod installation holes on the two outer webs, and the eccentric sleeve is cooled and then embedded in the basic hole on the middle web, so that the coaxiality of the rope-stopping rod installation hole and the hole distance between the rope-stopping rod installation hole and the pulley shaft installation hole are more in line with the requirements. Therefore, the present invention not only ensures the coaxiality of the rope-stopping rod installation hole, but also ensures the hole distance requirements between the rope-stopping rod installation hole and the pulley shaft installation hole. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is a process flow chart of the processing method of the present invention.

[0039] Figure 2 It is a schematic diagram of the web structure of the boom head in the present invention.

[0040] Figure 3 It is a schematic diagram of the single-piece web structure of the boom head in the present invention.

[0041] Figure 4 It is a schematic diagram of fixing multiple intermediate webs in groups in the present invention.

[0042] Figure 5 It is a schematic diagram of the assembly and welding of multiple intermediate webs in the present invention.

[0043] Figure 6 It is a schematic diagram of multiple intermediate webs installed in the eccentric sleeve in the present invention.

[0044] Figure 7 It is a schematic diagram of the boom in the present invention.

[0045] Figure 8 It is a side schematic diagram of the arm support D in the present invention.

[0046] Fig. 9 It is a side view of a single web in the present invention.

[0047] Fig.10 It is a schematic diagram of the eccentric sleeve in the present invention.

[0048] Fig.11It is a schematic diagram of the relationship between the outer web rope retaining rod installation hole and the middle web base hole in the present invention.

[0049] In the figure: the middle web 1, the first spindle 11, the second spindle 12, the spacer 13, the outer web 2, the inner hole 21 of the eccentric sleeve, the outer cylindrical surface 22, the eccentric sleeve 23, the pulley shaft mounting hole 3, the rope stop rod mounting hole 4, and the foundation hole 41. DETAILED DESCRIPTION

[0050] The present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0051] See also Figure 1 — Fig.11 A method for processing a multi-hole web of a boom head comprises the following steps:

[0052] Step 1: The boom head web includes several middle webs 1 and two outer webs 2; firstly, fix the middle webs 1 in groups on a lathe, and then, according to the drawings, mark the position center lines of the pulley shaft mounting hole 3 and the rope stop rod mounting hole 4 on the middle webs 1 fixed as one, and then, based on the position center line of the pulley shaft mounting hole 3, perform rough machining of the pulley shaft mounting hole 3 on the middle webs 1 fixed as one; based on the position center line of the rope stop rod mounting hole 4, perform machining of the basic hole 41 on the rope stop rod mounting hole 4 on the middle webs 1 fixed as one, and after machining, remove the middle webs 1;

[0053] Step 2: First, fix the two outer webs 2 as a group on the lathe, and then, according to the drawing, mark the position center line of the pulley shaft mounting hole 3 on the outer web 2, and then, based on the position center line of the pulley shaft mounting hole 3 on the outer web 2, perform rough machining of the pulley shaft mounting hole 3 on the two outer webs 2 fixed as one, and remove the two outer webs 2 after the machining is completed;

[0054] Step 3: First, use a plurality of mandrels and a plurality of spacers 13 to string together the above-mentioned intermediate webs 1 after processing, and then align the intermediate webs 1 and the boom head, and then weld them to the boom head one by one until all the intermediate webs 1 are welded, and then remove the mandrels and spacers 13; then use a plurality of mandrels and a plurality of spacers 13 to string together the above-mentioned outer webs 2 after processing and the welded intermediate webs 1, and after determining the positions, respectively weld the two outer webs 2 to the outermost sides on the left side and the outermost sides on the right side of the intermediate web 1;

[0055] Step 4: first, taking the roughly machined pulley shaft mounting hole 3 as a reference, respectively engrave the theoretical contour lines of the pulley shaft mounting hole 3 on the outer end surfaces of the two outer webs 2 according to the drawings, and then, taking the engraved center position line of the pulley shaft mounting hole 3 and the theoretical contour line as a reference, complete the fine machining of the pulley shaft mounting holes 3 on the multiple middle webs 1 and the two outer webs 2 in one clamping process on the boring machine, and stop the fine machining when the inner hole diameter of the pulley shaft mounting hole 3 meets the requirements of the drawings;

[0056] Step 5: First, take the processed pulley shaft mounting hole 3 as a reference, combine with the drawing, respectively carve the center position line and the outline line of the drawing on the outer end surface of the two outer webs 2, and then respectively use the carved center position line and outline line of the rope stopper rod mounting hole 4 on the outer web 2 as a reference, respectively process the rope stopper rod mounting holes 4 on the two outer webs 2, and after the processing is completed, stop processing the rope stopper rod mounting holes 4 on the outer web 2;

[0057] Step 6: first, using the rope-stopping rod mounting holes 4 on the two processed outer webs 2 as references, measure the center position of the basic hole 41 on each intermediate web 1 one by one, and then calculate the measured distances between the center of the basic hole 41 on each intermediate web 1 and the center of the rope-stopping rod mounting holes 4 on the two outer webs 2 according to the measured center position of the basic hole 41 on the intermediate web 1 and the center position of the rope-stopping rod mounting holes 4 on the two outer webs 2; finally, compare the center distances one by one with their theoretical distance values ​​to obtain the eccentricity of the basic hole 41 on each intermediate web 1 relative to the rope-stopping rod mounting hole 4 on the outer web 2;

[0058] Step 7: According to the eccentricity of the basic hole 41 on each of the intermediate webs 1 relative to the rope retaining rod mounting hole 4 on the outer web 2, and the aperture of each basic hole 41, an eccentric sleeve 23 adapted to each intermediate web 1 is manufactured respectively;

[0059] Step 8: embed the eccentric sleeve 23 into the corresponding basic hole 41 of the middle web 1 .

[0060] In the first step, the rough machining of the pulley shaft mounting hole 3 on the multiple pieces of the intermediate webs 1 fixed as one body refers to: turning the positions of the pulley shaft mounting holes 3 on the multiple pieces of the intermediate webs 1 fixed as one body on a lathe until the single-side machining allowance of the pulley shaft mounting holes 3 on the multiple pieces of the intermediate webs 1 reaches 4.5-10 mm, and then stopping the rough machining of the pulley shaft mounting holes 3 on the intermediate webs 1;

[0061] In the first step, the processing of the basic hole 41 for the rope stopper rod mounting hole 4 on the multiple pieces of the intermediate web 1 fixed as one body refers to: turning the position of the rope stopper rod mounting hole 4 on the multiple pieces of the intermediate web 1 fixed as one body on a lathe until the diameter of the processed hole is 8-10 mm larger than the theoretical diameter of the rope stopper rod mounting hole 4 on the drawing, and then stopping the processing, and the processed hole is the basic hole 41;

[0062] In the second step, the rough machining of the pulley shaft mounting hole 3 on the two outer webs 2 fixed as one body refers to: turning the position of the pulley shaft mounting hole 3 on the two outer webs 2 fixed as one body on a lathe until the single-sided machining allowance of the pulley shaft mounting hole 3 on the two outer webs 2 fixed as one body reaches 4.5-10mm, and then stopping the rough machining of the pulley shaft mounting hole 3 on the outer web 2.

[0063] In the fourth step, completing the fine machining of the pulley shaft mounting holes 3 on the multiple intermediate webs 1 and the two outer webs 2 during one clamping process on the boring machine means: during one clamping process on the boring machine, the boring bar is passed through the rough-machined pulley shaft mounting holes 3 on the multiple intermediate webs 1 and the two outer webs 2, and the boring machine drives the boring bar to rotate at a position close to the pulley shaft mounting holes 3 to perform fine machining on the pulley shaft mounting holes 3 on the multiple intermediate webs 1 and the two outer webs 2.

[0064] In the fifth step, the rope-stopping rod mounting holes 4 on the two outer webs 2 are processed separately, and after the processing is completed, the processing of the rope-stopping rod mounting holes 4 on the outer webs 2 is stopped, which means: firstly, the rope-stopping rod mounting holes 4 on one outer web 2 are processed by boring, and when the diameter of the rope-stopping rod mounting holes 4 on one outer web 2 reaches the requirements of the drawing, the processing of the rope-stopping rod mounting holes 4 on this outer web 2 is stopped, and then the rope-stopping rod mounting holes 4 on the other outer web 2 are processed by boring, and when the diameter of the rope-stopping rod mounting holes 4 on the other outer web 2 reaches the requirements of the drawing, the processing of the rope-stopping rod mounting holes 4 on the other outer web 2 is stopped.

[0065] In the third step, the mandrel includes a first mandrel 11 and a second mandrel 12, the diameter of the first mandrel 11 matches the aperture of the basic hole 41, and the diameter of the first mandrel 11 is 0.5-1.5 mm smaller than the aperture of the basic hole 41;

[0066] The diameter of the second spindle 12 matches the hole diameter of the pulley shaft mounting hole 3, and the diameter of the second spindle 12 is 0.5-1.5 mm smaller than the hole diameter of the pulley shaft mounting hole 3;

[0067] The number of the spacers 13 is the same as the number of intervals of the middle webs 1 , and the axial length of the spacers 13 is the same as the distance between two adjacent middle webs 1 required by the drawings.

[0068] In the third step, the step of first assembling the above-mentioned intermediate webs 1 after multiple processing by using a plurality of mandrels and a plurality of spacers 13 means that firstly, the matching first mandrel 11 is sequentially passed through the basic holes 41 and the spacers 13 on all the intermediate webs 1, and the spacers 13 are placed at the basic holes 41 of the intermediate webs 1 and sandwiched between adjacent intermediate webs 1, and at the same time, the matching second mandrel 12 is sequentially passed through the pulley shaft mounting holes 3 of all the intermediate webs 1;

[0069] In the third step, the use of a plurality of mandrels and a plurality of spacers 13 to string together the two processed outer webs 2 and the welded intermediate webs 1 means: spot welding a plurality of spacers 13 on adjacent intermediate webs 1, and at the same time, passing the second mandrel 12 through the pulley shaft mounting hole 3 of the outer web 2 on the left, all the intermediate webs 1, and the outer web 2 on the right in sequence.

[0070] In the sixth step, the distance between the center of the basic hole 41 on each intermediate web 1 and the center of the rope-blocking rod mounting hole 4 on the outer web 2 is calculated one by one, which means: taking the rope-blocking rod mounting hole 4 of the outer web 2 as a reference, drawing a cross center line, and measuring the distances from four symmetrical points of the basic hole 41 of the intermediate web 1 to the rope-blocking rod mounting hole 4, the distances from two longitudinally symmetrical points to the rope-blocking rod mounting hole 4 are L1 and L2 respectively, and the distances from two transversely symmetrical points to the rope-blocking rod mounting hole 4 are L3 and L4 respectively;

[0071] In the sixth step, the center distances are finally compared with their theoretical distance values ​​one by one to obtain the eccentricity of the basic hole 41 on each intermediate web 1 relative to the rope stop rod mounting hole 4 on the outer web 2, which means that the vertical distance between the basic hole 41 of the intermediate web 1 and the center of the rope stop rod mounting hole 4 of the outer web 2 is (L1-L2) / 2, the horizontal distance between the basic hole 41 of the intermediate web 1 and the center of the rope stop rod mounting hole 4 of the outer web 2 is (L3-L4) / 2, and the eccentricity

[0072]

[0073] In the seventh step, the eccentric sleeve 23 includes an eccentric sleeve inner hole 21 and an outer cylindrical surface 22;

[0074] The eccentricity of the inner hole 21 of the eccentric sleeve is equal to the eccentricity of the basic hole 41 on the corresponding intermediate web 1 relative to the rope stop rod mounting hole 4 on the outer web 2, and the diameter and tolerance of the inner hole 21 of the eccentric sleeve are the same as the diameter and tolerance of the rope stop rod mounting hole 4 required by the drawing;

[0075] The outer circumferential surface 22 matches the hole diameter of the corresponding basic hole 41 on the middle web 1 .

[0076] In the eighth step, embedding the eccentric sleeve 23 into the basic hole 41 of the intermediate web 1 means that the eccentric sleeve 23 and the basic hole 41 of the intermediate web 1 are interference fit, firstly, the theoretical cooling time of the eccentric sleeve 23 is calculated according to the interference fit between the outer cylindrical surface 22 and the basic hole 41, and then the eccentric sleeve 23 is cooled according to the theoretical cooling time, and then the cooled eccentric sleeves 23 are embedded one by one into the basic hole 41 of the intermediate web 1. When the eccentric sleeve 23 returns to normal temperature, the eccentric sleeve 23 and the basic hole 41 of the intermediate web 1 are interference fit.

[0077] Cooling the eccentric sleeve 23 according to the theoretical cooling time and then fitting the cooled eccentric sleeves 23 into the basic holes 41 of the corresponding intermediate webs 1 one by one means: placing the eccentric sleeve 23 into a heat preservation box filled with a coolant for cooling, taking out the eccentric sleeve 23 after the cooling time is reached, and fitting it into the basic holes 41 of the corresponding intermediate webs 1;

[0078] The interference fit between the outer cylindrical surface 22 of the eccentric sleeve 23 and the basic hole 41 is 0.02-0.04 mm.

[0079] The supplementary description of the present invention is as follows:

[0080] The preferred method of the present invention is to fix the middle webs 1 and the outer webs 2 in groups into one, which means that the webs are stacked on a machine tool workbench, adjusted in position, and fixed into one with a pressing plate to prevent the webs from moving.

[0081] The present invention preferably uses a marking needle to mark the position center line and contour line of the pulley shaft mounting hole 3 and the rope stop rod mounting hole 4 on the boom head web.

[0082] The reason why the present invention preferably sets the single-side machining allowance of the pulley shaft mounting hole 3 to 4.5-10 mm is that the diameter of the pulley shaft mounting hole 3 is 9-20 mm smaller than that required by the drawing, and is left for finishing.

[0083] In the present invention, the preferred single-side machining allowance of the pulley shaft mounting hole 3 on the middle web 1 and the outer web 2 is 7.5 mm.

[0084] The reason why the diameter of the basic hole 41 on the middle web 1 is preferably 8-10 mm larger than the theoretical diameter of the rope retaining rod mounting hole 4 in the drawings is that the portion larger than the theoretical diameter in the drawings is for the later embedding of the eccentric sleeve 23.

[0085] In the present invention, the diameter of the basic hole 41 on the middle web 1 is preferably 10 mm larger than the theoretical diameter of the rope retaining rod mounting hole 4 shown in the drawing.

[0086] The preferred spindle of the present invention is a shaft-like part passing through the center of the hole, which can be round steel or a steel pipe.

[0087] In the present invention, the diameter of the first mandrel 11 is preferably 1 mm smaller than the diameter of the basic hole 41 on the middle web 1 , and the diameter of the second mandrel 12 is preferably 1 mm smaller than the diameter of the pulley shaft mounting hole 3 .

[0088] In the present invention, the spacer 13 is preferably a steel pipe.

[0089] The preferred coolant of the present invention is liquid nitrogen.

[0090] In the present invention, the theoretical cooling time of the eccentric sleeve 23 is preferably determined according to the maximum radius, thickness, material and type of coolant of the eccentric sleeve 23 .

[0091] In the present invention, the material of the eccentric sleeve 23 is preferably consistent with that of the web.

[0092] The reason why the interference is preferably 0.02-0.04 mm in the present invention is that a too large interference will increase the difficulty of assembly.

[0093] The preferred interference ratio of the present invention is 0.03 mm.

[0094] The present invention preferably processes the rope-stopping rod mounting hole 4 on the outer web 2 according to the size of the drawing, and does not install the eccentric sleeve 23 because: the rope-stopping rod mounting hole 4 on the outer web 2 is simpler to process than the rope-stopping rod mounting hole 4 on the middle web 1, and the rope-stopping rod mounting hole 4 on the outer web 2 is the reference for the rope-stopping rod mounting hole 4 on the middle web 1 as the eccentric sleeve 23, and the rope-stopping rod mounting hole 4 on the outer web 2 processed by boring has good precision, which will make all the rope-stopping rod mounting holes 4 on the web more in line with the requirements of the drawing.

[0095] In the present invention, the inner diameter of the spacer sleeve 13 is preferably greater than or equal to the diameter of the first mandrel 11 .

[0096] In the present invention, the eccentric sleeve 23 is preferably made of round steel or steel pipe, and the eccentric sleeve inner hole 21 and outer cylindrical surface 22 of corresponding diameters are turned on a lathe, and the two end surfaces are processed to achieve the required flatness and roughness.

[0097] Embodiment 1:

[0098] See also Figure 1 — Fig.11 A method for processing a multi-hole web of a boom head includes the following steps:

[0099] The first step: the boom head web includes several middle webs 1 and two outer webs 2; firstly, fix the middle webs 1 in groups on the lathe, and then, according to the drawing, mark the center lines of the pulley shaft mounting hole 3 and the rope stop rod mounting hole 4 on the middle webs 1 fixed as one, and then, based on the center line of the pulley shaft mounting hole 3, perform rough machining of the pulley shaft mounting hole 3 on the middle webs 1 fixed as one; and based on the center line of the rope stop rod mounting hole 4, perform basic hole 41 machining of the rope stop rod mounting hole 4 on the middle webs 1 fixed as one, and after the machining is completed, remove the middle webs 1. The second step is to fix the two outer webs 2 as a group on the lathe, and then, according to the drawing, mark the center line of the pulley shaft mounting hole 3 on the outer web 2, and then, based on the center line of the pulley shaft mounting hole 3 on the outer web 2, perform rough processing of the pulley shaft mounting hole 3 on the two outer webs 2 fixed as one, and remove the two outer webs 2 after processing; the third step is to first use a plurality of mandrels and a plurality of spacers 13 to string together the multiple processed middle webs 1, and then align the middle webs 1 and the boom head, and then weld them one by one to the boom head until the middle webs 1 are aligned. After all the intermediate webs 1 are welded, the mandrel and the spacer 13 are removed; then the two processed outer webs 2 are mounted in series with the welded intermediate webs 1 using a plurality of mandrels and a plurality of spacers 13, and after the positions are determined, the two outer webs 2 are welded to the outermost sides on the left and right sides of the intermediate webs 1 respectively; the fourth step: first, taking the roughly machined pulley shaft mounting hole 3 as a reference, the theoretical contour lines of the pulley shaft mounting hole 3 are respectively engraved on the outer end surfaces of the two outer webs 2 according to the drawings, and then, taking the engraved center position line of the pulley shaft mounting hole 3 and the theoretical contour line as a reference, in the first clamping process on the boring machine , complete the fine processing of the pulley shaft mounting holes 3 on the multiple middle webs 1 and the two outer webs 2, and stop the fine processing when the inner hole diameter of the pulley shaft mounting hole 3 reaches the requirements of the drawing; Step 5: first use the processed pulley shaft mounting hole 3 as a reference, combine with the drawing, and respectively mark the center position line and the outline line of the drawing of the rope stop rod mounting hole 4 on the outer end surfaces of the two outer webs 2, and then use the center position line and the outline line of the rope stop rod mounting hole 4 on the marked outer webs 2 as a reference, respectively process the rope stop rod mounting holes 4 on the two outer webs 2, and after the processing is completed, stop the processing of the rope stop rod mounting holes 4 on the outer webs 2;Step 6: First, take the rope-stopping rod mounting holes 4 on the two processed outer webs 2 as references, measure the center position of the basic hole 41 on each intermediate web 1 one by one, and then calculate the measured distances between the center of the basic hole 41 on each intermediate web 1 and the center of the rope-stopping rod mounting holes 4 on the two outer webs 2 according to the measured center position of the basic hole 41 on the intermediate web 1 and the center position of the rope-stopping rod mounting holes 4 on the two outer webs 2; finally, compare the center distances with their theoretical distance values ​​one by one to obtain the eccentricity of the basic hole 41 on each intermediate web 1 relative to the rope-stopping rod mounting hole 4 on the outer web 2; Step 7: According to the eccentricity of the basic hole 41 on each intermediate web 1 relative to the rope-stopping rod mounting hole 4 on the outer web 2, and the aperture of each basic hole 41, respectively make eccentric sleeves 23 compatible with each intermediate web 1; Step 8: embed the above-mentioned eccentric sleeves 23 into the compatible basic holes 41 of the intermediate webs 1. ;

[0100] When in use, the pulley shaft mounting holes 3 on the multiple middle webs 1 and the two outer webs 2 and the base holes 41 of the rope stop rod mounting holes on the middle web 1 are rough-machined in groups by lathe turning, and then the pulley shaft mounting holes 3 of the multiple middle webs 1 and the two outer webs 2 are fine-machined and the rope stop rod mounting holes 4 of the outer webs are machined on a boring machine; since the lathe has a fast turning speed and high group processing efficiency, the boring machine processing can improve the accuracy of the hole diameter, and the combination of the lathe and the boring machine improves the processing efficiency, shortens the processing cycle, and thus reduces the processing cost compared to the prior art of single large-scale CNC boring machine processing. At the same time, since the mandrel and spacer are used during welding, the pulley shaft mounting holes 3 of all webs and the rope stop rod mounting holes 4 of the middle web 1 have high coaxiality.

[0101] Embodiment 2:

[0102] The basic content is the same as that of Example 1, except that: in the first step, the rough machining of the pulley shaft mounting hole 3 on the multiple intermediate webs 1 fixed as one refers to: turning the position of the pulley shaft mounting hole 3 on the multiple intermediate webs 1 fixed as one on a lathe until the single-sided machining allowance of the pulley shaft mounting hole 3 on the multiple intermediate webs 1 reaches 4.5-10mm, and then stopping the rough machining of the pulley shaft mounting hole 3 on the intermediate web 1; in the first step, the machining of the basic hole 41 on the rope stop rod mounting hole 4 on the multiple intermediate webs 1 fixed as one refers to: machining the position of the pulley shaft mounting hole 3 on the multiple intermediate webs 1 fixed as one on a lathe. The position of the rope stop rod mounting hole 4 on the plate 1 is turned until the diameter of the machined hole is 8-10mm larger than the theoretical diameter of the rope stop rod mounting hole 4 in the drawing, and then the machining is stopped. The machined hole is the basic hole 41; in the second step, the rough machining of the pulley shaft mounting hole 3 on the two outer webs 2 fixed as one is performed, which means: turning the position of the pulley shaft mounting hole 3 on the two outer webs 2 fixed as one on a lathe until the single-sided machining allowance of the pulley shaft mounting hole 3 on the two outer webs 2 fixed as one reaches 4.5-10mm, and then the rough machining of the pulley shaft mounting hole 3 on the outer web 2 is stopped.

[0103] During application, when the pulley shaft mounting holes 3 on the grouped middle webs 1 and the grouped outer webs 2 are roughly machined to a single-side allowance of 4.5-10mm, the machining is stopped. This facilitates the subsequent fine machining of the pulley shaft mounting holes 3 and improves the aperture accuracy of the pulley shaft mounting holes 3. At the same time, the basic hole 41 is machined for the rope stop rod mounting hole 4 on the middle web 1. The diameter of the basic hole 41 is 8-10mm larger than the theoretical diameter on the drawing, which facilitates the subsequent installation of the corresponding eccentric sleeve, thereby improving the coaxiality and aperture accuracy of the rope stop rod mounting hole 4.

[0104] Embodiment 3:

[0105] The basic content is the same as Example 1, except that: in the fourth step, completing the fine machining of the pulley shaft mounting holes 3 on the multiple intermediate webs 1 and the two outer webs 2 during one clamping process on the boring machine means: during one clamping process on the boring machine, the boring bar is passed through the rough-machined pulley shaft mounting holes 3 on the multiple intermediate webs 1 and the two outer webs 2, and at a position close to the pulley shaft mounting holes 3, the boring machine drives the boring bar to rotate to fine-machine the pulley shaft mounting holes 3 on the multiple intermediate webs 1 and the two outer webs 2.

[0106] During application, a boring machine is used to fine-process the pulley shaft mounting holes 3 on the multiple middle webs 1 and the two outer webs 2 welded on the boom head. The fine-processing of the pulley shaft mounting holes 3 of all webs is completed by one-time processing, so that the pulley shaft mounting holes 3 on the multiple middle webs 1 and the two outer webs 2 are more coaxial, and the hole diameter accuracy of the pulley shaft mounting holes 3 is higher.

[0107] Embodiment 4:

[0108] The basic content is the same as Example 1, except that: in the fifth step, the rope stopper rod mounting holes 4 on the two outer webs 2 are processed separately, and after the processing is completed, the processing of the rope stopper rod mounting holes 4 on the outer webs 2 is stopped, which means: first, the rope stopper rod mounting holes 4 on one outer web 2 are processed by boring, and when the diameter of the rope stopper rod mounting holes 4 on one outer web 2 reaches the requirements of the drawing, the processing of the rope stopper rod mounting holes 4 on this outer web 2 is stopped, and then the rope stopper rod mounting holes 4 on the other outer web 2 are processed by boring, and when the diameter of the rope stopper rod mounting holes 4 on the other outer web 2 reaches the requirements of the drawing, the processing of the rope stopper rod mounting holes 4 on the other outer web 2 is stopped; in addition, the processing of the rope stopper rod mounting holes 4 on the two outer webs 2 can be carried out by turning, drilling, boring, or any one or more combinations thereof.

[0109] When in use, the rope-stopping rod mounting hole 4 on one outer web 2 is processed first, and then the rope-stopping rod mounting hole 4 on the other outer web 2 is processed. The rope-stopping rod mounting holes 4 are processed one by one, which reduces the difficulty of processing the rope-stopping rod mounting holes 4 with smaller diameters and improves the aperture accuracy of the rope-stopping rod mounting holes 4.

[0110] Embodiment 5:

[0111] The basic content is the same as that of Example 1, except that: in the third step, the spindle includes a first spindle 11 and a second spindle 12, the diameter of the first spindle 11 matches the aperture of the basic hole 41, and the diameter of the first spindle 11 is 0.5-1.5 mm smaller than the aperture of the basic hole 41; the diameter of the second spindle 12 matches the aperture of the pulley shaft mounting hole 3, and the diameter of the second spindle 12 is 0.5-1.5 mm smaller than the aperture of the pulley shaft mounting hole 3; the number of the spacers 13 is the same as the number of intervals of the intermediate webs 1, and the axial length of the spacers 13 is the same as the spacing between two adjacent intermediate webs 1 required by the drawing; in the third step, a plurality of spindles and a plurality of spacers 13 are first used to process the plurality of pieces. The above-mentioned intermediate webs 1 are assembled into one after completion, which means: first, the matching first spindle 11 is passed through the basic holes 41 and the spacer sleeves 13 on all the intermediate webs 1 in turn, the spacer sleeves 13 are placed at the basic holes 41 of the intermediate webs 1, and clamped between adjacent intermediate webs 1, and at the same time, the matching second spindle 12 is passed through the pulley shaft mounting holes 3 of all the intermediate webs 1 in turn; in the third step, the two pieces of the above-mentioned outer webs 2 after processing and the welded intermediate webs 1 are assembled in series with a plurality of spindles and a plurality of spacer sleeves 13, which means: a plurality of spacer sleeves 13 are spot welded on adjacent intermediate webs 1, and at the same time, the second spindle 12 is passed through the pulley shaft mounting holes 3 of the outer web 2 on the left, all the intermediate webs 1, and the outer web 2 on the right in turn.

[0112] When in use, firstly, the first spindle 11 is passed through the basic hole 41 of the intermediate web 1 that has been processed, and the spacer 13 between the adjacent intermediate webs 1. At the same time, the second spindle 12 is passed through the pulley shaft mounting holes 3 that have been roughly processed on all the intermediate webs 1, and then the intermediate webs 1 are assembled into one piece. After being aligned with the boom head, the intermediate webs 1 are welded to the boom head one by one. After the welding of all the intermediate webs 1 is completed, the first spindle 11, the second spindle 12, and the spacer 13 are removed; then the spacer 13 is spot welded to the adjacent intermediate web 1, and at the same time, the second spindle 1 2 passes through the outer web plate 2 on the left, all the middle web plates 1, and the pulley shaft mounting hole 3 of the outer web plate 2 on the right in sequence, so that the two outer web plates 2 are serially mounted with all the welded middle web plates 1. After determining the position, the two outer web plates 2 are respectively welded to the outermost sides of the middle web plates 1. Due to the use of the mandrel, the coaxiality of the pulley shaft mounting hole 3 and the base hole 41 can be better guaranteed. Since the axial length of the spacer 13 is the same as the spacing between the two adjacent middle web plates 1 required by the drawing, the spacing between the adjacent middle web plates 1 can be better guaranteed.

[0113] Embodiment 6:

[0114] The basic content is the same as that of Example 1, except that: in the sixth step, the distance between the center of the basic hole 41 on each intermediate web 1 and the center of the rope-blocking rod mounting hole 4 on the outer web 2 is calculated one by one, which means: taking the rope-blocking rod mounting hole 4 of the outer web 2 as a reference, a cross center line is drawn, and the distances from four symmetrical points of the basic hole 41 of the intermediate web 1 to the rope-blocking rod mounting hole 4 are measured. The distances from two longitudinally symmetrical points to the rope-blocking rod mounting hole 4 are L1 and L2 respectively, and the distances from two transversely symmetrical points to the rope-blocking rod mounting hole 4 are L1 and L2 respectively. L3 and L4 respectively; in the sixth step, the center distances are finally compared with their theoretical distance values ​​one by one to obtain the eccentricity of the basic hole 41 on each intermediate web 1 relative to the rope-blocking rod mounting hole 4 on the outer web 2, which means: the vertical distance between the basic hole 41 of the intermediate web 1 and the center of the rope-blocking rod mounting hole 4 of the outer web 2 is (L1-L2) / 2, the horizontal distance between the basic hole 41 of the intermediate web 1 and the center of the rope-blocking rod mounting hole 4 of the outer web 2 is (L3-L4) / 2, and the eccentricity In the seventh step, the eccentric sleeve 23 includes an eccentric sleeve inner hole 21 and an outer cylindrical surface 22; the eccentricity of the eccentric sleeve inner hole 21 is equal to the eccentricity of the basic hole 41 on the corresponding intermediate web 1 relative to the rope stop rod mounting hole 4 on the outer web 2, and the diameter and tolerance of the eccentric sleeve inner hole 21 are the same as the diameter and tolerance of the rope stop rod mounting hole 4 required by the drawing; the outer cylindrical surface 22 matches the aperture of the basic hole 41 on the corresponding intermediate web 1; in the eighth step, the eccentric sleeve 23 is embedded in the basic hole 41 of the corresponding intermediate web 1, which means that the eccentric sleeve 23 and the basic hole 41 of the corresponding intermediate web 1 are interference fit, and the eccentric sleeve 23 is calculated according to the interference fit between the outer cylindrical surface 22 and the basic hole 41. 3, and then cool the eccentric sleeve 23 according to the theoretical cooling time, and then install the cooled eccentric sleeves 23 one by one into the basic hole 41 of the corresponding intermediate web 1. When the eccentric sleeve 23 returns to room temperature, the eccentric sleeve 23 and the basic hole 41 of the intermediate web 1 achieve interference fit; cooling the eccentric sleeve 23 according to the theoretical cooling time, and then installing the cooled eccentric sleeves 23 one by one into the basic hole 41 of the corresponding intermediate web 1 means: putting the eccentric sleeve 23 into an insulation box filled with coolant to cool it, taking out the eccentric sleeve 23 after the cooling time is reached, and assembling it into the basic hole 41 of the corresponding intermediate web 1; the interference fit between the outer cylindrical surface 22 of the eccentric sleeve 23 and the above-mentioned basic hole 41 is 0.02-0.04mm.

[0115] When applying, first calculate the eccentricity of the basic hole 41 of each intermediate web 1 relative to the rope stop rod mounting hole 4 of the outer web 2, and then combine the eccentricity and the aperture of the basic hole 41 on each intermediate web 1 to make a corresponding eccentric sleeve 23, and then calculate the theoretical cooling time of the eccentric sleeve 23 according to the interference fit amount of 0.02-0.04mm, put the eccentric sleeve 23 into an insulated box filled with coolant for cooling, take it out after the cooling time is reached, and assemble it into the basic hole 41 of the corresponding intermediate web 1. Since a suitable eccentric sleeve 23 is made for each intermediate web 1, an interference fit is adopted between the outer cylindrical surface 22 of the eccentric sleeve 23 and the inner wall of the basic hole 41, and the diameter and tolerance of the inner hole 21 of the eccentric sleeve are the same as the theoretical diameter and tolerance of the rope stop rod mounting hole 4, thereby ensuring the coaxiality of the rope stop rod mounting hole 4 and the hole distance between the rope stop rod mounting hole 4 and the pulley shaft mounting hole 3.

[0116] Embodiment 7:

[0117] The basic content is the same as Example 6, except that: when measuring the center distance, the rope stop rod mounting hole 4 of an outer web 2 is used as a reference, and the cross center line of the rope stop rod mounting hole 4 is engraved on each intermediate web 1, and then the rope stop rod or an axis with the same parameters as the rope stop rod is used to pass through the rope stop rod mounting holes 4 on the left and right outer webs 2, and then a cross section of the rope stop rod or the axis is taken at each intermediate web 1, and the distances from the horizontal and vertical symmetrical points of the base hole 41 to the cross section are measured according to the cross center line; then the eccentricity of the base hole 41 of each intermediate web 1 relative to the rope stop rod mounting hole 4 of the outer web 2 is calculated based on the vertical distance and the horizontal distance.

[0118] When in use, because the rope-stopping rod mounting holes 4 of the two outer webs 2 are processed based on the pulley shaft mounting holes 3, and the pulley shaft mounting holes 3 are processed and formed at one time, the positions and cross center lines of the rope-stopping rod mounting holes 4 on the left and right outer webs 2 are consistent, that is, they overlap when viewed from the side, and the rope-stopping rod mounting holes 4 of one outer web 2 can be selected as a reference.

[0119] The above description is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiment. Any equivalent modifications or changes made by ordinary technicians in this field based on the contents disclosed by the present invention should be included in the protection scope recorded in the claims.

Claims

1. A method for processing multiple holes in the web of a boom head, characterized in that: The method for processing the porous web of the boom head comprises the following steps: Step 1: The boom head web comprises a plurality of middle webs (1) and two outer webs (2); firstly, the plurality of middle webs (1) are fixed on a lathe in groups, and then, according to the drawings, the position center lines of the pulley shaft mounting holes (3) and the rope stop rod mounting holes (4) are engraved on the middle webs (1) fixed as one, and then, based on the position center lines of the pulley shaft mounting holes (3), the pulley shaft mounting holes (3) of the plurality of middle webs (1) fixed as one are roughly processed; based on the position center lines of the rope stop rod mounting holes (4), the basic holes (41) of the rope stop rod mounting holes (4) on the plurality of middle webs (1) fixed as one are processed, and after the processing is completed, the plurality of middle webs (1) are removed; Step 2: First, fix the two outer webs (2) as a group on a lathe, then, according to the drawing, mark the position center line of the pulley shaft mounting hole (3) on the outer web (2), and then, based on the position center line of the pulley shaft mounting hole (3) on the outer web (2), perform rough processing of the pulley shaft mounting hole (3) on the two outer webs (2) fixed as one, and remove the two outer webs (2) after the processing is completed; Step 3: First, use a plurality of mandrels and a plurality of spacers (13) to string together the above-mentioned intermediate webs (1) after they have been processed, then align the intermediate webs (1) assembled into one piece with the boom head, and then weld them one by one to the boom head until all the intermediate webs (1) are welded, and then remove the mandrels and spacers (13); then use a plurality of mandrels and a plurality of spacers (13) to string together the above-mentioned outer webs (2) after they have been processed and the welded intermediate webs (1), and after determining the positions, respectively weld the two outer webs (2) to the outermost left side and the outermost right side of the intermediate web (1); Step 4: first, taking the rough-machined pulley shaft mounting hole (3) as a reference, respectively engrave the theoretical contour lines of the pulley shaft mounting hole (3) on the outer end surfaces of the two outer webs (2) according to the drawings, and then, taking the engraved center position line of the pulley shaft mounting hole (3) and the theoretical contour line as a reference, complete the fine machining of the pulley shaft mounting holes (3) on the multiple intermediate webs (1) and the two outer webs (2) in one clamping process on the boring machine, and stop the fine machining when the inner hole diameter of the pulley shaft mounting hole (3) reaches the requirements of the drawings; Step 5: First, based on the processed pulley shaft mounting hole (3) as a reference and in combination with the drawing, the center position line and the outline line of the drawing of the rope-blocking rod mounting hole (4) are respectively engraved on the outer end surfaces of the two outer webs (2), and then based on the engraved center position line and outline line of the rope-blocking rod mounting hole (4) on the outer webs (2), the rope-blocking rod mounting holes (4) on the two outer webs (2) are respectively processed. After the processing is completed, the processing of the rope-blocking rod mounting holes (4) on the outer webs (2) is stopped; Step 6: first, using the rope-stopping rod mounting holes (4) on the two processed outer webs (2) as references, measure the center position of the basic hole (41) on each intermediate web (1) one by one, then calculate the measured distance between the center of the basic hole (41) on each intermediate web (1) and the center of the rope-stopping rod mounting holes (4) on the two outer webs (2) one by one based on the measured center position of the basic hole (41) on the intermediate web (1) and the center position of the rope-stopping rod mounting holes (4) on the two outer webs (2); finally, compare the center distances with their theoretical distance values ​​one by one to obtain the eccentricity of the basic hole (41) on each intermediate web (1) relative to the rope-stopping rod mounting hole (4) on the outer web (2); Step 7: According to the eccentricity of the basic hole (41) on each of the intermediate webs (1) relative to the rope retaining rod mounting hole (4) on the outer web (2), and the aperture of each basic hole (41), an eccentric sleeve (23) adapted to each intermediate web (1) is manufactured respectively; Step 8: embed the eccentric sleeve (23) into the corresponding basic hole (41) of the intermediate web (1).

2. A method for processing multiple holes in the web of the boom head according to claim 1, characterized in that: In the first step, the rough machining of the pulley shaft mounting hole (3) on the multiple pieces of the intermediate webs (1) fixed as one body refers to: turning the position of the pulley shaft mounting hole (3) on the multiple pieces of the intermediate webs (1) fixed as one body on a lathe until the single-side machining allowance of the pulley shaft mounting hole (3) on the multiple pieces of the intermediate webs (1) reaches 4.5-10 mm, and then stopping the rough machining of the pulley shaft mounting hole (3) on the intermediate webs (1); In the first step, the processing of the basic holes (41) on the rope-stopping rod mounting holes (4) on the multiple pieces of the intermediate webs (1) fixed as one body refers to: turning the positions of the rope-stopping rod mounting holes (4) on the multiple pieces of the intermediate webs (1) fixed as one body on a lathe until the diameter of the processed holes is 8-10 mm larger than the theoretical diameter of the rope-stopping rod mounting holes (4) on the drawings, and then stopping the processing, wherein the processed holes are the basic holes (41); In the second step, the rough machining of the pulley shaft mounting hole (3) on the two outer webs (2) fixed as one body refers to: turning the position of the pulley shaft mounting hole (3) on the two outer webs (2) fixed as one body on a lathe until the single-side machining allowance of the pulley shaft mounting hole (3) on the two outer webs (2) fixed as one body reaches 4.5-10mm, and then stopping the rough machining of the pulley shaft mounting hole (3) on the outer web (2).

3. The method for processing the multiple holes of the web of the boom head according to claim 1, characterized in that: In the fourth step, the finishing of the pulley shaft mounting holes (3) on the plurality of the intermediate webs (1) and the two outer webs (2) during one clamping process on the boring machine means: during one clamping process on the boring machine, the boring bar is passed through the pulley shaft mounting holes (3) that have been roughly machined on the plurality of the intermediate webs (1) and the two outer webs (2), and at a position close to the pulley shaft mounting holes (3), the boring machine drives the boring bar to rotate to finish the pulley shaft mounting holes (3) on the plurality of the intermediate webs (1) and the two outer webs (2).

4. The method for processing multiple holes in the web of the boom head according to claim 1, characterized in that: In the fifth step, the rope-stopping rod mounting holes (4) on the two outer webs (2) are processed respectively, and after the processing is completed, the processing of the rope-stopping rod mounting holes (4) on the outer webs (2) is stopped, which means: firstly, the rope-stopping rod mounting holes (4) on one outer web (2) are processed by boring, and when the diameter of the rope-stopping rod mounting holes (4) on one outer web (2) reaches the requirements of the drawing, the processing of the rope-stopping rod mounting holes (4) on this outer web (2) is stopped, and then the rope-stopping rod mounting holes (4) on the other outer web (2) are processed by boring, and when the diameter of the rope-stopping rod mounting holes (4) on the other outer web (2) reaches the requirements of the drawing, the processing of the rope-stopping rod mounting holes (4) on the other outer web (2) is stopped.

5. A method for processing multiple holes in the web of a boom head according to any one of claims 1 to 4, characterized in that: In the third step, the mandrel comprises a first mandrel (11) and a second mandrel (12), the diameter of the first mandrel (11) matches the aperture of the basic hole (41), and the diameter of the first mandrel (11) is 0.5-1.5 mm smaller than the aperture of the basic hole (41); The diameter of the second spindle (12) matches the hole diameter of the pulley shaft mounting hole (3), and the diameter of the second spindle (12) is 0.5-1.5 mm smaller than the hole diameter of the pulley shaft mounting hole (3); The number of the spacers (13) is the same as the number of intervals of the intermediate webs (1), and the axial length of the spacers (13) is the same as the distance between two adjacent intermediate webs (1) required by the drawings.

6. A method for processing multiple holes in the web of the boom head according to claim 5, characterized in that: In the third step, the step of first assembling the above-mentioned intermediate webs (1) after multiple processing by using a plurality of mandrels and a plurality of spacers (13) means that: first, a matching first mandrel (11) is sequentially passed through the basic holes (41) and the spacers (13) on all the intermediate webs (1), and the spacers (13) are placed at the basic holes (41) of the intermediate webs (1) and clamped between adjacent intermediate webs (1), and at the same time, a matching second mandrel (12) is sequentially passed through the pulley shaft mounting holes (3) of all the intermediate webs (1); In the third step, the use of a plurality of mandrels and a plurality of spacers (13) to string together the two processed outer webs (2) and the welded intermediate webs (1) means: spot welding a plurality of spacers (13) on adjacent intermediate webs (1), and at the same time, passing the second mandrel (12) through the pulley shaft mounting holes (3) of the outer web (2) on the left, all the intermediate webs (1), and the outer web (2) on the right in sequence.

7. The method for processing multiple holes in the web of the boom head according to claim 1, characterized in that: In the sixth step, the distances between the center of the basic hole (41) on each intermediate web (1) and the center of the rope-blocking rod mounting hole (4) on the outer web (2) are calculated one by one, which means: taking the rope-blocking rod mounting hole (4) of the outer web (2) as a reference, drawing a cross center line, and measuring the distances from four symmetrical points of the basic hole (41) of the intermediate web (1) to the rope-blocking rod mounting hole (4), the distances from two longitudinally symmetrical points to the rope-blocking rod mounting hole (4) are L1 and L2 respectively, and the distances from two transversely symmetrical points to the rope-blocking rod mounting hole (4) are L3 and L4 respectively; In the sixth step, the center distances are finally compared with the theoretical distance values ​​one by one to obtain the eccentricity of the basic hole (41) on each intermediate web (1) relative to the rope stop rod mounting hole (4) on the outer web (2), which means that: the vertical distance between the basic hole (41) of the intermediate web (1) and the center of the rope stop rod mounting hole (4) of the outer web (2) is (L1-L2) / 2, the horizontal distance between the basic hole (41) of the intermediate web (1) and the center of the rope stop rod mounting hole (4) of the outer web (2) is (L3-L4) / 2, and the eccentricity 8. The method for processing multiple holes in the web of the boom head according to claim 1, characterized in that: In the seventh step, the eccentric sleeve (23) comprises an eccentric sleeve inner hole (21) and an outer cylindrical surface (22); The eccentricity of the inner hole (21) of the eccentric sleeve is equal to the eccentricity of the basic hole (41) on the corresponding intermediate web (1) relative to the rope-stopping rod mounting hole (4) on the outer web (2), and the diameter and tolerance of the inner hole (21) of the eccentric sleeve are the same as the diameter and tolerance of the rope-stopping rod mounting hole (4) required by the drawing; The outer circular surface (22) matches the hole diameter of the corresponding basic hole (41) on the middle web (1).

9. A method for processing multiple holes in the web of the boom head according to claim 8, characterized in that: In the eighth step, the eccentric sleeve (23) is embedded into the basic hole (41) of the corresponding intermediate web (1), which means that the eccentric sleeve (23) and the basic hole (41) of the corresponding intermediate web (1) are interference fit, and the theoretical cooling time of the eccentric sleeve (23) is calculated according to the interference fit between the outer cylindrical surface (22) and the basic hole (41), and then the eccentric sleeve (23) is cooled according to the theoretical cooling time, and then the cooled eccentric sleeves (23) are embedded one by one into the basic hole (41) of the corresponding intermediate web (1). When the eccentric sleeve (23) returns to normal temperature, the eccentric sleeve (23) and the basic hole (41) of the intermediate web (1) are interference fit.

10. A method for processing multiple holes in the web of the boom head according to claim 9, characterized in that: The step of cooling the eccentric sleeve (23) according to the theoretical cooling time and then fitting the cooled eccentric sleeves (23) into the basic holes (41) of the corresponding intermediate webs (1) one by one means: placing the eccentric sleeve (23) into a heat preservation box filled with a coolant for cooling, taking out the eccentric sleeve (23) after the cooling time is reached, and fitting it into the basic holes (41) of the corresponding intermediate webs (1); The interference fit between the outer cylindrical surface (22) of the eccentric sleeve (23) and the basic hole (41) is 0.02-0.04 mm.

Citation Information

Patent Citations

  • Method for machining webs of ship loader telescopic arm support

    CN103737252A

  • Arm support processing method and process equipment

    CN111730295A

  • Synchronous boring method for multi-hole group cantilever crane structural member

    CN114178556A

  • Method of sheet metal construction for thin boom tube exhaust pipes

    US20020023346A1

Cited By

  • Batch machining process for inclined holes of inclined pulley shaft of European-style lifting hook group

    CN119260326A